1 INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT The Adapting to Rising Tides (ART) project evaluated the current condition of shoreline and community assets, and the stressors affecting them, because understanding existing conditions and stressors can inform an understanding of individual asset resilience (or lack thereof) to projected climate impacts, including sea level rise and storm events. Stressors can also provide information on current and future trends and how those trends may affect resilience. The existing conditions and stressors were analyzed and summarized for each asset category included in the ART project assessment. This analysis served as a foundation for the ART vulnerability and risk assessment, which examined asset exposure to five potential climate impacts, sensitivity of assets to these impacts, and the ability of assets to accommodate or adjust to these impacts with little financial or structural intervention. The following Existing Conditions and Stressors report chapter includes: a definition of the asset category; a synthesis of information about current conditions and stressors; and discussion of these conditions through the lenses of sustainability organized by society and equity, environment, economy and governance. The complete ART Existing Conditions and Stressors Report is available at the ART Portfolio website. 1

2 AIRPORT I. Definition Oakland International Airport (OAK) is located in the City of Oakland, about 6.5 miles southeast of downtown Oakland in Alameda County along San Francisco Bay (see Figure 1). OAK encompasses 2,600 acres and is owned and operated by the Port of Oakland, an independent department of the City of Oakland. The Port of Oakland was created in 1927 as an autonomous department of the City of Oakland under the exclusive direction of the Board of Port Commissioners by an amendment to the City s Charter. The Port manages property stretching along 20 miles of the eastern shore of San Francisco Bay. OAK s property is divided into North Field and South Field, and its facilities include terminal, airfield, parking, air cargo, general aviation, and maintenance facilities. Passenger terminal facilities, commercial airline service, and air cargo operations are concentrated at South Field while general aviation operations are concentrated at North Field. II. Location and Facilities South Field has OAK s primary air carrier runway (Runway 11/29) and North Field has three runways (Runway 9R/27L, Runway 9L/27R, and Runway 15/33). South Field s Runway 11/29 provides service to larger commercial aircraft, including turbo-jet and turbo-fan aircraft, fourengine reciprocating powered aircraft, and turbo-props over 17,000 pounds. North Field s three runways provide service to smaller aircraft, including general aviation and some air cargo. As Table 1 summarizes, the elevations of these critical runway facilities range from a low of only 1.8 feet above mean sea level to a high of only 8.7 feet. Table 1. Oakland International Airport Runway Facilities Runway Length (ft) Width (ft) Surface Type Runway end / Elevation (ft, MSL) Runway end / Elevation (ft, MSL) 09L/ 27R 5, Asphalt 09L = R = R/ 27L 6, Asphalt 09R = L = / 29 10, Asphalt 11 = = / 33 3, Asphalt 15 = = 4.0 Source: FAA Form 5010 Summary. 2

3 Figure 1. Map of Port of Oakland Facilities, Airport and Seaport 3

4 Runways constitute the largest aviation land use at OAK at approximately 1,078 acres (Oakland Airport Master Plan, 2006) (See Figure 2). South Field, which is defined as the airport area south of Ron Cowan Parkway, contains 208 acres of passenger facilities, which include Terminals 1 and 2. Additionally, South Field holds 104 acres of air cargo facilities, the largest of which is the FedEx Metroplex (their West Coast hub operation). North Field (the airport area north of Ron Cowan Parkway) contains a variety of aviation land uses, the largest of which is general aviation (approximately 85 acres), including aircraft hangars, ramps, and three fixed base operators, KaiserAir, Business Jet Center, and Landmark Aviation. North Field also accommodates some air cargo facilities (approximately 30 acres), including Ameriflight, a small package carrier. South Field currently has 29 aircraft gates at two terminals: Terminal 1 with 16 aircraft gates and Terminal 2 with 13 aircraft gates. Figure 2. Oakland International Airport Layout Source: Oakland International Airport Master Plan. III. Existing Plans and Future Capacity Based on forecasts of the number of passengers and flights through the airport, the 2006 Airport Master Plan estimated a need for 46 to 50 total aircraft gates to efficiently handle demand between 2010 and Currently, the airport has a total of 29 gates. The Master Plan Forecasts assumed a 2010 passenger demand of 18 million passengers per year, based on the 2005 FAA Terminal Area Forecast (TAF) and similar forecasts made in the 2000 Regional Airport System 4

5 Plan (RASP). However, due to several factors the national economic recession, airline competition, the steep and sudden increase in jet fuel prices, and several airline bankruptcies the 2010 passenger projections were not met. Reflecting such changes in airport demand, new projections were evaluated in 2010 as part of the update to the RASP. The RASP s Baseline and Delay Report predicts a decline in passenger and aircraft operations at OAK until 2020, followed by a surge in activity. The 2020 aviation forecast predicts 300,600 annual aircraft operations, which includes all commercial, general, and cargo aviation activity, followed by a steady annual increase to 354,000 by Airfield capacity at OAK is affected by its runway configuration and use patterns. The single air carrier runway on the South Field, Runway 11/29, is used by nearly all commercial flights. The three runways on the North Field have restrictions on turbojet operations due to noise ordinances and are used almost exclusively by general aviation and some charter and cargo flights. FAA regulations and airport policies dictate what type of planes can land on which runways. Aircraft with experimental or limited certification having over 1,000 horsepower or 4,000 pounds are restricted to Runway 11/29. It is preferred that aircraft landing at the North Field arrive on Runway 27L and depart on 9R or 27R. However, if these runways are unusable based on air traffic control instruction, then Runway 11/29 must be used. OAK has a 24-hour noise abatement procedure which prohibits turbojet- and turbofan-powered aircraft, turboprops over 17,000 pounds, four-engine reciprocating powered aircraft, and surplus military aircraft over 12,500 pounds from departing on Runways 27L and 27R or landing on Runways 9R and 9L (FAA Airport Master Record, 2011). However, these noise prohibitions can be waived in emergencies or whenever Runway 11/29 is closed due to maintenance, safety issues, high wind, or weather. According to the 2011 Regional Airport System Plan Update forecast for OAK, traffic growth is not projected to be a significant issue in the future. Accommodating the 2035 growth in activity with today s airfield facilities is feasible at only a four-minute average aircraft delay, which is well below the FAA standard metric of 15 minutes as the point at which delays must be reported (Regional Airport System Plan Update, 2011). The practical annual capacity of OAK (including North Field and South Field operations) is estimated to be between 400,000 and 450,000 annual operations. With actual operations at fewer than 220,000 in 2010, airfield capacity is not expected to be reached until after IV. Existing Stressors Earthquakes are a major hazard throughout the Bay Area, and OAK s location on top of bay fill makes it particularly susceptible to liquefaction and shaking. As such, airport operations were affected by the 1989 Loma Prieta earthquake, in spite of its location over 40 miles from the epicenter. Runway 11/29, the airport s main 10,000-foot runway, built on hydraulic fill over Bay mud, was severely damaged by liquefaction; 3,000 feet of the runway sustained cracks, some of which were a foot wide and a foot deep (USGS, 1998). Spreading of the adjacent unpaved ground resulted in cracks up to 3 feet wide. Large sand boils appeared on the runway and adjacent taxiway, a few as wide as 40 feet (see Figure 3). 5

6 Existing Conditions and Stressors Report Airport Figure 3. OAK s Main Runway after Loma Prieta Earthquake, with sand boils and cracks (above) and a close up of a sand boil on the main runway (below) Sources: U.S. Geological Survey, Photo from 10/18/1989. As a result, OAK was immediately shut down to evaluate runway damage. North Field s general aviation Runway 9R/27L was used to accommodate diverted air traffic for several hours before the main runway was reopened with a usable length of only 7,000 feet. This shorter runway length impacted cargo loads during takeoff. Over the 30 days following the earthquake, 1,500 feet of the 3,000-foot damaged section of the runway was repaired. An adjacent taxiway was also damaged by liquefaction. Repairs of this taxiway segment and the 6

7 final 1,500 feet of the main runway were completed six months later, with repair costs totaling approximately $6.8 million, including $3.5 million for runway repairs, $2.2 million for taxiway repairs, and $1.1 million for repair of other (non-liquefaction-related) damage. FAA funded approximately $5.5 million of the repairs, with the remainder funded by OAK. Neither San Francisco International Airport nor San Jose International Airport was affected by liquefaction in the Loma Prieta earthquake. A perimeter dike forms the southwestern shoreline of the airport property and protects the South Airport from flooding by waters of San Francisco Bay. The dike was constructed in three phases during the 1950 s, 60s, and 70s, mainly from materials dredged from the Bay, for the purpose of reclaiming land on which to develop and expand OAK s facilities. Dredged materials (mainly sand) were used to fill the area behind the dike. Portions of the dike currently do not meet FEMA 100-year flood standards, and portions are susceptible to liquefaction in a major seismic event. The Port of Oakland plans to construct improvements to the perimeter dike to correct these deficiencies, enabling the dike to withstand severe storms and seismic events, protect the Airport from potential flooding, and meet FEMA certification standards. In addition, the planned improvements would help mitigate the effects of potential sea level rise due to global warming. The project is currently in the environmental review phase. V. Economics/Jobs Twelve scheduled passenger airlines currently serve OAK. Southwest Airlines dominates market share, serving nearly 74% of all OAK passengers in 2010 (Port of Oakland, 2011), followed by Alaska/Horizon Air and JetBlue at 6.7% and 6.5%, respectively. OAK is currently the largest operating hub in California for Southwest. The airport is also the North American West Coast hub for FedEx, the largest air cargo operator at OAK, which performs intermodal sort and distribution of freight and overnight packages from around the world from its OAK facilities. FedEx averaged 15 flights a day, handling 907 million pounds of cargo in 2010 (Port of Oakland, 2011). UPS also has a large cargo presence at Oakland, averaging four cargo flights per day in 2010, transporting a total of 174 million pounds of goods. Ameriflight and West Air also operate air cargo transportation services out of OAK. In 2010, OAK carried 9,857,845 passengers, making it the 33 rd busiest airport in the United States in terms of total passengers, according to Airports Council International-North America (see Figure 4). This number is down from a 2007 all-time high of 14,613,489 passengers, reflecting both the downturn in the economy as well as a shift in travel to San Francisco International Airport from key domestic markets (Port of Oakland, 2011). 7

8 Figure 4. Annual Passengers at OAK Source: Port of Oakland, In 2010 the airport handled 510,947 metric tons of cargo and had 219,652 total aircraft movements (landings and takeoffs), ranking 12 th in the country by metric tons and 34 th by total aircraft movements. The 2010 figures represent a 4% increase from 2009 levels in metric tons of cargo, but a 6% decrease in total aircraft movements. In the Bay Area alone in 2010, aviation activity from OAK yielded 7,680 direct, 5,578 induced, and 1,408 indirect jobs, for a total of 14,466 (Martin Associates 2011). An additional 24,428 hospitality industry jobs are dependent upon OAK, and nationwide, over 383,000 jobs are estimated to be in some way related to aviation activity at OAK. These jobs generated $4.2 billion in business revenue and $1.9 billion in personal income. OAK also generated $197 million in state and local taxes. Direct payments to the City of Oakland totaled $3.2 million. VI. Equity/Environment OAK has a long history of working with its adjacent communities to develop programs that improve environmental quality and reduce the airport s negative impacts. For example, to reduce noise impacts on adjacent communities, the airport spent $34 million to insulate 760 houses and five schools in the cities of Alameda and San Leandro, reducing the average interior sound level by five to seven decibels. To help improve air quality, OAK has a compressed natural gas fueling station that is open to the public and helps fuel taxis, parking shuttles, and door-to-door vans. The station pumps the equivalent of 35,000 gallons of gasoline per month (Port of Oakland, 2011). To protect water quality, the airport organizes workshops, conducts pollution prevention training, collects and analyzes stormwater samples, and inspects approximately 40 Port and tenant facilities annually in compliance with the State Water Resources Control Board s industrial stormwater permit. The airport also reviews stormwater regulations with contractors and assists them in the development of stormwater pollution prevention plans. OAK, as a department of the Port of Oakland, strives to work collaboratively and inclusively with its surrounding communities to ensure that its plans and projects yield benefits for the 8

9 local community. The Maritime and Aviation Project Labor Agreement (MAPLA) was adopted by the Board of Port Commissioners in March 2000 (for more information see MAPLA is intended to ensure that 50% of the total hours worked on most Port projects are by residents within the Port Local Impact Area, which consists of the Cities of Oakland, Emeryville, San Leandro, and Alameda. Additionally, all workers covered by MAPLA are to be paid prevailing wages, as determined by the State of California. MAPLA projects include non-federally-funded on-site construction, modifications, alterations, repair, and demolition of Port projects in the Maritime and Aviation areas that are over $50,000 and Tenant Improvements in Maritime and Airport North Field over $150,000 and over $50,000 in the Airport area. In addition to MAPLA, the Port s Living Wage Program applies to all businesses with more than 20 employees working on Port-related contracts. References 2010 North American (ACI_NA) Final Rankings: Airports Council International-North America. na.org/content/airport- traffic- reports. Airport Perimeter Dike Improvement Environmental Assessment and Initial Study Public Scoping Workshop: Oakland International Airport, Economic Impacts of the Port of Oakland CY Martin Associates, 4/2011. East Bay Economic Outlook. East Bay Economic Development Alliance, 4/2011. Federal Aviation Administration, Airport Master Records and Report Form The Loma Prieta, California, Earthquake of October 17, 1989 Liquefaction. United States Geological Survey, Oakland International Airport Master Plan. Port of Oakland, March Port of Oakland Refunding Revenue Bonds Report of the Independent Consultants. Ricondo & Associates, Regional Airport System Planning Analysis 2011 Update. 9

ART Vulnerability and Risk Assessment Report September 2012

ART Vulnerability and Risk Assessment Report September 2012 Chapter 9. Airport Oakland International Airport (OAK) is located in the ART project area approximately 6.5 miles southeast of downtown Oakland on Bay Farm Island (Figure 1). It first opened to commercial

More information

Regional Jets ,360 A319/ , , , ,780

Regional Jets ,360 A319/ , , , ,780 Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.

More information

COMMERCIAL AND GENERAL AVIATION

COMMERCIAL AND GENERAL AVIATION Existing Facilities Daytona Beach International Airport is served by a number of airside and landside facilities. The airport has three asphalt runways: Runway 07L/25R (10,500 feet long by 150 feet wide),

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

3. Aviation Activity Forecasts

3. Aviation Activity Forecasts 3. Aviation Activity Forecasts This section presents forecasts of aviation activity for the Airport through 2029. Forecasts were developed for enplaned passengers, air carrier and regional/commuter airline

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

AGENDA REPORT Ordinance: Approval of Proposed Fiscal Year 2017-18 Airline Landing Fee Rates, Terminal Space Rental Rates, and Other Fees, and Amendment and Restatement of Port Ordinance No. 3634. (Aviation)

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

Yakima Air Terminal McAllister Field. Aviation Demand Forecast Workshop October 13, 2011

Yakima Air Terminal McAllister Field. Aviation Demand Forecast Workshop October 13, 2011 Yakima Air Terminal McAllister Field Aviation Demand Forecast Workshop October 13, 2011 Today s Agenda What is happening at YKM that is different from FAA s assumptions? What are the national trends for

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Forecast of Aviation Activity

Forecast of Aviation Activity DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

Chapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe

Chapter The All-new, World-class Denver International Airport Identify Describe Know Describe Describe Chapter 10 The aerospace subject is very large and diverse. As seen in previous chapters, there are many subject areas. So far you have learned about history, weather, space and aerodynamics. Now you will

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

Economic Impact of Small Community Airports and the Potential Threat to the Economies with the Loss of Air Service

Economic Impact of Small Community Airports and the Potential Threat to the Economies with the Loss of Air Service Economic Impact of Small Community Airports and the Potential Threat to the Economies with the Loss of Air Service January 2017 There are over 350 small communities in the U.S. that currently receive air

More information

Norman Y. Mineta San Jose International Airport Annual Noise Report

Norman Y. Mineta San Jose International Airport Annual Noise Report Norman Y. Mineta San Jose International Airport 2015 Annual Noise Report Annual Noise Report for Norman Y. Mineta San José International Airport Introduction and Purpose The purpose of this annual report

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Welcome to the Boise Airport Master Plan Update Open House

Welcome to the Boise Airport Master Plan Update Open House Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

Minneapolis-St. Paul International Airport (MSP)

Minneapolis-St. Paul International Airport (MSP) 2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY 19 April 2016 Dave Full, RS&H Katie van Heuven, Kaplan Kirsch & Rockwell TODAY S PRESENTATION ACRP Update Overview

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016 Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary COLUMBUS REGIONAL AIRPORT AUTHORITY Economic Impact Study Update Executive Summary November 2012 Hearing a plane overhead is an everyday occurrence. But how many people stop to think that what they are

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

BOARD OF AIRPORT COMMISSIONERS -

BOARD OF AIRPORT COMMISSIONERS - 0 OF1 Los Angeks World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS - Meeting Date: O'IAA.A.)1.Alk-Tort/uQA212J`s-- Approved by: Samantha Bricker - Deputy Executive Director 11/16/2017 11-Pleviewed

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department August 2007 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

Supplemental Proposals to Revising the

Supplemental Proposals to Revising the Presentation Summary of the Supplemental Proposals to Revising the Northern California Metroplex For Alameda County/Contra Costa County NEXTGEN SUBCOMMITTEE FOR THE OAKLAND AIRPORT/COMMUNITY NOISE FORUM

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues

More information

TED STEVENS ANCHORAGE INTERNATIONAL AIRPORT: ECONOMIC SIGNIFICANCE 2007

TED STEVENS ANCHORAGE INTERNATIONAL AIRPORT: ECONOMIC SIGNIFICANCE 2007 TED STEVENS ANCHORAGE INTERNATIONAL AIRPORT: ECONOMIC SIGNIFICANCE 2007 by Scott Goldsmith Mary Killorin Prepared for Ted Stevens Anchorage International Airport September 2007 Institute of Social and

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: March 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview of progress of efforts to reduce

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Partnership for Quieter Skies Report

Partnership for Quieter Skies Report Ft. Lauderdale-Hollywood International Airport Prepared by: Broward County Aviation Department July 2008 Partnership for Quieter Skies Report The Partnership for Quieter Skies Report provides an overview

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Aviation Activity Forecasts

Aviation Activity Forecasts C H A P T E R 2 Aviation Activity Forecasts 2.0 OVERVIEW This chapter contains aviation activity forecasts for Chippewa Valley Regional Airport over the 20-year planning horizon. Aviation demand forecasts

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

U.S. DOMESTIC INDUSTRY OVERVIEW FOR MAY 2009

U.S. DOMESTIC INDUSTRY OVERVIEW FOR MAY 2009 Inter-Office Memo Reno-Tahoe Airport Authority Date: June 30, 2009 To: Statistics Recipients From: Krys T. Bart, A.A.E., President/CEO Subject: RENO-TAHOE INTERNATIONAL AIRPORT PASSENGER STATISTICS U.S.

More information

MONTEREY PENINSULA AIRPORT REGIONAL AIRPORT PLANNING COMMITTEE

MONTEREY PENINSULA AIRPORT REGIONAL AIRPORT PLANNING COMMITTEE t1 t2 MONTEREY PENINSULA AIRPORT A SPECIAL PRESENTATION TO THE REGIONAL AIRPORT PLANNING COMMITTEE June 27, 2008 FLY MONTEREY 0 Slide 1 t1 tgreer, 6/26/2008 t2 tgreer, 6/26/2008 MONTEREY PENINSULA AIRPORT

More information

KOAK HIGH. Metropolitan Oakland Intl Airport Oakland, California, United States

KOAK HIGH. Metropolitan Oakland Intl Airport Oakland, California, United States NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: North Field Abatement Procedures All Aircraft Categories / Runways: 10L, 10R, 28L, 28R & 33 p. 1 of 9 NOISE ABATEMENT PROCEDURES by Whispertrack Diagram

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Various Counties MINUTE ORDER Page 1 of I

Various Counties MINUTE ORDER Page 1 of I TEXAS TRANSPORTATION COMMISSION Various Counties MINUTE ORDER Page 1 of I Various Districts Texas Government Code, Chapter 2056, requires that each state agency prepare a five-year strategic plan every

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

The Airport. p a g e 2

The Airport. p a g e 2 The Airport Serving the Long Beach area since 1923, the Long Beach Airport (LGB) is an important transportation and business hub for the Southern Los Angeles County and Northern Orange County areas. Strategically

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Norman Y. Mineta San José International Airport 2017 Annual Noise Report

Norman Y. Mineta San José International Airport 2017 Annual Noise Report Norman Y. Mineta San José International Airport 2017 Annual Noise Report Annual Noise Report for Norman Y. Mineta San José International Airport Introduction and Purpose The purpose of this annual report

More information

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS

RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS RULES OF TENNESSEE DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION CHAPTER 1680-1-2 LICENSING AND REGISTRATION OF AIRPORTS TABLE OF CONTENTS 1680-1-2-.01 Purpose 1680-1-2-.06 Repealed 1680-1-2-.02 Definitions

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information