Bicycle Wayfinding Signage Study

Size: px
Start display at page:

Download "Bicycle Wayfinding Signage Study"

Transcription

1 Bicycle Wayfinding Signage Study Fargo Moorhead Metropolitan Council of Governments January 2016 Version

2 Introduction The purpose of the Bicycle Signage Study was to set forth a method of creating wayfinding signs along popular bicycle and pedestrian routes. Wayfinding signage would support the current bicycle and pedestrian network by aiding bicyclists in finding destination points such as parks and schools. Many of the routes are interconnected; thereby creating a network that traverses the entire region and in many cases can be used to create loops from community to community. Study Approach The following recommendations were vetted though the Study Review Committee, which was comprised of: Name Cheryl Stetz Christine Laney Jeremy Gorden Kim Lipetzky Meagin Rude Michael Maddox Dan Farnsworth Spencer McCombs Tim Solberg Vic Pellerano Organization Representing City of Dilworth River Keepers City of Fargo Engineering Fargo Cass Public Health City of Fargo Planning Metro COG Metro COG City of Moorhead City of West Fargo Planning Fargo Park District The members of the steering committee were instrumental in developing all the aspects of this plan. They represent the many jurisdictions that deal with bicycle and pedestrian facilities in the Fargo Moorhead Region. Bicycle Signage Routes The project steering committee developed the routes shown in Figure 1 and the associated implementation policies. The overriding mantra in developing the routes was to encapsulate destinations that bicyclist would want to access. The Bicycle Signage Routes were developed based upon existing bicycle facilities, both on street and off street facilities, so no new connections would need to be constructed. Bicycle Signage Routes, as described in this section, were chosen for the placement of wayfinding signage to destinations on or in close proximity to the route. Figure 1 shows the various routes that have been proposed for signage to be placed upon. Route Naming Conventions Bicycle Signage Routes were named in two ways. First, those existing routes that have been identified, or are identifiable were named according to the existing route. In some cases, routes with identifiable destination were named according to the destination. For example, routes that lead through local universities were given the name of their corresponding mascot. All named routes were given the trail designation following the name. Named trails are as follows:

3 YellowRoute BisonTrail SugarBeetTrail DilworthTrail MoorheadTrail DragonsTrail CobbersTrail RedRoute GreatPlainsTrail LoopTrail PinkRoute PurpleRoute OrangeRoute <Null> BlueRoute HjemkomstTrail MilwaukeeTrail OakGroveTrail RedRiverTrail Miles [ Bicycle Signage Routes Bicycle Signage Study Figure 1

4 Red River Trail Hjemkomst Trail Bison Trail Dragons Trail Cobber s Trail Moorhead Trail Dilworth Trail West Fargo Loop Great Plains Trail Sugar Beet Trail Oak Grove Trail Secondly, all other routes that are not identifiable with a specific place were assigned a color. These facilities were designated as routes. Route examples are as follows: Red Route Yellow Route Pink Route Orange Route Blue Route Purple Route Signage Route Descriptions Below are descriptions of the each of the purposed routes and a corresponding map of the individual route. Figure 2: Bison Trail Bicycle Signage Route Bison Trail The Bison Trail begins at the Fargodome and ends at Renaissance Hall, though it connects to the Red River Trail via 4 th Avenue North. The main purpose of this route is to provide wayfinding between the North Dakota State University s main and downtown campuses. The north/south portion of the trail utilizes the one way pair system of 10 th Street and University Drive. 10 th Street has a bike lane that should only be utilized for northbound trips, while University Drive has a bike lane that should only be utilized for southbound trips. The connection downtown occurs via 4 th Avenue North, which eventually provides a connection to the Red River Trail. The Bison Trail is approximately 5 miles long.

5 Red River Trail The Red River Trail traverses the entirety of Fargo via a shared use path along the river. However, much of the trail relies on paths located alongside of roadways as well as on street facilities. The trail begins at Riverwood Park on the north side of Fargo and end at the intersection of 88 th Avenue South & University Drive on the south side of Fargo. Throughout the downtown area, from Oak Grove to Lindenwood Park, the trail consists of a shared use path that is adjacent to the Red River of the North. This is by far the longest trail facility in the region, and can serve long distance north/south trips. It also connects too many other of the routes and trails purposed in this study. There are at least seven locations to cross the Red River of the North along this trail. The Red River Trail is approximately 17.5 miles long. Figure 3: Red River Trail Bicycle Signage Route Milwaukee Trail Portions of the Milwaukee Trail follow the old alignment of the Fargo and Southern rail line, which was converted to a trail facility in southern Fargo. However, the route was expanded to create a trail that traverses the Fargo from north to south. The Milwaukee Trail, as it is designated for the purposes of this study, starts at the intersection of Main Avenue and 25 th Street. It follows 25 th Street until after crossing I 94. It then follows the traditional alignment of the Milwaukee Trail until reaching 25 th Street once again where it continues until 76 th Avenue South. There is turns on 76 th Avenue South and connects to the Red River Trail along University Avenue. The Milwaukee Trail is approximately 9 miles long. Figure 4: Milwaukee Trail Bicycle Signage Route

6 Orange Route This loop route both begins and ends at the Red River Trail in South Fargo. It starts at 40 th Avenue South and continues west until 42 nd Street where it heads northward for one block. It then continues west on path along Drain 57. The Orange Route continues along this path until the drain crossing between 51 st Street and 47 th Street where it turns eastward. After a short jog south on 47 th Street, the Orange Route follows 52 nd Avenue South eastward until it once again connects to the Red River Trail. The Orange Route is approximately 8 miles long. Figure 5: Orange Route Bicycle Signage Route Pink Route The Pink Route is an extension of the Orange Route that accesses neighborhoods along the Sheyenne River. The Pink Route both begins and ends at points along the Orange Route. The Route starts at the intersection of the path along Drain 27 and 40 th Avenue South. It then continues eastward until 66 th Street where it turns southbound. This section can either be completed as an on street or off street connection. 66 th Street becomes 45 th Avenue South. At this point, the route turns back toward the east. As the Pink Routes heads eastward, it follows a new shared use path on the south side of Osgood Golf Course until it reaches Veteran s Blvd where it turns to the south for one block. Utilizing the roundabout crosswalk to traverse Sheyenne Street, the Pink Route continues on a shared use path until it once again connects to the Orange Route. The Pink Route is approximately 3 miles long. Figure 6: Pink Route Bicycle Signage Route

7 Great Plains Trail The majority of the Great Plains Trail follows an abandoned railroad grade making for a nice shared use path not adjacent to an arterial street. The trail is a mixture of a loop and out and back route. It begins at the intersection of 52 nd Avenue South and Veteran s Blvd. The trail follows Veteran s Blvd northward until Osgood School Park where it turns to the northeast. The Great Plains Trail then continues on this path until 32 nd Avenue South. At this point, the trail becomes a loop around the Urban Plains Development utilizing facilities along Brandt Drive, 28 th Avenue South, 23 rd Avenue South, and 51 st Street. This route accesses many of the residential and commercial uses in the Urban Plains Development including Scheel s Arena. The Great Plains Trail is approximately 5 miles long. Figure 7: Great Plains Trail Bicycle Signage Route Southwest Loop The Southwest Loop accesses areas in both Fargo and West Fargo. The loop route connects to the Great Plains Trail in three locations, and shares a segment as well. Starting at the intersection of 23 rd Avenue South and 42 nd Street, the route goes west along 23 rd Avenue South. At Veteran s Blvd, the route turns south until 26 th Avenue South. Following 26 th Avenue South, the Southwest Loop goes west until 4 th Street East (West Fargo), where it turns southbound. At 36 th Avenue South the route turns back to the east and continues along 36 th Avenue until turning northbound on 42 nd Street and coming to the point at which it started. The total loop is 6.5 miles and services mainly residential areas. Main attractions along the route include the Red River Zoo, Anderson Softball Complex, and the Southwest Youth Ice Arena. Figure 8: West Fargo Loop Bicycle Signage Route

8 Purple Route The Purple Route connects elements of the Orange Route and Milwaukee Trail. The route utilizes onstreet bike facilities, shared use paths, and offstreet arterial routes that comprise a loop system connecting residences, shopping areas, and schools with one another. The route starts on 25 th Street just south of I 94 where the Milwaukee Trail turns. At 23 rd Avenue South the route turns westward and continues along the road until it becomes Wheatland Drive, at which point the route is heading south. When the Purple Route reaches 28 th Avenue South, it turns west onto an off road shared use path which connects to the I 29 Frontage Road. At 32 nd Avenue, the route goes eastward until 32 nd Street where it heads south. It again turns to the west at Stonebridge 2 nd Park. After going through the park the shared use path follows 35 th Avenue South to 36 th Street. Figure 9: Purple Route Bicycle Signage Route The purple route follows 36 th Street southbound until 52 nd Avenue South where it encounters the Orange Route. Utilizing the Orange Route to connect it, the Purple Route head back to the north utilizing the shared use path, which runs along Drain 53. When this path reaches 40 th Avenue South, it turns eastward for a short distance until reaching 25 th Street, which leads back northward to the start of the route. The Purple Route is 10 miles long. Red Route The Red Route runs between Elmwood Park in West Fargo and West Acres Mall. This route also connects other regional facilities such as Ranabus Park. The majority of the Red Route utilizes an arterial shareduse path that runs along the 17th Avenue South corridor; however, once in West Fargo it utilizes offroad shared use paths to connect to 13 th Avenue South. The Red Route is approximately 3.5 miles long. Figure 10: Red Route Bicycle Signage Route

9 Sugar Beet Trail The Sugar Beet Trail is named because of the American Crystal Sugar processing plant that is located along the corridor. This trail utilizes mostly on street bicycle facilities, especially along the 11 th /Oakport Street corridor where a wide shoulder accommodates bicycle traffic. Users of the Sugar Beet Trail should be cautious of large vehicle such as those hauling sugar beets as well as vehicles moving at highway speeds. The north end of the trail connects to the Red River Trail across the Oakport Bridge on Wall Street Avenue North. The Sugar Beet Trail is approximately 6 miles long. Figure 11: Sugar Beet Trail Bicycle Signage Route Oak Grove Trail The Oak Grove Trail is extremely short as it only serves to connect the Red River Trail to trails on the Minnesota side of the river via the Oak Grove Pedestrian Bridge. This is one of the few opportunities to cross over the river, especially because it is only one of two pedestrian only facilities in the region. Currently the pedestrian bridge is raised on stilts during high water events and is not taken down until flood threats have subsided. This leaves this connection broken for large time periods during the year. The Oak Grove Trail is approximately.5 miles long. Figure 12: Oak Grove Trail Bicycle Signage Route

10 Hjemkomst Trail This trail is named after the Hjemkomst (Norwegian for homecoming) Interpretive Center located in Viking Ship Park along the river in Moorhead, MN. Much of the trail runs through the park. In the winter, the portion of the trail through Viking Ship Park is used as a groomed cross country ski trail and is not open to bicyclists or pedestrians. The trail is approximately 2 miles long. Figure 13: Hjemkomst Trail Bicycle Signage Route Figure 14: Moorhead Trail Bicycle Signage Route Moorhead Trail Aptly named because the trail runs across the width of the City of Moorhead, the Moorhead Trail provides east/west connectivity to many other trails on the Minnesota side of the river. It accesses destinations such as the Moorhead Center Mall/City Hall. The Moorhead Trail is approximately 2 miles in length.

11 Dilworth Trail A logical extension of the Moorhead Trail, the Dilworth Trail provides bicycle connection between Dilworth and Moorhead. The Dilworth Trail was designed to access many of Dilworth s community facilities such as the community pool, community center, and many of its parks. The Dilworth trail is approximately 2.5 miles long. Figure 15: Dilworth Trail Bicycle Signage Route Dragon s Trail This trail is names after the Minnesota State University Moorhead mascot since the one of the primary destinations of this route is the campus. It also connects to the Hjemkomst Trail on the west side and the Yellow Route on the east. The route utilizes mainly on street bike facilities, although the roadway corridors do have sidewalks or shared use paths. The route is approximately 3 miles long. Figure 16: Dragon's Trail Bicycle Signage Route

12 Cobber s Trail Named after the mascot of Concordia College, this trail provides access to the Concordia College Campus. It also provides a means of creating a looping route system by connecting to the Dragon s Trail and the Red River Trail via the Gooseberry/Lindenwood Park pedestrian bridge. The trail consists of mainly on street facilities; however, the roadway corridors this trail utilizes have sidewalk facilities along them. The main destination is Concordia College as the route goes through its scenic campus. The trail is approximately 2 miles long. Figure 17: Cobber's Trail Bicycle Signage Route Figure 18: Blue Route Bicycle Signage Route Blue Route The blue route was chosen do to the regional event venue at its western terminus. Bluestem is an outdoor amphitheater catering to concerts and plays during the summer months. The Blue Route creates an opportunity for residents living in the area to bike to the venue, which may serve to alleviate parking concerns. The trail is approximately 5 miles long.

13 Bicycle Wayfinding Signage This section delineates the methodology and policy developed for creating a system of wayfinding signs to guide bicyclists around the community. The first step of the study, as explained in the preceding section, was to develop routes where signage can be placed. The second step, as explained by the subheadings below, was to choose locations along and/or adjacent to those routes. Designations were chosen based upon their perceived attraction to bicycle users. Only public places such as parks, schools, or municipal facilities were chosen. A few private places were chosen because of their regional significance. A prime Figure 19: Bicycle Wayfinding Sign example is West Acres Shopping Mall, a regionally recognizable destination that also acts as a transit hub for MATBUS. An example of a bicycle wayfinding sign is shown in Figure 19. Wayfinding Signage Policies The policies below govern the development and implementation of the usage of wayfinding signage. These policies govern everything from the placement to the design of the signs. Mileage Each wayfinding sign will record the distance to the destination it lists. The mileage listed on each sign will be rounded to one tenth of a mile. A sign listing zero miles will indicate the destination has been reached. In some instances, destination may not be exactly on the route. In these cases, an arrow will be placed on the sign indicating the direction of travel off of the designated route. Those destinations not directly on or adjacent to a route will be in the direction indicated on the sign without making any turns. Sign Standards Sign standards will be chosen by the implementing agency. Generally a sign standard will be a metal pole anchored in the ground onto which wayfinding signs are attached. No more than three wayfinding signs should be located on any one standard. This does not include a sign designating the name of the route/trail. Signs should be located approximately 1/3 of a mile apart from one another. This gives ample direction for users to follow the path to each of the destination points. Signs should also be located anywhere the route makes a defined turn. Location of signs Wayfinding signs should be located adjacent to the facility in which it directs users. If the intended users are on a path facility, then the signs should be adjacent to the path. If the

14 SignLocations LoopTrail YellowRoute PinkRoute BisonTrail PurpleRoute SugarBeetTrail OrangeRoute DilworthTrail <Null> MoorheadTrail BlueRoute DragonsTrail HjemkomstTrail CobbersTrail MilwaukeeTrail RedRoute OakGroveTrail GreatPlainsTrail RedRiverTrail Miles [ Bicycle Sign Standard Locations Bicycle Signage Study Figure 20

15 intended users are on and on street facility, then the signs should be located in the right of way of that roadway. Wayfinding signs should be placed dependent upon the type of facility and the direction of travel. Path Facility Signage along a path on one side of a roadway should take into consideration that users might be coming from either direction. In this case, there are one of two options. Signs can either have printing on one side, or have signs on either side of the standard. In the second option, this would mean that there would be six signs on a standard, three in either direction. On Street Facility Sign standards should be placed on either side of a roadway on segments where users share the road with vehicles. These signs would indicate destinations in opposite directions. Sign Design The signs should be designed the same a typical standard street sign. However, if the implementing agencies so chooses, it can color the signs according the colored routes. For named routes, the implementing agency may delineate any color or design it deems fit as long as it does not conflict with any other sign color that has been designated or implemented. Wayfinding Kiosks In addition to wayfinding signs along routes, kiosks could be placed in key spots throughout the bicycle network to guide users to the various routes along the region. These kiosks could be as elaborate or simple as the implementing agency desires. At a minimum, the kiosk would have a map containing both the bicycle route network as defined in this document, and various other bicycle facilities located throughout the region. Kiosk Design There are a number of options for the design/construction of wayfinding kiosks. There are numerous companies that sell a wide variety of kiosks at varying price points. It was the direction of the Study Review Committee for this project not to be prescriptive as to the design of the kiosks. There are places throughout the bicycle network that require different designs based on their individual location. A prime example is any kiosk that would be located along the Red River of the North. Due to frequent flooding, kiosks would have to be designed to be inundated by water or removed during high water events. Kiosk Maintenance Maintenance for the wayfinding kiosks would be the responsibility of the implementing agency and/or land owner, such as a municipality or park district. The route maps will be updated from time to time by Metro COG and distributed to the implementing agencies for printing and distribution to the kiosks. Kiosk Location Kiosks will be located at key spots around the region such as intersections of routes, trailheads, parks, schools, or prime activity hubs. The kiosks should be placed adjacent to marked routes so as to direct users throughout the system. Other kiosks could be located at prime activity hubs such as city halls or

16 on each of the university campuses. The kiosk should be easily identifiable as a resource for wayfinding, the route map being the paramount item. The Figure 21 details the possible locations for kiosks on the routes that have been identified.

17 Possible Wayfinding Kiosk Locations Bicycle Signage Study KioskLocations YellowRoute BisonTrail SugarBeetTrail DilworthTrail MoorheadTrail DragonsTrail CobbersTrail RedRoute GreatPlainsTrail LoopTrail PinkRoute PurpleRoute OrangeRoute <Null> BlueRoute HjemkomstTrail MilwaukeeTrail OakGroveTrail RedRiverTrail Miles [ Figure

18 Appendix A

19 Sign Locations Table

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

AGENDA MAT Coordinating Board June 18 th, :00am Metro Transit Garage (MTG) rd Street N, Fargo ND

AGENDA MAT Coordinating Board June 18 th, :00am Metro Transit Garage (MTG) rd Street N, Fargo ND dddddd Fargo-Moorhead Metropolitan Council of Governments 701.232.3242 FAX 701.232.5043 Case Plaza Suite 232 One 2 nd Street North Fargo, North Dakota 58102-4807 Email: metrocog@fmmetrocog.org http://www.fmmetrocog.org

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

OR MISSION TRAIL ELEMENTARY

OR MISSION TRAIL ELEMENTARY Leawood: overview OVERLAD PARK 24: p.70 I-LA PARK 32: p.72 TOMAHAWK PARK 23: p.69 31: p.71 GEZER PARK OR MISSIO TRAIL ELEMETARY 22: p.68 W 133rd St W 135th St KASAS CITY MO - other segments Beginning/end

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

Exterior Wayfinding Signage Design Standards

Exterior Wayfinding Signage Design Standards Exterior Wayfinding Signage Design Standards 05/25/12 TABLE OF CONTENTS CONTENTS SIGNAGE POLICY 2 VEHICULAR SIGNS 3 Main Gateway [Sign 1]... 3 Parking Lot [Sign 2]... 4 Building Identification [Sign 3]...

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: D1 (Map Color: Dark Blue) Description: This alignment connects to the north end of the Burroughs Creek Trail and continues along the west side of the Railroad to 8 th Street. Strengths: - This

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

CITY OF CHASKA PEDESTRIAN MOVEMENT / TRAILS PLAN FINAL CHAPTER 7 PEDESTRIAN MOVEMENT / TRAILS PLAN. Page 1 of 19, Chapter 7

CITY OF CHASKA PEDESTRIAN MOVEMENT / TRAILS PLAN FINAL CHAPTER 7 PEDESTRIAN MOVEMENT / TRAILS PLAN. Page 1 of 19, Chapter 7 FINAL CHAPTER 7 PEDESTRIAN MOVEMENT / TRAILS PLAN Page 1 of 19, Chapter 7 ORDER OF CONTENTS I. INTRODUCTION... 3 II. PURPOSE... 3 III. 2030 COMMUNITY TRAILS SYSTEM PLAN... 4 IV. TRAIL TYPES... 7 A. Regional

More information

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Figure San Dimas Bonita at San Dimas Avenue (view looking west) The adjoining neighborhood has an eclectic assortment of building types and uses, including: the historically significant but not architecturally or visually noteworthy San Dimas Lemon Association Packing

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No. Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK Santa Fe, Oregon, and California ational Historic Trails Olathe: overview W 135th St W 143rd St GARDER 91: p.117 SATA FE UICORPORATED JOHSO COUTY W Santa Fe St ELM GROVE CAMPGROUD OREGO TRAIL W Dennis

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

4.19 Parks, Recreation, and Conservation Lands

4.19 Parks, Recreation, and Conservation Lands interchange would have on the Reed Paige Clark Homestead located on the north side of Stonehenge Road. Alternative D would also affect Palmer Homestead, E.F. Adams House, and Knapp Brothers Shoe Manufacturing

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

Arvidson, Adam R. Adam,

Arvidson, Adam R. Adam, Arvidson, Adam R. From: Andrew Hestness Sent: Wednesday, May 18, 2016 5:39 PM To: Arvidson, Adam R. Cc: Renee Spillum; Schroeder, Michael Subject: RE: Park Dedication Attachments: FranklinPlan - Bystrom

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

CHAPTER FOUR: TRANSPORTATION

CHAPTER FOUR: TRANSPORTATION CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Downtown to Defiance Trolley Key Messages Jan. 2017

Downtown to Defiance Trolley Key Messages Jan. 2017 Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.

More information

Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher

Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher Valdosta-Lowndes MPO Memo To: From: City of Dasher Mayor and City Council VLMPO Staff CC: Date: 7/12/2018 Re: Bike/Pedestrian/Golf Cart Trail Recommendations for the City of Dasher The City of Dasher is

More information

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown. Raytown: overview Blue Ridge Cut-off map 18: p.42 RICE- TREMOTI HOME Raytown Tfwy KASAS 17: p.41 JUCTIO WITH ROCK ISLAD LIE RIGHT OF WAY 16: p.40 BUS STOP AT E 51ST AD BLUE RIDGE (KASAS ) Sterling Ave

More information

MEETING MINUTES District 1 Trail Planning Meeting 1

MEETING MINUTES District 1 Trail Planning Meeting 1 MEETING MINUTES District 1 Trail Planning Meeting 1 June 1, 2017 2:00 PM 3:30 PM City of Two Harbors 2:00 Introductions Attendees: Lisa Austin, MnDOT Bryan Anderson, MnDOT Jasna Hadzic-Stanek, MnDOT Justin

More information

Independence: overview

Independence: overview : overview Kentucky Ave 8: p.30 SUGAR CREEK SATA FE. OREGO, CALIFORIA 7: p.29 6: p.28 9: p.31 10: p.32 Square, Jackson County Courthouse. Photo: Vireo Trail swale area, Santa Fe Trail. Photo: Vireo HISTORIC

More information

Des Plaines River Trail Southern Segment Corridor Plan

Des Plaines River Trail Southern Segment Corridor Plan Des Plaines River Trail Southern Segment Corridor Plan 1 TABLE OF CONTENTS PURPOSE OF THE PLAN 3 HISTORY OF THE DES PLAINES RIVER TRAIL 4 EXISTING CONDITIONS FOR THE SOUTHERN SEGMENT 6 WHY THE SOUTHERN

More information

UNIVERSITY CITY TOMORROW S URBAN CENTER

UNIVERSITY CITY TOMORROW S URBAN CENTER UNIVERSIT Y CIT Y TO M O R R O W S U R B A N C E N T E R ABOUT University City: Tomorrow s Urban Center University City is poised to begin a new chapter as the opening of Charlotte s LYNX Blue Line Extension

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report TABLE OF CONTENTS A Message from the Mayor... 4 Data Count Reports... 5 Count Locations... 6 Count Locations Map... 7 Trail Data... 8 International

More information

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan Heart of the Lakes Area Recreation Plan 1. Design and construct the following trails (please see the following map): a. the Speedway Trail 1) primary pathway the main trail 2) secondary pathway the proposed

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Project Deliverable 4.1.3f Individual City Report - City of San Dimas Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

For Lease Retail Space LUXURY

For Lease Retail Space LUXURY 1127 LUXURY Euclid Avenue,Cleveland, Ohio 44115 RYAN FISHER Vice President Retail Services DIRECT 216 239 5069 ryan.fisher@colliers.com > PROPERTY HIGHLIGHTS Excellent opportunity to locate at the center

More information

Greater Minnesota Regional Parks and Trails Commission Designation Application

Greater Minnesota Regional Parks and Trails Commission Designation Application Greater Minnesota Regional Parks and Trails Commission Designation Application General Section Designation Application #: 16-022D Date Submitted: 04/29/2016 Park or Trail Name: Luverne Loop & Blue Mounds

More information

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DOWNTOWN BRT ALTERNATIVE - 19th AVE DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing

More information

Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy

Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy DRAFT ( ) Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy Prepared for: SATS Multi-Use Trails Jurisdictions Committee Table of Contents Introduction... 3 Signage

More information

Appendix L Technical Memorandum Aesthetics

Appendix L Technical Memorandum Aesthetics Technical Memorandum Aesthetics 1.0 AESTHETICS This section provides a discussion of the aesthetic resources in the vicinity of ARTIC. Aesthetics pertain to the elements that make a certain view pleasing

More information

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Prepared for: Town of East Greenbush 225 Columbia Turnpike Rensselaer, New York 12144

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Lincoln Woodstock. Riverfront Park and Trail System. Project Description

Lincoln Woodstock. Riverfront Park and Trail System. Project Description Lincoln Woodstock Riverfront Park and Trail System Project Description Rev: 6 Dated: May 16, 2008 Table of Contents I. Executive Summary Page 3 II. The Riverfront Park Page 4 III. The Trail System Page

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Welcome to the Cross County Trail Public Input Session!

Welcome to the Cross County Trail Public Input Session! Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector Back Creek Back Creek is a east-west trail corridor proposed within the East Park District. The corridor s endpoints are the Cabarrus County line to the east and Reedy Creek Park to the southwest. The

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE FIRST EDITION, SEPTEMBER 2011 Covers Section TN1 Base of Lookout Mountain to Soddy Daisy, TN THIS GUIDE IS NOT FOR SALE OR RESALE Guide To The Great Eastern

More information

DAKOTA CULTURE UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY

DAKOTA CULTURE UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY UPPER SIOUX COMMUNITY: AREA CHARACTER ANALYSIS ALIGNMENT STRATEGY 51 AREA CHARACTER ANALYSIS: OPPORTUNITIES & CONSTRAINTS RECREATIONAL VEHICLE PARK: A recreational vehicle park will be built to accommodate

More information

Cohoes Waterford Canalway Trail Connection Study

Cohoes Waterford Canalway Trail Connection Study Cohoes Waterford Canalway Trail Connection Study Prepared for New York State Canal Corporation By Parks and Trails New York September 2004 Page 2 Table of Contents Acknowledgements... 2 Executive Summary...

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

Colorado Springs & Pikes Peak Region Destination Master Plan

Colorado Springs & Pikes Peak Region Destination Master Plan Colorado Springs & Pikes Peak Region Destination Master Plan Overview June 19, 2018 DESTINATION MASTER PLAN What is Destination Master Planning? Focus on infrastructure, facilities, services, attractions

More information

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN

NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN NORTHEAST CARLTON COUNTY BICYCLE ROUTE PLAN 5/31/2014 and St. Louis River Trail Plan Update Produced by the Arrowhead Regional Development Commission (ARDC) in Partnership with the State Health Improvement

More information

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction Special study Areas Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN Introduction Beyond the boundaries of the 2030 General Plan, the City has defined Special Study

More information

Snowmobile Trail Signing REF: DNR Trail Signing Handbook

Snowmobile Trail Signing REF: DNR Trail Signing Handbook AWSC FALL WORKSHOP TRAIL SIGNING & MAINTENANCE NOVEMBER 5, 2011 Workshop presenters: Larry Erickson, AWSC Trails Committee Chairman, Iron County Director Dave Peterson, Langlade County Director Snowmobile

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A safe crossing at 9000 South and 850 West Proposed 9000 South Underpass Parkway Timeline Parkway, Trail, and Tourism Facts Blueprint Jordan River 1971 1973

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Mission Statement. Spur 601 Project Highlights

Mission Statement. Spur 601 Project Highlights Mission Statement SPUR 601 is a TxDOT project dedicated to provide a safe, efficient, reliable new corridor to improve the mobility in east-central El Paso. The SPUR 601 team is working in partnership

More information

I-75 in Hamilton County Project Termini

I-75 in Hamilton County Project Termini I-75 in Hamilton County Project Termini Introduction As part of the North South Transportation Initiative (NSTI), capacity improvements were recommended for the I-75 corridor through Hamilton County from

More information

TEMPE BEACH PARK - RECOMMENDATIONS

TEMPE BEACH PARK - RECOMMENDATIONS TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.

More information

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000. 1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

Stephens State Park Trails

Stephens State Park Trails TRAILS OF ALLAMUCHY MOUNTAIN & STEPHENS STATE PARKS Allamuchy Mountain and Stephens State Parks contain 28 marked trails providing access to diverse landscapes for walking, hiking, biking, bird-watching,

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Greater Minnesota Regional Parks and Trails Commission Designation Application

Greater Minnesota Regional Parks and Trails Commission Designation Application Greater Minnesota Regional Parks and Trails Commission Designation Application General Section Designation Application #: 15-096D Date Submitted: 06/29/2015 Park or Trail Name: Barn Bluff Park District

More information

Business Item No xx

Business Item No xx Business Item No. 2015-xx Metropolitan Parks and Open Space Commission Meeting date: April 7, 2015 For the Community Development Committee meeting of April 21, 2015 For the Metropolitan Council meeting

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN

DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN 1 DEN is the #1 Economic Engine of the State of Colorado and the Rocky Mountain region Generating over $26 Billion annually in economic benefit DEN directly employs 35,000 workers Another 155,000 indirect

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

IL 390 Station. Wood Dale Open House Summary 5/18/17

IL 390 Station. Wood Dale Open House Summary 5/18/17 Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information