1 Concepts, Alternatives and Development Plan Introduction The purpose of this chapter is to present the Development Plan for Paine Field, in terms of both its concept and reasoning. This chapter provides a description of the various factors and influences, which will form the basis for the ultimate plan and program. In concert with the status of the airport, some basic assumptions have been established which are intended to direct the development of the airport in the future. These assumptions are supported by the aviation activity forecasts and the various considerations on which the forecasts have been based. The assumptions also focus on continued airport development that centers upon facility enhancement, supports community needs, and generates economic growth. Assumption One. The airport will be developed and operated in a manner that is consistent with the Snohomish County Code, federal and state statutes, federal grant assurances, and Federal Aviation Administration regulations. Assumption Two. This assumption recognizes that this Master Plan Update for the airport is only the most recent effort in an on-going, long-term planning effort for Paine Field. In particular, the provisions and recommendations made in the 1978/79 Mediated Role Determination shall be considered in the formulation of development recommendations. Assumption Three. This assumption relates to the size and type of aircraft that will utilize Paine Field and the resulting setback and safety criteria used as the basis for the layout of airport facilities. Because various areas on the airport are intended for use by aircraft with widely varying physical and operational characteristics, they can be designed with different criteria. For Runway 16R/34L and its supporting taxiway/ramp system, the design aircraft is the B These portions of the airport should be designed using Airport Reference Code (ARC) D-V criteria. For Runway 16L/34R and Runway Master Plan Update D.1

2 11/29, which primarily accommodate general aviation aircraft under 12,500 pounds, design criteria as provided in ARC B-I (small aircraft only) are appropriate. Assumption Four. Because of the importance of the general aviation and industrial aviation activity at the airport, the fourth assumption relates to the need for the airport to accommodate aircraft operations with great reliability. This indicates that the airport's runway system should be developed with adequate runway lengths and approach guidance facilities to accommodate the forecast operations under almost all weather conditions. In addition, the airport's runway and taxiway system should be designed to maximize operational flexibility and facilitate large aircraft industrial operations. Assumption Five. Because landside development area at the airport is at a premium, the fifth assumption is that the plan for future airport development should strive to maximize the area available for aviation related activities. Aviation and non-aviation areas should be developed to be compatible with surrounding areas, as well as provide the maximum amount of revenues to help support airport operating and maintenance expenses. Assumption Six. The sixth assumption focuses on the relationship of the airport to offairport land uses and the compatible and complimentary development of each. This is inherent in the design considerations and placement of facilities so as to complement, to the maximum extent possible, off-airport development, and to enhance the compatibility of the airport environs with the operation of the airport. Assumption Seven. This assumption states that, in consideration of the congested airspace surrounding Paine Field and in the Seattle Metropolitan Area, recreational activities such as parachuting, ballooning, and ultra-light activity will be discouraged from occurring near the airport. Goals for Development Accompanying these assumptions are several goals that have been established for purposes of directing the plan and establishing continuity in the future for airport development. These goals take into account several categorical considerations relating to the needs of the airport both in the short-term and the long-term, including safety, noise, capital improvements, land use compatibility, financial and economic conditions, public interest and investment, and community recognition and awareness. While most are project oriented, some obviously represent more tangible activities than others; however, all are deemed important and appropriate to the future of the airport. Master Plan Update D.2

3 It should be noted that A Strategic Vision for Economic Strength plan was completed in September 1993 and developed for Snohomish County. This economic and investment plan recognizes the need for Snohomish County to, "stabilize and expand its manufacturing base, educate the citizens, provide for safe neighborhoods, and build the infrastructure that allows the community to become a more diverse place with all the amenities needed and desired." The Snohomish County General Policy Plan, as updated in 1999, sets an objective to maximize the growth potential of local Port and Airport resources through continued commitment of public financial resources, improved transportation access to the physical sites, and aggressive marketing. As reflected in the following goals, which are intended to guide the preparation of this Master Plan Update and future development at Paine Field, the airport plays a vital role in this strategic vision both as a transportation facility and an industrial/commercial economic center. Master planning and airport development goals: Provide effective direction for the future development of Paine Field through the preparation of a rational plan, followed by periodic updates and adherence to the adopted development program. As stated in the 1978/79 Mediated Role Determination adopted by the County as a policy statement, the airport has a "General Aviation" role. Activities that would be encouraged to continue and expand include: general aviation, aircraft related industries, business and corporate aviation, public service aviation, and air taxi/ commuter service. Mitigate negative airport impacts on surrounding residential development. Because of the operational requirements of the existing and projected aircraft fleet, the existing runway lengths at Paine Field should be retained. The instrument approach capabilities of Runway 16R/34L should be maximized. Maximize the aviation development area at Paine Field. This includes planning for the best use of the airport's undeveloped areas, planning for the redevelopment of several areas on the airport, and utilizing building designs that make efficient use of the limited amount of aviation-use land available (e.g., connected hangars vs. individual hangars). Master Plan Update D.3

4 Enhance the self-sustaining capability of the airport by ensuring the highest and best use of airport land that maximizes revenue to offset the airport s operation and maintenance expenses. Plan and develop the airport to be environmentally compatible with the community and minimize environmental impacts on both airport property and property adjacent to the airport. Specifically, this has included development of high quality wetland compensation banks, storm water detention areas, and noise berms/walls. In addition, adverse noise intrusion should be minimized through aircraft operations planning and land use compatibility planning. Encourage the protection of the significant County and Federal investment in the airport s land and facilities, by striving to minimize existing and potential land use conflicts. Plan and develop the airport to be capable of accommodating the future needs and requirements of the county and surrounding communities, thus continuing to serve as a regional general aviation/industrial aviation facility. Continue to minimize and mitigate activities and development at the airport that might encourage aviation wildlife hazards. Airside Development Concepts and Alternatives Introduction To best accommodate the projected operational demand at Paine Field through the year 2021, it is important to first analyze any alternatives related to future runway and/or instrument approach development. As defined in FAA planning terminology, airside facilities are those that are used during the active movement of aircraft; i.e., instrument approach facilities/equipment, runways, and taxiways. In the formulation of alternatives, the forecast operations and goals of Snohomish County relative to aviation development and economic enhancement were considered. These generalized alternatives are discussed in the following narrative. Following a review of these airside development alternatives, the purpose of which is to fulfill major facility requirements (basic runway configuration), recommendations for landside development are presented. For purposes of this Master Plan Update, landside facilities consist of aircraft parking aprons, hangar development areas, terminal area development, industrial aviation development areas, associated use areas, and airport access. The conclusion of this chapter will be the presentation of a generalized conceptual airport Master Plan Update D.4

5 development plan that will include recommendations for runway and taxiway improvements along with an on-airport land use plan. Details related to the exact alignment and configuration of the runway/taxiway system and the layout of landside development areas will be presented in a following chapter, entitled AIRPORT PLANS. Because all other airport functions relate to and revolve around the basic runway/ taxiway layout, airside development alternatives must first be carefully examined and evaluated. Specific considerations include taxiway layout, runway length, as well as runway orientation and instrument approach capabilities needed to support forecast use through the planning period. The main objective of the alternatives analysis presented herein is to analyze those alternatives that will result in a runway/instrument approach system capable of accommodating the forecast aircraft operations. Alternatives As stated previously, the basic runway system existing at the airport will remain in place for the foreseeable future. The need for additional runways or any major modification (extensions, approach threshold relocation, etc.) to the runway system has not been identified in this Master Plan Update. There is, however, the need to examine the feasibility of implementing improved instrument approach capabilities at the airport. The north end of the main runway (Runway 16R) currently has precision instrument approach capabilities, while the south end of the main runway (Runway 34L) has a non-precision instrument approach. The secondary parallel runway (Runway 16L/34R), and the crosswind runway (Runway 11/29) are currently visual approach runways. The single precision approach at Paine Field [Category I Instrument Landing System (ILS) approach from the north to Runway 16R] has some limitations with regard to full compliance with the airport s published Noise Abatement Program (NAP). To minimize low level flight over populated areas, the NAP for jet, turboprop, and large propeller aircraft discourages circling approaches, and requests pilots avoid turns before reaching the shoreline when departing on Runway 34L. When winds require landing from the south (Runway 34L), the single precision approach from the north makes a circling approach a necessity in instrument weather conditions. When winds require departures on Runway 34L, departing aircraft are often placed in a head to head conflict with aircraft on the Runway 16R instrument approach. Under these conditions, air traffic controllers require the departing aircraft to turn as soon as possible after departure to maintain a safe separation between the converging aircraft. The amount of instrument approach training activity at Paine Field is significant and is projected to increase in the future; thus, the frequency of the operational conditions described above is likely to increase in the future. Master Plan Update D.5

6 The options for improving this situation have been reviewed, including the potential for a second precision instrument approach to one of the other runway ends. The 1995 Paine Field Master Plan indicated that Runway 34L will have precision instrument approach capabilities with visibility minimums less than ¾ mile in the future. Appropriately, this provision was made in the 1995 Master Plan simply to protect the ability to implement a Runway 34L precision approach if feasible at some point in the future. As described previously in the CAPACITY AND FACILITY REQUIREMENTS chapter, providing the best instrument approach capabilities that are feasible at Paine Field are very important from an airport utilization and safety standpoint. The better the instrument approach capabilities, the less time the airport might be non-operational due to poor weather conditions. The airport experiences weather conditions with cloud ceilings and/or visibility conditions less than VFR minimums, but greater than the precision approach weather minimums (200-foot cloud ceiling and/or visibility of ½ mile) approximately 8.9% of the time annually. Weather conditions with cloud ceilings and/or visibility conditions less than VFR minimums, but greater than the non-precision approach weather minimums associated with Runway 34L (421-foot cloud ceiling and/or visibility of ¾-mile) occur approximately 7.7% of the time annually. With regard to the previously stated goals, alternative examination is intended to maximize the instrument approach capabilities at the airport. The airspace around Paine Field and in the Seattle Metropolitan area is complex with many interrelated issues. In addition, facility and technological improvements (e.g., radar and GPS) are in the process of being implemented, which will change how air traffic and approach procedures are controlled in the vicinity of Paine Field. There are two sets of characteristics that are analyzed in considering the implementation of improved instrument approach capabilities. The first is physical; i.e., on-site facilities, lighting, and property ownership. The second is land use within the Runway Protection Zone (RPZ). The RPZ s function is to enhance the protection of people and property on the ground. FAA policy standards indicate that certain land uses are to be prohibited within an RPZ; e.g., fuel storage facilities, residences, and places of public assembly. The FAA strongly recommends that an airport owner have control of the entire RPZ area through acquisition of sufficient property interest to control the height of objects and land use. If the airport has ownership control of the RPZ area, the land use policy standards with regard to prohibited activities are enforced as requirements. Where it is impracticable for the airport sponsor to acquire full control of the RPZ area, the RPZ land use standards have recommendation status for the portion of the RPZ not controlled by the airport owner. Master Plan Update D.6

7 Recommendation. Following additional discussion with several FAA divisions, it is recommended that the airport should continue to protect for a lower-than ¾ mile visibility minimum precision approach to Runway 34L. A detail of the physical layout of existing and future RPZs, approach lighting systems, and instrument approach facilities is provided in the following illustrations. The first illustration is entitled RUNWAY 34L INSTRUMENT APPROACH DETAIL NOT LOWER THAN ¾-MILE VISIBILTIY MINIMUM. The second illustration is entitled RUNWAY 34L INSTRUMENT APPROACH DETAIL LOWER THAN ¾-MILE VISIBILITY MINIMUM. As can be noted, the existing approach visibility minimum can be accomplished with a relatively simple Medium Intensity Approach Light System with Sequenced Flashing Light (MALSF). To support a lower than ¾-mile visibility minimum approach, a more sophisticated Medium Intensity Approach Light System with Runway Alignment Indicator Lights (MALSR) is needed. This is a long-term recommendation. The demand for a low minimum precision instrument approach to Runway 34L is presently not sufficient to justify its implementation; however, at some point in the future this improvement may become more important. Even if a lower minimum approach is programmed in the future, it remains a priority that a straight-in VOR approach (and/or a better more usable nonprecision GPS approach) be established to serve Runway 34L. Taxiway Improvements The existing taxiway system at the airport is arranged to be an efficient and safe system to facilitate the movement of aircraft to and from the runway system. As additional aviation facilities are developed, (e.g., on the west side of the airport), new access taxiways will be constructed as needed. Recommendation. From a general airport-use standpoint, several taxiway improvements have been identified. First, a 90 exit taxiway from the main runway to Taxiway A between existing Taxiways A-2 and A-3 would be well utilized by many large (e.g., Boeing 767/777) aircraft landing on Runway 34L. The second is to ensure that proper object setback standards are met to allow large aircraft (B ) unimpeded use of the south end of Taxiway A. This will require limiting access to the west side of an older hangar structure (#221), along with the ARFF/maintenance building, and some relocation of fencing. To support the substantial concentration of small aircraft storage hangars on the west ramp, a new taxiway connecting Taxilane E and Taxilane H should be constructed west of and parallel to Runway 11/29. Also, a run-up area should be constructed adjacent to Taxiway A-4. In addition to maintaining Taxiways K-5 and K-6, the west side of the main runway should be provided with new access taxiways opposite A-1 and opposite the above mentioned new 90 exit between Taxiways A-2 and A-3. Master Plan Update D.7

8

9

10 Recommended Airside Development Plan The airside development discussion provided above is intended to present Snohomish County with potential options to facilitate the formulation of an ultimate layout of facilities at the airport. Because no major changes in the runway/taxiway system at the airport are envisioned, the alternative considerations are limited. The development options were discussed with the Study Advisory Committee, Airport Staff, and the FAA before a decision was made on the preferred long-term layout of future airside facilities. The following illustration, entitled AIRSIDE DEVELOPMENT PLAN, provides a graphic illustration of existing and proposed airside facilities, along with the areas encompassed by runway safety areas, runway object free areas, critical taxiway object free areas, building restriction lines, and runway protection zones. It also indicates those areas on airport property that are outside of all the runway safety and object clearing zones, and are available for future development of landside facilities. Landside Development Concepts Introduction With the framework of the airport's ultimate airside development identified, alternatives involving the placement of needed landside facilities can now be analyzed. The overall objective of the landside development at the airport is the provision of facilities that are conveniently located and accessible to the community, which accommodate the specific requirements of airport users. For purposes of this Master Plan Update, landside facilities consist of aircraft parking aprons, hangar development areas, terminal area development, industrial aviation development areas, associated use areas, and airport access. Definitions Several terms are used in the following paragraphs to identify development areas that require definitions: Runway, Taxiway, and Approach System. These areas are reserved for aircraft movement and approach protection. They include all areas that are contained in FAA defined Runway Safety Areas, Object Free Areas, and all the area inside the established Building Restriction Line. The distance that a building restriction line is located away from a runway varies, depending on the largest aircraft designated to use a particular runway, the instrument approach capabilities provided to the runway, and the height of buildings (above the runway surface) expected in a certain area. Master Plan Update D.10

11

12 Runway Protection Zones. These areas include all existing and future Runway Protection Zones (RPZs). As stated above, the RPZ s function is to enhance the protection of people and property on the ground. The FAA recommends that an airport owner have control of the entire RPZ area through acquisition of sufficient property interest to control the height of objects and land use; however, where it is impracticable for the airport sponsor to acquire full control of the RPZ area, the requirements for land use control are considered to be recommendations. Aviation Use Development With Taxiway Access. These areas are outside of the Building Restriction Lines (BRL) associated with the runway system and possess physical characteristics indicating the potential for taxiway access at some point in the future. The ability to provide these areas with taxiway access indicates that they should be reserved for aviation use. Airport Compatible Development Without Taxiway Access. All future development within the bounds of the airport will be compatible with the primary purpose and function of the airport and will bring in lease revenue to support the operation of the airport. Some areas of the airport are not likely to be provided with taxiway access and are not identified for aviation use (although they can be utilized for an aviation support activity that does not require runway/taxiway access). The revenue generation potential of these areas will vary based on local traffic and road access. The development proposal for each specific site must be customized in consideration of these locational characteristics. County code should be modified to allow hotel development that supports airport activity. Specific proposals for non-aviation use will undergo additional review. Future Airport Property Acquisition. Because of their strategic locations adjacent to existing airport property, three parcels of land in the southeast quadrant of the airport have been identified for potential acquisition. If acquired, these three parcels will remain in airport compatible, non-aviation use. Using these definitions, the potential uses of airport property can be established using the overall guideline that all airport property, which can be reasonably provided with taxiway access, should be reserved for aviation use in the long-term. The land use concept for the airport is presented by geographic area in the following illustration, entitled ON-AIRPORT LAND USE PLAN. In addition to designation of land use, the size Master Plan Update D.12

13

14 of aircraft [by Airplane Design Group (ADG)] likely to use each area has also been identified. The wingspans associated with the various ADGs, along with example aircraft types are listed below. ADG 1 Wingspans up to 49 feet, including most of the small propeller driven general aviation aircraft. ADG 2 Wingspans of 49 feet up to 79 feet. This group includes all of the larger general aviation aircraft and a majority of the business jets, with the exception of the new very large business jets. The turboprop and regional jet commercial passenger aircraft are also included in this category. ADG 3 Wingspans of 79 feet up 118 feet. This group includes the new very large business jets (e.g., the Boeing Business Jet, the Gulfstream V, etc.) and most of the narrow body commercial passenger jet aircraft (i.e., the B-737, A-320, MD- 80, etc.). ADG 4 - Wingspans of 118 feet up to 171 feet. This group includes the largest narrow body commercial passenger aircraft (the B-757, etc.) and the smaller wide body commercial passenger aircraft (the B-767, MD-11, etc.). ADG 5 Wingspans of 171 feet up to 214 feet. The larger wide body commercial passenger aircraft (B-747, B-777, etc.) are included in this design group. ADG 6 Wingspans of 214 feet up to 262 feet. This group includes very large cargo aircraft (i.e., the AN-124 and the Lockheed C-5B). Conceptual Development Plan Introduction The next step in the establishment of a long-term development plan for Paine Field is to, where possible, detail the shape of development areas and/or formulate a conceptual building layout for the land use areas presented in previous illustrations. These more detailed conceptual building area plans and structure locations can only be provided for parcels where a relatively good idea of demand can be established. The focus of the Conceptual Development Plan proposal is on the various sites that are currently available for new development and those sites where redevelopment (removal of old facilities and replacement with new) is likely to occur. An illustration of the CONCEPTUAL DEVELOPMENT PLAN is provided on the following page. Master Plan Update D.14

15

16 Area A (Central, Terminal, and North Ramps) This area is located between the parallel runways, north of Runway 11/29. Currently, it is one of the most intensely developed areas on the airport. The efficient use of the available development space in Area A is critical. It currently contains a variety of functions, such as airport administrative offices, general aviation terminal facilities, general aviation hangars, FBO facilities, corporate aviation facilities, and industrial aviation facilities, which front on the airport s Central, Terminal, and North Ramps. Because the area has excellent airside and landside access, including an adequate aircraft parking ramp, it is programmed to continue to accommodate many of the airport's general aviation, industrial aviation, and administrative facilities, along with the airport's passenger terminal facility. It is expected that, in the long-term, the industrial aviation uses in Area A will be shifted to other areas on the airport. Following the events of September 11, 2001, increased security requirements have restricted automobile parking in close proximity to a passenger terminal building (+/- 300 feet, depending on the structural design of the terminal building). It is expected that these increased security requirements will remain in place for the foreseeable future. Because of this, if commercial passenger service is initiated at Paine Field (even a limited regional service such as Horizon Airlines recent proposal for a Paine Field to Portland route), it will be extremely unlikely that the passenger terminal function could be accommodated in an existing structure within Area A. Therefore, a new terminal building/administration building located in the infield area northeast of the intersection of Runway 16R/34L and Runway 11/29 is being proposed. Security requirements of the Federal Aviation Administration and the Transportation Safety Administration are evolving and the further refinement of the proposed terminal location recommendation may be required. A site for a new Aircraft Rescue and Fire Fighting facility has also been identified in the northwest corner of Area A. In addition to the passenger terminal facility development area described above, Area A has two other undeveloped tracts that are identified for aviation use development. The first is located on the northeast end of the inner terminal ramp, east of the new Air Traffic Control Tower (ATCT). This area, along with the Passenger Terminal Development area will be designed to accommodate the largest business jets and the small to medium size commercial passenger service aircraft (i.e., Gulfstream V, B-737, etc. - ADG 3). This area is programmed for the development of FBO/General Aviation Terminal facilities. The second is located in the northeast corner of Area A (the north ramp area). This area will continue to be developed for hangar facilities to accommodate medium to large general aviation aircraft (up to ADG 2 aircraft). Master Plan Update D.16

17 In addition, the north side of the Central Ramp area will likely be redeveloped for aviation use. This area currently contains the airport s restaurant (Building C-57), along with Buildings C-5 and C-71. When redeveloped, this area will continue to support facilities for smaller general aviation aircraft (ADG 1). Area B (West Ramp and South Ramp) This area is located between the parallel runways south of Runway 11/29. Like Area A, Area B is also intensely developed. Existing facilities include the industrial aviation facilities (primarily related to Goodrich Inc.) and general aviation facilities. It is important that potential development areas within Area B be well utilized. New general aviation hangars are programmed for the eastern portion of the west ramp. In addition, the eastern portion of Area B (adjacent to Runway 16L/34L - containing buildings C-19, C-20 C-21, C-22, and C-23) is programmed for aviation redevelopment, which will be focused on general aviation use. The potential to accommodate new industrial aviation development is identified in the area to the southwest of Goodrich Hangar 3. Industrial aviation redevelopment is identified for the South Ramp area (Buildings 201 and 207). The south ramp has also been identified as the location on the airport that could accommodate a temporary use by large air cargo aircraft. Because potential development areas on the airport, or directly adjacent to the airport, are at a premium and to ensure land use compatibility, the former Navy Housing tract in Area B was acquired in The majority of this tract (the southern portion of Area B) is identified for Airport Commercial/Industrial Development. Area C (Bomarc) This area is located east of Runway 16L/34R and northeast of Airport Road. In addition to continued use of the area for the Bomarc Business Park and its related functions, the area south of 100 th St S.W. (currently containing Snohomish County Public Works Department facilities) should be utilized for airport compatible commercial/industrial development. In addition, the plan identifies a parcel of land to be acquired on the east side of the county maintenance area. Area D (East Ramp) Area D is located East of Runway 16L/34R and currently contains several general aviation hangars. The portion of the area adjacent to the parallel taxiway on the east side of Runway 16L/34R, which is undeveloped, is designated for aviation use and should be Master Plan Update D.17

18 utilized for additional general aviation facilities (ADG 1). The tract in Area D, south of Minuteman Lane, is designated for airport compatible commercial/industrial development and currently contains the County s Solid Waste Transfer Station. In addition, there is a small tract in Area D located directly east of the Runway 34R RPZ, along with an adjacent tract that is recommended for acquisition. These tracts are programmed for Airport Compatible Commercial/Industrial facilities. Area E (West Side-North) This area is located west of Runway 16R/34L north of the RPZ associated with the approach to Runway 11. This area is currently undeveloped; however, it has excellent potential for taxiway access and has been designated to be used primarily for aviation facilities. This area can accommodate large corporate-type general aviation facilities or industrial aviation functions (e.g., expansion area for the Boeing Company, which has leasing right-of-first-refusal on this property). The layout of Area E facilities can be designed to accommodate large aircraft (up to ADG 5). The northern most portion of this area has been identified for commercial aviation/airport-related facilities including tour center, hotel, restaurant, and museum development. Area F (West Side-South) Area F is located west of Runway 16R/34L, south of the Runway 11 RPZ. The site immediately south of the Runway 11 RPZ contains several wetlands and has a significant amount of topographic relief; therefore, development for aviation use facilities will be limited to only that area in close proximity (within 950 of runway centerline) to the runway, where earth fill quantities will be minimized. The portion of Area F that is adjacent to Taxiways K-5 and K-6 is programmed for aviation use. This site is likely to accommodate large corporate-type general aviation facilities. To minimize the amount of fill needed for the construction of hangars on the northern portion of Area F, it is anticipated that a partial parallel access taxiway will be constructed which slopes down from Taxiway K-5. The area south of Taxiways K-5 and K-6, in Area F, is programmed for airport compatible development. Some of the area will remain open to accommodate existing wetlands. In the past, a park & ride facility has been proposed for the southern portion of this area. Master Plan Update D.18

19 Environmental Processing Requirements A general explanation of the Federal [National Environmental Policy Act (NEPA)] and State [Washington State Environmental Policy Act (SEPA)] environmental documentation/clearance process is provided below. Federal. In 1969, Congress passed the National Environmental Policy Act (NEPA) that required Federal agencies to consider the environmental impact of Federal actions. As a result of the NEPA, the FAA has developed detailed guidance documents titled FAA Order D Policies and Procedures for Considering Airport Environmental Impacts, and for airport development actions, FAA Order A Airport Environmental Handbook. In addition to describing the contents of environmental documents, these FAA orders describe the process by which Federal agencies are required to consider environmental issues as a part of their decision-making. As is noted in FAA Order A, not all development proposals require the preparation of environmental documents. This order specifically identifies the following categories for considering the environmental impact of Federal actions: Categorical Exclusions are projects excluded from the need to prepare environmental documents, as their impacts are presumed to not be significant; Environmental Assessment (EA) - if a project might result in environmental impacts, an EA is often prepared. If the action is found to result in a significant environmental impact that is not mitigated, an EIS is then prepared. If no significant unmitigated impacts are identified, the Federal agency then typically issues a Finding of No Significant Impact (FONSI). Environmental Impact Statement (EIS): An EIS is a detailed assessment of the impacts of a proposed action and its alternatives. The following table, entitled ACTIONS UNDER NEPA REQUIRING VARIOUS TYPES OF ANALYSIS, lists the actions that typically require one of the above types of actions. Master Plan Update D.19

20 Table D1 ACTIONS UNDER NEPA REQUIREING VARIOUS TYPES OF ANALYSIS Paine Field Master Plan Update Categorical Exclusions ** Runway, taxiway, apron, or loading ramp or repair work except where project will create adverse off-airport impacts Installation or upgrading of airfield lighting systems Installation of miscellaneous items including segmented circles, wind or landing direction indicators, fencing, etc. Construction or expansion of passenger handling facilities Construction, relocation or repair of entrance and service roadway Grading or removal of obstructions on airport property and erosion control actions with no offairport impacts Landscaping generally, and landscaping or construction of physical barriers to diminish impact of airport blast and noise Projects to carry out noise compatibility projects Land acquisition associated with any of the above Federal release of airport land Removal of Displaced Thresholds Environmental Assessment /FONSI ** Airport location New runway (except as noted for an EIS) Major runway extension Change in runway strength that could result in a significant noise increase to noise sensitive uses inside 65 DNL Construction or relocation of entrance or service road connections to public roads which adversely affect roadway capacity Land acquisition associated with the above Establishment or relocation of instrument landing system or an approach lighting system Any action that triggers: Use of DOT 4(f) land (such as a park or historic site) Effect on a site on or eligible for listing on the National register of Historic Places Conversion of valuable farmland Impacts to wetlands, coastal zones, or floodplains Impacts to endangered species Conveyances of government land for airport purposes Environmental Impact Statement First time Airport Layout Plan Approval for a Particular Airport A new runway capable of accommodating air carrier aircraft in a major metropolitan area Actions for which an EA has shown the need to prepare an EIS ** Extraordinary Circumstances- Issues such as impacts to DOT 4(f) lands, wetlands, coastal zones, endangered species, historic sites, protected farmland may require a higher level of environmental impact analysis. In addition, an action that is likely to be highly controversial on environmental grounds may represent extraordinary circumstances if opposed on environmental grounds by a Federal, State or local governmental agency or is opposed by a substantial number of persons affected by the action. Master Plan Update D.20

21 State. First adopted in 1971, the State Environmental Policy Act (SEPA) provided Washington State s basic environmental charter. Several years of committee work led to the 1974 legislative creation of the Council on Environmental Policy to write rules to interpret and implement SEPA. SEPA was modeled after the NEPA, and became effective in January 1976 (Washington Administrative Code ). Within SEPA, the following types of environmental processing are required: Environmental Checklist a formal screening analysis to identify if the impacts of the project are significant and require mitigation. If the impacts are determined to be non-significant, the responsible SEPA official can issue a notice or Determination of Non-Significance (DNS). If impacts are not significant after mitigation, the responsible SEPA official could also issue a Mitigated Determination of Non-Significance (MDNS). Environmental Impact Statement if the impacts of the project are likely to be significant, the responsible SEPA official may require preparation of an EIS. Environmental Considerations Federal In consultation with the Federal Aviation Administration, the critical environmental aspects for this Master Plan were identified as Aircraft Noise Exposure and Air Quality. From a federal perspective, no project construction environmental clearance is attributed to an Airport Master Plan. Therefore, no environmental impact documentation is required as an element of the preparation of an Airport Master Plan. It is also recognized that the implementation of the improvements specified in this Master Plan could have environmental consequences and that Snohomish County should be aware of environmental impact potentials for certain critical aspects. These aspects are discussed in more detail below. Aircraft Generated Noise. Noise impacts are certainly significant ingredients in establishing a basis for valid land use planning practices within the full environs of the airport. In many cases, noise impacts encompass a greater area than those covered by other considerations; however, safety factors in the form of runway protection zones and approach surfaces [including height restrictions on manmade and natural objects to conform with FAR Part 77 Objects Affecting Navigable Airspace (see AIRPORT AIRSPACE DRAWING in Airport Plans Chapter)] are additional ingredients on which to base land use decisions and implementation practices. These same land use planning practices and mechanisms are appropriate for both noise and safety concerns and should be employed in terms of establishing a proper and realistic set of land use recommendations for the airport environs. Master Plan Update D.21

22 Noise is generally defined as unwanted sound and, as such, the determination of acceptable levels is subjective. The day-night sound level (DNL) methodology is used to determine both the noise levels resulting from existing conditions and the potential noise levels that could be expected to occur at the end of the 20-year planning period. The basic unit in the computation of DNL is the Sound Exposure Level (SEL). An SEL is computed by adding the A weighted decibel level [db(a)] for each second of a noise event above a certain threshold ( A weighted refers to the sound scale pertaining to the human ear). For example, a noise monitor located in a quiet residential area [40 db(a)] receives the sound impulses of an approaching aircraft and records the highest db(a) reading for each second of the event as the aircraft approaches and departs the site. Each of these one-second readings is then added logarithmically to compute the SEL. The following table, entitled COMPARATIVE NOISE LEVELS, depicts the general db(a) values of noise commonly experienced by people. This illustrates the relative impact of single event noise in A weighted level. Master Plan Update D.22

23 Table D2 COMPARATIVE NOISE LEVELS Paine Field Master Plan Update Activity db(a) Levels Rustling Leaves 20 Room in Quiet Dwelling at Midnight 32 Soft Whisper at 5 Feet 34 Men s Clothing Department of Large Store 53 Window Air Conditioner 55 Conversational Speech 60 Household Department of Large Store 62 Busy Restaurant 65 Vacuum Cleaner in House (at 10 feet) 69 Ringing Alarm Clock (at 2 feet) 80 Loudly Reproduced Orchestral Music in Large Room 82 Printing Press Plant (medium size automatic) 86 Heavy City Traffic 92 Heavy Diesel-Propelled Vehicle (at 25 feet) 92 Air Grinder 95 Cut-off Saw 97 Home Lawn Mower 98 Turbine Condenser Cubic Foot Air Conditioner 100 Banging of Steel Plate 104 Air Hammer 107 Note: Prolonged levels over 85 db(a) represent beginning of hearing damage. Adapted from Impact of Noise on People, Federal Aviation Administration. The DNL index is a 24-hour, time-weighted energy average noise level based on the A- weighted decibel. It is a measure of the overall noise experienced during an entire day. Time-weighted refers to the fact that noise occurring during certain sensitive time periods is penalized. In the DNL scale, noise occurring between the hours of 10 p.m. to 7 a.m. is penalized by 10 db. This penalty was selected to attempt to account for the higher sensitivity to noise in the nighttime and the expected further decrease in background noise levels that typically occur in the nighttime. DNL is specified by the FAA for airport noise assessment, and the Environmental Protection Agency (EPA) specifies DNL for community noise and airport noise assessment. Master Plan Update D.23

24 DNL levels are usually depicted as grid cells or noise contours. Grid cells are squares of land of a specific size that are entirely characterized by a noise level. Noise contours are interpolations of noise levels based on the center of a grid cell and drawn to connect all points of similar level. Noise contours appear similar to topographical contours and form concentric footprints about a noise source. These footprints of DNL noise contours drawn around an airport are used to predict community response to the noise from aircraft using that airport. The main advantage of DNL is that it provides a common measure for a variety of differing noise environments. The same DNL level can describe both an area with very few high level noise events and an area with many low level events. DNL is thus constructed because it has been found that the total noise energy in an area best predicts community response. It must be remembered that the DNL noise contours do not delineate areas that are either free from excessive noise or areas that will be subjected to excessive noise. In other words, it cannot be expected that a person living on one side of a DNL noise contour will have a markedly different reaction than a person living nearby, but on the other side of the noise contour. What can be expected is that the general aggregate community response to noise within the 65 DNL noise contour, for example, will be less than the public response from the 70 DNL noise contour, and even less still than the response from within the 75 DNL noise contour. In order to consider future noise impacts for the twenty-year Development Plan, as described in Master Plan Update, existing and future noise contour maps have been prepared, and are illustrated in the following figures, entitled EXISTING (2000) NOISE CONTOURS & GENERALIZED EXISTING LAND USE and FUTURE (2021) NOISE CONTOURS & GENERALIZED EXISTING LAND USE. The formulation of these noise contours takes into consideration existing and forecast operational assumptions, flight track utilization [FAA/airport data base Aircraft Flight Tracking and Environmental Monitoring System (AFTEMS)], and aircraft runway use allocations. The future noise contours are based on the twenty-year Development Plan for the airport. Computer Modeling. The DNL noise contours were generated using the Integrated Noise Model (INM) Version 6.0c, which is the most current computer program developed by the Federal Aviation Administration specifically for modeling the noise environment at airports. The INM program requires the input of the physical and operational characteristics of the airport. Physical characteristics include runway end coordinates, displaced thresholds, airport altitude, topography, and temperature. Operational characteristics include aircraft mix and flight tracks. Optional data that can be incorporated in the model includes approach and departure profiles, approach and departure procedures, and aircraft noise curves. Data from Paine Field s Aircraft Flight Tracking and Environmental Monitoring System (AFTEMS) was used to calculate the INM flight tracks and noise levels. Refinements in INM version 6.0c enhance its ability to Master Plan Update D.24

25 Mukilteo City Limits 75 DNL 70 DNL 65 DNL 65 DNL 55 DNL Merrill Creek Barnard Dunkelberg & Company EVERETT MUKILTEO WHIDBEY ISLAND Existing Land Use:Field Surveys. Island County Snohomish County Washington State Ferry Mukilteo Speed way POSSESSION SOUND Everett Boulevard Mukilteo City Limits Mukilteo Airport Road Burlington Northern Railroad Upper Ridge Road Seaway Boulevard 100 Street SW West Casino Road 5 Avenue W 112 Street SW 128th Street SW Madison Street Everett Mall Way Everett City Limits Mill Creek City Limits Evergreen Way Colby Avenue Lowell Road Broadway 27 Avenue SE 4 Avenue W 35 Avenue W 52 Avenue West Beverly Park Road 148 Street SW Shelby Road Gibson Road Ash Way Boeing Freeway MILL CREEK State Route 96 5 Everett Golf & Country Club Park Paine Field Boulevard Walter E. Hall Golf Course Kasch Park 5 Park Park Park Harbour Point Golf Course Park Picnic Point County Park Mill Creek Golf Course Meadowdale County Park Source: Snohomish County Planning Department Mapping, Aerial Photography, and United States Geological Survey (USGS) Quadrangle Sheets. Picnic Point 525 Road Mukilteo 55 DNL Glenwood Avenue 60 DNL 60 DNL 55 DNL Parkway Hardeson Center Road Meadow Road Road 60 DNL SnohomishCountyAirport PaineField Dogwood Road Cascadian Way 76 Avenue SW Edmonds City 168 Street SW 176 Street SW Lynnwood City Limits Park County Parks 164 Street SW Limits LYNNWOOD EDMONDS 52 Avenue W 64 Avenue W Park 196 Street SW Golf Course Figure D6 Figure A7 Existing (2000) Noise Contours Generalized & Generalized Existing Land Use Airport Property Residential Commercial Industrial/Office Park Undeveloped/Parks/Open Space Schools Outside of Study Area 1 = 6,000 n MASTER PLAN PaineField UPDATE SnohomishCountyAirport D.25 A.21

26 Mukilteo City Limits 65 DNL 75 DNL 70 DNL 65 DNL 65 DNL 55 DNL Merrill Creek Barnard Dunkelberg & Company EVERETT MUKILTEO WHIDBEY ISLAND Existing Land Use:Field Surveys. Island County Snohomish County Washington State Ferry Mukilteo Speed way POSSESSION SOUND Everett Boulevard Mukilteo City Limits Mukilteo Airport Road Burlington Northern Railroad Upper Ridge Road Seaway Boulevard 100 Street SW West Casino Road 5 Avenue W 112 Street SW 128th Street SW Madison Street Everett Mall Way Everett City Limits Mill Creek City Limits Evergreen Way Colby Avenue Lowell Road Broadway 27 Avenue SE 4 Avenue W 35 Avenue W 52 Avenue West Beverly Park Road 148 Street SW Shelby Road Gibson Road Ash Way Boeing Freeway MILL CREEK State Route 96 5 Everett Golf & Country Club Park Paine Field Boulevard Walter E. Hall Golf Course Kasch Park 5 Park Park Park Harbour Point Golf Course Park Picnic Point County Park Mill Creek Golf Course Meadowdale County Park Source: Snohomish County Planning Department Mapping, Aerial Photography, and United States Geological Survey (USGS) Quadrangle Sheets. Picnic Point 525 Road Mukilteo 55 DNL Glenwood Avenue 60 DNL 55 DNL Parkway Hardeson Center Road Meadow Road Road 60 DNL SnohomishCountyAirport PaineField Dogwood Road Cascadian Way 76 Avenue SW Edmonds City 168 Street SW 176 Street SW Lynnwood City Limits Park County Parks 164 Street SW Limits LYNNWOOD EDMONDS 52 Avenue W 64 Avenue W Park 196 Street SW Golf Course Figure D7 Figure A7 Future (2021) Noise Contours Generalized & Generalized Existing Land Use Airport Property Residential Commercial Industrial/Office Park Undeveloped/Parks/Open Space Schools Outside of Study Area 1 = 6,000 n MASTER PLAN PaineField UPDATE SnohomishCountyAirport D.26 A.21

27 accurately predict noise impacts from aircraft engine run-ups and noise attenuation provided by terrain. Federal Land Use Compatibility Guidelines. Establishing land use compatibility within airport environs is the responsibility of local authorities, but should be based on a recognized standard. Federal Aviation Regulations (FAR) Part 150 guidelines are the acknowledged standards by the federal government regarding aircraft generated noise at airports. These guidelines indicate that the 65 DNL noise contour is the threshold noise level for defining incompatible land uses [some noise sensitive land uses (e.g., residential, schools, hospitals, etc.) may be incompatible if located within a 65 or higher DNL noise contour area]. Please reference the 1996 Paine Field FAR Part 150 Noise Study for a comprehensive discussion and analysis of noise and land use compatibility issues specifically related to Paine Field. Noise Contour Evaluation. Using the existing and forecast aircraft operation numbers presented earlier, noise contours have been generated and are presented in the proceeding illustrations. The 55, 60, 65, 70, and 75 DNL noise contours are illustrated on each map. The existing 75 DNL noise contour contains approximately 144 acres, all within airport/boeing Company property. The 70 DNL noise contour contains approximately 351 acres, also all contained within airport/boeing Company property. The 65 DNL encompasses roughly 604 acres, all of which is contained on airport/boeing Company property. The 60 DNL noise contour contains approximately 1,163 acres, while the existing 55 DNL contour contains approximately 2,563 acres. The 60 DNL noise contour extends off of airport property to the south of both parallel runways and to the north of the main runway. The 55 DNL noise contour extends off of airport property in all directions. The number of aircraft operations used as the 2000 base year in this Master Plan Update noise contour was 223,192 (based on 213,371 counted by the FAA Airport Traffic Control tower between 7:00am and 9:00pm, and 9,821 estimated between 9:00pm and 7:00am). The new noise contours generated by the INM Version 6.0c provide a more accurate depiction of airport related noise due to refined model inputs from the airport s new Aircraft Flight Tracking Environmental Monitoring System (AFTEMS) and the upgraded capabilities of the newer INM model to present noise effects from engine runups at Goodrich and Boeing. The future 75 DNL noise contour encompasses some 155 acres, while the 70 DNL contains approximately 378 acres, both of which are contained entirely within airport/boeing Company property. The future 65 DNL noise contour contains approximately 682 acres, extending off of airport/boeing company property only slightly Master Plan Update D.27

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Purpose and Need for the Proposed Project

Purpose and Need for the Proposed Project Purpose and Need for the Proposed Project Introduction Snohomish County Airport/Paine Field (PAE) is located in Snohomish County, Washington, approximately 20 miles north of Seattle. Figure A1 depicts

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Snohomish County Airport/Paine Field Part 150 Noise Exposure Maps Update

Snohomish County Airport/Paine Field Part 150 Noise Exposure Maps Update FAR Part 10 Noise Exposure Maps Update. Snohomish CountyAirport PaineField FAR Part 10 Noise Exposure Maps Update Barnard Dunkelberg & Company FAR Part 10 Noise Exposure Maps Update : September 2003 Snohomish

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

CatExes vs. EAs When and How to Prepare

CatExes vs. EAs When and How to Prepare CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Capacity Analysis and Facility Requirements

Capacity Analysis and Facility Requirements Capacity Analysis and Facility Requirements Introduction The capacity analysis for Paine Field is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Dallas Executive Airport

Dallas Executive Airport 648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

3.9 AIRPORT SUPPORT FACILITIES

3.9 AIRPORT SUPPORT FACILITIES 3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under

More information

PLAN Anoka County - Blaine Airport

PLAN Anoka County - Blaine Airport Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information

1 PURPOSE AND NEED 1.1 INTRODUCTION

1 PURPOSE AND NEED 1.1 INTRODUCTION 1.1 INTRODUCTION 1 PURPOSE AND NEED This Environmental Assessment (EA) addresses projects at Juneau International Airport (JIA) that are the direct outcome of a Master Plan prepared for the airport and

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information