1 Laurence Kenney, Transport Scotland 1. Introduction The paper title is a quote from the Glasgow Herald and marked the successful culmination of the intensive and comprehensive planning to deliver an integrated transport solution for the 2014 Ryder Cup at Gleneagles, 23rd to 28th September. The Ryder Cup is one of the most high profile sporting events in the world with a global television audience of around 500 million households. The Ryder Cup, last held in Scotland in 1973, presented the uniquely complex transport planning challenge of delivering 50,000 people a day to the PGA Centenary Course, a rural location in Perthshire. The challenge was heightened by the expectation of many of the spectators to be on course for the 1st tee coinciding with first light at 07:30. The challenge was met through a combination of park & ride bus (modal share 50%), coach (15%), rail (15%) and on-site parking for staff and VIPs (20%). The key partners with Ryder Cup Europe and Transport Scotland in the transport working group were Perth & Kinross Council and Police Scotland supported by Ryder Cup Travel Services, Stagecoach and First ScotRail. The paper will provide an overview of the event preparation and approach adopted for event delivery. Transport Scotland undertook a programme of data collection across all modes during the event which will be discussed, highlighting key points including trip patterns and volumes across the various modes, vehicle occupancy, impacts on business as usual journey times. The paper will then conclude with some key lessons learnt including: the importance of partnership working in the planning; the need for a central transport hub to ensure quick and joined up response to any incidents; the key role of community engagement in the development of plans; the use of trunk road CCTV and support vehicles in providing visibility to event controllers. 2. Event Preparation 2.1 Transport Planning Group The host for the 2014 Ryder Cup was announced in On behalf of the Scottish Government the transport preparations for the event were led by Event Scotland. In the summer of 2013 it became clear that as the event approached Transport Scotland was best placed to take over the delivery responsibilities. In preparation for a number of high profile events to be held in 2014, including the Glasgow Commonwealth Games, Transport Scotland established a dedicated 2014 Page 1

2 Team to assist with the delivery of transport. For the 2014 Ryder Cup, this allowed a dedicated resource to be put in place to co-chair the transport planning group with Ryder Cup Europe and to ensure delivery of all of the Scottish Government s commitments. With Ryder Cup Europe and Transport Scotland the core of the planning partnership were Perth & Kinross Council and Police Scotland. Other partners included Event Scotland, Ryder Cup Travel Services, Stirling Council, British Transport Police, Stagecoach East Scotland, CSP Ltd, the AA, First ScotRail, CH2M Hill and SIAS. 2.2 Transport Plan The principles underlying the development of the Transport Plan were to: Ensure safety of all spectators, staff and the travelling public; Create a working document for all parties to operate under; Ensure business as usual for travelling public; Minimise environmental impact; Minimise car movements at Gleneagles; and Leave legacy benefits where appropriate. This led to the a transport strategy focussing on travel by rail, shuttle bus from three park & ride sites and coach, as illustrated in Chart 2a. Chart 2a Transport Strategy Page 2

3 The partnership worked together to develop the strategy into a comprehensive plan. The full transport group met monthly to consider the overall planning. In addition, the core partnership met as a working group in between to allow strategic, local, event and policing elements of the plan to be discussed and agreed collaboratively and in the real time. Working with wider partners in Ryder Cup Travel Services, Stagecoach East Scotland, First ScotRail allowed the transport provision to closely aligned with the overall plan. The event planning was based on the daily number of spectators and staff of 52,000. To allow flexibility in transport provision, the transport plan provided for 56,000 across all modes and locations as show in Chart 2b. Chart 2b Approximate Passenger & Vehicle Numbers Method No Parking of spaces Maximum No. of Passengers Passenger Breakdown Rail n/a 7,250 Public, Hospitality North McDiarmid Park, Perth West Castleview, Stirling East Balado, Kinross ,400 Public, Disabled, VIP, staff 3,500 7,900 Public, Disabled, VIP, staff 7,500 17,000 Public, Disabled, VIP, staff Car Park BMW Courtesy Cars Only Car Park Wheelchair users and carers, pre-booked and pre-allocated. Car Park BMW Courtesy cars staging area, Hotel Guests Valet Car Park 4 2,000 4,500 Event Contracted Partners and Key Event Officials Car Park 5 1,500 3,400 Event Staff & Volunteers Car Park 6 1,000 2,260 Local Residents Page 3

4 RCTS Coaches n/a 9,500 RCTS Packages 1,803 Blue Bus Terminal 2.3 Park & Ride RCTS Packages 3,994 Yellow Bus Terminal Premier Golf/RCTS Public from North/Blairgowrie/Perth RCTS Shuttles n/a 2150 Written Media, Courtesy Cars ,000 Public from St Andrews Square, Edinburgh Players, Player Families and Partners, Boards and Officials Three park & ride sites were established at Balado by Kinross, McDiarmid Park in Perth and Castleview in Stirling. As shown in chart 2c, Balado was the largest site providing for 7,500 cars and also large areas for contingency parking. The site provided hard standing for security checks and bus loading and large areas of well drained grass areas for parking. McDiarmid Park was the smallest site providing for 1,500 cars. As an existing football stadium it provided hard standing for both bus loading and for car parking. Castleview was based around Stirling Council s existing Park & Ride site which was extended in partnership between the Scottish Government and the Council as a legacy benefit. The existing Park & Ride served as the bus loading area and privately owned adjoining grass fields were leased for parking cars. The characteristics including the journey times to and from the Gleneagles are shown in Chart 2c. Page 4

5 Chart 2c: Park & Ride Capacities & Journey Times P&R Site East Balado, Kinross North McDiarmid Park, Perth West Castleview, Stirling Maximum Car Capacity Maximum No of Visitors Total 12,500 28,300 Journey Time To Gleneagles Journey Time From Gleneagles 7,500 17, mins 50 mins 1,500 3, mins 23 mins 3,500 7, mins 24 mins Ticket holders could book a space at any of three park & ride sites. Booking patterns reflected the assumed patterns and minimised crossing manoeuvres, with ticket holders from the north and north east using McDiarmid Park and from the south east using Balado and from the west using Castleview. This is shown in Chart 2d. Chart 2d: Postcode Locations of Ticket Applications for Park & Ride sites Page 5

6 Each of the three park & ride sites required infrastructure works to enable them to work as efficiently and effectively as possible, such as new or upgraded accesses. They were delivered by Transport Scotland using existing partner supply chains. Ryder Cup Europe led on the delivery of the park & ride sites using contractors to provide, secure and operate the sites, including bus loading, lighting and trackway in parking areas. The Transport Planning Group determined appropriate routeing for vehicles approaching the respective park & ride sites. The routeing was supplied with car park tickets. A comprehensive on-road signage plan was also implemented to support this information. Traffic management was also implemented on the trunk and local roads surrounding all of the park & ride sites. This included measures such as reduced speed limits, traffic signals, parking restrictions, limited access restrictions. Ryder Cup Europe constructed two large bus terminals on site at Gleneagles to receive the Park & Ride shuttle bus and coaches travelling direct to the event. Some of the elements of the transport plan are shown in Chart 2e Chart 2e: Elements of the Transport Plan Park & Ride loading area at Stirling Aerial view of event site, showing the southern bus terminal and the upgraded access to Gleneagles station The upgraded Gleneagles Station Page 6

7 2.4 Rail The Gleneagles Railway Station is located close the Gleneagles resort, in fact the Gleneagles Hotel was built in 1925 by the Caledonian Railway Company, the then owner of the Station. The station formed in integral part of transport planning for the event. After years of constant service, the station was in need of upgrading. In addition, the refurbishment offered the opportunity to upgrade the station access. The hosting of the Ryder Cup provided the impetus to Perth & Kinross, Network Rail and ScotRail to deliver a new access road, an expanded car park, fully accessible lift access and a complete modernisation of station, see Chart 2e. During the event, British Transport Police and ScotRail managed spectators movement between the station and the event security check point. From there, a spectator route was provided along the closed road access to the A9 trunk road. Transport Scotland delivered a temporary footbridge over the A9 directly into the PGA Centenary Course. Train operator ScotRail operated dedicated services from Edinburgh, Glasgow, Inverness, Perth, Aberdeen and Dundee directly to Gleneagles Station. The approximate numbers that could be accommodated are shown in Chart 2f. Larger numbers were provided for on the return journeys to allow flexibility to cope with the departure profile. Chart 2f (i): Inbound rail passengers to Gleneagles Tuesday to Thursday Friday Saturday & Edinburgh Glasgow Dundee / Aberdeen Inverness Perth Total 2,850 2, ,720 7,500 3,250 2, ,680 8,350 Sunday 3,150 2, ,350 Chart 2f (ii): Outbound rail passengers from Gleneagles Tuesday to Thursday Friday Saturday & Edinburgh Glasgow Dundee / Aberdeen Inverness Perth Total 3,116 2, ,800 8,489 3,620 2, ,800 9,529 Sunday 3,518 2, ,800 9,238 Page 7

8 2.5 Community Engagement Community engagement was vital to successful delivery of the 2014 Ryder Cup. The partnership approach delivered a number of innovations. Ryder Cup Europe partnered with Police Scotland to fund a dedicated Community Engagement Officer in the 24 months before the event. This officer was a trusted point of contact for the local communities and fed issues back to the transport partnership to allow them to be resolved. Community briefings were undertaken in Auchterarder and around the three Park & Ride sites. These were delivered collaboratively by Transport Scotland and Perth & Kinross Council and all partners being on a panel to explain to and advise community representatives. This approach reinforced that the plans had been developed and agreed across all agencies. The partnership was also able to take back issues to discuss and modify the planning as appropriate. As noted above ensuring business as usual for travelling public was part of the plan. It was recognised that in addition to immediate local communities there was a larger community of travellers around central Scotland that could be impacted by the event. A Travel Demand Management (TDM) programme was put in place. Traffic Scotland s existing permanent Variable Messaging Signs (VMS) and fixed plate signs were used to provide advanced notification of the event. This was supplemented by a number of radio and written press announcements in the run up to the event. 2.6 Contingency Planning In addition to having an agreed plan in place the partnership decided it was essential to ensure the plan was robustly tested to cope with incidents. As the event approached, the partnership ran a number of contingency exercises between November 2013 and August Different partners took turns to facilitate the exercises to ensure different perspectives and issues were tested. During the process, the partnership identified 15 potential incidents, listed here: Need for diversion route Use of contingency fields at Balado Bus Breakdown Coach Breakdown Train Breakdown Rail fatality Road vehicle breakdown or collision Blocked/Slow route around park & ride site North Park & Ride reaches capacity and diverting traffic to East Park & Ride Wet weather general approach Site evacuation Loss of A9 footbridge Major disruption to Strategic Road Network Loss of Bus Terminals Page 8

9 For each the partnership agreed how the incident would initially be notified, who would be responsible for monitoring the ongoing incident, what the response would be and what steps could be taken to mitigate the incident. The later exercises allowed each of the partners to test their awareness of these plans. 3. Event Delivery For the event, the same transport partners moved into operational delivery mode and formed a joint Transport Hub. The partners in the Transport Hub and their linkages to the wider transport system are shown in Chart 3a. The Hub allowed issues across partners separate responsibilities and transport modes to respond quickly and efficiently to incidents. Chart 3a Transport Hub linkages This innovation was further enhanced by co-locating the Hub within the overall event control, the JOCC (Joint Operations and Communications Centre). Being co-located with the event control helped with gathering intelligence on issues such as match timings and crowd movements around the course to allow the transport system to respond (Chart 3b). Page 9

10 Chart 3b Transport Hub in action 4. Performance Monitoring 4.1 Introduction As noted, part of Transport Scotland s role during the 2014 Ryder Cup involved collating various metrics across the different transport modes to understand how those attending the event travelled to and from the Gleneagles course, and how well the transport system performed. The process relied on working closely with our transport partners to bring together key outcomes in terms of: traffic flows on trunk road network journey time information Park & Ride car parks: o arrival and departure profiles o car park occupancy o vehicle occupancy o pick-up / drop-off o shuttle bus journeys rail travel modal split. Some of the performance metrics were derived from established processes already in place such as the collation of traffic count and journey time data. Other performance metrics were derived from bespoke traffic surveys conducted on behalf of Transport Scotland by Sky High Technology Ltd, procured via an existing multiple framework data collection commission. This paper will focus on park & ride arrival and departure profiles, background traffic, vehicle occupancy, volumes across the modes and impacts on business as usual journey times. 4.2 Park & Ride Arrival and Departure Profiles As part of the performance monitoring survey programme, real-time footprint analytics were employed to provide information to the Transport Hub at Gleneagles. Page 10

11 The surveys involved capturing the numbers of arriving and departing vehicles in five minute intervals at each gate at each Park & Ride car park. The information was collected manually, entered into a spreadsheet using a tablet and relayed real-time to the Transport Hub to allow staff to track the level of car park occupancy at each of the P&R car parks. The surveys were conducted on Wednesday 24 th to Sunday 28 th September between 0500 and 1100hrs only. The observed arrival profile for each event day (Friday, Saturday and Sunday) are illustrated in Chart 4a (i),(ii) and (iii) for each site respectively. Chart 4a(i): East P&R Car Park (Balado) Ryder Cup Balado Park & Ride Site AM Arrival Profile 100 Number of Car Trips :00 05:10 05:20 05:30 05:40 05:50 06:00 06:10 06:20 06:30 06:40 06:50 07:00 07:10 07:20 07:30 07:40 07:50 08:00 08:10 08:20 08:30 08:40 08:50 09:00 09:10 09:20 09:30 09:40 09:50 10:00 10:10 10:20 10:30 10:40 10:50 Time (hh:mm) Friday Saturday Sunday Page 11

12 Chart 4a(ii): North P&R Car Park (McDiarmid Park) Ryder Cup McDiarmid Park & Ride Site AM Arrival Profile 100 Number of Car Trips :00 05:10 05:20 05:30 05:40 05:50 06:00 06:10 06:20 06:30 06:40 06:50 07:00 07:10 07:20 07:30 07:40 07:50 08:00 08:10 08:20 08:30 08:40 08:50 09:00 09:10 09:20 09:30 09:40 09:50 10:00 10:10 10:20 10:30 10:40 10:50 Time (hh:mm) Friday Saturday Sunday Chart 4a(iii): West P&R Car Park (Castleview) Ryder Cup Castleview Park & Ride Site AM Arrival Profile 100 Number of Car Trips :00 05:10 05:20 05:30 05:40 05:50 06:00 06:10 06:20 06:30 06:40 06:50 07:00 07:10 07:20 07:30 07:40 07:50 08:00 08:10 08:20 08:30 08:40 08:50 09:00 09:10 09:20 09:30 09:40 09:50 10:00 10:10 10:20 10:30 10:40 10:50 Time (hh:mm) Friday Saturday Sunday Notes: Source: Sky High Technology Ltd, Period: hrs The results of the arrival / departure surveys clearly illustrate the distinct profiles for each day of the event. The early start for spectators on the first event day (Friday) is evident at all three sites, with the second day (Saturday) slightly less pronounced. The final day (Sunday) profiles reflect the later tee-off time. Page 12

13 4.3 Background Traffic In addition to collating traffic data from the permanent ATC counters, video surveys were conducted at key locations on the network to capture changes in the daily traffic profile. This was achieved by installing temporary video survey equipment around the three P&R site locations: M9 Junction 10 (Craigforth) M90 Junction 6 (Kinross) A9(T) Junction with A85 Crieff Road (Perth). The surveys were conducted over 24hr periods on Friday 26-Sep-14 (the Friday of the event) and Friday 3-Oct-14 (the Friday after the event) only, and were aimed at capturing changes mainly in non-event traffic. Where possible, the cameras were located between the off and on ramp at the junctions the idea being that spectator traffic would have left or joined the network via the slip roads. As an example, the results of the survey between the junction 10 slip roads on the M9 at Stirling are illustrated graphically in Chart 4b for northbound (i) and southbound (ii). Chart 4b (i): Comparison of Daily Traffic Flow Profiles M9 Junction 10 (Craigforth) Northbound Ryder Cup Northbound Daily Traffic Profile - M9 Junction 10 (Craigforth) Friday 26-Sep :00 00:45 01:30 02:15 03:00 03:45 04:30 05:15 06:00 06:45 07:30 08:15 09:00 09:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 18:00 18:45 19:30 20:15 Traffic Flow (Vehs) 21:00 21:45 22:30 23:15 Time of Day Northbound Normal Friday Profile Page 13

14 Chart 4b (ii): Comparison of Daily Traffic Flow Profiles M9 Junction 10 (Craigforth) Southbound Ryder Cup Southbound Daily Traffic Profile - M9 Junction 10 (Craigforth) Friday 26-Sep Traffic Flow (Vehs) :00 00:45 01:30 02:15 03:00 03:45 04:30 05:15 06:00 06:45 07:30 08:15 09:00 09:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 18:00 18:45 19:30 20:15 21:00 21:45 22:30 23:15 Time of Day Southbound Normal Friday Profile Notes: Source: Sky High Technology Ltd Traffic flows between the on and off ramps of Junction 10 Period: hrs The results of the surveys suggest that for M9 Junction 10: Very early morning, between 0430 and 0600hrs, traffic flows were higher reflecting staff and volunteer traffic heading north to Gleneagles. During the traditional AM (0700 to 0900hrs) and PM (1600 to 1900hrs) periods, traffic flows were slightly lower suggesting a reduction / rerouting / retiming of regular commuter traffic. In the evening, after 1900hrs, there was a slight increase compared with the normal profile reflecting southbound traffic returning from Gleneagles. The results suggest that, overall, the mainline traffic volumes on the M9 were, on average, broadly similar to 2013 levels. The flow profile data alludes to regular / commuter traffic taking heed of travel advice (see section 2.5 above) to avoid the route but being replaced by spectator traffic heading to Gleneagles and the West P&R car park at Castleview. 4.4 Vehicle Occupancy The traffic modelling underpinning the transport planning for the 2014 Ryder Cup was based on an observed vehicle occupancy of 2.26, derived from survey work at the previous UK event at Celtic Manor in To inform future events, as part of the performance monitoring survey programme, vehicle occupancy surveys were conducted at each of the Park & Ride car parks. Page 14

15 The surveys were conducted for 30 minutes or so at each gate on a rotational basis. The surveys were conducted on Friday 26 th September only. The observed vehicle occupancy for each site is summarised in Charts 4c. Chart 4c (i): - Observed Vehicle Occupancy - East P&R Car Park Site (Balado) Gate Access Route Vehicle Occupancy (persons per car) Occupancy 1 A91 / North B918 / A977 / West Not Counted 5 B918 / A977 / East A977 VIPs Site (ii): North P&R Car Park (McDiarmid Park) Vehicle Occupancy (persons per car) Gate Access Route Occupancy A9 Slip Road A85 Crieff Road West A85 Crieff Road East Site (iii): West P&R Car Pak (Castleview) Notes: Gate Access Route Vehicle Occupancy (persons per car) Occupancy 4 Millennium Way West Millennium Way East Site Source: Sky High Technology Ltd Period: hrs Survey of vehicle occupancy on 26-Sep-14 only The results of the surveys suggest that the average vehicle occupancy for the event was around 2.22 persons per vehicle, which closely matches the value of 2.26 used during event planning. It should be noted that at both the North (McDiarmid Park) and East (Balado) car parks, the pick-up / drop-off area was located within the general car park. At the West (Castleview) car park, the pick-up / drop-off site was separate (external) to general parking. Consequently, the occupancy figures reflect this difference. As noted above, the surveys were conducted for one day only. It is assumed that the other event days followed a similar pattern. 4.5 Volumes Across the Modes In determining a feel for how spectators travelled to the 2014 Ryder Cup, it is difficult to derive a direct link between each of the metrics collected, particularly as they were Page 15

16 collected using different techniques by different organisations over different time periods. Instead, it is considered more robust to infer a modal split from ticket data collected by the ticketing agent SEE Tickets. Each member of staff, volunteer and spectator had their pass checked at point of entry / exit into / out of the transport system, effectively allowing some inferral of modal split to / from the event course. Therefore, Chart 4d uses the SEE Ticket data to infer an overall modal split for the 2014 Ryder Cup at Gleneagles, for road, rail, bus and coach modes. Chart 4d suggests that around 50% travelled to the event course using the Park and Ride facilities, with around 15% of each on rail and coach (direct to venue). The remaining 20% (mainly VIPs, officials, staff and volunteers) travelled directly to Gleneagles by car. Page 16

17 Chart 4d: Summary of Spectator Travel by Mode Practice Days Event Days Mode Modal Share 23-Sep Sep Sep Sep Sep Sep-14 Park & Ride East - Balado 1,144 2,559 5,218 8,023 8,211 7,982 West - Castleview 1,749 3,709 6,445 8,296 8,672 8,557 North - McDiarmid 889 1,986 3,298 3,744 3,411 3,655 Total 3,782 8,254 14,961 20,063 20,294 20, % Coach Yellow Bus Terminal ,858 4,353 4,216 4,481 Blue Bus Terminal ,517 2,129 2,198 2,161 Total 1,047 1,280 4,375 6,482 6,414 6, % Car Media/VVIPs/ Courtesy Cars (CP1 & CP3) ,523 2,320 2,452 2,576 Staff Car Park (CP2, CP4 & CP6) 1,761 2,791 4,264 4,953 4,930 5,110 Station (combination of CP5 and Rail from below) 1,142 2,423 5,005 6,279 7,568 7,832 Total 3,367 5,909 10,792 13,552 14,950 15, % Rail ex Euston ex Edinburgh ,148 3,228 2,480 3,193 ex Glasgow Queen St , ,245 ex Glasgow Central ,092 1,165 1,511 ex Aberdeen ex inverness ex Perth / Dundee Total 727 1,641 3,571 7,170 6,155 7, % 8,196 15,443 30,128 40,097 41,658 42, % Note: Source: SEE Ticket Data The above table reflects spectator ticket numbers Page 17

18 4.6 Journey Times Traffic Scotland s journey time service was used to monitor journey times on eight selected routes on the A9(T), M9 and M90. The routes were selected where information was already collected as part of the existing journey time service: A9(T) M90 Broxden - M9 J10 Craigforth A9(T) M90 Broxden - A9(T) A823 Gleneagles M9 J10 Craigforth - A9(T) A823 Gleneagles M9 J10 Craigforth - A9(T) M90 Broxden M9 J10 Craigforth - M9 J9 Bannockburn M9 J9 Bannockburn - M9 J10 Craigforth A9(T) A912 Inveralmond - A9(T) M90 Broxden A9(T) M90 Broxden - A9(T) A912 Inveralmond. A summary of the average change in journey time for the eight trunk road routes is tabulated in Chart 4e below. The information collected from the Traffic Scotland journey time service indicates that, overall, journey times on these sections of the trunk road network were, on average, just over 5% longer than normal. Chart 4e: Change in Journey Times on A9(T), M9 and M90 Date Event Time Period 00:00-07:00 07:00-10:00 10:00-16:00 16:00-19:00 19:00-24:00 07:00-19:00 00:00-24:00 23-Sep % 3.5% 4.3% 3.8% -0.3% 4.0% 2.8% 24-Sep-14 Practice Days 2.2% 3.3% 4.3% 7.7% -2.7% 4.9% 2.5% 25-Sep % 3.6% 7.6% 5.6% 1.0% 6.1% 3.6% 26-Sep % 7.4% 0.7% 3.0% 6.6% 2.9% 4.2% 27-Sep-14 Event Days 4.8% 7.4% 6.5% 9.0% 5.7% 7.3% 6.2% 28-Sep % 8.5% 7.2% 7.4% 5.5% 7.6% 7.1% Average 4.9% 5.7% 4.0% 4.7% 4.9% 5.4% 5.6% Notes: Source: Traffic Scotland Journey Time Service 5. Lessons Learned 5.1 Introduction Following the event a number of debrief activities were undertaken to fully capture the lessons from the event planning and delivery. Some key lessons are described here. 5.2 Partnership Partnership working was essential to the successful delivery of transport for the event across all levels and areas of responsibility. Some particular points highlighted in the debrief included the need to form the partnership early and in particular the Page 18

19 establishment of the focussed working group was very helpful in moving the planning forward. All partners need high level commitment, ideally to allow the deployment of dedicated staff and associated resources to the planning. The transport plan needs to signed off by the planning group well in advance of the event to allow for briefing and training of those involved in operational delivery. Planning assumptions need to be agree by all partners and sensitivity testing around key assumptions should be used to make the planning more robust. 5.3 Transport Hub The Transport Hub, discussed in section 3, worked extremely well. Having all partners together in one place allowed joined up and quick response to incidents. Also being co-located in the JOCC with the event control staff, CCTV camera feeds covering the whole site, and Police Scotland allowed the smooth flow of information. A key example of working with non-transport staff was at the end of each day approaching the end of play. Event staff were able to follow the movement of people around the site and to see when spectators were beginning to head to the bus terminals. This allowed the transport planning partners to get resources in place to deal with the crowds before the queuing at the terminals started. The lesson for future major events is to establish a transport hub with all partners and ideally to locate this within the overall event control. 5.4 Community Engagement As discussed in section 2.5, community engagement was a vital part of the planning and delivery of the event. The key lesson is to recognise the importance of this and ensure that resources are devoted to communicating with the community. While funding a fulltime member of staff may be harder for some events, the provision of a central point of contact is invaluable in building up trust with the community. Communicating and being willing to adapt plans based on community feedback is also important. 5.5 CCTV / TRISS Transport Scotland through Traffic Scotland have CCTV cameras located across the trunk road network [ In preparation for the 2014 Ryder Cup, additional cameras were installed providing fuller coverage of the key junction along the A9 corridor. The cameras provided a live feed back to the Transport Hub and to the Traffic Scotland control room at South Queensferry. Transport Scotland s trunk road operating companies provide Trunk Road Incident Support Service (TRISS) vehicles to the busiest sections of the network to deal with incidents and support the emergency services in clearing incidents [ During the 2014 Ryder Cup patrol routes were adjusted to allow comprehensive coverage of the trunk roads around and approaching the venue. This allowed a quick response to incidents in support of Police Scotland, which helped to keep the routes to and from the event flowing freely. The TRISS vehicles are also equipped with CCTV cameras which into the same trunk road CCTV system mentioned above. Page 19

20 In addition, the performance monitoring staff at all three park & ride sites were able to provide transport network focussed feedback directly into the Transport Hub. The lesson for future major events to ensure that appropriate resources are in place to allow central staff to have visibility across the transport network. 6. Conclusion A comprehensive victory of the European Team over the USA 16 ½ to 11 ½! The Transport Plan can t take any credit for that but it did provide a very significant contribution to what the First Minister, Nicola Sturgeon called a hugely successful event. In exit questionnaires 92 per cent of attendees reported being satisfied or very satisfied with transport provision, see Chart 6a. And according to Scottish motor racing legend Sir Jackie Stewart, in fact, it was the best spectator experience for the paying customer. Chart 6a: Overall how satisfied were you with the transport provision for The 2014 Ryder Cup? Reflecting back on the underlying principles, listed in section 2.2, helps demonstrate the success of the transport planning partnership: Safety and security on the transport network was enhanced throughout the event. Business as usual was maintained. Even with extensive traffic management on strategic road routes journey times were no more than 5 per cent longer than usual. All existing rail services were maintained and Gleneagles Station remained open for commuters. Environmental impact of car movements was minimised with a public transport mode share of 80 per cent. Legacy benefits included the upgraded Gleneagles Station (including an access road and local bus hub), an expanded park & ride site in Stirling, Page 20

21 enhanced CCTV coverage on the A9 corridor, and a prioritised road maintenance programme across the area. In additional to the physical legacy benefits, the wider benefit to the reputation of Scotland s transport community s ability to work in partnership is just as important as are the lessons learned for the planning and delivery of future events. Acknowledgements Thanks to: Ryder Cup Europe, Perth & Kinross Council and Police Scotland as core partners in the transport planning and delivery. Ryder Cup Travel Services, Stagecoach East Scotland, First ScotRail and other partners in the transport group. Iain Clement of SIAS for co-ordinating the performance monitoring for Transport Scotland. Paul Macfarlane for facilitating the debrief process. Page 21

Monitoring and data acquisition for the safety related traffic information services

Monitoring and data acquisition for the safety related traffic information services Monitoring and data acquisition for the safety related traffic information services Best Practices on Monitoring Deployment Workshop 12 th September 2013 - Helsinki Contents 1. Transport Scotland and Traffic

More information

Highland Mainline Journey Time Improvements Phase 2

Highland Mainline Journey Time Improvements Phase 2 Highland Mainline Journey Time Improvements Phase 2 1 Specified Outputs The objective for the second phase of the HML Improvements project was established in the Scottish Ministers Scotland High Level

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013 Park and Ride Update Committee Strategy and Programmes Date of meeting 29 November 2013 Date of report 6 November 2013 Report by Assistant Chief Executive (Operations) 1. Object of report To update the

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

VisitScotland s International Marketing Activity

VisitScotland s International Marketing Activity VisitScotland The Importance of the Visitor Economy A strong visitor economy helps to position Scotland on the world stage whilst the economic impact of the visitor spend spreads out from the traditional

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am. Present: Dr Jon Hargreaves - Chair Geoff Aitkenhead - Acting Vice Chair Tanya

More information

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

National Park Authority Board Meeting

National Park Authority Board Meeting Paper for decision 1. Introduction 1.1 Preparations for the introduction of four Camping Management Zones (covering less than 4% of the National Park) have progressed significantly since Scottish Ministers

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority

Accessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority Accessible Transport The London 2012 Legacy Mark Dyer Olympic Delivery Authority Agenda Introduction Improving public transport infrastructure Best use of existing infrastructure Complementary modes Better

More information

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference. East West Rail Consortium 14 th June 2018 Agenda Item 3: Terms of Reference Recommendation: It is recommended that the meeting consider and agree subject to any amendment agreed by the meeting the revised

More information

An Introduction to HS2

An Introduction to HS2 July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.

More information

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA) To: POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE On: 22 MAY 2018 Report by: DIRECTOR OF ENVIRONMENT & COMMUNITIES Heading: Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority

More information

Glasgow Life Comparison Report 2013/14

Glasgow Life Comparison Report 2013/14 Glasgow Life Comparison Report 2013/14 Glasgow Life To: Glasgow Life Leadership Team Date: 27 March 15 From: Chris Macdonald Business Analyst Contact: Chris Macdonald (Tel: 287 4422) Version 1.0 Contents

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009 PERTH AND KINROSS COUNCIL 4 09/494 Enterprise and Infrastructure Committee 4 November 2009 STRATEGIC PRIORITIES FOR TOURISM AND AREA TOURISM PARTNERSHIP ARRANGEMENTS Report by Depute Director (Environment)

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

T IN THE PARK LOCAL RESIDENT Q&A

T IN THE PARK LOCAL RESIDENT Q&A T IN THE PARK 2015 - LOCAL RESIDENT Q&A T in the Park is Scotland's longest running and most successful music festival. Since launching in 1994, it has grown to become one of the most recognised and respected

More information

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire. REPORT FOR EDLC BOARD Report Title: EDC Pitches Strategy Update Contact Officer: Mark Grant (0141 777 3146) Date: 30 th March 2016 Agenda Item No: 5 Report No: EDLCT/52/15/MG 1.0 PURPOSE 1.1. The purpose

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Connecting Scotland - How the Scottish Government and its agencies engage internationally. VisitScotland

Connecting Scotland - How the Scottish Government and its agencies engage internationally. VisitScotland Connecting Scotland - How the Scottish Government and its agencies engage internationally VisitScotland The Importance of the Visitor Economy A strong visitor economy helps to position Scotland on the

More information

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS PERTH AND KINROSS COUNCIL 8 16/278 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS Report by Senior Depute Chief Executive (Equality, Community Planning & Public Service

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

Edinburgh Waverley capacity upgrade

Edinburgh Waverley capacity upgrade Edinburgh Waverley capacity upgrade As part of our rail upgrade plan, and in order to facilitate the introduction of longer trains and to prepare for projected future growth in demand for both track and

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES ISBA ANNUAL CONFERENCE 21-22 May 2019 Manchester Central Convention Complex ISBA ANNUAL CONFERENCE 2019 SPONSORSHIP OPPORTUNITIES Tuesday 21 and Wednesday 22 May 2019 Manchester Central Convention Complex

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report Your Transport Levy Your Transport Future Sunshine Coast Council Transport Levy Annual Report 2016-2017 www.sunshinecoast.qld.gov.au T 07 5475 7272 F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre

More information

Argyll & the Isles Tourism Cooperative Growth Fund Case Study. Wild About Argyll

Argyll & the Isles Tourism Cooperative Growth Fund Case Study. Wild About Argyll Argyll & the Isles Tourism Cooperative Growth Fund Case Study Wild About Argyll Project Overview The Argyll & the Isles Tourism Cooperative (AITC) is a cooperative company acting on behalf of its members.

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES ISBA ANNUAL CONFERENCE ISBA ANNUAL CONFERENCE 2018 SPONSORSHIP OPPORTUNITIES Wednesday 9 and Thursday 10 May 2018 The Brighton Centre Supporting independent schools Access bursars and senior support staff

More information

Performance monitoring report for the second half of 2015/16

Performance monitoring report for the second half of 2015/16 Performance monitoring report for the second half of 2015/16 Gatwick Airport Limited 1. Introduction DATE OF ISSUE: 7 JUNE 2016 This report provides an update on performance at Gatwick in the second half

More information

Perth & Kinross Council. Community Planning Partnership Report June 2016

Perth & Kinross Council. Community Planning Partnership Report June 2016 Perth & Kinross Council Community Planning Partnership Report June 2016 Contents Foreword... 3 Section 1: Spring 2016 destination follow up of 2014/15 school leavers... 4 Background... 4 Section A: Initial

More information

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Update on the development of the Regional Real Time Passenger Information (RTPI) System Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018

More information

JOB DESCRIPTION FBO Manager

JOB DESCRIPTION FBO Manager JOB DESCRIPTION FBO Manager RESPONSIBLE TO: LOCATION: Managing Director London Biggin Hill Airport Ltd WHAT IS THE JOB LIKE? The role holder will have an oversight of operational issues and teams to ensure

More information

Tourism Development Plan for Scotland Questionnaire

Tourism Development Plan for Scotland Questionnaire Draft National Tourism Development Plan Public Consultation 2013 Tourism Development Plan for Scotland Questionnaire We would like your views on this Plan and, in particular, your comments on opportunities

More information

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 PSR3-10 SUBMISSION FROM THE HIGHLAND COUNCIL 1.0 1.1 1.2 1.3 1.4 2.0 2.1 Introduction Highland Council remains committed

More information

Fallside Road Bothwell G71 8BB Telephone:

Fallside Road Bothwell G71 8BB Telephone: Lanarkshire NHS Board Kirklands Hospital Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk Minute of Meeting of the Lanarkshire NHS Board held on Wednesday 27 September 2017

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Glasgow - a Collaborative Future

Glasgow - a Collaborative Future Glasgow s Smart City Journey Glasgow - a Collaborative Future Iain Langlands - F.R.I.C.S. GIS Manager Land and Environmental Services, Glasgow City Council 30 January 2018 OFFICIAL Slide 1 Glasgow s Smart

More information

Communication and consultation protocol

Communication and consultation protocol Communication and consultation protocol Airservices Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

Using Smart Data to Support Traffic Management at Sports Venues

Using Smart Data to Support Traffic Management at Sports Venues Using Smart Data to Support Traffic Management at Sports Venues Trevor Brennan - Strategy & Programme Manager - Hertfordshire County Council trevor.brennann@hertfordshire.gov.uk / 01992 658406 / 07484647546

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Airport accessibility report 2017/18

Airport accessibility report 2017/18 Consumer and Markets Airport accessibility report 2017/18 CAP 1679 Published by the Civil Aviation Authority, 2018 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

Airport accessibility report 2016/17 CAP 1577

Airport accessibility report 2016/17 CAP 1577 Airport accessibility report 2016/17 CAP 1577 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority, Aviation House, Gatwick Airport South, West Sussex, RH6 0YR. You can copy and use

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

SPONSOR AND EXHIBITOR OPPORTUNITIES

SPONSOR AND EXHIBITOR OPPORTUNITIES SPONSOR AND EXHIBITOR OPPORTUNITIES Be a partner in delivering the UK s flagship space conference in 2017 30 MAY 1 JUNE 2017 Manchester Central CONTENTS Introducing the UK Space Conference 2017...05 The

More information

Capital & Counties. October 2007

Capital & Counties. October 2007 Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing

More information

CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY

CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY This executive summary presents a brief overview of the public and stakeholder consultation on proposals to optimise the Doncaster bus network, undertaken

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Working Towards Sustainable Tourism in England s AONBs

Working Towards Sustainable Tourism in England s AONBs Working Towards Sustainable Tourism in England s AONBs Purpose: this Accord sets out a shared vision for tourism in England s Areas of Outstanding Natural Beauty (AONBs) and outlines the contribution that

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Iain Morris: Head of Asset Management Scott Roberts: Scottish Fleet Manager APSE, Seminar Aviemore 8 May 2014 The

More information

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between

More information

Alternative service delivery models in place in Scottish local authorities: summary report

Alternative service delivery models in place in Scottish local authorities: summary report Alternative service delivery models in place in Scottish local authorities: summary report May 2017 Authors This report was published by the Improvement Service s Change Management Team. 2 Alternative

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council, Dundee City Council Main catchment Dundee coastal Summary of flooding impacts

More information

Methodology and coverage of the survey. Background

Methodology and coverage of the survey. Background Methodology and coverage of the survey Background The International Passenger Survey (IPS) is a large multi-purpose survey that collects information from passengers as they enter or leave the United Kingdom.

More information

May 2011 to April 2012.

May 2011 to April 2012. Annual Performance 2011-2012 KEY FACTS 2011/12 38 million passenger journeys were made on Stagecoach in Fife, Stagecoach in Perth and Stagecoach Strathtay services 27.1 million miles operated across Fife,

More information

PERTH AND KINROSS COUNCIL. Council Meeting 17 May 2017 APPOINTMENT OF REPRESENTATIVES TO PARTNER ORGANISATIONS AND OUTSIDE BODIES

PERTH AND KINROSS COUNCIL. Council Meeting 17 May 2017 APPOINTMENT OF REPRESENTATIVES TO PARTNER ORGANISATIONS AND OUTSIDE BODIES PERTH AND KINROSS COUNCIL 7 17/182 Council Meeting 17 May 2017 APPOINTMENT OF REPRESENTATIVES TO PARTNER ORGANISATIONS AND OUTSIDE BODIES Report by Head of Democratic Services PURPOSE OF REPORT This report

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal 30 th January 2016 Local Government s critical role in driving the tourism economy January 2016 de Waal Contents Local Government can make or break tourism in their jurisdiction... 3 TNQ Tourism Vision...

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019

Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019 Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019 January 2019 V7 Page 1 Contents Our Customer Commitment... 2 Service level agreement... 3 1. Booking process...

More information

Scotland s railways - today

Scotland s railways - today Cynulliad Cenedlaethol Cymru National Assembly for Wales Y Pwyllgor Menter a Busnes Enterprise and Business Committee Ymchwiliad i r Blaenoriaethau ar gyfer Inquiry into the Priorities for the future dyfodol

More information

20th November 2013 CONTACT OFFICER: GENERAL MANAGER (TELEPHONE )

20th November 2013 CONTACT OFFICER: GENERAL MANAGER (TELEPHONE ) AGENDA ITEM NO: 8 EAST DUNBARTONSHIRE LEISURE AND CULTURE TRUST EDLCT 29/13/MG 20th November 2013 GENERAL MANAGER CONTACT OFFICER: GENERAL MANAGER (TELEPHONE 0141 777 3146) SUBJECT TITLE: COMMONWEALTH

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT Forth Crossing Public Transport Corridor: Introductory Notes The Scottish Association for Public Transport (SAPT) is concerned that the

More information

Situational Analysis. Issue: 1. Date: November 2017

Situational Analysis. Issue: 1. Date: November 2017 20 Issue: 1 Date: November 20 This report was written and prepared by the Royal Society for the Prevention of Accidents (RoSPA) and approved by the steering group of Water Safety Scotland. 2 Executive

More information

About this consultation

About this consultation About this consultation With under 18 months to go until the XX Commonwealth Games in Glasgow, the role of each of the Games Venues is coming sharply into focus. Glasgow 2014 Ltd. will be progressing planning

More information

Plan B When the Show Simply Can t Go on

Plan B When the Show Simply Can t Go on Plan B When the Show Simply Can t Go on CASE STUDY: City of Perth Australia Day Skyworks Cancellation 2017 Erica Mueller, City of Perth Today s Presentation Event Overview The Incident The Resources The

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information

What is Transport Focus? The Insight Plan. Insight Plan

What is Transport Focus? The Insight Plan. Insight Plan Insight Plan 2018-19 March 2018 Insight Plan 2018-19 What is Transport Focus? We are the independent, statutory, consumer watchdog for Britain s rail passengers, bus, coach and tram passengers in England

More information

Research Briefing Flood and Coastal Erosion Risk Management in Wales

Research Briefing Flood and Coastal Erosion Risk Management in Wales Research Briefing Flood and Coastal Erosion Risk Management in Wales Author: Wendy Dodds Date: September 2017 National Assembly for Wales Research Service The National Assembly for Wales is the democratically

More information

North West London Hospitals NHS Trust

North West London Hospitals NHS Trust North West London Hospitals NHS Trust Policy Communication Cover Sheet Policy Name: Post Holder Responsible: Approved by: Replaces: PARKING POLICY Philip Sutcliffe, Director of Corporate Services Executive

More information

TRANSPORT INFRASTRUCTURE

TRANSPORT INFRASTRUCTURE TRANSPORT INFRASTRUCTURE Existing Transport Infrastructure: Planned Transport Infrastructure: The framework for the construction of Tokyo s transport infrastructure began with the preparations for the

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Civil Approach Procedural Controller Military Terminal Radar Controller

Civil Approach Procedural Controller Military Terminal Radar Controller AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE PERTH AND KINROSS COUNCIL 6(ii) 16/437 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE Report by Senior Depute Chief Executive (Equality, Community Planning and Public Service Reform) PURPOSE OF REPORT

More information