COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION

Size: px
Start display at page:

Download "COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION"

Transcription

1 COASTAL CONSERVANCY Staff Recommendation May 27, 2010 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION File No Project Manager: Christopher Kroll RECOMMENDED ACTION: Authorization to disburse up to $317,000 to the San Dieguito River Park Joint Powers Authority to: 1) construct a trail segment of the Coast to Crest Trail; 2) construct the Mesa Loop Trail and 3) develop alternative alignments and complete engineering design, environmental review and construction documents for the Reach the Beach segment of the Coast to Crest Trail. LOCATION: San Dieguito River Valley, cities of Del Mar and San Diego, San Diego County PROGRAM CATEGORY: Public Access EXHIBITS Exhibit 1: Project Location Map Exhibit 2: San Dieguito River Park Map Exhibit 3: Trails Map Exhibit 4: Reach the Beach Trail Alternatives Exhibit 5: May 18, 2005 Staff Recommendation Exhibit 6: Project Letters Exhibit 7: Environmental Impact Report/Statement (Separate CD) RESOLUTION AND FINDINGS: Staff recommends that the State Coastal Conservancy adopt the following resolution pursuant to Sections et seq. of the Public Resources Code: The State Coastal Conservancy hereby authorizes the disbursement of an amount not to exceed three hundred seventeen thousand dollars ($317,000) to the San Dieguito River Park Joint Powers Authority (the JPA) for planning and construction related to the Coast to Crest Trail and construction of the Mesa Loop Trail, subject to the following condition: Page 1 of 11

2 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION Prior to commencement of the project, the JPA shall submit for the review and written approval of the Conservancy s Executive Officer the following: a) Evidence that the JPA has obtained all necessary permits and approvals and has conducted all necessary environmental review. b) A signing plan for the project acknowledging Conservancy participation. c) A final work plan (including the names of any contractors to be used in the completion of the project), and a project schedule and budget. d) An agreement between the JPA and the City of San Diego sufficient to allow the Mesa Loop Trail to be built, operated for public access and maintained for a period of no less than twenty years. Staff further recommends that the Conservancy adopt the following findings: Based on the accompanying staff report and attached exhibits, the State Coastal Conservancy hereby finds that: 1. The proposed project is consistent with the current Project Selection Criteria and Guidelines. 2. The proposed authorization is consistent with the purposes and objectives of Chapter 9 of Division 21 of the Public Resources Code, regarding coastal access. 3. The Coastal Conservancy has independently reviewed the sections of the San Dieguito Wetland Restoration Project Environmental Impact Report/Environmental Impact Statement relevant to segment 8 of the Coast to Crest Trail and the Mesa Loop Trail and finds that there is no substantial evidence that these aspects of the proposed project, as mitigated, will have a significant effect on the environment. 4. The proposed project will serve greater than local needs. PROJECT SUMMARY: Staff recommends that the Conservancy provide a grant of up to $317,000 to the San Dieguito River Park Joint Powers Authority (the JPA) for trail design and construction of segments of the Coast to Crest Trail and the Mesa Loop Trail adjacent to San Dieguito Lagoon in the cities of Del Mar and San Diego. The trails are located within the San Dieguito River Park, a regional river parkway extending 55 miles from Volcan Mountain along the San Dieguito River to the Pacific Ocean in Del Mar (Exhibit 2). Once completed, the Coast to Crest Trail will be one of San Diego County s major regional trails linking inland communities to the ocean. The trail has been divided into segments and is being constructed over time segment by segment as money becomes available. Of the 55 miles of the trail, 28 have already been constructed. The JPA has requested funding to: 1) construct segment 8 of the Lagoon Trail portion of the Coast to Crest Trail; 2) construct the Mesa Loop Trail; and 3) develop alternative alignments and complete engineering design, environmental review and construction documents for a preferred alternative for the Reach the Beach segment of the Coast to Crest Trail (Exhibit 3). Page 2 of 11

3 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION The Lagoon Trail is the portion of the Coast to Crest Trail located adjacent to San Dieguito Lagoon. The 2.7-mile Lagoon Trail has been divided into 9 segments. Funding for construction of segments 1-7 came from a Federal Transportation Enhancement Activities (TEA) grant and a 2005 grant from the Coastal Conservancy (Exhibit 3). Construction of these segments has been completed. The 2005 Conservancy grant was intended to help fund completion of segments 1-9 but the JPA was not able to construct all nine segments with the available funding. The JPA has recently obtained a $349,670 State Environmental Enhancement Mitigation Grant to construct the ½ mile long Segment 9 across the Del Mar Horse Park. Part of those funds will be used to reconfigure the horse show rings to enable the trail to be constructed through the site. The JPA is now requesting that the Conservancy provide additional funding for the construction of segment 8 which will link the future Nature Center to Del Mar Horse Park. Segment 8 is approximately 2300 linear feet in length. The Mesa Loop Trail is a 1.7-mile trail that will be located on a high mesa overlooking the newly restored lagoon. The trail will be designated a wildlife viewing area and will have interpretive signs. The trail is not part of the Coast to Crest Trail, nor is it required as part of the Southern California Edison mitigation project described below. The JPA is planning to construct a 25-car parking lot to serve visitors to the Mesa Loop Trail, but construction of that parking lot is not part of the project proposed for this grant. The Reach the Beach segment of the Coast to Crest Trail will extend approximately 1.39 miles from Jimmy Durante Boulevard to the beach at the mouth of the San Dieguito River (Exhibit 4). Alignment of this section of the trail has not been resolved as the trail must cross over or around the Del Mar Fairgrounds property (owned by the 22 nd District Agricultural Association), Jimmy Durante Boulevard, Highway 101, railroad tracks, and a sensitive wetland area near the mouth of the river. This segment of the Coast to Crest Trail is very important because it will connect the trail with both the future Coastal Trail alignment and the beach. But due to the difficulties in identifying the best alignment of this segment, the JPA has requested funding for an alternatives analysis to identify a preferred alignment. The JPA has also requested funding for design and environmental analysis (CEQA) of the preferred alignment, which was not analyzed in the San Dieguito Wetland Restoration Project EIR/EIS. The San Dieguito River Park Joint Powers Authority is a local government agency established in 1989 by San Diego County and the cities of Del Mar, Solana Beach, Escondido, Poway, and San Diego. The JPA acquires natural open space, restores habitat and provides recreation and educational interpretation in the San Dieguito River Park. The JPA currently owns and manages 1,200 acres of natural open space and 22 miles of multi-use trails in the San Dieguito River Valley and has initiated and implemented a number of construction and restoration projects in the park. Site Description: San Dieguito Lagoon has the largest watershed area (350 square miles) of the six San Diego County coastal lagoons. For decades, the floodplain was used for agriculture. Beginning in the early 20 th century developments such as the Del Mar Fairgrounds, Interstate 5, and the railroad began filling in the floodplain, reducing the estuarine open water and wetlands from 600 acres to about 200 acres. Both Interstate 5 and the railroad travel north/south cutting across the inlet channel. As more proposed development threatened to fill in the remaining floodplain and surrounding hillsides, local citizens began a grassroots effort to preserve and protect the lagoon, floodplain and surrounding undeveloped slopes. This effort led to the creation Page 3 of 11

4 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION of the San Dieguito River Park Joint Powers Authority. Today most of the coastal floodplain is in public ownership. An $83 million wetland restoration project is currently underway at the lagoon. The project began in 2006 and is being funded by Southern California Edison (SCE) as mitigation for fish impacts caused by the San Onofre Nuclear Generating Station. Over 150 acres of new tidal marshes and mudflats are being created and other areas restored on both sides of I-5. Most of these areas were previously farmland. Over the past two years SCE s contractor has dredged new tidal channels and water basins to form new wetlands. The mixture of salt water from the ocean and fresh water from the San Dieguito River upstream creates an important breeding and food environment for fish and bird populations. Shallow water habitat that is currently being expanded by the restoration project provides habitat for over 19 fish species. San Dieguito Lagoon supports hundreds of bird species (both permanent residents and winter visitors) including many that are threatened or endangered such as the Belding s savannah sparrow, western snowy plover, and the light-footed clapper rail found in the riparian area just outside of the project area. The lagoon restoration will also include seven new nesting sites for the endangered California least tern. Construction of the restoration project will be completed in 2009 although the area will undergo several more years of monitoring and maintenance before it reaches full maturity. Newly formed wetlands that are now open to tidal flushing are already supporting many fish species. Project History: The Coastal Conservancy has been involved with efforts to preserve and restore the San Dieguito Lagoon and River since 1979 when the Conservancy participated with the City of Del Mar in the completion of the San Dieguito Lagoon Resource Enhancement Program, which outlined projects west of I-5 including the restoration of a 70-acre tidal basin dredged by the California Department of Fish and Game in In 1989, the City of Del Mar developed the Conceptual Plan for the Expanded San Dieguito Lagoon Resource Enhancement Program, which proposed restoring the lagoon system to its historic extent east of I-5 with neighboring uplands. The JPA was formed in 1989 by the County of San Diego and the Cities of Del Mar, Escondido, Poway, San Diego and Solana Beach for the purpose of creating a greenway and natural open space park system in the San Dieguito River Valley. In 1994, the JPA adopted a Concept Plan for the 55-mile San Dieguito River Park. (The JPA adopted a revised and updated Concept Plan in 2002.) In 2000, the JPA completed the Park Master Plan for the Coastal Area of the San Dieguito River Valley Regional Open Space Park (Master Plan) with partial funding from the Coastal Conservancy. In 1992, the California Coastal Commission directed Southern California Edison to create 150 acres of wetlands at the San Dieguito Lagoon. This wetland restoration plan was augmented with funds secured in 1990 from the Coastal Conservancy, U.S. Fish and Wildlife Service and JPA to plan transitional, upland and freshwater habitat. This work culminated in the San Dieguito Wetland Restoration Project for the restoration of wetlands and associated uplands from El Camino Real to the Pacific Ocean which was approved by the San Dieguito River Park JPA Board of Directors in September The restoration project began construction in Page 4 of 11

5 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION At its meeting on May 27, 2004, the Coastal Conservancy granted funds to the JPA to purchase the 73.4-acre Boudreau property located on the eastern end of the wetland restoration area. The Boudreau property represented a critical west-east link between other publicly owned river corridor parcels along the 55-mile San Dieguito River Park and its purchase allowed the JPA to secure almost the entire coastal area from El Camino Real to the Pacific Ocean in public ownership. At its May 18, 2005 meeting, the Conservancy approved a grant to the JPA for the construction of segments 1-9 of the Lagoon Trail portion of the Coast to Crest Trail as match for a federal Transportation Enhancement Activities (TEA) grant (Exhibit 5). Construction of segments 1-7 was completed in early PROJECT FINANCING Coastal Conservancy $ 317,000 Total Project Cost $ 317,000 The expected source for the Conservancy funds for this project is an appropriation to the Conservancy in fiscal year from the Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Bond Act of 2006 (Proposition 84). Proposition 84 authorizes the use of bond funds for projects that promote access to and enjoyment of coastal resources. Public Resources Code This funding source may be used for the protection of San Diego Bay and adjacent watersheds. Public Resources Code 75060(f) states that the term San Diego Bay and adjacent watersheds includes the coastal and bay watersheds within San Diego County. Proposition 84 defines the term protection to include actions necessary to allow continued use and enjoyment of natural resources, including development. Public Resources Code Section (m). The San Dieguito River watershed is a coastal watershed in San Diego County. The proposed project will create additional public trails along the San Dieguito River. Consistent with the purposes of this funding source, the proposed project would be funded by the Coastal Conservancy pursuant to Division 21 of the Public Resources Code to promote access to and enjoyment of the coastal resources of the state. Although no matching funds have been identified for this project, a significant amount of other funding has been provided for the construction of this trail. The JPA recently secured $349,670 from an Environmental Enhancement Mitigation Grant to Segment 9 of the trail. More than $1.3 million in federal funding, combined with $177,000 from the Coastal Conservancy was used to construct Segments 1-7. Page 5 of 11

6 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION CONSISTENCY WITH CONSERVANCY S ENABLING LEGISLATION: The proposed project is consistent with Division 21, Chapter 9, of the Public Resources Code (Sections ), regarding public access and enjoyment of coastal resources. Section states that the Conservancy shall have a principal role in the implementation of a system of public accessways to and along the state s coastline. Through the proposed action, the Conservancy would continue its role in supporting the development of two important public accessways to and along a major segment of the California coast. The proposed San Dieguito River Park Coast to Crest Trail will provide access to the coast from a heavily populated inland area and will be an important regional trail system. The Mesa Loop Trail will provide public access along the restored San Dieguito lagoon, an ecologically important feature of the coast in this area, and will constitute the only public access for views of the lagoon from the east and south side of the lagoon. Section allows the Conservancy to award grants to a local agency for accessways that serve more than local public needs. The proposed San Dieguito River Park Coast to Crest Trail will serve residents of the numerous cities and communities along its 55 mile reach. The Mesa Loop Trail will serve residents of the surrounding cities of Del Mar, Solana Beach and San Diego. Both trails will also serve the many visitors to the San Diego area. Consistent with , staff recommends approval of this project after evaluating the amount of funding provided by the Conservancy in light of the total amount available for coastal public accessway projects, the fiscal resources of the grantee, the urgency of the project relative to other eligible projects (see discussion below), and the application of factors prescribed by the Conservancy for the purpose of determining project eligibility and priority. Section states that the Conservancy may assist public agencies in developing and implementing a system of public accessways to and along the state's coastline. The proposed project would further these goals by providing a major connecting public trail to a heavily-visited coastal area as part of a comprehensive public access plan. Section charges the Conservancy, in consultation with the Department of Parks and Recreation, to develop the California Coastal Trail. Section provides authority to award grants and provide assistance to link the California Coastal Trail to inland trail systems. The Coast to Crest Trail constitutes a major inland trail system which, when completed, will connect to the segment of the California Coastal Trail planned for this area. CONSISTENCY WITH CONSERVANCY S 2007 STRATEGIC PLAN GOAL(S) & OBJECTIVE(S): Consistent with Goal 1, Objective 1D of the Conservancy s 2007 Strategic Plan, the proposed project would result in the construction of approximately 2.2 miles of trails (the Mesa Loop Trail and Segment 8 of the Coast to Crest Trail) within public ownership. Page 6 of 11

7 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION Consistent with Goal 1, Objective 1E of the Strategic Plan, the proposed project would result in selection and design of the alignment of the 1.39-mile Reach the Beach segment of the San Dieguito River Coast to Crest Trail, a regional trail along a river, which will connect inland populations to the coast and expand recreational opportunities. Consistent with Goal 1, Objective 1F of the Strategic Plan, the proposed project would result in the construction of approximately 2300 feet of the Coast to Crest Trail, a regional trail along a river, which will connect inland populations to the coast and expand recreational opportunities. CONSISTENCY WITH CONSERVANCY S PROJECT SELECTION CRITERIA & GUIDELINES: The proposed project is consistent with the Conservancy s Project Selection Criteria and Guidelines, last updated on June 4, 2009, in the following respects: Required Criteria 1. Promotion of the Conservancy s statutory programs and purposes: See the Consistency with Conservancy s Enabling Legislation section above. 2. Consistency with purposes of the funding source: See the Project Financing section above. 3. Support of the public: The proposed project is supported by local organizations and elected officials, including State Senator Christine Kehoe and County Supervisor Pam Slater-Price. Project letters are included in Exhibit Location: The proposed project would be located within the coastal zone of the cities of Del Mar and San Diego. 5. Need: The JPA has constructed segments 1-7 of the lagoon trail portion of the Coast to Crest Trail with grants from the Federal Highway Administration and the Coastal Conservancy. The JPA has secured funding for the last segment, 9, through the Del Mar Horsepark. The JPA still needs funding to construct segment 8 to complete the lagoon trail and link up with the already constructed trail segment east of El Camino Real. 6. Greater-than-local interest: The Coast to Crest Trail is an important regional trail which when completed will link inland communities in San Diego with the coast at Del Mar. The Mesa Loop Trail will provide access along the lagoon and will serve residents of several surrounding cities as well as the many visitors to the San Diego area. 7. Sea level rise vulnerability: Both Segment 8 of the Coast to Crest Trail and the Mesa Loop Trail are proposed to be located at least 25 feet above mean sea level and are therefore less vulnerable to sea level rise due to their locations at higher elevation. The location of Segment 8 is outside of the area threatened by sea level rise within the next century based on current predictions. Under the worst case scenario of 4.6 feet of sea level rise by 2100, Segment 8 would be outside of the predicted highest high tides. However, the very western edge of the Mesa Loop Trail may be inundated during the highest high tides within approximately 30 years under the worst case scenario. Under the lower prediction of 1.7 feet of sea level rise Page 7 of 11

8 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION by 2100, the trails would be completely outside of areas threatened by sea level rise. Inundation of a portion of the Mesa Loop Trail during the highest high tides would not pose a hazard to trail users because tidal flooding would be predictable and the trail could be closed when coastal flooding is anticipated. Because the rate of sea level rise is unknown and various predictions exist, it is not possible to know exactly how long the western edge of the trail would remain above the mean tide line. If sea level reaches a level at which the Mesa Loop Trail is routinely inundated by the tides, the western edge would no longer be usable and measures would need to be taken to realign the trail. Because sea level rise will likely happen incrementally, the JPA will be able to manage the access to and location of the trail so as to protect the safety of trail users. Additional Criteria 13. Readiness: The JPA has completed environmental documentation and secured permits for segment 8 of the lagoon trail and is ready to construct that segment. 14. Realization of prior Conservancy goals: See Project History above. 16. Cooperation: The 22 nd DAA, which owns the Del Mar Horsepark, and the City of San Diego are working with the JPA on issues related to trail alignment and development of the Coast to Crest Trail and the Mesa Loop Trail. 17. Vulnerability from climate change impacts other than sea level rise: It is unclear whether other climate change impacts such as higher air temperatures, altered precipitation patterns, more severe El Nino climate events, increased storm frequency and intensity, higher coastal erosion rates, greater fire intensity and frequency, etc. will adversely impact the Mesa Loop Trail and Lagoon Trail section of the Coast to Crest Trail. The JPA will pursue an adaptive management approach to maintaining the new trails up to and including moving sections of the trails if needed in response to the impacts of climate change. 18. Minimization of Greenhouse Gas Emissions: The proposed Mesa Loop Trail and Lagoon Trail section of the Coast to Crest Trail will provide a trail opportunity within walking distance of a large surrounding residential population that can access the trails without having to drive. The trails will be accessible via existing public sidewalks and an existing connecting trail and, therefore, the trails will help reduce greenhouse gas emissions in the area by providing nearby residents a coastal recreational activity that is accessible by foot. Once completed, the Coast to Crest Trail will connect communities, provide access to the coast, and may help reduce vehicle miles traveled. During construction, there will be a short-term, less than significant increase in greenhouse gas emissions. The greenhouse gas emissions from construction will be minimized to the extent possible. Most of the trail building will utilize hand equipment. No major excavation of materials will occur and all excavated materials will be used onsite thereby eliminating the need for dump trucks to haul away materials. A small tractor will be used for the initial grading and to smooth the trail alignment and a small number of trucks (a maximum of ten trips are estimated) will deliver decomposed granite and other materials for trail surfacing and fencing. The JPA will attempt to secure a local source of materials for construction of the trails. Page 8 of 11

9 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION CONSISTENCY WITH THE COASTAL CONERVANCY S STANDARDS AND RECOMMENDATIONS FOR ACCESSWAY LOCATION AND DEVELOPMENT: The proposed project is consistent with the following standards established in the Conservancy s Standards and Recommendations for Accessway Location and Development: Consistent with Standard No. 1, Segment 8 of the Coast to Crest Trail and the Mesa Loop Trail have been designed to minimize alteration of natural landforms and be subordinate to the natural setting and to protect environmentally sensitive habitat. Consistent with Standard No. 5, the proposed project is consistent with the policies of Chapter Three of the Coastal Act, has been designed to avoid adverse impacts to sensitive wetland areas, and has been reviewed by the Department of Fish and Game and the California Coastal Commission. Consistent with Standard No. 13, the proposed project will accommodate or plan to accommodate those with mobility problems, and thus is of the highest priority for state funding. The trails have been designed to comply with Americans with Disabilities Act (ADA) standards. CONSISTENCY WITH LOCAL COASTAL PROGRAM POLICIES: The proposed project is consistent with the Local Coastal Program policies of the City of Del Mar and the City of San Diego. Construction of the proposed trail segments is consistent with the Land Use Plan of the City of San Diego s North City Local Coastal Plan, certified on March 31, 1981, which calls for: maximum public access consistent with resource protection through the provision of alternative modes of public access such as public transportation and properly designed pedestrian and bicycle routes. The proposed trails are located partly within the area governed by Torrey Pines Community Plan, which is incorporated into the North City LCP and contains the following policy concerning public accessways: Public access in areas of environmentally sensitive habitats shall be limited to low-intensity recreational, scientific, or educational use. Access shall be controlled or confined to designated trails or paths, and no access shall be approved which results in disruption of habitat. As discussed in the Project Description section above, the proposed project is designed to be consistent with the approved wetland restoration project. The Reach the Beach trail segment lies within the jurisdiction of the City of Del Mar. The City of Del Mar LCP Land Use Plan, certified on March 18, 1993, contains the following policies relating to public access which pertain to the proposed project. Page 9 of 11

10 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION Policy IV-5 provides that continuous public access trail easements be granted as conditions of development within certain designated areas, including the shore of the San Dieguito River and Lagoon. Public access must be provided in a manner that minimizes disturbance to natural systems and minimizes impacts on wildlife and sensitive habitats. The alternatives analysis for the Reach the Beach segment will address siting issues related to impacts to sensitive resources and habitats. Policy IV-18 recommends that the City cooperate with other local, state and federal agencies in developing a system of pedestrian trails and bicycle paths that would link together coastal recreation areas such as beaches and San Dieguito Lagoon. COMPLIANCE WITH CEQA: Pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Protection Act (NEPA), the JPA and the USFWS as lead agencies, undertook environmental assessment of the entire San Dieguito Wetland Restoration Project, which encompassed the trail construction projects described in this staff recommendation as well as restoration of coastal wetland and upland areas surrounding San Dieguito Lagoon. The JPA and the USFWS prepared and adopted an Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the restoration project. (Exhibit 7) On May 18, 2005, the Conservancy approved a grant for construction of segments 1-9 of the Coast to Crest Trail and found that there was no substantial evidence that construction of segments 1-9 of the Coast to Crest Trail, as mitigated, would have a significant effect on the environment. (Exhibit 5) Thus, the Conservancy has already made a finding that construction of segment 8, as mitigated, will not have a significant effect on the environment. The May 18, 2005 staff recommendation is incorporated by reference. Impacts of constructing and operating the Mesa Loop Trail were also evaluated in the San Dieguito Wetland Restoration Project EIR/EIS. The EIR/EIS identified three potentially significant impacts that have been avoided through design and construction practices. The potential environmental impacts associated with constructing and operating the Mesa Loop Trail and the corresponding mitigation are as follows: Impact: The proposed trail system has the potential to be incompatible with surrounding land uses and recreation in the project area, and with the future restoration components of the project. Mitigation: Use of the Mesa Loop Trail will be limited to pedestrian use only between dawn and dusk. In this way, use of the trail will not adversely impact nearby existing residential development. In addition, the Mesa Loop Trail will be located away from sensitive habitats to avoid impacting restoration components of the project. Furthermore, the Mesa Loop Trail will eliminate informal access and trails which can adversely impact sensitive habitat and provide management practices such as signs, policing, trash collection, interpretive and directional signs which will further reduce the impacts of public use in the area on surrounding land uses. Page 10 of 11

11 SAN DIEGUITO RIVER PARK TRAILS PHASE II TRAIL DESIGN AND CONSTRUCTION Impact: The project has the potential to impact the California Least Tern and the existing least tern nesting island. Mitigation: No construction activities will occur within 500 feet of nesting birds between early April and mid-september when the least terns may be either foraging or breeding in the area. Public access is not expected to affect nesting terns because trails open to the public will not be located near the area where the new nesting areas will be created. In addition, no dogs will be allowed on the Mesa Loop Trail. Impact: The project has the potential to impact the western snowy plover. Mitigation: No construction activities will occur within 500 feet of nesting birds between mid-march and September which is breeding season for western snowy plovers. Public access is not expected to affect nesting plovers because trails open to the public will not be located near where the new nesting sites will be created. These new nest sites are not considered optimal habitat for snowy plover nesting. In addition, no dogs will be allowed on the Mesa Loop Trail. The JPA prepared and adopted a Mitigation, Monitoring and Reporting Program (MMRP) to ensure that these measures are strictly enforced. Thus, the construction and operation of the Mesa Loop Trail, as mitigated, will not have a significant effect on the environment as defined in 14 California Code of Regulations Section Staff will file a Notice of Determination upon approval of the proposed authorization. The JPA adopted a statement of overriding considerations when it approved the San Dieguito Wetlands Restoration Project because the project will have significant environmental effects that cannot be avoided. Although the proposed trail projects (Coast to Crest Trail and Mesa Loop Trail) are an element of the San Dieguito Wetlands Restoration project and were addressed in the EIR/EIS for the Restoration Project, the proposed trail projects will not have any unavoidable significant environmental effects. Therefore, no statement of overriding considerations is necessary in order for the Conservancy to fund the proposed trail projects. The Reach the Beach Segment of the Coast to Crest Trail was not addressed in the EIR/EIS. The proposed project includes funding for preparation of CEQA documents for this segment of the trail. Engineering analysis, environmental review and design of the Reach the Beach segment alternatives are statutorily exempt from the requirement to prepare an EIR or negative declaration under 14 California Code of Regulations Section because they involve planning for possible future actions which the Conservancy has not approved, adopted, or funded. The proposed alternatives study will include an environmental review of the preferred alternative once it is identified. Staff will file a Notice of Exemption upon approval of the proposed authorization. Page 11 of 11

12 Exhibit 1 Project Location Map Project Location

13 Exhibit 2: The San Dieguito River Park Planning Area Volcan Mountain City of Del Mar

14 Exhibit 3: Trails Map 5 Via de la Valle Future Nature Center Trail Head Parking (60 Spaces) 8 VP Coast to Crest Trail Segment 8 VP Viewing Platforms Existing Coast to Crest Lagoon Trail Jimmy Durante to Beach Trail Feasibility Jimmy Durante Blvd. Mesa Loop Trail San Dieguito River Park Coast to Crest Trail - Segment 8, Mesa Loop Trail, Jimmy Durante to Beach Trail Feasibility

15 Exhibit 4: Reach the Beach Trail Alternatives

16 Exhibit 5: May 18, 2005 Staff Recommendation COASTAL CONSERVANCY Staff Recommendation May 18, 2005 SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL File No Project Manager: Prentiss Williams RECOMMENDED ACTION: Disbursement of an amount not to exceed one hundred seventyseven thousand dollars ($177,000) to the San Dieguito River Park Joint Powers Authority to construct a portion of the Coast to Crest Trail, a multi-use regional trail system that will eventually run from the Pacific Ocean in Del Mar 55 miles east to Volcan Mountain. (Exhibits 1 & 2) LOCATION: The Cities of San Diego and Del Mar, San Diego County PROGRAM CATEGORY: Public Access EXHIBITS Exhibit 1: Project Location Exhibit 2: San Dieguito River Park Planning Area Exhibit 3: Environmental Impact Report/Statement (Separate CD) Exhibit 4: Coastal portion of the Coast to Crest Trail Exhibit 5: Letters of Support Exhibit 6: JPA Findings & Statement of Overriding Considerations Exhibit 7: JPA Resolution Exhibit 8: JPA Notice of Determination RESOLUTION AND FINDINGS: Staff recommends that the State Coastal Conservancy adopt the following resolution pursuant to Sections et seq. of the Public Resources Code: The State Coastal Conservancy hereby authorizes the disbursement of an amount not to exceed one hundred seventy-seven thousand dollars to the San Dieguito River Park Joint Powers Authority (the JPA) for the construction of a portion of the Coast to Crest Trail subject to the following condition: Prior to the disbursement of funds for construction, the JPA shall submit for the review and Page 1 of 10

17 Exhibit 5: May 18, 2005 Staff Recommendation SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL approval of the Executive Officer of the Conservancy: a) Evidence that the JPA has obtained all necessary permits and approvals and has conducted all necessary environmental review. b) A signing plan for the project acknowledging Conservancy participation. c) A final work plan (including the names of any subcontractors to be used in the completion of the project), and a project schedule and budget. d) An agreement between the JPA, Southern California Edison and the 22 nd District Agricultural Association sufficient to allow the project to be built, operated for public access, and maintained for a period of no less than twenty years. e) An encroachment permit with the California Department of Transportation sufficient to allow the project to be built, operated for public access, and maintained for a period of no less than twenty years. Staff further recommends that the Conservancy adopt the following findings: Based on the accompanying staff report and attached exhibits, the State Coastal Conservancy hereby finds that: 1. The proposed project is consistent with the purposes and objectives of Sections et. seq. of the Public Resources Code regarding coastal access. 2. The proposed project is consistent with the Project Selection Criteria and Guidelines adopted by the Conservancy on January 24, The Coastal Conservancy has independently reviewed the Environmental Impact Report/ Environmental Impact Statement (attached to the accompanying staff recommendation as Exhibit 3) and findings adopted by the San Dieguito River Park Joint Powers Agency(attached to the accompanying staff recommendation as Exhibit 6) for the project and finds that there is no substantial evidence that the project, as mitigated, may have a significant effect on the environment. 4. The proposed project will serve greater than local needs. PROJECT SUMMARY: Staff proposes that the Coastal Conservancy authorize the disbursement of an amount not to exceed $177,000 to the San Dieguito River Park Joint Powers Authority (the JPA) to enable the JPA to construct the coastal portion of the Coast to Crest Trail in conjunction with the implementation of the San Dieguito Lagoon wetland restoration project. The JPA would use the proposed Conservancy grant to match a $1,361,000 federal Transportation Enhancement Activities (TEA) grant that it received earlier this year to complete a 12,771-foot segment of the Coast to Crest Trail from the El Camino Real Bridge to the Jimmy Durante Boulevard Bridge (Exhibit 4). The JPA intends to connect the coastal portion of the trail to an existing public trail located on the eastern side of El Camino Real in a future project phase. That trail connection would require an under-crossing of the El Camino Real Bridge, which will be designed and analyzed in association with a future bridge/road improvement project currently under consideration for El Camino Real by the City of San Diego. Page 2 of 10

18 Exhibit 5: May 18, 2005 Staff Recommendation SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL The Coast to Crest Trail will be a regional trail system for hikers, bicyclists, equestrians and, where feasible, wheelchair users. When completed, it will extend for 55 miles from Volcan Mountain, north of the town of Julian to the beach at Del Mar (Exhibit 2). The Coast to Crest Trail will consist of two separate trail types which will be aligned side-by-side for most of the trail system s distance but which may be separated in some locations. One trail type, designed to accommodate hikers and equestrians, would be an average of four feet in width and would have a tread surface of native soil or decomposed granite. The other trail type would be designed to accommodate bicyclists and other users who require a hardened surface such as wheelchair riders. This trail type, which is intended to meet the standards of the federal Americans with Disabilities Act (ADA) and the Class 1 bike path standards of the California Department of Transportation (CalTrans), would be 8 feet wide and be surfaced with concrete, soil cement or polymer binder. The portion of the Coast to Crest Trail that is the subject of this funding request would run along the north side of the San Dieguito River at the edge of the restored wetlands. The trail would run west from El Camino Real past the site of a proposed Nature/Interpretive Center (to be constructed in a future project phase). From the site of the future Nature Center, the trail would continue west and south, crossing under Interstate Highway 5 (I-5) via the north bay of the I-5 Bridge. On the west side of I-5, the trail would skirt the southernmost edge of the Del Mar Fairgrounds property, owned by the 22 nd District Agricultural Association (DAA). At the western end of the fairgrounds property, equestrian use of the trail would terminate and bicyclists would be directed to the existing bike lanes on Jimmy Durante Boulevard where they could then travel south to Powerhouse Park. Hikers would continue to follow along the north side of the river on an elevated boardwalk until the path reached an existing ramp leading up to Jimmy Durante Boulevard. Future project phases are expected to extend the trail westward over property owned by the City of Del Mar to provide access to the proposed San Diego Coastal Rail Trail and, ultimately, the beach Several special design features are proposed for the trail to insure compatibility with adjacent existing land uses and the soon-to-be-created wetlands and other sensitive habitats. For much of the trail s alignment, fencing would also be installed along the southern or eastern edge of the trail to provide a physical barrier between trail users and existing and future wetland areas. The trail has been designed to avoid runoff into adjacent wetlands and all trail treads will be composed of materials approved by the California Coastal Commission as suitable for use in proximity to wetland habitats. The proposed grant recipient is the San Dieguito River Park Joint Powers Authority, a local government agency in operation since 1989 with responsibility for acquiring natural open space, restoring habitat and providing recreation and educational interpretation in the San Dieguito River Park. The JPA currently owns and manages 1,200 acres of natural open space and 22 miles of multi-use trails in the San Dieguito River Valley and has initiated and implemented a number of construction and restoration projects in the Park. The JPA has four full-time rangers with responsibility for open space management, enforcement of rules and regulations, litter and dumping clean-up, and habitat restoration. Page 3 of 10

19 Exhibit 5: May 18, 2005 Staff Recommendation SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL The Coast to Crest Trail will be an important regional trail system linking inland areas with the coast and with the California Coastal Trail. As such, completion of the trail is a high priority for the Coastal Conservancy. Construction of the San Dieguito Lagoon Wetland Restoration Project will commence this summer and the trail must be constructed at the same time in order to minimize environmental impacts and disruption to the area. It will not be feasible to build the trail once the wetland restoration is underway. The Conservancy funds are necessary at this time to match the federal TEA grant to enable the trail construction to proceed at the same time as construction commences on the wetland restoration project this summer. Site Description: The proposed trail alignment runs through largely vacant lands consisting of previously cultivated transitional lands, wetlands, seasonal marsh, and river floodplain. A portion of the trail will skirt the edge of a dirt lot used as overflow parking for the Del Mar Racetrack/Del Mar Fairgrounds. This parking lot is operated seasonally by the 22 nd District Agricultural Association (DAA) for the seven-week racing season and for the Del Mar Fair (20 days during the middle of June and early July). Existing uses adjacent to the proposed trail alignment include an equestrian center operated by the 22nd District Agricultural Association, and the Surf and Turf driving range and mini golf center. The Coast to Crest Trail has been aligned at the outermost edge of the wetland restoration area to minimize impacts to wetlands and other sensitive habitat and to minimize construction impacts. However, a small portion of the trail (0.014) acres) would be constructed in an area that could be defined as wetlands by the California Coastal Commission, the City of San Diego or the US Army Corps of Engineers definition. The JPA evaluated the impacts to this area and considered them to be less than significant. A discussion of these potential impacts to wetlands can be found in the Consistency with CEQA section below and in Exhibit 6, pp Project History: The Coastal Conservancy has been involved with efforts to preserve and restore the San Dieguito Lagoon and River since 1979 when the Conservancy participated with the City of Del Mar in the completion of the San Dieguito Lagoon Resource Enhancement Program, which outlined projects west of I-5 including the restoration of a 70-acre tidal basin dredged by the California Department of Fish and Game in In 1989, the City of Del Mar developed the Conceptual Plan for the Expanded San Dieguito Lagoon Resource Enhancement Program, which proposed restoring the lagoon system to its historic extent east of I-5 with neighboring uplands. In 2000, the JPA completed the Park Master Plan for the Coastal Area of the San Dieguito River Valley Regional Open Space Park (Master Plan) with partial funding from Coastal Conservancy. The JPA was formed in 1989 by the County of San Diego and the Cities of Del Mar, Escondido, Poway, San Diego and Solana Beach for the purpose of creating a greenway and natural open space park system in the San Dieguito River Valley. In 1994, the JPA adopted a Concept Plan for the 55-mile San Dieguito River Park. (The JPA adopted a revised and updated Concept Plan in 2002.) In 1992, the California Coastal Commission directed Southern California Edison to substantially create 150 acres of wetlands at the San Dieguito Lagoon. This wetland restoration plan was Page 4 of 10

20 Exhibit 5: May 18, 2005 Staff Recommendation SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL augmented with funds secured in 1990 from the Coastal Conservancy, USFWS and JPA to plan transitional, upland and freshwater habitat. This work culminated in the Master Plan for the restoration of wetlands and associated uplands from El Camino Real to the Pacific Ocean and was approved by the San Dieguito River Park Joint Powers Authority Board of Directors in September SCE, the USFWS and the JPA will have obtained all of the permits necessary to implement the wetland restoration project and begin construction this summer. At its meeting on May 27, 2004, the Coastal Conservancy granted funds to the JPA to purchase the 73.4-acre Boudreau property located on the eastern end of the wetland restoration area. The Boudreau property represented a critical west-east link between other publicly owned river corridor parcels along the 55-mile San Dieguito River Park and its purchase allowed the JPA to secure almost the entire coastal area from El Camino Real to the Pacific Ocean in public ownership. PROJECT FINANCING: Coastal Conservancy $ 177,000 TEA Grant* 1,361,000 Total Project Cost $1,538,000 * Federal Transportation Enhancement Activities Grant Program The expected source of the proposed grant would be the Conservancy s FY 02/03 appropriation from the Coastal Access Account of the Coastal Conservancy Fund, which is funded through Coastal Development Permit fees. Consistent with the purposes of this funding source, the proposed project would involve a grant to a public agency for the development, maintenance, and operation of facilities that provide public access to the shoreline of the sea (Public Resources Code Section (c) (2)). CONSISTENCY WITH CONSERVANCY'S ENABLING LEGISLATION: The proposed project is consistent with Division 21, Chapter 9, of the Public Resources Code (Sections ), regarding public access and enjoyment of coastal resources. Section states that the Conservancy shall have a principal role in the implementation of a system of public accessways to and along the state s coastline. Through the proposed action, the Conservancy would continue its role in supporting the development of an important public accessway along a major segment of the California coast. Section allows the Conservancy to award grants to a public agency for accessways that serve more than local public needs. The proposed San Dieguito River Park Coast to Crest Trail would provide access to the coast from a heavily populated inland area and will be an important regional trail system. Consistent with , staff recommends approval of this project after evaluating the amount of funding provided by the Conservancy in light of the total amount of available for coastal Page 5 of 10

21 Exhibit 5: May 18, 2005 Staff Recommendation SAN DIEGUITO RIVER PARK COAST TO CREST TRAIL public accessway projects, the fiscal resources of the grantee, the urgency of the project relative to other eligible projects (see discussion below), and the application of factors prescribed by the Conservancy for the purpose of determining project eligibility and priority. The proposed authorization would leverage matching funds, providing an almost 8 to 1 ratio of federal dollars to Conservancy dollars needed to complete the access project. Section states that the Conservancy may assist public agencies in developing and implementing a system of public accessways to and along the state's coastline. The proposed project would further these goals by providing a major connecting public trail to a heavily-visited coastal area as part of a comprehensive public access plan. Section charges the Conservancy, in consultation with the Department of Parks and Recreation, to develop the California Coastal Trail. Section provides authority to award grants and provide assistance to link the California Coastal Trail to inland trail systems. The Coast to Crest Trail constitutes a major inland trail system which, when completed, will connect to the segment of the California Coastal Trail planned for this area. CONSISTENCY WITH CONSERVANCY'S STRATEGIC PLAN GOAL(S) & OBJECTIVE(S): Consistent with Goal 1, Objective E of the Strategic Plan, the proposed project would result in the construction of approximately 2.5 miles of the San Dieguito River Coast to Crest Trail, a river parkway trail system that connects inland populations with the coast. CONSISTENCY WITH CONSERVANCY'S PROJECT SELECTION CRITERIA & GUIDELINES: The proposed project is consistent with the Conservancy's Project Selection Criteria and Guidelines adopted January 24, 2001, in the following respects: Required Criteria 1. Promotion of the Conservancy s statutory programs and purposes: See the Consistency with Conservancy s Enabling Legislation section above. 2. Consistency with purposes of the funding source: See the Project Financing section above. 3. Support of the public: There is widespread public support for the completion of the Coast to Crest Trail system. The proposed project has the support of local organizations and elected officials, including State Senator Christine Kehoe and County Supervisor Pam Slater-Price. Letters received in support of the proposed project are included in Exhibit Location: The proposed project would be located within the coastal zone of the Cities of San Diego and Del Mar. 5. Need: The Coastal Conservancy grant is needed by the JPA to provide the non-federal matching funds required by the TEA grant program. Without these matching funds, the project cannot move forward. Page 6 of 10

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 GUALALA BLUFF TRAIL OPERATIONS AND MAINTENANCE

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 GUALALA BLUFF TRAIL OPERATIONS AND MAINTENANCE COASTAL CONSERVANCY Staff Recommendation June 5, 2008 GUALALA BLUFF TRAIL OPERATIONS AND MAINTENANCE File No. 08-047-01 Project Manager: Deborah Hirst RECOMMENDED ACTION: Consideration and possible Conservancy

More information

Executive Directors Report

Executive Directors Report SAN DIEGUITO RIVER PARK JOINT POWERS AUTHORITY 9:30 a.m. 12:00 p.m. Friday, July 18, 2014 County Administration Center 1600 Pacific Highway, Room 302/303 San Diego Speaker slips will be available. Please

More information

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION COASTAL CONSERVANCY Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION File No. 07-037-02 Project Manager: Michelle Jesperson RECOMMENDED ACTION: Authorization

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki COASTAL CONSERVANCY Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I File No. 03-142 Project Manager: Richard Retecki RECOMMENDED ACTION: Authorization to disburse up to $455,000

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2010 CITY OF SAN DIEGO NCCP PROGRAM VERNAL POOL HABITAT CONSERVATION PLAN

COASTAL CONSERVANCY. Staff Recommendation December 2, 2010 CITY OF SAN DIEGO NCCP PROGRAM VERNAL POOL HABITAT CONSERVATION PLAN COASTAL CONSERVANCY Staff Recommendation December 2, 2010 CITY OF SAN DIEGO NCCP PROGRAM VERNAL POOL HABITAT CONSERVATION PLAN Project No. 98-011-02 Project Manager: Mary Small RECOMMENDED ACTION: Authorization

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

COASTAL CONSERVANCY. Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING

COASTAL CONSERVANCY. Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING COASTAL CONSERVANCY Staff Recommendation March 17, 2011 EAST-SLOPE SONOMA MOUNTAIN RIDGE TRAIL PLANNING File No. 11-008-01 Project Manager: Sam Jenniches RECOMMENDED ACTION: Authorization to disburse up

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

COASTAL CONSERVANCY. Staff Recommendation October 21, 2010 PETALUMA TRESTLE REHABILITATION DESIGN

COASTAL CONSERVANCY. Staff Recommendation October 21, 2010 PETALUMA TRESTLE REHABILITATION DESIGN COASTAL CONSERVANCY Staff Recommendation October 21, 2010 PETALUMA TRESTLE REHABILITATION DESIGN Project No.: 10-017-01 Project Manager: Deborah Hirst RECOMMENDED ACTION: Authorization to disburse up to

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 SANTA CRUZ COUNTY MASTER COASTAL TRAIL PLAN. File No Project Manager: Laura Engeman

COASTAL CONSERVANCY. Staff Recommendation May 27, 2010 SANTA CRUZ COUNTY MASTER COASTAL TRAIL PLAN. File No Project Manager: Laura Engeman COASTAL CONSERVANCY Staff Recommendation May 27, 2010 SANTA CRUZ COUNTY MASTER COASTAL TRAIL PLAN File No. 09-004 Project Manager: Laura Engeman RECOMMENDED ACTION: Authorization to disburse up to $250,000

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Flow Stand Up Paddle Board Parkway Plan Analysis

Flow Stand Up Paddle Board Parkway Plan Analysis Regional Parks Department Jeffrey R. Leatherman, Director County of Sacramento Divisions Administration Golf Leisure Services Maintenance Rangers Therapeutic Recreation Services Flow Stand Up Paddle Board

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

Section 3.9 Recreation

Section 3.9 Recreation 3.9. 1 Introduction Section 3.9 Recreation This analysis provides a brief overview of existing recreational uses of Rancho Guadalupe Dunes County Park and recreational facilities in the general vicinity,

More information

Tahoe National Forest Over-Snow Vehicle Use Designation

Tahoe National Forest Over-Snow Vehicle Use Designation Tahoe National Forest Over-Snow Vehicle Use Designation USDA Forest Service Tahoe National Forest February 20, 2015 Introduction The Forest Service, U.S. Department of Agriculture will prepare an Environmental

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC PLANNING AREA 4.4 FORT BRAGG CITY LIMIT TO HARE CREEK PLANNING AREA (Includes Noyo) The Noyo community

More information

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer Item 14 DATE: January 19, 2017 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer Item 14: Consideration of a resolution to accept an acquisition

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project R-16-26 Meeting 16-06 March 9, 2016 AGENDA ITEM AGENDA ITEM 6 Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project GENERAL MANAGER S RECOMMENDATIONS 1. Direct

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

COASTAL CONSERVANCY. Staff Recommendation December 13, 2007 SANTA ANA RIVER PARKWAY. File No Project Manager: Mary Small

COASTAL CONSERVANCY. Staff Recommendation December 13, 2007 SANTA ANA RIVER PARKWAY. File No Project Manager: Mary Small COASTAL CONSERVANCY Staff Recommendation December 13, 2007 SANTA ANA RIVER PARKWAY File No. 07-097 Project Manager: Mary Small RECOMMENDED ACTION: Authorize disbursement of up to two million seven hundred

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE 65-13-1 Use of Other Power-Driven Mobility Devices by Persons with Mobility Disabilities at State Park Facilities See Also: 28 CFR 35 Title

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Date: October 19, 2009 DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Introduction Background Whom Guidelines Apply To How to Submit Comments Contact for Further Information General Issues:

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE North Thousand Islands Management Plan Appendices Maintenance Dredging Statement of Need & Permit Compliance The waterways, which consist

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 8-83 Date Subject 8353 Trail Management Areas Secretarially Designated (Public)

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No. Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint

More information

Coronado National Forest Santa Catalina Ranger District

Coronado National Forest Santa Catalina Ranger District United States Department of Agriculture Forest Service Coronado National Forest Santa Catalina Ranger District File Code: 1950 Date: October 14, 2015 Dear Interested Party: The Santa Catalina Ranger District

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

Pinellas County Environmental Lands

Pinellas County Environmental Lands Pinellas County Environmental Lands In addition to traditional parks and recreation facilities, Pinellas County owns and manages a system of environmental lands that provides specialized resource-based

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

Sibley LUPA. Board Executive Committee Meeting December 7, 2017 Sibley LUPA Board Executive Committee Meeting December 7, 2017 Project Location & Project Area 1,318-acre Robert Sibley Volcanic Regional Preserve Project Area Purpose Project Purpose & Goals Append the

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

Little River Trail Feasibility Study

Little River Trail Feasibility Study Final April, 2014 Prepared for the State Coastal Conservancy By the Natural Resources Services Division of Redwood Community Action Agency Table of Contents Executive Summary... 1 1. Project Purpose and

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Wilderness Areas Designated by the White Pine County bill

Wilderness Areas Designated by the White Pine County bill Wilderness Areas Designated by the White Pine County bill SEC. 321. SHORT TITLE. This subtitle may be cited as the `Pam White Wilderness Act of 2006'. SEC. 322. FINDINGS. Congress finds that-- The White

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

Section 3.6 Recreation

Section 3.6 Recreation 3.6 RECREATION This section evaluates the potential impacts of the proposed project on recreation within MTRP. The evaluation is based on field observations, a review of maps of MTRP and the MTRP Master

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report Revision No. 20170501-1 of Sonoma Agenda Item Summary Report Agenda Item Number: 37 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To:

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Boles Brook Snowmobile Bridge Decision Memo Boles Brook Snowmobile Bridge Project Town of Woodstock

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: June 4, 2014 SUBJECT: Specific Plan Amendment 14-01; Amending the Use Designation of 23.97 Acres within

More information

National Wilderness Steering Committee

National Wilderness Steering Committee National Wilderness Steering Committee Guidance White Paper Number 1 Issue: Cultural Resources and Wilderness Date: November 30, 2002 Introduction to the Issue Two of the purposes of the National Wilderness

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits

$866,000. $1,400,000 Health Benefits $13,156,000 TOTAL ANNUAL DIRECT BENEFITS. $10,890,000 Economic Benefits SINGING RIVER TRAIL Trails Create Value + Generate Economic Activity Trails generate economic returns through improved health, safety, and environmental conditions, raise property values, and attract visitors.

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Decision Memo Ice Age Trail Improvement (CRAC 37)

Decision Memo Ice Age Trail Improvement (CRAC 37) Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS SOUTH COAST CAC PLANNING AREA 4.10 NAVARRO RIVER TO MALLO PASS CREEK PLANNING AREA (Includes Greenwood/Elk) This planning

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Section 4(f) and Section 6(f) Technical Analysis

Section 4(f) and Section 6(f) Technical Analysis WESTSIDE SUBWAY EXTENSION PROJECT Contract No. PS-4350-2000 Section 4(f) and Section 6(f) Technical Analysis Prepared for: Prepared by: WSP USA 851 SW Sixth Avenue, Suite 1600 Portland, Oregon 97204 FEBRUARY

More information

Creating a User-Driven Long-Distance OHV Trail Through Partnering

Creating a User-Driven Long-Distance OHV Trail Through Partnering Joseph Raffaele Outdoor Recreation Planner U.S. Bureau of Land Management Yuma, Arizona Creating a User-Driven Long-Distance OHV Trail Through Partnering BLM is a multiple-use land management agency within

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

3.6 Recreation Resources

3.6 Recreation Resources This section of the Draft Environmental Impact Statement/Environmental Impact Report (referred to throughout as the Draft EIS/R) describes the existing recreational resources within the Phase 2 project

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Rural Rustic Road Program

Rural Rustic Road Program Virginia Department of Transportation s Rural Rustic Road Program Prepared by the Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Michael

More information

AMENDMENT NO. 03 TO THE OFFICIAL PLAN FOR THE TOWNSHIP OF ADJALA-TOSORONTIO OAK RIDGES MORAINE CONSERVATION PLAN

AMENDMENT NO. 03 TO THE OFFICIAL PLAN FOR THE TOWNSHIP OF ADJALA-TOSORONTIO OAK RIDGES MORAINE CONSERVATION PLAN AMENDMENT NO. 03 TO THE OFFICIAL PLAN FOR THE TOWNSHIP OF ADJALA-TOSORONTIO OAK RIDGES MORAINE CONSERVATION PLAN Adopted by Council July 19 th, 2004 Approved with modifications by the Province of Ontario

More information

Meeting Minutes Del Mar San Dieguito Lagoon Committee. Chair: Jim Tucker Vice Chair: Terry Kopanski Secretary: Ellen Breen

Meeting Minutes Del Mar San Dieguito Lagoon Committee. Chair: Jim Tucker Vice Chair: Terry Kopanski Secretary: Ellen Breen Meeting Minutes Del Mar San Dieguito Lagoon Committee Chair: Jim Tucker Vice Chair: Terry Kopanski Secretary: Ellen Breen WEDNESDAY, April 15th, 2015 6:00PM DEL MAR LIBRARY CALL TO ORDER 6:04 ROLL CALL

More information