FLIGHT OPERATIONS PANEL

Size: px
Start display at page:

Download "FLIGHT OPERATIONS PANEL"

Transcription

1 International Civil Aviation Organization FLTOPSP/WG/2-WP/11 24/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG2) Rome, Italy 4 to 8 May 2015 Agenda Item 6: Any Other Business Type B Instrument Approach Operations to 150 Feet Decision Height (Presented by Mr. Chris Hope) SUMMARY This paper proposes additional guidance material that is necessary to implement ICAO guidance and design criteria for Instrument Approach Procedures (IAP) with a Decision Height (DH) of 150 feet based on work performed in the All Weather Operations Harmonization Aviation Rulemaking Committee (AWOH ARC) 1. INTRODUCTION 1.1 There is presently no ICAO guidance material available to accommodate the use of 3D Type B approach operations to 150 foot Decision Height (DH). Some states currently conduct precision approach instrument procedures to 150 feet with the use of a Head-Up Display (HUD). Additionally, new hybrid technology incorporating vision systems and advanced guidance is encouraging states to seek minima lower than the historical and arbitrary 200 feet. There is no current ICAO guidance for the operation of such systems. 2. BACKGROUND/DISCUSSION 2.1 The Instrument Landing System (ILS) has been the mainstay of landing navigation aids for well over 50 years. The first landing of a scheduled U.S. passenger airliner using ILS was on January 26, 1938, when a Pennsylvania Central Airlines Boeing 247D flew from Washington, D.C., to Pittsburgh, Pennsylvania, and landed

2 in inclement weather guided only the Instrument Landing System. ILS was accepted as a standard system by the ICAO in The initial steps toward achieving the current CAT I operating minimums was taken on September 28, Prior to this time, turbojet minimums were 300 ft ceiling and ¾ statute miles visibility. The first air carrier operations with minimums of a ceiling of 200 ft. and a visibility of 1/2 statute miles were authorized on May 11, The concepts developed to permit this reduction in operating minimums established the foundation for a building block approach. With this approach operations evolved in an orderly manner as airborne and groundbased capabilities improved. The 1962 reduction in minimums to a ceiling of 200 ft. and 1/2 statute mile visibility was based on further improvements of airborne equipment, electronic ground-based navigation aids (NAVAID s), ground-based visual aids and enhanced pilot training and qualifications. In 1964, the minimums for runways not equipped with a high-intensity touchdown zone and runway centerline lights were reduced to 200 feet DH and RVR The modernized versions of the ILS used worldwide today continue to provide aircraft with precision vertical and horizontal navigation guidance information during approach and landing. With a growing emphasis on performance-based operations, different levels of operation may be authorized based on the flight equipment of a specific operator, and the ground equipment available at specific runways. While certain ground facility requirements are needed to support all levels of operations, a higher category of operations may be performed on different types of ground equipment if the airborne equipment, crew training, or other factors offset any changes in ground facility requirements. In these situations, operations are predicated on the use of specific equipment and/or procedures, which will require a specific approval. Additionally, the recent development of advanced displays, advanced guidance, vision systems, and hybrid systems have enabled a reduction of flight technical error (FTE) during approach operations. The reduction in FTE combined with a guided transition to the visual segment has led several states to develop, publish, and authorize IAPs with a 150 foot DH. 2.2 The FAA began publishing Special Authorization Category (SA CAT) I ILS approaches in The operational criteria are detailed in FAA Order D. This order authorizes Category I ILS approaches with a DH as low as 150 feet (using radio altimeter minima) and a visibility as low as RVR 450 m (1400 ft) at runways with reduced lighting (compared to standard Category II requirements). Only operators authorized for Category II operations using aeroplanes operationally approved for at least Category II operations and equipped with an operable HUD approved for at least Category II operations are eligible for this operation. A specific approval is required and the HUD must be operated in the mode used for Category II or III operations and used to the DH. SA CAT I ILS approach minimums to 150 feet make no changes in pilot/controller terminology, procedures, or pilot procedures, and require no new ground equipment, airborne equipment, or certifications at suitably equipped runways. It leverages the use of advanced avionics and flight guidance systems that are already in many aeroplanes today to get lower minimums on more runways. Additionally, the SA CAT I ILS uses the advanced avionics and flight guidance systems to mitigate some of the runway lighting and ancillary equipment that is normally required for low visibility operations. Specifically, centerline and touchdown zone lights are not required for SA CAT I operations. There was substantial testing done to demonstrate that this operation can be done safely without these lights. This movement to a cockpit centric operation provides significant cost savings for aerodromes and opens up the possibility of many more runways for low visibility operations. Figure 1 depicts a profile view of a typical Special Authorization CAT I ILS operation. The flight crew s visibility cone at 1400 RVR from an aircraft with a minimum 17 cockpit downward view angle is shown in yellow. As the drawing shows, at 150 feet DH with RVR 450 m (1400 ft.) the aircraft will have flown over the first 600 feet of a MALSR with the crew able to see approximately an 800 feet segment of the approach lights. Calculation also shows that the crew will be able to use the approach lights for runway alignment until approximately 210 feet from the threshold at an altitude of 65 feet, when the approach lights will no longer be visible. This approach procedure currently requires the use of HUD to DH. 2

3 Figure 1 Cockpit Visibility at 150 foot Decision Height 2.3 There are many benefits derived from a new 150 foot DH. Expanding capacity; increasing flexibility in the terminal environment; minimizing the impact of weather and other disruptions; reducing transit time; and increasing predictability (decreasing domestic curb-to-curb transit time) are all identified as key goals and objectives in planning future air operations. A 150 foot minimum contributes to meeting each of these objectives by making additional runways available during periods of reduced visibility. Having more approaches available with the lower authorized minimums of RVR 450 m (1400 ft.) means fewer flights will divert. Flights that divert will have shorter distances to fly to a diversionary airport. Fewer diversions and shorter routings will result in reducing the workload and minimizing the impact of weather disruptions to the airspace system. Diversions to airports nearer the planned destination means reduced fuel cost, reduced passenger inconvenience and faster return to scheduled operations. Lower minimums will have no effect on determination of suitable alternate airports for flight planning purposes. However, it will increase the number and proximity of suitable diversionary airports for aircraft that need to divert due to weather conditions or mechanical problems while airborne. For example, an aircraft en route from Washington Dulles to New York City s La Guardia airport may be able to divert to Islip, NY instead of the filed alternate of Boston, MA, since Islip will be able to accept arrivals down to RVR 450 m (1400 ft.) instead of RVR 550 m (1800 ft.). 2.4 With the success of the FAA SA CAT I ILS and the many benefits to a 150 ft. DH, the AWOH ARC is proposing establishing total system performance based criteria for operations down to 150 ft. DH. There have been numerous advances in both the navigational systems (ground and satellite based) and the aircraft avionics since the establishment of 200 ft. DH. The total system error (TSE) is much reduced compared to the ILS of the 1960 s. Simply put, these advances can consistently deliver the aeroplane to DH in a much tighter window than ever before. An example of a new technology that could meet the performance based criteria for operations down to a 150 ft. DH is Synthetic Vision Guidance System or SVGS. RTCA SC-213 has recently published Minimum Aviation Performance Specifications for a Synthetic Vision Guidance System (SVGS), DO-XXX. SVGS as defined in this MASPS is a new airborne guidance system designed to enable operations to a Decision Height as low as 150 ft. height above touchdown. SVGS is a combination of flight guidance display technology and high precision position assurance monitors. The SVGS flight instrument display provides a continuous, geo-spatially correct depiction of the external scene topography, including obstacles, augmented by the display of the runway of intended landing. The SVGS display may be implemented on a head down Primary Flight Display, and/or a Head- Up Display (HUD. SVGS includes additional symbology elements, integrity and performance monitors and 3

4 annunciations that support and enable low visibility operations. Additional flight instrument symbology and monitors to assure accurate rendering of the external scene are included. The additional systems and flight instrument display symbology, including an earth referenced flight path vector (FPV), flight path angle reference cue (FPARC) and Depiction of the Runway of Intended Landing (DRIL), provide enhanced control, and position and path awareness via a continuous, intuitive indication to the pilot of the aircraft trajectory relative to the touchdown zone. The additional airborne monitoring ensures the same level of accuracy, availability and integrity as the equivalent ground based systems normally used for these operations. The SVGS provides the pilot with a dynamic perception of position, trend, and motion, which facilitate the pilot s transition to the use of visual references out-the-window (OTW). The interpretation of this spatial context, i.e., interpretation of present and future position with respect to runway of intended landing, by the pilot, allows for improved flight technical error performance and reduced cognitive workload. The SVGS may be implemented on a Head-Down Display (HDD) or a Head-Up Display (HUD). However, when SVGS is implemented on a HUD, the SVGS must also be displayed on the pilot monitoring display to support crew coordination, and also be available to the primary flight display of the pilot flying in the event of failure of the HUD. The development of SVGS brings increased importance toward developing an ICAO standard for 3D Type B approach operations to 150 feet. 2.5 In summary, the AWOHARC has three recommendations for the development of published IAPs with 150 foot DH. First, coordinate with the IFPP to verify that current PANS-OPS criteria are suitable for IAPs with 150 foot DH if based on radio altimeters. Second, develop the performance based conditions required to obtain a specific approval for SA CAT I operations to a 150 foot DH. Third, work with the IFPP to develop criteria for charting these new procedures. 3. ACTION BY THE MEETING 3.1 The FLTOPSP/1 is invited to: a) Note and review the contents of this working paper; b) Agree, as may be amended, the actions listed in paragraph Attachments 1. Sample U.S. FAA Special Authorization CAT I ILS Instrument Approach Procedure 4

5 Attachment 1

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems REQUESTOR: RTCA Paper No. 349-16/PMC-1568 TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems Organization Federal Aviation Administration,

More information

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS ATT 2.B-1 ATTACHMENT 2.B HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS Supplementary to 2.2.2.2, 2.4.15.1, 3.4.2.7 and 3.6.12 Introduction The material in this attachment provides guidance

More information

Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports

Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports Ops Credit for Advanced Aircraft Equipment Improving Accessibility at Secondary Airports ICAO Final Approach Symposium 1 st February 217 Dr Jean-Philippe Ramu NetJets Europe pilot & SESAR Technical Manager

More information

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS) GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI 110 003 TELEPHONE: 091-011-4635261 4644768 FAX: 091-011-4644764 TELEX:

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

All-Weather Operations Training Programme

All-Weather Operations Training Programme GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 3 OF 2014 Date: OPERATIONS CIRCULAR Subject: All-Weather Operations Training Programme 1. INTRODUCTION In order to

More information

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA:AC-OPS052 SECURITY OVERSIGHT AGENCY June 2017 1.0 PURPOSE ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS This Order provides guidance to the

More information

Flight Operations in Low Visibility Conditions

Flight Operations in Low Visibility Conditions Flight Operations in Low Visibility Conditions Eduardo Chacin ICAO NACC Regional Office, Flight Safety Meeting to enhance State Coordination between MET, AIM, and ATM fields Mexico City, Mexico, 26-28

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

Operational Benefits, Affordability and Availability

Operational Benefits, Affordability and Availability Synthetic ti & Enhanced Vision i Operational Benefits, Affordability and Availability Tom Horne Experimental Test Pilot Mike Mena Director, Advanced Cockpit Programs Gulfstream Aerospace Corporation Gulfstream

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

LOW VISIBILITY OPERATION

LOW VISIBILITY OPERATION 1. Introduction LOW VISIBILITY OPERATION Low visibility procedures exist to support low visibility operations at aerodromes. Low visibility procedures (LVP) means procedures applied at an aerodrome for

More information

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures OCP-WG-WP 4.18 OBSTACLE CLEARANCE PANEL WORKING GROUP AS A WHOLE MEETING ST. PETERSBURG, RUSSIA 10-20 SEPTEMBER 1996 Agenda Item 4: PANS-OPS Implementation CFIT-Procedure Design Considerations Use of VNAV

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Economics of Safety Using Situational Awareness Tools

Economics of Safety Using Situational Awareness Tools Economics of Safety Using Situational Awareness Tools Aviation Insurance Association (AIA) May 3, 2014 Agenda > Rockwell Collins > Head-up Vision Systems > Implementation > Advantages Safety and Economics

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations

Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations March, 2017 2017 Rockwell 2017 Collins. Rockwell Collins. Agenda > HGS Introduction > HGS Value Safety & Economics

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Safety Enhancement SE ASA Design Virtual Day-VMC Displays Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.318 Effective Date: 8/13/15 Cancellation Date: 8/13/16 SUBJ: Optional Letter of Authorization (LOA) for Straight-In

More information

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration

ICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date:

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme

More information

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 LEGAL NOTICE. THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 Citation GN. No. of 20 Citation 1. These Regulations may be cited as the Civil

More information

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Operational Efficiency of Dynamic Navigation Charting Benefits such as improved

More information

FLIGHT PATH FOR THE FUTURE OF MOBILITY

FLIGHT PATH FOR THE FUTURE OF MOBILITY FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

The pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1

The pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1 The pilot and airline operator s perspective on runway excursion hazards and mitigation options Session 2 Presentation 1 Communications Communication hazards and mitigation The failure to provide timely,

More information

OLM FBW 2006 Toulouse September Head Up Display

OLM FBW 2006 Toulouse September Head Up Display OLM FBW 2006 Toulouse 26-28 September 2006 Head Up Display Head up Display Introduction Introduction Benefits Installation Core Symbology Total Energy Chevrons Taxi Display Take Off Display Pitch Rotation

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

SUBPART C Operator certification and supervision

SUBPART C Operator certification and supervision An AOC specifies the: SUBPART C Operator certification and supervision Appendix 1 to OPS 1.175 Contents and conditions of the Air Operator Certificate (a) Name and location (principal place of business)

More information

CIVIL AVIATION PUBLICATION CAP 05 ALL WEATHER OPERATIONS

CIVIL AVIATION PUBLICATION CAP 05 ALL WEATHER OPERATIONS CAP 05 ALL WEATHER OPERATIONS INDEX This Page Intentionally Left Blank CAP 05 ALL WEATHER OPERATIONS INDEX Section Title Page No. 1. Introduction... 1 1.1 General... 1 1.2 Applicability... 1 1.3 References...

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

Trajectory Based Operations

Trajectory Based Operations Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

KSFO RNAV TO GLS DEMONSTRATION

KSFO RNAV TO GLS DEMONSTRATION Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground

More information

Boeing 787 Dreamliner Flight Deck Safety, Comfort, Efficiency

Boeing 787 Dreamliner Flight Deck Safety, Comfort, Efficiency Boeing 787 Dreamliner Flight Deck Safety, Comfort, Efficiency Mike Carriker Chief Pilot, 787 Program Boeing Commercial Airplanes Boeing is a trademark of Boeing Management Company. Copyright 2006 The Boeing

More information

Regulations & Obligations

Regulations & Obligations Regulations & Obligations Thursday, March 24, 2015 9:00 a.m. 10:00 a.m.) PRESENTED BY: John Harpool Richard White Adam Hartley International Operators Conference San Diego, CA March 21 24, 2016 Sources:

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

Helicopter Performance. Performance Class 1. Jim Lyons

Helicopter Performance. Performance Class 1. Jim Lyons Helicopter Performance Performance Class 1 Jim Lyons What is Performance Class 1 Content of Presentation Elements of a Category A Take-off Procedure (CS/FAR 29) PC1 Take-off Requirements PC1

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

GHANA CIVIL AVIATION AUTHORITY ALL WEATHER OPERATIONS

GHANA CIVIL AVIATION AUTHORITY ALL WEATHER OPERATIONS ALL WEATHER INTENTIONALLY LEFT BLANK ISSUED AND APPROVED BY:.. DIRECTOR GENERAL INTENTIONALLY LEFT BLANK I. AERODROME OPERATING MINIMA GENERAL (A) An operator shall establish aerodrome operating minima

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational

More information

Navigation - Runways. Chap 2, Nolan

Navigation - Runways. Chap 2, Nolan Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

30 th Digital Avionics Systems Conference (DASC)

30 th Digital Avionics Systems Conference (DASC) 1 30 th Digital Avionics Systems Conference (DASC) Next Generation Air Transportation System 2 Equivalent Visual Systems Enhanced Vision Visual Synthetic Vision 3 Flight Deck Interval Management Four Broad

More information

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual. INSTRUMENT APPROACH CHARTS "An instrument approach is just a series of straight lines joined by rate one turns" Ron Magrath The aim of any instrument approach is to allow the aircraft to safely descend

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/14 27/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG/2) Rome Italy, 4 to 8 May 2015 Agenda Item 4 : Active

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures Safety Enhancement Action: Implementers: Statement of Work: Safety Enhancement 213.5 RNAV Safe Operating and Design Practices for STARs and RNAV Departures To mitigate errors on Standard Terminal Arrival

More information

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently.

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. 20 Contribution of Flight Systems to Performance-Based

More information

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative

More information

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94 INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS 48 th ANNUAL CONFERENCE - Dubrovnik, 20 th to 24 th April 2009 Agenda Item: B.5.12 IFATCA 09 WP No. 94 Study Go Around Procedures When on

More information

SATNAV-GBAS Project in India. V.K. Chaudhary Executive Director, CNS-P Airports Authority of India

SATNAV-GBAS Project in India. V.K. Chaudhary Executive Director, CNS-P Airports Authority of India SATNAV-GBAS Project in India V.K. Chaudhary Executive Director, CNS-P Airports Authority of India GBAS The GBAS is a Local Area Augmentation System (LAAS) that provides GPS correction data and navigational

More information

Analyzing Risk at the FAA Flight Systems Laboratory

Analyzing Risk at the FAA Flight Systems Laboratory Analyzing Risk at the FAA Flight Systems Laboratory Presented to: Workshop By: Dr. Richard Greenhaw, FAA AFS-440 Date: 29 November, 2005 Flight Systems Laboratory Who we are How we analyze risk Airbus

More information

2007 Instrument Procedures Handbook; Chapter 5 Approach

2007 Instrument Procedures Handbook; Chapter 5 Approach 2007 Instrument Procedures Handbook; Chapter 5 Approach Authors: US Department of Transportation, Federal Aviation Administration (Flight Procedures Standards Branch) From: www.faa.gov/library/manuals/aviation/instrument_procedures_handbook/media/web%20ch%2005.pdf

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36 DP-3 ICAO Electronic Terrain and Obstacle Data Amendments 33 & 36 1 Published Amendment 33 to ICAO Annex 15, Chapter 10 July 2004, ICAO Annex 15(Aeronautical Information Services) addeda new Chapter 10

More information