1 The New Northern Franchise The? Shape of things to come This document is produced by Noel Henry for the Friends of Reddish South and Denton stations campaign group (FORSADS), to highlight the benefits to the rail industry of including a service within the new franchise invitation to tender (ITT), which uses stock that currently terminates at Manchester Victoria, from various locations within Lancashire, that need to be moved on to free up platform space. 1

2 Contents page Manchester Victoria 3 Stockport 5 Advantages of extending services to Stockport from Victoria 8 Surveys 9 Stockport to Stalybridge Service 10 Reddish South 11 Denton 12 Potential Service Changes 13 We are not alone 13 Summary 14 Appendices: Results of surveys & petition appendix 1 15 appendix 2 16 appendix 3 18 Contact details: 18 there is an accompanying DVD with hard copy of this report inside the back cover 2

3 Manchester Victoria Manchester Victoria is undergoing exciting changes, with the work currently ongoing rejuvenating the building, and recent investment in the Ordsall Chord which will bring about new opportunities for service change. All being well, a new 1km section of track, called the Ordsall Chord, will be constructed by the end of December This will then allow TransPennine Express services from the North East, and Yorkshire, direct access to Manchester airport, via Manchester Victoria and Manchester Piccadilly stations. Currently there are train services from the North West which terminate at Victoria on the through platforms, examples are Southport, Clitheroe, Wigan Wallgate, Blackpool North, Liverpool Lime Street and Kirby. By 2017 these will be in the way of the express trains to/from the airport, and therefore need to be moved on to another location. Some through services dwell at the platform for up to 10 minutes, some train sets have to use the reverse sidings at Victoria, some return to Newton Heath depot and others have to roam the network as empty stock, for example to Bolton and back, or Brewery junction and back. The challenge facing Network Rail and the Train Operating Company (T.O.C.) is how to accommodate these services once the fast services from Yorkshire to Manchester Airport start. 3

4 The Department of Transport (DfT) in the High Level Output Strategy (HLOS) suggests moving them on to Rochdale or Stalybridge. Both stations have had new bay platforms built, but the option to Stockport, which required no new infrastructure was ignored. Why can t some go to Stockport? Allowing Network Rail and the T.O.C. planners to include Stockport as a choice of destination will improve their capability to secure efficiencies in operation of train services through Victoria. Sending all services to Rochdale and Stalybridge wouldn t necessarily produce any new business, and the new Franchisee is charged with the task of reducing service frequency in the peak and/or off-peak where demand is low and the current service represents poor value for the subsidy needed. The option to Stockport meets the DfT requirement of the new franchise, chapter 3.22 on page 32 of the Stakeholder Consultation says; 'we (DfT Rail Executive/Rail North) want rail services that drive forward growth and bring about a transformation in overall rail service provision. We are working together to achieve these aims, and will be seeking innovative and different ideas from bidders to maximise the potential opportunities'. The option to Stockport would provide new connections, generate new business, provide a more balanced service pattern and help fulfil the aspirations of the Northern Hub at providing cross Manchester connectivity. The option to Stockport utilises spare capacity on an underused part of the network, therefore improving the overall efficiency of the network. 4

5 Stockport With 14 off peak services per hour north from Stockport, only 2 get past Piccadilly (=14%) along the Castlefield corridor; one to Preston and one to Liverpool. The work associated with the Ordsall Chord and Northern Hub will provide extra paths for Manchester airport services accessing Piccadilly and Victoria stations, no guarantee of available spare paths through the Castlefield corridor for trains from Stockport. Growth in passenger numbers north from Stockport will only come with new destinations. Services to Piccadilly are well catered for, and if there are no spare paths through the Castlefield corridor, growth will only come by running services through to Manchester Victoria and beyond. The addition of one extra train per hour off peak improves the percentage from 14 to 20. Improved service patterns is one of the aims of TfGM Local Transport Plan. 5

6 Castlefield corridor Any extended service from Salford Crescent / Manchester Victoria to Stockport will address long outstanding complaints that Stockport doesn t connect with the Calder Valley and doesn t connect with all central Manchester stations. It also delivers on the core objective of TfGM Local Transport Plan that all parts of Greater Manchester have good access to Central Manchester stations. Connecting Stockport to Manchester Victoria gives better connection to Metrolink for services to Bury, Oldham and Rochdale. (See route map to the right). Rail North has three over-arching objectives for devolved rail services in the North of England. 1. To support economic growth by delivering more rail capacity and better rail connectivity. 2. To improve the quality to the railways in the North, with a better offer for passengers to encourage more use. 3. To deliver a more efficient railway and to secure greater value for money for the support from the public purse. Extending a service from Manchester Victoria to Stockport delivers better rail connectivity and improves the choice to passengers at Stockport, which will encourage more use. Extending a service is more cost effective than a dedicated service between Stockport and Victoria, and delivers the objectives of Rail North. 6

7 The diagram below is Northern Rails route map, highlighted in yellow are the services from Hazel Grove to Preston, operated by Northern, and Nottingham to Liverpool, operated by East Midlands, which pass Piccadilly. Ideally any extended service from Manchester Victoria to Stockport would not duplicate too many stations on the north with the existing Stockport Preston service. For example a service to Southport, Kirby or Wigan Wallgate would only duplicate Salford Crescent. Journey times from Victoria to Stockport of approximately 33 minutes give ample time for a robust timetable for hourly services; possible extension to Hazel Grove (42 minutes from Victoria) with its large free car park and increased catchment area to boost footfall. Service chosen would help maximise stock displaced at Victoria, therefore keeping costs to a minimum, and would be the best option for timetable and operational requirements. Whilst at present the Southport service could be extended with very little, if any, alteration to its current timings, other services may prove more favourable to be extended when the timetables are altered in December 2016 (completion of the Ordsall Chord) and again in December 2018 (completion of the electrification through to Stalybridge). 7

8 Advantages of extending services to Stockport from Victoria 1. The Stockport corridor would have instant access to Calder Valley services at Victoria. 2. The Stockport corridor would have access at Victoria to Metrolink services to Bury, Oldham and Rochdale. 3. Stockport passengers would have access to the Noma53 development at Manchester Victoria ( 4. Stockport passengers would have better access to the Northern Quarter, retail outlets, arenas, theatres and business at Manchester Victoria.( to list a few. 5. Stockport would have better access to Salford Central, giving better employment opportunities at Spinningfields. ( Stockport provides better level interchange with the intercity services to London for those passengers from the North West who would have to interchange at Piccadilly between the through platforms 13/14 and platform 12 where the London service terminates. 7. Stockport would better connect with Reddish South and Denton stations en route from Victoria. 8. Stockport has good connections with Piccadilly, but has poor connections beyond Piccadilly, a service to Victoria would help address this imbalance. 9. Having scheduled services between Stockport and Victoria will allow for better recovery from unplanned service disruptions between Stockport and Piccadilly. 8

9 10. Better use of spare capacity in the network. Extended services from Victoria could either terminate at the under-used bay platform 3a at Stockport or spare capacity could be utilised by terminating on the bidirectional platform 1 - or run through to further destinations like Hazel Grove for example. Surveys. Surveys have been carried out over the last 14 months by the Friends of Reddish South Station and a petition launched by the Friends of Denton Station on behalf of the campaign group. The results have been summarized in Appendices 1 & 2 of this report. You will see that part of the survey asks if potential passengers would be as - or more- in favour of a service to Stalybridge in preference to a service to Manchester Victoria. This was asked in response to a Transport for Greater Manchester(TfGM) suggestion that a service to Stalybridge would be more used and therefore more cost effective. As you will see from the results, most of those surveyed (locally and further afield) are very much in favour of a reinstated service from Stockport to Manchester Victoria. There is little or no possibility of Metrolink being extended to this area of Greater Manchester. 9

10 Stockport to Stalybridge service. Current service does not engage the communities of Reddish and Denton, in choice of destination or frequency. The service is inadequate to the business community. Stockport Good access to Piccadilly, access to Stalybridge and Guide Bridge from Piccadilly. Poor access North of Manchester. No access to Victoria or Salford Central Stations. Reddish South No Access to town (Stockport) or city. Very poor 'service' (one train per week) which is stunting business growth and life choices. Denton Very poor 'service' level of one train a week which restricts business opportunities and life choices. Guide Bridge Good access to services for Piccadilly. Stockport Messenger May 15 th

11 Reddish South It can be seen that the population within 800m of Reddish South is well above the Manchester Average and does NOT receive a level of service appropriate to its size. New housing in the 1980 s and 90 s close to the station and new apartments within Victoria Mill have all contributed to this figure, and with more apartments planned for in Elisabeth Mill, the population near to the station is set to increase to an all time high. Reddish South has a much larger business community than Reddish North; two mills located not more than 500m from Reddish South are the award winning Houldsworth Mill and Broadstone Mill Both are poorly serviced by quality rail destination i.e. to Stockport and Manchester, to be able to bring in more business and employment opportunities. Houldsworth Mill Broadstone Mill 11

12 Denton Good Motorway connections With a private developer eager to build a Park & Ride at Denton station, which would ease the traffic congestion along the A57 towards Manchester, and with more workers and business opportunities across the road, wwwtamesidebusinesspark.co.uk all that is missing is a regular train service into Manchester and Stockport. 12

13 Potential service change. The current level of the Stockport to Stalybridge service is one train a week one direction, whilst station footfall at Stockport (3,367,276), Stalybridge (1,028,260) and Guide Bridge (254,200) are high due to other services, Reddish South (122) and Denton (194) will always be low until a quality service is introduced. The communities of Reddish and Denton were not consulted in 1992 when the service was reduced, or in 2004 when Northern won the last franchise, but we do have a voice in the new franchise especially as the franchise objective is to support local communities to help deliver local transport integration, local regeneration and investment at and around stations. Footfall from Reddish South and Denton stations will always be greater into Manchester Victoria rather than Stalybridge, giving better access to service connections, jobs, universities, shops and leisure activities. This would also meet with a further two objectives of the franchise bid, realising the benefits from rail investment in the north of England (Ordsall Chord), and securing efficiencies in operation of the franchise through innovative and transformational approaches to operations, i.e. extending services from Victoria to Stockport for operational necessity due to platform constraints at Victoria as a result of public investment in the rail network (Northern Hub), and utilising spare capacity in the network to Stockport, creating new connections and new business, which would help the economy of the north of England thrive by offering good quality rail services for travellers across the region. We are not alone. The Friends of Reddish South (Stockport Council) and Denton (Tameside Council) have the full backing of their MP Andrew Gywnne and both Stockport and Tameside councils have given full and unanimous cross party support for a regular passenger service from Stockport to Manchester Victoria. We also are proud of support from Reddish Business Forum, Broadstone Mill, South East Manchester Community Rail Partnership (SEMcrp), Railfuture, Greater Manchester Transport Campaign(GMTC), Association of Community Rail Partnerships(ACORP), Manchester Chamber of Commerce, Stockport Chamber of Commerce, Heatons & Reddish Area Committee. We have forged links with Retrorail who now use Reddish South station as a scheduled stop on every chartered trip and Friends of Chapel-en-le-Frith station (Buxton line) who have put a direct service to Manchester Victoria on their 'wish list'. 13

14 Summary The communities of Reddish and Denton need a service which extends from Victoria to Stockport (or further), calling at Denton and Reddish South en route. Service pattern will be determined by current service pattern of extended service from Victoria, minimum of an hourly service with extra at peak time. Business located near to these stations need a service which can bring in customers and potential employees; better service will encourage more business to open. Reddish South and Denton at present have no desire to see any increase in the service to Stalybridge, so would like to see a service change to, Stockport to Manchester Victoria rather than the current Stockport to Stalybridge service. Stockport and Tameside councils will have their own views on service patterns and levels. 14

15 Appendix 1: Results of Surveys - Summary: The surveys took place over fourteen months at different locations, Stockport (Edgeley) Station, Hazel Grove and Cheadle Hulme. Reddish residents were questioned at 'Reddfest' in 2013, and opinions were also gathered at a Charity Day at Stockport Station in August of that year.the surveys were performed in 2-hour 'snapshots' bearing in mind we were questioning passengers early in the morning when they were going to work or out for a relaxing time. Results are detailed in Appendix 2 (p.16) but summarized as follows: Overall - 65% of passengers from all stations said a service direct to Manchester Victoria from Stockport would be useful. (Anecdotally, Hazel Grove rail staff reported that they had been asked, more than once or twice, for tickets direct to Manchester Victoria) Over 73% of passengers said a service to Manchester Victoria would be more useful than one to Stalybridge. Over 61% would find a service to Manchester Victoria from Stockport as useful as a service to Piccadilly. Reddfest Survey: 100% of Reddish residents surveyed would use a service to Manchester Victoria from Reddish South Station. 94% would use a service to Stockport from Reddish South Station. Over 94% of residents would find a service to Manchester Victoria more useful than a service to Stalybridge. Stockport Station Charity Day: Over 93% of Stockport residents surveyed would find a service direct to Manchester Victoria useful. 87% would find a service from Manchester Victoria to Stockport as useful as a service to Piccadilly. Over 91% would find a service to Manchester Victoria more useful than a service to Stalybridge. 15

16 Appendix 2 FORSS - Station passenger survey. Respondents answers. Railway Station & Date Question Question Question Question Question Question Service from Stockport to Mcr Victoria useful for you? Service to Victoria more useful than a service to Stalybridge? Service to Victoria from/to Stockport as useful as service to Piccadilly? Service from Stockport to Mcr Victoria useful for you? Service to Victoria more useful than a service to Stalybridge? Service to Victoria from/to Stockport as useful as service to Piccadilly? Answer Answer Answer Answer Answer Answer Yes Yes Yes No No No Edgeley - 11/04/2013 (survey 133) Edgeley - 20/04/2013 (survey 125) Hazel Grove - 27/03/2014 (survey 115) Cheadle Hulme - 10/04/2014 (survey 179) Total (survey 552) Results Percentages Edgeley - 11/04/2013 (survey 133) 66.92% 65.41% 66.17% 33.08% 34.59% 33.83% Edgeley - 20/04/2013 (survey 125) 79.20% 59.20% 79.20% 20.80% 40.80% 20.80% Hazel Grove - 27/03/2014 (survey 115) 55.65% 81.74% 49.57% 44.35% 18.26% 50.43% Cheadle Hulme - 10/04/2014 (survey 179) 59.78% 83.24% 52.51% 40.22% 16.76% 47.49% Total (survey 552) 65.04% 73.19% 61.23% 34.96% 26.81% 38.77% 16

17 Appendix 2 FORSS - Reddish South Residents Survey. Do you know where RS Station is and that there is no passenger service The line goes north to M/c Victoria would you use it? The line goes South to Stockport would you use it Service to Victoria more useful than a service to Stalybridge? Yes FORSS Survey August Fun Day Would you find a service from Stockport to Manchester Victoria useful to you? Would you find a service to Victoria from/to Stockport as useful as a service to Piccadilly? Service to Victoria more useful than a service to Stalybridge? No Yes No Yes % 98.08% % 94.23% 94.23% No % 1.92% 0.00% 5.77% 5.77% Yes % 93.62% 87.23% 91.49% No % 6.38% 12.77% 8.51% 17

18 Appendix 3: Petition - Friends of Denton Station: The petition was carried out over the last 12 months in the Denton area. The question asked: 'We are trying to reintroduce a service from Stockport Station to Manchester Victoria via Reddish South & Denton Stations. Please sign below if you would use the service' 1,234 Denton residents signed the petition and would use the service. This included 62 signatories from 'Centre Pointe' who also made the following statement in support of a reinstated service: 'We are a full time vocational college and evening dance school. We have people who travel a great distance to get to Denton. This station would be fantastic for us to use- we also have the Royal Ballet mid & junior associate programme which is run at Centre Pointe and people travel from country wide (London, Wales, Scotland etc..)' where to find us: contact: forss1@ntlworld.com 18

Manchester Victoria 11 day blockade Easter 2016

Manchester Victoria 11 day blockade Easter 2016 Manchester Victoria 11 day blockade Easter 2016 The Project Where and what? 1 billion investment. Between March 25 th and April 3 rd Major work will take place in the Manchester Victoria area in connection

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

THE STOPS ARE JUST THE START

THE STOPS ARE JUST THE START HS2 AND NORTHERN POWERHOUSE RAIL GROWTH STRATEGY THE STOPS ARE JUST THE START 1 2 This is an exciting time to be living, working, studying and investing in Greater Manchester. The region has always been

More information

Train times. Manchester to Hazel Grove and Buxton. 21 May 1 October northernrailway.co.uk. Salford Crescent. Manchester Piccadilly.

Train times. Manchester to Hazel Grove and Buxton. 21 May 1 October northernrailway.co.uk. Salford Crescent. Manchester Piccadilly. 20 Train times 21 May 1 October 2017 Manchester to Hazel Grove and Buxton Salford Crescent Manchester Piccadilly Deansgate Manchester Oxford Road Levenshulme Heaton Chapel Stockport Hazel Grove Davenport

More information

railfuture response to Northern RUS

railfuture response to Northern RUS railfuture response to Northern RUS railfuture offers its thoughts below on Northern RUS published in October 2010. Our response is in two parts: firstly responses to strategies identified in the document

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

Investing in Greater Manchester transport 2017/2018

Investing in Greater Manchester transport 2017/2018 TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects

More information

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY From Sunday 20 May 2018 customers across the North of England and into Scotland are set to benefit from improved connectivity, new journey opportunities and

More information

West Coast Main Line Track Access Applications Consultation:

West Coast Main Line Track Access Applications Consultation: David Wearing, Track Access Executive, Directorate of Railway Markets and Economics, Office of Rail Regulation, One Kemble Street, London WC2B 4AN 17 December 2010 Dear Mr. Wearing, West Coast Main Line

More information

Further details on interventions and funding are available within each Local Area Implementation Plan.

Further details on interventions and funding are available within each Local Area Implementation Plan. Greater Manchester Implementation Profiles Local Area Implementation Plans have been prepared for each of the ten District areas in Greater Manchester, and are available on the LTP3 website www.tfgm.com/ltp3.

More information

The future of the TransPennine Express and Northern rail franchises

The future of the TransPennine Express and Northern rail franchises The future of the TransPennine Express and Northern rail franchises 1. Name: Friends of Eccles Station (FRECCLES) 2. Are you responding as an individual or on behalf of an organisation? Organisation 3.

More information

Preston Leyland Buckshaw Parkway. Chorley Adlington Blackrod. Lostock. Bolton. Salford Crescent. Deansgate

Preston Leyland Buckshaw Parkway. Chorley Adlington Blackrod. Lostock. Bolton. Salford Crescent. Deansgate Blackpool North Layton Poulton-le-Fylde Kirkham & Wesham Parking available Staff in attendance Bicycle store facility Bike & Go Metrolink Interchange stations Disabled assistance available Airport link

More information

WIGAN PIER. Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter QUARTER

WIGAN PIER. Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter QUARTER Exciting new retail and leisure development, at the heart of the regeneration of the Wigan Pier Quarter WIGAN WIGAN H 2O Urban and Wigan Council are bringing forward the regeneration of this internationally

More information

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd Doncaster Chamber of Commerce Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing lines Up to 18

More information

TRANSFORMING TRANSPENNINE

TRANSFORMING TRANSPENNINE TRANSFORMING TRANSPENNINE MAY 2018 TIMETABLE We are now at a key milestone for our franchise, with the timetable change that comes into effect on Sunday 20 May 2018 the biggest and most important since

More information

Northern Powerhouse Rail

Northern Powerhouse Rail Northern Powerhouse Rail Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life. About Northern Powerhouse Rail This

More information

Manchester Piccadilly. Levenshulme. Heaton Chapel. Stockport. Davenport. Woodsmoor. Hazel Grove. Middlewood. Disley. New Mills Newtown.

Manchester Piccadilly. Levenshulme. Heaton Chapel. Stockport. Davenport. Woodsmoor. Hazel Grove. Middlewood. Disley. New Mills Newtown. Manchester Piccadilly Levenshulme Heaton Chapel Stockport Davenport Woodsmoor Hazel Grove Parking available Staff in attendance Bicycle store facility Bike & Go Metrolink Interchange stations Disabled

More information

Re-opening of the Skipton to Colne Railway Executive Summary

Re-opening of the Skipton to Colne Railway Executive Summary Re-opening of the to Colne Railway Executive Summary SELRAP SELRAP is the East Lancashire Rail Action Partnership. It was established with the objective of campaigning for the reinstatement of the railway

More information

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

Part B: General Meeting of Rail North Limited

Part B: General Meeting of Rail North Limited Part B: General Meeting of Rail North Limited Meeting date: Thursday 16 March 2017 Item: 7.0 Subject: Author(s): Rail Franchise Update Gary Bogan, Rail North Partnership Director 1. Purpose of report 1.1.

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

FirstGroup plc TransPennine Express

FirstGroup plc TransPennine Express FirstGroup plc TransPennine Express Rail franchise award Wednesday 9 December 2015 TransPennine Express awarded to FirstGroup FirstGroup is delighted to be selected by the Department for Transport (DfT)

More information

SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP A PRESENTATION TO SINTROPHER PARTNERSHIP MEETING

SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP A PRESENTATION TO SINTROPHER PARTNERSHIP MEETING SOUTH FYLDE LINE A PRESENTATION TO SINTROPHER PARTNERSHIP MEETING BY RICHARD WATTS RAIL PROJECTS MANAGER AND COMMUNITY RAIL PARTNERSHIP SECRETARY SOUTH FYLDE LINE The route THE COMMUNITY RAIL STRATEGY

More information

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is June 2018 www.hs2.org.uk In your area Stourton to Hunslet LA17 High Speed Two (HS2) is to Leeds M621 HUNSLET A639 STOURTON M621 A61 M1 A63 A639 M1 HS2 Phase 2b to Birmingham the Government s planned new

More information

DEVOLUTION OF RAIL FRANCHISING. A new strategy for rail in the North of England

DEVOLUTION OF RAIL FRANCHISING. A new strategy for rail in the North of England DEVOLUTION OF RAIL FRANCHISING A new strategy for rail in the North of England A BETTER RAILWAY IN THE NORTH We want the economy and prosperity of the North to grow and rail will play a pivotal role in

More information

New Northern, new look. Customer Report

New Northern, new look. Customer Report New Northern, new look Customer Report Autumn 217 Coming Together Our first new train is nearing completion at the CAF factory in Spain 18 months of change The station improvement trial is complete and

More information

Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017.

Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017. Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017. Subject: AE Bradford District Rail Update. Summary

More information

PRIME RETAIL INVESTMENT

PRIME RETAIL INVESTMENT PRIME RETAIL INVESTMENT IN AFFLUENT SOUTH MANCHESTER TOWN INVESTMENT SUMMARY Prime retail investment prominently located on a busy high street Located in Bramhall, an affluent South Manchester town Large

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Why MANCHESTER? MANCHESTER CASE

Why MANCHESTER? MANCHESTER CASE Why? Economic prosperity and a growing population are driving a strong case for investment in the UK s second city. A case further boosted by the UK government s Northern Powerhouse strategy, which puts

More information

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in performance of MVA Consultancy Ltd s duties and liabilities

More information

Connecting HS2 to Scotland: the North of England Criteria

Connecting HS2 to Scotland: the North of England Criteria Connecting HS to Scotland: the North of England Criteria Introduction The planning for the first two phases of High Speed is well underway. And, in October 1, the Secretary of State for Transport announced

More information

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY

HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY HOUSE OF COMMONS WELSH AFFAIRS COMMITTEE RESPONSE BY RAILFUTURE ON CROSS-BORDER ROAD AND RAIL CONNECTIVITY Railfuture is pleased to submit this consolidated national response on Cross-Border Road and Rail

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

Buses. Saturday 29 December Normal Saturday service.

Buses. Saturday 29 December Normal Saturday service. Buses Please remember to plan ahead and check with your bus operator before you travel on any of the dates listed below. Buses will run a normal or modified weekday service, or Saturday service with additional

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the

More information

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd The Hybrid Bill and the journey to Royal Assent Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing

More information

HARROGATE LINE SUPPORTERS GROUP - NEWS BULLETIN No. 13

HARROGATE LINE SUPPORTERS GROUP - NEWS BULLETIN No. 13 HARROGATE LINE SUPPORTERS GROUP - NEWS BULLETIN No. 13 - PROMISES OF MORE AND MORE TRAINS TO HARROGATE! There have been many important announcements and planned developments affecting rail services to

More information

CrossCountry Future Timetable Consultation

CrossCountry Future Timetable Consultation CrossCountry Future Timetable Consultation 1 Contents 1. Executive Summary... 3 2. Introduction... 4 3. Future Timetable Concept... 5 3.1 Introduction... 5 3.2 Passenger requirements... 5 3.3 How our timetable

More information

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government Wales The railway in Wales and Borders plays a critical role in connecting people, businesses and communities to support both regional and national economic growth. We run the safest railway in Europe,

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

On the right track. Stansted s vision for improved rail connectivity

On the right track. Stansted s vision for improved rail connectivity On the right track Stansted s vision for improved rail connectivity Stansted Airport - a catalyst for economic growth and productivity Stansted in 30 fast and reliable rail services Stansted wants to play

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

1.1 We note that the following WCML access applications have been made:

1.1 We note that the following WCML access applications have been made: David Wearing Track Access Executive Directorate of Railway Markets and Economics Office of Rail Regulation One Kemble Street London WC2B 4AN 5th Floor, Wellington House 39/41 Piccadilly, Manchester, M1

More information

Junction 9 M65. burnleybridge.co.uk

Junction 9 M65. burnleybridge.co.uk Junction 9 M65 burnleybridge.co.uk About Titanium Park offers ultimate flexibility for businesses seeking custom-built premises for manufacturing or distribution purposes. Developed by Eshton Group, the

More information

LOOKING BEYOND LONDON

LOOKING BEYOND LONDON LOOKING BEYOND LONDON COMPANIES LOOKING TO THE NORTH PROFESSIONALS LOOKING TO THE NORTH 1. 'Northshoring'- sharing around 20,000 per employee, per annum 2. Low business cost - start-up heaven 3. Comprehensive

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION. Local Rail Service Performance and Stations Update

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION. Local Rail Service Performance and Stations Update Item 9 TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION Sub Committee: Metrolink and Rail Networks Date: 29 June 2018 Subject: Report of: Local Rail Service Performance and Stations Update

More information

M6 CORRIDOR. Strategic Infrastructure Prospectus

M6 CORRIDOR. Strategic Infrastructure Prospectus CORRIDOR Strategic Infrastructure Prospectus May 2017 IntRODuCtIOn cumbria has real potential. We have a strong economy with major capability in energy, advanced manufacturing, logistics, agri-food and

More information

TRANSPORT UPDATE. September/October 2018

TRANSPORT UPDATE. September/October 2018 TRANSPORT UPDATE September/October 2018 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

FIT AND READY, FOR BUSINESS.

FIT AND READY, FOR BUSINESS. FIT AND READY, FOR BUSINESS. PHASE ONE COMPLETE & LET. PHASE TWO ONLY 25,000 SQ FT REMAINING MEDIA CITY SALFORD QUAYS M A N C H E S T E R AN EXCITING, BOLD, NEW ADDRESS BRIDGING MANCHESTER CITY CENTRE

More information

Summary of questions and discussion

Summary of questions and discussion London and South East Route Utilisation Strategy - Rail User Group Meeting Saturday 11 July 2009 Chair- Ashwin Kumar, Passenger Director, Passenger Focus Summary of questions and discussion A - Comments,

More information

JOINT GREATER MANCHESTER COMBINED AUTHORITY & AGMA EXECUTIVE BOARD MEETING. GMSF: Greater Manchester s Plan for Homes and Jobs. Update on Consultation

JOINT GREATER MANCHESTER COMBINED AUTHORITY & AGMA EXECUTIVE BOARD MEETING. GMSF: Greater Manchester s Plan for Homes and Jobs. Update on Consultation 7 JOINT GREATER MANCHESTER COMBINED AUTHORITY & AGMA EXECUTIVE BOARD MEETING Date: 31 March 2017 Subject: Report of: GMSF: Greater Manchester s Plan for Homes and Jobs. Update on Consultation Councillor

More information

In your area. Warmfield to Swillington and Woodlesford LA15. June Introduction

In your area. Warmfield to Swillington and Woodlesford LA15. June Introduction June 2018 www.hs2.org.uk In your area Warmfield to Swillington and Woodlesford LA15 LA15 Rothwell to Leeds A642 M62 M1 Woodlesford Oulton Bottom Boat to York HS2 Phase 2b Altofts A642 Swillington Methley

More information

Department for Transport

Department for Transport Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House

More information

International Quarter London Retail & catering

International Quarter London Retail & catering International Quarter Retail & catering 2 International Quarter Where the future works Computer generated image for illustrative purposes only 4 Vision An exciting retail opportunity Stratford is fast

More information

Office and retail space Manchester. Funky and affordable office and retail space, units from 100 to 10,000 sq ft

Office and retail space Manchester. Funky and affordable office and retail space, units from 100 to 10,000 sq ft Office and retail space Funky and affordable office and retail space, units from 100 to 10,000 sq ft Ducie House Ducie House was one of the first buildings in to be reinvented by Urban Splash. It has long

More information

UPPER CALDER VALLEY RENAISSANCE SUSTAINABLE TRANSPORT GROUP

UPPER CALDER VALLEY RENAISSANCE SUSTAINABLE TRANSPORT GROUP UPPER CALDER VALLEY RENAISSANCE SUSTAINABLE TRANSPORT GROUP RESPONSE TO THE DfT AND RAIL NORTH CONSULTATION ON THE NORTHERN RAIL AND TRANS PENNINE EXPRESS FRANCHISES. 12 August 2014. Lead author: Nina

More information

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017 Cabinet Date of Meeting 6 December 2017 Cabinet Member Cllr Daryl Turner Cabinet Member for Natural and Built Environment Lead Director Mike Harries Corporate Director for Environment and Economy Subject

More information

In your area. Tibshelf to Shuttlewood LA10. June Introduction

In your area. Tibshelf to Shuttlewood LA10. June Introduction June 2018 www.hs2.org.uk In your area Tibshelf to Shuttlewood LA10 LA10 M1 Calow Arkwright A632 Town Long Duckmanton Cock Alley Temple Normanton A617 Grassmoor Heath Holmewood North Wingfield Sutton Scarsdale

More information

*Andrew Oswald, a professor of economics at Warwick Business School

*Andrew Oswald, a professor of economics at Warwick Business School THIS IS TOWERS Towers is not a typical working environment. Home to over 2000 employees in modern efficient buildings, set in a beautifully landscaped setting. The park is excellently located for rapid

More information

Reducing traffic: a new plan for public transport

Reducing traffic: a new plan for public transport Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail

More information

Train times. Manchester to Sheffield The Hope Valley Line. 11 December May northernrailway.co.uk. Manchester Piccadilly

Train times. Manchester to Sheffield The Hope Valley Line. 11 December May northernrailway.co.uk. Manchester Piccadilly 23 Train times 11 December 2016 20 May 2017 Manchester to Sheffield The Hope Valley Line Manchester Piccadilly Ashburys Belle Vue Ryder Brow Reddish North Brinnington Stockport Bredbury Romiley Hazel Grove

More information

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act. Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Quarterly Progress Report

Quarterly Progress Report Quarterly Progress Report Team: Passenger Link Quarter: 3 Agenda Item: 6.2.4 Sponsor Ashwin Kumar Author(s): Lee Paddock 1. Highlights The paper attached provides an update on passenger facing work during

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Transport for Lancashire Committee 1 st July 2013 Local Major Transport Scheme Investment Programme Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Executive

More information

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum

The Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum The Future for Rail TravelWatch NorthWest Chris Green, Railway Forum Overview Patients and Passengers Chris Green, ex Chairman Virgin Trains Rail industry delivering again 12 year Roller Coaster Nationalised

More information

A GREAT PLACE TO INVEST. wearedoncaster.co.uk

A GREAT PLACE TO INVEST. wearedoncaster.co.uk A GREAT PLACE TO INVEST wearedoncaster.co.uk GETTING HERE TODAY Windsor > Kings Cross c75 mins Brighton > London c70 mins Doncaster > Kings Cross c88 mins (reduced to c75 mins in 2018 with the new Azuma

More information

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9 CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies

More information

Call: * northernrailway.co.uk/comments Customer Experience Centre Freepost NORTHERN RAILWAY Customer

Call: * northernrailway.co.uk/comments Customer Experience Centre Freepost NORTHERN RAILWAY Customer Our Customer Report April 2017 Welcome! This is our second full Customer Report, sharing our progress so far to improve your rail experience, together with our performance results between 18 September

More information

ASLEF s Response to the East Anglia Rail Franchise Consultation

ASLEF s Response to the East Anglia Rail Franchise Consultation ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Our business plan for making travel easier in Greater Manchester

Our business plan for making travel easier in Greater Manchester Our business plan for making travel easier in Greater Manchester 2018 21 Contents Foreword 3 Introduction 5 Our transport strategy 7 Our focus on customers 10 Our commitment to health and sustainability

More information

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Chapter 12. HS2/HS1 Connection. Prepared by Christopher Stokes Chapter 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes 12.1 This chapter relates to the following questions listed by the Committee: 3.1 Business

More information

National Rail Passenger Survey Autumn 2013 Main Report

National Rail Passenger Survey Autumn 2013 Main Report National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers

More information

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir, East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan REPORT OF THE EXECUTIVE DIRECTOR OF PLACE TO CABINET

More information

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Introduction We welcome your input to the New Cross Country (NCC) consultation

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

The Rail Network in Wales

The Rail Network in Wales The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

a manifesto for business

a manifesto for business a manifesto for business to 2020 Introduction and role of this manifesto What is Suffolk Chamber of Commerce s role? Suffolk is a county undergoing profound economic change. Suffolk Chamber of Commerce,

More information

SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP ACTION PLAN 2016/17

SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP ACTION PLAN 2016/17 SOUTH FYLDE LINE COMMUNITY RAIL PARTNERSHIP ACTION PLAN 2016/17 Contents 1. Introduction 2. Market Analysis 3. Action Plan 2016 Appendices Appendix 1 Terms of Reference for the SFLCRP Appendix 2 Route

More information

East Midlands Rail Franchise Public Consultation

East Midlands Rail Franchise Public Consultation Scarborough Leeds York Manchester Liverpool Doncaster Sheffield Barton-on -Humber Crewe Chesterfield Matlock Worksop Lincoln Mansfield Grimsby Cleethorpes Skegness Stoke-on-Trent Derby ottingham Grantham

More information

LEEDS PROPERTY GUIDE 2018/2019

LEEDS PROPERTY GUIDE 2018/2019 LEEDS PROPERTY GUIDE 2018/2019 LEEDS PROPERTY GUIDE - 2018/2019 WHY INVEST IN BUY-TO-LET? There has never been a better time to invest in buy-to-let in the UK. The number of people renting in the UK is

More information

Briefing for the Mayor and Combined Authority of Greater Manchester June 2017

Briefing for the Mayor and Combined Authority of Greater Manchester June 2017 TravelWatch NORTHWEST promoting quality public transport... Winner of CILT award for best practice in passenger transport (2013) Briefing for the Mayor and Combined Authority of Greater Manchester June

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

In your area. Stonebroom to Clay Cross LA09. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton

More information

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.

The case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response. Response The case for rail devolution in London Submission to the London Assembly Transport Committee Pedro Abrantes Senior Economist pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1

More information

AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM

AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM Designing A Thriving Place LBA Airport Link Road Consultation Leeds City Council Leeds LS2 8HD West Yorkshire 26 February 2016 Dear Sir This is the response

More information

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes

Appendix 12. HS2/HS1 Connection. Prepared by Christopher Stokes Appendix 12 HS2/HS1 Connection Prepared by Christopher Stokes 12 HS2/HS1 CONNECTION Prepared by Christopher Stokes Introduction 12.1 This appendix examines the business case for through services to HS1,

More information