TONOPAH AIRPORT REHABILITATE TAXIWAY B AND AIRCRAFT APRON

Size: px
Start display at page:

Download "TONOPAH AIRPORT REHABILITATE TAXIWAY B AND AIRCRAFT APRON"

Transcription

1 REHABILITATE TAXIWAY B AND AIRCRAFT APRON AIP NO PWP-NY NYE COUNTY, NEVADA MARCH 16, 2018 N 376 Coaldale 265 Silver Peak 6 95 Tonopah TONOPAH AIRPORT Goldfield Warm Springs 6 E to ly C:\Users\fitz1543\appdata\local\temp\AcPublish_4380\G-100 to TW B.dwg Mar 14, :59pm VICINITY MAP N.T.S. Oasis Nevada California 266 Lida 95 L to as Vegas LOCATION MAP N.T.S. COUNTY COMMISSIONERS CHAIRPERMAN JOHN KOENIG VICE CHAIRMAN DAN SCHINHOFEN COMMISSIONER ANDREW BORASKY COMMISSIONER DONNA COX COMMISSIONER LORINDA WICHMAN PUBLIC WORKS DIRECTOR-ACTING TIM DAHL Professional Circle, Suite 102 Reno, Nevada

2 SAFETY NOTES GENERAL NOTES EXISTING PROPOSED G-101 GENERAL NOTES AND LEGEND

3 PHASING NOTES 1) THE CONTRACTOR SHALL COORDINATE WORK ON THE AIRPORT AND INTERRUPTIONS OF AIRPORT OPERATIONS WITH THE ENGINEER. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER/ENGINEER A MINIMUM OF 48 HOURS PRIOR TO ANY WORK WITHIN RESTRICTED AREAS. 2) THE CONTRACTOR SHALL PLACE LOW PROFILE BARRICADES ACROSS THE ENDS OF TAXIWAY A TO PREVENT AIRCRAFT FROM ENTERING THE WORK ZONE AS SHOWN IN THE PLANS. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE AND TO MAINTAIN THE BARRICADES AND THE RED LIGHTS FOR THE DURATION OF THE PROJECT. ANY DAMAGE TO THE BARRICADES OR LIGHTS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. AT THE END OF THE PROJECT, ALL BARRICADES WILL BE RETURNED TO THE COUNTY IN GOOD WORKING CONDITION. 3) IF TEMPORARY RUNWAY DISPLACEMENTS ARE NECESSARY, THEY SHALL BE ASSEMBLED AS SHOWN IN THE PLANS. IT IS THE CONTRACTORS RESPONSIBILITY TO MAINTAIN THESE DISPLACEMENTS FOR THE DURATION OF THE PROJECT. THIS INCLUDES PROVIDING SET UP, DAILY INSPECTION, AND TEAR DOWN AS NECESSARY TO MAINTAIN FUNCTIONALITY. 4) THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE & ELECTRICAL FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL THE PROJECT IS COMPLETE. 5) WORK WITHIN THE RUNWAY OBSTACLE FREE ZONE (ROFZ) AND THE RUNWAY OBJECT FREE AREA (ROFA) SHALL BE PERFORMED WITH THE SUPERINTENDENT MONITORING THE UNICOM FREQUENCY OF FOR AIRCRAFT ACTIVITY. IF NECESSARY, ALL MEN AND EQUIPMENT SHALL VACATE THE ROFA UNTIL THE AIRCRAFT OPERATION HAS BEEN COMPLETED. 6) ALL EQUIPMENT SHALL BE RETURNED TO THE STAGING AREA AT THE END OF THE WORK DAY. NO EQUIPMENT OR STOCKPILES SHALL REMAIN IN THE ROFA OVERNIGHT. 7) SEQUENCE OF CONSTRUCTION EVENTS SUBJECT TO CHANGE: MOBILIZATION, SAWCUTS, CRACK SEAL, FOG SEAL, STRIPE, OPEN FOR USE, DEMOBILIZATION. PHASE (Calendar Days) CONSTRAINED START PHASE 1 - TAXIWAY B 14 Initial Notice to Proceed PHASE 2 - AIRCRAFT APRON 21 Initial Notice to Proceed TOTAL TIME 35 CONTROL POINTS CONTROL POINT NORTHING EASTING ELEVATION Panel Point ' Panel Point ' BASIS OF BEARINGS, NEVADA COORDINATE SYSTEM, CENTRAL ZONE, VALUES BASED ON THE NORTH AMERICAN DATUM OF 1983, THE BASIS OF ELEVATION FOR THIS SITE IS NAVD88 AND PP#11 IS REFERENCED AS THE PRIMARY X,Y,Z VALUES. OVERALL SITE, SAFETY & PHASING PLAN CS-101

4 CP-101 TAXIWAY B & AIRCRAFT APRON SITE, SAFETY & PHASING PLAN

5 CM-101 TAXIWAY B SAWCUT CRACK SEAL PLAN

6 CM-102 TAXIWAY B SAWCUT CRACK SEAL PLAN & DETAIL

7 CM-103 AIRCRAFT APRON SAWCUT CRACK SEAL PLAN

8 CM-104 TAXIWAY B SEAL COAT PLAN STATION 1+00 TO 32+00

9 CM-105 TAXIWAY B SEAL COAT PLAN STATION TO & DETAIL

10 CM-106 AIRCRAFT APRON SEAL COAT PLAN

11 CM-107 TAXIWA B STRIPING PLAN STATION 1+00 TO STATION 32+00

12 CM-108 TAXIWAY B STRIPING PLAN STATION TO STATION 48+00

13 CM-109 AIRCRAFT APRON STRIPING PLAN

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1 PHASING PLAN - PHASE 1 2 Weeks PHASE 1 SCOPE OF WORK Phase 1 consists of the reconstruction of a portion of Taxiway 'A' and the crack seal and seal coat of the North Apron. The portion of Taxiway 'A' to

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Request for Scoping Comments Regarding Environmental Issues of Concern

Request for Scoping Comments Regarding Environmental Issues of Concern March 16, 2009 Request for Scoping Comments Regarding Environmental Issues of Concern Environmental Assessment for Proposed Airport Land Lease and Airport Construction Pahrump Valley General Aviation Airport,

More information

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Major Runway/Taxiway Maintenance Work Bangalore International Airport (Devanahalli) (08 MAR 2012 TO 04 MAY 2012)

Major Runway/Taxiway Maintenance Work Bangalore International Airport (Devanahalli) (08 MAR 2012 TO 04 MAY 2012) AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN

More information

Aviation Trust Fund. The Results of Senate Bill 526

Aviation Trust Fund. The Results of Senate Bill 526 Aviation Trust Fund The Results of Senate Bill 526 Nevada Aviation Trust Fund Page 2 Inside: Background Funding Opportunities and Issues Senate Bill 526 2005 Aviation Trust Fund Results Airport Projects

More information

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET SHEET ID. SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET SHEET ID. SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET 1 2 3 4 5 SEAL \\acp3server.pondco.com\resources\vol1\national Guard Bureau\Projects\1160085 VTANG - VTANG Repair Apron and Taxiway\04.DRAWINGS\CURZ152810G-001-002.dwg jordanj 07/27/16-5:30 P D C B A SHEET

More information

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET ID. SHEET SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET

INDEX OF DRAWINGS INDEX OF DRAWINGS G-002 INDEX OF DRAWINGS SHEET ID. SHEET SHEET TITLE SHEET TITLE ID. G-001 COVER SHEET 1 2 3 4 5 M:\National Guard Bureau\Projects\1160085 VTANG - VTANG Repair Apron and Taxiway\04.DRAWINGS\CURZ152809G-001-002.dwg jordanj 07/27/16-12:04 P D C B A SHEET ID. INDEX OF DRAWINGS SHEET TITLE G-001

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR).

Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR). Heliport Information Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR). Location Identifier: 43IL Lat/Long: 41 51 47.3"N

More information

COMMISSIONING OF ADDITIONAL AIRCRAFT STANDS KEMPEGOWDA INTERNATIONAL AIRPORT BENGALURU (VOBL)

COMMISSIONING OF ADDITIONAL AIRCRAFT STANDS KEMPEGOWDA INTERNATIONAL AIRPORT BENGALURU (VOBL) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero AIRAC AIP SUPPLEMENT File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance

More information

Advisory Circular. U.S. Department of Transportation. Federal Aviation Administration. AC No: 150/5370-2F. Date: 9/29/11 Initiated by: AAS-100

Advisory Circular. U.S. Department of Transportation. Federal Aviation Administration. AC No: 150/5370-2F. Date: 9/29/11 Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Operational Safety on Airports During Construction Date: 9/29/11 Initiated by: AAS-100 AC : 150/5370-2F 1. Purpose.

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR 7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

Rodrigues Regional Assembly Chief Commissioner s Office

Rodrigues Regional Assembly Chief Commissioner s Office Ref: CCO/CAV/1/2013 Rodrigues Regional Assembly Invitation for Expressions of Interest Consultancy Services for the Design of Runway Extension & Ancillary Works at Sir Gaetan Duval Airport Plaine Corail,Rodrigues

More information

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak

More information

Date: 12/13/2017 Initiated By: AAS-100

Date: 12/13/2017 Initiated By: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Operational Safety on Airports During Construction Date: 12/13/2017 Initiated By: AAS-100 AC No: 150/5370-2G

More information

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Advisory Circular CT

Advisory Circular CT (CAA logo, name of the country, etc.) Advisory Circular CT-42-009 SUBJECT: Airport Movement Area and Related Facilities Maintenance DATE: MM/YYYY ASSOCIATED RULES According with (name of the country) Civil

More information

CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)

CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT DIVISION 1 GENERAL REQUIREMENTS 2019 ANNUAL AIRFIELD PAVEMENT REHABILITATION SECTION CONSTRUCTION SAFETY AND PHASING PLAN CONTRACT NO. 201947110 CONSTRUCTION

More information

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA UNITED KINGDOM AIP AD 2.EGSL-1 26 May 2016 EGSL ANDREWSFIELD EGSL AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGSL ANDREWSFIELD EGSL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates

More information

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

San Bernardino International Airport Authority Building 795

San Bernardino International Airport Authority Building 795 San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name

More information

Rebuilding Plan For Mosul International Airport

Rebuilding Plan For Mosul International Airport Rebuilding Plan For Mosul International Airport Contents Part- 1 General Information About Mosul International Airport (MIA) Before 2014 Part -2 Brief Description to Current Situation Part -2 Reconstruction

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

RALEIGH-DURHAM INTERNATIONAL AIRPORT RALEIGH, NORTH CAROLINA

RALEIGH-DURHAM INTERNATIONAL AIRPORT RALEIGH, NORTH CAROLINA RALEIGH, NORTH CAROLINA CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) RUNWAY 14-32 REHABILITATION RDU Project No.: 211100 Client: RALEIGH-DURHAM AIRPORT AUTHORITY Prepared by: TABLE OF CONTENTS DEFINITION

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

UNIVERSITY OF ALABAMA FOOTBALL

UNIVERSITY OF ALABAMA FOOTBALL UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division MIAMI-DADE AVIATION DEPARTMENT MIA Runway 8R8R-26L Pavement Pavement Rehabilitation Civil Environmental Engineering Division The Project Team Mission Statement C EXPERTISE + COMMITMENT = OWNERSHIP Project

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES MARK PESTRELLA, Director COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100

More information

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date: ICAO Recommended Airport Signs, Runway And Taxiway Markings Revision Date: 20051230 MANDATORY INSTRUCTION SIGNS A mandatory instruction sign identifies a location beyond which an aircraft taxiing shall

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP) AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG

More information

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN PILOT BRIEFING ROVANIEMI X-MAS FLY-IN GENERAL ICAO: EFRO IATA: RVN Runways: 03/21 AIP SUPPLEMENT An AIP Supplement will be in effect on the day of the event. This supplement details vital procedures for

More information

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport METHOD OF WORKING PLAN MOWP: ISSUE NO: DATE OF ISSUE: AMENDMENT NO. YORG 14/01 Version 1 9 February 2015 21 AERODROME: Orange Airport PROJECT DESCRIPTION: Runway 11/29 Extension, Runway 04/22 Extension,

More information

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 26, 2019 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

AIP Supplement. Effective at: NZDT ( UTC) This AIP Supplement is issued separately and should be retained until cancelled.

AIP Supplement. Effective at: NZDT ( UTC) This AIP Supplement is issued separately and should be retained until cancelled. AIP New Zealand AIRAC AIP Supplement Effective 29 MAR 18 Effective at: 1813290000 NZDT (1803281100 UTC) This AIP Supplement is issued separately and should be retained until cancelled. WARBIRDS OVER WANAKA

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA

WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AGENDA WELCOME TO YOUR REGIONAL AIRPORT AUTHORITY MEETING OF THE CITY OF MERCED AUTHORITY MEMBERS Larry Morelock-Chair, Alvin Osborn-Vice-Chair, John Sundgren, Rodrigo Flores, Ryan Smith, and Michael Bodine.

More information

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT March 13, 2012 LINCOLN COUNTY BOARD OF COMMISSIONERS 104 N. MAIN, STE. 110 CANTON, SD 57013-1703 (605)764-5732

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record: 1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent

More information

Construction of Pyongyang International Airport IP6

Construction of Pyongyang International Airport IP6 Construction of Pyongyang International Airport IP6 (Presented by GACA, DPR Korea) Summary The purpose of this paper is to update members regarding airport construction by outlining the successes and experiences

More information

CRATER LAKE KLAMATH REGIONAL AIRPORT JULY 23, 2018

CRATER LAKE KLAMATH REGIONAL AIRPORT JULY 23, 2018 WELCOME TO THE I would like to take the time to welcome you to the new Airport Connection. This bi monthly newsletter will be distributed the first week of every odd numbered month by Airport Administration.

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

Report of Aerodrome Certification Simulation Exercise KOLNDORF

Report of Aerodrome Certification Simulation Exercise KOLNDORF Report of Aerodrome Certification Simulation Exercise KOLNDORF INTRODUCTION The Aerodrome Rulemaking section has spent the last year developing the rules for oversight authorities, aerodrome operator organisations,

More information

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MAY 19, 2016

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MAY 19, 2016 A regular meeting of the Wilkes-Barre/Scranton International Airport Joint Board of Control was held Thursday, May 19, 2016 in the Terminal Building Conference Room at the Airport. The meeting was called

More information

Hollaway Consulting Engineers, LLC Statement of Qualifications

Hollaway Consulting Engineers, LLC Statement of Qualifications Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri

More information

Navigation - Runways. Chap 2, Nolan

Navigation - Runways. Chap 2, Nolan Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

Board Member Comments (items not on the Agenda)

Board Member Comments (items not on the Agenda) PO Box 285 Dallesport Washington 98617-0285 Airport Management 509-767-2272 airporttd@gorge.net Agenda for the MEETING OF THE REGIONAL AIRPORT BOARD OF THE COLUMBIA GORGE REGIONAL AIRPORT (Established

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

TO SAFETY REGULATION DIVISION NR T.04 AVIATION HOUSE HAWKINS STREET. DUBLIN 2 Tel Fax AFTN EIDWYOYX

TO SAFETY REGULATION DIVISION NR T.04 AVIATION HOUSE HAWKINS STREET. DUBLIN 2 Tel Fax AFTN EIDWYOYX NOTICE IRELAND TO SAFETY REGULATION DIVISION NR T.04 AERODROME IRISH AVIATION AUTHORITY ISSUE 4 AVIATION HOUSE LICENCE DATE 15.12.09 HAWKINS STREET HOLDERS DUBLIN 2 Tel +353 1 6718655 Fax +353 1 6774068

More information

Supplementary airfield projects assessment

Supplementary airfield projects assessment Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

AWP ACIP DATA SHEET. $100,000 $5,263 $105,263 Access Road Project

AWP ACIP DATA SHEET. $100,000 $5,263 $105,263 Access Road Project Fiscal Year 2011 Approved P Airport Layout Plan (ALP) Diagram Update 75,000 3,947 78,947 D Design Electrical, and Pavement Improvements 75,000 3,947 78,947 Include Construction Safety Plans E Environmental

More information

TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES)

TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES) AIP AD 2. AERODROMES AD 2.921 17 MAY 01 TVSC AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSC CANOUAN/Canouan Is. (ST. VINCENT AND THE GRENADINES) TVSC AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE

More information

CONSTRUCTION SAFETY AND PHASING PLAN JUNEAU INTERNATIONAL AIRPORT RUNWAY 8/26 REHABILITATION. Juneau, Alaska

CONSTRUCTION SAFETY AND PHASING PLAN JUNEAU INTERNATIONAL AIRPORT RUNWAY 8/26 REHABILITATION. Juneau, Alaska CONSTRUCTION SAFETY AND PHASING PLAN JUNEAU INTERNATIONAL AIRPORT RUNWAY 8/26 REHABILITATION CBJ Juneau, Alaska Prepared on Behalf of the Sponsor: City and Borough of Juneau Juneau International Airport

More information

AERODROME ADVISORY CIRCULAR

AERODROME ADVISORY CIRCULAR GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION AD AC NO. 1 of 2006 14 th Sept.2006 AERODROME ADVISORY CIRCULAR SUBJECT: GUIDELINES FOR PREPARATION & MAINTENANCE

More information

COMMISSIONING OF AIRCRAFT STANDS IN APRON 31 AND HOT SPOT LOCATIONS AT INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)

COMMISSIONING OF AIRCRAFT STANDS IN APRON 31 AND HOT SPOT LOCATIONS AT INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP) AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

a. Aeronautical charts DID THIS IN LESSON 2

a. Aeronautical charts DID THIS IN LESSON 2 AIRMAN CERTIFICATION STANDARDS: REMOTE PILOT SMALL: You will know and be able to explain in writing or oral form the below tasks regarding AIRPORT OPERATIONS Task References Objective Task B. Airport Operations

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

Airside Construction Safety: The Human Factor

Airside Construction Safety: The Human Factor Airside Construction Safety: The Human Factor Presented by The Massachusetts Port Authority Houssam H. Sleiman, P.E., CCM Director, Capital Programs and Environmental Affairs September 25, 2010 ACI-NA

More information

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September

More information

RENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, :30 p.m.

RENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, :30 p.m. RENO-TAHOE INTERNATIONAL AIRPORT USERS COMMITTEE BRIEF OF MINUTES May 18, 2015 4:30 p.m. COMMITTEE MEMBERS PRESENT Bill Eck, Chair Bob Larkin, Vice-Chair Lt. Col. Tony Machabee Robert Meurer Tom Hegge

More information

Squint s Ranch and Airport

Squint s Ranch and Airport Squint s Ranch and Airport Lake Arrowhead, CA Airport Project Summary The Lake Arrowhead Airport at The Lost Ranch is a valuable asset to the surrounding communities. Not only does it provide residents

More information

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS H-3-1 PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS 1. Regulations 1.1 These requirements are intended to ensure that

More information

LSGK Airport Briefing / PPR request

LSGK Airport Briefing / PPR request LSGK Airport Briefing / PPR request Introduction: The Airport Saanen (LSGK) is situated in a mountainous region near Gstaad in Switzerland. The number of incidents and accidents during the last couple

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES GAIL FARBER Director of Public Works COUNTY OF LOS ANGELES AVIATION COMMISSION To Enrich Lives Through Effective and Caring Service 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626)

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES Gail Farber Director of Public Works COUNTY OF LOS ANGELES AVIATION COMMISSION "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone:

More information

Sample Civil Aviation Regulations for Aerodromes (AGA)

Sample Civil Aviation Regulations for Aerodromes (AGA) Sample Civil Aviation Regulations for Aerodromes (AGA) First Edition (unedited version) November 2013 Notice to users: This document is an unedited version which is made available to the public for convenience.

More information

AERODROME ADVISORY CIRCULAR

AERODROME ADVISORY CIRCULAR GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION AD AC NO. 1 of 2006 14 th Sept.2006 AERODROME ADVISORY CIRCULAR SUBJECT: GUIDELINES FOR PREPARATION & MAINTENANCE

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

ADVISORY CIRCULAR AC-AD-005

ADVISORY CIRCULAR AC-AD-005 GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-AD-005 AERODROME QUALITY DATA SYSTEM GENERAL Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

sd/- DR. GURUPRASAD MOHAPATRA CHAIRMAN AIRPORTS AUTHORITY OF INDIA [EFFECTIVE DATE: 29 MARCH 2018] AERODROME DATA VADODARA AIRPORT (VABO)

sd/- DR. GURUPRASAD MOHAPATRA CHAIRMAN AIRPORTS AUTHORITY OF INDIA [EFFECTIVE DATE: 29 MARCH 2018] AERODROME DATA VADODARA AIRPORT (VABO) TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero AIRAC AIP SUPPLEMENT File No. AAI/ATM/AIS/09-09/2018 Following supplement is issued for information, guidance

More information

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MARCH 24, 2016

WILKES-BARRE/SCRANTON INTERNATIONAL AIRPORT BOARD MEETING MARCH 24, 2016 A regular meeting of the Wilkes-Barre/Scranton International Airport Joint Board of Control was held Thursday, March 24, 2016 in the Terminal Building Conference Room at the Airport. The meeting was called

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY

SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY SACRAMENTO COUNTY AIRPORT SYSTEM - OVERALL EXECUTIVE SUMMARY Executive Summary The Sacramento County Airport System Capital Improvement Plan (CIP) is comprised of projects that were identified and evaluated

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

AERODROME CHART ATIS CLNC DEL 121.4

AERODROME CHART ATIS CLNC DEL 121.4 AERODROME CHART ATIS 124.6 CLNC DEL 121.4 GND 121.7 (S) 127.15 (N) 275.8 -AD TWR 118.7 (S) 119.55 (N) 226.5 DEP 126.12 (N) 132.3 (S) 363.8 DECL DISTS 08R 26L 08L 26R 13 31 TORA 11500 11500 9940 9940 7300

More information

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

Brunswick Executive Airport. Airport Safety Program

Brunswick Executive Airport. Airport Safety Program Brunswick Executive Airport Airport Safety Program Why Runway Incursions FY 14 FY 13 FY 12 FY 11 1 st Quarter 298 273 226 215 2 nd Quarter 258 287 267 246 3 rd Quarter 359 328 352 257 4 th Quarter 349

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

APPENDIX A CONSTRUCTION SAFETY AND PHASING PLAN

APPENDIX A CONSTRUCTION SAFETY AND PHASING PLAN APPENDIX A CONSTRUCTION SAFETY AND PHASING PLAN CONSTRUCTION SAFETY AND PHASING PLAN JUNEAU INTERNATIONAL AIRPORT RUNWAY 8/26 REHABILITATION CBJ Juneau, Alaska Prepared on Behalf of the Sponsor: City

More information

GUIDELINES FOR THE PREPARATION OF A "PLAN OF CONSTRUCTION OPERATIONS (PCO)"

GUIDELINES FOR THE PREPARATION OF A PLAN OF CONSTRUCTION OPERATIONS (PCO) GUIDELINES FOR THE PREPARATION OF A "PLAN OF CONSTRUCTION OPERATIONS (PCO)" GHANA CIVIL AVIATION AUTHORITY January 2009 (First Edition) 1. Introduction The "Plan of Construction Operations (PCO)" is part

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information