FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

Size: px
Start display at page:

Download "FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)"

Transcription

1

2 1037 BB TRF A 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 1,800, , ,268, BB TRF B 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT PREVENTATIVE MAINTENANCE 1039 BB TRF ZC 2018 MANKATO MANKATO; SFY2018 GREATER MN NEW SERVICE EXPANSION CAPITAL FUNDS (7/1/17-6/30/18) 1040 BB TRF ZO 2018 MANKATO MANKATO; SFY2018 GREATER MN NEW SERVICE EXPANSION OPERATING FUNDS (7/1/17-6/30/18) 0.0 TR TRANSIT VEHCL PRCH 0.0 TR TRANSIT FTA 263, , ,000 LF 1,717, ,717,800 LF 549, , RR BLUE EARTH 1042 RR BLUE EARTH 1043 RR BLUE EARTH 1044 RR BLUE EARTH UP RR, INSTALL GATES, CSAH 5, MANKATO, BLUE EARTH DME RR, INSTALL GATES, CSAH 26, 227TH ST, MANKATO, BLUE EARTH DME RR, INSTALL GATES, CSAH 56, 598TH AVE, EAGLE LAKE, BLUE EARTH UP RR, INSTALL GATES, T363, 194TH ST, TOWNSHIP OF GARDEN CITY, BLUE EARTH 0.0 SR RR XING IMPV RRS 250, , , SR RR XING IMPV RRS 250, , , SR RR XING IMPV RRS 250, , , SR RR XING IMPV RRS 325, , , RR JACKSON UP RR, INSTALL GATES, CSAH 9, 10TH ST, HERON LAKE, JACKSON 1046 RR NOBLES UP RR, INSTALL GATES, MSAS 116, FLOWER LANE, WORTHINGTON, NOBLES 1047 RR MNDOT DME RR, UPGRADE EXISTING SIGNAL, MN 13, STATE ST S, WASECA, WASECA 0.0 SR RR XING IMPV RRS 250, , , SR RR XING IMPV RRS 250, , , SR RR XING IMPV RRS 250, , , CSAH WATONWAN CSAH 5, FROM TH 30 TO BROWN LINE, BITUMINOUS, SHOULDER PAVING, SAFETY WEDGE, RUMBLE STRIPES AND RESURFACE DECK OF BR & ON CSAH 8, FROM MARTIN CO CSAH 27 TO CR 108, BIT 7.4 SH PAVE SHOULDER HSIP 1,421, , ,259, CSAH COTTONWOO D 1050 CSAH COTTONWOO D CSAH 7, FROM CSAH 15 TO 390TH ST,, CURVE SHOULDER PAVING AND RUMBLE STRIPES (TIED TO ) CSAH 7, FROM CSAH 15 TO CSAH 13,, PAVE SHOULDERS AND RUMBLE STRIPES (TIED TO ) 1051 CSAH SIBLEY CSAH 9, FROM TH 5 TO NORTH LINE, BITUMINOUS 1052 CSAH WATONWAN CSAH 9, FROM CSAH 30 TO WATONWAN RIVER BRIDGE, BITUMINOUS, SHOULDER PAVING AT CURVES, RUMBLE STRIPES, CHEVRONS AND INTERSECTION IMPROVEMENTS & ON CSAH 8, FROM E LIMITS OF ORMSBY TO CSAH 27, BIT 1.3 SH PAVE SHOULDER 3.3 SH PAVE SHOULDER HSIP 436,800 17, ,550 HSIP 1,123, , , RS BIT STBGP 1,910, , ,183, SH PAVE SHOULDER HSIP 1,260,175 36, ,224,175 Page 1 of 13

3 1053 CSAH SIBLEY CSAH 13, FROM TH 5 TO NORTH LINE, BITUMINOUS 7.5 RS BIT STBGP 1,374, , , CSAH BROWN **SEC164** CSAH 29, JCT OF TH 4 & CSAH 29, CONSTRUCT ROUNDABOUT (TIED TO ) 0.3 SH ROUNDABOUT HSIP 885, , CSAH AC 2018 JACKSON 1056 CSAH WATONWAN 1057 CSAH BLUE EARTH **AC** CSAH 29, FROM IOWA STATE LINE TO CSAH 8, RECLAIM AND BITUMINOUS SURFACING (AC PAYBACK 1 OF 1) CSAH 57, FROM 0.2 MI NE OF TH 60 NORTH RAMPS TO SOUTH WEST LIMITS OF ST JAMES, MILL AND UNBONDED CONCRETE INLAY, BIT SHOULDERS AND GROUND IN WET REFLECTIVE PAVEMENT MARKINGS **AC** CSAH 90, AT THE JCT OF CSAH 90 & TH 22, CONSTRUCT ROUNDABOUT (TIED TO ) (AC, AC PAYBACK IN 2019) 4.8 RD BIT RECLM STBGP 1,200,000 1,200, SH PAVEMENT MARKINGS HSIP 665,950 15, , SH ROUNDABOUT HSIP 67, , , CSAH BLUE EARTH WIDE, CURVE AND INTERSECTION SAFETY 0.0 SH SIGNING HSIP 457, , ,753 IMPROVEMENTS 1059 CSAH JACKSON WIDE, IMPROVED CURVE DELINEATION 0.0 SH SIGNING HSIP 198, , , CSAH LE SUEUR WIDE, RUMBLE STRIPS/STRIPES, EDGELINE 0.0 SH PAVEMENT HSIP 612, , ,270 AND CENTERLINE MARKINGS MARKINGS 1061 LOCAL MANKATO **AC**TED** ADAMS ST; FROM TH 22 TO CSAH 12, CONSTRUCT NEW ROAD, ROUNDABOUT AND PED/BIKE TRAIL (AC PAYBACK IN 2019 & 2020) 1.1 MC GRADING ONLY STBGP 4,279, ,708 1,020, ,412, MSAS AC 2018 FAIRMONT **AC** MSAS 112, ON MARGARET STREET, FROM NORTH AVE TO TH 15, PAVEMENT REHAB, ADA AND CONSTRUCT PED/BIKE TRAIL (AC, PAYBACK 1 OF 1) 1063 MSAS AC 2018 NORTH MANKATO **AC** MSAS 116, ON LOOKOUT DRIVE FROM CAROL COURT TO HOWARD DRIVE IN NORTH MANKATO, RUCT AND MILL & AND ADA (PAYBACK 1 OF 1) 1064 MSAS MANKATO MSAS 138, ALONG WARREN STREET FROM BALCERZAK DRIVE TO STADIUM RD, CONSTRUCT SIDEWALK, SIGNALS AND ADDITIONAL PEDESTRIAN CHANNELIZATION AT VARIOUS LOCATIONS 1065 PED/BIKE COTTONWOO D 1066 PED/BIKE FARIBAULT IN WINDOM, ADJACENT TO 6TH AVE AT THE WINFAIR ELEMENTARY SCHOOL, CONSTRUCT DROP-OFF AND PICK-UP LANE **AC** IN BLUE EARTH, ALONG CSAH 16, W 2ND ST, CSAH 6 (380TH AVE), CSAH 44, FAIRVIEW ST & N GALLBRAITH ST, CONSTRUCT PED/BIKE TRAIL, ADA, STRIPING (AC PAYBACK IN 2021) 0.7 RD URBAN 1.0 MC URBAN STBGP 128, , STBGP 1,435,971 1,435, BT SIDEWALKS STBGTAP 721, , , BT EDUCATION & SAFETY STBGTAP 443, , , BT NEW TRAIL STBGTAP 61, , ,600 Page 2 of 13

4 1067 PED/BIKE LE SUEUR **AC** ALONG S 4TH ST, S 5TH ST AND BRIDGE ST, IN THE CITY OF LE SUEUR, RUCT SIDEWALKS AND ADA (AC, AC PAYBACK IN 2019) 0.0 BT SIDEWALKS STBGTAP 267, , , I MNDOT **SPPF17**ELLA** I90, WB LANES, FROM TH RD CONCRETE PAV NHFP 2,532,842 2,279, , TO ROCK/NOBLES LINE, CONCRETE PAVEMENT REHAB, SHOULDER REPLACEMENT & LIGHTING REHAB 1069 I MNDOT **17NEW** I 90, FROM SOUTH DAKOTA BORDER TO 1.3 MI W OF JCT OF DIAGONAL ROAD IN WORTHINGTON, INSTALL HIGH TENSION CABLE MEDIAN BARRIER ALONG WB LANES 41.0 SH TRAFFIC BARRIER HSIP 4,600,000 4,140, , MN MNDOT **SEC164** MN4, JCT OF TH 4 & CSAH 29, CONSTRUCT ROUNDABOUT (TIED TO ) 1071 MN MNDOT MN 15, IN NEW ULM FROM 20TH SOUTH ST TO WEST JCT TH 14/15 (7TH NORTH STREET), PLANT TREES 1072 MN MNDOT **SEC164** MN19, FROM 0.35 MI W OF CSAH 3 TO CSAH 89, CONSTRUCT CENTER LEFT & RIGHT TURN LANES AND LIGHTING (TO BE AUTHORIZED WITH FFY2017 SECTION 164 FUNDS) 1073 MN AC MNDOT **AC** MN 22, FROM 5TH AVE IN MAPLETON TO 0.1 MI N OF JCT CSAH 15, RUCT AND REPLACE BR 5959 WITH NEW BR (AC PAYBACK 1 OF 2) 1074 MN MNDOT MN 22, FROM CSAH 15 TO CSAH 90, MILL & (TIED TO ) (ASSOCIATED S) 1075 MN S 2018 MNDOT **AC** MN 22, AT JCT OF CSAH 90, CONSTRUCT ROUNDABOUT (TIED TO ) (ASSOCIATED ) (AC PAYBACK IN 2019) 0.3 SH ROUNDABOUT HSIP 885, , RS LANDSCAPING STBGP 55,000 24, ,000-25, SH TURN LANES HSIP 422, , MC NEW PAVEMENT 2.3 RS MILL AND STBGP 8,500,000 8,500, STBGP 3,700,000 2,960, , SH ROUNDABOUT HSIP 100, , , MN AC 2018 MNDOT **SPP**AC** MN 60, FROM WINDOM TO WEST OF MOUNTAIN LAKE, RUCT FROM TWO LANE TO FOUR LANE DIVIDED HIGHWAY, REPLACE CULVERT 8260 WITH NEW CULVERT 17X04 & LIGHTING (AC PAYBACK 1 OF 1) 8.0 MC GRADING ONLY NHPP 15,744,214 15,744, MN MNDOT MN 60, AT WILDER, REPLACE CONCRETE PANEL 0.0 RD CONCRETE PAV NHPP 300, , , REHAB 1078 MN MNDOT MN 60, FROM CSAH 35 TO NORTH OF I 90, PLACE SIGNS FOR THE WORTHINGTON WEIGH STATION 1.9 SC SIGNING NHPP 100,000 80, , MN MNDOT MN 99, FROM MINNESOTA RIVER BRIDGE TO CSAH 38 IN LE CENTER, MILL & 12.8 RS MILL AND STBGP 3,400,000 2,720, , Page 3 of 13

5 1080 MN MNDOT MN 109, FROM TH 22 TO I90 IN ALDEN, MILL AND, NEW BR 22X08, LIGHTING AND ADA 10.2 RS MILL AND STBGP 6,700,000 5,200, ,300, , MN MNDOT **ELLA** DISTRICTWIDE, CULVERT REPAIR AND REPLACEMENT 1082 US MNDOT **SPP** US 14, FROM WEST SIDE OF SLEEPY EYE TO 0.1 MI E OF CSAH 27, MILL &, CONCRETE GRINDING, ADA, SIGNALS & LIGHTING 0.0 DR CULVERT REHAB 1.9 RS MILL AND STBGP 1,430,143 1,144, , NHPP 2,500,000 1,840, , , US AC 2018 MNDOT **AC** US 14, FROM 0.25 MI E OF CSAH 5 TO 0.23 MI W OF W JCT CSAH 27, UNBONDED CONCRETE & SHOULDER RECLAMATION (AC PAYBACK 1 OF 1) 1084 US MNDOT **17NEW**SPP** US 14, FROM 0.1 MI E OF CSAH 27 TO THE WEST LIMITS OF NEW ULM, MILL & 1085 US MNDOT **PODI**SPP**AC**CHAP 152** US 14, BROADWAY ST TO 0.6 MI E OF HWY 14, 15 & CR 21 INT. & ON MN 15, HWY 14, 15 & CR 21 INT TO 0.1 MI N OF 428TH LANE, RUCT & REPLACE BR 9200 & 9294 WITH NEW BR & & NEW INTERCHANGE BR (AC, AC PAYBACK IN 2019) 1086 US 14 TZ MNDOT **ELLA** US14, RELOCATE NEW ULM TRUCK STATION TO COURTLAND 1087 US MNDOT **SPP** US 169, FROM 0.2 MI SOUTH OF JCT CSAH 6 TO 0.2 MI NORTH OF CSAH 12 IN WINNEBAGO, BITUMINOUS MILL &, ADA IMPROVEMENTS AND LIGHTING 1088 US MNDOT US 169, 1.5 MI NORTH OF JCT TH 112, LE SUEUR REST AREA, GRADING AND SITE IMPROVEMENTS 12.5 RS CONCRETE 9.6 RS MILL AND STBGP 5,273,021 5,273, NHPP 2,300,000 1,840, , BR BRIDGE REPL NHPP BF 20,093,000 12,458,400 15,360,000-1,554,600 5,400, , BT BLDG REMOVAL/DE MO SF 3,466, ,466, RS BIT NHPP 4,400,000 3,488, ,000-40, AM SAFETY REST AREA SF 1,250, ,000-1,000, US MNDOT US 169, 1.5 MI NORTH OF JCT TH 112, LE SUEUR REST AREA, RUCT BUILDING AND PARKING 1090 US MNDOT US 169, FROM.45 MI S OF N JCT TH 22 TO 0.1 MI N OF 270TH ST, NB LANES ONLY, GRADING, CONC SURFACE, MILL &, REPLACE BR WITH NEW BR 52018, ON BR BRIDGE RAIL AND GUARDRAIL IMPROVEMENTS, AND REHAB CULV 8961 & LIGHTING (ASSOCIATED S & SH) 0.8 AM SAFETY REST AREA 14.9 RD MILL AND SF 2,250, ,000-1,750,000 NHPP 15,000,000 12,000, ,000, Page 4 of 13

6 1091 US S 2018 MNDOT **ITS** US 169, FROM.45 MI S OF N JCT TH 22 TO 14.9 TM SIGNING STBGP 499, , , MI N OF 270TH ST, INSTALL DYNAMIC MESSAGE SIGNS (DMS) (ASSOCIATED & S) 1092 US SH 2018 MNDOT **AC** US 169, FROM 0.45 MI S OF N JCT TH 22 TO 0.1 MI N OF 270TH ST, INSTALL HIGH TENSION CABLE BARRIER (PAYBACK IN 2019) (ASSOCIATED & S) 14.9 SH TRAFFIC BARRIER HSIP 1,510,000 1,260, , , MN BI MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR RX BRIDGE REPAIR SF 600, , MN MA MNDOT DISTRICTWIDE SETASIDES - COOPERATIVE 0.0 AM COOP CONST SF 400, , AGREEMENTS AGR 1095 MN PD MNDOT DISTRICTWIDE SETASIDE - DEVELOPMENT CA MISC SF 11,000, ,000, MN RW MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY RW RIGHT OF WAY SF 1,500, ,500, MN RX MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ AND SEAL (BARC) MN SA MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO AND INCENTIVES MN ST MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING (BARC) RX BARC SF 1,900, ,900, SA SUP. AGR & COST OVRN 0.0 RX PAVEMENT MARKINGS SF 4,500, ,500, SF 1,000, ,000, ,017,490 92,680,105 19,509, ,000 35,742,843 5,400,000 18,474,542 Page 5 of 13

7 1100 BB TRF A 2019 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 1,900, , ,368, BB TRF B 2019 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT PREVENTATIVE MAINTENANCE 1102 BB TRF T 2019 MANKATO SECT 5339: CITY OF MANKATO PURCHASE ONE(1) BUS <30 FT REPLACEMENT BUS (CLASS 400) 1103 BB TRF ZO 2019 MANKATO MANKATO; SFY 2019 GREATER MN NEW SERVICE EXPANSION OPERATING FUNDS (7/1/18-6/30/19) 0.0 BB TRANSIT VEHCL PRCH 0.0 TR TRANSIT FTA 263, , ,000 FTA 200, , ,000 LF 1,080, ,080, RR BLUE EARTH 1105 RR BLUE EARTH 1106 RR FARIBAULT UP RR, INSTALL GATES, CSAH 20, 510TH AVE, LAKE CRYSTAL, BLUE EARTH DME RR, INSTALL GATES, CSAH 37, 631ST AVE, TOWNSHIP OF LE RAY, BLUE EARTH UP RR, INSTALL GATES, CSAH 13, 430TH AVE, TOWNSHIP OF BLUE EARTH, FARIBAULT 0.0 SR RR XING IMPV RRS 300, , , SR RR XING IMPV RRS 275, , , SR RR XING IMPV RRS 325, , , RR MNDOT UP RR, UPGRADE EXISTING SIGNAL, MN 19, MAIN ST W, NEW PRAGUE, LE SUEUR 0.0 SR RR XING IMPV RRS 354, , , RR WASECA 1109 CR WASECA DME RR, INSTALL GATES, CSAH 2, 360TH AVE, WASECA, WASECA CR 75, 1.6 MI W OF JCT CSAH 4 OVER LE SUEUR RIVER, REPLACE BR 1148 WITH NEW BR SR RR XING IMPV RRS 275, , , BR BRIDGE REPL BROS 503, , , CSAH COTTONWOO CSAH 7, FROM TH 62 TO CSAH 15,, PAVE D SHOULDERS AND RUMBLE STRIPES 1111 CSAH LE SUEUR CSAH 15, FROM TH 112 TO CSAH 26, COLD IN PLACE RECYCLE AND BITUMINOUS 3.0 SH PAVE SHOULDER 4.0 RD BIT COLD INPLACE RECL HSIP 900, , ,000 STBGP 1,704,375 1,363, , CSAH WATONWAN CSAH 21, FROM COTTONWOOD LINE TO CSAH 5, LIGHTING, SIGNING AND PAVEMENT MARKINGS (TIED TO ) 4.0 SH SIGNING HSIP 25,000 10, , CSAH WATONWAN CSAH 21, FROM WEST LINE TO JCT CSAH 5, CONCRETE (TIED TO ) 4.0 RD CONCRETE STBGP 2,488,000 1,714, , CSAH AC 2019 BLUE EARTH **AC** CSAH 90, AT THE JCT OF CSAH 90 & TH 22, CONSTRUCT ROUNDABOUT (TIED TO ) (AC PAYBACK 1 OF 1) 1115 LOCAL AC MANKATO **AC**TED** ADAMS ST; FROM TH 22 TO CSAH 12, CONSTRUCT NEW ROAD, ROUNDABOUT AND PED/BIKE TRAIL (AC PAYBACK 1 OF 2) 0.1 SH ROUNDABOUT HSIP 610, , MC GRADING ONLY STBGP 384, , Page 6 of 13

8 1116 MSAS NEW ULM MSAS 102 (5TH NORTH STREET), FROM HIGHLAND AVE (MSAS122) TO GARDEN STREET (MSAS121) IN NEW ULM, RUCT ROADWAY 0.4 MC URBAN STBGP 1,526, , , PED/BIKE BLUE EARTH 1118 PED/BIKE JACKSON 1119 PED/BIKE AC 2019 LE SUEUR IN THE CITY OF LAKE CRYSTAL, ALONG WATONWAN AND BLUE EARTH STREETS, CONSTRUCT SIDEWALKS ON DEWEY STREET BETWEEN NORTH HIGHWAY AND SPRINGFIELD PARKWAY (CSAH 14), CONSTRUCT PED/BIKE TRAIL **AC** ALONG S 4TH ST, S 5TH ST AND BRIDGE ST, IN THE CITY OF LE SUEUR, RUCT SIDEWALKS AND ADA (AC, PAYBACK 1 OF 1) 1120 US AC 2019 WASECA **AC** US 14, FROM THE WEST LIMITS OF WASECA TO THE EAST LIMITS OF WASECA, RUCT ROADWAY (AC PAYBACK 1 OF 1) 1121 I ADMIN I90, 4.2 MILES WEST OF JACKSON ON EB I90, CLEAR LAKE REST AREA REPLACEMENT 1122 I ADMIN I90, 1.5 MILES WEST OF TH 71 ON WB I90, DES MOINES REST AREA REPLACEMENT 1123 MN MNDOT MN 4, FROM IOWA STATE LINE TO W JCT CSAH 26, MILL & AND REPLACE BRIDGES 3572 & MN AC MNDOT **AC** MN 22, FROM 5TH AVE IN MAPLETON TO 0.1 MI N OF JCT CSAH 15, RUCT AND REPLACE BR 5959 WITH NEW BR (AC PAYBACK 2 OF 2) 1125 MN SAC 2019 MNDOT **AC** MN 22, AT JCT OF CSAH 90, CONSTRUCT ROUNDABOUT (TIED TO ) (AC PAYBACK 1 OF 1) 1126 MN MNDOT MN 22, FROM NORTH CITY LIMITS NEAR 5TH AVE NE OF MAPLETON (TO INCLUDE PLAZA AREA) TO INTERSECTION OF TH 22 AND 206TH STREET, LANDSCAPING 1127 MN MNDOT **SPP** MN 60, FROM 6TH ST (TH62) TO 490TH AVE IN WINDOM, EB & WB LANES, MILL &, ADA 1128 MN MNDOT MN 99, FROM CSAH 45 (RABBIT RD) TO TH 21, MILL &, REPLACE BR 8893, TURN LANES, DRAINAGE, LIGHTING AND ADA 1129 US MNDOT **ELLA** US 14, FROM 0.3 MI W OF LOOKOUT DRIVE TO 0.5 MI E OF CSAH 86, MILL &, ADA & REHAB BR BT SIDEWALKS STBGTAP 200, , , BT NEW TRAIL STBGTAP 101,855 81, , BT SIDEWALKS STBGTAP 383, , MC URBAN 0.7 RB SAFETY REST AREA 3.0 RB SAFETY REST AREA 10.1 RS MILL AND 10.6 MC NEW PAVEMENT STBGP 1,200,000 1,200, NHPP 4,322,359 3,890, , NHPP 4,322,359 3,890, , STBGP 6,700,000 5,360, ,340, STBGP 4,484,953 4,484, SH ROUNDABOUT HSIP 900, , RB LANDSCAPING SF 410, ,000-75, RS MILL AND 8.0 RD MILL AND 9.2 RS MILL AND SF 3,300, ,125, ,000 STBGP 8,600,000 6,880, ,720, NHPP 9,100,000 7,280, ,820, Page 7 of 13

9 1130 US AC 2019 MNDOT **AC**CHAP 152**SPP** US 14, BROADWAY ST TO 0.6 MI E OF HWY 14, 15 & CR 21 INT & ON MN 15, HWY 14, 15 & CR 21 INT TO 0.1 MI N OF 428TH LANE, RUCT & REPLACE BR 9200 & 9294 WITH NEW BR & & NEW INTERCHANGE BR (AC PAYBACK 1 OF 1) 1.0 BR BRIDGE REPL NHPP 15,360,000 15,360, US SHAC 2019 MNDOT **AC** US 169, FROM 0.45 MI S OF N JCT TH 22 TO 0.1 MI N OF 270TH ST, INSTALL HIGH TENSION CABLE BARRIER (PAYBACK 1 OF 1) (ASSOCIATED & S) 9.6 SH TRAFFIC BARRIER HSIP 990, , MN BI MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR RX BRIDGE REPAIR SF 600, , MN MA MNDOT DISTRICTWIDE SETASIDES - COOPERATIVE 0.0 AM COOP CONST SF 500, , AGREEMENTS AGR 1134 MN PD MNDOT DISTRICTWIDE SETASIDE - DEVELOPMENT CA MISC SF 8,000, ,000, MN RW MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY RW RIGHT OF WAY SF 500, , MN RX MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ AND SEAL (BARC) MN SA MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO AND INCENTIVES MN SHL MNDOT DISTRICTWIDE SETASIDES - LOCAL HSIP S MN ST MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING (BARC) RX BARC SF 1,900, ,900, SA SUP. AGR & SF 3,000, ,000, COST OVRN 0.0 SH HSIP HSIP 856, , , RX PAVEMENT MARKINGS SF 750, , ,594,287 58,267, ,000 24,454,472-5,992,297 Page 8 of 13

10 1140 BB TRF A 2020 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 2,000, , ,468, BB TRF B 2020 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT PREVENTATIVE MAINTENANCE 1142 BB TRF T 2020 MANKATO SECTION 5339: CITY OF MANKATO PURCHASE ONE(1) LOW FLOOR REPLACEMENT BUS (CLASS 400) 1143 CSAH AC 2020 BLUE EARTH **AC** CSAH 12, FROM CSAH 17 TO TH 83, CONSTRUCT NEW ROAD AND ROUNDABOUT AT JCT TH 83 (TIED TO ) (AC PAYBACK 1 OF 1) 0.0 BB TRANSIT VEHCL PRCH 1.7 MC GRADING ONLY FTA 200, , ,000 FTA 200, , ,000 STBGP 1,596,000 1,596, CSAH BLUE EARTH 1145 CSAH MARTIN CSAH 41 OVER LE SUEUR RIVER, 0.7 MI S OF JCT CR 183, REPLACE BR 7274 WITH BR AND APPROACHES CSAH 52, FROM TH 15 TO THE FARIBAULT LINE, FULL DEPTH RECLAIM AND BITUMINOUS WIDE, UPDATE CURVE DELINEATION & RURAL INTERSECTION IMPROVEMENTS 1146 CSAH JACKSON 1147 LOCAL AC MANKATO **AC**TED** ADAMS ST; FROM TH 22 TO CSAH 12, CONSTRUCT NEW ROAD, ROUNDABOUT AND PED/BIKE TRAIL (AC PAYBACK 2 OF 2) 0.0 BR BRIDGE REPL BROS 1,800, , , RD BIT RECLM STBGP 3,600,000 1,596, ,004, SH SIGNING HSIP 160, , , MC GRADING ONLY STBGP 636, , MN NEW PRAGUE MN 19, FROM FOURTH AVE(TH21) TO SEVENTH AVE SE, RUCT ROADWAY, LANDSCAPING AND LIGHTING (TIED TO ) 0.9 MC URBAN STBGP 4,375,000 1,772, ,603, PED/BIKE FAIRMONT FROM I90 TO 10TH STREET TRAIL CONNECTION IN FAIRMONT, CONSTRUCT PED/BIKE TRAIL 1150 PED/BIKE NORTH MANKATO AROUND DAKOTA MEADOWS SCHOOL IN NORTH MANKATO, IMPROVE VARIOUS CROSSINGS AND CONSTRUCT TRAILS 1151 I MNDOT I 90, 4.2 MILES WEST OF JACKSON ON EB I90, CLEAR LAKE REST AREA PAVEMENTS AND LIGHTING 1152 I MNDOT I 90, 1.5 MILES WEST OF TH 71 ON WB I90, DES MOINES REST AREA PAVEMENTS AND LIGHTING 1.8 EN NEW TRAIL STBGTAP 508, , , EN NEW TRAIL STBGTAP 334, , , RB SAFETY REST AREA 0.3 RB SAFETY REST AREA NHPP 1,805,760 1,625, , NHPP 2,166,679 1,950, , MN MNDOT **AC**LGA** MN 19, FROM FOURTH AVE(TH21) TO 5th AVE NW IN NEW PRAGUE, RUCT ROADWAY, LANDSCAPING AND LIGHTING (TIED TO ) (AC, AC PAYBACK IN 2021) 1.1 AM URBAN STBGP 1,098,400-4,393,600-1,098, MN MNDOT MN30, FROM TH 83 TO NEW RICHLAND, AND REPLACE BRIDGES 6789 & RD BIT RECLM STBGP 5,900,000 4,720, ,180, Page 9 of 13

11 1155 MN MNDOT MN 60, FROM TH 14 TO TH 13 IN WATERVILLE, MILL & 16.3 RS MILL AND STBGP 9,000,000 7,200, ,800, MN MNDOT **17NEW**SPP** MN60, FROM 1.2 MI W OF W 12.9 RD CONCRETE PAV NHPP 7,500,000 6,000, ,500, JCT TH 4 TO 0.7 MI W OF W JCT TH 15, EB & WB LANES, CONCRETE PAVEMENT REHAB AND BITUMINOUS MILL &, REHAB BR 83005, 83026, & REHAB 1157 MN MNDOT **ELLA** MN 91, FROM THE S ADRIAN CITY LIMITS TO NOBLES/MURRAY LINE, MILL &, ADA AND REPLACE CULVERTS 1503 & MN MNDOT **AC** MN 111, FROM 1ST ST IN NICOLLET TO JCT TH 22 & ON MN 22 FROM JCT TH 111 TO 280TH ST IN GAYLORD, BITUMINOUS RECLAIM AND BITUMINOUS SURFACING (AC PAYBACK IN 2021) 1159 US MNDOT US 71, FROM N JCT TH 60 IN WINDOM TO TH 30, MILL & AND REHAB BR 8701, 8328 & US MNDOT US 71, FROM CSAH 38 IN JACKSON TO TH 60 IN WINDOM, CIR, MILL & AND REPLACE BR RS MILL AND STBGP 7,100,000 5,632, ,408,100-59, RD BIT RECLM STBGP 4,980,000 2,720,000 6,320,000-2,260, RS MILL AND 17.8 RS MILL AND NHPP 4,400,000 3,520, , NHPP 9,000,000 7,200, ,800, MN BI MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR RX BRIDGE REPAIR SF 600, , MN MA MNDOT DISTRICTWIDE SETASIDES - COOPERATIVE 0.0 AM COOP CONST SF 500, , AGREEMENTS AGR 1163 MN PD MNDOT DISTRICTWIDE SETASIDE - DEVELOPMENT CA MISC SF 5,500, ,500, MN RW MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY RW RIGHT OF WAY SF 500, , MN RX MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ AND SEAL (BARC) MN SA MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO AND INCENTIVES MN SHL MNDOT DISTRICTWIDE SETASIDES - LOCAL HSIP S MN SHS MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP S MN ST MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING (BARC) RX BARC SF 1,900, ,900, SA SUP. AGR & SF 4,000, ,000, COST OVRN 0.0 SH HSIP HSIP 1,616,878 1,455, , SH HSIP HSIP 1,333,333 1,200, , RX PAVEMENT MARKINGS SF 750, , ,061,850 50,601,915 10,713, ,000 26,207,077-7,400,858 Page 10 of 13

12 1170 BB TRF A 2021 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 2,100, , ,568, BB TRF B 2021 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT PREVENTATIVE MAINTENANCE 1172 BB TRF T 2021 MANKATO SECT 5339: CITY OF MANKATO PURCHASE ONE(1) BUS <30 FT REPLACEMENT BUS (CLASS 400) 1173 BB TRF TA 2021 MANKATO SECT 5339: CITY OF MANKATO PURCHASE ONE(1) STD 40 FT REPLACEMENT BUS (CLASS 700) 0.0 BB TRANSIT VEHCL PRCH 0.0 BB TRANSIT VEHCL PRCH FTA 200, , ,000 FTA 200, , ,000 FTA 530, , , CSAH WATONWAN 1175 CSAH WATONWAN 1176 CSAH WATONWAN 1177 CSAH BROWN 1178 CSAH NICOLLET 1179 CSAH SIBLEY 1180 CSAH FARIBAULT CSAH 3, FROM TH 4 TO CSAH 27, 6" CENTERLINE STRIPING, UPGRADE SIGNS, SHOULDER PAVING, INTERSECTION IMPROVEMENTS CSAH 6, FROM BROWN CSAH 13 TO TH 15, CHEVRON SIGNS, SHOULDER PAVING, RUMBLE STRIPS, STREET LIGHTS, INTERSECTION SIGNING, PAVEMENT MARKINGS CSAH 10, FROM CR 103 TO TH 15, RUMBLE STRIPES, CHEVRON SIGNS, SHOULDER PAVING, INTERSECTION IMPROVEMENTS CSAH 13, FROM HANSKA TO 220TH ST NEAR NEW ULM, SURFACE REHABILITATION CSAH 13, FROM 506TH ST TO TH 99, MILL AND CONCRETE CSAH 17, FROM JCT TH 5 IN ARLINGTON TO PRAIRIE LINE RAILROAD, REPLACE BR WITH NEW BR CSAH 21, CSAH 2 TO CSAH 16, RECLAIM AND & REPLACE BR 9984 WITH NEW BR SH STRIPING HSIP 12,000 10, , SH SIGNING HSIP 60,000 54, , SH PAVE SHOULDER HSIP 100,000 90, , RD BIT RECLM STBGP 4,000,000 1,596, ,404, RD MILL AND STBGP 4,000,000 1,596, ,404, BR BRIDGE REPL BROS 978, , , BR BRIDGE REPL BROS 2,000, , ,520, CSAH WORTHINGT ON CSAH 35, FROM MCMILLAN STREET TO HUMISTON AVENUE(TH 59), RUCT ROADWAY, PED/BIKE CONSTRUCTION AND ADA 0.4 MC URBAN STBGP 2,884,000 1,500, ,384, MSAS NORTH MANKATO 1183 PED/BIKE AC 2021 FARIBAULT MSAS 119, FROM LOOKOUT DR TO LOR RAY DR, REMOVE AND REPLACE SURFACING, ADA AND LIGHTING **AC** IN BLUE EARTH, ALONG CSAH 16, W 2ND ST, CSAH 6 (380TH AVE), CSAH 44, FAIRVIEW ST & N GALLBRAITH ST, CONSTRUCT PED BIKE TRAIL, ADA, STRIPING (AC PAYBACK 1 OF 1) 1.0 RD URBAN STBGP 1,725, , , BT NEW TRAIL STBGTAP 246, , Page 11 of 13

13 1184 PED/BIKE NORTH IN NORTH MANKATO ALONG MONROE AVE, 0.0 EN NEW TRAIL STBGTAP 300, , ,972 MANKATO GARFIELD AVE, CENTER ST, RANGE ST AND WHEELER PARK, CONSTRUCT PED/BIKE TRAIL, ADA, CURB EXTENSIONS, STRIPING AND CREATE PICK UP/DROP OFF AREA 1185 PED/BIKE WORTHINGT ON IN WORTHINGTON, FROM CECILEE ST TO TRAIL ALONG TH 60, AND FROM KNOLLWOOD DRIVE TO PRAIRIE ELEMENTARY SCHOOL, CONSTRUCT PED/BIKE TRAILS 0.0 EN NEW TRAIL STBGTAP 286, , , MN MNDOT MN 5, FROM 0.01 MI N OF 5TH ST IN GREEN ISLE TO US 212 IN NORWOOD YOUNG AMERICA - MILL AND (DESIGNED BY D7, METRO PORTION OF $1.54M UNDER SP M) 1187 MN MNDOT MN 13, AT THE INTERSECTION OF TH 13 AND 7TH AVE NW IN THE CITY OF WASECA, REPLACE SIGNAL 1188 MN MNDOT MN 14/15, AT THE INTERSECTION OF 16TH NORTH ST AND TH 14, AND GARDEN ST AND TH 14, REPLACE SIGNAL S, AND AT THE INTERSECTION OF 19TH SOUTH ST AND TH 15, REPLACE CURB RAMP, IN THE CITY OF NEW ULM 6.4 RS MILL AND 0.0 SC TRAFFIC SIGNAL REV 0.0 SC TRAFFIC SIGNAL REV STBGP 2,700,000 2,160, , STBGP 290, , , ,000 STBGP 630, , , , MN AC 2021 MNDOT **AC**LGA** MN19, FROM FOURTH AVE(TH21) TO SEVENTH AVE SE IN NEW PRAGUE, RUCT ROADWAY (TIED TO ) (AC PAYBACK 1 OF 1) 1190 MN MNDOT MN 19, 0.8 MI E OF JCT TH 15, OVER CO DITCH #42 REPLACE BR WITH NEW BR 1191 MN MNDOT MN 30, FROM CSAH 7 TO TH 71, MILL AND 1192 MN MNDOT MN 30, FROM 2.2 MI E OF TH 15 TO 7.0 MI E OF TH 15, REPLACE BR 1575, 1576 & MN MNDOT MN 62, FROM PLUM AVE TO TH 60 IN WINDOM, MILL AND ULTRA THIN BONDED WEAR COURSE, ADA AND INSTALL A RRFB 1194 MN MNDOT MN 93, FROM US 169 TO THE FLOOD WALL IN HENDERSON, MILL AND, REHAB BR MN MNDOT MN 99, FROM BIRCH ST IN NICOLLET TO THE S JCT US 169 IN ST PETER, MILL AND, REPLACE BR 4596 & WITH NEW BR, LIGHTING AND ADA 1.0 AM URBAN STBGP 4,393,600 4,393, BR BRIDGE REPL STBGP 1,300,000 1,040, , RS MILL AND STBGP 5,600,000 4,480, ,120, BR BRIDGE REPL SF 3,900, ,900, RS MILL AND 3.6 RS MILL AND 11.5 RS MILL AND STBGP 1,100, , , STBGP 2,200,000 1,760, , STBGP 5,500,000 4,400, ,100, Page 12 of 13

14 1196 MN AC 2021 MNDOT **AC** MN 111, FROM 1ST ST IN NICOLLET TO JCT TH 22 & ON MN 22 FROM JCT TH 111 TO 280TH ST IN GAYLORD, BITUMINOUS RECLAIM AND BITUMINOUS SURFACING (PAYBACK 1 OF 1) 19.1 RD BIT RECLM STBGP 6,320,000 6,320, MN MNDOT MN 263, FROM CR 125 (CLARK ST) IN CEYLON TO THE NORTH RAMPS AT I90, RECLAIM, SHOULDER WIDENING, NEW GUARDRAIL AT BR AND ADA 1198 US MNDOT US 14, FROM 0.5 MI E OF THE TH14/TH 15/CR 21 INTERSECTION TO 1.5 MI W OF TH 99/OLD TH 14, MILL AND 1199 US MNDOT US 71, AT THE INTERSECTION OF TH 71 AND SHERMAN ST IN THE CITY OF JACKSON, REPLACE SIGNAL 1200 US MNDOT US 169, AT THE INTERSECTION OF TH 169 AND OWATONNA ST IN THE CITY OF MANKATO, REPLACE SIGNAL 11.2 RD BIT RECLM SF 7,100, ,100, RS MILL AND 0.0 SC TRAFFIC SIGNAL REV 0.0 SC TRAFFIC SIGNAL REV NHPP 8,500,000 6,800, ,700, NHPP 330, , , ,000 NHPP 370, , , , MN BI MNDOT DISTRICTWIDE SETASIDES - BRIDGE REPAIR RX BRIDGE REPAIR SF 600, , MN MA MNDOT DISTRICTWIDE SETASIDES - COOPERATIVE 0.0 MA COOP CONST SF 1,000, ,000, AGREEMENTS AGR 1203 MN PD MNDOT DISTRICTWIDE SETASIDE - DEVELOPMENT CA MISC SF 6,500, ,500, MN RW MNDOT DISTRICTWIDE SETASIDES - RIGHT OF WAY RW RIGHT OF WAY SF 500, , MN RX MNDOT DISTRICTWIDE SETASIDES - ROAD REPAIR/ AND SEAL (BARC) MN SA MNDOT DISTRICTWIDE SETASIDES - CONSTRUCTION SA, CO AND INCENTIVES MN SHL MNDOT DISTRICTWIDE SETASIDES - LOCAL HSIP S MN SHS MNDOT DISTRICTWIDE SETASIDES - MNDOT HSIP S MN ST MNDOT DISTRICTWIDE SETASIDES - STRIPING AND SIGNING (BARC) RX BARC SF 2,900, ,900, SA SUP. AGR & SF 5,000, ,000, COST OVRN 0.0 SH HSIP HSIP 1,272,444 1,145, , SH HSIP HSIP 1,333,333 1,200, , RX PAVEMENT MARKINGS SF 750, , ,712,042 42,854,400-1,276,000 33,926,333-11,655,309 Page 13 of 13

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP

DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department

More information

Genesis 1273 West Derrynane Le Center MN Hutchinson Coop Off of MN 5 Arlington MN

Genesis 1273 West Derrynane Le Center MN Hutchinson Coop Off of MN 5 Arlington MN Ag Bags Genesis 1273 West Derrynane Le Center MN 56057 507-357-2245 Hutchinson Coop Off of MN 5 Arlington MN 55307 507-964-2283 Lafayette City Clerk 700 9th Street Lafayette MN 56054 507-228-8241 Traverse

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

Report on Project Cost Comparisons

Report on Project Cost Comparisons Report on Project Cost Comparisons February 2018 Prepared by: The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

Appendix C Long-Range Highway and Transit Capital Project List

Appendix C Long-Range Highway and Transit Capital Project List Appendix C Long-Range Highway and Transit Capital Project List Appendix C was developed at the request of the U.S. Department of Transportation Federal Highway and Federal Transit Administrations and consists

More information

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV. 02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council

FY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund

More information

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

BID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Future Projects. District 3 Central Minnesota. mndot.gov/d3 Future Projects District 3 Central Minnesota 20 2021 mndot.gov/d3 Cass 20-2021 Construction Central Minnesota MnDOT District 3 Walker 34 Hackensack CASS 84 Remer 200 Longville Hill City Wadena 29 Osakis

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ALACHUA COUNTY Highways: Interstate 4230716 I-75(SR121)WILLISTON RD SR222(NW

More information

Metro District 10-Year Capital Highway Investment Plan ( )

Metro District 10-Year Capital Highway Investment Plan ( ) Metro District 10-Year Capital Highway Investment Plan (2019-2028) Cover Picture DRAFT JUNE 2018 Prepared by Office of Transportation System Management METRO DISTRICT 10-YEAR CHIP OVERVIEW Metro District

More information

Appendix E. Build Alternative Design Information

Appendix E. Build Alternative Design Information Appendix E. Build Alternative Design Information NORTHERN LIGHTS EXPRESS C/L SHIFTED MAINLINE TRACK C/L MAINLINE TRACK 5" 24: PROFILE GRADE 24: 24: PROFILE GRADE 24: 22' - 0" 22' - 0" SINGLE TRACK ON CURVES

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Project Title/Location Project Sponsor Improvement Type Source of Funds HIGHWAYS

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 Project Description Phase Milwaukee Milwaukee 24 2016307 2200-13-70 WEST HIGHLAND AVENUE, CITY OF

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 1 N 14 9 Chisago Interstate Highway 2011 Project Sites 8 12 6 Anoka 1 6 0 6 22 6 6 9 12 7 7 7 284 74 2 41 71 29

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

Current Corridor Characteristics

Current Corridor Characteristics Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Title/Location HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

WI SR Title and Work Description Region County Ad Date Range

WI SR Title and Work Description Region County Ad Date Range Advance Schedule of Projects These contracts are planned for advertisement by the Washington State Department of Transportation for December 1, 2014 through November 30, 2015. Please note the advertisement

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT UNIT BRIDGE ROSTER - SHOWING DEFICIENT T.H. BRIDGES STATEWIDE 08/02/2007 PAGE: 1 YEAR

MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT UNIT BRIDGE ROSTER - SHOWING DEFICIENT T.H. BRIDGES STATEWIDE 08/02/2007 PAGE: 1 YEAR BRIDGE ROSTER - SHOWING ICIENT T.H. BRIDGES EWIDE 08/02/2007 PAGE: 1 AITKIN ANOKA ANOKA ANOKA ANOKA ANOKA BELTRAMI BLUE EARTH BROWN BROWN BROWN CARLTON CARVER CARVER CARVER CARVER CASS CHIPPEWA CHIPPEWA

More information

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

CUY LAKE TO LAKES TRAIL (PHASE 2): PID 1299 Superior Avenue Cleveland, Ohio 44114 216-241-2414 (extension 287) 216-621-3024 (fax) emay@mpo.noaca.org NOACA MEMORANDUM To: Melinda Bartizal (216) 584-2087 From: Ed May (216) 241-2414 ext. 287 Date:

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION FY 20162025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM DVRPC FY 2017 Authorized and Unauthorized Projects (All funds $ millions) Burlington Arney's Mount Trail, Phase 1 (DB #D1713) TAP CON $3.000 $3.000

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout

More information

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

Changes in TIP projects Draft vs. Final Draft

Changes in TIP projects Draft vs. Final Draft Attachment 2 Dollars in $1,000 Key 08698 Franklin Road and Cloverdale Road Intersection Changes in TIP projects Draft vs. Final Draft RW - $1,314 UT - $1,000 CE - $341 CN - $3,675 CN - $499 09438 Caldwell

More information

2007 FFY OBLIGATED AND GRANTED PROJECTS LIST FEDERAL REGION PROJECT PHASE

2007 FFY OBLIGATED AND GRANTED PROJECTS LIST FEDERAL REGION PROJECT PHASE CAPITOL REGION SHARE 1001-0105 ROW OFF - SYSTEM BRIDGE TIMES FARM ANDOVER BR 04581 O/ HOP RIVER 26 21 1039-0088 CON HIGH RISK RURAL ROAD CT 20 EAST GRANBY WIDENING OF CT 20, VIC OF HOLCOMB ST/NEWGATE RD

More information

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1 Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Arkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)

Arkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34) ROUTE: 17 COUNTY: WOODRUFF KESSER INTERNATIONAL, INC. LITTLE ROCK, AR PHILLIPS HARDY, INC. BOONVILLE, MO PATRIARCH CONTRACTING, LLC SEARCY, AR COMMON CONSTRUCTION LLC SEARCY, AR SEAGRAVES CONSTRUCTION,

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

Michigan s Engineering Safety Program for Local Roadways

Michigan s Engineering Safety Program for Local Roadways Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Flash-Flooding Event from September 2016

Flash-Flooding Event from September 2016 Flash-Flooding Event from 21-22 September 2016 Event Overview On the evening of September 20 th, a warm front was stretched west to east across the Midwest originating from a developing low pressure system

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian

More information

City of Shenandoah Transportation Projects. September 20, 2018 By: Derek Wind, PE, CFM

City of Shenandoah Transportation Projects. September 20, 2018 By: Derek Wind, PE, CFM City of Shenandoah Transportation Projects September 20, 2018 By: Derek Wind, PE, CFM Shenandoah Proposed Improvements Montgomery County Precinct Boundary Precinct 2 North West side of I-45 and Research

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : February 14, 2007 BID OPENING OF February 15, 2007

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : February 14, 2007 BID OPENING OF February 15, 2007 PROJECT NO.: BRO-103D(059)CO J.P. NUMBER: 2110304 CALL ORDER: 020 PROPOSAL NUMBER: 070001 COUNTY: ATOKA HIGHWAY NO.: COUNTY ROAD DESCRIPTION: BRIDGE & APPROACHES LOCATION : COUNTY ROAD; OVER DELAWARE CREEK,

More information

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Welcome to Dayton Parkway Interchange Open House. November 26, 2018 Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange

More information