Appendix C Long-Range Highway and Transit Capital Project List

Size: px
Start display at page:

Download "Appendix C Long-Range Highway and Transit Capital Project List"

Transcription

1 Appendix C Long-Range Highway and Transit Capital Project List Appendix C was developed at the request of the U.S. Department of Transportation Federal Highway and Federal Transit Administrations and consists of a list of potential major capital highway and transit projects. The projects included in this list will be planned and implemented by either the Minnesota Department of Transportation (highways) or the Metropolitan Council/Metro Transit (transit). This list does not include projects on the local highway system or non-transitway systems; those projects are identified through the local planning process for county- and city-owned highways, and through specific transit improvement projects are usually funded through the Regional Solicitation and listed in the Transportation Improvement Program (TIP). All known regionally significant local projects are included in the Transportation Improvement Program, and Appendix E, Additional Air Quality Information. The federally required Transportation Improvement Program (TIP) for the Greater MSP region as defined by the U.S. Census Bureau and the Metropolitan Council to consist of the seven counties of Anoka, Carver, Dakota, Hennepin, Ramsey, Scott, and Washington, the contiguous urbanized areas of Wright and Sherburne counties, and a portion of Houlton, Wis. is updated each year by the Transportation Advisory Board and the Metropolitan Council. The federal transportation bill, Fixing America s Surface Transportation (FAST) Act, requires that all federally funded transportation projects within the Twin Cities region be included in the four-year TIP. The TIP is prepared by Metropolitan Council staff with assistance from the Minnesota Department of Transportation. It is a fiscally constrained four-year program for project delivery, which means anticipated revenues and estimated project costs balance over the four-year period covered by the TIP. The current Transportation Improvement Program is available on the Metropolitan Council website. The list here is intended to be changed through updates and amendments to the Transportation Policy Plan. Appendix C is not a project programming document and cannot be interpreted as a programming document. Appendix C summarizes known projects in the current revenue scenario; this is the long-range transportation planning scenario where known project costs are equal to anticipated revenues (also called the fiscally constrained plan in federal regulations). Appendix C summarizes the project s primary investment category, project location (called Route ), project description, for projects within the first ten years estimated cost in year of expenditure dollars, and approximate implementation timeframe. This list is intended to be exhaustive for Highway MnPASS, Strategic Capacity Enhancements, and Transitways only. When new projects are identified for funding in these three categories, 2040 TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-1

2 they must be amended into the Transportation Policy Plan, this appendix, and any other applicable sections of the plan. The projects listed in the other categories are examples of the types of projects to be funded in these categories and in the timeframes identified. Some projects in these other categories may be regionally significant for air quality analysis and thus require plan amendments prior to funding and construction. For more information contact Metropolitan Council long-range transportation planning staff. Long-Range Highway Capital Projects The Minnesota Department of Transportation provided the list of projects to be included in the Current Revenue Scenario for the 2040 Transportation Policy Plan. The list was based on work done initially for the Minnesota State Plan (MnSHIP) published in January 2017 and updated with more current project information when it was available. Projects are assigned to timeframes: (the Transportation Improvement Program adopted in 2017), , , and This list does not reflect additional spending as a result of the 2017 Minnesota Legislature as that is not yet reflected in the Transportation Improvement Program, MnDOT s Capital Highway Investment Plan or other data sources for this list of projects. It is also not directly comparable to Chapter 4: Transportation Finance [insert link] in that these projects reflect construction cost only while those in Chapter 4 also include internal agency costs necessary to deliver projects (e.g. design, right of way, planning, project management, etc.), during the timeperiod generally only preservation projects have been identified and beyond 2027 cost estimates are not available given the more general understanding that exists of these projects. This list is not intended to be exhaustive for all categories except MnPASS and Strategic Capacity Enhancements. For all other categories, the 2040 Transportation Policy Plan Highway Investment Direction and Plan anticipates funding that exceeds anticipated project costs identified here TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-2

3 Multidmodal MN 36 MN 36, FROM SUNNYSIDE DR TO 0.02 MI N OF OASIS CAFÉ AND FROM 0.02 MI N OF NELSON ST TO CHESTNUT ST IN STILLWATER-UPPER TRAIL, PIPE RAILING, PARKING LOT, ACCESS ROAD, DRAINAGE AS PART OF THE ST CROIX MITIGATION PACKAGE $2,550, Multidmodal MN 36 MN 36, WISCONSIN LOOP TRAIL IN ST. CROIX COUNTY WI AS PART OF THE ST. CROIX RIVER CROSSING PROJECT-WISCONSIN LET Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR BIKE/PED PROJECT - FY 2019 Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR BIKE/PED PROJECT - FY 2020 Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR BIKE/PED PROJECT - FY 2021 Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR CO ADA PROJECT - FY 2019 Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR CO ADA PROJECT - FY 2020 Multidmodal MN 999 DISTRICTWIDE SETASIDE FOR CO ADA PROJECT - FY 2021 Multidmodal MSAS 112 MSAS 112, FROM MACIVER AVENUE TO WRIGHT COUNTY CSAH 19 AT OTSEGO/ALBERTVILLE, RECONSTRUCTION WITH BIKE/PED TRAIL AND INTERSECTION IMPROVEMENTS AT CSAH 19/70TH STREET INTERSECTION $1,100, $1,673, $1,217, $1,106, $1,532, $1,683, $3,369, $1,821, Multidmodal US 10 CONSTRUCT BIKE/PED TRAIL ALONG US 10 FROM $799, ORONO PARK TO PROCTOR ROAD IN ELK RIVER MnDOT Subtotal for Multimodal $16,851, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-3

4 CSAH 1 CSAH 38 CSAH 38 I 35 SHERBURNE CSAH 1, US 10 TO THE BNSF RAIL CROSSING IN ELK RIVER, RECONSTRUCTION AND SAFETY IMPROVEMENTS **AC** WRIGHT CSAH 38, FROM MN 101 TO.1 MILES WEST OF ODEAN AVE IN OTSEGO, RECONSTRUCTION (AC PROJECT, PAYBACK IN 2019) **AC** WRIGHT CSAH 38, FROM MN 101 TO ODEAN AVE IN OTSEGO, RECONSTRUCTION (AC PAYBACK 1 OF 1) **ELLA**SPP**I 35, I 35E FROM 0.6 MI N OF 80TH ST E TO JCT I 35/I 35W/I 35E AND ON I 35W FROM 2.3 MI N OF MAIN ST TO JCT I 35/I 35W/I 35E IN LINO LAKES AND ON I 35 FROM JCT I 35/I 35W/I 35E TO 0.8 MI N OF US 8 IN CITIES OF COLUMBUS AND FOREST LAKE- CONCRETE OVERLAY, R $1,363, $4,500, $ $50,500, I 35 I 35 FROM CRYSTAL LK RD IN BURNSVILLE TO I 35/35W/35E SPLIT AND ON I 35W FROM THE SPLIT TO E 42ND IN MPLS - TRAFFIC MANAGEMENT SYSTEM $350, I 35 I 35, FROM MN 97 IN COLUMBUS TO US 8 IN FOREST LAKE-LANDSCAPING $200, I 35 I 35, SCOTT- CSAH 2 (MAIN STREET) OVER I 35 IN ELKO NEW MARKET- BRIDGE REHAB #70801 $325, I 35E I 35E NB FROM 0.2 MI E OF DAKOTA CR42 TO 0.1 MI W OF PORTLAND AVE IN BURNSVILLE - CONSTRUCT NOISEWALL $1,100, I 35E I 35E, FROM DAKOTA-CSAH42 IN BURNSVILLE TO CSAH32 IN EAGAN - REPLACE LIGHTING SYSTEMS $850, I 35E I 35E, FROM LITTLE CANADA ROAD IN LITTLE CANADA TO RAMSEY-CR J IN WHITE BEAR LAKE - LANDSCAPING $150, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-4

5 I 35E I 35E, IN LINO LAKES - STRUCTURAL FENCE $130, I 35W **AC**SPP**PoDI**I 35W, FROM CLIFF ROAD INTERCHANGE IN BURNSVILLE THROUGH 106TH ST INTERCHANGE IN BLOOMINGTON-REPLACE BRIDGE #5983 (NEW BRIDGES 27W38 AND 27W39), REPLACE BRIDGES 9043 AND 9044 (NEW BRIDGE 27W44) PAVEMENT RECONSTRUCTION, AUXILLIARY LANES, RE $140,000, I 35W **COCII**I 35W MN RIVER BRIDGE #5983 REPLACEMENT FROM CLIFF ROAD INTERCHANGE IN BURNSVILLE TO 106TH ST INTERCHANGE IN BLOOMINGTON-REPLACE BRIDGE #5983 (NEW BRIDGES 27W38 AND 27W39)-DESIGN BUILD ACTIVITIES $1,885, I 35W **ELLA**FLEX19**SPP**I 35W, FROM 4TH ST SE IN MPLS TO ROSEGATE IN ROSEVILLE-BITUMINOUS MILL AND OVERLAY, ADA $16,775, I 35W **SPP**I 35W, FROM PORTLAND AVE TO WASHINGTON AVE AND MN 65 FROM 15TH ST TO 10TH ST IN MPLS - BITUMINOUS MILL AND OVERLAY, CONCRETE PAVEMENT REHABILITATION, REPAIR DRAINAGE STRUCTURES AND PIPE, ADA UPGRADES, TMS $2,680, I 35W **SPP**I 35W, FROM 0.1 MI NORTH OF 76TH ST TO 66TH ST IN RICHFIELD -CONCRETE PAVEMENT REHABILITATION $315, I 35W **SPPF17** I 35W - ST ANTHONY BR #27410 AND #27409, REPLACEMENT OF LEAK COLLECTION SYTEM $500, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-5

6 I 35W I 35W I 35W, AT 5TH ST SE OVER I 35W IN MPLS - REPLACE PED BRIDGE AND APPROACHES, ADA I 35W, BR 27409, OVER MISSISSIPPI RIVER- REPLACE PROGRAMMABLE, AESTHETIC LIGHTING I 35W I 35W, FROM 8TH ST SE TO JOHNSON ST SE IN MPLS - LANDSCAPING I 35W I 394 I 35W, UNDER PED BRIDGE #27987 AT 5TH ST SE IN MPLS - LANDSCAPING I 394, FROM MN 100 IN GOLDEN VALLEY TO GLENWOOD AVE IN MPLS- TRAFFIC MANAGEMENT SYSTEM (FUNDS ARE FROM MNPASS REVENUE AND ABC GARAGE) $2,690, $3,000, $40, $90, $800, I 494 **FLEX19**SPP**I494, FROM 3RD AVE S IN S ST PAUL TO E END OF MN RIVER BRIDGE IN EAGAN - MILL AND OVERLAY, DRAINAGE, REHAB 8 BRIDGES, GUARDRAIL, TMS, TURN LANES, SIGNALS, ADA, AND SIDEWALK $26,150, I 494 **SPP**I494, AT HENNEPIN-CSAH 9 (ROCKFORD ROAD) IN PLYMOUTH - REHABILITATION ON BRIDGE #27972 INCLUDING APPROACHES, BITUMINOUS MILL AND OVERLAY/CONCRETE PAVEMENT REHABILITATION, SIGNALS, ADA, ADD TURN LANES ON RAMPS $2,795, I 494 I494 FROM E BUSH LAKE RD TO W BUSH LAKE RD IN BLOOMINGTON - REPLACE CABLE MEDIAN BARRIER I 494 I494, AT THE US212 INTERCHANGE IN EDEN PRAIRIE - LANDSCAPING $355, $125, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-6

7 I 494 I 494 I494, CSAH 61 OVER I494, BRIDGE IN EDEN PRAIRIE-RECONSTRUCT TRAIL ADJACENT TO BRIDGE AND REPLACE SIGNALS AT RAMP INTERSECTIONS I494, EAST AND WEST RAMPS AT CARLSON PARKWAY IN PLYMOUTH - REPLACE SIGNALS AND ADA UPGRADES $275, $525, I 494 I494, FROM 394 IN MINNETONKA TO I 94/I694 INTERCHANGE IN MAPLE GROVE- LANDSCAPING I 494 I 494 I 694 I494, FROM I 394 IN MINNETONKA ALONG CORRIDOR TO THE I 94/694 INTERCHANGE IN MAPLE GROVE- LANDSCAPING I494, HENNEPIN-CSAH 61 (FLYING CLOUD DR) OVER I494 IN EDEN PRAIRIE-BRIDGE REHAB #27762 **SPP**I694 IN OAKDALE - 10TH ST (CSAH10) TO JCT I694/I494/I 94 AND I494, 0.1 MI S TAMARACK RD TO JCT I694/I494/I 94 CONCRETE OVERLAY; AUXILIARY LANE SB FROM 10TH ST TO I 94; REPLACE AND WIDEN BRIDGES AND 82832; RECONSTRUCT SW LOOP; I 94 FROM JCT I694 $130, $170, $590, $10,735, I 694 **SPPF18**I694 IN OAKDALE - 10TH ST (CSAH10) TO JCT I694/I494/I 94 AND I494, 0.1 MI S TAMARACK RD TO JCT I694/I494/I 94 CONCRETE OVERLAY; AUXILIARY LANE SB FROM 10TH ST TO I 94; REPLACE AND WIDEN BRIDGES AND 82832; RECONSTRUCT SW LOOP; I 94 FROM JCT I $19,500, I 694 I 694, FROM 0.1 MI S OF 10TH ST (CSAH10) TO JCT I 694/494/94 AND I 494 FROM 0.1 M S TAMARACK RD TO JCT I 694/494/94- LANDSCAPING $200, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-7

8 I 694 I 694 I 94 I694, FROM 0.9 MI E OF RICE ST IN LITTLE CANADA TO 0.1 MI W OF LEXINGTON IN ARDEN HILLS - LANDSCAPING I694, N AND S RAMPS AT ANOKA-CSAH 1 (E RIVER ROAD) IN FRIDLEY- SIGNAL SYSTEM REPLACEMENT **SPP**I 94 MAINLINE, WB EXIT RAMP, & EB ENTRANCE RAMP OVER LRT, S 17TH AVE, AND HIAWATHA BIKE TRAIL LOCATED JUST EAST OF JCT OF TH55 IN MINNEAPOLIS REHAB BRIDGES 27859, 27861, AND 27V28 $125, $530, $1,165, I 94 **SPP**I 94, AT MN 100, I694/I 94 IN BROOKLYN CENTER - REHAB BRIDGE 27962, CONCRETE PAVEMENT REHAB AND DRAINAGE REPAIR ON MN 100 AND RAMPS FROM I 694 AND MN 252, AND GUARDRAIL $3,405, I 94 **SPP**I 94, FROM MN 280 TO 0.1 MI W OF WESTERN AVE IN ST PAUL - BITUMINOUS MILL AND OVERLAY, EROSION CONTROL AND DRAINAGE REPAIR I 94 **SPP**I 94, FROM NICOLLET AVE IN MPLS TO MN 280 IN ST PAUL - BITUMINOUS MILL & OVERLAY, TMS & STRIPING I 94 ADJACENT TO I 94 FROM MANNING AVE TO MIDWEST TRAIL N IN AFTON AND FROM 0.8 MI E OF NEAL AVE N TO 0.3 MI W OF STAGECOACH TRAIL N IN W LAKELAND TWP - RECONSTRUCT BITUMINOUS BIKE TRAIL AND DRAINAGE $7,195, $4,790, $385, I 94 ALONG I 94, BETWEEN CEDAR AVE AND MISSISSIPPI RIVER IN MINNEAPOLIS - REPLACE NOISEWALL $2,855, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-8

9 I 94 EB I 94, FROM 20TH ST S TO 23RD AVE S IN MINNEAPOLIS - REMOVE AND REPLACE NOISEWALL #98 I 94 I 94, AT GROTTO AND AT MACKUBIN IN ST PAUL - LANDSCAPING I 94 I 94 I 94, FROM NICOLLET AVE IN MPLS TO SHINGLE CREEK PARKWAY IN BROOKLYN CENTER - LANDSCAPING I 94, PEDESTRIAN BR (IRENE HIXON WHITNEY MEMORIAL) OVER I 94, LYNDALE AND HENNEPIN AVE IN MPLS -PAINT BRIDGE, SALVAGE WOODEN DECK BOARDS, REPAIR RAILING, MISC GROUTED BASEPLATE REPAIRS $720, $125, $190, $2,500, MN 100 MN 100, FROM 36TH ST TO CEDAR LAKE RD IN ST LOUIS PARK-LANDSCAPING $250, MN 13 **AB**MN 13, FROM MN 19 IN CEDAR LAKE TWP TO 0.1 MI SOUTH OF SCOTT-CSAH 21 (EAGLE CREEK AVE) IN PRIOR LAKE - RESURFACING, CONCRETE MEDIAN, DRAINAGE REPAIRS, TURN LANES $9,710, MN 13 **SPP**MN 13 FROM 0.3 MI N OF EAGLE CREEK IN PRIOR LAKE TO 0.1 MI S OF JCT MN 901B (OLD MN 101) IN SAVAGE - BITUMINOUS MILL AND OVERLAY, ADA, SIGNS, GUARDRAIL AND DRAINAGE $4,645, MN 149 **CHAP 152**CMGC**WK PAK #1 MN 149, OVER MISSISSIPPI RIVER FROM MN 5 (W 7TH ST) TO GEORGE ST IN ST PAUL - REHAB BRIDGE # SAFE SPAN $2,500, MN 149 **CHAP 152**CMGC**WK PAK #2 MN 149, OVER MISSISSIPPI RIVER FROM MN 5 (W 7TH ST) TO GEORGE ST IN ST PAUL - REHAB BRIDGE #62090, ADA RAMPS, MILL AND OVERLAY $36,560, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-9

10 MN 149 MN 149, FROM I 494 IN MENDOTA HEIGHTS TO MN 5 IN ST PAUL & ON MN 13 FROM MN 140 TO CHEROKEE HGTS BLVD -LANDSCAPING MN 149 MN 149, FROM I494 IN MENDOTA HEIGHTS TO GEORGE ST IN ST. PAUL AND ON MN 13 FROM MN 149 TO CHEROKEE HEIGHTS BLVD - BITUMINOUS MILL AND OVERLAY, TURN LANE, SIGNAL, ADA, SIDEWALK, BIKE LANES, BITUMINOUS TRAIL, AND DRAINAGE $100, $8,600, MN 156 MN156, FROM I494 IN S ST PAUL TO US 52 IN ST PAUL - CONCRETE PAVEMENT REHAB, BITUMINOUS MILL AND OVERLAY, ADA, SIDEWALKS, RETAINING WALL MN 21 MN 21, FROM 0.1 MI S OF SCOTT-CSAH 37(7TH ST NW) IN NEW PRAGUE TO MILL ST IN JORDAN - BITUMINOUS MILL AND OVERLAY, TURN LANES, ADA IMPROVEMENTS, DRAINAGE $7,975, $6,100, MN 21 TH 21, FROM HELENA ST TO THE NORTHERN INTERSECTION WITH HELENA BLVD IN JORDAN- REPLACE BRIDGE 9123 OVER UP RAILROAD, RECONSTRUCT PAVEMENT, BUILD RETAINING WALLS, REPAIR EROSION, CONSTRUCT DRAINAGE STRUCTURES AND STORM SEWER PIPE $6,295, MN 244 MN244, FROM JCT MN120 IN WHITE BEAR LAKE TO JCT 96 IN DELLWOOD - BITUMINOUS MILL AND OVERLAY, ADD SHOULDER, SIGNAL REVISION, CULVERT REPLACEMENT, ADA UPGRADES $3,130, MN 25 MN 25, FROM 0.1 MI SOUTH OF CARVER-CSAH30 IN MAYER TO STATE ST IN WATERTOWN- BITUMINOUS MILL AND OVERLAY, ADD RIGHT TURN LANE, ADA, DRAINAGE IMPROVEMENTS $3,860, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-10

11 MN 25 MN 25, FROM CARVER CO CSAH 10A IN WATERTOWN TO 7TH STREET IN MONTROSE, MILL AND OVERLAY; AND ON MN 25, FROM 0.6 MI N OF WRIGHT CR 30 SE, REPLACE BR# 8113 WITH BR# 86X08 OVER CREEK; AND ON US 12, FROM 7TH/OLIVER STREET IN COKATO TO 13TH AVE IN HOWARD LA $3,800, MN 282 MN282 FROM MILL ST IN JORDAN TO MN 13 IN SPRING LK TWP-FULL DEPTH RECLAMATION, BIT MILL AND OVERLAY, DRAINAGE, RETAINING WALL $6,870, MN 3 MN 3 FROM JCT WITH MN 149 TO N ANN MARIE TRAIL- RECONSTRUCT ROADWAY WITH BITUMINOUS PAVEMENT AND ON MN 149 FROM N OF JCT WITH MN 3-BITUMINOUS MILL & OVERLAY AND MODIFY INTERSECTION AT CR 71 $5,610, MN 316 **SPP**MN 316, FROM JCT US 61 IN GOODHUE COUNTY TO JCT US 61 IN DAKOTA COUNTY - BITUMINOUS MILL AND OVERLAY MN 36 MN 36, AT CSAH 35 (HADLEY AVE) IN OAKDALE - LANDSCAPING MN 36 MN 36, FROM FAIRVIEW AVE TO HAMLINE AVE IN ROSEVILLE - REPLACE LIGHTING SYSTEMS MN 36 MN 36, OVER ST CROIX RIVER NEAR STILLWATER- MITIGATION/CONSULTANT ITEMS FOR REPLACEMENT OF RIVER BRIDGE 4654 MN 36 MN 36, ST CROIX CROSSING PROJECT SETASIDE FOR SUPPLEMENTAL AGREEMENTS/OVERRUNS FOR REPLACEMENT OF RIVER BRIDGE 4654 MN 41 MEDIUM MILL AND OVERLAY, HUNDERTDMARK RD TO TH 5 $8,290, $100, $450, $3,096, $5,850, $3,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-11

12 MN 41 MN 47 MN 47 MN 5 MN 41, FROM 0.14 MI N OF US212 TO 0.3 MI N CSAH 14 IN CHASKA- LANDSCAPING MN 47, FROM 27TH AVE NE IN MPLS TO 0.1 MI N OF 40TH AVE NE IN COLUMBIA HEIGHTS - RESURFACING, ADA, FENCING MN 47, SB FROM 37TH AVE NE TO EDGE PLACE ROAD IN MPLS - CONSTRUCT NOISEWALL **SPP**MN 5, JCT I494 IN HENNEPIN CO TO S END OF THE MINNESOTA RIVER BRIDGE - CONCRETE OVERLAY, GRADING, PAVING, CABLE MEDIAN BARRIER, REHAB OF 11 BRIDGES $125, $3,050, $855, $18,865, MN 5 MN 5 (E 7TH) OVER BNSF AND CP RAIL, 0.2 MI SW OF JCT TH 61 IN ST PAUL - REHAB BRIDGE 62028, REPLACE SIDEWALK $810, MN 5 MN 5, FROM 0.01 MI N OF 5TH ST IN GREEN ISLE TO US212 IN NORWOOD YOUNG AMERICA - MILL AND OVERLAY (DESIGNED BY DISTRICT 7, D7 PORTION OF $2.7M UNDER ASSOCIATED SP ) $1,540, MN 5 MN 5, FROM WEST JCT ARCADE ST/E 7TH ST IN ST PAUL TO THE N JCT MN120 IN MAPLEWOOD- MILL AND OVERLAY, REPAIR/REPLACE DRAINAGE INFRASTRUCTURE, ADA IMPROVEMENTS $8,360, MN 50 MN 50, FROM MN 3 IN FARMINGTON TO US 52 IN HAMPTON-BITUMINOUS MILL AND OVERLAY, CONSTRUCT TURN LANES, MODIFY INTERSECTIONS AT CSAH 80 & 81, DRAINAGE, ADA IMPROVEMENTS $4,625, MN 51 MN 51, AT HOYT AVE IN FALCON HGTS/ST PAUL - SIGNAL SYSTEM REPLACEMENT $300, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-12

13 MN 51 MN 51 MN 55 MN 55 MN 55 MN 55 MN 55 MN 51, AT MIDWAY PARKWAY/DAN PATCH AVE IN ST PAUL - SIGNAL SYSTEM REPLACEMENT MN 51, W RAMP AT CO RD B-2 IN ROSEVILLE - REPLACE TRAFFIC SIGNAL **SPP**MN 55, OVER BASSETT CREEK IN MINNEAPOLIS - REPLACE BRIDGES (TUNNELS) 94277, 94278, WITH MN 55, AT MEADOW LANE IN GOLDEN VALLEY- SIGNAL REPLACEMENT MN 55, FROM MN 62 IN MINNEAPOLIS TO US 52 IN INVER GROVE HEIGHTS-SIGN REPLACEMENT MN 55, FROM OLD ROCKFORD RD/HAMEL RD IN PLYMOUTH TO MPLS CITY LIMITS - SIGN REPLACEMENT MN 55, OVER THE UP RR AND LUCE LINE TRAIL IN PLYMOUTH - REHAB BRIDGE #6721 MN 610 MN 610, ALONG CORRIDOR IN BROOKLYN PARK - SNOW FENCE/LANDSCAPING MN 62 MN 62 **ELLA**MN 62, FROM PORTLAND AVE TO 28TH ST IN MPLS - BITUMINOUS MILL AND OVERLAY, REHAB BRIDGE 27521, ADA IMPROVEMENTS **ELLA**SPP**MN 62, FROM BEACH RD TO UNDER TRACY AVE BRIDGE IN EDINA AND ON US212 FROM 0.1 MI S OF MN 62 TO E JCT WITH MN 62 IN MINNETONKA- MILL AND OVERLAY, FENCE REPAIR, CURB AND GUTTER, ADA IMPROVEMENTS $300, $91, $3,250, $300, $450, $500, $470, $250, $1,195, $7,780, MN 62 MN 62, AT FRANCE AVE (CSAH 17) OVER MN 62 IN EDINA - REHAB BRIDGE 7263, WIDEN RAMP (ASSOCIATED TO AND S) $2,383, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-13

14 MN 65 MN 65 **COCII** MN 65, AT BRIDGE #2440 (3RD AVE S) OVER MISSISSIPPI RIVER IN MPLS-DESIGN OF MAJOR STRUCTURE REHAB OF BRIDGE MN 65 FROM HENNEPIN-ANOKA COUNTY LINE IN MPLS TO US 10 IN BLAINE - SIGN REPLACEMENT MN 65 MN 65, AT 105TH AVE NE/104 WAY NE IN BLAINE - SIGNAL REPLACEMENT AND ADA UPGRADES MN 65 MN 7 MN 65, AT 41ST AVE NE IN COLUMBIA HTS - SIGNAL SYSTEM REPLACEMENT AND ADA IMPROVEMENTS **SPP**MN 7, FROM 0.1 MI E OF I494 IN MINNETONKA TO 0.25 MI W OF LOUISANA AVE IN ST LOUIS PARK- BITUMINOUS MILL AND OVERLAY, ADA, INTERSECTION REVISIONS AND SIGNALS $300, $450, $400, $280, $5,700, MN 77 **SPP**MN 77, FROM 0.5 MI S OF OLD SHAKOPEE ROAD IN BLOOMINGTON TO MN 62 IN MINNEAPOLIS - BITUMINOUS MILL AND OVERLAY AND EXTEND RIGHT TURN LANE ON EXIT RAMP FROM NB MN 77 TO OLD SHAKOPEE ROAD $8,610, MN 77 MN 77, AT DAKOTA-CSAH 32 (CLIFF RD) OVER MN 77 IN EAGAN - REHAB BRIDGE 19067, ADA IMPROVEMENTS, GUARDRAIL $1,880, MN 77 MN 77, FROM OLD SHAKOPEE ROAD IN BLOOMINGTON TO NORTH OF MN 13 IN EAGAN - REPLACE LIGHTING SYSTEMS $755, MN 77 MN 77, INTERCHANGES AT DAKOTA-CR30 (DIFFLEY RD) AND AT DAKOTA-CR32 (CLIFF RD) IN EAGAN - REPLACE LIGHTING $195, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-14

15 MN 95 MN 95, FROM 0.2 MI NORTH OF 8TH AVE N IN BAYPORT TO 0.1 MI SOUTH OF I 94 IN LAKELAND - BITUMINOUS MILL AND OVERLAY, ADA PED RAMP UPGRADES, DRAINAGE $6,060, MN 999 **ITS**STATEWIDE- REPLACE DYNAMIC MESSAGE SIGNS $1,250, MN 999 **ITS**STATEWIDE- REPLACE SHELTERS AND DYNAMIC MESSAGE SIGNS ($720K OF FHWA IS ITS) $1,825, MN 999 **SPP**DISTRICTWIDE SETASIDE FOR BRIDGE IMPROVEMENT PROJECTS ON NHS - FY 2021 $17,900, MN 999 **SPP**DISTRICTWIDE SETASIDE FOR RESURFACING & RECONDITIONING PROJECTS - FY 2021 $2,155, MN 999 **SPP**DISTRICTWIDE SETASIDE FOR RESURFACING & RECONDITIONING PROJECTS ON NHS - FY 2020 $1,730, MN 999 **TRLF**REPAYMENT, FY 2018, TRLF LOANS USED FOR RIGHT OF WAY PURCHASE ON TH 65 $216, MN 999 **TRLF**REPAYMENT, FY 2019, TRLF LOANS USED FOR RIGHT OF WAY PURCHASE ON TH 65 $216, MN 999 **TRLF**REPAYMENT, FY 2020, TRLF LOANS USED FOR RIGHT OF WAY PURCHASE ON TH 65 $216, MN 999 **TRLF**REPAYMENT, FY 2021, TRLF LOANS USED FOR RIGHT OF WAY PURCHASE ON TH 65 $216, MN 999 DISTRICT SETASIDE FOR MN 47 OVER BNSF MAINLINE IN ANOKA FY2020 $3,000, MN 999 DISTRICTWIDE SETASIDE FOR BRIDGE IMPROVEMENT PROJECTS - FY 2019 $165, MN 999 DISTRICTWIDE SETASIDE FOR BRIDGE IMPROVEMENT PROJECTS ON NON-NHS - FY 2021 $2,365, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-15

16 MN 999 MN 999 MN 999 MN 999 MN 999 MN 999 MN 999 MN 999 MN 999 MN 999 DISTRICTWIDE SETASIDE FOR LANDSCAPE PARTNERSHIPS - FY 2018 DISTRICTWIDE SETASIDE FOR LANDSCAPING & LANDSCAPE PARTNERSHIPS - FY 2019 DISTRICTWIDE SETASIDE FOR LANDSCAPING & LANDSCAPE PARTNERSHIPS - FY 2020 DISTRICTWIDE SETASIDE FOR LANDSCAPING & LANDSCAPE PARTNERSHIPS - FY 2021 DISTRICTWIDE SETASIDE FOR PREVENTIVE MAINTENANCE PROJECTS - FY 2018 DISTRICTWIDE SETASIDE FOR PREVENTIVE MAINTENANCE PROJECTS - FY 2019 DISTRICTWIDE SETASIDE FOR PREVENTIVE MAINTENANCE PROJECTS - FY 2020 DISTRICTWIDE SETASIDE FOR PREVENTIVE MAINTENANCE PROJECTS - FY 2021 DISTRICTWIDE SETASIDE FOR RESURFACING & RECONDITIONING PROJECTS - FY 2019 DISTRICTWIDE SETASIDE FOR RESURFACING & RECONDITIONING PROJECTS ON NON-NHS - FY 2020 $100, $150, $110, $925, $3,361, $3,867, $5,000, $5,000, $510, $1,255, MN 999 DISTRICTWIDE SETASIDE FOR ROAD REPAIR - FY 2018 $5,000, MN 999 DISTRICTWIDE SETASIDE FOR ROAD REPAIR - FY 2019 $5,000, MN 999 DISTRICTWIDE SETASIDE FOR ROAD REPAIR - FY 2020 $5,000, MN 999 DISTRICTWIDE SETASIDE FOR ROAD REPAIR - FY 2021 $5,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-16

17 MN 999 DISTRICTWIDE SETASIDE FOR TRAFFIC ENGINEERING ($2.135M), ROADSIDE SAFETY ($0), TMS($500K) & WRE ($0) - FY 2020 $2,635, MN 999 DISTRICTWIDE SETASIDE FOR TRAFFIC ENGINEERING ($2.36M), ROADSIDE SAFETY($250K), TMS($500K) & WRE ($0) - FY 2021 $3,110, MN 999 METROWIDE-TRAFFIC DETECTOR LOOP REPLACEMENTS $75, MN 999 METROWIDE-TRAFFIC DETECTOR LOOP REPLACEMENTS $75, US 10 US 10 AT DAYTON PORT REST AREA IN RAMSEY AND I 35 AT CHISAGO-CSAH1 IN RUSH CITY- REPLACE LIGHTING US 10 US 10 OVER ST CROIX RIVER IN DENMARK TWP/PRESCOTT- REHAB BRIDGE (WI IS LEAD) US 10 US 10, FROM XENIA AVE ST TO NORFOLK AVE IN ELK RIVER (EBL & WBL), RECONSTRUCTION US 10 US 10, FROM XENIA AVE ST TO NORFOLK AVE IN ELK RIVER (EBL & WBL), RECONSTRUCTION US 12 US 12, FROM E OF BNSF RR IN MAPLE PLAIN TO JCT I494/I 394 IN MINNETONKA - SIGN AND PANEL REPLACEMENT US 12 US12, AT CENTRAL AVE (CSAH 101) IN WAYZATA - REHABILITATION ON BRIDGE #27133 AND APPROACH PANELS, SIGNALS, LIGHTING AND ADA US 12 US12, WB ENTRANCE RAMP AT CARLSON PKWY AND DEER CREEK PKWY AND EB EXIT RAMP AT CARLSON PKWY AND OAKLAND RD IN MINNETONKA - SIGNAL REPLACEMENT AND ADA IMPROVEMENTS $180, $350, $8,400, $8,400, $400, $2,060, $500, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-17

18 US 169 **SPP**US169, AT MN 19 AND FROM 0.5 MI SOUTH OF MN 25 TO 0.6 MI NORTH OF MN 25, CONSTRUCT CROSS OVER; AND AT 0.4 MI NORTH OF CSAH 66 CONSTRUCT TURN LANE $560, US 169 **SPP**US169, AT ROCKFORD RD IN PLYMOUTH - REHAB BRIDGE #27551 US 169 **SPP**US169, FROM 0.3 MI NORTH OF MN 19 TO 0.1 MI NORTH OF ASH ST IN BELLE PLAINE - CONCRETE OVERLAY, CONCRETE PAVEMENT REHABILITATION, BITUMINOUS MILL AND OVERLAY AND DRAINAGE REPAIRS (TIE TO ) $165, $18,665, US 169 **SPP**US169, FROM MN 25 TO MN282 - CONCRETE OVERLAY, BITUMINOUS MILL AND OVERLAY, MILL BITUMINOUS PAVEMENT, MEDIAN CLOSURES, ADD U- TURNS, REDUCED CONFLICT INTERSECTION, DRAINAGE, LIGHTING AND TENSION CABLE GUARDRAIL (TIE TO ) $15,720, US 169 US169 FROM 0.1 MI SOUTH OF 101ST AVE IN BROOKLYN PARK TO HAYDEN LAKE ROAD IN CHAMPLIN CONCRETE PAVEMENT REHAB, ADA, DRAINAGE, CONSTRUCT SB ACCELERATION LANE AT 120TH AVE AND EXTEND NB TURN LANES $7,240, US 169 US169, AT MN 41 (CHESTNUT BLVD)/CSAH 78 IN JACKSON TWP - LANDSCAPING US 169 US169, FROM BREN ROAD TO 7TH ST IN HOPKINS - LANDSCAPING $75, $100, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-18

19 US 169 US169, FROM HAYDEN LAKE RD TO DEAN AVE IN CHAMPLIN - REPLACE AND WIDEN BRIDGE #6890 (NEW BRIDGE 27W37) AND REPLACE BRIDGE 6891 (NEW BRIDGE 27W36), EXTEND SB LEFT TURN LANE AT HAYDEN LAKE RD ONTO BRIDGE 27W37, RECONSTRUCT BITUMINOUS AND CONCRETE PAVEMENT ( $3,840, US 169 US169, FROM I 394 IN GOLDEN VALLEY TO I 94 IN BROOKLYN PARK - INSTALL TRAFFIC MANAGEMENT SYSTEM US 169 US169, FROM LANGFORD DR TO 0.2 MI N OF LINCOLN DR IN EDINA - CONSTRUCT NOISEWALL US 169 US169, FROM VALLEY VIEW RD TO APACHE RD IN EDINA - CONSTRUCT NOISEWALL US 212 **SPP**US212, FROM.02 MILE WEST OF MN 25/MN 5 TO CARVER-CSAH34 IN NORWOOD YOUNG AMERICA - BITUMINOUS MILL AND OVERLAY AND ADA IMPROVEMENTS US 52 **SPP**US 52, FROM 0.1 MI N OF THE US 52/I494 INTERCHANGE IN INVER GROVE HTS TO PLATO AVE IN ST PAUL - MILL AND OVERLAY, CPR, WEIGHT ENFORCEMENT PULL OFF PAD, WIM SENSORS, ADA AND SIGNING $925, $425, $1,810, $5,435, $11,335, US 52 **SPP**US 52, FROM THE S END OF CANNON RIVER BR IN GOODHUE COUNTY TO 0.2 MI N OF CR-86/280TH ST IN RANDOLPH TOWNSHIP- UNBONDED CONCRETE OVERLAY, GUARDRAIL, RR SIGNAL, CABLE BARRIER & JOINT REPAIR ON BRIDGES 9425 AND 9426 $7,625, US 61 **ELLA**US 61, WASHINGTON-CSAH19 OVER US 61 IN COTTAGE GROVE - REHAB BRIDGE #9071 $295, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-19

20 US 61 US 61 (VERMILLION ST) AT 15TH ST IN HASTINGS - SIGNAL REPLACEMENT AND ADA UPGRADES US 61 US 952A US 61, 0.2 MI N OF MAXWELL AVE IN MAPLEWOOD TO 0.2 MI S OF WARNER RD IN ST PAUL - REPLACE LIGHTING US952A (ROBERT ST), FROM ANNAPOLIS ST IN W ST PAUL TO 12TH ST IN ST PAUL - BITUMINOUS MILL AND OVERLAY, REHAB ON BRIDGES #62050, 62894, 9036, 90381, DRAINAGE, ADA, SIGNALS, AND SIDEWALK REPLACEMENT $300, $1,300, $12,385, I 35 CPR & DIAMOND GRIND, SOUTHBOUND ONLY FROM SB BRIDGE OVER LAKE MARION TO SCOTT/DAKOTA CL $4,300, I 35E MAJOR CPR & DIAMOND GR,.031 MI N 10TH ST BR TO $1,300, S END OF UNIVERSITY AVE BR I 35E MAJOR CPR & DIAMOND GR, JCT I 35W/I 35 TO 5 MI N $18,500, MN 77 I 35E RE-OVERLAY BR #19864 (CSAH 28/YANKEE DOODLE RD $2,750, OVER I 35E) I 35W MEDIUM CPR/MEDIUM BIT M&O, FROM PORTLAND $14,200, AVE TO WASHGINTON AVE I 35W MEDIUM MILL AND OVERLAY,.1 MI S OF BURNSVILLE $15,000, PKWY TO.1 MI N I-494 BR I 35W MINOR CRP, FROM SUNSET AVE TO 35E $1,000, I 35W RAISE BRIDGE/OVERLAY BR #9213, W 82ND OVER 35W $1,000, I 35W REHAB BR #9041 (W 90TH OVER I 35W) $500, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-20

21 I 394 MED BIT M&O, I-494/US 12 TO MN 100 $19,000, I 394 I 394 I 494 I 494 REDECK BR #27831 (I 394 OVER DUNWOODY BLVD) (YEAR 1 OF 2) REDECK BR #27831 (I 394 OVER DUNWOODY BLVD) (YEAR 2 OF 2) MAJOR CPR & DIAMOND GRIND, MISSISSIPPI RVR BR TO 24TH AVE MEDIUM MILL AND OVERLAY, 24TH AV S TO FRANCE AVE $30,709, $25,125, $5,100, $21,500, I 494 MINOR CPR, FRPM TAMARACK BLVD TO HARDMAN BR $4,500, I 494 MINOR CRP, FROM FRANCE AVE TO EXIT 19B WB US 12 $15,800, I 694 CPR, FROM US 61 TO CSAH 10 $3,500, I 694 MED BIT M&O, FROM E DUPONT TO I 35W $23,000, I 694 REOVERLAY BR #62824 (LEXINGTON AVE) OVER I 694 $800, I 694 REPAIR SUBSTRUCTURE AND REDECK BRIDGE # 6580 (RICE ST) OVER I694 I 94 I 94 I 94 I 94, FROM E MONTICELLO TO MN 241 IN ST. MICHAEL, UNBONDED OVERLAY I 94, OVERLAY AND REHAB BRIDGE #86817 OVER WRIGHT CO CSAH 19 IN ALBERTVILLE I 94, OVERLAY AND REHAB BRIDGE #86818 OVER WRIGHT CO CSAH 19 IN ALBERTVILLE $3,000, $21,000, $3,350, $3,350, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-21

22 I 94 I 94 I 94 MAJOR CONCRETE PAVEMENT REPAIR & DIAMOND GRIND, WESTERN AVE TO MOUNDS BLVD MEDIUM BITUMINOUS M&O, MN 280 TO WESTERN AVE OVERLAY BR #27782, #27715 (7TH ST AND LYNDALE NB OVER I 94) I 94 OVERLAY BR #27959 (101st) OVER 94 AND BR #27944 (CTY 144) OVER 94 I 94 PAVEMENT REPLACEMENT, (I 94/I 694) W END BROOKLYN BLVD BR TO HUMBOLDT AVE $6,700, $18,200, $3,500, $1,850, $15,000, I 94 REDECK/REPAIR BR #27796 (PLYMOUTH AVE OVER I 94) $3,000, I 94 RE-OVERLAY AND PAINT BR #27855 (I 94 OVER MN 55) $3,000, I 94 REOVERLAY BR #62878 (MARION/CSAH 56 OVER I 94 & EB RAMP) $2,500, I 94 REPLACE BR #27865 (20TH AVE OVER I 94) $2,600, I 94 REPLACE BR #62813 (PELHAM OVER RR AND I 94) $5,000, I 94 I 94 MN 100 MN 101 UNBONDED CONCRETE OVERLAY FROM MN 101 to CR 81 (FISH LAKE INTERCHANGE) UNBONDED CONCRETE OVERLAY FROM MN 120 TO WISCONSIN BORDER, EB ONLY MEDIUM MILL AND OVERLAY, UNDER PED BR/EX CEDAR LK RD TO I 694 FULL DEPTH RECLAIM, CSAH 61 (OLD 212) TO 0.14 MI N OF JCT CSAH 14 - LIKELY TURNBACK $75,000, $50,000, $24,000, $3,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-22

23 MN 101 MN 101 MEDIIUM MILL AND OVERLAY, MN 5 TO CSAH 10/TOWNLINE RD MINOR CRP, FROM CR 42 TO END OF MISSISSIPPI RIVER BR PAID FOR BY METRO DISTRICT $2,000, $3,600, MN 101 MN 101, FROM WRIGHT/HENNEPIN CO LINE (CROW RIVER) TO WRIGHT CR 42 IN OTSEGO (NB AND SB), MILL AND OVERLAY INCL INTERCHANGE RAMPS $1,800, MN 101 MN 101, FROM WRIGHT/HENNEPIN CO LINE (CROW $1,800, RIVER) TO WRIGHT CR 42 IN OTSEGO (NB AND SB), MILL AND OVERLAY INCL INTERCHANGE RAMPS MN 101 MN 101 REPLACE NB BR#71002 OVER US 10 IN ELK $2,200, RIVER MN 101 RECLAIM/MEDIUM MILL AND OVERLAY, FROM CSAH- $4,200, TO HENNEPIN/WRIGHT CL MN 101 RECLAIM/MEDIUM MILL AND OVERLAY, FROM CSAH- $4,200, TO HENNEPIN/WRIGHT CL MN 110 MED BIT M&O, FROM MN 55 TO I 35E $2,800, MN 120 FULL DEPTH RECLAIM, 4TH ST TO MN 244 $10,300, MN 121 PAVEMENT REPAIR, PED BRIDGE #27061 (OVER LYNDALE AVE S) TO W 58TH ST IN MPLS $1,000, MN 13 MEDIUM BIT MILL AND OVERLAY, MN 19 TO 0.3 MI S $6,800, OF MN 282 MN 13 REPAIR BR #9780, #9779 (MN 13 OVER I 35W) $3,000, MN 149 UTBWC, ALBANO TR TO.24 MI NO OF MENDOTA HTS RD $2,100, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-23

24 MN 19 Med Mill/Overlay $9,940, MN 19 MN 19 REPLACE BRIDGES 8741 (RP ), 8742 (RP ), AND 8713 (RP ) TH 19 FROM TH 13 TO TH 3, BITUMINOUS MILL AND OVERLAY $2,400, $10,190, MN 19 Thin Mill/Overlay $5,095, MN 20 MED BIT MILL & OVERLAY, JCT MN 19 TO JCT MN 50 $6,500, MN 21 REDECK AND REPLACE SUPERSTRUCTURE FOR BR #9124 (OVER SAND CREEK) MN 25 MN 25 MN 25 MN 25 MN 25 MICRO MILL + UTBWC, FROM TH 5 TO CSAH 30/1ST ST IN MAYER MN 25, AT MISSISSIPPI RIVER IN MONTICELLO, OVERLAY BRIDGE MN 25, FROM I 94 TO MISSISSIPPI RIVIER BRIDGE IN MONTICELLO (NB AND SB), MILL AND OVERLAY MN 25, FROM NORTH MONTICELLO TO US 10 IN BIG LAKE, MILL AND OVERLAY INCL ADA WORK RECONSTRUCT/OVERLAY, MN 169 TO MN RIVER (BRIDGE 72012) $1,700, $1,400, $1,714, $1,100, $1,600, $2,000, MN 252 MEDIUM CPR/MEDIUM BIT M&O, I 94 TO 85TH $10,900, MN 280 MAJOR CPR & DIAMOND GRIND, JCT I 94 TO COMO AVE $4,500, MN 284 FULL DEPTH RECLAIM, TH 212 TO SIERRA PARKWAY $6,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-24

25 MN 3 MEDIIUM MILL AND OVERLAY, CR 58 TO MN 149 $7,500, MN 3 MN 36 MEDIIUM MILL AND OVERLAY, RICE CL TO.1 MI S OF TH 50 MILL AND OVERLAY, WHITETOPPING/FDR, FROM JCT I 35W TO CSAH 66 (GREELEY AVE) MN 41 MED BIT M&O, 500' SOUTH OF MN RIVER TO CSAH 61 (OLD 212) $9,000, $39,700, $800, MN 41 MINOR CPR, FROM US 169 TO RR XING # $700, MN 47 CIR/MEDIIUM MILL AND OVERLAY, BUNKER LK BLVD TO ANOKA/ISANTI CL $11,700, MN 47 MEDIUM MILL AND OVERLAY, MN 65 TO 27TH AVE $5,000, MN 47 MN 47 MN 47, FROM ISANTI/ANOKA CO LINE TO JCT TH 95 IN JCT MN 95, MILL AND OVERLAY THIN MILL AND OVERLAY, JCT US 10/MN 47 TO JCT BUNKER LAKE/INDUSTRY BLVD MN 47 UTBWC, FROM 1000' W OF COON RAPIDS BLVD TO E. JCT US 10 MN 5 MN 5 CONCRETE PAVEMENT REPAIR AND DIAMOND GRIND, E JCT OF I-494 TO POST RD /E END BR TERMINAL #1 ENTRANCE MED BIT MILL & OVERLAY, JCT ELM ST TO.5 M E BIRCH ST (WACONIA) $6,400, $900, $165, $3,200, $800, MN 5 MED CPR & D.G., FROM MN 41 TO CSAH 4 $12,500, MN 5 THIN BIT MILL AND OVERLAY, MUNSTER AVE TO JCT 61/MOUNDS BLVD $14,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-25

26 MN 50 FULL DEPTH RECLAM OR WHITETOPPING, FROM BR # OVER US 52 TO US 61 MN 51 MN 51 MEDIUM MILL AND OVERLAY, MN 36 TO JCT I 694/UTBWC OVERLAY BR #62015 (MN 51/SNELLING) OVER COMO AVE $14,500, $5,500, $1,000, MN 55 MED CPR & DIAMOND GR/MEDIUM MILL AND OVERLAY/RECLAIM, FROM BR OVER BLOOMINGTON RD TO CR-63 (ARGENTA TR) $12,000, MN 55 MED MRP & D.R., FROM CR 63 TO US 52 $3,500, MN 55 MEDIUM BIT M&O/MINOR CPR, FROM 13TH AVE S TO MN 62 $10,700, MN 55 MILL AND OVERLAY, GEN MILLS BLVD TO.2 MI W OF $3,100, MN HWY 100 MN 55 MILL RECLAIM, 494 TO GENERAL MILLS BLVD $12,900, MN 55 REDECK BR #27849 (MN 55 EB/8TH ST OVER I 35W AND RAMPS), #27875 (MN 55 WB/7TH ST OVER I 35W AND RAMPS), #27177 (MN 55 OVER FRANKLIN AVE) $10,000, MN 55 REDECK/OVERLAY BR #19819 (MN 55 OVER I 35E), BR $10,000, #19827 (MN 55 OVER I-494) MN 55 REDECK/REPAIR BR #5891 (OVER RR EAST OF HWY 100) $4,000, MN 55 MN 56 REHABILITATE RAILING ON BRIDGE# 4190 (MENDOTA BRIDGE) MED BIT MILL & OVERLAY, GOODHUE/DAKOTA CL TO MN 50/US 52 $5,000, $5,100, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-26

27 MN 610 MEDIUM CPR, US169 TO MISSISSIPPI RIVER $6,000, MN 610 MN 62 REDECK BR #27239 (TH 610 WB OVER MISSISSIPPI RIVER) MEDIUM CPR + DIAMOND GRIND, FROM 28TH AVE TO MN 55 $4,000, $3,000, MN 62 RECONSTRUCT, TRACY AVE BR TO UNDER PENN AVE BR $28,500, MN 62 REDECK/REPAIR BR #27083 (TRACY AVE OVER MN 62) $2,000, MN 62 MN 62 REOVERLAY BR #27572, #27573, MN 62 OVER NINE MILE CREEK REOVERLAY BR #27572, #27573, MN 62 OVER NINE MILE CREEK $1,000, $1,000, MN 62 REPLACE BR #7264 TH 62 OVER VALLEY VIEW RD $2,000, MN 65 MN 65 MED BIT MILL & OVERLAY, END OF BR #2440 TO S OF 53RD AVE NE MEDIUM MILL AND OVERLAY/NOVACHIP, CSAH 10 TO 153RD AVENUE $11,000, $15,700, MN 65 RECLAIM/WHITETOPPING, 153RD AVE TO 217TH AVE $20,000, MN 65 MN 65 REHAB BR #2440 OVER MISSISSIPPI RIVER IN MPLS (3RD AVE BRIDGE) YEAR 2 OF 3 REOVERLAY BR #27015, MN 65 (CENTRAL AVE) OVER RR IN MPLS $32,100, $750, MN 65 REPAIR BR #9263, #9264 (CSAH 10 OVER MN 65) $1,600, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-27

28 MN 65 MN 65 MN 7 MN 7 REPLACE BR. #6817, REPAIR/REPLACE #9417 OVER COON CREEK REPLACE BR. #6817, REPAIR/REPLACE #9417 OVER COON CREEK 1.8 MILES E. OF MCLEOD/CARVER COUNTY LINE REPLACE BRIDGE 8518 PAID FOR BY DISTRICT 8 MEDIUM BITUMINOUS M&O/RECLAIM, FROM CHRISTMAS LAKE RD TO I-494 $1,950, $1,950, $650, $10,000, MN 7 RECLAIM, ST. BONIFACOUS TO CHRISTMAS LAKE RD $18,000, MN 7 REPAIR BRIDGES #27033, #27193, #27068 $1,000, MN 7 REPAIR BRIDGES #27033, #27193, #27068 $1,000, MN 7 SILVER LAKE TO MN 25, MEDIUM M&O $8,000, MN 77 MN 77 MN 77 MN 77 MN 913A MN 95 MEDIUM BITUMINOUS OVERLAY, FROM CSAH 23 TO MN 13 MEDIUM BITUMINOUS OVERLAY, FROM I-494 TO 63RD ST REHAB BRIDGES #9600N AND #9600S MN 77, OVER THE MN RIVER IN BLOOMINGTON/BURNSVILLE REOVERLAYS & PAINT BR #27046, 27048, 27052C (KILLEBREW DR EB OVER MN 77) MEDIUM MILL AND OVERLAY, OLD SIBLEY MEMORIAL HWY MED BIT MILL & OVERLAY, 0.17 MI N OF JCT MN 47 TO W JCT MN8 $12,800, $3,000, $1,965, $500, $1,000, $10,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-28

29 MN 95 MEDIUM MILL AND OVERLAY, W OF JCT I 94 TO 40TH ST S/BAILEY ROAD $2,700, MN 97 RECLAIM/MILL AND OVERLAY, I 35 TO MN 95 $12,700, US 10 US 10 US 10 US 10 US 10 MEDIUM MILL AND OVERLAY, FROM CLEVELAND/JARVIS TO FAIROAK MEDIUM MILL AND OVERLAY, FROM CLEVELAND/JARVIS TO FAIROAK MEDIUM MILL AND OVERLAY, JCT US 61 TO W END OF ST CROIX BRIDGE US 10, FROM BIG LAKE TO JOPLIN AVE IN ELK RIVER (EB AND WB), MILL AND OVERLAY INCL ADA WORK UTBWC,.2 MI W OF I 694 BR TO US 10 DEC DIR BEOMES CO $12,600, $12,600, $2,500, $8,600, $500, US 10 UTBWC, FROM MN 47 BRIDGE TO MN 65 BRIDGE $1,300, US 10 WHITETOP/UBOL, MN 65 TO N JCT ISTH-35W $17,800, US 12 MEDIUM MAJOR CRP & D.G./MED M&O, WAYZATA EXIT TO I-494 $12,000, US 12 MEDIUM MILL AND OVERLAY, CSAH-29 TO RP 48 $600, US 169 US 169 US 169 CONCRETE PAVEMENT REPAIR & DIAMOND GRIND/MILL & OVERLAY, 101ST AVE TO US 10 LONG JT + UTBWC, N END BLOOMINGTON FERRY RV BR TO S END ANDERSON LK BR MINOR CPR & DIAMOND GRINDING, CSAH 15 TO BLOOMINGTON FERRY BR $8,100, $1,700, $17,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-29

30 US 169 MINOR CPR, FROM MN 21 TO CSAH 15 $13,000, US 169 REDECK BR #27534, (63RD AVE OVER US 169) $2,500, US 169 US 169 REDECK/REPAIR BR #27550, #27523 (36TH ST OVER US 169) REDECK/REPAIR BR #27550, #27523 (36TH ST OVER US 169) $500, $500, US 212 MEDIUM BITUMINOUS M&O, CSAH 134 TO CSAH 36 $4,900, US 212 MINOR CPR/BIT RECONSTRUCT,.01 MI W CSAH-134 TO BEG CHASKA BYPASS $18,500, US 212 MINOR CRP/MED BIT M&O, FROM CSAH 4 TO MN 62 $10,800, US 52 US 52 UBOL/MILL AND OVERLAY, MAJOR CRP, CLAYTON TO MN 55 UNBONDED CONCRETE OVERLAY, NORTH OF COUNTY ROAD 86 TO CSAH 42 $19,100, $39,700, US 61 MED BIT M&O, FROM CARVER AVE TO E JCT ISTH-94 $7,600, US 61 MED BIT MILL & OVERLAY, 0.2 S OF ROSELAWN TO 0.15 S OF WHITE BEAR AVE US 61 MED BIT MILL & OVERLAY, 0.5 MI S OF MN 97 TO 0.2 NO OF N FOREST LAKE CL US 61 MEDIUM MILL AND OVERLAY, JCT MN 316 TO W 36TH ST (HASTINGS) $9,700, $5,000, $10,800, US 61 MEDIUM MILL AND OVERLAY, N JCT HWY 316 TO 4th St $2,900, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-30

31 US 61 THIN MILL AND OVERLAY, WEST OF MN 5 TO 0.2 MI S OF ROSELAWN $5,700, US 8 MED BIT M&O, JCT I 35 TO WYOMING AVE $9,000, US 952A MED BIT MILL & OVERLAY, MN 65 (UNIVERSITY & 4TH ST SE) TO BR OVER I 35W $1,800, I 35W 4th St. to County Road C #N/A I 35W I 35W over 106th St, Bloomington #N/A I 35W I 35W to MN 55 #N/A I 394 I 394 WB on ramp over EB/WB 9-94 #N/A I 494 France to 24th Ave #N/A I 494 I-494 over MN River, 9217W #N/A I 494 I-494 over MN River; 9217E #N/A I 694 CSAH 10 over I 694; Oakdale #N/A I 94 Cedar Ave, 20th Ave, Riverside Ave #N/A I 94 I 94 over Fairview Ave; #N/A I 94 I 94 over MN 55, #N/A TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-31

32 I 94 I 94 to Washington Ave #N/A MN 100 MN 100 over 394; #N/A MN 100 MN 100 over 394; #N/A MN 100 MN 100 over 394; #N/A MN 100 MN 100 to I 94 #N/A MN 51 MN 51 MN 36; 9013 #N/A MN 51 MN 51MN 36; 9012 #N/A MN 77 77; Cnty Road 42 to 13 #N/A MN 77 MN 77 over MN River; 9600N #N/A MN 77 MN 77 over MN river; 9600S #N/A US 10 US 10 over Rum River; 9700 #N/A US 10 US 10 over Rum River; 9713 #N/A US 10 US 10 over Rum River; 9714 #N/A US 10 US 10 Over Rum River; 9715 #N/A TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-32

33 US 10 US 10 Over Rum River; 9716 #N/A US 10 US 10 Over Rum River; 9717 #N/A US ; to 101 #N/A US 169 US 169 to I 35W #N/A US 952A Robert St (US952A) over MSRiver; 9036 #N/A I 35 I 35 to Chisago City #N/A I 35E I 35e over Jefferson Ave; #N/A I 35E I 35E; MN 110 to MS River #N/A I 35E I 35E SB over University Ave; 9655 #N/A I 35W I 35W over CR1; 9603 #N/A I 394 I 394 over I 94; #N/A I 394 I 394R over I 394WB; 27776A #N/A I 494 I-494 over TH 13; #N/A I 694 I 694 EB over East River Road; 9862 #N/A TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-33

34 I 694 I 694 WB over river; 9321 #N/A I 694 Silver Lake Road over I 694; 9869 #N/A I 94 I 94 over US 61; #N/A I 94 I 94; Nicollet Ave to Western Ave #N/A MN 100 TH 100 over BNSF; 5310 #N/A MN 13 MN 13; US 169 to I 35W #N/A MN 5 W 7th St. (TH 5) over I 35E; 9531 #N/A MN 55 Shingle Creek Blvd to MN 55 #N/A US 10 US 10 over BNSF; 9717 #N/A US 12 US 12 over CSAH 15; #N/A US 169 US 169; #N/A US 52 US 52 over MN 156; #N/A US 8 US 8 over US 61; #N/A I 35E I 35E over Ayd Mill Road #N/A TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-34

35 I 35W I 35W over 3rd St #N/A I 35W I 35W over CSAH 88; #N/A I 35W I 35W over Industrial Blvd #N/A I 35W I 35W over MC RY (railyard; #N/A I 35W I 35W over NB 280 ramp #N/A I 35W I 35W over Stinson Blvd #N/A I 35W I 35W SB over Johnson St; #N/A I 494 I-494; MN River to MI River #N/A I 494 Pilot Knob over I-494 #N/A I 494 South Split to I-494 #N/A I 694 I 694; MN 100 to MN 51 #N/A I 94 Cretin Ave over I 94 #N/A I 94 I 94 over Dunwoody Blvd; #N/A I 94 I 94; MN 55 to Nicollet #N/A TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-35

36 I 94 I 94; Western Ave to Mounds Blvd #N/A I 94 Weaver Lake Road over I 94; #N/A MN 101 MN 101 over I 94 #N/A MN 280 University Ave over MN 280; 9472 #N/A MN 5 West 7th St. over CP Rail; #N/A MN 51 MN 51 over CR B2; #N/A US 10 US 10; Elk River to Fairoak Blvd #N/A US 12 US 12; County Rd 101 to I-494 #N/A US , Jordan to Shakopee #N/A US 212 US 212; I-494 to US 169 #N/A US 212 Valley View Rd over US 212; #N/A US 52 Thompson Ave over US 52; #N/A US 52 US 52; I-494 to Concord #N/A MnDOT Subtotal for $1,951,921, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-36

37 Regional Mobility CSAH 19 WRIGHT COUNTY CSAH 19, FROM LAMPLIGHT DR TO N OF 70TH ST IN ALBERTVILLE, EXTEND MULTILANE ROADWAY Regional Mobility I 35W **AC**PoDI**SPP**I 35W, FROM CO RD B2 IN ROSEVILLE TO 0.1 MI N SUNSET AVE (ANOKA CR 53) IN LINO LAKES, CONSTRUCT MNPASS LANE FROM CR C TO LEXINGTON AVE (ANOKA CSAH 17), CONC OVLY FROM CR C TO CR 53, MISC PAVEMENT RECONSTRUCT & BIT M&O, REHAB 17 BRIDGES AND $5,000, $208,000, Regional Mobility I 35W **AC**SPP**I 35W, FROM 43RD ST TO 11TH AVE, WB I 94 FROM 1ST AVE TO PARK AVE, AND MN 65 FROM 24TH ST TO 15TH ST IN MPLS - MNPASS LANE CONSTRUCTION, PAVEMENT RECONSTRUCTION, TRANSIT STATION, NOISEWALLS, RETAINING WALLS, CONSTRUCT NEW BRIDGES 27W01, 27845, REP Regional Mobility I 35W I 35W, FROM BURNSVILLE PARKWAY TO NB I 35W IN BURNSVILLE-CONSTRUCT HIGH OCCUPANCY VEHICLE BYPASS, CONCRETE PAVEMENT REHAB Regional Mobility I 35W I 35W, FROM CO RD B2 IN ROSEVILLE TO 0.1 MI N SUNSET AVE (ANOKA CR 53) IN LINO LAKES - I 35E N MNPASS PROJECT UTILITY AND RAILROAD AGREEMENT Regional Mobility I 494 **FLEX18**SPP**AC**I494, FROM 0.2 MI E HARDMAN AVE S IN S ST PAUL TO BLAINE AVE E IN INVER GROVE HEIGHTS-CONSTRUCT AUXILIARY LANE, CONCRETE PAVEMENT REHAB, RESURFACING SHOULDERS, BRIDGE REHAB, ADA, NOISEWALLS, SIGNING, TMS, LIGHTING, DRAINAGE (AC PROJECT, $ $360, $2,120, $19,200, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-37

38 Regional Mobility MN 120 MN120, FROM I 94 S RAMP TO WOODLAND DR IN MAPLEWOOD-ATMS INSTALLATION AND SIGNAL OPTIMIZATION Regional Mobility MN 36 **TED**MN 36, AT CSAH 35 (HADLEY AVE) IN OAKDALE-CONSTRUCT INTERCHANGE AND CONSTRUCT GATEWAY STATE TRAIL ACCESS (TIED TO AND ) $1,085, $4,000, Regional Mobility MN 36 MN 36, AT I 35 INTERCHANGE WITH WI ST. CROIX COUNTY TH-E-CONSTRUCT WI SNOW STORAGE POND AS PART OF THE ST. CROIX RIVER CROSSING PROJECT- WISCONSIN LET Regional Mobility MN 36 MN 36, FROM SUNNYSIDE DR TO 0.2 MI N OF SUNNYSIDE DR - LANDSCAPING AS PART OF THE ST CROIX RIVER CROSSING PROJECT Regional Mobility MN 36 MN 36, S JCT MN 95 TO E CHESTNUT ST IN STILLWATER AND ON MN 95 FROM S JCT MN 36 TO 10TH AVE N IN BAYPORT- LANDSCAPING AS PART OF THE ST CROIX RIVER CROSSING PROJECT Regional Mobility MN 36 MN 36, ST CROIX MIT ITEM - KOLLINER PARK: REMOVAL OF NON-HISTORIC ELEMENTS TO ALLOW REVERSION TO "NATURAL"-WISCONSIN LET Regional Mobility MN 41 **TED**MN 41, US212 TO 0.3 MI N CSAH 14 IN CHASKA- DESIGN ENGINEERING, RIGHT OF WAY, AND CONSTRUCTION FOR ROADWAY RECONSTRUCTION AND EXPANSION, INTERSECTION IMPROVEMENTS, SIGNALS, ADA AND CONSTRUCT PED/BIKE UNDERPASS (BR #10X20) (TIED TO AND 100 Regional Mobility MN 41 MN 41, FROM 2ND ST TO MN 5 IN CHASKA-ATMS INSTALLATION AND SIGNAL OPTIMIZATION $70, $180, $300, $100, $3,500, $747, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-38

39 Regional Mobility MN 41 MN 41, FROM US212 TO 0.3 MI N CSAH 14 IN CHASKA- ROADWAY RECONSTRUCTION AND EXPANSION, INTERSECTION IMPROVEMENTS, SIGNALS AND ADA (TIED TO AND E) $345, Regional Mobility MN 47 MN 47, FROM 37TH AVE IN COLUMBIA HEIGHTS TO US 10 N RAMP IN COON RAPIDS-ATMS INSTALLATION AND SIGNAL OPTIMIZATION Regional Mobility MN 55 MN 55, FROM MN61 TO GENERAL SIEBEN DR AND US 61 FROM CSAH 47 TO 4TH ST IN HASTINGS-ATMS INSTALLATION AND SIGNAL OPTIMIZATION Regional Mobility MN 97 **ELLA**MN 97, FROM 0.1 MI W OF THE WESTERN RAMP TERMINALS TO 850 FT W OF THE COUNTY LINE- REPLACE BRIDGE (02818) AND APPROACHES (ASSOCIATED TO AND ) Regional Mobility MN 999 **SPP**DISTRICTWIDE SETASIDE FOR LOWER COST CONGESTION MGMT PROJECT - FY 2020 Regional Mobility MN 999 **SPP**DISTRICTWIDE SETASIDE FOR LOWER COST CONGESTION MGMT PROJECT - FY 2021 Regional Mobility MN 999 **SPP**DISTRICTWIDE SETASIDE FOR MOBILITY - FY 2021 Regional Mobility MN 999 CSAH 61 (FLYING CLOUD DR) FROM PIONEER TRAIL TO PRAIRIE CENTER DR, CROSSING I494 AND US212, AND CSAH 39 (VALLEY VIEW RD) AND CROSSING I494 AND US212 IN EDEN PRAIRIE- ATMS INSTALLATION AND SIGNAL OPTIMIZATION $1,346, $649, $8,300, $880, $7,000, $29,480, $1,800, Regional Mobility MN 999 DISTRICTWIDE SETASIDE FOR RIGHT OF WAY - FY 2018 $16,250, Regional Mobility MN 999 DISTRICTWIDE SETASIDE FOR RIGHT OF WAY - FY 2019 $12,000, Regional Mobility MN 999 DISTRICTWIDE SETASIDE FOR RIGHT OF WAY - FY 2020 $12,000, Regional Mobility MN 999 DISTRICTWIDE SETASIDE FOR RIGHT OF WAY - FY 2021 $10,000, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-39

40 Regional Mobility MN 999 DISTRICTWIDE SETASIDE FOR TEAM TRANSIT PROJECTS - FY 2019 Regional Mobility MN 999 DISTRICTWIDE SETASIDE-INCIDENT MANAGEMENT PROJECTS - FY 2020 Regional Mobility MN 999 DISTRICTWIDE SETASIDE-INCIDENT MANAGEMENT PROJECTS - FY 2021 Regional Mobility US 10 EB US 10, FROM SB I 35W TO RAMSEY CSAH 96 IN ARDEN HILLS - CONSTRUCT 2 LANE EXIT FROM I 35W, EB US 10 AUXILIARY LANE, AND NOISE WALLS Regional Mobility US 169 **TED**US169, AT MN 41 (CHESTNUT BLVD)/CSAH 78 IN JACKSON TWP-RIGHT OF WAY TO CONSTRUCT INTERCHANGE Regional Mobility US 169 US169, 0.6 MI N OF MN 41 (CHESTNUT BLVD)/CSAH 78 TO 0.5 MI S OF CSAH 14 -CONSTRUCT INTERCHANGE, CONSTRUCT BRIDGES 70046, 70047, 70048, REPLACE OLD BRIDGE 8829 WITH NEW BRIDGE 70X04, REPLACE CULVERT WITH NEW BOX CULVERT (ASSOCIATED TO ) $50, $500, $500, $2,445, $10,000, $5,000, Regional Mobility US 52 **ITS**US 52, VARIOUS LOCATIONS ON US 52 BETWEEN SOUTHVIEW BLVD IN S ST PAUL AND CONCORD BLVD E (CSAH 56) IN INVER GROVE HEIGHTS -INSTALL FIBER OPTIC CABLE AND CAMERAS Regional Mobility I 694 Southbound auxiliary lanes from 10th St to Westbound I-94 and from Westbound I-94 to Tamarack Rd $130, #N/A Regional Mobility I 94 Auxiliary lanes Brockton to 610 #N/A Regional Mobility MN 51 Lane add northbound from Ramsey CR B2 through #N/A Lydia St 2040 TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-40

41 Regional Mobility County 70 Dakota County 70 2 to 4 lane expansion from east of I- 35 to Cedar Ave/Dakota County 50 Regional Mobility County 27 Scott County 27 2 to 4 lane expansion from Scott County 21 to Scott County 44 Regional Mobility County 42 Scott County 42 2 to 4 lane expansion from Scott County 17 to Scott County 83 #N/A #N/A #N/A Regional Mobility I 94 Brockton Ln Interchange #N/A Regional Mobility US st Ave Interchange #N/A Regional Mobility US 10 Fairoak Ave Underpass #N/A Regional Mobility US 10 Thurston Interchange #N/A Regional Mobility US 212 Carver County 44 new ramps to/from north #N/A Regional Mobility MN 13 Dakota Av Interchange #N/A Regional Mobility MN th Av Interchange & 70th Av Access Closed #N/A Regional Mobility MN 36 Manning Av Interchange #N/A Regional Mobility MN 77 77th St Underpass #N/A Regional Mobility I 494 Rockford Rd, add turn lanes to exit ramps #N/A Regional Mobility #N/A MN 77 Northbound exit to Old Shakopee Rd, extend turn lane Regional Mobility County 13 Washington County 13 from 3rd St to Hudson Rd add southbound third lane across 94 #N/A Regional Mobility MN 3 Dakota CR 26 Roundabout #N/A Regional Mobility County 78 Anoka CR 78 2 to 4 lanes from 139th Lane NW to Anoka #N/A CR 18 Regional Mobility County 81 Hennepin County 81 from 71st Av to 83rd Av 4 to 6 lanes #N/A Regional Mobility I 35W SB Cliff Rd ramp terminal realignment #N/A Regional Mobility I 35W Bridge over MN River & northbound truck climbing lane #N/A from Cliff Rd to north of Mississippi river 2040 TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-41

42 Regional Mobility MN 156 TWTL on Concord from Annapolis St E to Hardman Ave #N/A Regional Mobility 2 to 4 lane expansion from Flying Cloud Dr to Pioneer #N/A MN 101 Trail Regional Mobility 4 to 6 lanes from TH 241 to CR 19, interchange I 94 improvements at 241, CR 37 and CR 19 including new entrance from CR 19 to eastbound 94 $56,000,000 Regional Mobility I 494 MnPASS eastbound from France to MN 77 & westbound from MN 77 through I-35W $134,000,000 Regional Mobility I 494 Directional ramp movement at I-35W $70,000,000 Regional Mobility US 169 to north of Valley Industrial Blvd S, adding turn #N/A County 83 lanes & median Regional Mobility through Chaska, 4 lane to 2-lane w/ turn lanes, 4-lanes #N/A MN 41 through Chaska Blvd intersection remain Regional Mobility County 26 Dakota County 26 2 to 4 lane expansion from MN 55 to #N/A MN 3 Regional Mobility #N/A I 35W MnPASS from Ramsey CR C to downtown Minneapolis Regional Mobility Foley Blvd RR overpass #N/A Regional Mobility County 14 Carver County CR 14 - new 2 lane divided highway from #N/A #N/A Carver County 43 to Carver County 11 in Victoria Regional Mobility County 39 Wright County 39-2 to 4 lane expansion from Parish to #N/A #N/A Wright County 42 in Otsego/ from Parish Ave to Odean Ave NE Regional Mobility US to 4 lane expansion from Carver County 11 to Carver #N/A #N/A County 36 Regional Mobility County 10 Carvery County 10 2 to 4 lane expansion from Clover Ridge Dr to Carver County 11 in Chaska #N/A #N/A 2040 TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-42

43 Regional Mobility County 10 Carvery County 10 2 to 4 lane expansion from MN 41 to US 212 Regional Mobility County 10 Carver County 10 2 to 4 lane expansion from Carvery County 11 to Carver County 43 Regional Mobility County 11 Carver County 11 2 to 4 lane expansion from 6th St to US 212 in the City of Carver Regional Mobility County 18 Carver County 18 new 2 lane arterial from Bavaria Rd to MN 41 Regional Mobility East Waconia Bypass #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A New 2-lane arterial from Carver County 10 to MN 5 #N/A #N/A Regional Mobility MN 5 4-lane from Main St to TH 284 in Waconia #N/A #N/A Regional Mobility Regional Mobility US169 Convert to freeway from US 10 N Ramp through 198th Av $157,000,000 #N/A Freeway conversion of MN 252 and MnPASS from 610 MN 252 to Dowling along I-94 Regional Mobility I 94 I 94 MANAGED LANE, ST PAUL TO MINNEAPOLIS (YEAR 1 OF 2) Regional Mobility I 94 I 94 MANAGED LANE, ST PAUL TO MINNEAPOLIS (YEAR 2 OF 2) $50,000, $50,000, MnDOT Subtotal for Regional Mobility $880,338,700 Safety I 35E I 35E FROM CR J IN LINO LAKES TO I 35E/I 35W SPLIT IN $1,026, COLUMBUS - INSTALL HIGH TENSION CABLE MEDIAN BARRIER Safety LOCAL 999 COUNTYWIDE, RAILROAD CROSSING PAVEMENT MESSAGE ENHANCEMENTS AT SHERBURNE COUNTY ROADS $113, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-43

44 Safety LOCAL 999 METRO ATP SETASIDE FOR HSIP PROJECTS YET TO BE SELECTED FOR FY 2021 Safety MN 3 **ELLA**MN 3, FROM 0.25 MI S OF DAKOTA-CSAH86 TO 0.25 MI N OF DAKOTA-CSAH86 IN CASTLE ROCK TOWNSHIP-MODIFY INTERSECTION, ADD TURN LANES, REPLACE BOX CULVERT #8479, GUARDRAIL $925, $1,124, Safety MN 3 MN 3 AT TWP 15 (200TH ST) IN EMPIRE TWP - CONSTRUCT SB LEFT TURN LANE Safety MN 3 MN 3 AT TWS 58 (170TH ST) IN EMPIRE TWP- CONSTRUCT ROUNDABOUT Safety MN 36 MN 36, FROM NB I 35E TO EB MN 36 RAMP IN LITTLE CANADA - REALIGN RAMP USING CONCRETE PAVEMENT, TMS, LIGHTING Safety MN 51 MN 51, FROM FORD PKWY TO RANDOLPH AVE IN ST. PAUL-CONSTRUCT CENTER MEDIAN AND LEFT TURN LANES, PED SAFETY ADA IMPROVEMENTS Safety MN 55 MN 55, FROM 0.15 MILES WEST OF DAKOTA-CSAH 42 TO 0.22 MILES EAST OF FAHEY AVE IN ROSEMOUNT- CONSTRUCT TURN LANES Safety MN 55 MN 55, FROM WRIGHT/HENNEPIN COUNTY LINE IN ROCKFORD TO THEODORE WIRTH PARKWAY IN MPLS - RUMBLE STRIPS, GUARDRAILS, GRADING, CONCRETE WALK AND PIER PROTECTION BR #27604 (ASSOCIATED TO ) Safety MN 62 MN 62, FROM FRANCE AVE 0.3 MI E IN EDINA - CONSTRUCT PARALLEL ACCELERATION LANE AT EB ENTRANCE RAMP FROM FRANCE AVE (ASSOCIATED TO AND ) $522, $2,129, $735, $710, $593, $1,850, $620, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-44

45 Safety MN 65 **ELLA**MN 65, FROM 0.2 MI S 143RD AVE NE IN HAM LAKE TO 0.2 MI N VIKING BLVD (CSAH 22) IN EAST BETHEL-CONSTRUCT REDUCED CONFLICT INTERSECTIONS AT 143RD AVE NE, 153RD AVE NE, 157TH AVE NE, 181ST AVE NE, 187TH AVE NE, AND VIKING BLVD $5,005, Safety MN 65 **ELLA**MN 65, FROM 85TH AVE NE IN BLAINE TO SIMS RD IN EAST BETHEL - EXTEND 16 LEFT TURN LANES, ADD LEFT TURN LANE WB US 10 TO SB MN 65, REPAIR CULVERTS, ADD CURB AND GUTTER Safety MN 65 MN 65 AT MSAS 103 (KLONDIKE DR) IN EAST BETHEL - CONSTRUCT REDUCED CONFLICT INTERSECTION Safety MN 65 MN 65, FROM 144TH AVE TO 145TH AVE IN HAM LAKE- FRONTAGE ROAD AND CLOSE ACCESSES Safety MN 77 MN 77, FROM NORTH END OF BRIDGE #9600N TO E OLD SHAKOPEE RD IN BLOOMINGTON - INSTALL HIGH TENSION CABLE MEDIAN BARRIER Safety MN 95 MN 95, FROM 70TH ST TO MN61 IN COTTAGE GROVE - CONSTRUCT RIGHT TURN LANES, WIDEN SHOULDERS, BITUMINOUS MILL AND OVERLAY Safety MN 95 MN 95, FROM WASHINGTON-CSAH18 (BAILEY RD/40TH ST S) TO WASHINGTON-CSAH22/70TH ST S - WIDEN SHOULDERS, ADD RIGHT TURN LANES, BITUMINOUS MILL AND OVERLAY Safety MN 97 MN 97, REALIGN/RECONSTRUCT FRONTAGE RD (HORNSBY ST) ON NORTH SIDE OF MN 97 IN COLUMBUS-RELOCATE INTERSECTION 500 FT EAST Safety MN 999 AT VARIOUS LOCATIONS IN MPLS- SIGNAL REPLACEMENT AND ADA UPGRADES $900, $550, $710, $92, $4,920, $2,200, $346, $2,066, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-45

46 Safety MN 999 DISTRICTWIDE SETASIDE FOR HSIP - FY 2020 $2,494, Safety MN 999 DISTRICTWIDE SETASIDE FOR SAFETY CAPACITY $35, PROJECTS - FY 2019 Safety MN 999 METROWIDE - INSTALL LEFT TURN SIGNS ON OVERHEAD PANELS TO MEET MNMUTCD STANDARDS Safety MN 999 METROWIDE - INSTALL SIGNS ON HORIZONTAL CURVES TO COMPLY WITH NEW MMUTCD STANDARDS Safety MN 999 METROWIDE ON I694, MN 100, MN 77 AND I494 RAMPS - APPLY HIGH FRICTION TREATMENT Safety US 10 US 10 FROM CSAH 51 (UNIVERSITY AVE) IN BLAINE TO I 35W IN MOUNDS VIEW - INSTALL CONTINUOUS FREEWAY LIGHTING Safety US 10 US 10, FROM THURSTON AVE IN ANOKA TO MN 101 IN ELK RIVER - CABLE MEDIAN BARRIER (DESIGNED BY METRO DISTRICT, ATP3 PORTION OF $650K UNDER ASSOCIATED SP M) Safety US 10 US 10, FROM THURSTON AVE IN ANOKA TO MN 101 IN ELK RIVER - CABLE MEDIAN BARRIER (DESIGNED BY METRO DISTRICT, METRO DISTRICT PORTION OF $995,000 UNDER ASSOCIATED SP ) Safety US 12 US12, AT HENNEPIN-CSAH 90 IN INDEPENDENCE - CONSTRUCT ROUNDABOUT Safety US 12 US12, FROM HENNEPIN-CSAH 6 IN ORONO TO INTERSECTION WITH HENNEPIN-CSAH 29 IN MAPLE PLAIN - WIDEN TO CONSTRUCT 10 FOOT BUFFER WITH MEDIAN BARRIER Safety US 212 US 212, AT CARVER-CSAH 41 IN BENTON TWP AND CSAH 36 IN DAHLGREN TWP-CONSTRUCT REDUCED CONFLICT INTERSECTIONS $800, $530, $1,355, $1,248, $995, $672, $4,315, $5,120, $1,275, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-46

47 Safety US 212 US212, FROM MN 5/CR131 TO MORSE ST IN NORWOOD YOUNG AMERICA - TURN LANE EXTENSIONS, RESTRICT ACCESS WITH SOUTH LEG CLOSURE AT MORSE ST $849, Safety US 52 US 52, FROM NORTH END OF THE CANNON RIVER $500, BRIDGE TO S OF DAKOTA-CSAH-86 IN RALDOLPH TOWNSHIP- CABLE MEDIAN BARRIER. Safety US 61 US 61, FROM 0.24 MI S 159TH ST N TO 0.2 MI N 159TH $730, ST N IN HUGO - CONVERT NB LEFT TURN BYPASS LANE TO DEDICATED LEFT TURN LANE Safety US 8 US 8 FROM I 35 IN FOREST LAKE TO MN/WI STATE LINE $540, INSTALL 6" WET REFLECTIVE STRIPING MnDOT Subtotal for Safety $48,598,426 MnDOT Total for Identified Projects $2,897,709, TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-47

48 Long-Range Transit Capital Projects The Metropolitan Council (including Metro Transit), local governments including cities and counties, and the suburban transit providers worked together to develop the list of transit projects included in the current revenue scenario. The list of projects includes only those projects for which potential funding sources, transit mode, and route alignment are identified in the plan. The plan anticipates funding that exceeds anticipated project costs identified in the Transitway System Investments category. Transitway projects will be added to this list through future plan updates and amendments. For multi-year projects with expenditures outside the timeframe, this appendix lists the total estimated project cost, including already spent funds TRANSPORTATION POLICY PLAN METROPOLITAN COUNCIL October 2018 UPDATE Appendix C: Project List Page C-48

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 1 N 14 9 Chisago Interstate Highway 2011 Project Sites 8 12 6 Anoka 1 6 0 6 22 6 6 9 12 7 7 7 284 74 2 41 71 29

More information

Twin Cities Region Population and Household Estimates, 2014 (PRELIMINARY)

Twin Cities Region Population and Household Estimates, 2014 (PRELIMINARY) and Household s, (PRELIMINARY) Andover 30,598 31,874 1,276 9,811 10,273 462 Anoka 17,142 17,586 444 7,060 7,252 192 Bethel 466 477 11 174 177 3 Blaine (part) 57,186 62,066 4,880 21,077 22,647 1,570 Centerville

More information

Metropolitan Council 2016 Population and Household Estimates Published July 2017

Metropolitan Council 2016 Population and Household Estimates Published July 2017 Metropolitan Council 2016 and s Published July 2017 City or Township Andover 30,598 32,335 1,737 9,811 10,391 580 Anoka 17,142 17,995 853 7,060 7,436 376 Bethel 466 461-5 174 174 0 Blaine (part) 57,186

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

Metropolitan Council 2017 Final Population and Household Estimates Certified and published July 2018

Metropolitan Council 2017 Final Population and Household Estimates Certified and published July 2018 Metropolitan Council Final and s Certified and published July 2018 City or Township - - Andover 30,598 32,470 1,872 9,811 10,445 634 Anoka 17,142 18,205 1,063 7,060 7,525 465 Bethel 466 499 33 174 179

More information

Metro District 10-Year Capital Highway Investment Plan ( )

Metro District 10-Year Capital Highway Investment Plan ( ) Metro District 10-Year Capital Highway Investment Plan (2019-2028) Cover Picture DRAFT JUNE 2018 Prepared by Office of Transportation System Management METRO DISTRICT 10-YEAR CHIP OVERVIEW Metro District

More information

Service Improvement Plan

Service Improvement Plan Metro ransit Service Improvement Plan ransportation Committee April 13, 2015 Cyndi Harper Manager of Route Planning Kyle Burrows ransit Planner What is the Service Improvement Plan (SIP)? Bus service expansion

More information

Metro Transit Service Improvement Plan

Metro Transit Service Improvement Plan Metro ransit Service Improvement Plan ransportation Committee April 13, 2015 Cyndi Harper Manager of Route Planning Kyle Burrows ransit Planner What is the Service Improvement Plan (SIP)? Bus service expansion

More information

Freeway Volume-Crash Summary

Freeway Volume-Crash Summary Freeway Volume-Crash Summary Twin Cities Metropolitan Area Continuation Report 22 Data Minnesota Department of Transportation Office of Traffic, Security and Operations Freeway Operations Section Regional

More information

Table 14 Ranking of Per Capita Outstanding Long-Term Debt Cities Over 2,500 in Population For the Year Ended December 31, 1999

Table 14 Ranking of Per Capita Outstanding Long-Term Debt Cities Over 2,500 in Population For the Year Ended December 31, 1999 WACONIA 5,818 $40,482,394 $6,958 BLUE EARTH 3,642 20,397,618 5,601 GLENCOE 5,368 27,884,598 5,195 BUFFALO 9,950 50,868,148 5,112 CHASKA 15,801 76,712,330 4,855 MARSHALL 12,825 61,989,898 4,834 PARK RAPIDS

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project.

This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 13-0194 Metropolitan

More information

PARTICIPATION IN THE LIVABLE COMMUNITIES ACT LOCAL HOUSING INCENTIVE ACCOUNT A

PARTICIPATION IN THE LIVABLE COMMUNITIES ACT LOCAL HOUSING INCENTIVE ACCOUNT A This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp PARTICIPATION IN THE

More information

SNAPSHOT Investing in Roads and Bridges 2016 Budget for a Better Minnesota

SNAPSHOT Investing in Roads and Bridges 2016 Budget for a Better Minnesota SNAPSHOT Investing in Roads and Bridges 2016 Budget for a Better Minnesota Modern roads, bridges, and transit are the foundation of an economy that works for all Minnesotans everywhere in Minnesota. Our

More information

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 1037 BB TRF-0028-18A 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 1,800,000 - - 532,000 - - 1,268,000 1038 BB TRF-0028-18B 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT

More information

Ranking of 1998 Per Capita Expenditures Cities Over 2,500 in Population

Ranking of 1998 Per Capita Expenditures Cities Over 2,500 in Population Ranking of 1998 Per Capita Expenditures July 24, 2000 Government Information Division Office of the State Auditor State of Minnesota 525 Park Street, Suite 400, St. Paul, MN 55103 gid@osa.state.mn.us www.osa.state.mn.us

More information

Anoka County Foreclosures (2006)

Anoka County Foreclosures (2006) noka County Foreclosures (26) Elk River 48 urns ) 47 St. Francis 17 Oak ethel East ethel Linwood 48 Ramsey ndover 49 Ham Columbus 35 ) 97 1 noka Champlin 169 49 47 47 Coon Rapids ) 242 laine 51 Centerville

More information

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO

More information

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Future Projects. District 3 Central Minnesota. mndot.gov/d3 Future Projects District 3 Central Minnesota 20 2021 mndot.gov/d3 Cass 20-2021 Construction Central Minnesota MnDOT District 3 Walker 34 Hackensack CASS 84 Remer 200 Longville Hill City Wadena 29 Osakis

More information

±22.22 acres of mixed-use land for sale

±22.22 acres of mixed-use land for sale Howard Clear Forest Sr. H.S. Hwy 97 (Scandia Trail-17,400 VPD) 66,000 VPD Running Aces Harness Park Forest Motor Sports Forest Sports Complex Forest Airport Forest Blvd N (8,700 VPD) Hwy 50 Future International

More information

Foreclosures and short sales

Foreclosures and short sales Foreclosures and short sales in the Twin Cities Housing Market Update A Special Research Report from the Minneapolis Area Association of REALTORS Jeff Allen MAAR Research Manager www.mplsrealtor.com Aaron

More information

RETAIL / RESTAURANT EXPERIENCE

RETAIL / RESTAURANT EXPERIENCE PROJECT/LOCATION SIZE/SQUARE FOOT BUILDING TYPE 7th Place Building St. Paul, MN 20,000 Retail 7th Place Building - Phase 2B St. Paul, MN 10,000 Retail 1221 West Lake St. Minneapolis, MN 39,000 Office/Retail

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT UNIT BRIDGE ROSTER - SHOWING DEFICIENT T.H. BRIDGES STATEWIDE 08/02/2007 PAGE: 1 YEAR

MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT UNIT BRIDGE ROSTER - SHOWING DEFICIENT T.H. BRIDGES STATEWIDE 08/02/2007 PAGE: 1 YEAR BRIDGE ROSTER - SHOWING ICIENT T.H. BRIDGES EWIDE 08/02/2007 PAGE: 1 AITKIN ANOKA ANOKA ANOKA ANOKA ANOKA BELTRAMI BLUE EARTH BROWN BROWN BROWN CARLTON CARVER CARVER CARVER CARVER CASS CHIPPEWA CHIPPEWA

More information

2006 Nonresidential Construction in the Twin Cities Region

2006 Nonresidential Construction in the Twin Cities Region Publication No.74-07-047 October 2007 2006 Nonresidential Construction in the Twin Cities Region Introduction This report provides a regionwide review of nonresidential construction activity. The report

More information

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Welcome to Dayton Parkway Interchange Open House. November 26, 2018 Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange

More information

*Note: This data is preliminary and subject to change*

*Note: This data is preliminary and subject to change* *Note: This data is preliminary and subject to change* This product is an objective analysis of NWS Cooperative Observer Program (COOP) and Community Collaborative Rain, Hail and Snow Network (CoCoRaHS)

More information

Summary for the December 3rd-4th, 2010 Snow Storm

Summary for the December 3rd-4th, 2010 Snow Storm Summary for the December 3rd-4th, 2010 Snow Storm A widespread area of snowfall impacted southern and central Minnesota and west Central Wisconsin beginning on the morning of December 3rd that slowly tapered

More information

RANKING OF 2001 PER CAPITA EXPENDITURES OF CITIES OVER 2,500 IN POPULATION YEAR ENDED DECEMBER 31,2001

RANKING OF 2001 PER CAPITA EXPENDITURES OF CITIES OVER 2,500 IN POPULATION YEAR ENDED DECEMBER 31,2001 RANKING OF 2001 PER CAPITA EXPENDITURES OF CITIES OVER 2,500 IN POPULATION YEAR ENDED DECEMBER 31,2001 Description of the Office of the State Auditor The Office of the State Auditor (OSA) serves as a watchdog

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

2013 HOUSING COUNTS November 2014

2013 HOUSING COUNTS November 2014 2013 HOUSING COUNTS November 2014 MINNEAPOLIS 2013 Affordable Units with Financing Closed New Production: Rental @30% @50% @60% AMI AMI AMI Pillsbury Historic Redevelopment... 251 *Snelling Apartments

More information

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT APPENDIX A: Sections of regionally significant roads and highways that are in need of reconstruction. All roadway segments are between 1-20 miles in length and carry at least 5,000 average daily traffic

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

Postal Verification Card Report for November 2010 General Election

Postal Verification Card Report for November 2010 General Election This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp STATE OF MINNESOTA

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Hennepin County 2040 Bicycle Transportation Plan. Appendix D. Full list of planned bikeway system corridors

Hennepin County 2040 Bicycle Transportation Plan. Appendix D. Full list of planned bikeway system corridors Hennepin County 2040 Bicycle Transportation Plan Appendix D. Full list of planned bikeway system corridors Full Listing of Planned 2040 Bikeway System Segments Figure 1 Planned 2040 Bikeway System Corridors

More information

HealthPartners Journey Pace (PPO) HealthPartners Journey Steady (PPO) HealthPartners Journey Stride (PPO) HealthPartners Journey Group (PPO)

HealthPartners Journey Pace (PPO) HealthPartners Journey Steady (PPO) HealthPartners Journey Stride (PPO) HealthPartners Journey Group (PPO) HealthPartners Journey Pace (PPO) HealthPartners Journey Steady (PPO) HealthPartners Journey Stride (PPO) HealthPartners Journey Group (PPO) 2019 PHARMACY DIRECTORY This Pharmacy Directory was updated

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

LINK (5465) N. Robert St., St. Paul, MN 55101

LINK (5465) N. Robert St., St. Paul, MN 55101 651-602-LINK (5465) www.transitlinktc.org 390 N. Robert St., St. Paul, MN 55101 Service Details Customer Guide Table of Contents Customer Guide... page 1 Service Details... page 2 Areas... page 2 Eligibility...

More information

HealthPartners Journey Stride (PPO)

HealthPartners Journey Stride (PPO) HealthPartners Journey Stride (PPO) 2018 PHARMACY DIRECTORY This Pharmacy Directory was updated March 2018. For more recent information or other questions, please contact HealthPartners Member Services

More information

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015 Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund

More information

Project Requests for State Funds Governor's

Project Requests for State Funds Governor's Anoka Rum River Dam in Anoka Asian Carp Barrier Improvements 1 5,000 0 0 5,000 Anoka County US 10/CSAH 83 Interchange Construction 1 $17,000 $0 $0 $17,000 Arrowhead Regional Corrections Northeast Regional

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

MN Asbestos Contractors and Consultants

MN Asbestos Contractors and Consultants Minnesota Companies Page 1 of 11 Consultants A-1 Abatement, LLC 11/30/2018 (218) 391-7134 307 2nd St, PO Box 134, Carlton, MN 55718 AECOM Technical Services, Inc. 10/06/2018 (612) 376-2425 800 LaSalle

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

Webinar Series for Comprehensive Plan Updates. Making Your Plan a Walk in the Park

Webinar Series for Comprehensive Plan Updates. Making Your Plan a Walk in the Park Webinar Series for Comprehensive Plan Updates Making Your Plan a Walk in the Park Presented by Jan Youngquist and Michael Peterka September 15, 2016 Today s Presentation Importance of Parks and Trails

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

Number of Graduates Hired by Employer Class of Minnesota State University, Mankato, College of Allied Hlth & Nursing Campus

Number of Graduates Hired by Employer Class of Minnesota State University, Mankato, College of Allied Hlth & Nursing Campus IMMANUEL ST JOSEPH'S-MAYO HEALTH SYSTEM MANKATO MN 18 MAYO CLINIC ROCHESTER MN 10 MANKATO PUBLIC SCHOOLS MANKATO MN 6 UNITED HOSPITAL ST PAUL MN 6 ST PETER REGIONAL TREATMENT CENTER ST PETER MN 5 ABBOTT

More information

Baker/Carver Regional Trail master plan public review draft

Baker/Carver Regional Trail master plan public review draft Baker/Carver Regional Trail master plan public review draft November 2014 the mission of Three Rivers Park District is to promote environmental stewardship through recreation and education in a natural

More information

TWIN CITIES PREMIUM OUTLETS JOINT VENTURE WITH PARAGON OUTLETS

TWIN CITIES PREMIUM OUTLETS JOINT VENTURE WITH PARAGON OUTLETS EAGAN, MINNESOTA PROPERTY OVERVIEW TWIN CITIES PREMIUM OUTLETS JOINT VENTURE WITH PARAGON OUTLETS EAGAN, MN 52 35E MAJOR METROPOLITAN AREAS SELECT TENANTS 94 Minneapolis: St. Paul: RETAIL GLA (sq. ft.)

More information

Table 2 SIP Project Description Summary

Table 2 SIP Project Description Summary 2 Urban Core 3 Urban Core 3 Urban Core 3 Urban Core 4 Urban Core Meet HFN criteria between Franklin Av and Wash/Oak, Marcy Holmes. Improve frequency between Franklin/Hennepin and Oak/Wash to 10" between

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Current Corridor Characteristics

Current Corridor Characteristics Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

Three Rivers Park District

Three Rivers Park District ATTACHMENT C Regional Parks Policy Plan Update Proposed System Additions May 4, 2010 MPOSC Meeting ATTACHMENT C Three Rivers Park District Map Designation Site Name Type Conversion Acres Trail Length (miles)

More information

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH KNOW BEFORE YOU GO COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH Travel Tips Minnesota is ready, prepared, and excited to welcome you to the Bold North! Clock Management: Experience

More information

SOUTHEAST CORNER OF HIGHWAY 36 & FAIRVIEW AVENUE NORTH ROSEVILLE (MINNEAPOLIS MSA), MN

SOUTHEAST CORNER OF HIGHWAY 36 & FAIRVIEW AVENUE NORTH ROSEVILLE (MINNEAPOLIS MSA), MN SOUTHEAST CORNER OF HIGHWAY 36 & FAIRVIEW AVENUE NORTH ROSEVILLE (MINNEAPOLIS MSA), MN INVESTMENT HIGHLIGHTS S U B J E C T O F F E R I N G Mid-America Real Estate Corporation, in cooperation with Mid-America

More information

Appendix E. Build Alternative Design Information

Appendix E. Build Alternative Design Information Appendix E. Build Alternative Design Information NORTHERN LIGHTS EXPRESS C/L SHIFTED MAINLINE TRACK C/L MAINLINE TRACK 5" 24: PROFILE GRADE 24: 24: PROFILE GRADE 24: 22' - 0" 22' - 0" SINGLE TRACK ON CURVES

More information

STAFF RESPONSE TO PUBLIC COMMENTS

STAFF RESPONSE TO PUBLIC COMMENTS STAFF RESPONSE TO PUBLIC COMMENTS The Transportation Advisory Board held a 45-day public comment period on the draft 2018-2021 Transportation Improvement Program (TIP), beginning on June 23 and ending

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Number of Graduates Hired by Employer Class of St. Cloud State University, School of Education Campus

Number of Graduates Hired by Employer Class of St. Cloud State University, School of Education Campus ST CLOUD PS ST CLOUD MN 12 MINNEAPOLIS PS MINNEAPOLIS MN 7 ELK RIVER PS ELK RIVER MN 6 BUFFALO HANOVER MONTROSE PS BUFFALO MN 5 RUSH CITY PS RUSH CITY MN 5 MILACA PS MILACA MN 4 SAUK RAPIDS RICE PS SAUK

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Project Title/Location Project Sponsor Improvement Type Source of Funds HIGHWAYS

More information

MN Asbestos Contractors and Consultants

MN Asbestos Contractors and Consultants Page 1 of 14 Consultants A-1 Abatement, LLC 11/30/2018 (218) 391-7134 307 2nd St, PO Box 134, Carlton, MN 55718 AECOM Technical Services, Inc. 10/06/2018 (612) 376-2425 800 LaSalle Ave Suite 500, Minneapolis,

More information

Report on Project Cost Comparisons

Report on Project Cost Comparisons Report on Project Cost Comparisons February 2018 Prepared by: The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774

More information