Neighbourdhood Committee NDG-Westmount-Montréal-Ouest. February 6, 2018

Size: px
Start display at page:

Download "Neighbourdhood Committee NDG-Westmount-Montréal-Ouest. February 6, 2018"

Transcription

1 Neighbourdhood Committee NDG-Westmount-Montréal-Ouest February 6, 2018

2 2 Presentation Outline Feedback on questions Traffic Monitoring Work update and closures Reconstruction of Saint-Jacques bridge Dismantling Operations Progress Sound Monitoring Local Closures Questions

3 3 Feedback on questions Green strip : funding envelope Budget for a decrease in property values Budget for active transportation in the project Implementation of bollards on Chemin Glen to define a corridor for cyclists Avenue Greene : addition of signs for local traffic CN Installation of a metallic structure by the CN near Avenue Brock sud.

4 4 Traffic Monitoring Rue Saint-Antoine Ouest Parking on St-Antoine between Atwater and Rose-de-Lima Analysis of traffic conditions Free flow right turn impossible Truck access Light dedicated to pedestrians Actions: Push button for pedestrian Detection system in the Atwater exit

5 5 Traffic Monitoring Boul. Pullman et Angrignon Intervention requests to allow simultaneous movments or add movements 1 2

6 6 Traffic Monitoring Boul. Pullman et Angrignon Intervention requests to allow simultaneous movements or add movements 1. Angrignon exit from A-20 W: new movements in intersection Simultaneous right turn impossible for trucks (conflict) 2. Entry to A-20 W: new movement Add left turn to access entry traffic congestion 2. 1.

7 7 Work update and closures

8 8 Reconstruction of Saint-Jacques bridge Weekend of 9 february

9 9 Reconstruction of Saint-Jacques bridge

10 10 Reconstruction of Saint-Jacques bridge

11 11 Dismantling Operations Progress

12 12 Dismantling Operations Temporary bridge av. Greene Monday to Friday work between 7 AM et 5 PM Work sequence and approximate schedule 1. Roadway removal: February 5 to Bridge deck removal and dismantling: February 13 to Dismantling of the west abutment: from February 22nd 3 2 1

13 13 Dismantling Operations Montréal-Ouest area Start: around February 17 End: April 2018 Work schedule Monday to Friday: 6 AM to 7 PM Week-end: 24 hours a day or 6 AM to 11 PM

14 14 Sound Monitoring Methodology Equipment Sound level meter Calibrator Wind protector

15 15 Sound Monitoring Methodology Favorable weather conditions Positioning Parameter Value Humidity Less than 90% Temperature Minimum of -10 ºC Wind speed 20 km/h or less Precipitation None

16 16 Sound Monitoring Methodology What is a sound test? Measurement of the sound climate in L 10 Characterizes the peak levels over a defined period of time when the noise is less stable Recording time of 30 minutes The equipment identifies the noise levels with the highest thresholds 10% of the time

17 17 Sound Monitoring Online console Manual noise level surveys by the quality team on the site

18 18 Sound Monitoring Authorization to exceed the established thresholds Exceptional situation: acknowledgement of an impossibility Submission of an application by KPH Analysis by the Ministère Mitigation measures taken Specificity and technical constraints Duration of the work Nature of the work

19 19 Sound Monitoring A-720 ouest Dismantling Week-end of December 16 and 17, 2017 Average temperatures between -11,5 ºC and -16,7 ºC 1 to 2 cm of precipitation - snow Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 61.8 db 16 dec h db 17 dec. - 9 h db 16 dec. 15 h 84.7 db 17 dec. 11 h db 16 dec h 84.7 db 16 dec. 15 h 71.8 db 17 dec. - 8 h db 16 dec h 37

20 20 Sound Monitoring A-720 ouest Dismantling January 14, 2018 Average temperature -22,8 ºC Manual sound recording not possible Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 76,6 db 18 H 58.8 db Midi 69.2 db 20 h 30 61,5 db 13 h

21 21 Sound Monitoring A-720 ouest Dismantling Week-end of January 20 and 21, 2018 Average temperatue between 1,5 ºC et -3,1 ºC No precipitation Work area Manual sound recording by KPH Tucot MTMDET Monitoring stations (highest treshold) 80.7 db 21 jan. 13 h db 21 jan. 8 h db 21 jan. - 9 h db 21 jan h db 21 jan. 11 h 68.1 db 20 jan. 7 h db 20 jan. 6 h db 20 jan. 17 h 60.4 db 20 jan. 9 h 68.6 db 21 jan. - 2 h 85 db 20 jan h 79.6 db 20 jan h db 21 jan. - 1 h 20

22 22 Local Closures Rue Saint-Jacques Ferbruary 9 to 12 Visuel navette ch. Glen - MTMDET

23 23 Local Closures Chemin Glen February 16 to 19

24 24 Questions

25 25 Communications Neighborhood Committee NDG-Westmount March 28, 2018 Victoria Hall Westmount (4626, rue Sherbrooke Ouest) Neighborhood Committee Sud-Ouest February 13, 2018 Project website: Monthly electronic bulletin (subscription on the Turcot website) Direct phone line: Turcot

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Neighbourdhood Committee NDG-Westmount. October 16, 2017 Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase

More information

NDG-Westmount Neighbourhood Committee. November 16, 2015

NDG-Westmount Neighbourhood Committee. November 16, 2015 NDG-Westmount Neighbourhood Committee November 16, 2015 2 Feedback on previous questions Order-in-Council 890-2010 - condition 8 The ministère des Transports must : Establish a buffer zone at the foot

More information

Neighbourhood Committee NDG - Westmount. September 12, 2016

Neighbourhood Committee NDG - Westmount. September 12, 2016 Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry

More information

NDG/Westmount Neighbourhood Committee. May 16, 2016

NDG/Westmount Neighbourhood Committee. May 16, 2016 NDG/Westmount Neighbourhood Committee May 16, 2016 2 Presentation Outline Feedback on previous questions What s new on the Turcot website Public consultations online Reconstruction of Saint-Jacques overpass

More information

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017 2017 Work and Launch of the Next Phase Information meeting, Montréal-Ouest September 14, 2017 2 Presentation Outline Work progress Launch of the next phase Mitigation measures Dismantling Communications

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

GROUPE IMMOBILIER SANTÉ MCGILL Chantal Sorel (Vice-President and MUHC Project Director, SNC-Lavalin)

GROUPE IMMOBILIER SANTÉ MCGILL Chantal Sorel (Vice-President and MUHC Project Director, SNC-Lavalin) GOOD NEIGHBOURLY RELATIONS COMMITTEE MUHC Glen site: Construction and Roadwork MINUTES OF PROCEEDINGS Meeting held on Tuesday, June 18, 2013 Committee members in attendance VILLE DE MONTRÉAL Sébastien

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

25 th Avenue Grade Separation. Community Meeting November 13, 2018

25 th Avenue Grade Separation. Community Meeting November 13, 2018 25 th Avenue Grade Separation Community Meeting November 13, 2018 Agenda I. Project Need II. Project Benefits III. Project Description IV. Funding V. Schedule VI. Construction VII. Next Steps 2 Project

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights. Capacity declaration Amsterdam Airport Schiphol: Summer 2019 1. Definitions The following definitions apply: Commercial Aviation: General Aviation: Night departure slot: Night arrival slot: Night slot:

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1

More information

Pacifica. Short Term Aircraft Noise Monitoring

Pacifica. Short Term Aircraft Noise Monitoring Short Term Aircraft Noise Monitoring March March, Pacifica Prepared for the Oddstad Boulevard Park Pacifica Avenue Neighborhoods by San Francisco International Airport Noise Abatement Office P.O. Box 8097

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018 TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN APRIL 25, 2018 2018-2019 SCHEDULE Project progress Contract signed with the winning consortia on April 12, 2018 Project office set up for the

More information

Engineering. Traffic Division Involvement. Two Locations in Lynnwood. Disclaimer. Design Constraints: 12/4/2013

Engineering. Traffic Division Involvement. Two Locations in Lynnwood. Disclaimer. Design Constraints: 12/4/2013 Traffic Division Involvement Engineering-Create Design Constraints, Locate Signs, Contribute to Problem Resolution. Technical-Program Schedule for Beacons, Maintain: Beacons, Pedestrian Push Button Crossings,

More information

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014 LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Integrated Optimization of Arrival, Departure, and Surface Operations

Integrated Optimization of Arrival, Departure, and Surface Operations Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University

More information

Northeast Stoney Trail In Calgary, Alberta

Northeast Stoney Trail In Calgary, Alberta aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Computer Modelling For Northeast Stoney

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

Venues and Directions Au Sommet Place Ville Marie Location: 3 Place Ville Marie, Montreal, QC H3B 2B6 Main entrance: Cathcart Street

Venues and Directions Au Sommet Place Ville Marie Location: 3 Place Ville Marie, Montreal, QC H3B 2B6 Main entrance: Cathcart Street Venues and Directions Au Sommet Place Ville Marie Location: 3 Place Ville Marie, Montreal, QC H3B 2B6 Main entrance: Cathcart Street Direction from Sheraton (By foot: 8-10 minutes) As you exit the hotel,

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

ICAO Noise Standards

ICAO Noise Standards Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 ICAO Noise Standards Neil Dickson, Environment Branch, ICAO This presentation ICAO Environmental Goals

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

G Street Undercrossing. City Council Meeting Date: November 3, 2008

G Street Undercrossing. City Council Meeting Date: November 3, 2008 G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

Réseau électrique métropolitain (REM)

Réseau électrique métropolitain (REM) Réseau électrique métropolitain (REM) Technical briefing Update on the route and environmental impacts August 24, 2016 0 cdpqinfra.com A PROJECT WITH IMPACT Largest public transit project in the past 50

More information

VOLUME CHANGES OF THE GLACIERS IN SCANDINAVIA AND ICELAND IN THE 21st CENTURY

VOLUME CHANGES OF THE GLACIERS IN SCANDINAVIA AND ICELAND IN THE 21st CENTURY VOLUME CHANGES OF THE GLACIERS IN SCANDINAVIA AND ICELAND IN THE 21st CENTURY Valentina Radić 1,3 and Regine Hock 2,3 1 Depart. of Earth & Ocean Sciences, University of British Columbia, Vancouver, Canada

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101

Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101 Second Avenue: Union Street to Lenora Street, Condominium Owners c/o Michael McQuaid 1521 Second Avenue Seattle, WA 98101 Subject: New Development - Cumulative Downtown Alley Traffic Congestion and Safety

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Cell: (408) Release MA June 25, 2012

Cell: (408) Release MA June 25, 2012 VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier. Airport Capacity. Outline/Notes for Class

CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier. Airport Capacity. Outline/Notes for Class CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier Airport Capacity Outline/Notes for Class SYST 460/450 1 Factors that Affect Airport Capacity 1. Space

More information

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights September 11, 2013 9:00 11:00 am Trellis Hall, Citrus Heights Project Overview The City of Citrus Heights is studying the feasibility of establishing a multi use trail system within the City s 26 miles

More information

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements Jan Perry Councilwoman, District 9 Welcome Remarks Arthur T. Leahy Chief Executive Officer, Metro Metro ExpressLanes Overview

More information

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze

Strategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

Classification: Public. Night Flights and Quiet Night Charter update

Classification: Public. Night Flights and Quiet Night Charter update Night Flights and Quiet Night Charter update - 2018 Airspace and Noise Performance Team June 2018 What are Night Flights? Flights that occur between 23:00-07:00 (Night Period) and 23:30-06:00 (Night Quota

More information

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands The Adelaide City Council invites engagement from the community about Feedback on an event licence application for the Park Lands Project Summary The Adelaide City Council has received an application from

More information

Noise Mitigation Program

Noise Mitigation Program Noise Mitigation Program Quick Facts 78% decrease year over year in complaints related to scheduled engine-run ups which is attributable to the new Ground Run-Up Enclosure (GRE) that went into operation

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

AIRBUS Generic Flight Test Installation

AIRBUS Generic Flight Test Installation AIRBUS Generic Flight Test Installation Jean-Pascal CATURLA AIRBUS Operations SAS, Toulouse, France ABSTRACT This paper describes new concepts of test mean and processes to perform flight test for all

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

METROBUS SERVICE GUIDELINES

METROBUS SERVICE GUIDELINES METROBUS SERVICE GUIDELINES In the late 1990's when stabilization of bus service was accomplished between WMATA and the local jurisdictional bus systems, the need for service planning processes and procedures

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update February 19, 19 For Grain (18-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var.

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m Last

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

A Study of Tradeoffs in Airport Coordinated Surface Operations

A Study of Tradeoffs in Airport Coordinated Surface Operations A Study of Tradeoffs in Airport Coordinated Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA, Miguel MUJICA MOTA Amsterdam

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

COME VISIT! heartofthetownships.com

COME VISIT! heartofthetownships.com COME VISIT! heartofthetownships.com visit@heartofthetownships.com 1-844-228-4500 New England charm with a French flair! * *IN CANADIAN DOLLARS 4h CANADA OTTAWA MONTREAL 1h30 3h30 2h30 QUEBEC CITY SHERBROOKE

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

Metra Board of Directors. Board Meeting November 11, 2011

Metra Board of Directors. Board Meeting November 11, 2011 Metra Board of Directors Board Meeting November 11, 2011 State of Metra Operations Metra Board of Directors November 11, 2011 Presented by George Hardwidge Deputy Executive Director Operations System On-Time

More information

Technical Report. Aircraft Noise Analysis. Portola Valley and Woodside, California. July Prepared by: Aircraft Noise Abatement Office

Technical Report. Aircraft Noise Analysis. Portola Valley and Woodside, California. July Prepared by: Aircraft Noise Abatement Office Technical Report Aircraft Noise Analysis Portola Valley and Woodside, California Prepared by: San Francisco International Airport P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction

More information

Meeting Notes Public Open House

Meeting Notes Public Open House Meeting Notes Public Open House, 5:30-8:00 pm Fairbanks Pipeline Training Center, 3605 Cartwright Court, Fairbanks, Alaska= Agenda: Open House: 30 minutes Presentation: 45 minutes Question and Answers:

More information

ARTERIAL ROAD RECONSTRUCTION 127 STREET AVENUE TO YELLOWHEAD TRAIL

ARTERIAL ROAD RECONSTRUCTION 127 STREET AVENUE TO YELLOWHEAD TRAIL ARTERIAL ROAD RECONSTRUCTION 127 STREET - 118 AVENUE TO YELLOWHEAD TRAIL Public Open House - April 6, 2016 Please take a comment form, visit the display boards to view the final plans and design elements,

More information

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by:

Technical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by: Aircraft Noise Abatement Office Technical Report Aircraft Overflight and Noise Analysis Brisbane, California Prepared by: P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction In response

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

2017 LRT Passenger Count Report

2017 LRT Passenger Count Report Urban Form & Corporate Strategic Development City Planning City of Edmonton 8 Floor, Edmonton Tower 10111 104 Avenue Edmonton, AB T5J 0J4 Tel: 780-496-6086 Email: varjinder.chane@edmonton.ca 2017 LRT Passenger

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

I-35 Reconstruction Project

I-35 Reconstruction Project I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,

More information

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised 2017/2018 Q3 Performance Measures Report Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised Contents Ridership & Revenue... 1 Historical Revenue & Ridership...

More information

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program Memorandum DATE: May 9, 2018 TO: FROM: SUBJECT: Board of Directors Jim Derwinski, CEO/Executive Director Fare Structure Study Fare Pilot Program RECOMMENDATION Board action is requested to approve an ordinance

More information

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0 Date: 1 June 2015 Version: 3.0 Document Control Version Date Changes Prepared By Approved By 1.0 Jan 2012 Initial P. Fagnano G. Cabral 2.0 Dec 2013 Permitted & Restricted hours P. Fagnano G. Cabral 3.0

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Section 4(f) and Section 6(f) Technical Analysis

Section 4(f) and Section 6(f) Technical Analysis WESTSIDE SUBWAY EXTENSION PROJECT Contract No. PS-4350-2000 Section 4(f) and Section 6(f) Technical Analysis Prepared for: Prepared by: WSP USA 851 SW Sixth Avenue, Suite 1600 Portland, Oregon 97204 FEBRUARY

More information

Figure 1: Little Dry Creek Trail Crossing

Figure 1: Little Dry Creek Trail Crossing Figure 1: Little Dry Creek Trail Crossing Figure 2: Little Dry Creek Trail Crossing Northwest Rail Environmental Evaluation Temporary Trail Detour Concurrence Form Adams County, Little Dry Creek Trail

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Project Status Update Meeting Culver City Senior Center Wednesday, July 16, 2008 Description 8.6 mile corridor from downtown to Culver City in West Los Angeles 1.3

More information