Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
|
|
- Sharyl Hoover
- 5 years ago
- Views:
Transcription
1 Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High /7/7 Tuesday Daily Precipitation.25" Weather Conditions: Rain Progress Report Copyright 25, Sevenson Environmental Services, Inc. All Rights Reserved.. Sennebogen loading a scow in Pleasure Bay Loading a truck with dredge material for disposal Sennebogen dredging in Pleasure Bay PC-4 Longstick loading sandy material in the Access Channel PC-4 dredging in the Access Channel near Paradise Bay Unloading material from the mixing cell for further drying of 5
2 Weekly Summary Date Dredge QTY (CY) Disposal QTY (Tns) - Continued communication with residents regarding residential slip /6/7 Mon --,284 dredging - Continued blending dredge material with Portland Cement /7/7 Tue 89,33 - Continued staging blended dredge material in anticipation of /8/7 Wed disposal /9/7 Thu Continued noise level monitoring activities /2/7 Fri Continued dust monitoring activities - Continued disposal of ammended dredge material to Cape Mining /2/7 Sat Landfill #### /22/7 Sun Sennebogen 43 #### continued dredging in Pleasure Bay - PC-4 continued dredging in the Access Channel near Paradise Weekly Totals 89 CY 2,65 Tns Bay Work Performed by Sevenson - Sennebogen removed 554 cys from Pleasure Bay - PC-4 removed 336 cys from the Access Channel - Both machines are in areas with shallow cuts Safety Remarks - No accidents or incidents observed or reported. - Conducted daily safety meeting: Pinch Points - Disposed of,33 tons of dredge material from the Access Channel to Cape Mining Landfill Remarks/Verbal Directives - None Work Performed by Subcontractors Planned Activities - Continue survey of residential slips for residential slip dredging - Continue load out of dredge material - Begin dredging in Paradise Bay - Continue dredging in Pleasure Bay Equipment/Materials Delivered to Site - FOR A LIST OF EQUIPMENT RECEIVED TODAY PLEASE SEE PAGE 3 Other Information Production Tables Disposal Kinsley Today Previous Total 4,667 4,667 Cape Mining,33 54,37 55,368 Beach Other Other Total,33 58,74 6,35 Unit Tons Tons Tons Dredging Available Pay (CY) Quantity Data Source Dredged Today (CY) Dredged To Date (CY) % Complete South Basin Snug Harbor Shelter Haven Entrance Stone Harbor Pleasure Bay Carnival Bay Sanctuary Bay Paradise Bay Access Channel Stone Harbor Hole Tuxedo Cove Residential Dredging 4,862 9,445,834 4,878,84 5,874 6,39,57 2,875 2,552, AD Survey 26 AD Survey 26 AD Survey 26 AD Survey 26 AD Survey 26 BD Survey ,385 6,53, % % % % 64% % % % 87% % % 33% *** Fire Boat Slip 88 Fire Boat AD Survey % TOTALS 99, ,38 46% * Volumes include Required and Allowable Pay Overdepth **% Complete when approved by Owner *** Change Order 2 of 5
3 Sevenson Equipment List SES Equipment # Heavy Equipment Make/Model Description Date Onsite Hrs Qty Buckets Cat 336E Ex Komatsu PC 35 Ex Komatsu PC 4 LF Sennebogen 86 Sennebogen 86 Cat 95 Loader Cat 966 Loader Komatsu 45 Loader JCB 54 Lodall JCB 9 Skid Steer Cat Excavator PC 35 Excavator PC 4 LF Excavator Material Handler Material Handler Cat 95 Front End Loader Cat 966 Front End Loader Komatsu 45-3MC Loader Telescoping Forklift Rubber Tire Skid Steer /2/26 9/2/26 //26 9/3/26 9/6/26 9/4/26 9/2/26 /2/26 9/3/26 9/5/ B Anvil Bucket Anvil Bucket Anvil Bucket 4. CY Clamshell Bucket 3.5 CY Clamshell Bucket 3.5 CY Clamshell w/ Teeth 9/3/26 /3/26 /8/ Cablearm Bucket 5CY Cablearm Clamshell Bucket /6/26 Compressor / Generator / Power Pack s IR 85 Compressor XQ6 Generator Hydraulic Power Pack Air Compressor 85 Generator XQ6 Winch Power Pack 8hp 9/5/26 9/5/26 9/5/ Amida Amida Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light Terex RL 4 Light 9/2/26 9/2/26 9/2/26 //26 //26 //26 /2/26 /2/26 /2/26 Seabox BB Seabox Seabox Seabox Seabox Vehicles 3-66 Ford F25 Pickup Pickup 3-63 Street Sweeper International Sweeper Truck Water Treatment System 458-E Bag Filter Housing Bag Filter Housing 76-E Bag Filter Housing Bag Filter Housing 673-E Bag Filter Housing Bag Filter Housing 78-E Bag Filter Housing Bag Filter Housing 674-E Bag Filter Housing Bag Filter Housing 762-E Bag Filter Housing Bag Filter Housing Boats 3-82 Hydraulic Push Boat Hydraulic Push Boat Yamaha Twin Outboard Push Boat Bumblebee Boat Push Boat Tugboat Shirley Tugboat Tugboat 7 Bells Tugboat Dredge Tender DSC Dredge Tender Triumph 2' Boat Boat Rake Ends / Spuds RAKE ENDS BARGE RAKE ENDS BARGE RAKE ENDS Poseidon 5' Spud SP 2433 Poseidon Spud 9/3/26 9/5/26 /6/26 //26 9/2/26 9/2/26 9/2/26 9/2/26 9/2/26 9/2/26 /2/26 /24/26 9/4/26 9/5/26 /6/26 9/23/26 9/2/26 9/23/26 /6/ of 5
4 Sevenson Equipment List Rental Equipment Make/Model Description Date Onsite Hrs Qty Barges PF7-27RCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 PF7-79QCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 247B8 Poseidon Barge 4' 4'x'x7' Barge 9/4/26 PF7-28RCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 99EC Shakerton Barge 4' 4'x'x5' Barge 9/4/ Shakerton Barge 4' 4'x'x5' Barge 9/4/26 J--E Shakerton Barge 4' 4'x'x5' Barge 9/4/26 99EJ Shakerton Barge 4' 4'x'x5' Barge 9/4/ Shakerton Barge 4' 4'x'x5' Barge 9/4/26 99ER Shakerton Barge 4' 4'x'x5' Barge 9/4/26 PF273QC Poseidon Barge 2' 2'x'x5' Barge 9/5/26 PF2732QCT Poseidon Barge 2' 2'x'x5' Barge 9/5/26 227B6 Poseidon Barge 2' 2'x'x5' Barge 9/5/26 227B33 247B34 Poseidon Barge 2' Poseidon Barge 4' 2'x'x5' Barge 4'x'x7' Barge 9/5/26 9/5/26 247C34 P4Q Poseidon Barge 4' Poseidon Barge 4' 4'x'x7' Barge 4'x'x5' Barge 9/5/26 9/5/26 99Ea Shakerton Barge 4' 4'x'x5' Barge 9/5/ Shakerton Barge 4' 4'x'x5' Barge 9/5/26 996EB Shakerton Barge 4' 4'x'x5' Barge 9/5/26 996EG Shakerton Barge 4' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/26 Shakerton Barge 4' x ' x 5' Barge /6/26 9 Scows /28/ /6/ /6/ /6/ /6/ /6/ /6/ /28/ /28/ /28/26 Rental Equipment Frac Tank Adler Adler Open Top Weir Tank 9/6/26 2 Frac Tank Adler 2K Gal Frac Tank 9/6/26 Roll Off 288-B Adler Anvil Adler Roll Off Geotube Box 3.5CY Clamshell Bucket 9/2/26 9/4/26 3 Anvil 3.5CY Clamshell Bucket - DEMO /4/26 Roll Off Container H4 Roll Off Container 9/2/26 Roll Off Container H4 Roll Off Container 9/2/26 Break Trailer Modspace Break Trailer 9/2/26 Office Trailer Modspace Office Trailer 9/23/26 Barge Floats Northstar Marine Flexi Floats /4/26 6 s Sunbelt Rentals s //26 4 Noise Meter Pine Environmental Pine Environmental Noise Meter 9/26/26 5 gal fuel tank Taylor Oil Gas Tank 9/2/26 5 gal fuel tank Taylor OIl Off Road Diesel Tank 9/2/26 4 of 5
5 Labor SES Personnel SES Subcontractor Personnel Shift: Day Hrs Shift: Day Hrs Day Shift General Superintendent 2. Hydrographic Surveys Employees 22 Project Manager. Project Superintendent 2. Night Shift Site Superintendent. Employees QA/QC Manager. Surveyor 2. Daily Total Mechanic 2. Employees 22 Health and Safety. SES Foreman 2. Labor Foreman 72/ Laborer 72/ Operator Licensed Boat Op Day Shift Hours Mate Deckhand Night Shift Dredge Op Hours. Today's Man Hours Totals Totals. SES Personnel SES Subcontractor Personnel Shift: Night Hrs Shift: Day Hrs Total Man Hours to Date. 7,73.5 Total Man Hours Since Lost Time Incident 7,73.5 Lost Time Incidents To-Date - Last Lost Time Incident - N/a Totals. Totals. 5 of 5
6
7
Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 42 33 63 45 2/8/6 Thursday Daily Precipitation. Weather Conditions: Overcast 2 Progress
More informationProgress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.
Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 64 5 2 45 /2/6 Wednesday Daily Precipitation. Weather Conditions: Clear 2 Progress
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,
More informationKissimmee DAYS February 6th- 9am 80% ABSOULTE
80% ABSOULTE Sale Site: 651 West Southport Road Kissimmee, Florida, USA, 34746 T: +1 407.396.6060 F: +1 407.396.8181 6 DAYS February 6th- 11th @ 9am Kissimmee 2017 Unused Caterpillar 320FL - choice of
More informationCORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015
CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS
More informationEUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00
1. LANDING per ton MTOW EUR BAM A/c up to 25 tons MTOW 11,00 22,00 A/c over 25 tons MTOW 14,00 27,00 2. RUNWAY LIGHTING 40% of landing charge 3. PARKING Per ton/24 hours 2,55 5,00 4. PASSANGER SERVICE
More informationHARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH
HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:
More informationU.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee
Am erican Waterways Operators August 05, 2015 Established Safety Metrics U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Towing Industry Safety Statistics
More informationJ. P. MEĐUNARODNI AERODROM "SARAJEVO" D.O.O.
1 od 14 U ovom dokumentu sve strane imaju istu reviziju! 0 22.12.2008. I. Budimlić E. Šćeta B. Karahasanović Rev Datum Izradio (Ime, Potpis) Verifikovao (Ime, Potpis) Odobrio (Ime, Potpis) Status REVIZIJE
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting August 3, 216 Established Safety Metrics For 16 years, the
More informationAgency on Bay Management Gulfstream Phase IV Expansion
Agency on Bay Management Gulfstream Phase IV Expansion July 13, 2006 Al Taylor Vice President, Operations 1 Company Overview - Introduction Placed into service in May 2002, Gulfstream is a stateof-the-art
More informationFACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010
FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about
More informationLincoln, NE November 9, 2018 (Friday)
Lincoln, NE November 9, 2018 (Friday) Unreserved public auction Caterpillar D6N XL 1 of 2 John Deere 770D Caterpillar 627F 2011 Case 550 QuadTrac Caterpillar 963D 2016 Smithco SX3-46-36 46 Ft ACCEPTING
More informationInvestigation Report Worker Fatality March 31, 2014
Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in
More informationBRIDGE SPAN 'X28'X6', 35 OF 108 DROPS SINGLE CONCRETE BRIDGE SPAN, 5 SINGLE CONCRETE BRIDGE SPAN, 6
A B C D E F G H I 1 2 3 4 REEFNAME MATERIAL1 MATERIAL2 TONS LORAN1 LORAN2 LATITUDE LONGITUDE DESCRIPTION ST GEORGE ISLAND BRIDGE PILINGS 40 BRIDGE PILINGS, BRIDGE REEF-WEST END (40) 80.00 2930.052 8449.937
More informationWelcome to the City of Ketchikan Port & Harbors
Effective Sept 1, 2017 Welcome to the City of Ketchikan Port & Harbors The City of Ketchikan operates five public boat harbors in the Ketchikan area. Harbor regulations and user fees are established by
More informationTENTATIVE SCHEDULE
TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014
More informationM/Y LIGAYA 38m. Year 2002/Refit 2008
M/Y LIGAYA 38m Year 2002/Refit 2008 Ligaya meaning joy, happiness, serenity and pleasure, perfect defines this beautiful yacht. With her graceful profile and classic lines she will take your breath away.
More informationTeddy Bear BBQ & Music Festival Arts & Crafts rental spaces August
Arts & Crafts rental spaces August 12-13-14 2016 10 X 10 Rental space only $40.00 10 X 20 Rental space only $50.00 10 X 30 Rental space only $60.00 10 X 40 Rental space only $70.00 10 X 50 Rental space
More informationCapital Planning City of Ocean City 1
City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block
More informationIt was Shell Jurong Island (SJI) s first ever trip to Pulau Semakau and we had young friends from LFS accompanying us there!
Journey to zero waste It was Shell Jurong Island (SJI) s first ever trip to Pulau Semakau and we had young friends from LFS accompanying us there! About the Semakau landfill Covering an area of 350 hectares,
More informationSunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.
Sunken Barge ARTHUR J & Tug MADISON Case Study by LCDR Chico Knight, DBA, M.S. July 19, 2012 Background On 19JUL, Sector Detroit was notified by the tug DRUMMOND ISLANDER II that the 110 dredge barge ARTHUR
More informationJanuary 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions
House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary
More informationSFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 01/06/2014 Ops. Construction (650)821-3341 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey
More informationNEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May
Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83
More informationFloating Crane. operation with capacity. Height Lifting capacity 100 tons on 10. meters. our berths, Hatch. Floating. 200 tons. is R=0.
Beşiktaş Shipyard 2013 / New Layout In addition to Yard s two docks, another panamax size floating dock is in operation with an additional pier. Besiktas Shipyard has recently purchased neighboring yard
More informationOPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee
OPEN CELL SHEET PILE TECHNOLOGY Presentation to Alaska State Legislature, House Finance Committee OPEN CELL SHEET PILE Technology Retaining Wall System Patents Obtained by PND Engineers ARRC Dock, Seward,
More informationPanama Canal Stakeholder Working Group Meeting
Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749
More informationMadagascar. Ports description
Madagascar Ports description Toamasina (Tamatave) Access Specification Map reference number and Description 1 Mole A - General cargo Length (m) Draught (m) East 110 6.50 Head 59 7.5 West 192 5 Remarks
More informationMOVE IN/OUT & SHIPPING Exhibit Installation Exhibit Removal Freight Shipping Procedures Shipping Labels Move In Schedules Truck Route
EXHIBITOR MANUAL GENERAL INFORMATION Deadlines and Checklist SHOW RULES & REGULATIONS Character & Conduct Rules and Regulations Security Precautions Limits of Liability & Responsibility Playing of Music
More informationSFO Construction and Maintenance Schedule 2013
Mon SUN MONDAY 08/05/2013 Ops. Construction (650)821-3341 Item # Activity/Contractor Time 1 SFO P&G - Crack Seal RWY 10R/28L 0000-0600 4 6 Clean Harbors/Superior Drilling/SFIA Water Treatment - Excavation/Cleaning
More information69' (21.20m) FERRETTI
Gus VIII 69' (21.20m) FERRETTI LOA: Beam: Min Draft: Max Draft: Speed: 69' 7" (21.20m) 18' 6" (5.63m) Year: Builder: Type: Price: Location: Mfg-2003 Model-2003 FERRETTI Motor Yacht Flybridge approx. ($624,986
More informationOUTDOOR RECREATION RENTAL GUIDE
OUTDOOR RECREATION RENTAL GUIDE Hours Of Operation Monday, Tuesday, Thursday, and Friday: 8:30 a.m. to 5 p.m. Wednesday, Saturday, Sunday, and Holidays: CLOSED Prices current as of October 2017. All prices
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More informationTITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V
TITAN pt. no.: 02 0000 0128 Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS G e n e r a t i o n V Extended
More informationMake Model Length Price Year Condition. Amels Custom 178 ft EUR 14,950, Used
Amels Custom Make Model Length Price Year Condition Amels Custom 178 ft EUR 14,950,000 1998 Used Boat Name Hull Material Draft Number of Engines Fuel Type Location Faribana V Steel 11 ft 6 in 2 Diesel
More informationRegister free at Hillhead.com. Come and visit our team on stand RB14 registration area June Hillhead Quarry Buxton Derbyshire UK
26 28 June Hillhead Quarry Buxton Derbyshire UK Register free at Hillhead.com #Hillhead18 Three days of live demonstrations, 500 exhibitors and thousands of products for the quarrying, construction and
More informationJob Demands Analysis NEEDLE RECOVERY (PARK BOARD)
Purpose Job Demands Analysis NEEDLE RECOVERY (PARK BOARD) The purpose of the job of a Needle Recovery Employee working for the City of Vancouver s Parks & Recreation Department is to pick up needles in
More informationDiscount for staying in your camper or hotel - $200. No Charge For primitive Camp Site / Hook up sites are must be reserved
2017 DREAM CAMP Registration Form Page 1 of 5 DREAM CAMP Quad Week (Quads Only) (5) Days and (5) Nights Mon-Tue-Wed-Thur & Friday July 17 th to the 21 st 2017 Sign in For Camp is Sunday July 16 th after
More informationMarine. endry. Our History. Our Busines.s HENDRYMARINE.COM
endry Marine HENDRYMARINE.COM Our Busines.s Hendry Marine Industries, Inc. (HMI) consists of a diverse range of maritime businesses, including commercial and government ship repair, marine environmental
More informationKISSIMMEE. Wednesday, Oct 25 th 08:30am. Florida - USA CALL NOW TO CONSIGN QUALITY EQUIPMENT
License Number: AU-C003078 KISSIMMEE Florida - USA Wednesday, Oct 25 th 2017 @ 08:30am 2006 John Deere 670D 13-14 Caterpillar 320EL - choice CALL NOW TO CONSIGN QUALITY EQUIPMENT +1 419-865-3990 www.yoderandfrey.com
More informationGenting Dream Ex Singapore
Genting Dream Ex Singapore 5N CRUISE (SUN SAILING) Singapore-High Seas-Surabaya-North Bali DAY PORT ETA ETD Jan: 13 Mar: 17 Mon High Seas -- -- Tue Surabaya 0800 (0700) 1700 (1600) Wed North Bali (Celukan
More informationGENERAL TARIFF PROVISIONS :
GENERAL TARIFF PROVISIONS : a) Overtime working hours are considered from 22.00 hrs to 06.00 hrs of the next day, and from 22.00 hrs on Friday to 06.00 on Monday as well as during holidays. b) Service
More information2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION
2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION On your return trip from Mackinac Island, you will likely want to go at a more leisurely pace, stopping in different harbors
More informationPresented to: City of Petaluma City Council
Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November
More informationState of the Waterway 2017
State of the Waterway 2017 Steven W. Nerheim Director VTS Houston/Galveston Lone Star Harbor Safety Committee 2 FEBRUARY 2018 U.S. Port Rankings 2015 1 South Louisiana, LA, Port of 259.1-3.07% 15 Texas
More informationSYSTEM BRIEF DAILY SUMMARY
SYSTEM BRIEF SUMMARY * ANNUAL (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR ON
More informationNC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James
More informationOctober 17, Sandy Related Project Update From June 2013
October 17, 2013 Sandy Related Project Update From June 2013 BEACH North End Beach Fill Completed South End Sand Berm Completed Sand Fence, and Beach Grass Installation underway ADA Beach Paths constructed
More informationPRINCESS V PRICE: 349,950 EX VAT. Ref:PB RECENTLY SERVICED AND UPDATED
2010 PRICE: 349,950 EX VAT Ref:PB1085 RECENTLY SERVICED AND UPDATED 2010 PRINCESS V56 HARD TOP MOTOR YACHT FOR SALE FITTED WITH: Twin Volvo D13 900hp diesel engines White hull Leather upholstery Companion
More informationPARK PERMIT APPLICATION
Park Requested: Byrd Park Dean Park Museum Lawn Nelson Park Stonewall Park Please call or check the online calendar for availability. CITY OF MANASSAS Please send completed registration form with payment
More informationDay and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April
New M5 Work notification 4 April 2018 Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April A significant amount
More informationA. TARIFF SCHEDULE OF PORT SERVICES
TARIFF SCHEDULE OF PORT SERVICES AND CHARGES OF DUBROVNIK PORT AUTHORITY Contents: A. TARIFF SCHEDULE OF PORT SERVICES I II III IV V GENERAL PROVISIONS QUAYAGE DEMURRAGE QUAYAGE boats - yachts ANCHORAGE
More informationOFFICIAL LICENSED PRODUCT CATALOG
OFFICIAL LICENSED PRODUCT CATALOG SNAP-ON IS A TRADEMARK OF SNAP-ON INCORPORATED AND IS USED UNDER LICENSE. SNAP-ON MAKES NO REPRESENTATIONS OR WARRANTIES WITH RESPECT TO THE MERCHANDISE IN THIS CATALOG.
More informationKEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors
2473 (2012) Driveline 30m Hopper Barge Design 2462 (2011) Land & Water Land & Water 8.0m River Tug 2454 (2011) Hopper Barge 2444 (2011) Abwood Marine Abwood Marine Pontoon 2443 (2011) Abwood Marine Abwood
More informationJOHN GLENN COLUMBUS INTERNATIONAL AIRPORT
JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of GAC & SAC = $2.06 / 1,000 lbs) $3.32 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.91 / sq. ft. $0.41
More informationPlan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays
BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Burlington International Airport has prepared this pursuant to 42301 of the FAA Modernization and Reform Act of 2012. Questions regarding this
More information2.1 General Characteristics. 2.2 General Dimensions. 2.3 Ground Clearances. 2.4 Interior Arrangements. 2.5 Cabin Cross Sections
2.0 AIRPLANE DESCRIPTION 2.1 General Characteristics 2.2 General Dimensions 2.3 Ground Clearances 2.4 Interior Arrangements 2.5 Cabin Cross Sections 2.6 Lower Cargo Compartments 2.7 Door Clearances JUNE
More informationMarine Consultants & Specialist Brokers. We are exclusively authorized to offer : WORK BARGE MAJOR
Marine Consultants & Specialist Brokers We are exclusively authorized to offer : WORK BARGE MAJOR D E T A I L E D S P E C I F I C A T I O N page Main data sheet 3 and 4 Crawler crane load-chart 5 Various
More informationJOHN GLENN COLUMBUS INTERNATIONAL AIRPORT
JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of General Airline Credit = $1.91 / 1,000 lbs) $3.17 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.78 /
More informationWELCOME TO DAMEN SONG CAM
WELCOME TO DAMEN SONG CAM HISTORY 2002 - Damen starts building ships with Song Cam Shipyard March 20, 2014 - Damen Song Cam grand opening ceremony As from 2015 - Damen Song Cam starts building series of
More informationCapable Accommodation work Barge with helideck. Large Work Deck with 400t deck crane. Accommodation for 165 pax. Mynx. Accommodation Work Barge
Capable Accommodation work Barge with helideck Large Work Deck with 400t deck crane Accommodation for 165 pax Mynx Accommodation Work Barge hnical Drawing Proven and Capable shallow water accommodation
More informationAid to Local Ports FY19 Requests
City Accomack- Greenbackville Harbor Phase III Accomack-Quinby Harbor Bulkhead Cape Charles- Installation of 4 th breakwater Total Project Cost Amount Requested Proposed Allocation Carryover Request $260,000.00
More information55 Meter (180ft) World Explorer motoryacht
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 55 Meter (180ft) World
More informationACCEPTING CONSIGNMENTS, CONTACT US NOW
Las Vegas, NV April 20, 2018 (Friday) Unreserved public auction 2014 Komatsu D375A-6 2015 Komatsu WA380-7 7 of 8 2012 Volvo A40F 6x6 2016 Komatsu PC390LC-11 2010 Peterbilt 389 Heavy Haul ACCEPTING CONSIGNMENTS,
More information18 Sep 07 Oct 2018 $ 5998
Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au
More informationFOR SALE Willamette Pass Inn & Chalets Crescent Lake, OR
Located in the High ated in Cascades of Central Oregon FOR SALE Willamette Pass Inn & Chalets Crescent Lake, OR PRICE REDUCED! 19821 HWY 58 Crescent Lake, OR 97733 Combination of 13 rooms in the Inn and
More information2013 IQA Young Members Network Study Tour Hong Kong / China
2013 IQA Young Members Network Study Tour Hong Kong / China Introduction IQA Young Members Network (YMN) Alliance Construction Materials Hong Kong Sponsor 5 Quarries 1. Anderson Road Quarry 2. Lam Tei
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More informationSunshine Coast & Powell River (June 27th, September 3rd, 2012)
Sunshine Coast & (June 27th, 2012 - September 3rd, 2012) From Comox (Little River) To (Westview) 4 From (Westview) To Comox (Little River) 4 From (Saltery Bay) To Sechelt (Earls Cove) 5 From Sechelt (Earls
More informationSabre Hardback Express Carina
Sabre Hardback Express Carina Make: Sabre Boat Name: Carina Model: Hardback Express Hull Material: Fiberglass Length: 42 ft Number of Engines: 2 Price: $ 379,000 Fuel Type: Year: 2005 Diesel Condition:
More informationFountain Exp Cruiser LLC OWNED
Fountain Exp Cruiser LLC OWNED Make: Model: Length: Fountain Exp Cruiser LLC OWNED 65 ft Price: $ 495,000 Year: 2000 Condition: Used Location: Long Beach, CA, United States Hull Material: Draft: Number
More information18 Sep 07 Oct 2018 $ 5998
Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au
More informationInvestigation Report. Identification. Factual information. German Federal Bureau of Aircraft Accidents Investigation. TX002-0/07 September 2008
German Federal Bureau of Aircraft Accidents Investigation Investigation Report TX002-0/07 September 2008 Identification Type of incident: Incident Date: 12 January 2007 Place: Aircraft: Manufacturer /
More informationOverview of Industrial Holding BLRT Grupp
Overview of Industrial Holding BLRT Grupp On June 12, 1912 was decided to establish Russo-Baltic Shipbuilding Yard in Tallinn. Year 1916 manufacturing area of Russo-Baltic Shipbuilding Yard in Tallinn,
More information22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland
Dream Maker Travel (Australia) Pty Ltd METROPOL SHOPPING CENTRE 742 Creek Road (Cnr Creek Rd & Pine Mountain Rd) MOUNT GRAVATT EAST QLD 4122 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au
More information[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form
Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that
More information2- Pilotage Cost Tonnage. 1- Pilotage Cost Tonnage. Currency
2- Pilotage Cost Tonnage 3* 4* Currency Harbor Pilot in the Port area And Docks (Egyptian 45 30 Until 999 60 40 1000-4999 90 60 5000-9999 112.5 75 10000-19999 217.5 145 20000-29999 322.5 215 30000-39999
More information86' (26.21m) Cantiere delle Marche
86' (26.21m) Cantiere delle Marche LOA: Beam: Min Draft: Max Draft: Speed: 86' 0" (26.21m) 24' 3" (7.39m) Max 7' 5" (2.26m) Cruising 10 knots Max 11 knots Year: Builder: Type: Price: Location: Mfg-2015
More informationProposal from Crowne Plaza Memphis Downtown 300 North Second Street, Memphis, Tennessee, 38105, USA
PROPOSAL DETAILS RFP Name RFP Code Event Name Sept 2017-ALRP FZNKPLGJF69 Sept 2017-ALRP Response Date Mon, 13-Mar-2017 2:19 PM Proposal Status Cancelled Supplier Name Crowne Plaza Memphis Downtown Supplier
More informationThe Whitefish Trail
The Trail - 2017 Trail Construction Specifications & Scope of Services The Lower Haskill section of Trail construction will take place on two different land ownerships: City of and Iron Horse. This section
More informationEuropean aviation sector reactions on the Ebola threat
Cairo, 17 - November 2014 European aviation sector reactions on the Ebola threat Perspective of the European Aviation Crisis Coordination Cell (EACCC) Marc van Oudheusden Sr. Political Advisor Crisis Management
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationNC Dredge Studies NCBIWA Spring Conference April 23, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference
More informationALASKA RRT. Arctic & Western Alaska Area Committee Brief March 5, 2019
ALASKA RRT Arctic & Western Alaska Area Committee Brief March 5, 2019 AREA COMMITTEE UPDATE Notable Events within Area Committee: 5 Subcommittees met and began work on OSC tasking Workgroups formed underneath
More informationJD F1445 Mower / cab E-Z-Go Work Horse 11HP
Equipment Description City Department Contact Ford F600 w/pump Belle Plaine Fire Dept Fire Truck Belle Plaine Fire Dept Sterling Truck with plow Belle Plaine Public Works Chipper Belle Plaine Public Works
More informationThe Corps of Engineers Dredges on the West Coast
The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011
More informationWENATCHEE CITY COUNCIL WENATCHEE CITY HALL
WENATCHEE CITY COUNCIL WENATCHEE CITY HALL AGENDA February 26, 2009 5:15 p.m. Pledge of Allegiance Consent Items: Motion to approve agenda, vouchers, and minutes from previous meetings Resolution No. 2009-22
More informationDredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015
Dredging 101 Why, Who, How and So What! 2015 WAMSI Research Conference 30 March 2015 Presentation Contents Quick Oversight on Why we need to Dredge and Who Carries it out Global Context of some of our
More informationPRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE
PRESS RELEASE September 28, 2015 WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE On February 10 th, M/V GOODFAITH amid severe weather run aground on the north coast of Andros. Bulk Carrier
More informationMONTHLY OPERATIONS REPORT SEPTEMBER 2015
MONTHLY OPERATIONS REPORT SEPTEMBER 215 Table of Contents SEPTEMBER 215 Section Page September Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...
More informationCOMMISSIONERS Meeting Minutes July 28, 2017
COMMISSIONERS Meeting Minutes July 28, 2017 The Commissioner s meeting convened at 10:00 a.m. in the meeting room at the North Conway Water Precinct 104 Sawmill Lane North Conway, NH. The following were
More informationSECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY
WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new
More informationWork Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent
Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE
More informationREPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004
REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004 The Marine Casualty Investigation Board was established on the 25 th March, 2003 under The Merchant Shipping (Investigation
More informationSERVICES & CHARGES 2019
SERVICES & CHARGES 2019 MARINA BERTHING All of our marina contracts include A fully serviced berth afloat or ashore at any time during the contract period Membership of our partnership marina arrangements
More informationDiscount for staying in your camper or hotel - $100.
2018 MOTO CAMP Registration Form Page 1 of 5 MOTO CAMP Bike Week (Bikes Only) (5) Days and (5) Nights Mon-Tue-Wed-Thur & Friday August 13 th, 14 th, 15 th, 16 and 17 th. Sign in For Camp is Sunday August
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationJanuary 2009 City of Long Branch
January 2009 City of Long Branch Garbage Pickup North of Broadway Garbage Pickup South of Broadway January 2009 City of Long Branch All Dog Dog Licenses Licenses must must be renewed be renewed by January
More information