From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas
|
|
- Frank Payne
- 5 years ago
- Views:
Transcription
1 Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Jack Hsu Mark Varellas 1
2 Information Systems Corporate Background Global and orth American Presence Overview Mission-critical operational focus Strong backlog, stable customers Space Missions Capability foundation for the Company Worldwide customer base Founded in 1969 Major projects and businesses around the world Over 2,200 employees Revenues FY10 CAD$ 689M Integrated Information Solutions Geospatial Services Use, duplication or disclosure of this document or any of the information contained herein is subject to the restrictions on the title page of this document. 4 2
3 Stable and Growing Company Year ended December 31 In Aviation For Over 30 Years We have over 100 staff dedicated to aviation systems development MDA s experience and capabilities include: Air Traffic Control Systems Flight Briefing Systems OTAM Systems Flight Procedure Design Systems Aeronautical Information Management Systems Engine-out procedure design and take-off performance Airport Surveys (through MDA GSI) Aviation Business Solution Analysis (BSA) Agenda 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps We work extensively with the FAA and US Air Force 3
4 Icon Legend The AIS World Is Product-Centric The AIM World is Data-Centric Aeronautical Assets (eg. avaids) Products Products Obstacles AIP AIP Terrain OTAM OTAM Flight Procedures Briefings Briefings Charts Digital OTAMs OTAMs Focus on Products (product/paper-centric) Often duplication of data. o single truth Data often varies in accuracy and precision Similar data often lives in silos/compartments Focus on Digital Data and Products One truth correct and consistent One owner for each data type Data is shared Electronic Charts Future Products 4
5 Key Driver: Satellite Based avigation ICAO Roadmap AIS to AIM PB/RP/RAV requires greater accuracy and integrity than ever in Aeronautical Information Information Management Moving from AIS to AIM is a business change ot (just) a technology change Benefits Implementing PB Enhanced safety Increased System capacity Reduced fuel consumption More efficient use of airspace Environmental benefits Reduction in cancellations Going Digital Consolidation Step 1 Vision and Plan 5
6 What is in the Vision and the Plan? Example: Organizational Responsibility Agenda Who? Does what? When? Using what? Metrics? Processes People/Organizations Business Strategy ICAO Compliance Budgets and Funding Short Term Objectives Long Term Objectives Organizational Responsibility Role Definitions & Job Descriptions Training Information & Data What is data? Whose data? Where resides? Access rights? Associations? Identification? Quality? Org. 1 Org. 2 Org Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Schedule Intended Use? Metrics Format? Metrics? Org. 4 Current Systems COTS Software Custom Software Sizing Metrics Facilities Platforms Systems 6
7 Within extgen the Enterprise is the FAA s answer to AIS to AIM FAA Enterprise The Enterprise is a single source of aeronautical information to Government & Commercial Consumers Within the AVIS DB roles & responsibilities are clearly defined Aero. Info. Mgmt Group Aero. Info. Products Group Procedure Designers Aero. Data Specialists Obs. Specialists Cartographers AVIS DB Geo. Specialists OTAM Office OTAM Specialist AIXM 5 Web Services Flight Briefing Office Airport Authority ATM System Other ASP AVIS DB 7
8 Each type of data is managed by a Data Steward MDA s AIRAV is the database used to manage aeronautical data The quality & integrity of the data is checked on a number of different levels Data input Aero. Info. Mgmt Group Aero. Info. Products Group Integrity & quality verification Understands & maintains data relationships 1: Completeness 2: Self consistency Aero. Data Specialists Procedure Designers Cartographers Aero. Data Specialists AIRAV Audit trail Data sheet generation lat/long lat/long length Obs. Specialists Google Maps visualization Geo. Specialists OTAM Office Versioning & temporality Workflow model 3:Consistency with other data in AIRAV 3:Associations with other databases OTAM Specialist Supports future development AVIS DB AIXM 5 web services 8
9 Changes to the aeronautical data are managed in time There is an integrated Work Flow model Within AIRAV there are 3 models of the airspace Publication Future Test 9
10 Products are created based on the aeronautical data MDA s GPD is the procedure design platform used by the FAA GPD is a fully integrated decision making environment Procedure Design Specialists Verifies quality of aero. data Aero. Info. Mgmt Group Aero. Data Specialists Aero. Info. Products Group Procedure Designers IFP GPD Rich geospatial environment Supports RAV & RP criteria Detects deviations from criteria Cartographers Generates digital data products Obs. Specialists OTAM Office Geo. Specialists OTAM Specialist AVIS DB 10
11 Change detection is an essential part of AVIS Agenda A Solution is more than a System People Aero. Info. Mgmt Group Aero. Info. Products Group Procedure Designers 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Business Processes Information & Data Aero. Data Specialists * Cartographers Obs. Specialists OTAM Office Geo. Specialists OTAM Specialist AVIS DB Systems 11
12 BSA - Part of MDA s Solution Engineering Lifecycle MDA s BSA Methodology BSA Example #1: Instrument Procedure Development at the FAA 1. Discover 2. Frame 3. Detail Problems: Step Define Business Context Define Current Situation Define eeds & Objectives Define Solution & Options Update Business Case & Plan > 20,000 conventional IPs Push for RAV & RP Scope Mission & Vision Marketplace Stakeholders Influential Factors Differentiators Objectives Strategy / Plan KPIs / Metrics People & Org. Business Processes Info Model Systems Data Infrastructure Financial Legal & other factors Modernisation Objectives eeds Problems Opportunities Priorities Boundaries People & Org. Business Processes Info Model Systems Data Infrastructure Financial Legal & other factors Plan Long Term: high-level ext Phase: detailed Transition Budget / Cost Business Case Costs Benefits Business Drivers: Enhanced safety Increased productivity Leveraged investments Results Sufficient to direct Modernisation Objectives Sufficient to support Solution Definition Sufficient to direct Solution Definition Sufficient to plan next phase & direct System Specification Sufficient to meet budgetary accuracy Improved services Enhanced partnerships 12
13 A wide range of stakeholders contributed to the Working Groups In 2005/2006 MDA lead a 6 month BSA with the FAA The result a clear vision for the Instrument Procedure design business at the FAA Oct ov Dec Jan Feb Mar Vision Plan Aviation System Standards Flight Standards Agency Flight Procedures Group Flight Procedures Mgmt Team Flight Inspection Operations Group ational Aeronautical Charting Group RP Office IT Development Team Flight Standards Agency Flight Procedures Group Develop Plan WG #1 WG #2 WG #3 WG #4 Review Delivery 13
14 BSA Example #2: Obstacle Evaluation at the FAA A range of stakeholders contributed to the Working Groups The result was a clear vision for the Obstacle Evaluation business at the FAA Problems: Increased demand Inconsistent responses to proponents Adverse affect on IPs Vision Plan Aviation System Standards Flight Standards Agency Business Drivers: Replace current tool Cope with increased demand Flight Procedures Office ational Aeronautical Charting Group IT Development Team Flight Procedures Group Flight Procedures Office Air Traffic Control Improved quality & accuracy Respond in a timely manner Leveraged investments OE Specialists OE Results DB OE DB 14
15 Agenda The ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps MDA has extensive experience in planning business change in the Aviation domain MDA is supporting the FAA in their AIS to AIM transition Time is short. ICAO is pushing AIS to AIM transition through SARPS. Annex 15 Amendment 36 is applicable now. Annex 15 Amendment 37 is applicable MDA can support or lead the development of an AIS to AIM Plan involving stakeholders from all aviation agencies The plan can be incrementally developed and funded 15
AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION
AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation
More informationFrom AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez
From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air
More informationAIXM/WXXM CONFERENCE 2010
AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationThe Importance of AIM and the Operational Concept
Global Harmonization Through Collaboration The Importance of AIM and the Operational Concept Presented By: Michael Hohm International Civil Aviation Organization Date: August 28, 2012 Flightplan Background
More informationMIDAD Project IDS Vision
MIDAD Project IDS Vision Cairo July, 2013 Ramy El-Jabi Outline MIDAD Scope Solution High Level Architecture IDS Air Navigation Suite Proposed Implementation Schedule 2 MIDAD Scope Drawbacks related to
More informationICAO GANP Requirements and Evolution
ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)
IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical
More informationDP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011
DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen
More informationAmendment 37,38 to Annex 15 Amendment 57 to Annex 4
International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to
More informationQMS for AIS/MAP Service Implementation Workshop
TITLE DP-9 QMS for AIS/MAP Service Implementation Workshop AIS to AIM transitions: The AFI challenges The global evolution from AIS to AIM capability is considered an essential and over-arching objective
More informationFrom AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL
From AIS to AIM Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL AIS-AIM Study Group Active from 2008-2015 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance
More informationQuality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E
Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation
More informationAdvisory Circular. File No.: Z U Issue No.: 01
Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationDevelopment of the Global AIM Strategy (AIM Projects)
Development of the Global AIM Strategy (AIM Projects) Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline Status-quo: ICAO AIM provisions
More informationAIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place
AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)
More informationAvitech GmbH AIXM Capabilities & Experiences
Avitech GmbH AIXM Capabilities & Experiences Werner Schwarze Regional Sales Director Dakar/04. October 2016 Avitech Introduction Avitech GmbH of Germany, is a key piece in Indra ATM being the unique provider
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationUser Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management
User Forum 2011 AIM/EAD Evolutions Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management The European Organisation for the Safety of Air Navigation EAD General Concept
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationWork Programme of ICAO Panels and Study Groups
SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National
More informationGANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation
GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework
More informationSingapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2
Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)
More informationFederal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe
Federal GIS Conference 2014 February 10 11, 2014 Washington DC ArcGIS for Aviation David Wickliffe What is ArcGIS for Aviation? Part of a complete system for managing data, products, workflows, and quality
More informationThis working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.
International Civil Aviation Organization MIDADD SG*/1-WP/7 18/01/ 12 MID Region AIS Database Study Group First Meeting (MIDADD SG*/1) (Cairo, Egypt, 20 22 February 2012) Agenda Item 8: Legal & Institutional
More informationNavigation Data Chain Certification
853d Electronic Systems Group Navigation Data Chain Certification Prepared by: 853rd ELSG/NT Electronic Systems Center Hanscom AFB, MA 23 May 2008 Nav Data Chain Certification Overview Background Why certify
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationFlight Procedure Design and Cartography
Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits
More information30 SEP - 02 OCT, 2014
EASTERN CARIBBEAN AERONAUTICAL INFORMATION MANAGEMENT (AIM) FAMILIARIZATION WORKSHOP TRINIDAD AND TOBAGO AVIATION AUTHORITY COMPLEX PORT OF SPAIN, TRINIDAD AND TOBAGO, 30 SEPTEMBER TO 2 OCTOBER 2014 30
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen
Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).
More informationOverview ICAO Standards and Recommended Practices for Aerodrome Safeguarding
Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July
More informationAirport AIM as a Service Presented at World ATM Congress 2016
Airport AIM as a Service Presented at World ATM Congress 2016 Ulrich Kaage Sales Manager AIM Outline Airport data is a considerable part of the AIM data chain The move from paper centric to data driven
More informationIntroduction to Amendment 40 to Annex 15
Introduction to Amendment 40 to Annex 15 Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline From Aeronautical information services (AIS)
More informationOn Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1
On Time Total Airspace Management 8 th Global ATFM Conference Cancun - Mexico 12/30/2014 Commercial-in-Confidence 1 ATFM 101 Services Airspace capacity optimization Flight Procedure PBN design SID s STARS
More informationATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)
ATIEC 2017 Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) Content AIXM usage - current and future Interoperability Digital NOTAM AIXM intended use AIXM 2.1/3.3/4.5 - developed for the EAD (European
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationSESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM
SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well
More informationAIS-AIM Study Group Working Status
International Civil Aviation Organization AIS-AIM Study Group Working Status Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline Development and Implementation of AIS
More informationAFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)
AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan
More informationIRELAND SAFETY REGULATION DIVISION
NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353
More informationAIXM Coding guidelines for the ICAO data sets
AIXM Coding guidelines for the ICAO data sets Eduard POROSNICU DECMA/STR/SWM July 2018 Context Restructured Annex 15 Digital data sets AIP Obstacles Terrain Airport Mapping Instrument Flight Procedures
More informationAerodrome Obstacle Survey Information Checks
United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars
More informationAirport Safety Management Systems: Integrating Planning Into the Process
Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for
More informationAIS/AIM System in South Africa (ATNS)
AIS/AIM System in South Africa (ATNS) Description: Dynamic Component comprises of I. Flight Planning and Management II. NOTAM Management (Creation, PIB, etc) III. Internet Briefing and Flight Planning
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationA NO COUNTRY LEFT BEHIND Initiative:
A NO COUNTRY LEFT BEHIND Initiative: Catalin RADU DD/SAF/ANB ANC Informal Briefing FINDING The State has not implemented a formal inspection policy and associated procedures for the continued surveillance
More informationGlobal ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization
SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the
More informationAeronautical Information Management
Aeronautical Information Management NOTAM Activities Introduction Presented to: By: Barry C. Davis Date: May 3, 2011 What s AIM? Dynamic, integrated management of aeronautical information services safely,
More informationDP-3 ICAO Electronic Terrain and. Amendments 33 & 36
DP-3 ICAO Electronic Terrain and Obstacle Data Amendments 33 & 36 1 Published Amendment 33 to ICAO Annex 15, Chapter 10 July 2004, ICAO Annex 15(Aeronautical Information Services) addeda new Chapter 10
More informationAERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG/9-SN/12 20/04/2014 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) NINETH MEETING Tokyo, Japan, 21 to 25 April 2014 Agenda Item 4 Aeronautical
More informationWORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World
WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationAIM in support of ATM
AIM in support of ATM Abbas NIKNEJAD Regional Officer, AIM/ATM ATM SG/3 (Cairo, Egypt, 22-25 May 2017) Role of AIS ATM The dynamic, integrated management of air traffic and airspace. Enabling flight operations.
More informationICAO EUR Region Performance Framework
ICAO EUR Region Performance Framework Regional Performance Framework Workshop Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office 9 April 2014 Page 1 OUTLINES Why a Regional Performance
More informationInitiated By: AFS-400
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated
More informationSpatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application
Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application Sept 29 - Oct 1, 2015 Kualal Lumpur Shyam Parhi Washington DC What is driving Airports GIS? Reduce costs to Airports,
More informationIATA FUEL EFFICIENCY CAMPAIGN
IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationThe support of an European ANSP
The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on
More informationIntroduction to the Data Catalogue
AIS-AIMSG/11-SN /11 22/04/15 AERONAUTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) ELEVENTH MEETING Montreal, 27 April to 1 May 2015 Agenda Item 2: AIM Domain Scope
More informationAgenda Item 6: Aviation Security and Facilitation
50 th Conference of Directors General of Civil Aviation Asia and Pacific Regions Agenda Item 6: Aviation Security and Facilitation Boubacar Djibo Director, Air Transport Bureau ICAO Page 1 Presentation
More informationTerms of Reference for a rulemaking task
Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationLufthansa Systems AIM from a navigation data house perspective
AIM/SAM/10, August 2017 Lima Peru Lufthansa Systems AIM from a navigation data house perspective genda The Company & Products Electronic Terrain and Obstacle Data (etod) Transition from AIS to AIM Aeronautical
More informationProcedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981
Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes
More informationData Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84
Data Origination, Management and WGS 84 1 Learning Objectives Overview Understand the implication of publishing incorrect navigational data in the State s AIP Identify why it is essential to use a common
More information1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7
New Veterans Charter Evaluation Plan TABLE CONTENTS Page 1.0 BACKGROUND... 1 2.0 NEW VETERANS CHARTER EVALUATION OBJECTIVES... 2 3.0 STUDY APPROACH... 3 4.0 EVALUATION LIMITATIONS... 7 5.0 FUTURE PROJECTS...
More informationAndres Lainoja Eesti Lennuakadeemia
Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began
More informationREGULATORY APPROACH FOR THE
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SINGLE EUROPEAN SKY (SES) REGULATIONS REGULATORY APPROACH FOR THE AERONAUTICAL DATA INTEGRITY 24 May 2006 Released Edition 2.0 DOCUMENT
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationSharing UAE experience in. AIM implementation
Sharing UAE experience in AIM implementation NCLB AIM WORKSHOP Cairo, Egypt, 11 13 September 2017 MID Region NCLB Strategy No Country Left Behind campaign help ensure all States of effective implementation
More informationCIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS
CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control
More informationOfficial Journal of the European Union L 7/3
12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far
More informationAIRPORTS GIS UPDATE. Federal Aviation Administration. https://airports-gis.faa.gov/
AIRPORTS GIS UPDATE Presented to ACC Airports Technical Workshop Presented by John R. Dermody, Manager, Airport Engineering Division Date July 29, 2014 1 Airports GIS Update 1. AGIS Overview 2. NAV Lean
More informationAFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016
AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016 Communication Requirements for a Digital AIM Implementation & Operation in the AFI Region Presented by François-Xavier SALAMBANGA,
More informationSession 2.2 Data Catalogue
Federal Office of Civil Aviation FOCA Safety Infrastructur/ section Airspace Session 2.2 Data Catalogue Institutional significance and potential regional benefits Interregional EUR MID WS - Paris 20180710
More informationFAA GBAS Program Update January 29, 2010
US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed
More informationSAMPLE TEMPLATE APPENDIX 3.5C-1
APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE
More informationCombined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013
IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY
More informationICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012
ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome
More informationPaperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management
Paperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management IATA s Paperless Initiatives Passenger Reservations, Ticketing and Airport Processes e-ticketing
More informationDEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)
EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO
More informationAerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports
ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION
More informationFlight Operations Briefing Notes
Flight Operations Briefing Notes I Introduction Strict adherence to suitable standard operating procedures (SOPs) and associated normal checklists is a major contribution to preventing and reducing incidents
More informationAeronautical Information Services Issue 1 30 May 2012
United Kingdom Overseas Territories Aviation Circular OTAC 175-1 Aeronautical Information Services Issue 1 30 May 2012 GENERAL Effective: on issue Overseas Territories Aviation Circulars are issued to
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2010R0073 EN 20.10.2014 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EU) No 73/2010 of 26 January
More informationAERONAU INFORMATION MANAGEM. International TENTH MEETING THE QUALITY OF SUMMARY. such quality added). global ATM 1.3. regard, the.
International Civil Aviation Organization 10/ /11/2014 INFORMATION PAPER AERONAU UTICAL INFORMATION SERVICES-AERONAUTICAL INFORMATION MANAGEM MENT STUDY GROUP (AIS-AIMSG) TENTH MEETING Montréal, 10 to
More informationSUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT
ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International
More informationDRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft
DRAFT COMMISSION REGULATION (EU) / of XXX laying down rules and procedures for the operation of unmanned aircraft THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European
More informationImplementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14
of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,
More informationRequired Navigation Performance (RNP) in the United States
Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes
More informationAUGUST 2017 GNSS REVIEW. Survey Economics Chances of success. Mobile Mapping Airport scanning. Stag s Leap Winery Pre-construction plan
AUGUST 2017 GNSS REVIEW Survey Economics Chances of success Stag s Leap Winery Pre-construction plan Mobile Mapping Airport scanning RISING PERFORMANCE» ERIK DAHLBERG Civil aviation is an outlier. It s
More informationAIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide
AIM WG: Contributing to ATM Success Roland Baumann Head Planning & Development AIM skyguide AIM Contributing to ATM Success change of the value proposition towards ATM Information Management Services the
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationRISING PERFORMANCE. Civil aviation is an outlier. It s BY ERIK DAHLBERG
RISING PERFORMANCE Compact mobile mapping systems can be installed on small passenger cars. Civil aviation is an outlier. It s among the few industries where tight government regulations are widely accepted
More informationVALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection
VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection The FANS Group 8703 Yates Drive, suite 125 Westminster, Colorado 80031 www.fans-group.aero 877.710.7932
More information