WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

Size: px
Start display at page:

Download "WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT"

Transcription

1 WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT Forth Crossing Public Transport Corridor: Introductory Notes The Scottish Association for Public Transport (SAPT) is concerned that the proposed configuration of the Forth Road Bridges, including the bus corridor proposals, creates an unbalanced road capacity situation and is an extremely ill-thought out project considering the high capital cost involved. Bus traffic on the existing Forth Road Bridge amounts to less than 1% of the overall vehicle movements. Even a doubling of bus traffic from development of P+R will still amount to less than 2% of overall vehicle movements. The existing Forth Road Bridge will, therefore, be effectively empty, while the new bridge is expected to absorb all the car and HGV traffic. A significant cost is involved in modifying the approach roads to provide access to the new bridge for all traffic other than buses. But it is obvious that once the new bridge opens, there will be irresistible pressure on politicians from road users to re-open the existing bridge to car traffic to relieve traffic congestion at peak periods on the new bridge. Given that this is the most expensive Scottish transport infrastructure investment of the 20 th and 21 st century, it is of the utmost concern that the proposed configuration of the two Forth Road bridges is illogical, and that further significant and expensive re-design of the approach roads is almost certain to be undertaken, under public pressure, to revert to making greater use of the existing bridge for car traffic, leading to a major increase in road capacity from Fife into the Lothians. SAPT recommends that the design of the approach roads, including the bus access roads, should be suspended to allow a more logical solution to be investigated. The rushed timetable for design of the new bridge and the approach road philosophy, in response to over-reaction to the corrosion problems, should be halted while results from the current anti-corrosion exercise are completed. Analysis of road traffic statistics, which will be presented to the TICC Committee orally by SAPT on 23 rd February, show that there is no pressure from road traffic growth to urgently provide additional road capacity on the Forth crossing. Furthermore, train capacity across the Forth can be expanded by further train and platform lengthening, and additional signalling. More Park+Ride parking spaces at railway stations throughout Fife, where feasible, together with train/ tram connections to west Edinburgh once the Gogar Interchange opens, should help reduce road traffic on the Forth road bridge, giving time for a measured review of the situation. Regards, John McCormick Chairman Scottish Association for Public Transport

2 This statement complements parallel submissions being made to Forth Bridge Bill and Finance Committees of Scottish Parliament. These conclude that in the present budget context and with a prime priority for an improving and sustainable Scottish economy:- a) the principles of the Forth Crossing Bill are unsupported by robust evidence and would lead to a damaging contraction of spending on the programmes needed to accelerate shifts in energy sources and cuts in greenhouse gas emissions over the years to 2020 and on to 2050 b) inadequate attention is given in the Bill to actions to encourage modal shift from cars (a key policy aim of the Scottish Government) and increased car-sharing, especially at peaks. The rest of this submission deals with the scope for a major change of approach to the Forth Public Transport Corridor in the years to 2017 (the first full year an extra bridge could be available) and from 2017 to It supports the view of the adjacent City of Edinburgh, West Lothian and Fife Councils that there is a pressing need, ignored in the Policy Memorandum, to encourage greater shifts to public transport in the years to 2017 and to continue such a momentum in a cost-effective way. The proposals in the Policy Memorandum are not cost effective and largely an afterthought to the emphasis on an additional crossing rather than central to the Scottish Government policy aims of greater shifts to public transport and greater cuts in carbon emissions. The Period The Bill s Policy Memorandum and the extensive additional information available on the Transport Scotland Forth Crossing website has the fundamental flaw of concentrating on road vehicle flows rather than on passenger volumes and occupancy levels crossing the Forth. There are only incidental references to the Forth Rail Bridge, no information on passenger mode share and no evaluation of steps to improve car occupancy at peaks or of the impact on travel patterns of multimodal smart ticketing and a multi-modal Gogar (Edinburgh West) interchange. Table 1 shows the Transport Scotland data on actual and expected road vehicle crossings in 2005 and 2017 Forth Crossing: Road Vehicle Volumes per Day (thousands) % change 2017 % change ( no extra bridge) (on new bridge) (on present bridge) % % Since traffic levels on motorway and A road traffic levels in Scotland have stabilised (APPENDIX 1) and since toll removal on the Forth Bridge in early 2008 has had only a marginal impact on traffic levels (apart from some rise in off-peak volumes), Forth Road Crossing volumes are unlikely to be more than 68,000 in 2010, possibly rising to 70,000 on the existing bridge by 2017 but with some absolute reduction in peak volumes. The Transport Scotland estimates of 26% to 44% growth between 2005 and 2017 are unsubstantiated and conflict with existing information on changes in passenger flow totals and mode share since Table 2 shows SAPT mid-range estimates of passenger volumes across the lower Forth in 2005, 2010 & They assume that around 10% of traffic volumes relate to HGV and LGV goods movement. Forth Crossing : Average Passenger Volumes per Day (thousands) Passengers Road Vehicles Car 1 occupant * Car multi-occupant Bus/coach/DRT ** Rail Ferry 2 TOTALS *including taxis with 1 passenger ** including private hire buses, minibuses, taxis with 2+ passengers

3 Transport Scotland has been invited to confirm actual data for 2005 and their up-dated estimates and underlying assumptions for 2010 and The SAPT data is based on the assumptions in Appendix 2. The Period : Suggested Actions Defer decisions on an additional Forth crossing until the results of present technical studies and of a stronger public transport and car-sharing strategy to 2017 have been observed. This may permit further extension of the life of the present road bridge but, if road vehicle volumes are higher than expected, it will be important to maintain the momentum of a strategy supporting an increased modal share for public transport and taking forward the proposals already being advanced by official bodies yet, for reasons which are unclear, omitted from the Bridge Bill Policy Memorandum and the Transport Scotland Forth Crossing website. SAPT would draw the Committee s attention to Transport Scotland s own conclusion that road vehicle traffic growth at Queensferry is expected to be much lower after 2016, amounting to total growth of only 6% between 2017 and There is a need to clarify whether there is an implicit assumption here that, if growth is higher, it could be handled by hard-shoulder running on the new bridge and/or the reopening of a least one lane each way on the present bridge to general traffic rather than bus only operation. The further public transport actions to which the attention of the Committee is drawn are:- the Scottish Government plans for the extension of rail electrification into Fife and to Dundee/Aberdeen by 2027 with the route to Perth and Inverness following the construction of a new and direct rail link from the Ferrytoll area to Halbeath and beyond (Project 28 in the Strategic Transport Projects Review, December 2008, costed at 100 to 250m) plans to reopen to passengers the rail branch from Thornton to Windygates and Leven (also for freight) possible restoration of passenger rail services between Dunfermline and Alloa (on a freight line) plans to develop a Glasgow-Lanarkshire-Livingston-west Edinburgh-Fife- Dundee/Aberdeen rail corridor in association with a high-speed route from London to Scotland via the West Midlands, Lancashire and Carlisle to Scotland, dividing for Glasgow and Edinburgh north of Carstairs. modification of the existing Forth Road Bridge as part of plans for tram extensions from West Edinburgh into West Lothian and also South Fife Conclusions and Recommendations The Forth Bridge Bill and the related Policy Memorandum and Transport Scotland documentation gives inadequate consideration to the potential for increased modal share for public transport on existing Forth Crossings - especially in a situation where the evidence points strongly to reduced rates of growth in total in passenger movement across the Forth even after allowance is made for expected change in population and employment levels and locations. The optimum solution is to make better use of the existing road and rail bridges in the coming decade rather than proceed to a very expensive additional crossing and underutilisation of the existing rail and road bridges. The Committee is urged to make two recommendations as top priorities:- 1) an early multi-modal reappraisal of total passenger movement and mode share on the Forth Crossing Corridors with a view to an action programme agreed within 12 months to encourage mode shift to public transport and car-sharing over the years to ) cancellation of further work on the Forth Crossing Bill on the grounds that this is not an essential and cost-effective project within the stated overall aims of the Scottish Government in a period of tightened public finance.

4 APPENDIX 1 Road and Car Traffic Statistics (million vehicle Kms) - Rail Comparisons Scottish M-way & A Roads All traffic 28,209 28,055 28,898 28,986 28,810 Cars 22,308 22,060 22,610 22,392 22,221 STS No 28 p 124 M90 at Kelty (average daily flows for all traffic- thousands) 29,565 30,703 26,511 30,787 STS No 28 p 130 Rail Passenger kms in Scotland outwith SPT area (millions) , % STS No p 152 Total pass kms in Scotland continued upwards from 2,224m in to 2,601m in i.e. +18% with rate of growth being higher in the east of Scotland STS No 28 p 158 Examples of yearly passenger usage of Forth area rail stations (thousands) Dundee 1,438 1,515 1,490 1,600 Kirkcaldy ,072 1,126 1,152 Inverkeithing ,032 Dunfermline Town South Gyle Leuchars Dalmeny Dunfermline Queen Margaret Dalgety Bay Annual data in STS on 100 top stations and usage of new stations more detail available from ORR Ferrytoll Park And Ride and other P+R Data requested but not yet available Estimated usage of Gogar Rail/Tram/Bus Interchange in first full year is 750 thousand APPENDIX 2 Assumptions made in relation to Passenger Volumes in ) 50% rise in real cost of petrol/derv but rail and bus fare rises capped at rate of inflation 2) introduction on the existing bridge of a peak period priority lane for buses, other high occupancy vehicles, vans and approved HGVs within the next 12 months (peak period being defined as the Monday to Friday commuting peaks plus well-publicised extensions to cover periods when major events would otherwise lead to bridge delays; approved HGVs defined as those with no easy alternative to using the present bridge and paying an appropriate 3- monthly or yearly fee; bridge ban on non-approved HGVs) 3) ramp metering at Ferrytoll, Inverkeithing & Halbeath junctions and/or peak-time lone occupant car charges 4) opening of Gogar(Edinburgh West) as a fully intermodal interchange by 2012, including interchange from rail to a quality bus network for west Edinburgh and to quality bus links to West Lothian and along the Edinburgh Bypass (this could be financed in part by a delay in the planned provision of a direct rail link from Gogar to the Falkirk line by 2017 and earlier extension of Edinburgh tram Route 1 from the Airport to a new interchange station at Ratho Station/Newbridge also serving the Ingliston Exhibition and Showground zone) 5) early introduction of multi-modal smart ticketing in association with a rise in long- stay parking charges in west Edinburgh and at Edinburgh Airport (with proceeds used for public transport and active travel) 6) provision of high-capacity Forth Metro rail services from east of Edinburgh to Cowdenbeath via Gogar, Ferrytoll, Inverkeithing, Rosyth, Dunfermline & Halbeath on a 15 minute or higher frequency

5 7) further improvements in rail passenger capacity and trip times to Dundee, Aberdeen, Perth and Inverness 8) enhanced use of rail, bus & cycle park and ride and local bus feeders 9) development of Ferrytoll as an interchange including rail facilities, bus feeders and direct bus links to Newbridge/Livingston and to Granton/Leith development zones 10) provision of at least one fast passenger ferry route from south Fife to Edinburgh Waterfront

FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT)

FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT) FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT) Assessment of Principles and Fit with Future Budgets Submission to Forth Crossing Bill and Finance Committees

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

Guide to tickets and fares from 7 January 2019

Guide to tickets and fares from 7 January 2019 from 7 January 2019 page 1 of 7 Introduction This guide provides a summary of our popular and great value tickets and fares for Stagecoach services in the East of Scotland. For further information, visit

More information

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013 Park and Ride Update Committee Strategy and Programmes Date of meeting 29 November 2013 Date of report 6 November 2013 Report by Assistant Chief Executive (Operations) 1. Object of report To update the

More information

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

Tourism Development Plan for Scotland Questionnaire

Tourism Development Plan for Scotland Questionnaire Draft National Tourism Development Plan Public Consultation 2013 Tourism Development Plan for Scotland Questionnaire We would like your views on this Plan and, in particular, your comments on opportunities

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

Go First Go Far Go Forth Queensferry One

Go First Go Far Go Forth Queensferry One Go First Go Far Go Forth Queensferry One queensferryone.com A new, international waterside destination. queensferryone.com Edinburgh Forth Rail Bridge Forth Bridge Queensferry Crossing South Queensferry

More information

Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening journeys serving Amazon.

Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening journeys serving Amazon. Service changes from 13 August 2018 A summary of changes is given below. Stagecoach East Scotland Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening

More information

Changes to your services

Changes to your services Changes to your services Saturday 30 May - Sunday 26 July 2015 Glasgow - Falkirk High - Edinburgh Alloa / Dunblane / Stirling - Edinburgh Edinburgh - Glenrothes - Edinburgh (Fife Circle)...plus busier

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

STAG - Part 1 Appraisal Summary Table

STAG - Part 1 Appraisal Summary Table Proposal Details Proposal Name: Option 1 - Do-minimum Proposal Description: This assumes that the Council only carry out the statutory requirements under the Roads (Scotland) Act 1984. This would include

More information

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016 Agenda 11 Strathclyde Bus Alliance progress update Date of meeting 9 December 2016 Date of report 15 November 2016 Report by Assistant Chief Executive (Operations) 1. Object of report The object of this

More information

Capital & Counties. October 2007

Capital & Counties. October 2007 Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing

More information

committee report To inform the Committee about the outcome from the Strategic Transport Projects Review (STPR)

committee report To inform the Committee about the outcome from the Strategic Transport Projects Review (STPR) committee report Strategic Transport Project Review Committee Strategy and Programmes Date of Meeting 30 January 2009 Date of report 08 January 2008 Report by Assistant Chief Executive (Business Support)

More information

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant Workplace Parking Levies: the contribution of commuters to funding public transport Sue Flack Consultant Summary 1. 2. 3. 4. 5. Example of Nottingham, UK Use of Workplace Parking Levy Revenue Why Workplace

More information

Borders Railway - Scottish Borders Work Plan

Borders Railway - Scottish Borders Work Plan Borders Railway - Scottish Borders Work Plan March 2015 This Scottish Borders Work Plan sets out the short, medium and longer term actions that the Council and other local partners need to take to ensure

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

For Sale: 0.52 ha (1.28 acres) 9,981 sqm (107,436 sqft)

For Sale: 0.52 ha (1.28 acres) 9,981 sqm (107,436 sqft) For Sale: 0.52 ha (1.28 acres) 9,981 sqm (107,436 sqft) Prime development site Existing detailed consent for office use An opportunity to acquire an office development site on Scotland s premier business

More information

Submission by Heathrow Southern Railway Ltd.

Submission by Heathrow Southern Railway Ltd. Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,

More information

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 EARL/S2/06/9/A EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 The Committee will meet at 2.00 pm in Committee Room 6 1. Decisions on taking

More information

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business

More information

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,

More information

Linkline. 1. Christmas and New Year Services. Information updates for staff and agents. Issue No 50/02 4th November 2013

Linkline. 1. Christmas and New Year Services.   Information updates for staff and agents. Issue No 50/02 4th November 2013 www.citylink.co.uk Linkline Information updates for staff and agents Issue No 50/02 4th November 2013 In this issue 1. Christmas & New Year Services 2. Halbeath Park & Ride 3. Hogmanay 1. Christmas and

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

HSR the creation of a mega-project

HSR the creation of a mega-project HSR the creation of a mega-project Jim Steer Director Greengauge 21 Omega Centre May 2009 2oth May 2009 omega centre: transport mega-projects 1 Outline Motivations The formative history on HSR: how a mega-project

More information

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of

More information

Report of. Transport Key Performance Indicators

Report of. Transport Key Performance Indicators Report of Transport Key Performance Indicators August 2008 CONTENTS 1) INTRODUCTION 2 2) RELIABILITY OF SHETLANDS TRANSPORT NETWORK 3 3) STANDARD OF ROAD MAINTENANCE 5 4) FUEL CONSUMPTION LEVELS 6 5) MARKET

More information

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership South West of Scotland Transport Partnership.org.uk Regional Transport Strategy Revised June 2008 Serving Dumfries and Galloway South West of Scotland Transport Partnership.org.uk SOUTH WEST OF SCOTLAND

More information

Proposed M9 Spur Extension. Kirkliston

Proposed M9 Spur Extension. Kirkliston Forth Road Bridge N Queensferry Proposed Scotstoun Interchange Proposed Humbie Flyover Proposed M9 Spur Extension M9 Motorway Kirkliston A720 Edinburgh City Bypass M8 Motorway This drawing has been reproduced

More information

CAA Passenger Survey Report 2005

CAA Passenger Survey Report 2005 Economic Regulation Group CAA Passenger Survey Report 2005 Survey of passengers at Aberdeen, Bournemouth, Durham Tees Valley, Edinburgh, Gatwick, Glasgow, Heathrow, Inverness, Leeds Bradford, Luton, Manchester,

More information

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition:

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition: LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE 568 Introduction 1. This paper invites the Committee to consider for the third time the following Petition: PE 568 by the Scottish Accessible Transport

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Re-opening of the Skipton to Colne Railway Executive Summary

Re-opening of the Skipton to Colne Railway Executive Summary Re-opening of the to Colne Railway Executive Summary SELRAP SELRAP is the East Lancashire Rail Action Partnership. It was established with the objective of campaigning for the reinstatement of the railway

More information

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM CONTENTS INTRODUCTION 3 POLICY OBJECTIVES OF THE BILL 3 BACKGROUND 4 NECESSITY FOR A PRIVATE BILL 6 DETAILS OF THE PROPOSED RAILWAY

More information

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective

Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Scottish Fire and Rescue Service a journey of change From an Asset Management Perspective Iain Morris: Head of Asset Management Scott Roberts: Scottish Fleet Manager APSE, Seminar Aviemore 8 May 2014 The

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

May 2011 to April 2012.

May 2011 to April 2012. Annual Performance 2011-2012 KEY FACTS 2011/12 38 million passenger journeys were made on Stagecoach in Fife, Stagecoach in Perth and Stagecoach Strathtay services 27.1 million miles operated across Fife,

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Draft City Centre Transport Proposals

Draft City Centre Transport Proposals Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX

RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX RESIDENTIAL DEVELOPMENT SITE AT WHITEHILLS SAWMILL, MILL FARM ROAD, BY CROSSGATES, FIFE, KY4

More information

Sharing the Way with Sustainable Transport Options

Sharing the Way with Sustainable Transport Options Sharing the Way with Sustainable Transport Options Planning Institute Australia Professional Development Seminar Adelaide, SA Thursday 1 st May 2008 John Devney Sustainable Transport What is Sustainable

More information

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Waverley Railway (Scotland) Bill. Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY

Waverley Railway (Scotland) Bill. Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY Waverley Railway (Scotland) Bill Scottish Borders Council ( Promoter ) WAVERLEY RAILWAY Non -Technical Summary of the Outline Business Case submitted to the Waverley Railway (Scotland) Bill Committee Turner

More information

EDINBURGH AIRPORT RAIL LINK BILL

EDINBURGH AIRPORT RAIL LINK BILL Final Draft 2 EDINBURGH AIRPORT RAIL LINK BILL Draft PROMOTER S MEMORANDUM INTRODUCTION 1. This document relates to the Edinburgh Airport Rail Link Bill introduced into the Scottish Parliament on [ ] 2005.

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Board meeting

Board meeting Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To

More information

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS 2015/16 Council LOGO 0 ABOUT US Strathclyde Partnership for Transport (SPT) is the Regional Transport Partnership for the west of Scotland and is a partnership of twelve councils. SPT was established by

More information

FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE. Sheridan Property Consultants

FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE. Sheridan Property Consultants FOR SALE SALE & LEASEBACK CONVENIENCE STORE INVESTMENT 1-7 STATION ROAD KIRKLISTON WEST LOTHIAN EH29 9BE Sheridan Property Consultants LOVED AND EXPERIENCED BY CUSTOMERS SINCE EARLY 1859 INVESTMENT SUMMARY

More information

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009

London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 London and South East Route Utilisation Strategy (RUS) Rail User Group Meeting - Saturday 11 July 2009 Appendix 1 Flip chart notes from Breakout Groups Groups were asked to consider what gaps and issues

More information

TAYSIDE CONTRACTS JOINT COMMITTEE 20 AUGUST Report by the Managing Director

TAYSIDE CONTRACTS JOINT COMMITTEE 20 AUGUST Report by the Managing Director TAYSIDE CONTRACTS JOINT COMMITTEE 20 AUGUST 2007 Report by the Managing Director Report No JC 18/2007 Subject: ANNUAL SICKNESS ABSENCE MANAGEMENT and HEALTH SURVEILLANCE ABSTRACT This report details Tayside

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

TAYplan SDPA. Main Issues Report. Options for Scotland s s SusTAYnable Region (Strategic Development Planning Authority)

TAYplan SDPA. Main Issues Report. Options for Scotland s s SusTAYnable Region (Strategic Development Planning Authority) TAYplan SDPA (Strategic Development Planning Authority) Main Issues Report Options for Scotland s s SusTAYnable Region 2012-2032 2032 Content 1. The Development Plan System in Scotland 2. TAYplan in Context

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

RAC Foundation for Motoring Local Authority Parking Finances in Scotland

RAC Foundation for Motoring Local Authority Parking Finances in Scotland RAC Foundation for Motoring Local Authority Parking Finances in Scotland 2015-16 This note covers parking finances for the 32 local authorities in Scotland. Local authorities are required to submit details

More information

The Future of Air Transport

The Future of Air Transport The Future of Air Transport Summary December 2003 The White Paper and the Government s role The White Paper sets out a strategic framework for the development of airport capacity in the United Kingdom

More information

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016 Agenda item no 7 Strathclyde Bus Alliance - Proposal Committee Strategy and Programmes Date of meeting 20 May 2016 Date of report 25 April 2016 Report by Assistant Chief Executive (Operations) 1. Object

More information

Demand and Appraisal Report

Demand and Appraisal Report Demand and Appraisal Report HS2 London - West Midlands Report for HS2 Ltd MVA Consultancy, In Association With Mott MacDonald and Atkins April 2012 Document Control Project Title: MVA Project Number: Document

More information

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,

More information

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Update on the development of the Regional Real Time Passenger Information (RTPI) System Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018

More information

Glasgow Life Comparison Report 2013/14

Glasgow Life Comparison Report 2013/14 Glasgow Life Comparison Report 2013/14 Glasgow Life To: Glasgow Life Leadership Team Date: 27 March 15 From: Chris Macdonald Business Analyst Contact: Chris Macdonald (Tel: 287 4422) Version 1.0 Contents

More information

High-Speed Rail Inquiry

High-Speed Rail Inquiry High-Speed Rail Inquiry Evidence from HACAN HACAN is the well-established organisation which represents residents under the Heathrow flight paths. www.hacan.org.uk There is evidence that high-speed rail

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

were these made available?

were these made available? (1) What publicity was undertaken across LB Brent by TfL and by Brent? No information is held by Brent Council as to what publicity TfL undertook in the London Borough of Brent. No publicity was undertaken

More information

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:

More information

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN NHS Lothian John Jack Director of Facilities 5th June 2008 REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN 1 Purpose of the Report 1.1 The purpose of this report

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Auckland Port and the Unitary Plan Dr Douglas Fairgray

Auckland Port and the Unitary Plan Dr Douglas Fairgray Auckland Port and the Unitary Plan Dr Douglas Fairgray Source: Auckland 1886 - Sir George Grey Special Collections, Auckland Libraries, NZ Map 374 Scope The interface between the Unitary Plan and the Port

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Lower Thames Crossing consultation response

Lower Thames Crossing consultation response Lower Thames Crossing consultation response Context: This is the response from Campaign for Better Transport to the Department for Transport s consultation Options for a new Lower Thames Crossing. Consultation

More information

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir, East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33

More information

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes

Chapter 11. Links to Heathrow. Prepared by Christopher Stokes Chapter 11 Links to Heathrow Prepared by Christopher Stokes 11 LINKS TO HEATHROW Prepared by Christopher Stokes 11.1 This submission relates to the following questions listed by the Committee: 2.3 Implications

More information

EXAMINING THE WIDER CONTEXT OF RAIL-AIR COMPETITION BETWEEN SCOTLAND AND ENGLAND & WALES. Ross Clark Rail Performance Manager Transport Scotland

EXAMINING THE WIDER CONTEXT OF RAIL-AIR COMPETITION BETWEEN SCOTLAND AND ENGLAND & WALES. Ross Clark Rail Performance Manager Transport Scotland EXAMINING THE WIDER CONTEXT OF RAIL-AIR COMPETITION BETWEEN SCOTLAND AND ENGLAND & WALES Ross Clark Rail Performance Manager Transport Scotland ross.clark@transportscotland.gsi.gov.uk INTRODUCTION There

More information

For Sale Prime Residential Development Land. Extending to 59.5 acres with Minded to Grant Planning Permission in Principle.

For Sale Prime Residential Development Land. Extending to 59.5 acres with Minded to Grant Planning Permission in Principle. For Sale Prime Residential Development Land Extending to 59.5 acres with Minded to Grant Planning Permission in Principle South Queensferry, Edinburgh Sale on behalf of Builyeon Farms LLP P2 Prime Development

More information

Investing in Greater Manchester transport 2017/2018

Investing in Greater Manchester transport 2017/2018 TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects

More information

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh Gateway Connected Bathgate Lothian Gateway 05 The Site Whitehill Industrial Estate Development is being undertaken by Riddochhill Developments Limited, based at: Stotforth Hill House Windlestone Rushyford

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

The Rail Network in Wales

The Rail Network in Wales The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This

More information

Rail & Bus for Herefordshire. Buses Supplement Spring 2018

Rail & Bus for Herefordshire. Buses Supplement Spring 2018 Rail & Bus for Herefordshire Buses Supplement Spring 2018 Keeping you informed about your bus and train services Rail & Bus for Herefordshire Hon. President: Professor John Whitelegg Newsletter Editor

More information

Inspire a life. Teach in Fife. We re looking for exceptional teachers to help inspire the future of children and education in Fife.

Inspire a life. Teach in Fife. We re looking for exceptional teachers to help inspire the future of children and education in Fife. Inspire a life Teach in Fife We re looking for exceptional teachers to help inspire the future of children and education in Fife. Inspire a life... teach in Fife Are you an enthusiastic teacher, keen

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

TRANSPORT, INFRASTRUCTURE AND CLIMATE CHANGE COMMITTEE AGENDA. 21st Meeting, 2008 (Session 3) Tuesday 11 November 2008

TRANSPORT, INFRASTRUCTURE AND CLIMATE CHANGE COMMITTEE AGENDA. 21st Meeting, 2008 (Session 3) Tuesday 11 November 2008 TIC/S3/08/21/A TRANSPORT, INFRASTRUCTURE AND CLIMATE CHANGE COMMITTEE AGENDA 21st Meeting, 2008 (Session 3) Tuesday 11 November 2008 The Committee will meet at 1.30 pm in Committee Room 6. 1. Climate change

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information