Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

Size: px
Start display at page:

Download "Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM"

Transcription

1 Approach 15 Australasian PBN Forum Flight Deck Equipage to Enable CNS/ATM

2 Contents Australian CNS / ATM mandates Regulatory Structure Installation Considerations Continuing airworthiness consideration Minimum Equipment Lists Human Factors in the automated flight deck

3 Date Australian CNS / ATM Mandates Requirement* 12 Dec 13 All aircraft operating at or above FL290 require ADS-B. 6 Feb 14 All IFR aircraft new to the Australian register require GNSS and ADS-B. Existing aircraft modified after this date must install equipment that meets the CAO requirements. TSO C145a, C146a or C196a GNSS. ADS-B & Mode S Transponder. 4 Feb 16 All IFR aircraft require GNSS. Aircraft operating in Class A, B, C or E airspace or above 10,000 feet in Class G airspace in the quadrant 500 NM north to 500 NM east of Perth airport require ADS-B. Aircraft operating at Brisbane, Sydney, Melbourne and Perth airports require an ADS-B capable Mode S transponder. 2 Feb 17 All IFR aircraft require ADS-B. *Refer to CAO for full details of the requirements.

4 Operation Aerial Work & Private Charter & RPT Mode S Transponder Equipment Requirements Equipment Required 1 TSO C145a, C146a or C196a; or 1 TSO C129 GNSS plus 1 TSO d ADF or VOR 2 TSO C145a, C146a or C196a GNSS; or 1 TSO C129, C145a, C146a or C196a GNSS plus 1 TSO d ADF or VOR. TSO C112a If Enhanced Surveillance DAPs are transmitted, they must meet ICAO Annex 10 requirements. ADS-B 1090 MHz Extended Squitter TSO C166( ) - RTCA DO AMC 20-24

5 Installation Regulatory Structure The PBN Manual contains the functional and performance requirements. The PBN Manual does NOT contain all requirements so cannot be used for certification. Refer Vol II Part A Section Airworthiness requirements are determined in accordance with Part 21. Continuing airworthiness requirements are an integral part of PBN compliance.

6 Installation Considerations The number of systems required depends on the navigation specifications intended to be used. Oceanic operations require dual systems. When dual systems are required, they must be independent no common mode failures. All airworthiness criteria must be complied with: Equipment and installation fit for purpose. Visibility of displays. Access to controls. Integration to flight displays, autopilot and flight director. System safety.

7

8 BN-2A Modified Configuration DI AI EFD 1000 ASI ALT

9 BN-2A Final Configuration AI DI EFD 1000 ASI ALT

10 Visibility & Accessibility (Q300)

11 Visibility & Accessibility (F50)

12 Recommended Crossfill Configuration Automatic GNSS #1 GNSS #2 Manual

13 Power Supplies Reversionary Sources Main Bus #1 Battery Bus Main Bus #2 GNSS #1 GNSS #2

14 Continuing Airworthiness Continuing airworthiness is an integral part of PBN compliance. Avionics systems continuing airworthiness is generally weak. Installation designers tend not to provide adequate instructions for continuing airworthiness. 2X.1529 requirements are applicable to design changes! Software configuration management is a perpetual source of problems! Operators must have sound software configuration management procedures.

15 Minimum Equipment Lists Many MELs have latent safety deficiencies that stem from the Master MEL: Systems connected to reversionary power supplies are not required to be operative on despatch. Loss of comm or nav function is a minor failure condition (except oceanic). Loss of the comm and nav functions is a hazardous failure condition. Inertial systems are assessed as navigation sensors only. Inertials should be assessed independently as a primary attitude reference and a navigation sensor. Interconnected systems do not identify the effect on other systems. Operators and assessors need to consider the airworthiness and operational impact of failures.

16 Human Factors in the Flight Deck Recent accidents in aircraft with automated systems commonly have human factors issues. The primary role of the pilot is to manage the flight path. Automation tools may help the pilot fly the aircraft; they are not in charge. Accidents have indicated the inverse case. When things start going wrong, the pilot has not intervened. Installation design must consider the operation of the aircraft and the flight crew function. See FAA Human factors in automated flight decks report.

17 Mode Awareness & Mode Control Equipment and installation designs must continuously and unambiguously display active and armed control modes to the crew. New designs must address the automation human factors issues. Existing aircraft are what they are: Shortcomings in design need to be mitigated by training and procedures.

18 Multi-Crew Cockpits PF and PM must be able to carry out their duties independently. PF and PM need specific responsibilities for flight path management. Define what monitoring really means. What does the pilot actually do? Pilot vulnerability in automated cockpits: Pilots must be prepared and ready to intervene at any time.

19 Key Human Factors Issues Knowledge and training. Instructor training and qualification. Understanding the underlying systems. Practice and exposure. Flying the aircraft manually. Flight path deviation and off path management.

20 Summary Installations must meet the relevant airworthiness standards but must consider: Fitness for purpose. System safety. Human factors. System installation designs must be flight crew centric.

21 Questions?

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, February 2014 Safely guiding pilots and their passengers worldwide for

More information

Advisory Circular. Automatic Dependent Surveillance - Broadcast

Advisory Circular. Automatic Dependent Surveillance - Broadcast Advisory Circular Subject: Automatic Dependent Surveillance - Broadcast Issuing Office: Standards PAA Sub Activity Area: Aviation Safety Regulatory Framework Document No.: AC 700-009 File Classification

More information

Navigation 101 Chapter 3 RNP-10

Navigation 101 Chapter 3 RNP-10 853d Electronic Systems Group Navigation 101 Chapter 3 RNP-10 853 ELSG/NT Electronic Systems Center Hanscom AFB, MA 20 Mar 07 ESC 07-0399 Briefing Overview RNP-10 Fundamentals Avionics Systems Qualifications

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, July 2015 Safely guiding pilots and their passengers worldwide for over

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator: Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

United States Aircraft Certification Standards and Guidance on ADS-B

United States Aircraft Certification Standards and Guidance on ADS-B United States Aircraft Certification Standards and Guidance on ADS-B Date: Presented To: ADS-B SITF/12 Date: April 15, 2013 Overview ADS-B Out Final Rule Overview Dual Frequencies Timeline ADS-B Out Standards

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 8 AIRCRAFT OPERATIONS SERIES 'S', PART III ISSUE

More information

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

PBN Operational Approval The Process. ICAO PBN Operational Approval Course PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based

More information

North Atlantic Initiatives

North Atlantic Initiatives North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

Excerpts from ICAO PBCS Manual

Excerpts from ICAO PBCS Manual IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,

More information

ADS-B. Not just a mandate! Forrest Colliver Becker Avionics GmbH Becker Avionics GmbH All rights reserved -

ADS-B. Not just a mandate! Forrest Colliver Becker Avionics GmbH Becker Avionics GmbH All rights reserved - ADS-B Not just a mandate! Forrest Colliver Becker Avionics GmbH 2016 Becker Avionics GmbH All rights reserved - www.becker-avionics.com Automatic Dependent Surveillance Broadcast What are the benefits?

More information

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars

NextGen and GA 2014 Welcome Outline Safety Seminars Safety Seminars NextGen and GA 2014 Presented by Thomas Gorski CFI Welcome Restrooms Exits Emergency Evacuation Sponsor Acknowledgment Interactive Presentation Style Breaks 2 Outline My Background Overview of FAASTeam

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

Automatic Dependent Surveillance-Broadcast (ADS-B)

Automatic Dependent Surveillance-Broadcast (ADS-B) Automatic Dependent Surveillance-Broadcast (ADS-B) Tenth Meeting of the ICAO ADS-B Study and Implementation Task Fce (ADS-B SITF/10) Jessie Turner Principal Engineer/DER Singape Avionics Air Traffic Management

More information

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No. Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA Phone/ Fax : 62 21 3507603 Telegraphic Address AFS : WRRRYNYX REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIR NAVIGATION SUB DIRECTORATE AERONAUTICAL

More information

AIC 02/ JUN 2014

AIC 02/ JUN 2014 TEL: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: ais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIC 02/2014 06 JUN 2014

More information

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

ADS-B Implementation Update 2011 CNS/ATM Conference

ADS-B Implementation Update 2011 CNS/ATM Conference ADS-B Implementation Update 2011 CNS/ATM Conference Prepared by Jeff Cochrane Manager, CNS Service Design June 2011 Briefing Overview Canadian ADS-B Implementation Review of Requirements for ADS-B surveillance

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010) OPERATOR APPLICATION TO CONDUCT RNP 10 OPERATIONS IN DESIGNATED OCEANIC CONTROL AREAS (CTAs) Introduction. This RNP 10 Job Aid was developed by the FAA Hq Flight Technologies & Procedures Division (AFS-400)

More information

TDR Mode S and ADS-B Transponders

TDR Mode S and ADS-B Transponders Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance

More information

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS) GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI 110 003 TELEPHONE: 091-011-4635261 4644768 FAX: 091-011-4644764 TELEX:

More information

28 January, 2010 New Delhi, India. Larry Coughlin. Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B)

28 January, 2010 New Delhi, India. Larry Coughlin. Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B) Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B) 28 January, 2010 New Delhi, India Larry Coughlin Managing Director India Operations Boeing Commercial Airplanes BOEING is

More information

Appendix A REQUEST FOR AUTHORIZATION FORM

Appendix A REQUEST FOR AUTHORIZATION FORM Appendix A REQUEST FOR AUTHORIZATION FORM Note. For details on completing this form, and for definitions of acronyms and abbreviations, see section on Information Required for the Assessment of Authorization

More information

Frequently Asked Questions ADS-B. (Automatic Dependent Surveillance Broadcast)

Frequently Asked Questions ADS-B. (Automatic Dependent Surveillance Broadcast) Frequently Asked Questions ADS-B (Automatic Dependent Surveillance Broadcast) WARNING: Information, statements and opinions contained in this document are given in good faith and have been derived from

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation

More information

ADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service

ADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service ADS-B Installation Challenges July 13, 2017 James Marks ADS-B Focus Team Lead FAA Flight Standards Service Agenda ADS-B Out Mandate Equipage Enablers Installation Challenges Rule Performance Monitoring

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

The Australian ADS-B Program Greg Dunstone

The Australian ADS-B Program Greg Dunstone The Australian ADS-B Program Greg Dunstone Surveillance Program Lead, Airservices Australia 2001-4 : Australian operational trial Operationally commissioned 9 aircraft Dh8, Shorts, B200, Jabiru Objective

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration FOREWORD

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration FOREWORD U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations Date: 12/8/11 Initiated by: AFS-400 AC No: 90-114

More information

GTX 345 Transponder & ICAO IFR Filing. Charlotte County Composite Squadron FL Feb 2017 Maj Dick Morrell, Lt Tom Britton

GTX 345 Transponder & ICAO IFR Filing. Charlotte County Composite Squadron FL Feb 2017 Maj Dick Morrell, Lt Tom Britton GTX 345 Transponder & ICAO IFR Filing Charlotte County Composite Squadron FL-051 21 Feb 2017 Maj Dick Morrell, Lt Tom Britton N922CP C-172S GTN GPS Cockpit KLN 94 NON WAAS GPS Replaced with Garmin GTN

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication.

This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication. 1 This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication. 1. What is ADS-B?... 6 1.1 How does ADS-B work?... 6 1.2 Why is New Zealand

More information

AIRCRAFT INCIDENT REPORT

AIRCRAFT INCIDENT REPORT AIRCRAFT INCIDENT REPORT (cf. Aircraft Accident Investigation Act, No. 35/2004) M-04303/AIG-26 OY-RCA / N46PW BAe-146 / Piper PA46T 63 N, 028 W 1 August 2003 This investigation was carried out in accordance

More information

APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS

APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS Appendix A APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS Summary Main performance impact as per Doc 9854 Operating environment/ Phases of flight Applicability considerations Global concept component(s)

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES ADS-B SITF/6-IP/3 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) SEMINAR AND THE SIXTH MEETING OF ADS-B STUDY AND IMPLEMENTATION TASK FORCE (ADS-B SITF/6)

More information

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance NATA Aircraft Maintenance & System Technology Committee Best Practices Reduced Vertical Separation Minimum (RVSM) Airspace reduces the vertical separation above flight level (FL) 290 from 2000-ft minimum

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

AMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations

AMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations AMC 20 26 Effective: 23/12/2009 Annex II to ED Decision 2009/019/R of 16/12/2009 AMC 20 26 Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations This AMC provides

More information

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended

More information

The FAA published Federal Regulation 14 CFR and 111 cm in May The final rule dictates that effective January 1, 2020, aircraft

The FAA published Federal Regulation 14 CFR and 111 cm in May The final rule dictates that effective January 1, 2020, aircraft The FAA published Federal Regulation 14 CFR 91.225 and 111 cm 91.227 in May 2010. The final rule dictates that effective January 1, 2020, aircraft operating in airspace defined in 91.225 are required to

More information

Annex to Decision 2016/015/R

Annex to Decision 2016/015/R Annex to Decision 2016/015/R AMC and GM to Part-CAT Issue 2, Amendment 6 The Annex to Decision 2014/015/R is hereby amended as follows: The text of the amendment is arranged to show deleted, new or amended

More information

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and

More information

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information This document is scheduled to be published in the Federal Register on 12/20/2017 and available online at https://federalregister.gov/d/2017-27202, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal

More information

Federal Aviation Administration. Summary

Federal Aviation Administration. Summary Federal Aviation Administration Memorandum Date: February 16, 2006 From: Kim Smith, Manager, Small Airplane Directorate, ACE-100 To: See Distribution Prepared by: Ervin Dvorak, (816) 329-4123 Subject:

More information

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S. Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)

More information

An advisory circular may also include technical information that is relevant to the standards or requirements.

An advisory circular may also include technical information that is relevant to the standards or requirements. Advisory Circular AC91-21 RNAV 1, RNAV 2, RNP 1, RNP 2, RNP APCH and BARO VNAV Operational Approvals Revision 0.3 5 September 2016 General Civil Aviation Authority advisory circulars contain guidance and

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_001 Subject: Implementation of Performance Based Separation Minima Originator: NAT SPG Issued: 06 February 2018 Effective: 29 March 2018 The purpose of this North Atlantic Operations

More information

Hazard Identification Questionnaire

Hazard Identification Questionnaire Hazard Identification Questionnaire OVERVIEW This questionnaire is designed to help identify potential risks and help identify areas of risk exposure. It is not an exhaustive list. This questionnaire is

More information

OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI

OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 2 - AIRWORTHINESS SERIES 'R', PART IV DATED 8 TH

More information

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

GOLD / PBCS Operational Approval (Compliance)

GOLD / PBCS Operational Approval (Compliance) Session 3: Preparation for data link implementation (Operator) GOLD / PBCS Operational Approval (Compliance) Presented to: Operational Data Link Familiarization Seminar (Nairobi, Kenya) By: Tom Kraft tom.kraft@faa.gov

More information

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180 Advisory Circular Subject: Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180 Issuing Office: Civil Aviation, Standards Document

More information

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION. CNS / ATM CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps CNS / ATM Agenda Introduction Roadmaps PBN LPV ADSB CPDLC Next Steps Introduction Communication Navigation Surveillance /

More information

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval File No. 5009-32-0 PL No. 551-003 RDIMS No. 1019349-V5 Issue No. 01 Issuing Branch Aircraft Certification Effective

More information

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT 1. For those installations not installed in accordance with GDL 82 Mooney M20 Series STC SA02573SE, a flight manual supplement may be created

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

The INs and OUTs of ADS-B

The INs and OUTs of ADS-B The INs and OUTs of ADS-B Presented by: Date: John Fisher Nov 12, 2016 Outline Glider ANPRM Process Surveillance Overview ATCRBS, Mode S, and ADS-B ADS-B OUT and IN 1090ES and 978 UAT Other Systems ADS-B

More information

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY International Civil Aviation Organization 23/02/12 North American, Central American and Caribbean Office (NACC) Seventh Central American Air Navigation Experts Working Group Meeting (CA/ANE/WG/7) Ninth

More information

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region ICG Experts Meeting Global Navigation Satellite Systems Services 14 18 December 2015, Vienna, Austria ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'O',

More information

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations. GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 6 OF 2014 Date: 4 TH SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

More information

SERVICE LETTER REVISION

SERVICE LETTER REVISION Revision 13 REVISION TRANSMITTAL SHEET This sheet transmits Revision 13 to, which: A. Updates the Accomplishment Instructions and the list of training agencies. B. Revises the expiration date to March

More information

FLIGHT PATH FOR THE FUTURE OF MOBILITY

FLIGHT PATH FOR THE FUTURE OF MOBILITY FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment

More information

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant Certification Memorandum Guidance to Certify an Aircraft as PED tolerant EASA CM No.: CM-ES-003 Issue 01 issued 23 August 2017 Regulatory requirement(s): CS 23.1309(b)(1), CS 25.1309(a)(1), CS 27.1309(a),

More information

AIRWORTHINESS ADVISORY CIRCULAR

AIRWORTHINESS ADVISORY CIRCULAR AAC No. 1 of 2017 Dated 28 th February 2017 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION AIRWORTHINESS ADVISORY CIRCULAR Subject: Procedure for approval of Modification

More information