GIS and the Electronic ALP Upcoming Changes to Requirements

Size: px
Start display at page:

Download "GIS and the Electronic ALP Upcoming Changes to Requirements"

Transcription

1 GIS and the Electronic ALP Upcoming Changes to Requirements Thomas Wade Regional Planner FAA Southwest Region Gil Neumann Sr Airport Planner FAA National Planning Division

2 Today s Topics Airports GIS: Development Airports GIS: Paradigm Shifts Airport Benefits from A-GIS Airports GIS: Implementation electronic ALP: Development (the 1 st A-GIS Module) A-GIS ealp: Vision/Next Steps

3 NextGen Transformation Directly Affects Airports The FAA is implementing a Geographic Information System (GIS) to manage spatial data required to support safe and efficient aviation activities GIS data (particularly airports data) will be used to develop new approach procedures, conduct obstruction analyses, produce moving maps, support enotams, update airport diagrams, and for many other purposes

4 Why is FAA advancing Airports GIS (A-GIS)? Reduce Costs to Airports, Air Carriers, FAA Make Better, Informed Decisions Faster Data Transformation Transition to Satellite-Based Navigation from Land- Based NAVAIDS Produce a Single, Net-Centric Database for Airport Information Need to Share Data with Stakeholders NextGen Airports Foundation The need to increase safety, efficiency and capacity as demand for services increases

5 A-GIS/eALP Vision 1: From There to Now What if the FAA could capture and validate data against a defined standard, import it from and/or export it to an ALP, and make it available electronically for whoever needs it? AIP Grant: AIP No AIP Grant: AIP No Name: Rehabilitate Apron Material: Name: Asphalt Rehabilitate Apron Area: Material: 11,243 Asphalt SY Status: Area: Completion 11,243 SY date 10/2009 Status: Completion date 10/2009 Element: Runway Attribute: Element: Runway Threshold Attribute: Runway End: Threshold 19R Runway NAVD End: 88 19R Elevation: 8.8 NAVD 88 Elevation: Length: 8.8 7,500 Width: Length: 200 7,500 Degrees-Minutes- Width: 200 Seconds Degrees-Minutes- (NAD83 DMS) Seconds (NAD83 AIP DMS) Grant: AIP No Lat. 37 deg 37' AIP Grant: AIP No " Lat. N 37 deg 37' Name: Rehabilitate Long " 122 N Runway Name: Rehabilitate deg 22' Material: 12.44" Runway Long. W 122 Asphalt deg 22' Status: Material: 12.44" Completion W Asphalt date 10/2009 Status: Completion date 10/2009 Element: NAVAID Attribute: Element: VOR/DME NAVAID Frequency; Attribute: VOR/DME Operator: Frequency; FAA NAVD Operator: 88 Elevation: FAA 13 Lat. NAVD 37 deg 8837 Elevation: N 13 Long. Lat deg N W Long. 122 deg W

6 Problem: Airports Data is Disparate $ $ $ $ Remote Remote Sensing Sensing Ground Ground Surveys Surveys Remote Remote Sensing Sensing Ground Ground Surveys Surveys NFDC NASR NFPG data 5010 data 5010 data Flight Procedures Flight Procedures Which data is correct?! NFDC NASR/5010 data? NFPG data? $ $ Remote Remote Sensing Sensing Ground Ground Surveys Surveys ioe/aaa data Obstruction Evaluation Obstruction Evaluation ioe/aaa data?

7 Resolution: Airports GIS (A-GIS) $ $ Remote Remote Sensing Sensing Ground Ground Surveys Surveys AC150/ ,- 17,-18 Conceived to address the airport data problems (up-to-date, accuracy) airport sponsors and the FAA experience nationwide To create a better way of collecting, storing, managing, and sharing airports data To design a integrated data sharing tool for airport sponsors, planners, surveyors, and FAA for greater airport planning/design flexibility NFDC NASR/5010 data A-GIS A-GIS NFPG data ioeaaa data NextGen requires a more robust, integrated, and accurate data set: AIRPORTS GIS

8 A-GIS: New Data Requirements New Surveying & GIS Model Standards Implemented Through Three Advisory Circulars Issued in September / A Geodetic Control 150/ B Imagery Requirements (Updated 9/29/08) 150/ B Data Acquisition & GIS Schema (Updated 05/21/09) We are not asking for new data, rather we are asking it be submitted in a new way: a Formalized & Structured Data Submittal Data now submitted through the Airports-GIS website portal Requirements & Safety-Critical Data Review now conducted by NGS GIS data deliverable (via the A-GIS website) for ALL new construction projects

9 A-GIS: New Paradigms Airports have increased responsibility for airport-related data Vertically Guided Approaches NGS provides Quality Control of Safety- Critical Data Imagery is now a deliverable for Obstruction Surveys and Airport Layout Plan updates Single set of surfaces evaluated for Obstruction Surveys and Airport Airspace Analyses: dependent only on the type of approach (Vertically Guided or Non- Vertically Guided) Object Identification Surfaces FAA Surveying Standard 405 has sunset

10 A-GIS: Improved Data Management /Utilization Airports GIS Data is Owned by the Airport Hosted on FAA Server Managed by the FAA Office of Airports Provides Airports Ready Access to Airport and FAA Data via web Portal Does Not Require an Airport-Based GIS Products and Tools (*Future Modules) ealp (Geo-Referenced: PDFs / Reports) eobstruction Charts* enra* (ealp updates) enotams* enasr* (5010)

11 A-GIS: User-friendly Website Portal Sponsor Controls Creates Projects Assigns Representative(s) Monitors Progress Downloads Data Views Information Projects Require Statement of Work (accepted by FAA) Up to 3 plans (accepted by NGS for Safety- Critical Data) Browser / Viewer scheduled for deployment in early FY10 FAA access to view or download data in several formats

12 A-GIS: Survey Project Work Flow

13 A-GIS: Browser Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming AIP Grant: AIP No AIP Grant: AIP No Name: Rehabilitate Apron Name: Rehabilitate Material: Apron Asphalt Area: Material: 11,243 Asphalt SY Status: Area: 11,243 Completion SY date 10/2009 Status: Completion date 10/2009 Illustration Only Element: Runway Attribute: Element: Runway Runway Threshold Attribute: Runway Runway End: Threshold 19R Runway NAVD End: 19R 88 Elevation: 8.8 NAVD 88 Elevation: Length: 8.8 7,500 Width: Length: 200 7,500 Degrees-Minutes- Width: 200 Degrees-Minutes- AIP Seconds Seconds Grant: (NAD83 AIP (NAD83 No DMS) AIP Grant: AIP No DMS) Name: Lat deg 37' Lat. 37 Rehabilitate deg 37' Runway 37.94" Name: N Rehabilitate 37.94" N Material: Long. Runway 122 Asphalt deg 22' Status: Material: Long. 122 deg 22' 12.44" W Completion Asphalt date 10/2009 Status: 12.44" W Completion date Element: NAVAID 10/2009 Attribute: Element: VOR/DME NAVAID Frequency; Attribute: VOR/DME Operator: Frequency; FAA NAVD Operator: 88 Elevation: FAA 13 Lat. NAVD 37 deg 88 Elevation: N 13 Long. Lat deg deg N W Long. 122 deg W

14 A-GIS (and ealp): Airport Operator Benefits Green No Hard Copy ALPs to Create or Ship Web access by various users at multiple locations Faster Actions with Reduced Costs Reduced ALP Approval Time Ready Access to Airport and Official FAA Data enotams* enras* Reduced time, Cost and Effort to issue Documented Categorical Exclusions and EAs Faster Grant Coordination and Approvals Faster 5010/NASR Changes Reflected in FAA Documents Improved Airport Access Potentially Improved Approach Minima Through Higher Accuracy Obstacle Data Improved Efficiencies through Envisioned Tools Signage and Marking Plan Report Pavement Management Capability Safety Management System Line-of-Sight Tools Access to Imaginary Surfaces Reduced Costs Use of Data in GIS for Planning and Design Rather than re-creating (e.g. Contour Data,) ALP Updates will start with existing, validated data Provides Leverage for Local GIS System To Manage Non-FAA Related Items Think Internet, , and Google Earth

15 A-GIS/eALP Pilot Program: Objectives To implement Airports-GIS into standard airport and FAA business practices in a planned and orderly manner for all parties to develop critical skills and make appropriate modifications for the nationwide deployment To evaluate, beta-test, and provide recommendations to improve tools, software, and processes being developed by the FAA to create ealps To identify costs to assist in developing a nationwide deployment program To evaluate national training materials in development To develop FAA internal / external e-coordination procedures (future) To provide recommendations to improve A-GIS portal FY2009: Southwest Region 6 Airports of varying size FY2010: Nationwide 18 Airports of varying size in remaining Regions

16 Pilot Program: Southwest Region Airports DFW Dallas/Ft. Worth International Airport Large Hub 7 Runways Existing GIS System MSY Louis Armstrong New Orleans International Medium Hub 2 Runways No Local GIS ABQ OKC ASW COT DFW XNA MSY OKC Will Rogers World (Oklahoma City, OK) Small Hub 3 Runways Standing Up Local GIS System Completing ALP Update XNA Northwest Arkansas (Fayetteville, AK) Small Hub 1 Runway Alternate Landing Surface Under Construction Obstruction Survey Underway HRL Valley International (Harlingen, TX) Small Hub 3 Runways RW Extension Planned HRL COT Cotulla, TX 1 Runway GA Airport Runway Extension and Parallel Taxiway in 5- Year Development Plan State Block Grant Oversight ABQ Albuquerque International Sunport Populating A-GIS and creating an ealp as part of an Environmental Assessment

17 Pilot Program: Scope 90-95% Data Collection / A-GIS Input 5-10% Creation / Evaluation of ealp Implement Data Related FAA ACs 150/ , -17 & -18 Conduct Obstruction Survey for All Runways and Perform Airport Airspace Analysis. Conduct Part 77 Analysis Collect Planimetric GIS Data from Electronic Imagery Translate and Import existing non Planimetric Data where available (Property Maps, Boundary Surveys, Environmental Data, Underground Utilities) Translate to GIS and Import Planned development on Existing ALP Work with FAA-developed e-alp software tools (in development) to identify needed software/process improvements and enhancements Reports Provided to the FAA 1) Imagery/Geodetic Control / Obstruction Survey/Airport Airspace Analysis 2) Collection and Submission of Planimetric Data 3) Conversion and Submission of Cadastral and Utility Data 4) Conversion and Submission of Planned development and ealp Assembly Scope of Services provided Considerations/Rationale Cost/time information for subtasks within report area Recommendations for improvements to scope, guidance, templates, tools and process

18 A-GIS: Airport Investment Returns Single source for official Airport and FAA Airport-centric Data Orthoimagery - Improved Airport Environment Visualization with up to 3 inch ground sample distance resolution Ability to Browse the Airport Environment from your office Ability to collaborate with FAA and Consultants interactively on the same imagery Improved Obstacle Accuracy and potentially better approach minima 1A (20 horizontal & 3 vertical) vs. 2C (50 horizontal & 20 feet vertical) Future Ability to Query the database Faster CIP review / ALP Approvals / Environmental Decisions / Grant Offers Metadata Data about the data (who, what, when & where) Geo-referenced Data Ground contours to provide to subsequent engineering consultants Imaginary Surfaces and NAVAID Critical Areas A Foundation for enasr (Airport data changes), enra (ALP updates), enotam, Pavement Management, Safety Management System, Ops Inspection Management, Environmental Inventories

19 A-GIS: Costs (Comprehensive vs. Incremental) National approach is currently incremental (Pilot Programs are comprehensive) Cost drivers (from ASW Pilot Program) Airport size / runways (number; length) Facilities (airport owned, FAA, other) Airport data availability Existing GIS (data translation) <- Large Airports Obstacle environment Cost estimates are still being calculated and evaluated (think: long-term benefits) Initial learning curve will drive costs initially, but anticipate a lowering in future Programming and CIPs will need to be carefully evaluated with reasonable, thoughtful funding prioritizations (especially at smaller airports)

20 A-GIS 1 st Module: ealp Development Progress Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming

21 A-GIS: Process Overview for ealp Development PROGRESS A-GIS D-BASE COMPLETED IN FY07 Remote Remote Sensing Sensing Ground Ground Surveys Surveys AC150/ ,- 17,-18B 1 A-GIS A-GIS Mission Mission Critical Critical Data Data FY09/10: IN Refinement Delineate Features Pilot Program Verification FY09/10: IN Refinement FY09/10: e-alp beta IN Refinement Add Attributes AIRPORTS 2 ealp ealp Develop Requirements FAA Resolve Policy & Process END USERS

22 Why FAA is Developing ealp? Currency: all NPIAS airports are required to keep their ALPs current (many are outdated) Versioning: paper copies of ALPs are typically housed in multiple locations and the latest version(s) often vary Accuracy: plotted ALPs frequently contain airport information that differs from airports data collected for use in other LOBs and/or other airport projects A-GIS A-GIS ealp ealp NextGen: needs real-time, web-based access of the same ( living document) version by all stakeholders Diligence: efficient use of updated, precise data (input into A-GIS) for optimal NextGen airport planning, reporting, and decision making

23 ealp: Developing Requirements for the Module ealp National Standards Development Team Mary Vargas ANM SEA-ADO Fernando Yanez AWP SFO-ADO Matt Freeman AAL-601 Add Attributes Scott Tener ACE-611 ealp Thomas Wade ASW-610 Paul Lo AGL-610 Develop Require -ments Amanda Wingerter ANE-620 Jim Fels AEA HAR-ADO FAA/HQ Bob Bonanni AAS-101 Gil Neumann APP-400 Kay Ryder APP-500 Rebecca Henry ASO ORL-ADO Team Meetings July 08: Great Lakes Region Sep 08: A-GIS Training Oct 08: Southwest Region Dec 08: FAA Academy OKC Feb 09: Washington DC Oct 09: beta Tests OKC Software Programming Jan 09: Requirements Doc Nearing Completion Mar 09: Submission Target May 09: ealp v1.0 Review Sep 09: Flight Plan Target NSDT Progress Define what is e-alp? Standardize checklists Develop ealp design layouts Develop programming requirements for the drawing set Approve design layouts Re-define data standards Evaluate coordination processes (pen-and-ink, review, approval, e-sign); recommend changes Provide inputs to initial program guidance and updates to ACs

24 ealp: A Closer Look at the Paradigm Shift 1. Project Scope ALP 2. Establish Ground Control 3. Collect Aerial Imagery 4. Derive Planimetric Data 5. Prepare plans 6. Create ALP Drawings 1. Organize onto layers 2. Apply symbology 3. Add annotations 4. Add title block 7. FAA Approval of Plans (Written Signatures) ealp 1. Project Scope 2. Establish Ground Control 3. Collect Aerial Imagery 4. Derive Planimetric Data 5. Prepare plans 6. Prepare Data 1. Convert to GIS or CADD 2. Enter Attributes 7. Submit to Airports-GIS 8. NGS Validates 9. FAA Approval of Plans (Electronic Signatures)

25 ealp: A More Dynamic Planning Tool ALP Collaborate with FAA Basis for Airport Planning Basemap for maps ealp Collaborate with FAA Basis for Airport Planning Basemap for maps Basis for FAA LOB Communication/Review Procedure Design Runway Capacity Decisions Obstruction Analyses Basis for Airport GIS Usage GIS Development

26 ealp: Development Progress Proof-of-Concept completed Sept 15, 2009 FY10 beta testing & functionality improvements Document existing facilities & warranted planned facilities found to be safe & efficient use of airspace & potentially eligible for federal funding Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming Assembled from A-GIS dataset Submitted, reviewed, & approved electronically (internal processes & procedures in development) Can be easily shared Not envisioned as working documents as is current ALP set

27 ealp: Website Portal Progress Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming Beta-tested version 1 for field use with A-GIS targeted for deployment in late CY10 or early CY11 FAA access to view or download data in several formats

28 ealp: Dynamic On-line Viewer Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming

29 ealp: Web Portal Data Tables Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming

30 ealp: Background Imagery Pre-DRAFT Preliminary Images: REFINEMENTS forthcoming

31 A-GIS and e-alp: Process PROGRESS A-GIS D-BASE COMPLETED IN FY07 Remote Remote Sensing Sensing Ground Ground Surveys Surveys AC150/ ,- 17,-18B 1 A-GIS A-GIS Mission Mission Critical Critical Data Data FY09/10: IN Refinement Delineate Features Pilot Program Verification FY09/10: IN Refinement FY09/10: e-alp beta IN Refinement NextGen: Net Centric Data Access Greater Design Flexibility Thorough Decision- Making Add Attributes AIRPORTS Improved Extensive Planning 2 ealp ealp Multi-User Accessible ALP Set END USERS Develop Requirements Improved ALP Coordination FAA Resolve Policy & Process Efficient Review & Approval

32 A-GIS/eALP: Where are we now? A-GIS/eALP DEVELOPMENT ARP (via AOSC charter) Completed Guidance for Airport Surveys 3 Flight Plan Goals completed (including ealp alpha) Consolidated FAA Data Order around A-GIS Developed ARP/FAA-wide A-GIS business processes Distributed A-GIS/eALP Education Materials A-GIS/eALP IMPLEMENTATION ARP/Airport Sponsors FAA grants and SOWs compliant with ACs 500+ projects initiated into A-GIS website/system Southwest Region Pilot Program initiated Nationwide Pilot Program (candidate airports submitted) Program Guidance Letters drafted; SOAR programmed

33 A-GIS/eALP: Next Steps A-GIS/eALP DEVELOPMENT FAA Airports (via AOSC charter) ealp: beta-testing of base model in FY10 Education: FAQ guide; potential training workshops (ACC/ACI) Data Integration: other A-GIS modules (with ealp collaboration) in development (eg. Airport Design Standards, Environmental Inventories, Noise Programs, Land Use, Zoning, Pavement Studies, Safety Management Systems) A-GIS/eALP IMPLEMENTATION FAA/Airport Sponsors Data Collection: lessons learned from the ASW pilot and incremental projects; deploy nationwide pilot in FY10 (total Pilots: 24 airports selected by Regions) ealp: beta-testing (deployable model targeted for CY11) Education: field guidance; deploy IDLE web-based training for sponsors and consultants (early CY10); training workshops Policy: Establish/refine funding eligibility; evaluate ealp policy implications; establish ealp deployment policy (esignatures, review/approval, granularity, etc.) and operation plan

34 ealp: National Implementation Team TBD ANM ADO TBD AWP ADO TBD AAL A-GIS/eALP Implementation Team TBD ACE ADO Thomas Wade ASW ADO TBD AGL ADO TBD ANE FAA/HQ Gil Neumann APP-400 TBD APP-500 TBD ASO ADO TBD AEA ADO Primary Team Objectives Identify best practices for practical field implementation Evaluate and improve national guidance related to ALP-review processes and CIP programming Develop a continuing education plan for field personnel Continuing support to development of additional A-GIS modules (proper data integration) Resolve Policy & Process Team Meetings FY10 Discussions on: Initial training concepts (potential IDLE add-ons) Practical deployment of AGIS as it relates to ealp Advisory Circular updates Granularity in AIP eligibility e-signatures (re: versioning for ealp updates; major vs. minor / accommodating pen-and-ink changes) Programming/Sequencing Planning for AGIS within Capital Improvement Plans Harnessing added value from AGIS reports for decision making (system planning) What updating AGIS looks like (for future ealps)

35 A-GIS/eALP: Looking Forward We ALL currently face a challenging transition period; be prepared to make progress w/end-state in mind. Work with us to champion the long-term perspective! Help the Airport Planning, Engineering, and Design Community: Get up to speed with A-GIS ACs; Register with the A-GIS website; anticipate paradigm shift from ALPs to ealps Evaluate/Submit reasonable survey costs in A-GIS SOWs Suggest practical improvements and best practices based on realistic challenges you face at your airport and in the field Anticipate A-GIS and ealp guidance relative to program adjustments and associated policy changes for conducting surveys and electronicallygenerated ALP drawing sets as the program database and software is refined

36 Vision 2a: Potential GIS Dovetails Abound! Widely-accepted GIS format means there is significant potential for integrated capability/connectivity for airports data sharing $ $ Remote Remote Sensing Sensing Ground Ground Surveys Surveys AC150/ ,- 17,-18B Airport Land Project Cert.System NFDC NASR/5010 data A-GIS A-GIS Environmental Design Tool NFPG data EnviroMapper (EPA) INM EDMS NIRS National Atlas (USGS) ealp ealp EPA Natl. Geospatial Data CH Watershed Assessment Tracking FWS Natl. Wetland Inventory ioeaaa data NRCS Natl. Geospatial Data CH

37 Vision 2b: From Now to NextGen! Can our dreams for airport data become NextGen reality?

FAA Airports-GIS Program

FAA Airports-GIS Program FAA Airports-GIS Program FAA Office of the Associate Administrator of Airports (ARP) ARP Airport Safety and Standards (AAS) ARP Airport Planning and Programming (APP) Presented to FGDC Metadata Working

More information

Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application

Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application Sept 29 - Oct 1, 2015 Kualal Lumpur Shyam Parhi Washington DC What is driving Airports GIS? Reduce costs to Airports,

More information

agis a brief overview

agis a brief overview agis a brief overview Steve Welebny Photogrammetrist Keystone Aerial Surveys Villanova University 1 Villanova University 2 Nav Aid Cost VOR Install = $250,000 20 year life cycle cost = $1,100,000 ILS Install

More information

Geospatial Data Collection for the FAA Airports GIS Program

Geospatial Data Collection for the FAA Airports GIS Program Geospatial Data Collection for the FAA Airports GIS Program A Change in Direction Dr. Michael T. McNerney, P.E. FAA Office of Airports Office of Airport Safety and Standards Assistant Manager, Airport

More information

FAA Airports GIS Program

FAA Airports GIS Program FAA Airports GIS Program Environmental Feature Classes for Airport Noise Michael T. McNerney, Ph.D., P.E. Office of Airports Airport Safety and Standards Airport Engineering Division Mike.mcnerney@faa.gov

More information

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: South Dakota Airports Conference Chris Hugunin & Dave Anderson March 18, 2015 FY 2014 DMA ADO Total AIP Funding $107.2

More information

AGIS/eALP Project Experience

AGIS/eALP Project Experience Agenda AECOM Experience Introduction to AGIS/eALP Executing an AGIS/eALP Sample Data What you can do with the Data? Data Maintenance Questions and Answers AGIS/eALP Project Experience AGIS/eALP Project

More information

FAA A-GIS and e-alp at Valley International Airport

FAA A-GIS and e-alp at Valley International Airport FAA A-GIS and e-alp at Valley International Airport Annual ACI Conference Austin, TX October 2009 Kevin Carlson Associate Vice President, Aviation Presentation Overview Introduction to the Program Valley

More information

AIRPORTS GIS UPDATE. Federal Aviation Administration. https://airports-gis.faa.gov/

AIRPORTS GIS UPDATE. Federal Aviation Administration. https://airports-gis.faa.gov/ AIRPORTS GIS UPDATE Presented to ACC Airports Technical Workshop Presented by John R. Dermody, Manager, Airport Engineering Division Date July 29, 2014 1 Airports GIS Update 1. AGIS Overview 2. NAV Lean

More information

Update on FAA Standard Operating Procedures (SOP)

Update on FAA Standard Operating Procedures (SOP) Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

OBSTACLE IDENTIFICATION SURFACE CALCULATION TOOL (OIS CT) FOR AIRPORT AIRSPACE OBSTRUCTION ANALYSES AT CIVIL AIRPORTS IN THE UNITED STATES

OBSTACLE IDENTIFICATION SURFACE CALCULATION TOOL (OIS CT) FOR AIRPORT AIRSPACE OBSTRUCTION ANALYSES AT CIVIL AIRPORTS IN THE UNITED STATES OBSTACLEIDENTIFICATIONSURFACECALCULATIONTOOL(OISCT) FORAIRPORTAIRSPACEOBSTRUCTIONANALYSESATCIVILAIRPORTS INTHEUNITEDSTATES ApostolPanayotov,PhD,Mr.MarkGibbs,M.S.A,A.A.E,Mr.BradKetel IntroductiontotheObstacleIdentificationSurfaceAnalyses

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach

More information

Federal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe

Federal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe Federal GIS Conference 2014 February 10 11, 2014 Washington DC ArcGIS for Aviation David Wickliffe What is ArcGIS for Aviation? Part of a complete system for managing data, products, workflows, and quality

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Creating a Clear Vision with your Airport Layout Plan

Creating a Clear Vision with your Airport Layout Plan Creating a Clear Vision with your Airport Layout Plan Presentation & Panel Discussion NCAA 38 th Annual Conference The Economic Impact of Aviation March 28, 2017 Pinehurst, NC Photo Credit: Jason Barnette

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

Federal Aviation. Administration. Office of Airports. Update from the. Federal Aviation Administration

Federal Aviation. Administration. Office of Airports. Update from the. Federal Aviation Administration Update from the Office of Airports Prepared for: Presented by: Airports Council International (ACI-NA) Small Airports Committee Minneapolis, Minnesota Elliott Black Deputy Director Office of Airport Planning

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

GIS Specialist at CDM Smith since 2007

GIS Specialist at CDM Smith since 2007 Andrew Clem, GISP SCAUG 2013 Addison, TX One Glen Lakes 8140 Walnut Hill Lane Suite 1000 Dallas, Texas 75231 Andrew Clem, GISP GIS Specialist at CDM Smith since 2007 Projects: Airports GIS (AGIS), environmental

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Airport Safety Management Systems: Integrating Planning Into the Process

Airport Safety Management Systems: Integrating Planning Into the Process Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for

More information

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans CONTENTS Preface Guidebook Overview What s New... 2 Purpose of the Guidebook... 2 The Florida Philosophy of Airport Master Planning... 2 Guidebook Structure and Use... 3 Part 1 - Master Plans: Setting

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee ...while at FAA By: Kelvin L. Solco, P.E., MBA, President, The Solco Group Presented to the: NCTCOG Air Transportation Advisory Committee Presented to the: NCTCOG Air Transportation Advisory Committee

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS

USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS USE OF 3D GIS IN ANALYSIS OF AIRSPACE OBSTRUCTIONS A project by by Samuka D. W. F19/1461/2010 Supervisor; Dr D. N. Siriba 1 Background and Problem Statement The Airports in Kenya are the main link between

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS

EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS EXHIBIT A SCOPE OF SERVICES For an AIRPORT MASTER PLAN STUDY AND AIRPORT LAYOUT PLAN (ALP) UPDATE For LAWRENCE MUNICIPAL AIRPORT LAWRENCE, KANSAS INTRODUCTION The Lawrence Municipal Airport Master Plan

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems REQUESTOR: RTCA Paper No. 349-16/PMC-1568 TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems Organization Federal Aviation Administration,

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19 Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update 6th Working Group Briefing 1/7/19 Study Purpose Agenda Background Summary of last stakeholder meetings Refresher on DNL,

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

ARP Forecast Review Critical Aircraft Data Sources

ARP Forecast Review Critical Aircraft Data Sources ARP Forecast Review Critical Aircraft Data Sources Kent Duffy FAA Office of Airports National Planning & Environmental Division, APP-400 December 14, 2015 Aviation Forecasts Airport sponsors

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

MONTROSE REGIONAL AIRPORT

MONTROSE REGIONAL AIRPORT MONTROSE REGIONAL AIRPORT FEBRUARY 25, 2016 DRAFT AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify

More information

Using LiDAR for Precise Vegetation Management

Using LiDAR for Precise Vegetation Management Using LiDAR for Precise Vegetation Management Quantum Spatial is a proven partner to airport planners, engineers, facility managers, and contractors whose objective is to build, expand, and make improvements

More information

THE NATIONAL ACADEMIES PRESS

THE NATIONAL ACADEMIES PRESS THE NATIONAL ACADEMIES PRESS This PDF is available at http://nap.edu/23574 SHARE NextGen for Airports, Volume 1: Understanding the Airport s Role in Performance-Based Navigation: Resource Guide DETAILS

More information

Sharing UAE experience in. AIM implementation

Sharing UAE experience in. AIM implementation Sharing UAE experience in AIM implementation NCLB AIM WORKSHOP Cairo, Egypt, 11 13 September 2017 MID Region NCLB Strategy No Country Left Behind campaign help ensure all States of effective implementation

More information

and Forecast Review and Approval Process

and Forecast Review and Approval Process LONG BEACH, CALIFORNIA FAA Terminal Area Forecast (TAF) Overview and Forecast Review and Approval Process Paul Devoti Airport Planner Federal Aviation Administration paul.devoti@faa.gov 1 TAF Overview

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/11 24/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG2) Rome, Italy 4 to 8 May 2015 Agenda Item 6: Any Other

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal

More information

Office of Airport Safety and Standards

Office of Airport Safety and Standards Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

April 4, McKinney Airport Advisory Committee Airport Master Plan Update.

April 4, McKinney Airport Advisory Committee Airport Master Plan Update. McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Global Information Management. Status Report: AIXM

Global Information Management. Status Report: AIXM Global Information Management Status Report: AIXM Presented By: Allen Proper, FAA Date: August 25, 2015 Content AIXM versions in use AIXM Change Control Board activity FAA perspective AIXM 4.5 Published:

More information

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: Minnesota Council of Airports Chris Hugunin April 15, 2015 FY 2014 DMA ADO Total AIP Funding $107.2 Million / 136 Grants

More information

Initiated By: AFS-400

Initiated By: AFS-400 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013 Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.

More information

Proposed Establishment of and Modification to Restricted Areas; Fort Sill, OK

Proposed Establishment of and Modification to Restricted Areas; Fort Sill, OK This document is scheduled to be published in the Federal Register on 10/19/2015 and available online at http://federalregister.gov/a/2015-26499, and on FDsys.gov 4910-13 DEPARTMENT OF TRANSPORTATION Federal

More information

Optimizing trajectories over the 4DWeatherCube

Optimizing trajectories over the 4DWeatherCube Optimizing trajectories over the 4DWeatherCube Detailed Proposal - SES Awards 2016 Airbus Defence and Space : dirk.schindler@airbus.com Luciad : robin.houtmeyers@luciad.com Eumetnet : kamel.rebai@meteo.fr

More information

[Docket No. FAA ; Airspace Docket No. 13-ASW-2] Proposed Amendment of Class E Airspace; Fort Polk, LA

[Docket No. FAA ; Airspace Docket No. 13-ASW-2] Proposed Amendment of Class E Airspace; Fort Polk, LA This document is scheduled to be published in the Federal Register on 04/30/2013 and available online at http://federalregister.gov/a/2013-10169, and on FDsys.gov [4901-13] DEPARTMENT OF TRANSPORTATION

More information

Preface. Guidebook Overview

Preface. Guidebook Overview CONTENTS Preface Guidebook Overview What s New... 2 Purpose of the Guidebook... 2 The Florida Philosophy of Airport Master Planning... 2 Guidebook Components and Structure... 3 Using this Guidebook...

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

AEROVISION AUGMENTED REALITY AIRPORTS IN 3D Young Professionals Innovation Competition Daniel Schoenberg, RS&H Jill Geboy, Jacobs Engineering Daniel

AEROVISION AUGMENTED REALITY AIRPORTS IN 3D Young Professionals Innovation Competition Daniel Schoenberg, RS&H Jill Geboy, Jacobs Engineering Daniel AUGMENTED REALITY AIRPORTS IN 3D Young Professionals Innovation Competition Daniel Schoenberg, RS&H Jill Geboy, Jacobs Engineering Daniel Pruim, Horry County Department of Airports Challenges Explore Innovate

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

IAC 2011 Cape Town, October th

IAC 2011 Cape Town, October th Cape Town, October 05 05 th Project Partners External Supporters and Sponsors The Problem The Solution Overview S 2 BAS Concept of Operations Architecture Possible Applications Stakeholders Flight Phases

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Menlo Park Fire District Training Division. Unmanned Aerial System Pilot

Menlo Park Fire District Training Division. Unmanned Aerial System Pilot Menlo Park Fire District Training Division TASK BOOK FOR THE POSITION OF Unmanned Aerial System Pilot Date Issued TASK BOOK ASSIGNED TO: Individuals name, assignment DATE TASK BOOK INITIATED The material

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

MONTROSE REGIONAL AIRPORT APRIL 12, 2016

MONTROSE REGIONAL AIRPORT APRIL 12, 2016 MONTROSE REGIONAL AIRPORT APRIL 12, 2016 AGENDA READY FOR TAKE OFF WHAT ARE WE GOING TO DO TODAY? Introductions Why conduct an airport master plan? Master Plan Process Deliverables Schedule Identify Goals

More information

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower Planning In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower Adventure is just bad planning. Roald Amundsen, Norwegian Explorer Failure

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

THE NATIONAL ACADEMIES PRESS

THE NATIONAL ACADEMIES PRESS THE NATIONAL ACADEMIES PRESS This PDF is available at http://nap.edu/24791 SHARE NextGen for Airports, Volume 5: Airport Planning and Development DETAILS 84 pages 8.5 x 11 PAPERBACK ISBN 978-0-309-44631-0

More information

RUNWAY SAFETY GO-TEAM METHODOLOGY

RUNWAY SAFETY GO-TEAM METHODOLOGY RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

SUMMARY: This action proposes to amend Class D airspace, and Class E airspace

SUMMARY: This action proposes to amend Class D airspace, and Class E airspace This document is scheduled to be published in the Federal Register on 01/23/2018 and available online at https://federalregister.gov/d/2018-01026, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

California State University Long Beach Policy on Unmanned Aircraft Systems

California State University Long Beach Policy on Unmanned Aircraft Systems California State University, Long Beach June 14, 2016 Policy Statement: 16-04 California State University Long Beach Policy on Unmanned Aircraft Systems The following policy statement was recommended by

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator

More information

Proposed Amendment of Class D and Class E Airspace for the following Oklahoma

Proposed Amendment of Class D and Class E Airspace for the following Oklahoma This document is scheduled to be published in the Federal Register on 03/11/2016 and available online at http://federalregister.gov/a/2016-05177, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

TRB and ACRP Research Updates: Practical Application

TRB and ACRP Research Updates: Practical Application TRB and ACRP Research Updates: Practical Application 2014 ACI Environmental Affairs Conference Danielle J. Rinsler, AICP FAA Office Airports, Airport Planning and Environmental Division Baltimore, MD Advisory

More information

RISING PERFORMANCE. Civil aviation is an outlier. It s BY ERIK DAHLBERG

RISING PERFORMANCE. Civil aviation is an outlier. It s BY ERIK DAHLBERG RISING PERFORMANCE Compact mobile mapping systems can be installed on small passenger cars. Civil aviation is an outlier. It s among the few industries where tight government regulations are widely accepted

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information