Bicycle Wayfinding Signage Study

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Bicycle Wayfinding Signage Study"

Transcription

1 Bicycle Wayfinding Signage Study Fargo Moorhead Metropolitan Council of Governments January 2016 Version

2 Introduction The purpose of the Bicycle Signage Study was to set forth a method of creating wayfinding signs along popular bicycle and pedestrian routes. Wayfinding signage would support the current bicycle and pedestrian network by aiding bicyclists in finding destination points such as parks and schools. Many of the routes are interconnected; thereby creating a network that traverses the entire region and in many cases can be used to create loops from community to community. Study Approach The following recommendations were vetted though the Study Review Committee, which was comprised of: Name Cheryl Stetz Christine Laney Jeremy Gorden Kim Lipetzky Meagin Rude Michael Maddox Dan Farnsworth Spencer McCombs Tim Solberg Vic Pellerano Organization Representing City of Dilworth River Keepers City of Fargo Engineering Fargo Cass Public Health City of Fargo Planning Metro COG Metro COG City of Moorhead City of West Fargo Planning Fargo Park District The members of the steering committee were instrumental in developing all the aspects of this plan. They represent the many jurisdictions that deal with bicycle and pedestrian facilities in the Fargo Moorhead Region. Bicycle Signage Routes The project steering committee developed the routes shown in Figure 1 and the associated implementation policies. The overriding mantra in developing the routes was to encapsulate destinations that bicyclist would want to access. The Bicycle Signage Routes were developed based upon existing bicycle facilities, both on street and off street facilities, so no new connections would need to be constructed. Bicycle Signage Routes, as described in this section, were chosen for the placement of wayfinding signage to destinations on or in close proximity to the route. Figure 1 shows the various routes that have been proposed for signage to be placed upon. Route Naming Conventions Bicycle Signage Routes were named in two ways. First, those existing routes that have been identified, or are identifiable were named according to the existing route. In some cases, routes with identifiable destination were named according to the destination. For example, routes that lead through local universities were given the name of their corresponding mascot. All named routes were given the trail designation following the name. Named trails are as follows:

3 YellowRoute BisonTrail SugarBeetTrail DilworthTrail MoorheadTrail DragonsTrail CobbersTrail RedRoute GreatPlainsTrail LoopTrail PinkRoute PurpleRoute OrangeRoute <Null> BlueRoute HjemkomstTrail MilwaukeeTrail OakGroveTrail RedRiverTrail Miles [ Bicycle Signage Routes Bicycle Signage Study Figure 1

4 Red River Trail Hjemkomst Trail Bison Trail Dragons Trail Cobber s Trail Moorhead Trail Dilworth Trail West Fargo Loop Great Plains Trail Sugar Beet Trail Oak Grove Trail Secondly, all other routes that are not identifiable with a specific place were assigned a color. These facilities were designated as routes. Route examples are as follows: Red Route Yellow Route Pink Route Orange Route Blue Route Purple Route Signage Route Descriptions Below are descriptions of the each of the purposed routes and a corresponding map of the individual route. Figure 2: Bison Trail Bicycle Signage Route Bison Trail The Bison Trail begins at the Fargodome and ends at Renaissance Hall, though it connects to the Red River Trail via 4 th Avenue North. The main purpose of this route is to provide wayfinding between the North Dakota State University s main and downtown campuses. The north/south portion of the trail utilizes the one way pair system of 10 th Street and University Drive. 10 th Street has a bike lane that should only be utilized for northbound trips, while University Drive has a bike lane that should only be utilized for southbound trips. The connection downtown occurs via 4 th Avenue North, which eventually provides a connection to the Red River Trail. The Bison Trail is approximately 5 miles long.

5 Red River Trail The Red River Trail traverses the entirety of Fargo via a shared use path along the river. However, much of the trail relies on paths located alongside of roadways as well as on street facilities. The trail begins at Riverwood Park on the north side of Fargo and end at the intersection of 88 th Avenue South & University Drive on the south side of Fargo. Throughout the downtown area, from Oak Grove to Lindenwood Park, the trail consists of a shared use path that is adjacent to the Red River of the North. This is by far the longest trail facility in the region, and can serve long distance north/south trips. It also connects too many other of the routes and trails purposed in this study. There are at least seven locations to cross the Red River of the North along this trail. The Red River Trail is approximately 17.5 miles long. Figure 3: Red River Trail Bicycle Signage Route Milwaukee Trail Portions of the Milwaukee Trail follow the old alignment of the Fargo and Southern rail line, which was converted to a trail facility in southern Fargo. However, the route was expanded to create a trail that traverses the Fargo from north to south. The Milwaukee Trail, as it is designated for the purposes of this study, starts at the intersection of Main Avenue and 25 th Street. It follows 25 th Street until after crossing I 94. It then follows the traditional alignment of the Milwaukee Trail until reaching 25 th Street once again where it continues until 76 th Avenue South. There is turns on 76 th Avenue South and connects to the Red River Trail along University Avenue. The Milwaukee Trail is approximately 9 miles long. Figure 4: Milwaukee Trail Bicycle Signage Route

6 Orange Route This loop route both begins and ends at the Red River Trail in South Fargo. It starts at 40 th Avenue South and continues west until 42 nd Street where it heads northward for one block. It then continues west on path along Drain 57. The Orange Route continues along this path until the drain crossing between 51 st Street and 47 th Street where it turns eastward. After a short jog south on 47 th Street, the Orange Route follows 52 nd Avenue South eastward until it once again connects to the Red River Trail. The Orange Route is approximately 8 miles long. Figure 5: Orange Route Bicycle Signage Route Pink Route The Pink Route is an extension of the Orange Route that accesses neighborhoods along the Sheyenne River. The Pink Route both begins and ends at points along the Orange Route. The Route starts at the intersection of the path along Drain 27 and 40 th Avenue South. It then continues eastward until 66 th Street where it turns southbound. This section can either be completed as an on street or off street connection. 66 th Street becomes 45 th Avenue South. At this point, the route turns back toward the east. As the Pink Routes heads eastward, it follows a new shared use path on the south side of Osgood Golf Course until it reaches Veteran s Blvd where it turns to the south for one block. Utilizing the roundabout crosswalk to traverse Sheyenne Street, the Pink Route continues on a shared use path until it once again connects to the Orange Route. The Pink Route is approximately 3 miles long. Figure 6: Pink Route Bicycle Signage Route

7 Great Plains Trail The majority of the Great Plains Trail follows an abandoned railroad grade making for a nice shared use path not adjacent to an arterial street. The trail is a mixture of a loop and out and back route. It begins at the intersection of 52 nd Avenue South and Veteran s Blvd. The trail follows Veteran s Blvd northward until Osgood School Park where it turns to the northeast. The Great Plains Trail then continues on this path until 32 nd Avenue South. At this point, the trail becomes a loop around the Urban Plains Development utilizing facilities along Brandt Drive, 28 th Avenue South, 23 rd Avenue South, and 51 st Street. This route accesses many of the residential and commercial uses in the Urban Plains Development including Scheel s Arena. The Great Plains Trail is approximately 5 miles long. Figure 7: Great Plains Trail Bicycle Signage Route Southwest Loop The Southwest Loop accesses areas in both Fargo and West Fargo. The loop route connects to the Great Plains Trail in three locations, and shares a segment as well. Starting at the intersection of 23 rd Avenue South and 42 nd Street, the route goes west along 23 rd Avenue South. At Veteran s Blvd, the route turns south until 26 th Avenue South. Following 26 th Avenue South, the Southwest Loop goes west until 4 th Street East (West Fargo), where it turns southbound. At 36 th Avenue South the route turns back to the east and continues along 36 th Avenue until turning northbound on 42 nd Street and coming to the point at which it started. The total loop is 6.5 miles and services mainly residential areas. Main attractions along the route include the Red River Zoo, Anderson Softball Complex, and the Southwest Youth Ice Arena. Figure 8: West Fargo Loop Bicycle Signage Route

8 Purple Route The Purple Route connects elements of the Orange Route and Milwaukee Trail. The route utilizes onstreet bike facilities, shared use paths, and offstreet arterial routes that comprise a loop system connecting residences, shopping areas, and schools with one another. The route starts on 25 th Street just south of I 94 where the Milwaukee Trail turns. At 23 rd Avenue South the route turns westward and continues along the road until it becomes Wheatland Drive, at which point the route is heading south. When the Purple Route reaches 28 th Avenue South, it turns west onto an off road shared use path which connects to the I 29 Frontage Road. At 32 nd Avenue, the route goes eastward until 32 nd Street where it heads south. It again turns to the west at Stonebridge 2 nd Park. After going through the park the shared use path follows 35 th Avenue South to 36 th Street. Figure 9: Purple Route Bicycle Signage Route The purple route follows 36 th Street southbound until 52 nd Avenue South where it encounters the Orange Route. Utilizing the Orange Route to connect it, the Purple Route head back to the north utilizing the shared use path, which runs along Drain 53. When this path reaches 40 th Avenue South, it turns eastward for a short distance until reaching 25 th Street, which leads back northward to the start of the route. The Purple Route is 10 miles long. Red Route The Red Route runs between Elmwood Park in West Fargo and West Acres Mall. This route also connects other regional facilities such as Ranabus Park. The majority of the Red Route utilizes an arterial shareduse path that runs along the 17th Avenue South corridor; however, once in West Fargo it utilizes offroad shared use paths to connect to 13 th Avenue South. The Red Route is approximately 3.5 miles long. Figure 10: Red Route Bicycle Signage Route

9 Sugar Beet Trail The Sugar Beet Trail is named because of the American Crystal Sugar processing plant that is located along the corridor. This trail utilizes mostly on street bicycle facilities, especially along the 11 th /Oakport Street corridor where a wide shoulder accommodates bicycle traffic. Users of the Sugar Beet Trail should be cautious of large vehicle such as those hauling sugar beets as well as vehicles moving at highway speeds. The north end of the trail connects to the Red River Trail across the Oakport Bridge on Wall Street Avenue North. The Sugar Beet Trail is approximately 6 miles long. Figure 11: Sugar Beet Trail Bicycle Signage Route Oak Grove Trail The Oak Grove Trail is extremely short as it only serves to connect the Red River Trail to trails on the Minnesota side of the river via the Oak Grove Pedestrian Bridge. This is one of the few opportunities to cross over the river, especially because it is only one of two pedestrian only facilities in the region. Currently the pedestrian bridge is raised on stilts during high water events and is not taken down until flood threats have subsided. This leaves this connection broken for large time periods during the year. The Oak Grove Trail is approximately.5 miles long. Figure 12: Oak Grove Trail Bicycle Signage Route

10 Hjemkomst Trail This trail is named after the Hjemkomst (Norwegian for homecoming) Interpretive Center located in Viking Ship Park along the river in Moorhead, MN. Much of the trail runs through the park. In the winter, the portion of the trail through Viking Ship Park is used as a groomed cross country ski trail and is not open to bicyclists or pedestrians. The trail is approximately 2 miles long. Figure 13: Hjemkomst Trail Bicycle Signage Route Figure 14: Moorhead Trail Bicycle Signage Route Moorhead Trail Aptly named because the trail runs across the width of the City of Moorhead, the Moorhead Trail provides east/west connectivity to many other trails on the Minnesota side of the river. It accesses destinations such as the Moorhead Center Mall/City Hall. The Moorhead Trail is approximately 2 miles in length.

11 Dilworth Trail A logical extension of the Moorhead Trail, the Dilworth Trail provides bicycle connection between Dilworth and Moorhead. The Dilworth Trail was designed to access many of Dilworth s community facilities such as the community pool, community center, and many of its parks. The Dilworth trail is approximately 2.5 miles long. Figure 15: Dilworth Trail Bicycle Signage Route Dragon s Trail This trail is names after the Minnesota State University Moorhead mascot since the one of the primary destinations of this route is the campus. It also connects to the Hjemkomst Trail on the west side and the Yellow Route on the east. The route utilizes mainly on street bike facilities, although the roadway corridors do have sidewalks or shared use paths. The route is approximately 3 miles long. Figure 16: Dragon's Trail Bicycle Signage Route

12 Cobber s Trail Named after the mascot of Concordia College, this trail provides access to the Concordia College Campus. It also provides a means of creating a looping route system by connecting to the Dragon s Trail and the Red River Trail via the Gooseberry/Lindenwood Park pedestrian bridge. The trail consists of mainly on street facilities; however, the roadway corridors this trail utilizes have sidewalk facilities along them. The main destination is Concordia College as the route goes through its scenic campus. The trail is approximately 2 miles long. Figure 17: Cobber's Trail Bicycle Signage Route Figure 18: Blue Route Bicycle Signage Route Blue Route The blue route was chosen do to the regional event venue at its western terminus. Bluestem is an outdoor amphitheater catering to concerts and plays during the summer months. The Blue Route creates an opportunity for residents living in the area to bike to the venue, which may serve to alleviate parking concerns. The trail is approximately 5 miles long.

13 Bicycle Wayfinding Signage This section delineates the methodology and policy developed for creating a system of wayfinding signs to guide bicyclists around the community. The first step of the study, as explained in the preceding section, was to develop routes where signage can be placed. The second step, as explained by the subheadings below, was to choose locations along and/or adjacent to those routes. Designations were chosen based upon their perceived attraction to bicycle users. Only public places such as parks, schools, or municipal facilities were chosen. A few private places were chosen because of their regional significance. A prime Figure 19: Bicycle Wayfinding Sign example is West Acres Shopping Mall, a regionally recognizable destination that also acts as a transit hub for MATBUS. An example of a bicycle wayfinding sign is shown in Figure 19. Wayfinding Signage Policies The policies below govern the development and implementation of the usage of wayfinding signage. These policies govern everything from the placement to the design of the signs. Mileage Each wayfinding sign will record the distance to the destination it lists. The mileage listed on each sign will be rounded to one tenth of a mile. A sign listing zero miles will indicate the destination has been reached. In some instances, destination may not be exactly on the route. In these cases, an arrow will be placed on the sign indicating the direction of travel off of the designated route. Those destinations not directly on or adjacent to a route will be in the direction indicated on the sign without making any turns. Sign Standards Sign standards will be chosen by the implementing agency. Generally a sign standard will be a metal pole anchored in the ground onto which wayfinding signs are attached. No more than three wayfinding signs should be located on any one standard. This does not include a sign designating the name of the route/trail. Signs should be located approximately 1/3 of a mile apart from one another. This gives ample direction for users to follow the path to each of the destination points. Signs should also be located anywhere the route makes a defined turn. Location of signs Wayfinding signs should be located adjacent to the facility in which it directs users. If the intended users are on a path facility, then the signs should be adjacent to the path. If the

14 SignLocations LoopTrail YellowRoute PinkRoute BisonTrail PurpleRoute SugarBeetTrail OrangeRoute DilworthTrail <Null> MoorheadTrail BlueRoute DragonsTrail HjemkomstTrail CobbersTrail MilwaukeeTrail RedRoute OakGroveTrail GreatPlainsTrail RedRiverTrail Miles [ Bicycle Sign Standard Locations Bicycle Signage Study Figure 20

15 intended users are on and on street facility, then the signs should be located in the right of way of that roadway. Wayfinding signs should be placed dependent upon the type of facility and the direction of travel. Path Facility Signage along a path on one side of a roadway should take into consideration that users might be coming from either direction. In this case, there are one of two options. Signs can either have printing on one side, or have signs on either side of the standard. In the second option, this would mean that there would be six signs on a standard, three in either direction. On Street Facility Sign standards should be placed on either side of a roadway on segments where users share the road with vehicles. These signs would indicate destinations in opposite directions. Sign Design The signs should be designed the same a typical standard street sign. However, if the implementing agencies so chooses, it can color the signs according the colored routes. For named routes, the implementing agency may delineate any color or design it deems fit as long as it does not conflict with any other sign color that has been designated or implemented. Wayfinding Kiosks In addition to wayfinding signs along routes, kiosks could be placed in key spots throughout the bicycle network to guide users to the various routes along the region. These kiosks could be as elaborate or simple as the implementing agency desires. At a minimum, the kiosk would have a map containing both the bicycle route network as defined in this document, and various other bicycle facilities located throughout the region. Kiosk Design There are a number of options for the design/construction of wayfinding kiosks. There are numerous companies that sell a wide variety of kiosks at varying price points. It was the direction of the Study Review Committee for this project not to be prescriptive as to the design of the kiosks. There are places throughout the bicycle network that require different designs based on their individual location. A prime example is any kiosk that would be located along the Red River of the North. Due to frequent flooding, kiosks would have to be designed to be inundated by water or removed during high water events. Kiosk Maintenance Maintenance for the wayfinding kiosks would be the responsibility of the implementing agency and/or land owner, such as a municipality or park district. The route maps will be updated from time to time by Metro COG and distributed to the implementing agencies for printing and distribution to the kiosks. Kiosk Location Kiosks will be located at key spots around the region such as intersections of routes, trailheads, parks, schools, or prime activity hubs. The kiosks should be placed adjacent to marked routes so as to direct users throughout the system. Other kiosks could be located at prime activity hubs such as city halls or

16 on each of the university campuses. The kiosk should be easily identifiable as a resource for wayfinding, the route map being the paramount item. The Figure 21 details the possible locations for kiosks on the routes that have been identified.

17 Possible Wayfinding Kiosk Locations Bicycle Signage Study KioskLocations YellowRoute BisonTrail SugarBeetTrail DilworthTrail MoorheadTrail DragonsTrail CobbersTrail RedRoute GreatPlainsTrail LoopTrail PinkRoute PurpleRoute OrangeRoute <Null> BlueRoute HjemkomstTrail MilwaukeeTrail OakGroveTrail RedRiverTrail Miles [ Figure

18 Appendix A

19 Sign Locations Table

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Cohoes Waterford Canalway Trail Connection Study

Cohoes Waterford Canalway Trail Connection Study Cohoes Waterford Canalway Trail Connection Study Prepared for New York State Canal Corporation By Parks and Trails New York September 2004 Page 2 Table of Contents Acknowledgements... 2 Executive Summary...

More information

UNIVERSITY CITY TOMORROW S URBAN CENTER

UNIVERSITY CITY TOMORROW S URBAN CENTER UNIVERSIT Y CIT Y TO M O R R O W S U R B A N C E N T E R ABOUT University City: Tomorrow s Urban Center University City is poised to begin a new chapter as the opening of Charlotte s LYNX Blue Line Extension

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

For Lease Retail Space LUXURY

For Lease Retail Space LUXURY 1127 LUXURY Euclid Avenue,Cleveland, Ohio 44115 RYAN FISHER Vice President Retail Services DIRECT 216 239 5069 ryan.fisher@colliers.com > PROPERTY HIGHLIGHTS Excellent opportunity to locate at the center

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE FIRST EDITION, SEPTEMBER 2011 Covers Section TN1 Base of Lookout Mountain to Soddy Daisy, TN THIS GUIDE IS NOT FOR SALE OR RESALE Guide To The Great Eastern

More information

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN 1 DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN directly employs 35,000 workers Another 155,000 indirect

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

County of Peterborough Active Transportation Master Plan

County of Peterborough Active Transportation Master Plan The TMP developed a conceptual AT/cycling network for Peterborough County that identified both on-road and off-road (trail) AT facilities. This was a coarse network based on the existing trails and off-road

More information

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. Trails Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. TRAIL S, PATHS, ROUTES AND CONNECTORS Citizen input pointed to trails, paths, bike

More information

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Prepared by: The University of Texas at Arlington Program in Landscape Architecture, School of Architecture and The Institute of

More information

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar Minnesota Department of Natural Resources Division of Parks and Trails July 2012 Glacial Lakes State Trail Master Plan

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) A travel description of the Brisbane Airport Domestic Terminal Precinct Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013) Brisbane Airport is located approximately 18 kilometres

More information

FINCH HYDRO CORRIDOR TRAIL PROJECT

FINCH HYDRO CORRIDOR TRAIL PROJECT FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event

More information

Northwest Arkansas Heritage Trail Plan

Northwest Arkansas Heritage Trail Plan Northwest Arkansas Heritage Trail Plan A regional network of bicycle and pedestrian facilities that connects Northwest Arkansas citizens and visitors to our rich heritage, our recreational and cultural

More information

A History of the Construction of the Radial Expressway System in Cook County

A History of the Construction of the Radial Expressway System in Cook County ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation

More information

Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd.

Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd. Meshach Browning Trail System at the Deep Creek Lake Lion s Club Park on Bumble Bee Rd. The Meshach Browning trail system will be a public, non-motorized, multi-use (running, dog-walking, cross country

More information

THE CANAL BASIN DISTRICT PLAN

THE CANAL BASIN DISTRICT PLAN T h e C a n a l B a s i n D i s t r i c t P l a n, C l e v e l a n d, O h i o - 2 0 0 9 F i n a l R e p o r t The Canal Basin District Plan creates a new green infrastructure for the city of Cleveland,

More information

4. Proposed Transit Improvements

4. Proposed Transit Improvements 4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well

More information

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE PROJECT INTRODUCTION Project partners: St. Cloud Area Planning Organiza on (APO) and the City of St. Cloud. The project area is approximately 2.5 miles long, extending

More information

Stuart Thain. Elizabeth Leader Cameron Simonsen

Stuart Thain. Elizabeth Leader Cameron Simonsen I-15 AND SOUTHERN PARKWAY ST GEORGE, UT Developed by: Desert Color is a master-planned community built around a plan of connectivity, community and sustainability. It is a place where you will find the

More information

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

West Trails Trek Guide. Chief Pontiac Trail Credential Hikes

West Trails Trek Guide. Chief Pontiac Trail Credential Hikes West Trails Trek Guide Kensington Start Edition Chief Pontiac Trail Credential Hikes RDS.WTW.110609 WP# Dist. Accum. Dist. Accum. Feet Miles Meters Meters 1 0 0.0 0 0 2 410 0.1 125 125 3 164 0.1 150 275

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

The HOP Offers Route Refinements

The HOP Offers Route Refinements The HOP Offers Route Refinements Hill Country Transit District, operator of The HOP, Central Texas regional public transit system, frequently reviews fixed routes in efforts to ensure the routes are able

More information

TRAIL MASTER PLAN DRAFT. Broken Bow, Nebraska Adopted: Month, JEO Project No.:

TRAIL MASTER PLAN DRAFT. Broken Bow, Nebraska Adopted: Month, JEO Project No.: TRAIL MASTER PLAN DRAFT Broken Bow, Nebraska Adopted: Month, 2017 JEO Project No.: 161982.00 City of Broken Bow Mayor Cecil Burt City Council Members Rod Sonnichsen, President Neal Neth Chris Myers Jacob

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

July rails MASTER PLAN. prepared by: peter j. smith & company, inc. Grounds for Play. Culture. programs EVENTS. festivals.

July rails MASTER PLAN. prepared by: peter j. smith & company, inc. Grounds for Play. Culture. programs EVENTS. festivals. July 2014 T rails MASTER PLAN prepared by: peter j. smith & company, inc. Grounds for Play programs festivals Culture SPORTS trails health Recreation waterfront EVENTS Parks iipeter j. smith & company,

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

The Light Rail System Safety & Grade Crossing Equipment

The Light Rail System Safety & Grade Crossing Equipment The Light Rail System Safety & Grade Crossing Equipment A Peer Review Provided by the American Public Transportation Association (APTA) Presented by: Mark Benedict, Director, Light Rail Operations and

More information

Sudbury to Hudson Transmission Reliability Project

Sudbury to Hudson Transmission Reliability Project An independent assessment of routing options Sudbury to Hudson Transmission Reliability Project and use of a rail-banked corridor for this purpose Prepared by: NorthEast Logistics Systems, LLC August 29,

More information

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands 1.0 Introduction 1.1 Purpose of Report This Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

More information

Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador

Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador The plot and program area is approximately 75,000 sq.m. It is the second phase and complementary programme for the flagship project of

More information

PROJECT.

PROJECT. A PROJECT 1 2 0 0 R o u t e 2 0 6 M o n t g o m e r y T o w n s h i p, N J 0 8 5 4 0 www.montgomerypromenade.net WELCOME TO MONTGOMERY Montgomery Promenade is a 300,000 square foot regional shopping/entertainment

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2014-64 DATE: October 3, 2014 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue. TORONTO TRANSIT COMMISSION REPORT No S7 MEETING DATE June 4, 1968 FROM: General Manager Subway Construction Date June 3, 1968 Subject: QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its

More information

Rails with Trails Finding the mobility, safety, and liability sweet spot 5/10/2017

Rails with Trails Finding the mobility, safety, and liability sweet spot 5/10/2017 Rails with Trails Finding the mobility, safety, and liability sweet spot 5/10/2017 The National Transportation Systems Center Advancing transportation innovation for the public good U.S. Department of

More information

OFFICE PROPERTIES FOR LEASE

OFFICE PROPERTIES FOR LEASE Far North Central Carl Bohn cbohn@reocsanantonio.com /pdf/office/1202_e_sonterra_villages_on_sonterra_bldg_6.pdf 1202 E Sonterra, Villages on 20,356 sf $14.50 Neg 1 : 250 6,474 1202 E Sonterra Blvd, Bldg

More information

Trails, steps, & P-Patch to be south of I- 5 Colonnade

Trails, steps, & P-Patch to be south of I- 5 Colonnade UW Campus Trails, steps, & P-Patch to be south of I- 5 Colonnade Blaine and Howe Street steps REI N new lighting existing features connector trail new features or improvements overhead freeway and support

More information

This report recommends two new TTC transit services in southwest Toronto.

This report recommends two new TTC transit services in southwest Toronto. Report for Action New TTC Services - Southwest Toronto Date: March 20, 2018 To: TTC Board From: Chief Customer Officer Summary This report recommends two new TTC transit services in southwest Toronto.

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

Post Oak Blvd & San Felipe St

Post Oak Blvd & San Felipe St MEMORIAL PARK RIVER OAKS UPTOWN PARK FREEWAY WEST LOOP FOUR OAKS PLACE ASTORIA CONDOS BELFIORE CONDOS FOUR LEAF TOWERS BHP BILLITON HQ FRESH MARKET WESTBRIAR LANE 1.6 ACRE DEVELOPMENT SITE STREET FELIPE

More information

TRAILS INTERSECTION SIGNS

TRAILS INTERSECTION SIGNS TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.

More information

The Atlanta BeltLine. Project Overview Map

The Atlanta BeltLine. Project Overview Map The Atlanta BeltLine Project Overview Map The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit system, multi-use trails, greenspace, and affordable

More information

STRENGHTS TEXAS TECH UNIVERSITY

STRENGHTS TEXAS TECH UNIVERSITY STRENGHTS TEXAS TECH UNIVERSITY The university is a vital component to the Lubbock economy. Every year, Texas Tech brings in millions of dollars from sporting events, students, and support. The total campus

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Construction Staging Area 19 Western Battery Road

Construction Staging Area 19 Western Battery Road REPORT FOR ACTION Construction Staging Area 19 Western Battery Road Date: December 6, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York

More information

Centennial Airport Flight school practice areas. A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club

Centennial Airport Flight school practice areas. A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club Centennial Airport Flight school practice areas A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club The Denver metro area airspace is very complex and congested. Centennial

More information

Westbrook Station. Transit Oriented Development Opportunity

Westbrook Station. Transit Oriented Development Opportunity DEVELOPM Westbrook Station Transit Oriented Development Opportunity OPPOR Table of Contents Prime Real Estate Development Opportunity page 1 Calgary City of Opportunity page 3 What is Transit Oriented

More information

TABLE OF CONTENTS. 1 P age

TABLE OF CONTENTS. 1 P age TABLE OF CONTENTS PROJECT DESCRIPTION... 2 PROJECT LOCATION... 5 PROEJCT PARTIES... 8 GRANT FUNDS AND SOURCES/ USES OF PROJECT FUNDS... 8 PRIMARY SELECTION CRITERIA/ QUALITY OF LIFE... 9 RESULTS OF BENEFIT

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

Hemisfair Civic Park. Vision and Program Plan

Hemisfair Civic Park. Vision and Program Plan Hemisfair Civic Park Vision and Program Plan OCTOBER 2013 Hemisfair Civic Park Vision and Program Plan Prepared under the direction of the Hemisfair Park Area Redevelopment Corporation. Planning assistance

More information

Minnesota River Valley Area Survey Summary Report

Minnesota River Valley Area Survey Summary Report Minnesota River Valley Area Survey Summary Report Report prepared by: Minnesota Department of Natural Resources Office of Management and Budget Services May 2002 ACKNOWLEDGMENTS A number of organizations

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE

I. INTRODUCTION EAST COAST GREENWAY STUDY PURPOSE I. INTRODUCTION STUDY PURPOSE The purpose of this study is to determine the engineering feasibility of developing the Eastern Trail. It was initiated at the request of the and funded by the Maine Department

More information

TOURISM & PUBLIC SERVICES RURAL SIGNAGE POLICY

TOURISM & PUBLIC SERVICES RURAL SIGNAGE POLICY Policy and Procedures Subject Title: Tourism and Public Services Rural Signage Policy Corporate Policy (Approved by Council): X Policy Ref. No.: ROADS-01-07 Administrative Policy (Approved by CAO): By-Law

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Portneuf Greenway Trail System

Portneuf Greenway Trail System Portneuf Greenway Trail System The purpose of this Master Plan is to outline the vision for the development of the Portneuf Greenway Trail System Master Plan Approved BTPO January 5, 2009 Table of Contents

More information

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP // LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP PROJECT OVERVIEW MAP The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Eakin Community Park. Getting There

Eakin Community Park. Getting There Eakin Community Park Quiet woods along the Accotink Creek are the hallmark of Eakin Community Park. Actually a string of smaller parks, Eakin is made-up of Mantua Park, Kern Drive Park, Eakin Park, Woodburn

More information

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas

San Luis Obispo. Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas San Luis Obispo Bishop Peak Felsman Loop Eagle Rock Maino Open Space Poly Canyon Poly P Other Areas 1 JCT. ELEV. 72 400 00 0 FELSMAN LOOP GATE LOOP RIDGE 600 FENCE JCT. ELEV. 860 1000 1200 BISHOP PEAK

More information

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.

The vision for enhanced service on Riverside between downtown and the airport is not a new concept. 0 1 The vision for enhanced service on Riverside between downtown and the airport is not a new concept. BRT service operating on Riverside/SH 71 to ABIA identified in 2004 in the Capital Metro All Systems

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

TART Trails, Inc. (231)

TART Trails, Inc.  (231) TART Trail System TART Trails, Inc. www.traversetrails.org (231) 941-4300 Leelanau Trail Stretching 15 miles along a former railroad corridor, the TART-owned Leelanau Trail connects Traverse City and Suttons

More information

Ash Creek Trail Master Plan. April 2005

Ash Creek Trail Master Plan. April 2005 Ash Creek Trail Master Plan April 2005 Acknowledgements City of Independence Greg Ellis, City Manager City of Monmouth Jim Hough, Interim City Manager Ash Creek Multi-Use Trail Committee LeVay Jeffries,

More information

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction Braceville Nature Preserve is one of MetroParks largest preserves.

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

Alpine Trails Mountain Community Development Lands Fernie, British Columbia Winter 2018

Alpine Trails Mountain Community Development Lands Fernie, British Columbia Winter 2018 FOR SALE Residential Development Land 228 ± Acres Size: Zoning: Price: 228 +/- Acres R1B and R3 $7,700,000 CAD ($33,772.00 /Acre) $6,055,000 USD ($26,557.00 /Acre) Alpine s Mountain Community Development

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

MCTC Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS)

MCTC Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) 1 MCTC 2014 Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) Overview MCTC Regional Transportation Plan / Sustainable Communities Strategy (RTP/SCS) Between February and April

More information

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011 Imagine the result Laredo Urban Transportation Study August 31 st, 2011 Bus Rapid Transit Feasibility Study Prepared for: Laredo Urban Transportation Study Prepared by: ARCADIS U.S., Inc. 2410 Paces Ferry

More information

Transportation Guide

Transportation Guide 2018 schedules Transportation Guide train pass to go here POWER HOUR: 5:30-6:30 pm, Saturday - Monday! (appointments recommended) An opportunity to extend meetings an additional hour after the 5:30 pm

More information

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014 The Atlanta BeltLine & Sustainable Development GAFM Conferance // March 25, 2014 04/22/2014 Atlanta BeltLine // 2013 Page 1 // Organizational Structure Project Owner and Sponsor Redevelopment Authority

More information

Town of Marlborough, Connecticut Recreational Trail Master Plan

Town of Marlborough, Connecticut Recreational Trail Master Plan Town of Marlborough, Connecticut Recreational Trail Master Plan Drafted and Approved by the Nature Trails and Sidewalks Commission, with assistance from the Planning and Development Director May 2014 Acknowledgements

More information

Campus Business District

Campus Business District Campus Business District Saginaw Charter Township November 2015 Introduction Saginaw Charter Township has long been a hub of activity in the region. Located in mid-michigan, Saginaw Township is proud to

More information

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter 134 AC_BEU_CCMP_3_TM5_8_FD.indd 134 20/07/12 12:30 PM 05 CITY RAIL LINK New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter 5 MO VE 0 1 2 8 KEY 1 Britomart

More information

2017 Annual Service Plan

2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan Objectives Transition to a Frequent Transit Network (FTN) with a strong grid network Preparing the Viva Network Expansion Plan

More information

Attachment 1: Revitalizing Yonge Downtown Yonge Street

Attachment 1: Revitalizing Yonge Downtown Yonge Street Attachment 1: Revitalizing Yonge Downtown Yonge Street Photo credit: Downtown Yonge BIA Attachment - Revitalizing Yonge Downtown Yonge Street 1 Photo credit: Downtown Yonge BIA Photo credit: Downtown Yonge

More information