TRANSPORT UPDATE. September/October 2018
|
|
- Berniece Wright
- 5 years ago
- Views:
Transcription
1 TRANSPORT UPDATE September/October 2018
2 TRANSPORT UPDATE Below is a list of the main local, regional and national transport projects that the Chamber is involved with, either directly or indirectly. Mention is also made of the Chamber s broad stance regarding the projects. A64/Hopgrove Roundabout Highways England has announced that four detailed options are being developed to upgrade the existing single carriageway to dual the carriageway from the Hopgrove roundabout to the exiting dual carriageway near to Castle Howard. The work will also include improvements to the Hopgrove roundabout. Details are likely to be available in early The Chamber is supportive of the proposals to improve the roundabout and to dual the carriageway however concerns have been expressed about the approx. 3 miles of single carriageway to the west of Malton which will remain once the upgrade has taken place and the congestion that is likely to arise. HS2 In July 2017 the Department for Transport (DfT) reaffirmed its support for HS2 Phase 2b and confirmed the preferred route for the full Y network north of Birmingham. This now enables preparations for the third HS2 Hybrid Bill to begin and which is intended to go before Parliament in autumn 2019 with construction work likely to commence in 2023/24. DfT s announcement also identified an alternative site for the rolling stock depot originally proposed for Crofton near Wakefield. The new site is to the east of Leeds in the Aire Valley adjacent to the M1 motorway. The Chamber of Commerce has been a supporter of HS2 for a good number of years primarily because of the improved connectivity and increased capacity the scheme will bring. The Chamber s proposals for an integrated classic and HS2 rail station in Leeds were adopted and in addition the Chamber s suggestion that some HS2 services should travel through the station have also been accepted. The Chamber remains supportive of HS2 but has also stated that local rail services must be improved to maximise the economic impact of High Speed Rail arriving in Leeds. HS rail services will also travel to York and beyond however, and despite a number of attempts, the Chamber has yet to have meaningful engagement with City of York Council about plans to upgrade the rail station in the city to accommodate the HS services. This is disappointing however attempts will continue to try and engage with the Council. In July 2018 the government confirmed that the new HS2 eastern leg rolling stock depot will be constructed in Leeds close to junction 45 of the MI motorway and in the city s Enterprise Zone. The depot will play a crucial role in enabling 24-hour maintenance of the new high-speed trains and create up to 125 skilled jobs.
3 Sir Terry Morgan has been appointed HS2 Ltd s new chairman, taking over from Sir David Higgins. Sir Terry Morgan moves from Crossrail, where he has been chairman since 2009 and will take up his new role on 1 August One of the last public appearances of Sir David Higgins was in Leeds in July at which he launched HS2 Realising the Potential, a report that reflects both the progress that has been made and the challenges that remain. In early September the Department for Transport confirmed that the Hybrid bill needed to begin work on the eastern and western legs of the line north of Birmingham will now be tabled in However the government insists that this will have no bearing on the final completion date. The bill is being paused to take account of Northern Powerhouse Rail (NPR)linking Liverpool, Manchester, Leeds Sheffield and Newcastle. The Chamber understands why the bill has been paused and the need to include touchpoints where HS2 and NPR cross is understandable but could have been better communicated. HS2 Growth Strategy The Leeds City Region (LCR) HS2 Growth Strategy has been developed to ensure the overall opportunity from HS2 is maximised. An overarching document that summarises the Growth Strategy has been developed and which also brings together the different work streams associated with the work. One of these is the Leeds Integrated Station Masterplan (LISM) and the Chamber s desire for an integrated classic and HS2 rail station is reflected in the proposals. In addition work is also being undertaken to ensure that the economic impact of HS2 is fully realised by improving and increasing local rail services. The Chamber has provided input into the early discussions about the strategy and is supportive of the need to ensure that the economic impact is spread as wide as possible. In addition the Chamber has commented: - A door to door integrated approach to connectivity is essential, - Better integration of the existing different modes of transport is required, - Cross modal and boundary ticketing should be introduced as soon as possible. Leeds Bradford Airport The Airport announced plans in September 2018 for a new, state-of-the-art terminal extension. When completed, in late 2019, the new extension will transform the Airport s international arrivals. After the extension is finished, work to re-model the existing terminal building will start. These works are expected to be complete by Further public consultation is set to take place in early 2019 on the Airport s and north west Leeds connectivity and growth plans. The consultation will include proposals for improved road and rail access. The road proposals were first announced at the end of 2015 and the Chamber supported the proposals for a new road from the A65 running alongside the eastern side of the airport before joining the A658 but with congestion
4 mitigation measures at each end of the road and also that all possible rail options (including heavy rail) should continue to be explored. Leeds Public Transport Investment Programme Work is now underway to deliver the Leeds Public Transport Investment Programme funded by a 173.5m grant from DfT, contributions from the West Yorkshire Combined Authority (WYCA), Leeds City Council, and vehicle investment by the major bus companies. The Programme includes: - A further 2000 more Park & Ride services are to be created with a new site opening at Stourton in 2019 and the exploration of a north of city site, plus possible expansion of the Elland Road Park and Ride service, - Bus corridor improvements on 4 key arterial routes, including the A660 route from Adel to Leeds, via Lawnswood and Headingley, and the A61 south from Leeds to Wakefield, via Stourton and Hunslet, - The introduction of a large number of new, more environmentally friendly buses including First Bus investing 71m to provide 284 new vehicles, - Increased capacity on both Northern and Trans-Pennine rail services, - Development work on three new rail stations in Leeds, - A 32m programme of car park extensions at a number of rail stations across West Yorkshire, - The East Leeds Orbital Road which will connect the outer ring road at Red Hall around the east of the city joining a new Manston Lane Link road and connecting through Thorpe Park into junction 46 of the M1 motorway. (following the collapse of Carillion PLC, which was the chosen contractor for the development and construction of the East Leeds Orbital Ring Road, Balfour Beatty has been appointed for the fisrt two phases of the work). Enhanced bus travel is key element of the programme, with the target set of doubling the current 250,000 bus trips made in the city per day within 10 years. The plans include longer and new bus lanes, smart traffic signals and new junction layouts to help keep buses moving, especially during peak travel times. Two contactors have been appointed to undertake the work associated with the city centre and also the main bus corridor activity. Pressure is mounting to ensure the projects are delivered on time. The Chamber has raised concerns about the impact of disruption across the city and has been assured that this will be kept to a minimum but some is inevitable. In addition the Chamber has also commented that an effective communications programme should be put in place to raise awareness of the work and also the potential disruption. Overall the Chamber is supportive of the proposed investment programme however Sara Gilmore, the chair of the Chamber s transport group has written to both Leeds City Council and WYCA expressing the Chamber s disappointment that the buses from the Temple
5 Green Park & Ride site, and the ones from the proposed new site at Stourton, do not drop off or collect in the city s business district. London North Eastern Railway Chris Grayling MP, Secretary of State for Transport informed the House of Commons earlier this year that the franchise for the operation of East Coast Main Line services would in due course run out of money and would not last until Consequently Virgin East Coast s franchise to run the services was terminated on the 24 th of June On that day a new long-term brand for the East Coast Mainline was launched London North East Railway (LNER). A new board with an independent chair to oversee the operation of the LNER route and work with the Department of Transport on building a new partnership has been created. In all circumstances ownership of the infrastructure will remain in the public sector but the railway will be a partnership between the public and private sectors. Tickets, timetables and services have all stayed the same. The Chamber remains concerned that the line has been in multiple ownership over the last decade or so but the majority have failed is there some underlying problem that has not been addressed. Northern Powerhouse Rail (NPR) The NPR programme seeks to achieve radical changes in service patterns, and journey times between the cities and key economic centres of the North. WYCA and Leeds City Region partners have put forward a clear, convincing and evidence led position on its ambitions for NPR and how it should serve the area. This includes Bradford, Leeds and York. Transport for the North (TfN) is working on a Strategic Outline Business Case for NPR and this should be submitted to government by the end of This is based on an emerging, preferred rail network that s proposed by TfN through its draft Strategic Transport Plan and which mentions an NPR line between Leeds, Bradford and Manchester. The City of Bradford council s preference is for an NPR station in the centre of Bradford. (TfN hasn t made it clear where an NPR station would be located in the city). The Chamber is supportive of an NPR station in the centre of Bradford because of the regeneration and additional investment it would bring. WYCA and Bradford Council are commissioning two pieces of work to strengthen the evidence base for a city centre location. In addition the Chamber will continue to work closely with Bradford Council to promote Next Stop Bradford, the name of the campaign for NPR to come to Bradford. Trans-Pennine Route Upgrade (TRU) TRU was borne out of the original Trans-Pennine Electrification and Northern Hub rail schemes which were required at the time by Government to support improved performance and integration of the north s economy. The electrification scheme was paused for a time and then unpaused by the previous Secretary of State for Transport in
6 autumn 2015, with TRU again committed to in Spring The new proposed completion date for TRU is 2022 and Network Rail has submitted it its plans for the upgrade to the DfT in mid-december 2017 as required. A final decision is expected in late 2018/early2019. The Chamber is supportive of TRU for the following reasons: - It will upgrade the existing lines to create extra capacity for a more frequent rail service between Leeds and Manchester to cope with existing overcrowding and forecast growth, and - Improved journey times including Leeds to Manchester from 49 to 40 minutes and York to Manchester from 74 to 62 minutes. Transport for the North (TfN) Following Parliamentary approval TfN became the first sub-regional transport body in the UK from 1 April As a statutory body TfN will become a partner to the Department for Transport, Highways England, and Network Rail to ensure that the North s strategic transport priorities are delivered. TfN will be publishing its Strategic Transport Plan (STP) in December 2018 following consultation on a draft plan earlier this year. The STP will be TfN s flagship document setting out plans for investment in strategic transport in the north up to The Chamber of Commerce has established its own TfN group and which is chaired by Paula Dillon. Meetings have already taken place with representatives from TfN and it is hoped they will take place on a regular basis. The Chamber is supportive of TfN although it has expressed concerns that, as yet it has no formal powers or funding. In addition the Chamber will want to see effective collaboration between TfN at a strategic level and local authorities/combined authorities at the local level happens to ensure that investment is maximised and benefits are fully realised. On a practical level the Chamber has mentioned the following at recent workshops organised by TfN: - The M62 is the main trans-pennine route used by road traffic to travel east-westeast but is frequently severely congested and with forecasts for continued increases in usage, what can be done to increase the motorway s capacity? - How can transport connections north of Leeds and Bradford plus Keighley be improved to better connect with North East Lancashire? Doing so might alleviate some of the capacity pressures on the M62, and - Could existing roads be better utilised by introducing more passing lanes and/or dualling existing ones rather than building new ones? The above points were also mentioned in the Chamber s response to TfN s consultation on its STP. In addition the Chamber reinforced its support for an NPR station in Bradford city centre. In addition, and amongst other points raised, the Chamber queried when a
7 delivery plan for improving the North s transport connectivity would be produced and what criteria would be used for prioritising schemes. York Plans for a new access road to the York Central site have been developed and have nearly been agreed. The Chamber supports the new road because without one the site will remain largely inaccessible and therefore undeliverable. However the Chamber has expressed concern about the possibility of traffic being able to travel through the whole site and the impact this might have on congestion and possible rat-running in and out of the city centre. However the York Central Partnership is hopeful of producing an outline masterplan for the development of the site by late August The City of York Council announced last year that it intends to upgrade seven of the roundabouts on the city s northern ring road. The work began in early 2018 and the first roundabout is nearly finished. Planning permission has been granted for work on the second roundabout Monks Cross with work likely to start by the end of The Chamber is supportive of the work being undertaken because it will help reduce congestion and in addition the new roundabout layouts will be designed to accommodate a potential future scheme to dual the road. However the Chamber believes that in the long term the road should be dualled and recently raised this in a meeting with Bernadette Kelly CB, Permanent Secretary at the Department for Transport.
2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.
Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating
More informationThe Government s Aviation Strategy Transport for the North (TfN) response
The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering
More informationIn your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is
June 2018 www.hs2.org.uk In your area Stourton to Hunslet LA17 High Speed Two (HS2) is to Leeds M621 HUNSLET A639 STOURTON M621 A61 M1 A63 A639 M1 HS2 Phase 2b to Birmingham the Government s planned new
More informationAn Introduction to HS2
July 16 1 Overview HS2 is a vital part of the Government s long term economic plan, strongly supported by midland, northern English and Scottish cities. HS2 will not be a separate, standalone railway.
More informationSection A: Scheme Summary
Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054
More informationEast Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)
Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and
More informationCABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A
21 Agenda Item 5 CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of the Report PART A 1. To present the
More informationMINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS
MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, 40-50 WELLINGTON STREET, LEEDS Present: Councillor Keith Wakefield OBE (Chair) Councillor
More informationM6 CORRIDOR. Strategic Infrastructure Prospectus
CORRIDOR Strategic Infrastructure Prospectus May 2017 IntRODuCtIOn cumbria has real potential. We have a strong economy with major capability in energy, advanced manufacturing, logistics, agri-food and
More informationDepartment for Transport
Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House
More informationIn your area. South Kirkby to Sharlston Common LA14. June Introduction
June 2018 www.hs2.org.uk In your area South Kirkby to Sharlston Common LA14 A645 to Leeds A628 A638 Sharlston A639 Crofton Wragby HS2 Phase 2b Wintersett A638 Kinsley Ryhill A628 Hemsworth A6201 South
More informationA TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES
THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the
More informationNorthern Powerhouse Rail
Northern Powerhouse Rail Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life. About Northern Powerhouse Rail This
More informationEmerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine
Emerging Strategy Executive Summary November 2016 Midlands Connect Powering the Midlands Engine Foreword Sir John Peace Chairman of Midlands Engine and Midlands Connect As we get closer to the finalisation
More informationIn your area. Warmfield to Swillington and Woodlesford LA15. June Introduction
June 2018 www.hs2.org.uk In your area Warmfield to Swillington and Woodlesford LA15 LA15 Rothwell to Leeds A642 M62 M1 Woodlesford Oulton Bottom Boat to York HS2 Phase 2b Altofts A642 Swillington Methley
More informationEconomic Development Sub- Committee
Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and
More informationAgenda Item 5: Rail East Midlands Rail Franchise Consultation
Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by
More informationEAST WEST RAIL EASTERN SECTION. prospectus for growth
EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote
More informationStrategic Transport Forum
Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH
More informationTransport Infrastructure Construction and RMI Market Report - UK Analysis
Transport Infrastructure Construction and RMI Market Report - UK 2017-2021 Analysis Published: 19/12/2017 / Number of Pages: 60 / Price: 845.00 Introduction and Overview The 6th Edition of the 'Transport
More informationOpen Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee
Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update
More informationRoad Investment Strategy A1 East of England Strategic Road Study
Road Investment Strategy 2020-2025 A1 East of England Strategic Road Study Report of the fourth meeting of the Stakeholder Reference Group March 2017 The fourth meeting of the A1 Stakeholder Reference
More informationReport of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017.
Report of the Strategic Director (Place) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 March 2017. Subject: AE Bradford District Rail Update. Summary
More information1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.
East West Rail Consortium 14 th June 2018 Agenda Item 3: Terms of Reference Recommendation: It is recommended that the meeting consider and agree subject to any amendment agreed by the meeting the revised
More informationBARNSLEY METROPOLITAN BOROUGH COUNCIL
BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan REPORT OF THE EXECUTIVE DIRECTOR OF PLACE TO CABINET
More informationConsultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England
Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May
More informationBACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE
BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE 1 The East Coast Main Line 1.1 The East Coast Main Line (ECML) is one of two high-capacity north-south trunk routes that run between
More informationIn your area. Stonebroom to Clay Cross LA09. June Introduction
June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton
More informationTRANSPORT COMMITTEE A G E N D A
TRANSPORT COMMITTEE MEETING TO BE HELD AT 11.00 AM ON FRIDAY, 8 SEPTEMBER 2017 IN COMMITTEE ROOM A, WELLINGTON HOUSE, 40-50 WELLINGTON STREET, LEEDS 1. APOLOGIES FOR ABSENCE A G E N D A 2. DECLARATIONS
More informationAs part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is
As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity
More informationIn your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is
June 2018 www.hs2.org.uk In your area Manchester Piccadilly Station MA08 High Speed Two (HS2) is A57(M) A5067 Manchester A5103 A5067 Newton Street Piccadilly A34 A665 Store Street A6 Manchester Sheffield
More informationTHE STOPS ARE JUST THE START
HS2 AND NORTHERN POWERHOUSE RAIL GROWTH STRATEGY THE STOPS ARE JUST THE START 1 2 This is an exciting time to be living, working, studying and investing in Greater Manchester. The region has always been
More informationConneCting the northern Powerhouse
ConneCting the northern Powerhouse high speed rail for Leeds City region rethinking Leeds hs2 station July 2015 West & North Yorkshire Chamber of Commerce British Chambers of Commerce Accredited Contents
More informationIn your area. Tibshelf to Shuttlewood LA10. June Introduction
June 2018 www.hs2.org.uk In your area Tibshelf to Shuttlewood LA10 LA10 M1 Calow Arkwright A632 Town Long Duckmanton Cock Alley Temple Normanton A617 Grassmoor Heath Holmewood North Wingfield Sutton Scarsdale
More informationThe Future for Rail TravelWatch NorthWest. Chris Green, Railway Forum
The Future for Rail TravelWatch NorthWest Chris Green, Railway Forum Overview Patients and Passengers Chris Green, ex Chairman Virgin Trains Rail industry delivering again 12 year Roller Coaster Nationalised
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationPlugging the greater Midlands region into global wealth
Plugging the greater Midlands region into global wealth A great airport for a great city Birmingham Airport will be at the centre of a network of great airports delivering aviation capacity and connectivity
More informationIAT Annual Conference 'Driving Forward
Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little
More information33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,
East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33
More informationInfrastructure for Growth
A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has
More informationSHAPING REGIONAL INFRASTRUCTURE
SHAPING REGIONAL INFRASTRUCTURE PRIORITIES FOR GROWTH YORKSHIRE AND THE HUMBER APRIL 2017 1 Introduction As the UK begins its exit from the EU, there will need to be a renewed focus on delivering growth
More informationFirstGroup plc TransPennine Express
FirstGroup plc TransPennine Express Rail franchise award Wednesday 9 December 2015 TransPennine Express awarded to FirstGroup FirstGroup is delighted to be selected by the Department for Transport (DfT)
More informationIn your area. Pinxton to Newton and Huthwaite LA08. June Introduction
June 2018 www.hs2.org.uk In your area Pinxton to Newton and Huthwaite LA08 to Chesterfield and Sheffield Westhouses Blackwell Newton M1 South Normanton to Leeds Hilcote 28 Pinxton Huthwaite A38 HS2 Phase
More informationApologies for absence were received from Councillor Michael Lyons, Councillor Tim Swift and Councillor Ian Gillis.
MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 12 JANUARY 2018 AT COMMITTEE ROOM A, WELLINGTON HOUSE, 40-50 WELLINGTON STREET, LEEDS Present: Councillor Keith Wakefield OBE (Chair) Councillor
More informationIntroduction to West Yorkshire Combined Authority
Director: Dave Pearson, Director of Transport Services Report to: Leeds District Consultation Sub-Committee Date: 9 October 2017 Subject: Information Report 1 Purpose 1.1 Matters of information relating
More informationReport Author: Jo Turton, Executive Director for the Environment, Lancashire County Council
Transport for Lancashire Committee 1 st July 2013 Local Major Transport Scheme Investment Programme Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council Executive
More informationRe-opening of the Skipton to Colne Railway Executive Summary
Re-opening of the to Colne Railway Executive Summary SELRAP SELRAP is the East Lancashire Rail Action Partnership. It was established with the objective of campaigning for the reinstatement of the railway
More informationRail Update Station Usage Statistics and Network Rail Performance
Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update
More informationThis report is PUBLIC [NOT PROTECTIVELY MARKED] Board Meeting. Councillor Roger Lawrence Transport
Agenda Item No. 5.4 Board Meeting Date 17 February 2017 Report title Cabinet Member Portfolio Lead Accountable Managing Director Accountable Employee Report has been considered by West Midlands Bus Alliance
More informationLEEDS. INNOVATIVE INFRASTRUCTURE DELIVERY Creating a catalyst for regeneration and unlocking investment opportunities. Leeds Railway Station
LEEDS INNOVATIVE INFRASTRUCTURE DELIVERY Creating a catalyst for regeneration and unlocking investment opportunities Leeds Railway Station INTRODUCTION Leeds is at the centre of the Northern Powerhouse
More informationStrategic Cross Border Planning in the West Midlands
Strategic Cross Border Planning in the West Midlands RTPI Planners, Birmingham 21/02/2018 Adam Harrison, TfWM Transport Governance and WMCA Renaissance: Why the West Midlands? Transforming our place? Challenges
More informationWakefield District Consultation Sub Committee. Date: 14 February 2019
Report to: Wakefield District Consultation Sub Committee Date: 14 February 2019 Subject: Director(s): Author(s): Information Report Dave Pearson Director Transport Services Various 1. Purpose of this report
More informationFUTURE AIRSPACE CHANGE
HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationAIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM
AIREBOROUGH NEIGHBOURHOOD DEVELOPMENT FORUM Designing A Thriving Place LBA Airport Link Road Consultation Leeds City Council Leeds LS2 8HD West Yorkshire 26 February 2016 Dear Sir This is the response
More informationASLEF s Response to the East Anglia Rail Franchise Consultation
ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately
More informationThe case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.
Response The case for rail devolution in London Submission to the London Assembly Transport Committee Pedro Abrantes Senior Economist pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1
More informationHigh Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond
High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond Moving Britain Ahead Cm9355 November 2016 High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and
More informationThe Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd
The Hybrid Bill and the journey to Royal Assent Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing
More informationWest Midlands Sustainable Urban
West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence
More informationMidlands Connect Strategy: Powering the Midlands Engine
Midlands Connect Strategy: Powering the Midlands Engine March 2017 Midlands Connect Powering the Midlands Engine Sir John Peace Chairman of Midlands Engine and Midlands Connect Foreword I am honoured to
More informationCalderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan
Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1
More informationThe Rail Network in Wales
The Rail Network in Wales The Case for Investment Summary Professor Mark Barry 12 July 2018 Mark Barry M&G Barry Consulting Ltd www.mgbarryconsulting.com Mae r ddogfen yma hefyd ar gael yn Gymraeg. This
More information2nd March, 2017 Corporate Report Format. Conisbrough Mexborough Sprotbrough
2nd March, 2017 Corporate Report Format To the Chair and Members of the Full Council HIGH SPEED TWO PHASE 2B PROPERTY AND ROUTE REFINEMENT CONSULTATIONS Relevant Cabinet Member(s) Mayor Ros Jones Cllr
More informationSite Allocations Plan. Leeds Local Plan
Site Allocations Plan Leeds Local Plan Development Plan Document Updated Infrastructure Background Paper (including IDP) July 218 1 Introduction 1.1 This paper is a full update of the Infrastructure Background
More informationPart B: General Meeting of Rail North Limited
Part B: General Meeting of Rail North Limited Meeting date: Thursday 16 March 2017 Item: 7.0 Subject: Author(s): Rail Franchise Update Gary Bogan, Rail North Partnership Director 1. Purpose of report 1.1.
More informationUNLOCKING THE BRIGHTON MAINLINE
UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to
More informationA303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016
Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities
More informationJim O Sullivan Chief Executive
Jim O Sullivan Chief Executive Imperatives Customer Service Safety Delivery The Strategic Road Network (SRN) Connects the nation Supports the wider transport network Drives the economy 4,300 miles of SRN
More informationTRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION
TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel
More informationAirport Operators Association National Needs Assessment: Call for evidence
Airport Operators Association National Needs Assessment: Call for evidence Introduction the need for aviation to grow across the UK 1. This response is submitted on behalf of the Airport Operators Association
More informationReport of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018
Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control
More informationAirlines UK 24 May 2018: Speech by Richard Moriarty
24 May 2018 Airlines UK 24 May 2018: Speech by Richard Moriarty 1. Good afternoon everyone. I d like to thank Tim and Airlines UK for organising today s event, which I hope will mark a significant milestone
More informationJuly 2016 Briefing pack: David Higgins South Yorkshire Report
July 2016 Briefing pack: David Higgins South Yorkshire Report Overview On 7 July 2016, David Higgins, Chairman of HS2 Ltd, published a report making recommendations to Government on the station location
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationRail Delivery Group. Consultation on the future of the East Midlands rail franchise
Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,
More informationInvesting in Greater Manchester transport 2017/2018
TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects
More informationLiverpool City Region Today:
Liverpool City Region Today: Challenges, Opportunities and the Role of the LEP Mark Basnett, Managing Director Liverpool City Region LEP ROLE OF THE LEP 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
More informationWest London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London
West London Economic Prosperity Board 21 March 2017 Title Orbital Rail in West London Report of Status Urgent Enclosures Officer Contact Details Amar Dave (LB Brent) Public No Appendix 1: Specification
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationWokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement
Wokingham Borough Council Response to the Consultation on the Draft Airports National Policy Statement The consultation Draft Airports National Policy Statement (Draft NPS) sets out Government s policy
More informationSubmission by Heathrow Southern Railway Ltd.
Response to Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow Submission by Heathrow Southern Railway Ltd. 22 nd September 2017 Contact; Steven Costello,
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD
More informationSurface Access Congestion
Bristol Airport the connectivity challenge up to 2050 Mark Herbert Planning Manager Surface Access Congestion Surface Access Congestion Primary Catchment Area 7 MILLION Secondary Catchment Area 3 MILLION
More informationA47 Business Case. Gateway to Growth ALLIANCE
Business Case Gateway to Growth ALLIANCE September 2017 3 By planning for the longer term we can ensure that we maximise the resulting economic benefits for our communities. Cllr William Nunn, Leader of
More informationSouth of England north-south connectivity
South of England north-south connectivity An outline economic case for the inclusion of north-south connectivity improvements to form part of the government s road investment strategy (RIS2) Weston-super-Mare
More informationBartlett Square Welcome. Investment Framework. London Airport Ltd
1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local
More informationMinutes. ACTION: Ian Frost to provide the economic values study from Wandsworth at the next meeting.
Meeting title / subject: Date: 4 th December 2014 Venue: Heathrow Academy, CR3 Attendees: Name Organisation Fraser Brown (acting chairman) HEX Ian Frost HAL Derek Lawrence AOC Andrew Genever Network Rail
More informationSurvey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results
Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationAs at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council
Liverpool City Region Candidate M As at 1 May 2013 Sponsoring Authority Halton Borough Council Halton Borough Council Halton Borough Council Halton Borough Council Knowsley Council Knowsley Council Liverpool
More informationInside Government Conference Case Study: Norwich Northern Distributor Road
Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What
More informationRailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements
- - Proposed Train Service Improvements TO GRIMSBY Show Your Support: www.railfair.co.uk TO SLEAFORD LINCOLN Hykeham Swinderby Collingham TO DONCASTER & THE NORTH NEWARK NORTHGATE NEWARK CASTLE TO PETERBROUGH
More informationDEVOLUTION OF RAIL FRANCHISING. A new strategy for rail in the North of England
DEVOLUTION OF RAIL FRANCHISING A new strategy for rail in the North of England A BETTER RAILWAY IN THE NORTH We want the economy and prosperity of the North to grow and rail will play a pivotal role in
More informationDoncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd
Doncaster Chamber of Commerce Andy Taylor Head of Public Affairs, HS2 Ltd HS2 one railway, two phases 330 miles of new track 9 HS2 stations High speed trains running on HS2 and existing lines Up to 18
More informationRealising the potential
Realising the potential High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental
More informationAirdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1
Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More information