VALIDITY FROM : TO MAINTENANCE SERVICES 2018

Size: px
Start display at page:

Download "VALIDITY FROM : TO MAINTENANCE SERVICES 2018"

Transcription

1 VALIDITY FROM : TO FOR MAINTENANCE STATIONS: STARTING SUMMER 18: DUS DUSSELDORF AIRPORT TXL BERLIN TEGEL AIRPORT MUC MUNICH AIRPORT CGN COLOGNE AIRPORT LEJ LEIPZIG AIRPORT BRE BREMEN AIRPORT STR STUTTGART AIRPORT HAJ HANNOVER AIRPORT MAINTENANCE SERVICES 2018 CALL-IN MAINTENANCE IATA chapter SGHA (2008 & 2013): Chapter 1: (J) Chapter 8: 8.3.1; 8.3.2; Call in (including 1 man-hour) Call in support by EASA part 66 AML B1 / B2 licensed engineer Price 795,00 per event CALL-IN OUTSTATION SUPPORT Support on other station outside the scope supported by Nayak-LM Germany GmbH. The rates are: On-call basis: 1.995,00 per shift includes maximum 10 man-hours counting starts from departure send out stations, intention is to send support from closest nearby station or DUS/TXL includes daily allowance and rates for overtime / work on public holidays Other costs: tickets, local transport, hotel, etc. excluded. To be charged with a handling fee of 20%. AD-HOC ADDITIONAL MANHOURS IATA chapter SGHA (2008 & 2013): Chapter 1: (J) Chapter 8: 8.3.1; 8.3.2; Additional man-hours EASA part 66 AML B1 / B2 licensed engineer 245,00 Additional man-hours EASA part 66 Cat A licensed engineer 195,00 Additional man-hours non licensed engineer 145,00 Logistic man-hours 75,00 NDT-Hours (NDT-Tool not included) 245,00 1

2 INSPECTIONS IATA chapter SGHA (2008): Section 1: (j) (Retaining period of three years at the station in question) Section 3: (a1,b1), (b) (check for water draining during winter period only) Section 4: 4.2.1(b) Section 6: Section 8: 8.1.1, 8.1.2, 8.1.3, 8.1.4, 8.2.1, (a) (a,b), 8.2.4, (include defect rectification up to one man-hour), 8.3.2, 8.3.3, 8.3.4(a) IATA chapter SGHA (2013): Section 1: (j) (Retaining period of three years at the station in question) Section 3: (a1,b1), (b) (check for water draining during winter period only) Section 4: 4.2.2(a) Section 6: Section 8: 8.1.1, 8.1.2, 8.1.3, 8.1.4, 8.2.1, (b) 8.2.3, 8.2.5, (include defect rectification up to one man-hour), 8.3.2, 8.3.3, 8.3.4(a) Prices per inspection 2018 Transit / Daily inspection ATR 42/72 / Bae 146-Avro RJ / ERJ 135/145/170/190 / Fokker 50/70/ ,00 Transit / Daily inspection A320-series / B737 NG/MAX 695,00 Transit / Daily inspection B737 CL / B757 / B ,00 Transit / Daily inspection A300 / A ,00 Transit / Daily inspection A330 / B747 / B777 / B ,00 Weekly inspection ATR 42/72 / Bae 146-Avro RJ / ERJ 135/145/170/190 / Fokker 50/70/ ,00 Weekly inspection A320-series / B737 NG 895,00 Weekly inspection B737 CG / B757 / B ,00 Weekly inspection A300 / A ,00 Weekly inspection A330 / B777 / B ,00 2

3 OTHER SERVICES Refill nitrogen (including 1 man-hour) 695,00 Oxygen Service (including 1 man-hour) 695,00 Fueling service non CRS 295,00 Talk out per occasion 195,00 Store space per sqm/per month 90,00 Engine storage per day 50,00 Aircraft Towing Narrow Body 195,00 Aircraft Towing Wide Body 245,00 Ram Air Turbine Test 3.850,00 HANGAR PRICELIST 2018 Facilities Charged are for Summer time ( to ) Winter charges ( to ) + 40 % for heated Hangar Charges are for up to 8 hours. After first 8 hours next rate for 8 hours will be added Aircraft up to 50 tons MTOW EUR 650,00 A318/A319/A320 & B737 series EUR 726,00 A321/B757 EUR 762,00 B767 EUR 1.650,00 A330 EUR 2.400,00 A /300 & B777 EUR 2.850,00 A & B747 EUR 3.300,00 Other aircraft On request Long Term A/C parking Late booking charge add on Within 24 hrs 100 % Within 3 days but before 24 hrs. 75 % Within 7 days but before 3 days 25 % 3

4 Hangar Usage not included Engine Borescope inspection Engine Video Boroscope Boroscope Service V2500 / CFM56 PW4000 RR Trent 700 V2500 / CFM56 PW4000 RR Trent 700 EUR 2.800,00 EUR 3.150,00 EUR 5.250,00 EUR 3.700,00 EUR 4.250,00 EUR 6.400,00 Engine Boroscope inspection (Birdstrike Boroscope / without findings) V2500 / CFM 56 PW4000 RR Trent 700 EUR 1.980,00 EUR 2.250,00 EUR 3.750,00 APU Video Boroscope All EUR 1.650,00 Engine Change APU Removal / Installation V2500 / CFM 56 PW2000 / RB211 PW4000 / CF 6 / RR Trent 700 A320 Family / B737 A330 / A340 / B757 / B767 4

5 Hangar Usage not included Special Service Engine Wash Narrow Engine Wash Wide A/C Wash Q400 DRY A/C Wash Q400 WET A/C Wash A320 Family/B737 DRY A/C Wash A320 Family/B737 WET A/C Wash B757 / A321 DRY A/C Wash B757 / A321 WET A/C Wash B767 DRY A/C Wash B767 WET A/C Wash A330 DRY A/C Wash A330 WET A/C Wash A340 DRY A/C Wash A340 WET Aircraft weighing (Single Aisle only) EUR 1.400,00 EUR 1.650,00 EUR 1.396,00 EUR 920,00 EUR 3.399,00 EUR 1.709,00 EUR 4.542,00 EUR 2.704,00 EUR 6.489,00 EUR 3.353,00 EUR 8359,00 EUR 4.619,00 EUR 8.923,00 EUR 5.267,00 EUR 3.950,00 Administration fee Administration fee Day 1-10 Loan fee per day Day Loan fee per day Day 31 > (Component/Tooling) LOAN 150,-- EURO 2% of Purchase Price per day of loan for days 1 to 10 of loan period / min. charge for tools is EUR 25 per day 1,5% of Purchase Price per day for days 11 to 30 of loan period / min. charge for tools is EUR 25 per day 1% of Purchase Price per day starting on day 31 of loan period / min. charge for tools is EUR 25 per day Loan fee per day Special charges No return of component % of manufacturer's latest list price BER of returned component % of manufacturer's latest list price Incomplete return, parts missing Parts charged against list price + 30% 5

6 Excluded costs Transportation costs Recertification costs Charged at costprice + 20% handling fee Charged at costprice + 20% handling fee EXCHANGE Used UNIT Administration fee Exchange fee 150,-- EURO 15% of manufacturer's latest list price FACTORY NEW UNIT Exchange fee 25% of manufacturer's latest list price SPECIAL No return of exchanged component % of manufacturer's latest list price BER of exchanged component % of manufacturer's latest list price Incomplete return, parts missing Parts charged against list price + 30% Late return (> 10 days) core unit Additional fee according loan fee EXCLUDED COSTS Transportation costs Recertification costs Charged at costprice + 20% handling fee Charged at costprice + 20% handling fee Additional cost material (excl. oil & greases*) Expendables / Consumables Sale Min. Handlingcharge is EUR 150 per Order AOG Charge EUR 150 per Order Delivery within DUS Airport area Dangerous goods packing charge CCP with 20 % Handling 75,- Euro 75,- Euro ADR for road transport Import Handling Pick Up Invoice Export Handling Pick Up Invoice 75,- 125,- 125,- Euro Euro Euro 6

7 EUR 150 Administration will be added for loan of GSE (if not used during line maintenance by Nayak LM) GSE Loan Steps Working Ladder Aircraft Jacks Aircraft Jacks Cherry Picker / Mobile Working Platform Use of Ruthmann-Car Use of Nitrogen/Oxygencar Fork Lifter 8 tons (without driver) Fork Lifter 15 tons (without driver) Driver Hangar Crane usage Tank Inspection Cart Water System Desinfektion Cart Hydraulik Power Unit Engine Wash Equipment Fuel Sample Equipment Tow Bar Wheel/Brake Change Car NDT-Tool DFDR-Download Tool / Narrow Body / Wide Body EUR 26,00 EUR 425,00 EUR 540,00 EUR 173,00 EUR 250,00 EUR 163,00 EUR 165,00 EUR 360,00 EUR 75,00 EUR 206,00 EUR 106,00 EUR 52,00 EUR 487,00 EUR 206,00 EUR 303,00 EUR 56,00 EUR 155,00 EUR 155,00 EUR 155,00 CONTACT DETAILS: CALL : +49 (0) or +49 (0)

8 8

Content. Price List Line Maintenance Services (German Stations only) 1/ Notes. 2/ Aircraft Handling. 3/ Ground Equipment. 4/ Fluids / Lubricants

Content. Price List Line Maintenance Services (German Stations only) 1/ Notes. 2/ Aircraft Handling. 3/ Ground Equipment. 4/ Fluids / Lubricants Content 1/ Notes 2/ Aircraft Handling 3/ Ground Equipment 4/ Fluids / Lubricants 5/ Fluids / Facilities 6/ CyClean Engine Water Wash (according LHT approved method) 7/ Engineering Services 8/ Material

More information

Line Maintenance Stations Germany

Line Maintenance Stations Germany More mobility for the world Subline for division or prod Germany Overline 12pt maximum two lines Station Capability Headline List with maximum two place image uct Line Maintenance Stations Germany This

More information

FBO Network Germany. FBO Düsseldorf Terminal & Infrastructure Charges

FBO Network Germany. FBO Düsseldorf Terminal & Infrastructure Charges FBO Network Germany FBO Düsseldorf Terminal & Infrastructure Charges Jet Aviation German FBO Network Jet Aviation and Kurz Aviation Service provide a total network solution within Germany. The companies

More information

Attachment No. NAYLS 001 to the NAYAK MOE

Attachment No. NAYLS 001 to the NAYAK MOE Attachment No. NAYLS 001 to the NAYAK MOE for Nayak Aircraft Service GmbH & Co. KG Flughafen Köln-Bonn, Hangar 6 D-51147 Köln List of approved Line Maintenance Stations Page 1 1. Table of contents 1. Table

More information

: Holder of an EU Part 66 Aircraft Maintenance Licence. Ratings as stated on this AML are as follows

: Holder of an EU Part 66 Aircraft Maintenance Licence. Ratings as stated on this AML are as follows Curriculum Vitae Personal Profile Name : Grothe W Joost Place of birth : Amersfoort, the Netherlands Nationality : Dutch Address : Koninginnelaan 200 7315ED Apeldoorn Netherlands Mail adress : joostgrothe@hotmail.com

More information

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 7/26/2017

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 7/26/2017 Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 7/26/2017 Invoicing Model with two Alternatives Introduction in Winter Season 2016/2017 The current invoicing

More information

SR Technics Training Services

SR Technics Training Services SR Technics Services Booklet 4Q 2017 Table of Contents > /... 03 >... 05 > > Classroom 06 > License Extensions.. 13 > Examinations..... 14 > > and Categories 15 > Airbus Type... 20 > Boeing Type.... 29

More information

Boeing Shanghai Overview BOEING SHANGHAI PROPRIETARY

Boeing Shanghai Overview BOEING SHANGHAI PROPRIETARY Overview 2018 AGENDA Company Profile Organization & Facility Capability Customers Company Profile A Boeing led joint venture bringing a new standard of service into the MRO industry Boeing Shanghai Aviation

More information

Skills Training WSQ Code Course Title Duration (days)

Skills Training WSQ Code Course Title Duration (days) Skills Training WSQ Code Course Title Duration WSQ HIGHER CERTIFICATE IN AEROSPACE AR-CCU-201C-1 WSQ (IU1) - Perform Basic Aircraft Safety Practices & Documentation 8 SSG (up to 90%) Core AR-CCU-201G-1

More information

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 15 th of July 2018

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 15 th of July 2018 Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 15 th of July 2018 Invoicing Model with two Alternatives for Winter Season 2018/2019 The current invoicing

More information

ABOUT DUBLIN AEROSPACE

ABOUT DUBLIN AEROSPACE ABOUT DUBLIN AEROSPACE Dublin Aerospace is based at Dublin International Airport, Ireland. Our facility is over 22,000m2 and consists of 3 Hangars. We operate a 4 bay base maintenance facility that can

More information

The Only Way is Up. AVIAPRIME One of the Fastest Growing MRO Organizations in Central and Eastern Europe

The Only Way is Up. AVIAPRIME One of the Fastest Growing MRO Organizations in Central and Eastern Europe The Only Way is Up AVIAPRIME One of the Fastest Growing MRO Organizations in Central and Eastern Europe Base Maintenance Line Maintenance Up to 10 slots in Poland Up to 7 slots in Slovenia Poland Slovenia

More information

Welcome! Bart Mak Owner and Principal Consultant at Mak Aircraft Engineering Services.

Welcome! Bart Mak Owner and Principal Consultant at Mak Aircraft Engineering Services. Bart Mak Owner and Principal Consultant at Mak Aircraft Engineering Services info@mak-aviation.com www.mak-aviation.com Welcome! 1 Personal Background Career start as helicopter mechanic apprentice Bristow

More information

CAPABILITIES LISTING INTRODUCTION

CAPABILITIES LISTING INTRODUCTION FAA CERTIFIED REPAIR STATION No. 3LZR235N CAPABILITIES LISTING INTRODUCTION The repair station will not alter or maintain any item for which it is not rated and will not maintain or alter any article for

More information

Sida 1 av 7 Ivan Forsman SGHA HMV Kopia

Sida 1 av 7 Ivan Forsman SGHA HMV Kopia STANDARD GROUND HANDLING AGREEMENT HMV 002-2018 Annex B... - Location(s), Agreed Services and Charges To the Standard Ground Handling Agreement (SGHA) of 2018 between: Airline adress xxxxx city Contry

More information

LIST OF SERVICE CHARGES FOR NON- RESIDENTS. Valid As Of 19 July, 2018

LIST OF SERVICE CHARGES FOR NON- RESIDENTS. Valid As Of 19 July, 2018 LIST OF SERVICE CHARGES FOR NON- RESIDENTS Valid As Of 19 July, 2018 2 Table of Contents 1. Aircraft Towing 2. General internal cleaning 3. Internal cleaning 4. External cleaning of aircraft 5. Other service

More information

Station Capability List

Station Capability List Summer Season 2018 Station Capability List Line Maintenance Services by Lufthansa, SWISS and Austrian Airlines Get professional service and maximum value Lufthansa, SWISS and Austrian Airlines are leading

More information

Sida 1 av 7 Ivan Forsman SGHA externa flygbolag doc

Sida 1 av 7 Ivan Forsman SGHA externa flygbolag doc STANDARD GROUND HANDLING AGREEMENT - SIMPLIFIED PROCEDURE Annex B... - Location(s), Agreed Services and Charges To the Standard Ground Handling Agreement (SGHA) of 2019 between: having its principal office

More information

Technical Operations Division. LATIN MRO 2018 Panamá

Technical Operations Division. LATIN MRO 2018 Panamá Technical Operations Division LATIN MRO 2018 Panamá February 14, 2018 Our Mission Maintain the company s aircraft at the highest level of safety, quality and reliability standards at the lowest posible

More information

COLOGNE HANOVER WEGBERG (DE) ERFURT (DE) PAFOS (CY) CITATION MAINTENANCE EXPERIENCE OF DECADES

COLOGNE HANOVER WEGBERG (DE) ERFURT (DE) PAFOS (CY) CITATION MAINTENANCE EXPERIENCE OF DECADES COLOGNE HANOVER WEGBERG (DE) ERFURT (DE) PAFOS (CY) CITATION MAINTENANCE EXPERIENCE OF DECADES PART 145 WELCOME ON BOARD Constantly updating and improving our experience, striving for perfection and excellence,

More information

-Asia Best Employer Brand Awards

-Asia Best Employer Brand Awards -Asia Best Employer Brand Awards - IATA Authorized Training Center (IATA-ATC) -Middle East Top Authorized Training Center -Quality Management System- ISO - ISO - - Customer Satisfaction ISO - ISO - - Approved

More information

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

An advisory circular may also include technical information that is relevant to the rule standards or requirements. Adventure Aviation Special Aircraft Operations Revision 0 24 June 2016 General Civil Aviation Authority advisory circulars contain guidance and information about standards, practices, and procedures that

More information

The Quality Manager. EASA Approval of Part 147 Maintenance Training Organisation Exposition and/or associated documents

The Quality Manager. EASA Approval of Part 147 Maintenance Training Organisation Exposition and/or associated documents Frederic MU R Senior Expert - Maintenance Organisation Flight Standards Directorate 2018(D)54513 fmu/gfe/fsl Cologne, 22.11.2018 The Quality Manager TRAINING CENTER "AVIATOR" AVTOMOTORNAYA STR 1/3, BUILD.

More information

The Quality Manager. EASA Approval of Part 147 Maintenance Training Organisation Exposition and/or associated documents

The Quality Manager. EASA Approval of Part 147 Maintenance Training Organisation Exposition and/or associated documents Frederic MU R Senior Expert Maintenance Organisation Flight Standards Directorate 2018(D)54513 fmu/gfe/fsl Cologne, 22.11.2018 The Quality Manager TRAINING CENTER "AVIATOR" AVTOMOTORNAYA STR 1/3, BUILD.

More information

HAECO XIAMEN. Welcome to Xiamen for Air Astana Media Visit. Updated on Apr.28, 2015

HAECO XIAMEN. Welcome to Xiamen for Air Astana Media Visit. Updated on Apr.28, 2015 HAECO XIAMEN Welcome to Xiamen for Air Astana Media Visit Updated on Apr.28, 2015 Contents 1 Corporate Overview 2 HAECO XIAMEN Introduction Corporate Background Group Entities HAECO Group Subsidiary &

More information

Passion for Details. The Fine Art of MRO Services

Passion for Details. The Fine Art of MRO Services Passion for Details The Fine Art of MRO Services We want to optimize your fleet! At your service You need someone to keep a keen eye on your aircraft engines at all times someone who is always there to

More information

The Quality Manager. The European Aviation Safety Agency hereby encloses your EASA Part-147 approval certificate reference:

The Quality Manager. The European Aviation Safety Agency hereby encloses your EASA Part-147 approval certificate reference: Karl SPECHT Maintenance Organisation Oversight Section Manager Flight Standards Directorate 2018(D)54116 ksp/gfe/fs1 Cologne, 23.10.2018 The Quality Manager USA Subject: Initial Issue of EASA Part-147

More information

OPERATING HOURS AND FACILITATION PARAMETERS & PRINCIPLES FOR SALZBURG AIRPORT

OPERATING HOURS AND FACILITATION PARAMETERS & PRINCIPLES FOR SALZBURG AIRPORT SCA/KO/PV/183 05th October 2017 OPERATING HOURS AND FACILITATION PARAMETERS & PRINCIPLES FOR SALZBURG AIRPORT ALL TIMES IN UTC Update: Noise Guidelines Valid from 05. October 2017, until further notice

More information

Continuing Airworthiness

Continuing Airworthiness Continuing Airworthiness Objectives To provide an overview of EASA Part M(g) as applicable to CAT operators Continuing Airworthiness Management Organisation approval The Controlled Environment Airworthiness

More information

EUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00

EUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00 1. LANDING per ton MTOW EUR BAM A/c up to 25 tons MTOW 11,00 22,00 A/c over 25 tons MTOW 14,00 27,00 2. RUNWAY LIGHTING 40% of landing charge 3. PARKING Per ton/24 hours 2,55 5,00 4. PASSANGER SERVICE

More information

Maintaining a success

Maintaining a success More mobility for the world NEW Life cycle support Boeing 737 M AX Services for the Boeing 737 Maintaining a success Maximum support for the 737 The Boeing 737 is the the perfect example of how Lufthansa

More information

SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts

SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts HANDLING FEES 2017 SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts Opérations department Tél : +33 2 99 29 60 04 Fax : +33 2 99 29 60 37 E-Mail : ops@rennes.aeroport.fr

More information

Environmental Aspects of Aviation Charges

Environmental Aspects of Aviation Charges Environmental Aspects of Aviation Charges GAP Research Workshop, Berlin, January 23, 2009 Hansjochen Ehmer, Alexandra Stöpfer, Johannes Rott International University of Applied Sciences Bad Honnef Bonn

More information

Strategy. The strategy of S7 Technics Holding is based on the provision of world class aircraft and component maintenance and repair.

Strategy. The strategy of S7 Technics Holding is based on the provision of world class aircraft and component maintenance and repair. Strategy The strategy of S7 Technics Holding is based on the provision of world class aircraft and component maintenance and repair. The minimum duration of aircraft maintenance is ensured by highly qualified

More information

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT

CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT May 2016 Page 1 of 8 CHAPTER 22 WEIGHT CONTROL OF AIRCRAFT 1. Introduction 1.1. The mass and centre of gravity of aircraft should be determined prior to the initial issuance of the Certificate of Airworthiness.

More information

Acceptance report Airworthiness

Acceptance report Airworthiness This form needs to be accompanied by the form " Application Certificate of " and if applicable an Review Report. When a question from the list is answered positively you are required to put your initial

More information

More mobility for the world. Services for the Airbus A320. Family business NEW

More mobility for the world. Services for the Airbus A320. Family business NEW More mobility for the world NEW Life cycle support Airbus A320neo Services for the Airbus A320 Family business The one-stop shop for a global family Aircraft from the A320 family amount to one-third of

More information

Board of Directors. Maintenance & Engineering EGYPTAIR. Eng. Mohamed Abdel Megeed Touban VP Planning Ministry of Civil Aviation

Board of Directors. Maintenance & Engineering EGYPTAIR. Eng. Mohamed Abdel Megeed Touban VP Planning Ministry of Civil Aviation EGYPTAIR Maintenance & Engineering Board of Directors Mohamed Allouba/IBA Eng. Abd El-Aziz Fadel Chairman Mohamed Allouba/IBA Eng. Mohamed Abdel Megeed Touban VP Planning Ministry of Civil Aviation Eng.

More information

Airport Choice in Germany - New Empirical Evidence of the German Air Traveller Survey 2003

Airport Choice in Germany - New Empirical Evidence of the German Air Traveller Survey 2003 MPRA Munich Personal RePEc Archive Airport Choice in Germany - New Empirical Evidence of the German Air Traveller Survey 2003 Wilken, Dieter; Berster, Peter and Gelhausen, Marc Christopher German Aerospace

More information

Engine Fleet Management

Engine Fleet Management Engine Fleet Management A future perspective and where innovations are needed Dr. Claus Bauer, AG ISABE Conference Manchester September 2017 Agenda Engine Services: An overview Learnings from customers

More information

JetLeads, November 2016 Blind Copy

JetLeads, November 2016 Blind Copy JetLeads - November 2016 Summary Total Leads 23 Tenders 11 RFPs 12 Total Aircraft Required 51 Purchase/LP 6 Dry Lease 31 Wet Lease 14 Total Engine Required 3 Purchase 0 Lease 3 Exchange 0 Tenders for Active

More information

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION FAA TYPE CERTIFICATE DATA SHEET NO. A55NM

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION FAA TYPE CERTIFICATE DATA SHEET NO. A55NM DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION A55NM Revision 7 328 Support Services GmbH Dornier Model 328-300 September 8, 2016 FAA TYPE CERTIFICATE DATA SHEET NO. A55NM This data sheet

More information

Eng. Er1 '~'- '""..\!-Jelwi

Eng. Er1 '~'- '..\!-Jelwi KCASR PART-145 APPROVAL CERTIFICATE Certificate Number: DGCA/AM0/002 Pursuant to Lnw No. 30 for the yenr 1960 nurl nil subsequent amendments/orders/ministerial decisions thereof goveming the Civil Aviation

More information

The Take Off Charge is calculated on the basis of the aircraft s MTOW. Reductions, exemptions, and restrictions to this charge are listed below.

The Take Off Charge is calculated on the basis of the aircraft s MTOW. Reductions, exemptions, and restrictions to this charge are listed below. Pricelist 2017 Price charges The charges consist of: Take Off Charge Passenger Charge Parking Charge Charges outside opening hours Other charges Take Off Charge The Take Off Charge is calculated on the

More information

Subpart H. 2042/2003

Subpart H. 2042/2003 AIRWORTHINESS NOTICE Issue of Certificate of Airworthiness No 12 Issue 3 May 2014 1 Purpose and scope The Civil Aviation Directive CAD-AIRW/8(1)-1 incorporates the Annex Part 21 to the European Commission

More information

Lease Rate Digest. Issue: 17B August Member of ISTAT UK CAA Approval No. UK.MG.0622

Lease Rate Digest.  Issue: 17B August Member of ISTAT UK CAA Approval No. UK.MG.0622 Lease Rate Digest Issue: 17B August 2017 Member of ISTAT UK CAA Approval No. UK.MG.0622 www.iba.aero Table of Contents Typical Monthly Lease Rental Definition Market Reference Data i vii viii Section i:

More information

Learjet 31 Aircraft Maintenance Manual READ ONLINE

Learjet 31 Aircraft Maintenance Manual READ ONLINE Learjet 31 Aircraft Maintenance Manual READ ONLINE Bombardier Learjet 31A - Aerospace Technology - The Learjet 31A was announced in 1990 as a replacement for the Learjet 31. pilot and maintenance training

More information

Providing industry leading aircraft maintenance and engineering solutions.

Providing industry leading aircraft maintenance and engineering solutions. Providing industry leading aircraft maintenance and engineering solutions www.etihadengineering.com Etihad Airways Engineering offers industry leading aircraft maintenance and engineering solutions including

More information

AIRCRAFT PARTS AND SERVICES With Non-Stop Service Worldwide. NAS International Inc. Proprietary

AIRCRAFT PARTS AND SERVICES With Non-Stop Service Worldwide. NAS International Inc. Proprietary AIRCRAFT PARTS AND SERVICES With Non-Stop Service Worldwide OVERVIEW Militaries that operate USA origin aircraft rely on NAS for much more than aircraft spare parts. NAS s services commence at the planning

More information

Jeff Lewis Vice President- Business Development Restoring flight is our business.

Jeff Lewis Vice President- Business Development Restoring flight is our business. Jeff Lewis Vice President- Business Development Restoring flight is our business. A320 Series Why the A320 Series? Factors Affecting Values Approx 5,300 aircraft still in service. (109 recycled) Strong

More information

Aviation market is back worldwide

Aviation market is back worldwide GE Infrastructure Analyst Meeting November 2, 2005 GE Aviation Scott C. Donnelly November 2, 2005 Aviation market is back worldwide Airline Passenger Demand 2,800 2,600 2,400 2,200 2,000 1,800 Revenue

More information

Maintenance Training Standard Course Syllabus

Maintenance Training Standard Course Syllabus Page 1 of 5 Maintenance Training Standard Course Syllabus Course: FSL0000 787-8/9 821 Rnd: 1 RR 0% DS Singapore Campus 5987319 05/Mar/2018 Initiate Work (821_EASA - Mechanical/Avionics (B1/B2) - Theoretical)

More information

Registry Publication 17

Registry Publication 17 Preparation Requirements for Certificate of Airworthiness (C of A) Renewal Survey The following are the preparation requirements to enable the Operator (normally the person identified on Form 31 as the

More information

Wade Leach - Senior Vice President, Commercial ATI Specialty Materials May 12, ATI. All Rights Reserved.

Wade Leach - Senior Vice President, Commercial ATI Specialty Materials May 12, ATI. All Rights Reserved. Wade Leach - Senior Vice President, Commercial ATI Specialty Materials May 12, 2015 2015 ATI. All Rights Reserved. Forward Looking Statements This presentation contains forward-looking statements. Actual

More information

IAI Israel Aerospace Industries

IAI Israel Aerospace Industries IAI Israel Aerospace Industries 1 IAI - Israel Aerospace Industries Largest Defense and Aerospace company in Israel Government owned Established at 1953 Cutting edge technologies and solutions for: Space,

More information

Big Enough to Get the Job Done Small Enough To Care AVIATION SERVICES. United States Canada Europe

Big Enough to Get the Job Done Small Enough To Care AVIATION SERVICES. United States Canada Europe AVIATION SERVICES Big Enough to Get the Job Done Small Enough To Care United States Canada Europe www.cdaviationservices.com 417.206.2327 About CD Aviation Services provides Honeywell TPE331 & TFE731 engine

More information

Prestige terminals in the provinces: Is the EU over-airported?

Prestige terminals in the provinces: Is the EU over-airported? Impulse presentation ITB Aviation Day 2006 Prestige terminals in the provinces: Is the EU over-airported? Dr. Jürgen Ringbeck Berlin 8 March 2006 0 Key questions How is overall demand developing in Europe,

More information

GECAS A B O V E & B E Y O N D

GECAS A B O V E & B E Y O N D GECAS A B O V E & B E Y O N D Offering the widest range of aircraft types and financing solutions in the industry More than 270 clients call us partner from startup and regional airlines to national flag

More information

AIRCRAFT MAINTENANCE PROGRAMME - Matrix NOTE: This AMP is only for Danish National Aircrafts (Annex I).

AIRCRAFT MAINTENANCE PROGRAMME - Matrix NOTE: This AMP is only for Danish National Aircrafts (Annex I). AIRCRAFT MAINTENANCE PROGRAMME - Matrix NOTE: This AMP is only for Danish National Aircrafts (Annex I). Mechanic/Owner applying for approval of a Maintenance Program according to BL 1-12 and BL 1-3 and

More information

-1- Company Presentation Flughafen Wien AG Results 2007

-1- Company Presentation Flughafen Wien AG Results 2007 -1- Company Presentation Flughafen Wien AG Results 2007 March 2008 -2- Content 1. Highlights 2007 2. Financial Results 2007 and Investments 3. Results by Segment 4. Traffic Results 5. Strategy 6. International

More information

GENERAL TARIFF PROVISIONS :

GENERAL TARIFF PROVISIONS : GENERAL TARIFF PROVISIONS : a) Overtime working hours are considered from 22.00 hrs to 06.00 hrs of the next day, and from 22.00 hrs on Friday to 06.00 on Monday as well as during holidays. b) Service

More information

1.0 SCOPE DISTRIBUTION REVIEW/UPDATE DISTRIBUTION TO CUSTOMERS MARATHONNORCO AEROSPACE, INC. PMA PRODUCTS...

1.0 SCOPE DISTRIBUTION REVIEW/UPDATE DISTRIBUTION TO CUSTOMERS MARATHONNORCO AEROSPACE, INC. PMA PRODUCTS... TABLE OF CONTENTS 1.0 SCOPE... 3 2.0 DISTRIBUTION... 3 3.0 REVIEW/UPDATE... 3 4.0 DISTRIBUTION TO CUSTOMERS... 3 5.0 MARATHONNORCO AEROSPACE, INC. PRODUCTS... 3 Page 2 1.0 SCOPE This RS lists all MarathonNorco

More information

CAMO. Continuing Airworthiness Management & Maintenance Management Service

CAMO. Continuing Airworthiness Management & Maintenance Management Service CAMO Continuing Airworthiness Management & Maintenance Management Service Your single point of contact Original Equipment Manufacturer Design Organization Aviation Authority LBAS CAMO + MMS Maintenance

More information

Airport Fees and Charges List

Airport Fees and Charges List Airport Karlovy Vary Ltd. Airport Fees and Charges List Effective July 01, 2018 (Amendment Nr. 3) This Airport Fees and Charges List was approved by the decision of the Council of Karlovy Vary Region,

More information

Price cap Regulation of airports in Continental Europe an Overview

Price cap Regulation of airports in Continental Europe an Overview Price cap Regulation of in Continental Europe an Overview Niemeier Strategy and Regulation of Airport Charges at 1 Issues UK price cap became standard for many public utilities in Europe and to some extent

More information

Marco Island Executive Airport 2016 Rates and Charges

Marco Island Executive Airport 2016 Rates and Charges Marco Island Executive Airport 2016 Rates and Charges Building Rates Office Space $18.5806 Per Sq Ft/Year Building A $4.2904 Per Sq Ft/Year Building B Single Engine Units $4.5515 Per Sq Ft/Year Building

More information

Manufacturer: Goodrich Part number Application ATA reference CMM no. Form 0051 no.

Manufacturer: Goodrich Part number Application ATA reference CMM no. Form 0051 no. Components shall only be added to the World Aero capability list (WA/CAPABILITYLIST/001) upon completion of World Aero Form 0051 which details the items which must be satisfied prior to addition to the

More information

Business Plan 2015/2016

Business Plan 2015/2016 Business Plan 2015/2016 Pacific Asia Travel Association Deutschland e.v. Pacific Asia Travel Association Germany Chapter Eisgrubweg 23 Phone: +49 6131 6277437 Fax: +49 6131 6277438 E-Mail: office@pata-germany.de

More information

Aerospatiale Aerospatiale ATR-42 (1) m m Ref: ATR42 Aerospatiale ATR-72 (1) m m Ref: ATR42

Aerospatiale Aerospatiale ATR-42 (1) m m Ref: ATR42 Aerospatiale ATR-72 (1) m m Ref: ATR42 Commercial Aircraft Aerospatiale Aerospatiale ATR-42 (1) 22.670m 24.575m Ref: ATR42 Aerospatiale ATR-72 (1) 27.166m 27.051m Ref: ATR42 Airbus Airbus A300B2 (except B2-320) (1) 53.610m 44.840m Ref: A300B2

More information

the journal for commercial aircraft business

the journal for commercial aircraft business the journal for commercial aircraft business Media pack 2008 aircraft commerce aircraft commerce aircraft commerce the journal for commercial aircraft business aircraft commerce a The magazine Aircraft

More information

Air Berlin PLC 20 March 2013 Annual Results Press Conference

Air Berlin PLC 20 March 2013 Annual Results Press Conference Air Berlin PLC 20 March 2013 Annual Results Press Conference 1. Overview o o o o o Management Summary Financial KPI Operational KPI Key financial development Development on Etihad relationship o Development

More information

Application form (deadline: Sun 28 May 2017)

Application form (deadline: Sun 28 May 2017) 2017 3 RD GONGKWON YUSUL GRANDMASTER S WORLD SEMINAR Application form (deadline: Sun 28 May 2017) Surname: Given name: Date of birth: Name of your martial arts school/club: Address: Phone: Mobile: Email:

More information

SMALL TRANSPORT AIRCRAFT

SMALL TRANSPORT AIRCRAFT SMALL TRANSPORT AIRCRAFT A Catalogue of New and Used Commuter / Regional Aircraft SAMPLE AVMARK, Inc. Table of Contents Introduction 1 Market Overview 2 Regional Jet Phenomenon 4 ATR 42 5 ATR 72 12 BAE

More information

Online Handbook Part-66 AML

Online Handbook Part-66 AML Online Handbook Part- AML 1 APR-19 Contents 1. Part- Aircraft Maintenance Licence (AML)... 4 The Part- AML... 4 Part- AML statutory requirements... 4 2. Basic Knowledge.A.25... 5 3. Basic Experience.A.30...

More information

Tariff regulations for the commercial airport Karlsruhe/Baden-Baden valid from April 1 st 2018

Tariff regulations for the commercial airport Karlsruhe/Baden-Baden valid from April 1 st 2018 Tariff regulations for the commercial airport Karlsruhe/Baden-Baden valid from April 1 st 2018 General conditions All charges shall generally be paid in Euro to the airport operator prior to the take-off

More information

Company Information. Overhaul Service

Company Information. Overhaul Service Company Information Turner Aviation is a wholly owned subsidiary of Turner & Co (Glasgow) Limited, a privately owned business since 1912 with headquarters in Glasgow, Scotland. Turner & Co. have a combined

More information

85 Heart Lake Road South Brampton, Ontario, Canada L6W 3K2 Phone: Fax:

85 Heart Lake Road South Brampton, Ontario, Canada L6W 3K2 Phone: Fax: Big Joe by Blue Giant Warranty AC Power Drive Straddle Trucks (PDS) AC Power Pallet Trucks (WPT45, D40) AC Power Rider Trucks (WRT-60) AC Power Counterbalanced Truck (CB-22) AC Power Task Support Vehicle

More information

Airport Handling Manual. Effective 1 January 31 December th Edition

Airport Handling Manual. Effective 1 January 31 December th Edition Airport Handling Manual Effective 1 January 31 December 2018 38th Edition NOTICE DISCLAIMER. The information contained in this publication is subject to constant review in the light of changing government

More information

Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST

Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST Combined CAME & MOE INITIAL / AMENDMENT* COMPLIANCE CHECK LIST Please tick/fill as applicable, forward application with cover letter to your Principal Airworthiness Inspector. ORGANISATION DETAILS Organisation

More information

EXPERIENCES WITH AIR-RAIL PASSENGER INTERMODALITY THE CASE OF GERMANY

EXPERIENCES WITH AIR-RAIL PASSENGER INTERMODALITY THE CASE OF GERMANY EXPERIENCES WITH AIR-RAIL PASSENGER INTERMODALITY THE CASE OF GERMANY Intermodality Seminar University Castilla La Mancha, Ciudad Real 10th November 2009 Wolfgang Grimme German Aerospace Center (DLR) Air

More information

Clarifying Airline Rights in Maintenance IATA MCC meeting September 10 th 2014

Clarifying Airline Rights in Maintenance IATA MCC meeting September 10 th 2014 Clarifying Airline Rights in Maintenance IATA MCC meeting September 10 th 2014 About HEICO HEICO Corporation is a rapidly growing aerospace and electronics company focused on niche markets and cost-saving

More information

Chinese Civil Aviation Emissions and the Future Intention

Chinese Civil Aviation Emissions and the Future Intention Chinese Civil Aviation Emissions and the Future Intention ICAO Colloquium on 16th May, 007 Zhou Kaixuan Deputy Director General of Aircraft Airworthiness Certification Department, General Administration

More information

Traffic Guidelines Concerning access to the exhibition centre during the construction and dismantling periods

Traffic Guidelines Concerning access to the exhibition centre during the construction and dismantling periods Amenity Areas, Traffic Guidelines Concerning access to the exhibition centre during the construction and dismantling periods Dear Exhibitor, Koelnmesse GmbH Messeplatz 1 50679 Köln Postfach 21 07 60 50532

More information

Guidelines for Life Limited Part (LLP) Movement History Sheet

Guidelines for Life Limited Part (LLP) Movement History Sheet Guidelines for Life Limited Part (LLP) Movement History Sheet 1. Background 1.1. History Transfer of LLPs between owners/operators has in the past caused issues and time consuming tasks. Operators have

More information

Improving planning and preparation for an AOG

Improving planning and preparation for an AOG Improving planning and preparation for an AOG Denis Edinosyak, MRO BEER 2016, Prague Key Company Milestones The Volga-Dnepr Group (VDG) was established in 1990 More than 10 business units in 9 countries

More information

The Catch 22 of Cost Based OCC Decisions

The Catch 22 of Cost Based OCC Decisions AIRLINE FORUM 2015 Airline Operations Control The Catch 22 of Cost Based OCC Decisions The Catch 22 Costs are not the issue Airlines burn money every day Outdated IT Systems Cost based decision making

More information

Order on the Danish Transport, Construction and Housing Authority s fees and charges in the aviation area etc.

Order on the Danish Transport, Construction and Housing Authority s fees and charges in the aviation area etc. Order no. 1487 of 14 December 2017 Order on the Danish Transport, Construction and Housing Authority s fees and charges in the aviation area etc. In pursuance of 148 (4), (5) and (7) of the Danish Air

More information

J. P. MEĐUNARODNI AERODROM "SARAJEVO" D.O.O.

J. P. MEĐUNARODNI AERODROM SARAJEVO D.O.O. 1 od 14 U ovom dokumentu sve strane imaju istu reviziju! 0 22.12.2008. I. Budimlić E. Šćeta B. Karahasanović Rev Datum Izradio (Ime, Potpis) Verifikovao (Ime, Potpis) Odobrio (Ime, Potpis) Status REVIZIJE

More information

Catalogue of Charges for Extra Services

Catalogue of Charges for Extra Services Catalogue of Charges for Extra Services (excluding Ground Handling) Effective: January 1st., 2018 Flughafen Hamburg GmbH Leistungsentgelte Postfach D-22331 Hamburg Code Leistung Einheit Euro Charges for

More information

Environmental restrictions and the efficiency of airports - the case of slot restrictions at Dusseldorf Airport -

Environmental restrictions and the efficiency of airports - the case of slot restrictions at Dusseldorf Airport - Environmental restrictions and the efficiency of airports - the case of slot restrictions at Dusseldorf Airport - 5th Conference INFRADAY GARS TU Berlin 07 October 06 Hansjochen Ehmer, Thorsten Heidelmeier

More information

HAECO Group. Last updated 9 October 2017

HAECO Group. Last updated 9 October 2017 HAECO Group Last updated 9 October 2017 Contents 1 2 Corporate Overview 3 Group Services Swire Pacific Airframe Services HAECO Group Milestones Freighter Conversion Line Services Cabin Solutions About

More information

Valuation Implications of Aircraft Life Cycle. Bruce Burnett AVITAS June 8, 2015

Valuation Implications of Aircraft Life Cycle. Bruce Burnett AVITAS June 8, 2015 Valuation Implications of Aircraft Life Cycle Bruce Burnett AVITAS June 8, 2015 Contents AVITAS Who Are We? Oil Prices Global Fleet Forecast Fleet Trends Parting Out Aircraft Market Demand Factors Future

More information

Schedule of Services and Facilities

Schedule of Services and Facilities Schedule of Services and Facilities 2019 Effective January 1, 2019 Issued from: Greater Moncton Roméo LeBlanc International Airport Telephone (506) 856-5444 Facsimile (506) 856-5431 www.cyqm.ca 1 CONTENTS

More information

Application for Issue, Extension or Recommendation of an Airworthiness Review Certificate and Permit to Fly Privilege

Application for Issue, Extension or Recommendation of an Airworthiness Review Certificate and Permit to Fly Privilege M.A Subpart G Approval No: UK.MG.0035 Application for Issue, Extension or Recommendation of an Airworthiness Review Certificate and Permit to Fly Privilege Form No. Issue: Date: ENG/1603 4 30 Nov 2017

More information

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT Heading towards a SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT something about us Ambition > What we do: We are low-cost European point-to-point short-haul airline. > Where we do it: Intra-European

More information

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON AIRLINE INDUSTRY

ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON AIRLINE INDUSTRY ROYAL MALAYSIAN CUSTOMS GOODS AND SERVICES TAX GUIDE ON AIRLINE INDUSTRY TABLE OF CONTENTS INTRODUCTION... 1 Overview of Goods and Services Tax (GST)... 1 GENERAL OPERATIONS OF THE INDUSTRY... 1 GST TREATMENT

More information

AERODROME/HELIPORT CHARGES

AERODROME/HELIPORT CHARGES AIP Azerbaijan AIC A 07/2017-1 Contact Post: Aeronautical Information Service "Azeraeronavigation" Air Traffic Department Heydar Aliyev International Airport AZ1044 Baku, Azerbaijan Tel:+(99412) 4971683,

More information

SURVEY REPORT AND RECOMMENDATION FOR CERTIFICATE OF AIRWORTHINESS. Issue Renewal Export

SURVEY REPORT AND RECOMMENDATION FOR CERTIFICATE OF AIRWORTHINESS. Issue Renewal Export SURVEY REPORT AND RECOMMENDATION FOR CERTIFICATE OF AIRWORTHINESS Issue Renewal Export The data shall be completed by the operator s Contracted Continued Airworthiness Management Organisation. Where specified*

More information

AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC

AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC Valid from 01 October, 2017 until 31 March, 2018 Approved by Mr Laszlo Herdon, Managing Director OLDAL: 1 / 23 1. LIST OF MODIFICATIONS Line number

More information