EUROCAE Symposium & 54 th General Assembly. London, April 2017

Size: px
Start display at page:

Download "EUROCAE Symposium & 54 th General Assembly. London, April 2017"

Transcription

1 EUROCAE Symposium & 54 th General Assembly London, April 2017

2

3 EUROCAE Symposium SESSION 4: PERFORMANCE BASED NAVIGATION Moderator: Manfred MOHR, IATA Speakers: Friedhelm RUNGE, EASA Franca PAVLICEVIC, EUROCONTROL Sylvain RAYNAUD, Airbus Geoff BURTENSHAW, UK CAA John DYSON, NATS Richard MACFARLANE, ICAO

4 EUROCAE Symposium Manfred MOHR IATA

5 EUROCAE Symposium Friedhelm RUNGE EASA

6 Performance Based Navigation Friedhelm Runge Chief Expert Avionics and Electrical Systems

7 What is PBN SAFER & BETTER FLIGHT EFFICIENCY PBN EUROCAE 7 Symposium

8 Main principles Route structure based on waypoints and independent from ground based navigation facilities (VOR, DME, NDB) Aircraft ability to maintain a path with a given accuracy => RNAV and provide an alarm when getting outside the limits => RNP Harmonised at ICAO level in PBN manual and translated into aircraft certification requirements and route design criteria PBN EUROCAE Symposium 8

9 Proposed PBN Regulation (EASA Opinion) Opinion En route En route Remains RNAV 5 TMA PCP 24 Major TMA/ADR SID/STAR must be: RNP 1 (plus addtl. function.) Opinion Other TMA/ADR SID/STAR may be: RNAV 1 or RNP 1 (plus addtl. function.) APCH Approach must be: RNP APCH with APV All NPA Rwys must be: RNP APCH with APV PBN EUROCAE Symposium 9

10 Supported by standards ED-75D MASPS: REQUIRED NAVIGATION PERFORMANCE FOR AREA NAVIGATION, October 2014 ED-72A MINIMUM OPERATIONAL PERFORMANCE SPECIFICATION FOR AIRBORNE GPS RECEIVING EQUIPMENT USED FOR SUPPLEMENTAL MEANS OF NAVIGATION, April 1997, superseded by RTCA DO- 316, dated 14/04/2009 RTCA/DO-229D MOPS for GPS SBAS, dated December 2006 WG 28/SC 159 work on SBAS CAT II/III WG 62 works on MOPS for GALILEO/GPS Dual Frequency Multi Constellation SBAS receiver PBN EUROCAE Symposium 10

11 Further standards ED-54 MOPS for Distance Measuring Equipment Interrogator (DME/N and DME/P), dated January 1987 No MOPS for scan DME exists but is one foreseen backup ED-22B MOPS for VOR (Jan 1988) Flight Management Systems ED-58 (June 1988) superseeded by RTCA/DO-283B, dated ED-76A STANDARDS FOR PROCESSING AERONAUTICAL DATA, June PBN EUROCAE Symposium 11

12 Outlook EUROCAE has a policy to revisit standards for actuality from time to time It is suggested to revisit the navigation sensor standards as they exist for quite a while and are still important in the PBN context PBN EUROCAE Symposium 12

13 European Aviation Safety Agency Any questions? Thank you for your attention

14 EUROCAE Symposium Franca PAVLICEVIC EUROCONTROL Sylvain RAYNAUD Airbus Geoff BURTENSHAW UK CAA

15 PBN Challenges Franca Pavličević Head of NAV & CNSS Research EUROCONTROL & Solutions Sylvain Raynaud FMS/ANF Design team leader Navigation Systems - EYAN Airbus Operations S.A.S EUROCAE ANNUAL SYMPOSIUM, April 2017 Geoff Burtenshaw PBN Implementation Lead UK CAA

16 Three in one The concept PBN, at the beginning and then? From Concept to Flight deck reality PBN on the flight deck From perfect paths to implementation reality Environmental Impact of PBN PBN Challenges and Solutions 16

17 PBN at the beginning and then? Franca Pavličević Head of Navigation & CNSS Research EUROCONTROL

18 Navigation quick refresh! I know where I want to go, but.. Are we Philosophers? Where am I? How will I get there? How long will it take? Or Explorers? PBN Challenges and Solutions 18

19 In search of the perfect lateral and vertical path. 1910s 1930s 1970s Visual Reference Conventional Navigation The Magic is in the Box Area Navigation (RNAV) PBN (RNAV + RNP) PBN Challenges and Solutions 19

20 Why PBN? P R E B-RNAV P-RNAV US-RNAV RNP10 RNP 4 RNP/RNAV RNAV and RNP Other States-Regions Russia US Europe Boeing Australia China Airbus Canada Japan South America India F U T U R E PBN Challenges and Solutions Development of a variety of navigation applications NO INTEROPERABILITY 20

21 PBN, a snapshot Routes/Holds/IFP Decided locally by implementation using NS/NI Different applications possible. Respond to different airspace concepts. (ANSP) Navigation Applicatio n Interoperability guaranteed Aircraft/Aircrew requirements Fixed globally with acceptable means of compliance (in PBN Manual). Some options. Logic is that state / regional certification should not be more demanding. (OEM/Regulator): e/tsos part of AMC Navigation Specification NAVAID Infrastructure Standardised SET DME / GNSS Globally promulgated performance standards (in ICAO Annex 10). Choice of Infra depends on NAV spec requirements and local infrastructure decisions. (Service Provider) PBN Challenges and Solutions 21

22 PBN. Stopped the myth that accuracy = RNAV & RNP Generally, Nav Spec linked to flight phase. International Navigation Specifications published in Volume II of PBN Manual PERFORMANCE Obsolete RNP Concept 10 Navigation Specification Functionalities Navigation Sensors Air crew requirements Document used by State as basis for developing Certification & Operational Approval 10 Global Specifications - Vol II, ICAO Doc 9613 PBN Challenges and Solutions 22

23 Navigation Specifications RNP 4 For Oceanic & Remote Continental ICAO Navigation Specifications RNP SPECIFICATIONS RNP 2 RNP 1 A-RNP RNP APCH RNP AR APCH RNP 0.3 For various flight phases * RNP future PUBLISHED IN PBN MANUAL Used by State as basis for developing Certification & Operational Approval RNAV SPECIFICATIONS RNAV 10 RNAV 5 For Oceanic & RNAV 2/1 Remote For en route & Continental terminal PBN Challenges and Solutions 23

24 PBN, in context Based on needs; sum of Operational, Airspace; Environmental, technological reality.. AIRSPACE CONCEPT Data/ Voice Interoperability guaranteed ATS Routes SID/STARs/IAP In ECAC = RADAR >> ADS-B; WAM Standardisation SET Procedures & Tools PBN Challenges and Solutions 24

25 Enter PBN PBN improves Safety which tops any list. PBN s key benefits: Safety especially on Final Approach Flexibility where ATS routes, SIDs/STARs can be placed A great airspace planning/design tool if used correctly Interoperability one qualification, works everywhere; Better access to airports and airspace. PBN functions provide Confidence in navigation performance, both laterally and vertically, along a flight path (i.e. SID/STAR/IAP). Confidence is provided by PBN s ten RNAV and RNP specifications. These spell out crew and aircraft navigation performance needed to operate on a route. PBN Challenges and Solutions 25

26 PBN Challenges PBN Concept is Simple Application is Complex RNAV & RNP Terminology: Mix of Old/New and technical / operational Confused stakeholders Who needs to know what? Making PBN work for on the flight deck and for air traffic controllers Standardising 10 navigation specifications globally suggests one size fit all Is there a mandate? Let s have Mixed Mode and Let s have BEBS (Best-Equipped-Best-Served) No incentive to equip Rationalisation of Navaids difficult The Environmental Impact of PBN PBN Challenges and Solutions 26

27 PBN on the flight deck: Aircraft implementation for the Approach Sylvain Raynaud FMS/ANF Design team leader Navigation Systems - EYAN Airbus Operations S.A.S

28 Airbus Flight Operations NOvember 2016 One aircraft design Which behavior do you expect?? Select the best sensors (GPS) Apply Guidance laws (efficiency/comfort) Along a specific path Best performance (GPS) at all times. No performance degradation related to RNP value Only alert limits are changed!! 28 Page 28

29 Airbus Flight Operations NOvember 2016 External Monitoring On-Board Monitoring TSE ATC (mode S, ADS-B,.) NSE Accuracy NAV ACCURACY Integrity GPS PRIMARY FTE XTK OBPMA RNAV RNP 29 TSE: Total system Error NSE: Navigation System Error FTE: Flight Technical Error Page 29

30 Airbus Flight Operations NOvember 2016 External Monitoring ATC (mode S, ADS-B,.) On-Board Monitoring OBPMA NSE On-Board Monitoring TSE Accuracy NAV ACCURACY Integrity GPS PRIMARY FTE XTK OBPMA RNAV RNP 30 TSE: Total system Error NSE: Navigation System Error FTE: Flight Technical Error Page 30

31 Airbus Flight Operations NOvember 2016 MONITORING / INTEGRITY Monitoring and Alerting: GPS/NAV PRIMARY LOST +Based on GNSS/Inertial mode Integrity monitoring related to threshold Except RNP AR below 0.15 NM, GPS/NAV PRIMARY LOST message triggered regardless of the selected RNP value 31 Page 31

32 Various flight phases RNP SPECIFICATIONS RNAV SPECIFICATIONS RNP 4 For Oceanic & Remote Continental RNP 2 RNP 1 A-RNP RNP APCH RNP AR APCH RNP 0.3 For various flight phases RNP future RNAV / RNP approaches include variants, each with operational implications: RNAV(GNSS) aka RNP APCH -> may benefit from on board ILS look-alike solution (pilots and ATC can then handle such procedures similarly to ILS) LPV -> full precision approach service (ILS look-alike solution) RNP-AR -> require specific authorization for aircraft, airline, and crew; may require a specific a/c solution; specific handling from ATC to join the procedure RNAV Visual?? Situation is complex * RNAV 10 RNAV 5 For Oceanic & RNAV 2/1 Remote For en route & Continental terminal PBN Challenges and Solutions 32

33 Presentation title runs here (go to Header and Footer to edit this text) DD Month, YEAR 33

34 Presentation title runs here (go to Header and Footer to edit this text) DD Month, YEAR 34

35 The Environmental Impact of PBN Geoff Burtenshaw PBN Implementation Lead UK CAA

36 Argus News Thursday 27 February 2014 New Gatwick flight path trials are 'destroying' Sussex village life Good luck. I hope you are not planning to implement PBN below 10,000 feet or it could be 2028 not 2018 when it happens Wow! PBN has been so amazing. I am now not able to sleep at night and get no respite from aircraft noise even though my family and I were previously unaffected PBN is torturing lives NOW, if torture is the way of the future it s not a future I look forward too Residents around your PBN systemisation routes are not impressed. Want you to return to seat of the pants based navigation PBN Challenges and Solutions 36

37 UK Government Airspace Policy Framework Public Response to PBN and Aviation Noise UK Government Consultation February 2017: UK Airspace Policy July 2015 Airports Commission Recommendations CAA/Industry Noise Task Force Noise Mitigation Considerations when Designing PBN Departure and Arrival Procedures CAP 1378 Independent Commission on Civil Aviation Noise ICCAN) UK Airspace Policy: A Framework for Balanced Decisions on the Design and use of Airspace CAA Draft Airspace Design Guidance: CAP 1520 Air Navigation Guidance on Airspace and Noise Management and Environmental Objectives PBN Challenges and Solutions 37

38 UK Government Aviation Noise Policy Limit, and where possible, reduce the number of people significantly affected by aircraft noise Priority should be given to reducing significant impacts rather than the number of people who will experience some aircraft noise Explicit consideration of design options that compare single routes with multiple routes. The need to assess permanent and planned redistribution (PPR) of traffic Consideration of environmental factors from the outset via Design Principles and earlier community engagement Greater efforts at transparency and explaining noise impacts in meaningful terms PBN Challenges and Solutions 38

39 Example: Multiple PBN routes to disperse traffic below 7000ft (Relief options for PBN SIDs not constrained by NPRs below 4,000ft) Noise Objective: Relief, Concentration or Dispersal Environmental impacts Total number of people affected by noise New populations exposed to noise Intensity/frequency of aircraft experienced by those affected Noise Preferential Routes Fuel/ CO2 efficiency Operational impacts Runway Capacity ATC System capacity ATC system complexity Aircraft capability issues Fly-ability FMC capacity PBN Challenges and Solutions Applicability 39

40 Example: SID Alternation PBN Challenges and Solutions 40

41 Example: Multiple PBN routes to enable use of certain routes at certain times Noise Objective: Relief, Concentration or Dispersal CAP 1385: Noise Mitigation Considerations when Designing PBN Departure and Arrival Procedures Environmental impacts Total number of people affected by noise New populations exposed to noise Intensity/frequency of aircraft experienced by those affected Noise Preferential Routes Fuel/ CO2 efficiency Operational impacts Runway Capacity ATC System capacity ATC system complexity Aircraft capability issues Fly-ability FMC capacity Applicability PBN Challenges and Solutions 41

42 Lufthansa SESAR AAL Trials AAL - Augmented Approaches to Land Curved approaches for the reduction of fuel and noise B748 Higher noise emission due to Configuration and higher thrust setting in turns! PBN Challenges and Solutions 42

43 Summary of the Environmental Challenges and Solutions Airspace change programme risks in the form of: Public consultation Cost Judicial review Hostility from local residents Local and national government politics All can have a serious impact on timescales for deployment One cannot overlook the potential downsides for the communities close to an airport from implementing PBN Environmental pressures: real risk to regulatory compliance including ICAO Assembly Resolution A37-11, SES Pilot Common Project, PBN-Implementing Regulation Challenge: take mitigation measures through airspace design to minimise the environmental impact on those communities PBN Challenges and Solutions 43

44 Summary of the Environmental Challenges and Solutions Area navigation techniques are part of the modern aircraft s DNA Seat of the pants navigation is over In theory: can design PBN routes to mitigate environmental (noise) impacts, but more work needed to assess actual level of respite/relief; New route designs May have environmental benefits, but create operational impacts & aircraft capability issues May also have dis-benefits local community perceptions are important It s not just a challenge to PBN The aircraft is the noise generator : Aircraft factors include: operating procedures, configuration changes, climb/descent profile, loading on departure and arrival routes, night-time noise etc. There will be no optimal solution that addresses all stakeholder needs but a balance will be required in order to find the most acceptable route positioning or operating concept PBN Challenges and Solutions 44

45 Thank you

46 EUROCAE Symposium John DYSON NATS

47 PBN Implementation, Implications and Opportunities John Dyson

48 Implementation RNAV 1 across London TMA estimated RNAV 1 - Prestwick Lower airspace, - Scottish, Manchester, Birmingham TMAs and Irish Sea - from Airport RNAV 1 SIDS and PBN approaches DVOR replacement programme 19 sites to 2020 DVOR & NDB rationalisation programme ongoing DME optimisation and replacement programme 48

49 Implications Over 100 ANSPs = co-ordination issues!! Delays to TMA implementation removing airport procedures from VORs (A/Ps own SIDS) NATS Policy to remove all en-route dependencies from DVOR / NDBs Costs and timescales of changing airports procedures Solutions / options for continued DVOR support site by site basis Airspace changes environmental challenge, consultation, reviews and costs Expectation for DFMC provide increased resilience to GNSS support of PBN 49

50 Opportunities Ground based equipment rationalisation (DVOR, NDB, DME, could also be Cat I ILS?) DME optimisation replacement / rationalisation / spectrum management - for DME/DME Co-ordinate Standards, regulations and implementation activities accuracy performance of modern DME Transponders can be taken into account Environmental capacity, fuel, parallel routings, noise, Safety - confidence in positioning accuracy Airspace re-design DME / DME currently independent back up to GNSS support of PBN 50

51 Thank you John Dyson

52 EUROCAE Symposium Richard MACFARLANE ICAO

53 Eurocae Annual Symposium Performance-based Navigation April 2017, London Richard MacFarlane DD/AN, ANB, ICAO

54 ICAO assistance for PBN Implementation PBN Manual 5 th Edition How To Guides Workshops, Manual Updates Flight Procedures Programme (FPP)

55 PBN Manual 5 th Ed. Additional guidance for Implementation Advanced-RNP Use of RF Legs Advisory VNAV Transition to Final

56 How To Guides Overview of the concept Task based approach Linked material Supported by added value elements such as worksheets, checklists

57 How To Guides

58 How To Guides Need for a guide to step user through the process Layers of information Basic Steps Detail for each Step Links to source material Topic Oriented Task Oriented

59 How To Guides Step 1 Step 2 Step 3 Step 1 Detailed instructions Step 2 Detailed instructions Step 3 Detailed instructions Reference Centre (Link to useful information for the user)

60 Reference Centre Added Value: Customers who subscribe will have access to the online Reference Centre: Allows for dynamic search of multiple PBN Documents and the Guide Provides fast reference Capacity to search Annexes and other useful external information Can ultimately integrate training, videos, data and newsletter(s)

61 Reference Centre (sample)

62 How To Guides Step 1 Step 2 Step 3 PBN Ops Approval Step 1 Detailed instructions Step 2 Detailed instructions Step 3 Detailed instructions PBN Business Case Reference Centre PBN Airspace design PBN Procedure Design Step 1 Detailed instructions Step 2 Detailed instructions Step 3 Detailed instructions Step 1 Step 2 Step 3

63 How To Guides PBN Ops Approval Proof of Concept In development now PBN Business Case In discussion with consultant PBN Procedure Design

64 Workshops In support of How To Guides Revised Manuals Ops Approvals Airspace Design Additional Activities

65 FPPs Flight Procedures Programme Currently 2 FPPs Africa and APAC 3 rd (MID) FPP planned for Sep 2017

66 FPPs Flight Procedures Programme Support States by: Assisting with the development of PBN Implementation plan Developing a sustainable IFP capability in the region Providing training on PBN and IFP subjects Ops Approval, Airspace design, Flight Procedure Design

67 Questions?

68 EUROCAE Symposium SESSION 4: PERFORMANCE BASED NAVIGATION Moderator: Manfred MOHR, IATA Speakers: Friedhelm RUNGE, EASA Franca PAVLICEVIC, EUROCONTROL Sylvain RAYNAUD, Airbus Geoff BURTENSHAW, UK CAA John DYSON, NATS Richard MACFARLANE, ICAO

69 EUROCAE Symposium Starting at 20:00 Gala Dinner & Award Night at Royal Aeronautical Society 4 Hamilton Place, Mayfair, London (map)

70

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

Performance Based Navigation Implementation of Procedures

Performance Based Navigation Implementation of Procedures Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

APV Implementation in the UK Initiative

APV Implementation in the UK Initiative APV Implementation in the UK Initiative ICAO APV Workshop 25 May 2011 Geoff Burtenshaw Directorate of Airspace Policy UK CAA The UK APV Implementation Initiative»A Joint CAA and NATS Group, comprising:»

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

Aircraft Systems and 4D Trajectory Management

Aircraft Systems and 4D Trajectory Management Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize

More information

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

SDM WORKSHOP ON PBN (19/10/2017)

SDM WORKSHOP ON PBN (19/10/2017) SDM WORKSHOP ON PBN (19/10/2017) Experience from real implementations GNSS Department 25/10/2017 Agenda PBN Implementation Plan in Spain PCP Implementation Status RNP APCH Palma de Mallorca RNP APCH Barcelona

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement. Simon Young Strategy, Innovation and Service Performance Manager Australian Environment and PBN Drivers

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

Airports Commission s Senior Delivery Group - Technical Report Number 01

Airports Commission s Senior Delivery Group - Technical Report Number 01 Airports Commission s Senior Delivery Group - Technical Report Number 01 Implementation of Performance-Based Navigation in the UK Summary The UK Future Airspace Strategy (FAS) is a programme designed to

More information

What is an Airspace Concept? Module 5

What is an Airspace Concept? Module 5 What is an Airspace Concept? Module 5 European Airspace Concept Workshops for PBN Implementation Overview Learning Objectives: At the end of this presentation you should: Understand what the purpose of

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

FAA GBAS Program Update January 29, 2010

FAA GBAS Program Update January 29, 2010 US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE Practical Experiences & ATM Workshop ATM Requirements Setting the Scene Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest problems to solve 2 What is mixed

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

GNSS/EGNOS services and applications in civil aviation

GNSS/EGNOS services and applications in civil aviation GNSS/EGNOS services and applications in civil aviation Euromed GNSS II project/medusa: Lebanon national workshop Euromed GNSS II national workshop, Beirut, 26 November 2013 1 Index EGNOS SoL operation

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene Practical Experiences & ATM Workshop ATM Requirements Setting the Scene ATM Requirements Forum - INTRO 2 Issue Many Issues (and many solutions) This Forum s central theme MIXED MODE One of the thorniest

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study. Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03

More information

Framework Brief. Edinburgh SIDs

Framework Brief. Edinburgh SIDs Framework Brief 11-Nov-2015 CAA House Edinburgh SIDs 2 Security Statement Unclassified This presentation has been approved for public distribution and publication on the CAA website. Copyright 2015 NATS/

More information

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH

ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH ANNEX B. ASSESSMENT OF THE NEED FOR A PBN IR AND PROPOSED OPTIONS FOR THE REGULATORY APPROACH B.1 Introduction The general objective of the SES PBN IR as described in the EC mandate to EUROCONTROL is to

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area

CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Future Airspace Strategy Deployment CAA Consultation on the Scope and Management of an RNAV 1 Mandate for Operations in the London Terminal Manoeuvring Area Status: Published Version Owner: Phil Roberts

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

PBN Operational Approval The Process. ICAO PBN Operational Approval Course PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based

More information

Performance-based Navigation (PBN) Operations Plan VERSION 1.1

Performance-based Navigation (PBN) Operations Plan VERSION 1.1 Performance-based Navigation (PBN) Operations Plan VERSION 1.1 Page intentionally left blank 2 Performance-based Navigation (PBN) Operations Plan Prepared/Coordinated Jeff Cochrane Manager, CNS Service

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile First LPV 200 approach in Europe Paris Charles de Gaulle Benoit Roturier DSNA ESSP Workshop Warsaw - 2016 PBN Implementation Status PBN FOR APPROACHES TARGETS FOR FRANCE Modernizing/rationalizing French

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information