Proposed Winter Notices 2018

Size: px
Start display at page:

Download "Proposed Winter Notices 2018"

Transcription

1 Proposed s 2018 Aire & Calder Navigation Main Line ID Date :00 to :00 A ffected Water wa rth-east - Aire & Calder Navigation Main Line Bullhome Lock 10, Castleford, Aire & Calder The junction with the Wakefield Branch, near Bridge 4. Downstr eam wind ing hole The junction with the River Aire near Bridge 15. A closure is required to carr out repairs to the mechanical sluice. At the same time we will undertake an engineering stud of Bullholme Lock to investigate the possibilit of increasing its length / width b a minimal amount in order for it to facilitate Euro Class II / Container barges. 1 of :30:19

2 Ashb Canal ID Date :00 to :00 A ffected Water wa West Midlands - Ashb Canal Bramcote Road Bridge 6, Ashb Canal Junction with Coventr Canal Downstr eam wind ing hole Just north of Basin Bridge 22, Basin Bridge Lane. Above-water repairs to the cracked arch of the bridge, parapets, soffit and weathered sandstone stonework. Repairs to the wet abutment, below water level, will also be carried out. The extent of these works will not be known until the navigation is de-watered. Relocation of bat roosts within the arch ma dictate timing of the works. Further updates to this notice will be made if an changes are required. Please also be aware the towpath will be closed for the duration of the works. A diversion will be put in place from Bulkington Road Bridge 5 (to the west) and Mill Bridge 8 (to the east). This will be clearl signed. 2 of :30:19

3 Alesbur Arm (Grand Union Canal) ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Alesbur Arm (Grand Union Canal) Lock 7 and Lock 8 Wilstone, Alesbur Arm Above Lock 1 Marsworth Downstr eam wind ing hole Below Lock 13 Redhouse Carr out repairs as follows: Lock 7 - replace bottom gates. Lock 8 - carr out repairs to masonr within the lock chamber. ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Alesbur Arm (Grand Union Canal) Lock 12 to Lock 13 Alesbur Arm (Grand Union Canal) Above Lock 1 Marsworth Downstr eam wind ing hole Below Lock 13 Redhouse Carr out repairs as follows Lock 12 - reline and refit bottom gate Lock 13 - repairs to reduce leakage on the ground paddle Lock 11 - top gate replacement will be deferred until Winter 2019 to allow other, more urgent, arising works to be carried out in the area. ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Alesbur Arm (Grand Union Canal) Lock 16, near Tesco, Alesbur Arm (Grand Union Canal) Below Lock 13 Redhouse Downstr eam wind ing hole Alesbur Basin Repairs to Lock 16 will include the replacement of both top and bottom gates. Repairs to Lock 15 were carried out earlier in the ear under restriction. 3 of :30:19

4 Birmingham & Fazele Canal ID Date :00 to :00 A ffected Water wa West Midlands - Birmingham & Fazele Canal Lock 2, Curdworth, Birmingham & Fazele Canal Curdworth Top Lock Downstr eam wind ing hole Curdworth Bottom Lock Replace bottom gate. Repair quoins, cill and chamber brickwork. Following customer feedback, we have delaed the start of this closure to allow additional cruising time over the new ear period. ID Date :00 to :00 A ffected Water wa West Midlands - Birmingham & Fazele Canal Farmers Bridge Lock 1, Top Lock,and Farmers Bridge Lock 2, Birmingham & Fazele Canal Junction with New Mainline Downstr eam wind ing hole Aston Junction Replace bottom gate and repair the top. Repair brickwork, quoins and improve lock ladders. Our Customer Service teams will be also be completing some smaller, below water, tasks on the surrounding locks that fall within this stoppage. 4 of :30:19

5 Bradle Arm (Old Main Line) ID Date :00 to :00 A ffected Water wa West Midlands - Bradle Arm (Old Main Line) Glasshouse Bridge, Bilston, Bradle Arm (Old Main Line) Bradle Arm, between Caponfield New Furnace Basin Bridge and Highfield Bridge. Downstr eam wind ing hole ne Third Part contractors, Bagnalls, will be carring out works, on behalf of Cadent Gas, to this pipe bridge. This will require installation of scaffolding which will necessitate closure of the navigation. 5 of :30:19

6 Calder & Hebble Navigation ID Date :00 to :00 A ffected Water wa rth-east - Calder & Hebble Navigation Lock 13, Anchor Pit, Clifton and Lock 15, Kirklees Low Lock. Calder and Hebble Navigation. Downstream of Woodside Lock Downstr eam wind ing hole Huddersfield Broad Junction Lock 13, repairs to lock floor. Lock 15, replace lock floor timbers. ID Date :00 to :00 A ffected Water wa rth-east - Calder & Hebble Navigation Flood Gates, Batteford. Calder and Hebble Huddersfield Broad Junction Downstr eam wind ing hole River Calder Junction Closure to allow for repairs to the cill. ID Date :00 to :00 A ffected Water wa rth-east - Calder & Hebble Navigation Washwall and Lock 21, Double Lock Bottom near Thornhill, Calder and Hebble navigation. River Calder Junction Downstr eam wind ing hole River Calder Junction Closure to allow for washwall repairs within this kilometre length of the canal and masonr repairs at lock of :30:19

7 ID Date :00 to :00 A ffected Water wa rth-east - Calder & Hebble Navigation Lock 19 Greenwood, Ravensthorpe, Calder & Hebble Navigation. Junction of the River Calder Downstr eam wind ing hole Junction of the River Calder A closure is required to enable the re-building of the wash wall on the lock landing. 7 of :30:19

8 Caldon Canal ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Caldon Canal Bedford Street Bridge, Stoke on Trent, Caldon Canal. Upstream winding hole Upstream of Iv House Bridge 12 Downstr eam wind ing hole Caldon junction with the Trent and Merse canal Closure to undertake bridge deck replacement. A towpath diversion will be available. ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Caldon Canal Lock 15 Woods Lock, near Cheddleton, Caldon Canal Bridge 48 Oakmeadorford Downstr eam wind ing hole Flintmill Bridge 42 Closure to replace tail gates, the bumper and other minor repairs at the time. ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Caldon Canal Lock 5 Waterworks Lock and Lock 8 Road Lock, near Stockton Brook, Caldon Canal. Bridge 27a Stanle moss Downstr eam wind ing hole Bridge 22 (south) Closure to allow for replacement of Lock 5 ground paddles and replacement of Lock 8 tail gates, along with other minor repairs as required at the time. 8 of :30:19

9 ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Caldon Canal Lock 13 Cheddleton Top Lock, Cheddleton, Caldon Canal Bridge 48 Oakmeadorford Downstr eam wind ing hole Flintmill Bridge 42 Closure to replace Top Gate and undertake other minor repairs at the time. ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Caldon Canal Bridge 50B London Works Bridge, near Consall, Caldon Canal Upstream winding hole Bridge 51 Downstr eam wind ing hole Bridge 48 Oakmeadorford Replace or repair the timber walkwa for the bridge, as required. ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Caldon Canal Bridge 23, Long Butts Drawbridge, rton Green, Caldon Canal Bridge 27a Stanle moss Downstr eam wind ing hole Bridge 22 (south) Closure to undertake the required repairs to the bridge 9 of :30:19

10 Chesterfield Canal ID Date :00 to :00 A ffected Water wa East Midlands - Chesterfield Canal Locks 30 and 31, Brickard Double Lock, near Shireoaks, Chesterfield Canal Thorpe Windinghole Downstr eam wind ing hole Turnerwood Bridge Locks 30 and 31, Brickard Double Lock, near Shireoaks, Chesterfield Canal. Replacement of Bottom Gates. Please be aware the start date of this closure is outside our published Winter Stoppage period ID Date :00 to :00 A ffected Water wa East Midlands - Chesterfield Canal Lock 29, Milestone Lock, near Shireoaks, Chesterfield Canal Thorpe Windinghole Downstr eam wind ing hole Turnerwood Bridge Replacement of bottom lock gates ID Date :00 to :00 A ffected Water wa East Midlands - Chesterfield Canal Lock 65, West Stockwith Lock and Flood Gate, Chesterfield Canal Upstream winding hole rth of Bridge 78 Downstr eam wind ing hole Turning space on River Trent The Environment Agenc will be pressure-testing the tidal/flood gates at West Stockwith b pumping water in between stop planks and the closed gates. A navigation closure is required. The Trust will replace two life-expired powerpacks at Lock 65, once the testing has been completed. 10 of :30:19

11 ID Date :00 to :00 A ffected Water wa East Midlands - Chesterfield Canal Locks 26 to 28, Thorpe Locks, near Shireoaks, Chesterfield Canal Thorpe Windinghole Downstr eam wind ing hole Turnerwood Bridge Replacement of Lock 27 Bottom Gates, Lock 28 Bottom Gates and Lock 26 Top Gates 11 of :30:19

12 Droitwich Barge Canal ID Date :00 to :00 A ffected Water wa South Wales and Severn - Droitwich Barge Canal Ladwood Top Lock 8 and the towpath in the Salwarpe area, Droitwich Barge Canal Junction with Worcestershire & Birmingham Canal Downstr eam wind ing hole Junction with River Severn Navigation Repairs are needed to the failing offside wall at Ladwood Top Lock 8, Droitwich Barge Canal. Repairs will also be carried out to the towpath wall where required. Navigation through the Droitwich Barge Canal and Droitwich Junction Canal will be affected. Following customer feedback, we have delaed the start of this closure to allow additional cruising time over the new ear period. 12 of :30:19

13 Droitwich Junction Canal ID Date :00 to :00 A ffected Water wa Upstream winding hole South Wales and Severn - Droitwich Junction Canal Ladwood Top Lock 8 and the towpath in the Salwarpe area, Droitwich Barge Canal ne Downstr eam wind ing hole ne Repairs are needed to the failing offside wall at Ladwood Top Lock 8, Droitwich Barge Canal. Repairs will also be carried out to the towpath wall where required. Navigation through the Droitwich Barge Canal and Droitwich Junction Canal will be affected. Following customer feedback, we have delaed the start of this closure to allow additional cruising time over the new ear period. 13 of :30:19

14 Dudle 1 Canal ID Date :00 to :00 Affected A Waterwa West Midlands - Dudle 1 Canal Blowers Green Lock, Parkhill, Dudle 1 Canal Blowers Green, Lock 3, Parkhead Downstr eam wind ing hole Woodside Bridge Repair top and bottom gates and improve handrails. Repair brickwork and coping stones. Improve lock ladders and install kickers on quadrants. Following customer feedback, we have delaed the start of this closure to allow additional cruising time over the new ear period. 14 of :30:19

15 Gloucester & Sharpness Canal ID Date :00 to :00 A ffected Water wa South Wales and Severn - Gloucester & Sharpness Canal Purton Upper Bridge 4, Purton, Gloucester & Sharpness Canal Junction with Stroudwater Canal Downstr eam wind ing hole Junction with Old Arm Upgrade to the bridge, including a new control panel, wig wags, road barriers and hdraulics. 15 of :30:19

16 Grand Union Canal ID Date :00 to :00 A ffected Water wa West Midlands - Grand Union Canal Lock 45, Hatton, Grand Union Canal Hatton Station Downstr eam wind ing hole Mton, Leamington Spa Repairs to top and bottom gates and improvements to the lock ladders. Repairs to landings and quadrants. Our Customer Service teams will be also be completing some smaller, below water tasks on the surrounding locks that fall within this stoppage. ID Date :00 to :00 A ffected Water wa West Midlands - Grand Union Canal Lock 40, Hatton, Grand Union Canal Hatton Station Downstr eam wind ing hole Mton, Leamington Spa Repairs to the top and bottom gates. Improvements to lock ladders and installation of approach bollards. Our Customer Service teams will be also be completing some smaller, below water tasks on the surrounding locks that fall within this stoppage. ID Date :00 to :00 A ffected Water wa West Midlands - Grand Union Canal Lock 36, Middle Lock Lane, Hatton, Grand Union Canal Hatton Station Downstr eam wind ing hole Mton, Leamington Spa Repairs to the top and bottom gates and improvements to the lock ladders. Approach bollards will also be installed. 16 of :30:19

17 ID Date :00 to :00 A ffected Water wa West Midlands - Grand Union Canal Lock 24, Cape Lock, Warwick, Grand Union Canal Saltisford Junction Downstr eam wind ing hole Mton, Leamington Spa Due to the significant leakage from the bottom lock gates at Lock 24, Cape Bottom Lock, we have made the decision to defer until 2019/2020 the lower priorit relining works at Lock 28 Hatton (which were previousl advertised). Instead we will carr out similar relining works at Lock 24, Cape. The gates will be repaired and relined and improvements will also be made to the lock ladders. The dates for this closure are not affected. ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Lock 58, near Winkwell, Grand Union Canal Lock 56 Below Downstr eam wind ing hole Lock 61 Winkwell A closure is required to replace the bottom gates. Please note this closure will now take place before Christmas. This is to allow the work to be carried out b our London direct services team, whilst the local Grand Union team focuses on other works in the area. ID Date :00 to :00 A ffected Water wa London - Grand Union Canal Lock 98, Osterle Lock, Grand Union Canal Regina Road, Southall Downstr eam wind ing hole Transport Ave Brentford Carr out repairs to top gate mitre and bottom gate to reduce leakage. 17 of :30:19

18 ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Lock 29, Church Lock, Grand Union Canal Above Lock 30, Bridge 120, Slapton Downstr eam wind ing hole Bridge 114, Linslade Refit top gates, replace bottom gates and carr out repairs ID Date :00 to :00 A ffected Water wa South-East - Grand Union Canal Lock 21 Cosgrove, Grand Union Canal Immediatel above Lock 21 Downstr eam wind ing hole Bridge 71B, New Bradwell Replace top and bottom gates ID Date :00 to :59 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Bridge 152, Albion Bridge, Hemel Hempstead, Grand Union Canal Lock 61 Winkwell Downstr eam wind ing hole Grove Wharf, below Lock 73 Third Part contractors will be carring out major refurbishment and strengthening works to the underside of the canal crossing road bridge. The contractor has requested a closure due to the nature of the work. However, following further discussion with the third part promoters of the project, the duration of the towpath and canal closure has been reduced b four weeks and the start date delaed b four das. 18 of :30:19

19 ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Lock 30 Slapton, Grand Union Canal Above Lock 30, Bridge 120, Slapton Downstr eam wind ing hole Bridge 114, Linslade Replace bottom gate. Carr out repairs to the towpath side ground paddle to reduce leakage. ID Date :00 to :00 A ffected Water wa South-East - Grand Union Canal Lock 9 and Lock 13, Buckb, Grand Union Canal rton Junction Downstr eam wind ing hole Winding Hole at Weedon Wharf Carr out repairs as follows Lock 9 - reline top and bottom gates Lock 13 - reline bottom gates ID Date :00 to :00 A ffected Water wa South-East - Grand Union Canal Lock 16 to Lock 20, Stoke Bruerne, Grand Union Canal Upstream winding hole Above Lock 14 Downstr eam wind ing hole Below Lock 20 River Tove Carr out repairs as follows: Lock 16 - reline bottom gates and carr out general repairs. Address movement in the bottom gate pots. Lock 17 - carr out repairs to address movement in the pots on the top and bottom gates. Lock 20 - carr out repairs to reduce leakage on the mitre. 19 of :30:19

20 ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Lock 46 Cow Roast, Grand Union Canal Above Lock 46 Cowroast Downstr eam wind ing hole Lock 61 Winkwell Replace top and bottom gates. ID Date :00 to :00 A ffected Water wa London - Grand Union Canal Lock 89, Cowle Lock, Cowle Peache, Grand Union Canal Swan and Bottle pub, Uxbridge Downstr eam wind ing hole Junction with Slough Arm Repairs required to bottom gate to reduce leakage. ID Date :00 to :00 A ffected Water wa London - Grand Union Canal Springwell Lock 83, near Maple Cross, Grand Union Canal Tesco, Rickmansworth Downstr eam wind ing hole Coppermill Lock Repair required to the gates to resolve leaks on the mitres. 20 of :30:19

21 ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Grand Union Canal Lock 47 Dudswell, Grand Union Canal Above Lock 46 Cowroast Downstr eam wind ing hole Lock 61 Winkwell Replace bottom gates 21 of :30:19

22 Huddersfield Narrow Canal ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Huddersfield Narrow Canal From East of Standedge Tunnel to the Standedge Tunnel End Waste Weir, Marsden, Huddersfield Narrow Canal Between Lock 32 East and Lock 31 East Downstr eam wind ing hole Between Lock 21 West and Lock 22 West Carr out repairs to the wash wall and refurbish the sluice and weir. ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Huddersfield Narrow Canal Lock 17 West (Greenfield Lock) Huddersfield Narrow Canal Above lock 19 West Downstream winding ing hole Lock 7 West Replace tailgates, lock ladder and carr out masonr and other repairs ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Huddersfield Narrow Canal Lock 10 West, near Buckton Vale, Lock 9 West, near Buckton Vale, Huddersfield Narrow Canal Upstream winding hole Upstream of Manns Bridge 82 Downstream winding ing hole Upstream of Lock 7 West To carr out grouting of the lock walls in order to reduce leakage 22 of :30:19

23 ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Huddersfield Narrow Canal Lock 30 and 32 West, Diggle, Huddersfield Narrow Canal Bridge 62, Standedge Downstr eam wind ing hole Downstream of Wool Road Bridge 70 Lock 30 and Lock 32 West, Diggle. Carr out grouting of the lock walls in order to reduce leakage. Carr out repairs to the washwall where required in the area. ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Huddersfield Narrow Canal Locks 27 West to Lock 29 West, Diggle, Huddersfield Narrow Canal Above Lock 32 West Downstr eam wind ing hole Below Lock 24 West Lock 27 West - Replace tailgates, lock ladder and carr out repairs to improve b-wash leakage Lock 28 West - Replace tailgates Lock 29 West - Repairs to lock gate ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Huddersfield Narrow Canal Manns Wharf Embankment, Greenfield, Huddersfield Narrow Canal Above Lock 21 West, Upper Mill Downstream winding ing hole Lock 7 West To carr out repairs to reduce leakage. 23 of :30:19

24 ID Date :00 to :00 A ffected Water wa Upstream winding hole Manchester, Pennine and Potteries - Huddersfield Narrow Canal Lock 1 East, Stanle Dawson Lock and Lock 2 East, Coal Wharf Lock, Huddersfield Narrow Canal Below Lock 9 East Downstream winding ing hole Below Lock 1 East at Asple Marine Lock 1 - Repairs to the head and tail gates. Lock 2 - repairs to the top and bottom balance beams. ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Huddersfield Narrow Canal Weir between Golcar Aqueduct & Lock 12 East, Rough Holme Lock, Huddersfield Narrow Canal Above lock 16 East (Westwood Lock), Linthwaite Downstr eam wind ing hole Below Lock 9 East, Milnsbridge Marina Stonemasonr repairs are required on the spillwa of the weir ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Huddersfield Narrow Canal Lock 14 East, Ramsden Lock, Linthwaite, Huddersfield Narrow Canal Above lock 16 East (Westwood Lock), Linthwaite Downstr eam wind ing hole Below Lock 9 East, Milnsbridge Marina Overhanging Chamber Stone needs to be reset 24 of :30:19

25 Kennet & Avon Canal ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 16, Harris Lock, Semington, Kennet & Avon Canal Foxhangers Wharf Downstr eam wind ing hole Whaddon, between Bridges 161 and 162 The navigation will be dewatered to allow a full investigation of the condition of the lock. Emergenc repairs will be carried out during the closure, as appropriate. This stoppage will now take place before Christmas to bring it in line with other works in the area. ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Bridge 156, Seend Park Bridge, Kennet & Avon Canal Sells Green swing bridge, Bridge 150. Downstr eam wind ing hole Semington Lock 15 To carr out rebuilding of the walls on each side of the swingbridge. The bridge will also be lifted off to repair the race and ball bearings. ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 89, Widmead Lock, near Thatcham, Kennet & Avon Canal Upstream winding hole West of Widmead Lock 89 Downstr eam wind ing hole Monke Marsh, Bridge 43 Repairs needed to replace missing brickwork 25 of :30:19

26 ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 93, Heales Lock, near Midgham, Kennet & Avon Canal West of Bridge 36, Midgham Road Bridge Downstr eam wind ing hole Heales Lock or Lock 96, Padworth Carr out repair works to the lock ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal South of Bridge 199, Bath, Kennet & Avon Canal Above Bridge 195, Widcombe Bridge, at the junction with River Avon Downstr eam wind ing hole Below Bridge 205, Weston Footbridge Installation of new pedestrian and ccle bridge. Please be aware the end date of this closure is now earlier than originall stated b the Third Part contractors. The will also tr to build in navigation windows into their programme wherever possible. ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Culvert 9, between Bridges 67 and 68, near Newbur,Kennet & Avon Canal Upstream winding hole Below Copse Lock 80 Downstr eam wind ing hole Bridge 62, West Mills Repairs needed to the culvert 26 of :30:19

27 ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 66, Potters Lock, near Great Bedwn, Kennet & Avon Canal Upstream winding hole Above Bridge 98 Downstr eam wind ing hole Between Bridge 92 and 93 Reline gates, replace missing brickwork. Repairs to copings and replace anchor blocks. ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 46 to Lock 28, Caen Hill, Kennet & Avon Canal Devizes Wharf Downstr eam wind ing hole Foxhangers Wharf Locks 46, 40, 34, 33, 32, 32. Relining of gates and repairs to reduce leakage. Locks 36, 28. Repair to reduce leakage ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Bath Deep Lock 8/9, Kennet & Avon Canal Upstream winding hole Above Lock 13 Downstr eam wind ing hole The junction on the River Avon. Replacement of penstock at Bath Deep Lock Pumping Station 27 of :30:19

28 ID Date :00 to :00 A ffected Water wa Kennet and Avon - Kennet & Avon Canal Lock 64, Church Lock, Great Bedwn, Kennet & Avon Canal Upstream winding hole Above Bridge 98 Downstr eam wind ing hole Between Bridge 92 and 93 Reline top and bottom gates and repairs to be made to copings. Replacement of missing bricks and quoin stone. 28 of :30:19

29 Lee Navigation ID Date :00 to :00 A ffected Water wa London - Lee Navigation Between Bridges 10 and 11, near Roach Road, Hackne Wick E3, Lee Navigation. Junction of Hertford Union Canal Downstr eam wind ing hole Junction with Old River Lea The installation of a new road bridge b contractors working on behalf of LLDC. Please note this will be a night time closure onl and the navigation should not be affected during the da. 29 of :30:19

30 Leeds & Liverpool Canal ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Manchester Road Bridge 130B to Finsle Gate Bridge 130E, Burnle, Leeds & Liverpool Canal. After Bridge 137, Lob Lane Bridge. Downstr eam wind ing hole Before Bridge 130B. Manchester Road Bridge. The length from Manchester Road Bridge 130B to Bridge 130E will be dewatered to allow for canal re lining works. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Bridge 130B, Manchester Road Bridge and Sandholme Aqueduct, Burnle, Leeds & Liverpool Canal After Bridge 137, Lob Lane Bridge. Downstr eam wind ing hole Before Bridge 130B. Manchester Road Bridge. Bridge 130B and Sandholme Aqueduct are to be dewatered to allow new stop grooves to be constructed at 130B and existing grooves to be inspected at Sandholme. The two structures will be dewatered at the same time. ID Date :00 to :00 A ffected Water wa Upstream winding hole rth-west - Leeds & Liverpool Canal Lock 48 (Lock 4) Barrowford Reservoir, Leeds & Liverpool Canal At Bridge 145, Wanless Bridge. Downstr eam wind ing hole Before Bridge 141D, Hodge Bank. Closure to allow for both sets of gates to be replaced. 30 of :30:19

31 ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Carolina Street Changeline Bridge and Stanle Road Changeline Bridge, Liverpool, Leeds & Liverpool Canal Between Litherland Road and Marsh Lane Bridges (2B-2C) Downstr eam wind ing hole Sandhills Railwa Bridge H Closure to allow for repairs and repainting of two steel footbridges. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Lock 85 Bottom Gate, Wigan, Leeds & Liverpool Canal Haigh Park Rowing bridge Downstr eam wind ing hole Leigh Branch Junction Closure to allow for the replacement of the lock tail gates. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Lock 73, Lock 9, Kirkless Hall, Leeds & Liverpool Canal Haigh Park Rowing Bridge Downstr eam wind ing hole Leigh Branch Junction Repairs to the lock tail gates. 31 of :30:19

32 ID Date :00 to :00 A ffected Water wa Upstream winding hole rth-west - Leeds & Liverpool Canal Lock 45, Top Lock, near Barrowford Reservoir, Leeds & Liverpool Canal At Bridge 145, Wanless Bridge. Downstr eam wind ing hole Before Bridge 141D, Hodge Bank. Construction of a new wash wall and lock landing for the downstream towpath side of Lock 45 Top Lock. A signed towpath diversion will be in position. Following customer feedback, the start date for this closure has been delaed until 7th Januar ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Micklethwaite Swing Bridge 199, near Crossflats, Leeds & Liverpool Canal Riddlesden, near Bridge 197 Downstr eam wind ing hole Airedale Boat Club Closure to allow Belwa/Redrow Homes to construct 15 service ducts across the canal. The canal will be dewatered near the bridge for the duration of the works. Towpath diversions will be in place. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Bridge P, Lancs & Yorks Railwa Bridge near Merton Road and Bootle Oriel Road station, Leeds & Liverpool Canal Between Bridge 2b and 2c Downstr eam wind ing hole Sandhills Railwa Bridge H Network Rail Contractors, J Murph & Sons, are replacing an existing rail bridge due to its structural condition. 32 of :30:19

33 ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Lock 81 (Lock 17), Wigan, Leeds & Liverpool Canal Haigh Park Rowing bridge Downstr eam wind ing hole Leigh Branch Junction Closure to allow for lock gate repairs. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Moss Swing Bridge 218, Rodle, Leeds & Liverpool Canal Apperle Bridge Marina Downstr eam wind ing hole Near Redcote Bridge 224 Third Part contractors will be replacing the existing swing bridge with a wider bridge and footwa. The canal will be dewatered near the bridge for the duration of the works. Towpath diversions will be in place. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Lock 7, Kirkstall Little Lock, near Kirkstall, Leeds & Liverpool Canal Apperle Bridge Marina Downstr eam wind ing hole Near Redcote Bridge 224 Carr out repairs to the approach wall and lock gates at Lock 7. Repairs at Lock 10 have been deferred which has allowed the start date of this closure to be put back until 4th Februar of :30:19

34 ID Date :00 to :00 A ffected Water wa Upstream winding hole rth-west - Leeds & Liverpool Canal Leeds & Liverpool Canal near Nelson At Bridge 145, Wanless Bridge. Downstr eam wind ing hole Bridge 132A Barden Washwall repairs undertaken within the kilometer length of this section of canal, between bridges 141C Reedford bridge and 141B Pendle street bridge. ID Date :00 to :00 A ffected Water wa rth-west - Leeds & Liverpool Canal Lock 43, Middle Lock, Coates, Leeds & Liverpool Canal Long Ing Bridge 153 Downstr eam wind ing hole Changeline Bridge 158 Closure to allow for lock gate repairs. 34 of :30:19

35 Leicester Line (Grand Union Canal) ID Date :00 to :00 A ffected Water wa Upstream winding hole East Midlands - Leicester Line (Grand Union Canal) Lock 30, Kilb Lock, Wigston & Lock 32, Ervins Lock, Wigston, Leicester Line (Grand Union Canal) Kilb Bridge Downstr eam wind ing hole Near Bridge 98, Glen Parva Replacement of the bottom gates and general repairs to Lock 30. Repairs to the approach wall on Lock 32. ID Date :00 to :00 A ffected Water wa Upstream winding hole East Midlands - Leicester Line (Grand Union Canal) Bridge 96A, Railwa Bridge, near Glen Parva, Leicester Line (Grand Union Canal) Kilb Bridge Downstr eam wind ing hole Near Bridge 98, Glen Parva Third Part contractors, AMCO, will be carring out works to the railwa bridge on behalf of Network Rail. This will require installation of a pontoon and scaffolding which will necessitate closure of the navigation. ID Date :00 to :00 A ffected Water wa East Midlands - Leicester Line (Grand Union Canal) Lock 38, Kings Lock, near Alestone, Leicester Line (Grand Union Canal) Near Bridge 98, Glen Parva Downstr eam wind ing hole Near Pillings Lock 52, Barrow on Soar Replacement of the top and bottom lock gates 35 of :30:19

36 ID Date :00 to :00 A ffected Water wa South-East - Leicester Line (Grand Union Canal) Lock 1 to Lock 7 Watford Locks, Leicester Line (Grand Union Canal) Upstream winding hole Immediatel above Lock 7 Downstr eam wind ing hole Immediatel below Lock 1 Carr out repairs to Watford Locks as follows: Lock 1 - top and bottom gate replacement, repairs to cill fender, lock ladder and leak in top ground paddles. Lock 2 - bottom gate refit and brickwork repairs in the lock chamber. Lock 2 to Lock 3 - repairs to eroded bank and brick repairs under the copings. Lock 4 - bottom gate reline and refit and repointing below copings. Lock 5 - bottom gates refit and reline and chamber brickwork repairs. Lock 6 - chamber brickwork repairs and replacement of cill fender. Lock 7 - reline bottom gates, repairs to handrails, repointing chamber walls. Brick work repairs on cill front, replacement of brick copings and cill fender timber. 36 of :30:19

37 Leigh Branch (Leeds & Liverpool Canal) ID Date :00 to :00 A ffected Water wa rth-west - Leigh Branch (Leeds & Liverpool Canal) Lock 2 Bottom Lock, Poolstock, Leigh Branch. Leeds & Liverpool Canal. Leeds & Liverpool Canal junction Downstr eam wind ing hole Ince Moss, Bridge 2B Closure to allow for lock gate repairs. A towpath diversion sign will be in place. ID Date :00 to :00 A ffected Water wa Upstream winding hole rth-west - Leigh Branch (Leeds & Liverpool Canal) Bridge 7, Plank Lane Lift Bridge, Leigh Branch (Leeds & Liverpool Canal) Crank Wood, Bridge 5A Downstr eam wind ing hole Bridge 7, Plank Lane Lift Bridge, Pennington Wharf Closure to allow for lift bridge repairs to be undertaken. 37 of :30:19

38 Llangollen Canal ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Locks 4 and 1, Hurleston Locks, Llangollen Canal Stonele Green, Bridge 10, Llangollen Canal Downstr eam wind ing hole Junction of Shropshire Union Canal Lock 4 - Repair/replace balance beam and missing brickwork in the paddle chamber. Carr out extensive repairs to the inwards leaning towpath side wall. Lock 1 - Repair and reline bottom gates and quoin. Please be aware the end date of this closure is outside of our published winter stoppage period due to the extent of the works involved. ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Bridge 5, Platts Bridge, Burland, Llangollen Canal Stonele Green, Bridge 10, Llangollen Canal Downstr eam wind ing hole Junction of Shropshire Union Canal Carr out repairs to voids in the bridge approach masonr. ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Whitehouses Tunnel, Llangollen Canal Bridge 31W, Llangollen Canal Downstr eam wind ing hole Black Park, Rhoswaun, Langollen Canal Repairs needed to collapsed washwall and copers 38 of :30:19

39 ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Pontcsllte Aqueduct, Llangollen Canal Bridge 31W Llangollen Canal Downstr eam wind ing hole Black Park, Rhoswaun, Llangollen Canal Repairs to the aqueduct handrail. ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Lock 2, Swanle Lock to Bridge 9, Butchers Bridge, Swanle, Llangollen Canal Stonele Green, Bridge 10, Llangollen Canal Downstr eam wind ing hole Junction of Shropshire Union Canal Bottom Gate reline, top cill, ladder & masonr repairs to Lock 2. Repair to arch barrel brickwork at Bridge 9. ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Bridge 13, Grange Bridge, Baddile, Llangollen Canal Thomasons, Bridge 22, Llangollen Canal Downstr eam wind ing hole Stonele Green, Bridge 10, Llangollen Canal Repairs to the parapet and barrel brickwork 39 of :30:19

40 ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Poves Lock, Bradele, Llangollen Canal Lock 1, Grindle, Llangollen Canal Downstr eam wind ing hole Thomasons, Bridge 22, Llangollen Canal Replacement of the bottom gates ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Llangollen Canal Lock 4, Grindle Brook Locks, Llangollen Canal Lock 1, Grindle, Llangollen Canal Downstr eam wind ing hole Thomasons, Bridge 22, Llangollen Canal Replacement of bottom gates 40 of :30:19

41 Macclesfield Canal ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Macclesfield Canal Bridge 14A, Burgess Arm Towpath Bridge, near Higher Ponton, Macclesfield Canal Junction with Peak Forest Canal or Br.12 (High Lane) Downstr eam wind ing hole Between bridges 15 and 16, Higher Ponton Repair voids under the surface of the towpath. ID Date :00 to :00 A ffected Water wa Manchester, Pennine and Potteries - Macclesfield Canal Lock 3 to Bottom Lock 12, Bosle, Macclesfield Canal Between Bridge 49 and Bridge 50 Macclesfield Canal Downstr eam wind ing hole Between Bridge 63 and Bridge 64 Macclesfield Canal Extensive grouting, masonr and gate repairs at Locks 3, 8 and 12, to reduce leakage. Pointing the sluice chamber walls below Lock 12. Please note we are taking advantage of the unexpected closure of the Bosle flight during August to bring forward the gate replacement and repairs at Lock 5 41 of :30:19

42 Middlewich Branch (Shrop Union Canal) ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Middlewich Branch (Shrop Union Canal) Lock 4, Cholmondeston Lock, Middlewich Branch Shropshire Union Canal Upstream winding hole Bridge 4 Downstr eam wind ing hole Hollingshead, north of Bridge 16 New head & tail gates, masonr and other minor repairs 42 of :30:19

43 Monmouthshire & Brecon Canal ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Near Dfnant Bridge Bridge 125, Monmouthshire & Brecon Canal Panteague Bridge 128 Downstr eam wind ing hole Llangattock Wharf Leak repair works to canal channel ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Bridge 144, Talbont Drawbridge, Monmouthshire & Brecon Canal Pencelli Bridge 154 Downstr eam wind ing hole Talbont Wharf To carr out the installation of pedestrian gates at the bridge and to undertake repairs on the towpath approaches. Following further refinement of the methodolog for the works at the lift bridge, our contractors have now advised the require two weeks to complete these works. ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Peterstone, Monmouthshire & Brecon Canal Upstream winding hole Watton Wharf Bridge 165 Downstr eam wind ing hole Storehouse Bridge 158 Leak repair works required to the canal channel 43 of :30:19

44 ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Near Herons Rest Marina, Pen-Pedair-Heol, Monmouthshire & Brecon Canal Llangattock Wharf Downstr eam wind ing hole Dan-Y-Graig Bridge 107 Repairs to concrete channel ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Glanusk/Dard, Monmouthshire & Brecon Canal Aber Howie Bridge 127 Downstr eam wind ing hole Wind corner Bridge 109 A closure is required in order to carr out repairs to the concrete channel. ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Llangnidr, near Bridge 132, Monmouthshire & Brecon Canal Talbont Wharf Downstr eam wind ing hole Llangnidr Bridge 131 Leak repair works required to the canal channel 44 of :30:19

45 ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Lock 67, near Glawcoed, Monmouthshire & Brecon Canal Talbont Wharf Downstr eam wind ing hole Lock 65, Cwm Crawnon Bottom gate to be replaced, improvements to be made to the quadrant. Tail bridge to be replaced and approach bollards installed ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Lock 68,Toffs Lock, Monmouthshire & Brecon Canal Talbont Wharf Downstr eam wind ing hole Lock 65, Cwm Crawnon Repair top gate, bottom quoin and repair the lock quadrants ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Between Penawr Bridge 150 and Cross Oak Bridge 147, Monmouthshire & Brecon Canal Pencelli Bridge 154 Downstr eam wind ing hole Talbont Wharf Repairs to failed timber edge 45 of :30:19

46 ID Date :00 to :00 A ffected Water wa South Wales and Severn - Monmouthshire & Brecon Canal Lock 69, Brnich Lock, Monmouthshire & Brecon Canal Upstream winding hole Watton Wharf Bridge 165 Downstr eam wind ing hole Brnich Turn Bridge 162 Replace the top gate and install kickers on the quadrants. 46 of :30:19

47 Montgomer Canal ID Date :00 to :00 A ffected Water wa rth Wales and Borders - Montgomer Canal Locks 1 and 4, Frankton Locks, Montgomer Canal Bridge 69 Montgomer Canal Downstr eam wind ing hole Bridge 70 Montgomer Canal Lock 1 - repair/reline the bottom gates and repair the quoins. Lock 4 - repairs to top gate quoins and cill. 47 of :30:19

48 New Mainline ID Date :00 to :00 A ffected Water wa West Midlands - New Mainline Broad Street Bridge, Birmingham, New Main Line Deep Cutting Junction Bridge, junction with Birmingham & Fazele Canal Downstr eam wind ing hole Gas Street Basin Third Part contractors, Midland Metro Alliance, have requested a closure to allow essential works to be carried out to the canal bridge structure ID Date :00 to :00 A ffected Water wa West Midlands - New Mainline Embankment - Pupp Green Bridge to Netherton Tunnel Branch, New Main Line Factor Junction Bridge, junction with Old Main Line Downstr eam wind ing hole Dudle Port Junction Waterwa wall repairs to be carried out under drained conditions between Pupp Green Pipe Bridge and Netherton Tunnel Branch (Dudle Port Junction). Please be aware the end date of this closure is outside our published winter stoppage period due to the extent of the works involved. An alternative route is available b using the Old Main Line (Wolverhampton Level) from Factor Junction through to Gower Branch Junction and down Brades Locks back onto the New Main Line Canal at Gower Branch Turnover Bridge 48 of :30:19

49 rth Stratford Canal ID Date :00 to :00 A ffected Water wa West Midlands - rth Stratford Canal Bridge 24, Saddlerswell Lane, Hockle Heath, rth Stratford Canal Rotherham's Oak Bridge 22 Downstr eam wind ing hole Wharf Lane Bridge 27 Repairs to brickwork within the arch of the bridge ID Date :00 to :00 A ffected Water wa West Midlands - rth Stratford Canal Lock 4, Lapworth, rth Stratford Canal Upstream winding hole Wharf Lane Bridge 27 Downstr eam wind ing hole Junction with Kingswood Arm (rth Stratford Canal) Replace top gate and repair the quoins. Repair chamber copings and improve lock ladders. Our Customer Service teams will be also be completing some smaller, below water, tasks on the surrounding locks that fall within this stoppage. ID Date :00 to :00 A ffected Water wa West Midlands - rth Stratford Canal Lock 13, Lapworth, rth Stratford Canal Upstream winding hole Wharf Lane Bridge 27 Downstr eam wind ing hole Junction with Kingswood Arm (rth Stratford Canal) Replace top gate and repair the bottom gate. Repair brickwork, copings, and paddles. Improve lock ladders and install approach bollards. Our Customer Service teams will be also be completing some smaller, below water, tasks on the surrounding locks that fall within this stoppage. 49 of :30:19

50 rthampton Arm (Grand Union Canal) ID Date :00 to :00 A ffected Water wa South-East - rthampton Arm (Grand Union Canal) Lock 1 to Lock 17 rthampton Arm (Grand Union Canal) Upstream winding hole Immediatel above Lock 1 Downstr eam wind ing hole Immediatel below Lock 17 Carr out repairs to Locks 1 to 17 across the rthampton Arm as follows Lock 1 - replace bottom gate. Carr out repairs to ladder, bollards, clapper post and top gate head post. Lock 5 - refit bottom gate and cill. Repairs to ladder and bollards. Lock 7 - replace bottom gate, carr out repairs to ladder and bollards and to reduce leakage. Lock 9 - carr out repairs to reduce leakage on the bottom gate. Lock 10 - carr out repairs to reduce leakage. Lock 12 - reline bottom gates. Lock 14 - grouting of the lock walls to reduce leakage. Lock 17 - reline top gate. Grouting of the lock walls to reduce leakage. 50 of :30:19

51 ttingham & Beeston Canal ID Date :00 to :00 A ffected Water wa East Midlands - ttingham & Beeston Canal Bridge 1c, LMS Main Line 25, ttingham, ttingham and Beeston Canal Old basin at Premier Inn, 100m north of bridge Downstr eam wind ing hole River Trent at Meadow Lane Lock Contractors (J Murph & Sons), working on behalf of Network Rail, are proposing to replace the bridge deck of the railwa bridge over the ttingham & Beeston Canal. This closure is awaiting confirmation and these dates are provisional onl. We are working closel with Network Rail and their contractors to minimise the disruption to our customers. 51 of :30:19

52 Ocker Hill Tunnel Branch (Walsall Canal) ID Date :00 to :00 A ffected Water wa Upstream winding hole West Midlands - Ocker Hill Tunnel Branch (Walsall Canal) Ocker Hill Branch Bridge, Ocker Hill Tunnel Branch (Walsall) Junction of Thame Valle Canal Downstr eam wind ing hole Bales Land Bridge Basin Third Part contractors, Bagnalls, will be carring out works, on behalf of Cadent Gas, to this pipe bridge. This will require installation of scaffolding which will necessitate closure of the navigation. access to the basin will be possible during 3 week stoppage. 52 of :30:19

53 Old Main Line ID Date :00 to :00 A ffected Water wa West Midlands - Old Main Line Lock 20, Aldersle, Wolverhampton, Old Main Line Carvers Arm, Broad Street, Lock 1 Downstr eam wind ing hole Junction with Staffordshire & Worcestershire Canal Replace bottom gates. Repair brickwork and coping stones. Repair quadrants, including kickers and improve lock ladders. Our Customer Service teams will be also be completing some smaller, below water, tasks on the surrounding locks that fall within this stoppage. ID Date :00 to :00 A ffected Water wa West Midlands - Old Main Line Lock 11, Dunstall Hall, Wolverhampton, Old Main Line Carvers Arm, Broad Street, Lock 1 Downstr eam wind ing hole Junction with Staffordshire & Worcestershire Canal Replace bottom gate and extend handrails. Repair quoins including kickers. Repair chamber brickwork, install approach bollards and improve lock ladder. Our Customer Service teams will be also be completing some smaller, below water, tasks on the surrounding locks that fall within this stoppage. 53 of :30:19

54 Oxford Canal ID Date :00 to :00 A ffected Water wa South-East - Oxford Canal Rugb Radio Station Link Road Bridge Canal Crossing, near Clifton on Dunsmore, Oxford Canal Clifton Arm Junction Downstr eam wind ing hole Bridge 70, Grathams Bridge Third Part contractors installing the new road bridge require consecutive night stoppages (between 9pm and 7am) to lift the new bridge beams and deck into place and to carr out associated works. Please note the start date of these works is outside the normal winter stoppage dates but we have restricted this to night time working onl and so the navigation will not be affected during the da. ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Oxford Canal Lock 9, Napton, Oxford Canal Upstream of Lock 14, in entrance to canal arm feeder Downstr eam wind ing hole Downstream of Lock 8. Take down and rebuild the towpath chamber wall. Take down and rebuild the offside approach walls. Carr out localised repairs throughout. Please be aware the end date of this closure is outside our published winter stoppage period due to the extent of the works involved. ID Date :00 to :00 A ffected Water wa Upstream winding hole South-East - Oxford Canal Bridge 164A, Footbridge, Banbur, Oxford Canal Bridge 162, Hennef Wa Downstr eam wind ing hole South of Bridge 168 Third Part Contractors building the new shopping centre development will require a canal stoppage to construct the canal interface infrastructure, including the installation of a new footbridge. 54 of :30:19

Dr Adam Comerford National Hydrology Manager, Water Management team

Dr Adam Comerford National Hydrology Manager, Water Management team The monitoring of lock operations across the Canal & River Trust network remains an essential element in our water resources management but also to understand the changing patterns in use of the 2,000

More information

Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract - Visitor moorings progress - Water

Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract - Visitor moorings progress - Water Jeff Whyatt Autumn 2013 Trust so far Maintenance priorities this year Major works activity Vegetation & FM priorities & new contract Boating - Visitor moorings progress - Water situation / Lockage volume

More information

Inverness LOCH NESS CALEDONIAN LOCH OICH LOCH LOCHY WATERWAY MAP Key SCALE 0 50 kilometres Fort William Managed by British Waterways 0 10 20 30 miles Managed by British Waterways Scotland Perth Dundee

More information

Communications Update

Communications Update Communications Update 15 th January 2016 Happy New Year and welcome to our first communications update of 2016 The latest flooding news We re continuing to deal with the aftermath of the Christmas floods

More information

NORTH WEST SPRING LOCAL WATERWAY FORUM PRE-MEETING QUESTIONS

NORTH WEST SPRING LOCAL WATERWAY FORUM PRE-MEETING QUESTIONS USER QUESTION RESPONSE John Fiddies Wheelton Boat Club As a result of failed temporary repairs undertaken to a number of lock chambers during the Winter Stoppages has safety been compromised? The most

More information

RE-PRICING OF 12 MONTH MOORING PERMITS 2015

RE-PRICING OF 12 MONTH MOORING PERMITS 2015 RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORINGS AREA REPORT FOR BUCKS & HERTS Introduction This report provides the rationale for mooring price decisions for 2015. VAT is payable at the rate set by

More information

Wilts and Berks Canal Trust

Wilts and Berks Canal Trust Wilts and Berks Canal Trust Melksham Link Waterway, Pedestrian and Off-road Cycle Routes Engineering Design Contents Background 4 Technical Design Part 1 Semington to Berryfield 5 Part 2 Berryfield to

More information

Following the Worcester & Birmingham Canal Feeder in Kings Norton Visiting Lifford Reservoir & Wychall Reservoir. Lifford

Following the Worcester & Birmingham Canal Feeder in Kings Norton Visiting Lifford Reservoir & Wychall Reservoir. Lifford Worcester-Birmingham & Droitwich Canals Society SUMMER WALK Following the Worcester & Birmingham Canal Feeder in Kings Norton Visiting Lifford Reservoir & Wychall Reservoir Lifford Reservoir Wychall Reservoir

More information

Annual Lockage Report 2018

Annual Lockage Report 2018 Annual Lockage Report 2018 The monitoring of lock operations across the Canal & River Trust network remains an essential element in our water resources management but also to understand the changing patterns

More information

Cadburys World Warwick Castle from Alvechurch

Cadburys World Warwick Castle from Alvechurch UK Canal Boating UK Canal Boating Escape with a canal boating holiday! Telephone : 01395 443545 Email : contact@ukcanalboating.com Booking Office : PO Box 57, Budleigh Salterton. Devon. EX9 7ZN. England.

More information

STATE OF THE WATERWAYS HERITAGE 2012/13

STATE OF THE WATERWAYS HERITAGE 2012/13 STATE OF THE WATERWAYS HERITAGE 2012/13 June 2013 Nigel Crowe Heritage, Technical T: 07710 175026 Page 2 of 25 Cover photograph North Warehouse, Sharpness, repaired in 2012/13 and no longer at risk. INTRODUCTION

More information

Dimension Data. Aire & Calder Navigation

Dimension Data. Aire & Calder Navigation Dimension Data The data published in this documentis British Waterways estimate of the dimensions of our waterways based upon local knowledge and expertise. Whilst British Waterways anticipates that this

More information

Historic England (Designation) Consultation Report 14 December 2017

Historic England (Designation) Consultation Report 14 December 2017 Case Name: North Trans-Pennine Phase 2: Footbridge MVL3/8 Case Number: 1449762 Background Historic England has been asked to assess this structure for listing in connection with the proposed upgrade of

More information

ENGLAND NARROWBOAT BARGE CANAL HOLIDAYS WITH A CREW 4 to 9-days / 8-nights on fully catered cruises aboard a traditional English canal boat

ENGLAND NARROWBOAT BARGE CANAL HOLIDAYS WITH A CREW 4 to 9-days / 8-nights on fully catered cruises aboard a traditional English canal boat CANAL BOAT HOLIDAYS ENGLAND NARROWBOAT BARGE CANAL HOLIDAYS WITH A CREW 4 to 9-days / 8-nights on fully catered cruises aboard a traditional English canal boat 2015 Highlights: Departs: Cost: The Llangollen

More information

Berkhamsted and Hemel Hempstead from Iver Marina

Berkhamsted and Hemel Hempstead from Iver Marina UK Canal Boating UK Canal Boating Escape with a canal boating holiday! Telephone : 01395 443545 Email : contact@ukcanalboating.com Booking Office : PO Box 57, Budleigh Salterton. Devon. EX9 7ZN. England.

More information

TOWPATH AND ACCESS IMPROVEMENTS BIRMINGHAM AND BLACK COUNTRY CANALS

TOWPATH AND ACCESS IMPROVEMENTS BIRMINGHAM AND BLACK COUNTRY CANALS TOWPATH AND ACCESS IMPROVEMENTS BIRMINGHAM AND BLACK COUNTRY CANALS BACKGROUND Department for Transport grants Early 2013, the Parliamentary Under-Secretary for Transport, Norman Baker MP, announced 62m

More information

KENNET & AVON VISITOR MOORING REVIEW BATH TO FOXHANGERS

KENNET & AVON VISITOR MOORING REVIEW BATH TO FOXHANGERS KENNET & AVON VISITOR MOORING REVIEW BATH TO FOXHANGERS 09 March 2015 Introduction The Kennet & Avon Local Plan recommended that a review of the visitor moorings between Bath and Foxhangers be carried

More information

Warwick and return from Stratford upon Avon

Warwick and return from Stratford upon Avon UK Canal Boating UK Canal Boating Escape with a canal boating holiday! Telephone : 01395 443545 Email : contact@ukcanalboating.com Booking Office : PO Box 57, Budleigh Salterton. Devon. EX9 7ZN. England.

More information

Cotswold Canals Restoration

Cotswold Canals Restoration Gloucestershire Society for Industrial Archaeology Cotswold Canals Restoration Phase 1b. Saul Junction to The Ocean, Stonehouse Project S01 Stroudwater Canal Features Influenced by the Ship Canal to Gloucester

More information

Notes and Images. Image 2: The junction of The Droveway and

Notes and Images. Image 2: The junction of The Droveway and Notes and Images Image 1: The junction of The Droveway and Barnhurst Lane on the Staffordshire/West Midlands administrative boundary. Signing is needed on the junction and safety improvements are recommended

More information

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options Page 1 of 13 Barnsley, Dearne & Dove Canals HS2 Mitigation Options December 2013 Elsecar Branch, Top Pound Prepared by Ulrich Signer, Director, BDDCT Mike Silk, Engineer, BDDCT The Barnsley, Dearne and

More information

CANAL BOAT HOLIDAYS IN ENGLAND

CANAL BOAT HOLIDAYS IN ENGLAND CANAL BOAT HOLIDAYS IN ENGLAND CREWED NARROWBOAT HOTEL BARGE HOLIDAYS 4 to 9-day fully catered cruises on a traditional canal boat Highlights include the Llangollen Canal, Stratford-upon-Avon & the English

More information

MOORING AREA REPORT FOR YORKSHIRE

MOORING AREA REPORT FOR YORKSHIRE RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORING AREA REPORT FOR YORKSHIRE Introduction This report provides the rationale for mooring price decisions for 2015. VAT is payable at the rate set by the

More information

James Brindley ( )

James Brindley ( ) 1 James Brindley ( 1716-1772 ) These notes are designed to help you with homework and other projects. It will help you to find out: About James Brindley s early life How he became a famous canal engineer

More information

Update on progress in reducing on-line moorings - Review March 2017

Update on progress in reducing on-line moorings - Review March 2017 Update on progress in reducing on-line moorings - Review March 2017 The policy of the Canal & River Trust (the Trust) is to reduce on-line moorings within a 30 mile radius of each new marina (or other

More information

Analysis. British Waterways' Waterways Condition Survey

Analysis. British Waterways' Waterways Condition Survey NABO 2009 BW Waterways Condition Survey 2009 Page 1 Analysis of British Waterways' Waterways Condition Survey 2009 in association with Page 2 BW Waterways Condition Survey 2009 NABO 2009 Table of Contents

More information

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine Emerging Strategy Executive Summary November 2016 Midlands Connect Powering the Midlands Engine Foreword Sir John Peace Chairman of Midlands Engine and Midlands Connect As we get closer to the finalisation

More information

Stratford Upon Avon and return from Alvechurch

Stratford Upon Avon and return from Alvechurch UK Canal Boating UK Canal Boating Escape with a canal boating holiday! Telephone : 01395 443545 Email : bookings@ukcanalboating.com Booking Office : PO Box 57, Budleigh Salterton. Devon. EX9 7ZN. England.

More information

STATE OF THE WATERWAYS HERITAGE

STATE OF THE WATERWAYS HERITAGE APPENDIX 1 STATE OF THE WATERWAYS HERITAGE REPORT 2010/11 Summary 2010/11 was a challenging year for British Waterways (BW). But despite a difficult economic climate and the need to implement a cost reduction

More information

Heritage. Report 2016/2017

Heritage. Report 2016/2017 Heritage Report 2016/2017 September 2017 1 2 Fig 1. Distribution of designated heritage assets owned by the Canal & River Trust Case Studies The following case studies are included in the Report: Managing

More information

Hay Wood, Rowington and Baddesley Clinton - Warwickshire

Hay Wood, Rowington and Baddesley Clinton - Warwickshire Hay Wood, Rowington and Baddesley Clinton - Warwickshire Starts at Lay-by alongside Hay Wood 2 hours 30 minutes 5.5miles 8.8km Leisurely ID: 0.683 Developed by: John Clift Checked by: Andy Page www.ramblersroutes.org

More information

MORE TIME FOR YOU. WELCOME. Phil Langley Marina and Operations Director WINNER WINNER WINNER

MORE TIME FOR YOU. WELCOME. Phil Langley Marina and Operations Director WINNER WINNER WINNER AQUEDUCT MARINA MORE TIME FOR YOU. Inland marina of the year 2017 Inland marina of the year 2018 Inland marina of the year 2018/19 WINNER WINNER WINNER WELCOME. We believe leisure time is an essential

More information

Crinan Canal Customer Forum David talked about some of the challenges Scottish Canals have faced since separating from the Canal & River Trust.

Crinan Canal Customer Forum David talked about some of the challenges Scottish Canals have faced since separating from the Canal & River Trust. Attendees Scottish Canals: Russell Thomson Head of Customer Operations David Lamont Head of Operational Delivery Joe Murphy, Operations and Maintenance Manager, Crinan Canal Josie Saunders, Head of Corporate

More information

RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORINGS AREA REPORT FOR BERKS, WILTS & AVON

RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORINGS AREA REPORT FOR BERKS, WILTS & AVON RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORINGS AREA REPORT FOR BERKS, WILTS & AVON Introduction This report provides the rationale for mooring price decisions for 2015. VAT is payable at the rate

More information

6:30 Leeds Flood Alleviation Scheme Leeds City Council/BAM

6:30 Leeds Flood Alleviation Scheme Leeds City Council/BAM 5:30 Introduction and apologies Jon Horsfall 5:40 History and Progress at the Trust Jon Horsfall 5:50 Operational update Mike Marshall 6:10 Volunteering update Rebecca Dent 6:20 Community update and priorities

More information

P a g e Update on progress in reducing on-line moorings - Review 2018

P a g e Update on progress in reducing on-line moorings - Review 2018 Update on progress in reducing on-line moorings - Review 2018 The policy of the Canal & River Trust (the Trust) is to reduce on-line moorings within a 30 mile radius of each new marina (or other new off-line

More information

TRANQUIL ROSE Cruising Schedule & Route Guide 2019

TRANQUIL ROSE Cruising Schedule & Route Guide 2019 TRANQUIL ROSE Cruising Schedule & Route Guide 2019 Welcome to our 2019 Cruising Schedule A warm welcome to old friends and new, as we look forward to our ninth year of operating Tranquil Rose, or TR as

More information

Department for Transport

Department for Transport Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House

More information

South East User Group Meetings Spring th Braunston, 25 th Tring

South East User Group Meetings Spring th Braunston, 25 th Tring South East User Group Meetings Spring 2013 16 th April @ Braunston, 25 th April @ Tring The Trust so far - Corporate - SE Partnership Maintenance priorities 2013 / 2014 Major works activity 2013/2014 Lock

More information

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation WAIMAKARIRI DISTRICT COUNCIL REPORT FILE NO: GOV-26-01-07, CPR-04-04-01 / 150609090834 REPORT TO: Kaiapoi Community Board DATE OF MEETING: 15 June 2015 FROM: SUBJECT: Craig Sargison, Manager Community

More information

M6 Toll West Midlands Regional Map

M6 Toll West Midlands Regional Map Toll West Midlands Regional Map Stoke on Trent Newcastle-under-Lyme Nottingham Derby Stafford Burton upon Trent Cannock Telford 4 Wolverhampton Kidderminster Willenhall W.Bromwich TOLL Walsall Dudley Stourbridge

More information

Trading on the Wilts and Berks Canal

Trading on the Wilts and Berks Canal Vale and Downland Museum Local History Series Trading on the Wilts and Berks Canal Reg Wilkinson Since the formation of the Wilts & Berks Canal Amenity Group in October 1977, attention has focused on the

More information

Welcome. Stunning place. Peaceful and tranquil. Cath

Welcome. Stunning place. Peaceful and tranquil. Cath Welcome Set in the magnificent Cheshire countryside, Aqueduct Marina offers award winning facilities that will enhance your boating experience to give you more enjoyment from your leisure time. Our 150-berth

More information

TransPennine Route Listing Review: Existing Listings Prepared for Network Rail and Historic England March Alan Baxter

TransPennine Route Listing Review: Existing Listings Prepared for Network Rail and Historic England March Alan Baxter TransPennine Route Listing Review: Existing Listings Prepared for Network Rail and Historic England March 2017 TransPennine Route Listing Review: Existing Listings Prepared for Network Rail and Historic

More information

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD

LOCATION AND COMMENTS LINES AND FEATURES MILEAGE GRID. REF. UP DOWN GREATER U/BRIDGE A107 UPPER CLAPTON LONDON ROAD UP DOWN U/BRIDGE A107 UPPER CLAPTON ROAD CLAPTON STATION Situated on A107 Upper Clapton Road at Junction with Gunton Road E.5 U/BRIDGE SOUTHWOLD ROAD L165 3m 78ch 4MP 4m 03ch TQ 348 866 L164 4m 16ch MOUNT

More information

.com. Enjoy the World at your own pace

.com. Enjoy the World at your own pace .com Enjoy the World at your own pace Welcome to We are a family run business and have been operating since 2004. All of our vessels are moored at Pershore on the river Avon. Pershore is a beautiful, quiet

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

The resignalling scheme

The resignalling scheme & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m

More information

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO. 148 Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust A487 PONT SEIONT ARCHAEOLOGICAL RECORDING prepared for Welsh Office Highways

More information

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL BS 4449:2005 GRADE B500B BAR AND COIL DIAMETER SIZE EXTRA* COIL EXTRA* 8 mm 40.00 15.00 10 mm 25.00 15.00 12 mm 20.00 15.00 Base price + the following extras per size and/or format (coil) 16 mm - 15.00

More information

Alton Towers and Caldon Canal from Stone

Alton Towers and Caldon Canal from Stone UK Canal Boating UK Canal Boating Escape with a canal boating holiday! Telephone : 01395 443545 Email : bookings@ukcanalboating.com Booking Office : PO Box 57, Budleigh Salterton. Devon. EX9 7ZN. England.

More information

Communications Update. 9 September 2016

Communications Update. 9 September 2016 Communications Update 9 September 2016 News Round Up Back to school this week. But the silly season was nice while it lasted The Evening Standard, Time Out (1/9/16) and BBC website (2/9/16) previewed the

More information

A Sustainable Future. Proposed Environment Agency Navigations for Transfer to Canal & River Trust

A Sustainable Future.   Proposed Environment Agency Navigations for Transfer to Canal & River Trust A Sustainable Future Proposed Environment Agency Navigations for Transfer to & Trust www.waterways.org.uk/eatransfer 1 Keeping our waterways alive 1. Introduction IWA is campaigning for Environment Agency

More information

Network Rail. Bridges & Stations Track Record

Network Rail. Bridges & Stations Track Record Bridges & Stations Track Record Bridges track record Apperley Bridge - Leeds Jack Tighe Ltd 2015 Braehead M8 Railway Bridge Jack Tighe Ltd 2015 Calverly, Leeds - TJC3-32A Pyeroy 2015 Kirkbridge Footbridge

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

A party of five members of the Shadow Cabinet, led by Liam Fox are scheduled to visit The Falkirk Wheel on 17 th January.

A party of five members of the Shadow Cabinet, led by Liam Fox are scheduled to visit The Falkirk Wheel on 17 th January. MEMORANDUM TO THE BOARD CHIEF EXECUTIVE S REPORT 1. STAKEHOLDER RELATIONS 1.1 Defra Funding - 2007/08 Defra notified us of our 2007/08 grant on the 20 December. The amount is 57.545m which after deducting

More information

South East Waterway Partnership Draft Strategic Plan. Our Objectives and Aims

South East Waterway Partnership Draft Strategic Plan. Our Objectives and Aims South East Waterway Partnership Draft Strategic Plan Our Objectives and Aims 1. Build community engagement, volunteering and ownership. This means increasing the number of community based and business

More information

MOORINGS AREA REPORT FOR PENNINES

MOORINGS AREA REPORT FOR PENNINES RE-PRICING OF 12 MONTH MOORING PERMITS 2015 MOORINGS AREA REPORT FOR PENNINES Introduction This report provides the rationale for mooring price decisions for 2015. VAT is payable at the rate set by the

More information

Historic England (Designation) Reject at Initial Assessment Report 13 March 2018

Historic England (Designation) Reject at Initial Assessment Report 13 March 2018 Historic England (Designation) Reject at Initial Assessment Report 13 March 2018 Application Name: North Trans-Pennine Phase 2: Ladywood Road Culvert, MVN 2/200 Number: 1448558 Type: New Heritage Category:

More information

TRANSFORMING TRANSPENNINE

TRANSFORMING TRANSPENNINE TRANSFORMING TRANSPENNINE MAY 2018 TIMETABLE We are now at a key milestone for our franchise, with the timetable change that comes into effect on Sunday 20 May 2018 the biggest and most important since

More information

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond

High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond High Speed Two: From Crewe to Manchester, West Midlands to Leeds and beyond Phase 2b Route Decision Moving Britain Ahead July 2017 September 2016 High Speed Two: From Crewe to Manchester, West Midlands

More information

Discover little adventures on your doorstep. Take a picnic and watch the boats crossing Avoncliff Aqueduct

Discover little adventures on your doorstep. Take a picnic and watch the boats crossing Avoncliff Aqueduct South West Gloucestershire Wiltshire Worcestershire Somerset Discover little adventures on your doorstep Take a picnic and watch the boats crossing Avoncliff Aqueduct Watch out for wildlife such as swans,

More information

Off-Site Solutions. CPM Headwalls. Concrete for Life

Off-Site Solutions. CPM Headwalls. Concrete for Life Off-Site Solutions CPM Headwalls Concrete for Life Welcome to CPM CPM is a market leading manufacturer of concrete products with production facilities across the UK. This combined with a network of specialist

More information

NORTH WEST WATERWAY PARTNERSHIP HYBRID WORKSHOP 1 & 2 - NOTES

NORTH WEST WATERWAY PARTNERSHIP HYBRID WORKSHOP 1 & 2 - NOTES NORTH WEST WATERWAY PARTNERSHIP HYBRID WORKSHOP 1 & 2 - NOTES LANCASTER CANAL How and why do people / communities currently use the canals in each Strategic Character Boating (leisure and business) Walking

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Press briefing. Richard Parry 13 February 2015 Chief Executive Update. Living waterways transform places and enrich lives

Press briefing. Richard Parry 13 February 2015 Chief Executive Update. Living waterways transform places and enrich lives Press briefing Richard Parry 13 February 2015 Chief Executive Update Living waterways transform places and enrich lives 2014 Usage Performance 2% annual increase in lock usage on average in 2014 Increases

More information

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

Martin Savage Jon Skinner Nottingham Piscatorial Society. Long Eaton District Scouts. Yvonne Shattower Nottingham Federation of Anglers

Martin Savage Jon Skinner Nottingham Piscatorial Society. Long Eaton District Scouts. Yvonne Shattower Nottingham Federation of Anglers MINUTES e Title East Midlands Waterway Southern Waterway Forum Date 24 March 2015 Venue Nottingham Sailing Club, West Bridgford Attendees Name Representative of Sean McGinley Canal & River Trust David

More information

#element of bullying / harassment South West 2gether NHS FT Mental Health Small

#element of bullying / harassment South West 2gether NHS FT Mental Health Small 1 South West 2gether NHS FT Mental Health Small 3 2 0 3 0 Aintree University Hospital NHS FT Yorks and Humber Airedale NHS FT Combined Acute and Community Small 28 0 8 7 1 North West Alder Hey Children's

More information

Northern Powerhouse Rail

Northern Powerhouse Rail Northern Powerhouse Rail Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life. About Northern Powerhouse Rail This

More information

Business Boating team contacts

Business Boating team contacts Business Boating team contacts Business Boating Managers are the first port of call for anyone wanting to set up a new boating business. They also help existing boating businesses if they want to expand,

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

Regent Mews. Chapel Street Royal Leamington Spa CV31 1EJ. An exclusive development of 4 bedroomed Town Houses in the heart of Royal Leamington Spa

Regent Mews. Chapel Street Royal Leamington Spa CV31 1EJ. An exclusive development of 4 bedroomed Town Houses in the heart of Royal Leamington Spa Regent Mews Royal Leamington Spa CV31 1EJ An exclusive development of 4 bedroomed Town Houses in the heart of Royal Leamington Spa AVAILABLE SPRING 2015 Royal Leamington Spa Royal Leamington Spa offers

More information

South East. Hertfordshire Oxfordshire Buckinghamshire Berkshire

South East. Hertfordshire Oxfordshire Buckinghamshire Berkshire South East Hertfordshire Oxfordshire Buckinghamshire Berkshire Disco ver li ttle a on yo dvent ur do ures ors te p Walk along the to d iffe wpath rent and types of bo Co un ats t how many spot and n water

More information

Improving rail links to Heathrow from the West and beyond

Improving rail links to Heathrow from the West and beyond Public Consultation Improving rail links to Heathrow from the West and beyond We are seeking your views on our proposed design to build a new rail link between the Great Western Main Line and London Heathrow

More information

Martin Latimer. Board Member. Welcome, Housekeeping Matters & Agenda Items

Martin Latimer. Board Member. Welcome, Housekeeping Matters & Agenda Items Welcome Martin Latimer Board Member Welcome, Housekeeping Matters & Agenda Items Agenda 10:00am 10.05am 10.30am 11.10am 11.20am 11.35am 11.40am 11.45am 12.30pm Welcome by Martin Latimer Operational overview

More information

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd

Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd A453 Widening M1 Junction 24 to A52 Nottingham Project Details Project Details Widen 11.5km of existing single carriageway Project

More information

WOLVERHAMPTON ST MARY'S Canal Boats on Canal between Stafford Road and Canal Street. Age of Females

WOLVERHAMPTON ST MARY'S Canal Boats on Canal between Stafford Road and Canal Street. Age of Females Canal Boats Name and Surname of Each Person 1871 - WOLVERHAMPTON ST MARY'S Canal Boats on Canal between Stafford Road and Canal Street Relation to head of family Condition Age of Males Age of Females Rank,

More information

NARROWBOAT BARGING IN ENGLAND 2015

NARROWBOAT BARGING IN ENGLAND 2015 NARROWBOAT BARGING IN ENGLAND 2015 UK CANAL BOATS AND WATERWAY HOLIDAYS Stratford-upon-Avon and the Midlands, Llangollen Canal in Wales, Bath and most major canal rings Our traditional narrowboat canal

More information

HOLIDAY GUIDE. shopping. pets. eating out. boat facilities. arrival ALVECHURCH WATERWAY HOLIDAYS. where to go. what to do.

HOLIDAY GUIDE. shopping. pets. eating out. boat facilities. arrival ALVECHURCH WATERWAY HOLIDAYS. where to go. what to do. ALVECHURCH WATERWAY HOLIDAYS HOLIDAY GUIDE boat facilities what to wear pets arrival where to go eating out what to do marina locations shopping directions to bases CONTENTS Page Introduction 3 Arrival

More information

Leaden Boot Challenge ROUTE INSTRUCTIONS

Leaden Boot Challenge ROUTE INSTRUCTIONS Leaden Boot Challenge ROUTE INSTRUCTIONS Section 1 Alstonefield to Ilam From the village hall car park turn R then L and pass through the village keeping to the R to enter Church Street. Pass the Church

More information

CONTRACTS EXCHANGED WITH STAFFORD RIVERSIDE

CONTRACTS EXCHANGED WITH STAFFORD RIVERSIDE CONTRACTS EXCHANGED WITH RIVERSIDE OPENING SUMMER 06 LOCATION Stafford is the county town and administrative centre of Staffordshire in the West Midlands. The town is located 7 miles north west of Birmingham,

More information

Customer consultation

Customer consultation Customer consultation Anglian Waterways navigation charges 2018/19 July 2017 Introduction We need to increase the boat registration charges payable for any boat kept, used or let for hire on our Anglian

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Oriel 2018 (2019intake) Hospital and Health Board Employers

Oriel 2018 (2019intake) Hospital and Health Board Employers Oriel 2018 (2019intake) Hospital and Health Board Employers Employer Name ABERTAWE BRO MORGANNWG UNIVERSITY HEALTH BOARD AINTREE UNIVERSITY HOSPITAL NHS FOUNDATION TRUST AIREDALE NHS FOUNDATION TRUST ALDER

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters

Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters Background Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters Methodology Online survey conducted in March 2016-1,024

More information

Profile west. Impressive modern office environment. Excellent national and international access.

Profile west. Impressive modern office environment. Excellent national and international access. Profile west Impressive modern office environment. Excellent national and international access. At 52,990 sq ft (4,923 sq m ) Profile West is a landmark building which provides an impressive modern office

More information

School improvement monitoring and brokering grant provisional allocations for illustrative purposes

School improvement monitoring and brokering grant provisional allocations for illustrative purposes School improvement monitoring and brokering grant provisional allocations for illustrative purposes The school improvement monitoring and brokering grant was announced on 30 November 2016. This grant of

More information

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019

1.6 million sq ft TO LET/FOR SALE AVAILABLE Q4 2019 ON SITE NOW 1.6 illion sq ft TO LET/FOR SALE AVAILABLE Q4 019 / WEEDON ROAD NN7 4DE Build-to-suit and speculative buildings Direct access to Junction 16 Clear height up to 18 Three speculatively built

More information

grade A space grade a location FOR SALE TO LET

grade A space grade a location FOR SALE TO LET grade A space grade a location FOR SALE TO LET www.lancashire.gov.uk/lancsbusinesspark Grade A space Grade A location A MAJOR NEW DEVELOPMENT Lancashire Business Park is one of the North West s premier

More information

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK IMMEDIATELY AVAILABLE TO LET UNITS 4 & 5 CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK SAY HELLO TO THE SWEET SP T UNIT 5 66,500 SQ FT UNIT 4 51,500 SQ FT Strategic location

More information

Bus Service Changes. Changes to Local Bus Service Registrations within the West Midlands. Produced by the Network Delivery Team

Bus Service Changes. Changes to Local Bus Service Registrations within the West Midlands. Produced by the Network Delivery Team Registrations within the Produced by the Network Delivery Team This sheet contains all Bus Service Registrations received by Transport for provided by Bus Operators. The information is ordered by 'date

More information

Healthwatch is the independent champion for people who use health and social care services.

Healthwatch is the independent champion for people who use health and social care services. B R I E F I N G State of Support Local Healthwatch Funding 2017/18 30 November 2017 Overview Healthwatch is the independent champion for people who use health and social care services. Across the country

More information

Registered Charity No

Registered Charity No Docklands Canal Boat Trust Registered Charity No 288345 Holidays & Day Trips on the River Boat MV. Challenge A purpose built Wide Beam River Boat providing holidays and day trips for people with disabilities,

More information

BURGHCLERE PARISH RIGHTS OF WAY

BURGHCLERE PARISH RIGHTS OF WAY BURGHCLERE PARISH RIGHTS OF WAY Full descriptions compiled by Neill & Miggie Bruce All photos Miggie Bruce FP23 on Ridgemoor, looking south, with FP22 crossing by the bush FP1. From C183 Aldern Bridge

More information

Berkshire Local Transport Body. Pro- forma for Consideration of a Transport Scheme at Programme Entry Stage. Section 1: Headline Description

Berkshire Local Transport Body. Pro- forma for Consideration of a Transport Scheme at Programme Entry Stage. Section 1: Headline Description Berkshire Local Transport Body Pro- forma for Consideration of a Transport Scheme at Programme Entry Stage Section 1: Headline Description Local Authority Royal Borough of Windsor and Maidenhead Number

More information

NARROWBOAT BARGING IN ENGLAND 2014

NARROWBOAT BARGING IN ENGLAND 2014 NARROWBOAT BARGING IN ENGLAND 2014 UK CANAL BOATS AND WATERWAY HOLIDAYS Stratford-upon-Avon and the Midlands, Llangollen Canal in Wales, Bath and most major canal rings Our traditional narrowboat canal

More information