PBN Operational Approval Continental En Route Navigation Specifications
|
|
- Prosper Watson
- 5 years ago
- Views:
Transcription
1 PBN Operational Approval Continental En Route Navigation Specifications
2 Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2
3 RNAV 5 Flight Phase Navigation Specification En Route Oceanic/ Remote En Route Continental ARR RNAV Approach Initial Intermed Final Missed DEP RNAV RNAV RNP 2 2 A-RNP RNP
4 RNAV 5 B-RNAV (Basic RNAV) in ECAC since 1998 RNP 5 in Middle East RNAV 5 in Caribbean and South America In the PBN concept RNP 5 does not exist. Any existing RNP 5 approvals should be re-issued as RNAV 5 4
5 RNAV 5 Transition RNAV 5 replaces B-RNAV Re-examination not required for B-RNAV approved operators RNAV 5 requirements are identical to B-RNAV 5
6 RNAV 5 Routes RNAV 5 routes dependent on ground aids Sufficient VOR and DME coverage required Based on basic VOR/DME navigator Developed in 1970s but now generally obsolete May be flown using self contained nav system IRS or INS GNSS 6
7 RNAV 5 Systems Single nav system permitted Typically IRS updated by DME and VOR GNSS updating not required (classic aircraft) INS (independent system) INS without automatic radio updating - max 2 hrs IRS (multi-sensor system) GNSS 7
8 RNAV 5 GNSS TSO C129a Older C129 require pseudo-range step detection and health word checking TSO C145/146 Both stand-alone and FMS systems suitable No gaps in integrity coverage > 5 minutes FD capability only required Tip: Any aircraft with a properly installed IFR GNSS receiver is capable of RNAV 5 8
9 RNAV 5 - Functionality Continuous indication of position relative to track Distance and Bearing to active (To) Waypoint Groundspeed or time to active (To) Waypoint Storage of 4 waypoints (minimum) Failure indication of RNAV system Lateral deviation display: Scaling compatible with alerting and annunciation limits Must have scaling and full-scale deflection Turbo-jet air transport aircraft do not typically provide a lateral deviation scale (CDI/HSI). Suitably scaled map displays are considered adequate for RNAV 5 9
10 RNAV 5 - Pre-Flight Check Navaid availability: Ground navaid coverage RAIM prediction for GNSS (if required) Review contingency procedures File R in FPL field 10, and PBN/B1-5 in Item 18 B1 All permitted sensors B2 GNSS B3 DME/DME B4 VOR/DME B5 INS/IRS 10
11 R PBN/B1 11
12 RNAV 5 - En-Route Cross-check position as required Maintain route centreline (+/- 2.5nm) Advise ATC if Unable RNAV Stand-alone GNSS receivers operating in en-route mode (default) conform to RNAV 5. CDI scaling is automatically selected to +/- 5NM full scale deflection 12
13 Pilot Knowledge: RNAV 5 - Training RNAV system capabilities and limitations GNSS principles and operation if GNSS used Navaid limitations Operating procedures Contingency procedures Phraseology Flight planning Ground training is normally sufficient. Flight training is not required 13
14 RNAV 5 - Oversight Navigation Database: If fitted must be current and appropriate for the operations Oversight of Operators: Navigation error reports analyzed to determine remedial action: Remedial training Operational restrictions Software changes Caution: RNAV 5 NavSpec provides for manual entry of waypoints. This should authorised only where necessary and subject to thorough crew procedures Manual entry should be prohibited where a database is carried 14
15 Certification Documentation FAA Order AC90-96A Approval of US Operators and Aircraft to operate under Instrument Flight Rules (IFR) in European Airspace designated for Basic Area Navigation (B- RNAV) and Precision Area Navigation (P-RNAV) EASA AMC 20-4 Airworthiness Approval and Operational Criteria for the use of Navigation Systems in European Airspace designated for Basic RNAV operations 15
16 RNAV 5 - Summary Automatic transition from B-RNAV to RNAV 5 Existing B-RNAV approvals should be re-issued as RNAV 5 Almost all aircraft with basic Area Navigation capability qualify Single navigation system Formal operational approval may not be necessary 16
17 RNAV 2 Flight Phase Navigation Specification En Route Oceanic/ Remote En Route Continental ARR RNAV Approach Initial Intermed Final Missed DEP RNAV RNAV RNP 2 2 A-RNP RNP
18 RNAV 2 Operational Approval is RNAV 1 and RNAV 2 Separate RNAV 2 approval not required Suitable for en-route continental operations Routes dependent on ground aids Adequate DME and/or VOR coverage required ANSP consideration Not an ops approval issue RNAV 1 and 2 approval permits operations on: RNAV 2 routes RNAV 1 routes/procedures (SIDs/STARs) 18
19 R PBN/C1 19
20 RNAV 2 - En-Route Cross-check position as required Maintain route centreline (+/- 1nm) Advise ATC if unable RNAV 2 Stand-alone GNSS receivers operate in en-route mode by default. But CDI scaling is automatically selected to +/- 5NM full scale deflection The track keeping requirements for RNAV 2 can be met provided the flight crew maintains +/- 1NM (one dot) 20
21 RNP 2 A-RNP 2 2 or
22 RNP 2 GNSS required May be used in varied environments Oceanic/Remote/Continental En-route Geographic areas with little or no ground NAVAID infrastructure, limited or no ATS surveillance, and low to medium density traffic Will gradually replace RNAV 5 for continental routes 22
23 RNP 2 Continental En-route Continental En-route requires lower continuity Duplicated navigation equipment not required Provided suitable alternate navigation available If RNP 2 Ops Approval is limited to Continental En-route Must be annotated as a condition on the approval 23
24 Advanced RNP Flight Phase Navigation Specification En Route Oceanic/ Remote En Route Continental ARR RNAV Approach Initial Intermed Final Missed DEP RNAV RNAV RNP 2 2 A-RNP 2 2 or RNP
25 A-RNP Desired Path Variable Variable Advanced RNP Single assessment of aircraft eligibility applying to more than one navigation accuracy requirement and to multiple applications across all phases of flight. Incorporates RNAV 5, RNAV 2, RNAV 1, RNP 1 and RNP APCH. Applicable for oceanic/remote, continental en-route, arrivals, departures and approaches. Relies solely on integrity of RNP system without recourse to conventional means of navigation. 25
26 A-RNP Avoids the need for individual operational approvals Published in 4 th Edition PBN Manual Manufacturers yet to document A-RNP capability Relies entirely on RNP system (GNSS) no back-up ground navaids required Additional requirements: Options RF required for SIDs/STARs/Approaches FRT, TOAC, VNAV, Scalable RNP 26
27 A-RNP Functionality Requires RF functionality FRT, Scalable RNP, Baro VNAV, Higher Continuity and Time of Arrival Control are optional Integrity provided by SBAS or ABAS 27
28 A-RNP Functionality Displays of: Deviation Active waypoint Bearing and distance to active waypoint Groundspeed, time and distance to go to active waypoint Desired track Actual track Slaved course Active sensor 28
29 A-RNP Functionality Path terminator capability: CA, CF, DF, FA, FM, HM, IF, RF, TF, VA, VI, VM Transitions and automatic sequencing Fly-over, fly-by, Fixed radius (RF & FRT) Intercept final approach Holding Parallel Off-set Direct to Automatic RNP changes Navigation database 29
30 RNP 0.3 Navigation Specification En Route Oceanic/ Remote En Route Continental ARR RNAV Flight Phase Approach Initial Intermed Final Missed DEP RNAV RNAV RNP 2 2 A-RNP RNP
31 RNP 0.3 Intended for short range operations Typically helicopters Also applicable to fixed wing RNP 0.3 capability Departure En-route Arrival Approach Typically requires FMS Note: Most helicopters are fitted with standalone receivers which operate in fixed modes. RNP 0.3 requires advanced systems which permit RNP to be selected Capability to provide 0.3 in all phases of flight 31
32 Questions? 32 32
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationOverview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1
Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationRNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS
RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide
More informationAdvisory Circular. Radius to Fix (RF) Path Terminator
Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationPBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING
PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware
More informationAREA NAVIGATION RNAV- MANAGEMENT
1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationOFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'O',
More informationNavigation 101 Chapter 3 RNP-10
853d Electronic Systems Group Navigation 101 Chapter 3 RNP-10 853 ELSG/NT Electronic Systems Center Hanscom AFB, MA 20 Mar 07 ESC 07-0399 Briefing Overview RNP-10 Fundamentals Avionics Systems Qualifications
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationPROCEDURES SPECIAL OPERATIONS
Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /
More informationFlight Operations Inspector Manual
1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationPBN Operational Approval Overview
PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationApplication Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:
Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational
More informationIntentionally left blank
Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11
More informationAn advisory circular may also include technical information that is relevant to the standards or requirements.
Advisory Circular AC91-21 RNAV 1, RNAV 2, RNP 1, RNP 2, RNP APCH and BARO VNAV Operational Approvals Revision 0.3 5 September 2016 General Civil Aviation Authority advisory circulars contain guidance and
More informationEASA RNP (AR) Workshop The Landscape Working Together
EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches
More informationAircraft and Operators approval for RNP 2 operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 14 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP 2 operations 1. PURPOSE This
More informationSubject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 11 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations
More informationREQUIRED NAVIGATION PERFORMANCE / AREA NAVIGATION GUIDE
UCTION NOVEMBER 2008-1 - TABLE OF CONTENTS 1. Introduction 2. Definitions 3. Performance Requirements 4. Functionality Requirements 5. RNP Types 6. RNP Airspace Environment and Implementation 7. Aircraft
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationPBN Operational Approval The Process. ICAO PBN Operational Approval Course
PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based
More informationAdvisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.
Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework
More informationPBN and RNAV concepts
PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)
More informationRNAV - RNP. July 2010
RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,
DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :
More informationFinal Approach Operations Symposium
Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations
More informationNEW FPL Transition Phase & Implementation Stages
International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation
More informationTitle: PBN Operations and Licensing Requirements - Declaration for AOC Holders
Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation
More informationSUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation
DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change
More informationWhat is B-RNAV? 1. 1 Adaptado de [ ]
What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained
More informationEffective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationPerformance Based Navigation Operational End-State 2023
Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,
More informationNOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.
Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)
More informationStandards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY
216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to
More informationGeneral Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08
General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications Version 1.0 8/8/08 Glossary of Terms Advisory Circular (AC) AC 90 series provide operational
More informationAMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300
Application for PBN operations approval Completion of form: Application: Each relevant box should be completed with a tick ( ) or a (X). Items marked with an asterisk (*) to be completed only for first
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationGENERAL INFO NOTICE 1. BACKGROUND
GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial
More informationAnnex to Decision 2016/015/R
Annex to Decision 2016/015/R AMC and GM to Part-CAT Issue 2, Amendment 6 The Annex to Decision 2014/015/R is hereby amended as follows: The text of the amendment is arranged to show deleted, new or amended
More informationCivil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots
Civil Aviation Authority INFORMATION NOTICE Number: IN 2017/034 Issued: 18 August 2017 Implementation of Performance Based Navigation Guidance for Pilots This Information Notice contains information that
More informationOpen Questions & Collecting Lessons Learned
Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationCASAS ADVISORY PAMPHLET
No. 18 CASAS ADVISORY PAMPHLET Subject: GUIDENCE ON THE APPROVAL OF SURINAMESE OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION
More informationP-RNAV GENERAL INFO NOTICE. 1. Background
GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial
More informationRNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS
RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation
More informationVOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation
VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE 4-76 GENERAL. Section 4 Class II Navigation A. Concepts, Direction, and Guidance. This
More informationStatus of PBN implementation in France
Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions
More informationCIVIL AVIATION PUBLICATION CAP 04 DESIGNATED AIRSPACE OPERATIONS
finished CIVIL AVIATION PUBLICATION CAP 04 DESIGNATED AIRSPACE OPERATIONS INDEX - GENERAL INDEX - DETAIL This Page Intentionally Left Blank CAP 04 DESIGNATED AIRSPACE OPERATIONS INDEX GENERAL LIST OF ABBREVIATIONS
More informationADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS
AC 91-002 SRVSOP ADVISORY CIRCULAR AC : 91-002 DATE : 12/10/09 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS 1. PURPOSE This advisory circular (AC) provides
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationAMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations
AMC 20 26 Effective: 23/12/2009 Annex II to ED Decision 2009/019/R of 16/12/2009 AMC 20 26 Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations This AMC provides
More informationCIVIL AVIATION PUBLICATION CAP 04 DESIGNATED AIRSPACE OPERATIONS
CAP 04 DESIGNATED AIRSPACE OPERATIONS INDEX - GENERAL INDEX - DETAIL This Page Intentionally Left Blank CAP 04 DESIGNATED AIRSPACE OPERATIONS INDEX GENERAL LIST OF ABBREVIATIONS GLOSSARY CHAPTER 1 - INTRODUCTION
More informationINSTRUMENT FLIGHT RULES
ENR 1.3-1 ENR 1.3 INSTRUMENT FLIGHT RULES 1 Compliance with IFR A flight conducted above flight level 200 shall be flown in compliance with IFR as prescribed in this part. 2 Aircraft Equipment Aircraft
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationGarmin GNS 430W. Advanced Technology Offering Enhanced Situational Awareness and Safety
Garmin GNS 430W IFR Certified TSO C146a Huge Jeppesen Database Most Airports, VOR, NDB, Intersections, FSS/ATC Frequencies, SUAs, Approaches, STARs, DPs, etc. WAAS, TIS-B Traffic, FIS-B Weather, TAWS Weather
More informationPerformance-based Navigation (PBN) Operations Plan VERSION 1.1
Performance-based Navigation (PBN) Operations Plan VERSION 1.1 Page intentionally left blank 2 Performance-based Navigation (PBN) Operations Plan Prepared/Coordinated Jeff Cochrane Manager, CNS Service
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 8 AIRCRAFT OPERATIONS SERIES 'S', PART III ISSUE
More informationFlight Safety Division Case Nr. Page 1 of 11
FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL
More informationGuidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)
Guidance material DATE : 01/11/13 REVISION : 1 ISSUED BY : EUR PBN TF SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) 1. PURPOSE This guidance material
More informationSubject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 6 OF 2014 Date: 4 TH SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.
More informationUnderstanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations
Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations White Paper Doc No.: WHTP-2013-16-10 May 2018 Safely guiding pilots and their passengers worldwide for over 35 years
More informationDate: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ).
- Advisory Circular Subject: U.S. TERMINAL AND EN ROUTE AREA NAVIGATION (RNAV) OPERATIONS Date: 1/7/05 Initiated by: AFS-400 AC No: 90-100 Change: 1. PURPOSE. a. This advisory circular (AC) provides operational
More informationICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM
ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationApproach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM
Approach 15 Australasian PBN Forum Flight Deck Equipage to Enable CNS/ATM Contents Australian CNS / ATM mandates Regulatory Structure Installation Considerations Continuing airworthiness consideration
More informationAREA NAVIGATION (B-RNAV & P-RNAV) Online Course
Page 1/12 TABLE OF CONTENT LEGAL CAUTION... 2 (RNAV)... 2 INTRODUCTION... 2 ARINC 424:... 2 (RNAV):... 2 Basic Area Navigation (BRNAV):... 2 Closed Termination:... 2 Course to a Fix:... 2 FLY-BY waypoints:...
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationFlight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach
Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129
More informationIATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry
More informationGOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',
More informationNavigation at the. Federal Aviation Administration Crossroads
Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Changes to Air Operator Certificates and Private Operator Registration Documents Issuing Office: Civil Aviation, Standards Document No.: AC 700-043 File Classification No.: Z
More informationABBREVIATIONS. Aircraft-based augmentation system. Automatic dependent surveillance broadcast. Automated dependent surveillance contract
ABBREVIATIONS ABAS ADS-B ADS-C AFM AIP ANSP APV ATM ATS CDI CDU CFIT CRC CRM DME DTED EASA ECAC EUROCAE EUROCONTROL FAA FTE FMS FRT GBAS GNSS GPS GRAS Aircraft-based augmentation system Automatic dependent
More informationAPPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL
SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'P-RNAV Notes for Completion' before completing the form. Please
More informationAircraft Systems and 4D Trajectory Management
Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationPERFORMANCE-BASED NAVIGATION MANUAL
Doc 9613 PERFORMANCE-BASED NAVIGATION MANUAL VOLUME I CONCEPT AND IMPLEMENTATION GUIDANCE AND VOLUME II IMPLEMENTING RNAV AND RNP OPERATIONS Notice to Users This document is an unedited advance version
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationSubject: Aircraft and Operators approval for RNP Authorisation Required Approach (RNP AR APCH) Operations
GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 13 OF 2014 Date: 04 th SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Authorisation
More informationProcedure Manual Performance-Based Navigation Operational Approval
CIVIL AVIATION AUTHORITY REPUBLIC OF MOLDOVA Approved by Director CAA RM I. ARMAŞ 2014 Procedure Manual Performance-Based Navigation Operational Approval Procedure Manual Performance Based Navigation Operational
More information