1 ENGINEERING NOTICE NO. 340/17 6th DECEMBER 2017 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE WEDNESDAY NIGHT/THURSDAY, 6th/7th DECEMBER Track Access Control and Signaller telephone numbers are available from the websites shown below. WEBSITES Our primary website for track safety publications, including rule books is available at You will need to register with us to access this site. Please send your details to The address for our backup website is This site does not require a password PUBLICATION OF ENGINEERS TRAINS IN POSSESSIONS Any Engineers Train, Tamping machine or other on track plant working in a single stage Engineering Hours Possession, where there are no Special Current Arrangements, will be published along with its associated Possession Arrangements in Section E1 of the Engineering Notice, all other possessions will continue to be published in Sections E2 and E3. HAMMERSMITH SERVICE CONTROL CENTRE Hammersmith Service Control Centre is currently being used for Service Control operational training and the testing of the new CBTC signalling system in preparation for Go Live in March It is essential that all maintenance activities and access are closely planned and co-ordinated with the on-site Construction Managers at Hammersmith SCC. Please use the following address when booking maintenance access: SCCSitevisits@tfl.gov.uk E1 ENGINEER'S TRAINS TONIGHT CENTRAL, METROPOLITAN, PICCADILLY, DISTRICT AND NORTHERN LINES Train No. 620 Locomotive, two rail cars (with ELK equipment) and locomotive (maximum length 76m) (a) Outward Path: Leave Ruislip depot 23.31, run to Ruislip siding, depart 23.41, cross over, run to west of Rayners Lane, after the passage of Train 450 (23.06½ ex Aldgate), follow Train 324 (23.46½ ex Rayners Lane) to Acton Town No. 4 platform, run via the eastbound local line to west of Turnham Green, follow Train 23 (00.09 ex Richmond) to Hammersmith, cross over to the eastbound Piccadilly line, run to Kings Cross, reverse, run via King s Cross and Euston loops to Euston (City) southbound platform, reverse, run to Angel. (b) Working at Site: When the Train Master has defined the Specified Area, work to and fro as required under own power. On completion, run to Old Street and wait there. * This train will not uncouple at any time. (c) Return Path: Provided that current is switched on, depart 04.30, run to Moorgate, depart 04.33¾, reverse, cross over, run to Euston loop, reverse, run via King s Cross loop to King s Cross (Picc), depart 05.06, reverse, cross over, run to Barons Court, run via the westbound fast line to Acton Town No. 2 platform, depart 05.28½, after the passage of Train 61 (05.25 ex Ealing Common depot), run to east of Rayners Lane, follow Train 430 (05.20 ex Baker Street) to Rayners Lane, pass 05/50, run to Ruislip siding, then run to Ruislip depot and stable. (d) Specified Area: Angel to Old Street, SB (e) Late Current Off: South Kensington to Hyde Park Corner EB Leicester Square to Russell Square EB Earl's Court to South Kensington EB Picc Russell Square to Holloway Road EB (f) Late Current until Train Master informs Line Controller: Angel to Old Street SB Hyde Park Corner to Leicester Square EB Barons Court to Earl's Court EB Picc Angel to Euston (City) NB Euston (City) to Angel SB (g) Early Current On: Elephant & Castle to Old Street NB 04:30 Old Street to Elephant & Castle SB 04:30 Old Street to Angel NB 04:30 Angel to Euston (City) NB 04:30 Russell Square to Holloway Road EB 04:30 Russell Square to Leicester Square WB 05:05 Holloway Road to Russell Square WB 04:30 Leicester Square to Hyde Park Corner WB 05:10 South Kensington to Earl's Court WB Picc 05:15 Hyde Park Corner to South Kensington WB 05:15 Earl's Court to Barons Court WB Picc 05:20 (h) JNP Train V Knight SABRE EWSA ID Page 1 of 11

2 Train No 767 Track recording train PICCADILLY, DISTRICT, METROPOLITAN AND JUBILEE LINES (a) Outward Path: Leave Northfields depot, 00.10, run to Northfields No. 4 platform, run via the eastbound local line to west of Acton Town, after the passage of Train 313 (00.06½ ex Rayners Lane) run via Acton Town No. 4 platform to Acton Town No. 22 siding, after the passage of Train 253 (00.31 ex Acton Town) run via Acton Town No. 2 platform, follow Train 372 (23.20 ex Cockfosters depot) to Rayners Lane, reverse, cross over, run to north of Harrow-on-the-Hill, after the passage of Train 443 (00.40 ex Watford), run to Harrow-on-the-Hill No. 5 platform, cross over to the southbound fast line, run to Wembley Park No. 6 platform, run to Neasden depot Klondyke No. 22 road, run to Neasden No. 3 platform. (b) Working at Site: Provided that the last Jubilee line train has arrived at Westminster, work as required on current on all Jubilee lines between Stanmore and Stratford including Charing Cross (excluding Charing Cross sidings) crossing over as required and using route secure moves only, in accordance with the ITMP shown below. On completion, run to Wembley Park No. 3 platform, reverse, run via the flyunder to Neasden depot to arrive no later than and stable. *This train will not uncouple at any time. (c) Late Current Off: Rayners Lane to Harrow SB Uxbridge Harrow to Preston Road SB Local Neasden to Willesden Green SB Met Harrow to Preston Road SB Fast Preston Road to Neasden SB Fast Met (d) Current arrangements:- Current will remain switched on to the following sections throughout the night and Engineering Hours on these sections are cancelled: Canons Park to Stanmore NB Stanmore to Canons Park SB Queensbury to Canons Park NB Canons Park to Queensbury SB Preston Road to Queensbury NB Queensbury to Preston Road SB Wembley Park to Preston Road NB Jub Preston Road to Wembley Park SB Jub Wembley Park to Neasden SB Jub Neasden to Wembley Park NB Jub Neasden to Willesden Green SB Jub Willesden Green to Neasden NB Jub Willesden Green to Kilburn (Exeter Road) SB Jub Kilburn (Exeter Road) to Finchley Road SB Jub Finchley Road to Kilburn (Exeter Road) NB Jub Kilburn (Exeter Road) to Willesden Green NB Jub Finchley Road to St John's Wood SB Jub St John's Wood to Finchley Road NB Jub St John's Wood to Baker Street SB Jub Baker Street to St John's Wood NB Jub Baker Street to Hays Mews SB Hays Mews to Baker Street NB Hays Mews to Green Park SB Green Park to Hays Mews NB Green Park to Waterloo EB Waterloo to Green Park WB Waterloo to Redcross Way EB Redcross Way to Waterloo WB Redcross Way to Canada Water EB Canada Water to Redcross Way WB Canada Water to North Greenwich EB North Greenwich to Canada Water WB North Greenwich to Canning Town EB Canning Town to North Greenwich WB Canning Town to Stratford Market Depot EB Stratford Market Depot to Canning Town WB Stratford Market Depot to Stratford EB Stratford to Stratford Market Depot WB Green Park to Charing Cross SB Charing Cross to Green Park NB Charing Cross siding SB Charing Cross siding NB (e) Due to timetable activated signalling issues, traction current will be switched off from the following sections but no access will be granted during Engineering Hours: Preston Road to Neasden SB Fast Met Neasden to Willesden Green SB Met Willesden Green to Neasden NB Met (f) This train must work in accordance with ITMP 4 version 4 (g) Tubelines Train A Little SABRE EWSA ID CENTRAL LINE Train No. 575 Locomotive, hopper wagon, Matisa tamping machine, hopper wagon and locomotive (maximum length 80m) (a) Outward Path: Leave Hainault depot 00.17, run to Grange Hill, follow Train 143 (23.06¼ ex Ealing Broadway) to Roding Valley, after the passage of Train 11 (00.37 ex Epping), run to east of Woodford, after the departure of Train 11 (01.05 ex Woodford), run to Woodford, reverse, cross over, run to Debden, run to Debden No. 22 road, after the passage of Train 4 (01.20½ ex Epping) reverse, cross over, run to Debden westbound platform. (b) Working at Site: When the Train Master has defined the Specified Area, uncouple and work both portions of train and Tamping machine to and fro under own power, recoupling and uncoupling as required. On completion, recouple at Debden and wait there. Points at Debden must be secured as necessary for movement over them. (c) Return Path: Provided that current is switched on depart 04.47, run to Woodford, reverse, cross over, run to Hainault No. 2 platform, reverse, run to Grange Hill, reverse, then run to Hainault depot and stable. (d) Specified Area: Theydon Bois to Debden, WB Page 2 of 11

3 (e) Late Current Off: Loughton to Epping EB Roding Valley to South Woodford WB Roding Valley to Loughton EB (f) Late Current until Train Master informs Line Controller: Epping to Loughton WB (g) LUL Train S Lynch SABRE EWSA ID Train No. 510 Four road rail vehicles Hainault to Roding Valley IR South Woodford to Roding Valley EB CIRCLE & HAMMERSMITH AND METROPOLITAN LINES (a) Working at Site: When the Train Master has defined the Specified Area, on track from Royal Oak on tracking point, work to and fro under own power, crossing over as required. On completion, off track to Farringdon city sidings. Points at Praed Street Junction, Edgware Road, Baker Street junction, King's Cross and Farringdon must be secured as necessary for movement over them. (b) Specified Area: Royal Oak to Barbican, all (excluding Edgware Road No. 26 road) (c) Late Current until Train Master informs Line Controller: Royal Oak to Paddington (Suburban) EB (d) LUL Train D Conlon SABRE EWSA ID Train No. 565 RGS Rail Grinder (maximum length 35m) PICCADILLY LINE Paddington (Suburban) to Royal Oak WB (a) Outward Path: Leave Cockfosters depot 00.35, run to Oakwood westbound platform, run via Arnos Grove No. 4 platform to Wood Green. (b) Working at Site: When the Train Master has defined the Specified Area, work to and fro as required under own power. On completion, run to Bounds Green and wait there. * This train will not uncouple at any time. Points at Wood Green must be secured as necessary for movement over them. (c) Return Path: Provided that current is switched on, depart 04.20, run to west of Kings Cross, reverse, cross over, run via Arnos Grove No. 1 platform to Oakwood, run to Cockfosters depot and stable. (d) Specified Area: Bounds Green tunnel mouth to Wood Green, WB (e) Late Current until Train Master informs Line Controller: Wood Green to Manor House WB (f) Early Current On: Wood Green to Manor House WB 04:20 Wood Green to Arnos Grove EB 04:20 Arnos Grove to Wood Green WB 04:20 Arnos Grove to Southgate EB 04:20 Southgate to Arnos Grove WB 04:20 Manor House to Holloway Road WB 04:25 Russell Square to Holloway Road EB 04:30 Holloway Road to Russell Square WB 04:30 Holloway Road to Manor House EB 04:35 Manor House to Wood Green EB 04:40 (g) The speed of this train must not exceed 25mph (h) Tubelines Train T Wenham SABRE EWSA ID Train No 675 RGU Rail Grinder (maximum length 27m) VICTORIA LINE (a) Working at Site: When the Possession Master has defined the Possession, leave Northumberland Park depot and work to and fro under own power, crossing over as required. On completion, run to Northumberland Park depot and stable. * This train will not uncouple at any time. Points at King's Cross, Highbury & Islington, Finsbury Park, Seven Sisters and Northumberland Park depot must be secured as necessary for movement over them. (b) Possession Granted: 80m south of Kings Cross to 80m north of Tottenham Hale and the stop board markers on Nos. 48 to 51 roads (Northumberland Park depot), all Protection:- secure normal No points (Finsbury Park) also in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Northumberland Park depot). Protecting traction current section:- Dover Street to Cobourg Street, NB and Walthamstow to Forest Road, SB (c) in Northumberland Park depot (d) Possession Plan No. PPLN-VIC-KICtoTOH (e) LUL Train Engineering Works Manager SABRE EWSA ID Page 3 of 11

4 E2 ENGINEERING WORKS REQUIRING POSSESSIONS DEPOTS & SIDINGS AT ALL TIMES AND MAINLINE POSSESSIONS DURING ENGINEERING HOURS ONLY (a) AT ALL TIMES Nil. (b) WEDNESDAY NIGHT BAKERLOO LINE London Road depot, all, excluding sheds Point maintenance to Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (London Road depot) Protecting traction current section: Elephant & Castle to Embankment, NB Work carried out in collaboration with Duty depot/train Operations Standard Manager Possession Plan No. PP-BKR-LRD-ALL-EH-01 A1 LUL Possession R Skillet CENTRAL LINE Loughton sidings, all Point maintenance to Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current section: Epping to Loughton, WB Possession Plan No. PP-CEN-LOU-SDGS-ALL-RDS-EH LUL Possession N Darke Ruislip depot, Nos. 23 to 27 and 38 to 52 roads west mauve Point maintenance to and red/mauve sections Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Ruislip depot) Protecting traction current section: Ruislip substation to West Ruislip WB Possession Plan No: PP-CEN-RUI-DPT-MAUVE-RED.MAUVE-EH LUL Possession S Lynch CIRCLE AND HAMMERSMITH & CITY LINES 1. Hammersmith depot, all excluding Nos. 6 and 8 ATC installation to shed roads Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Hammersmith depot) Protecting traction current sections: Hammersmith to Shepherds Bush, both Possession Plan No. PP-HAM-DPT-ALL-EH Hammersmith depot, all excluding Nos. 6 and 8 shed ATC installation to roads with current alive on the brown section Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Hammersmith depot) Protecting traction current sections: Hammersmith to Shepherds Bush, both Possession Plan No. PP-HAM-DPT-ALL-EH Only one of the above Possessions to take place at any time LUL Possession A Weeks DISTRICT LINE Lillie Bridge depot, all Signal track inspections/maintenance and vegetation clearance Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current sections: Barons Court to Earl's Court EB Local Earl's Court to Kensington Olympia both and single. Possession Plan No. PP-DIS-LBD-ALL-RDS-EH LUL Possession SOM (SSL South) to Putney Bridge substation gap and Wimbledon, all Track and signal maintenance to Protection: maintain at Danger signal WG14 (Putney Bridge) also in accordance with Network Rail Rules (Point Pleasant Junction and Wimbledon) Possession Plan No LUL Possession M Norton Page 4 of 11

5 Triangle sidings, all Points and signals maintenance track inspections and vegetation clearance Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current sections: Earl's Court to High Street Kensington both Possession Plan No. PP-DIS-TRIANGLE SDGS-ALL-RDS-EH LUL Possession SOM (SSL South) to DISTRICT & PICCADILLY LINES Ealing Common depot, blue section Signal track inspections/maintenance and vegetation clearance to Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Ealing Common depot) Protecting traction current sections: North Ealing and Ealing Broadway to Acton Town, both Work carried out in collaboration with Duty depot/train Operations Standard Manager Possession Plan No. PP-DIS-EAL-COM- BLUE-SEC-EH LUL Possession SOM (SSL South) METROPOLITAN LINE Limit of current rails south of Harrow-on-the-Hill Nos. 1 and 2 Signal maintenance to platforms to NR/ LUL boundary, both Protection: maintain at Danger Network Rail signal ME27 (Neasden South Junction) in accordance with Network Rail Rules, also in accordance with Section 11 of Rule Book 15 Protecting traction current sections: Northwood to Harrow, SB main Preston Road to Harrow, NB fast Work carried out in collaboration with Duty depot/train Operations Standard Manager Possession Plan No. PPLN-MET-HOTH-BOUNDARYLU/NWR LUL Possession Engineering Works Manager NORTHERN LINE High Barnet sidings, all Signal assets and track maintenance to Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current section: High Barnet and Totteridge to Woodside Park, SB Work carried out in collaboration with Duty depot/alstom Production Manager Possession Plan No. P1780 LUL Possession D Trueman PICCADILLY LINE Cockfosters depot, No. 45 road, Nos. 46 to 54 roads west, Oakwood end reception and shunt neck blue and brown sections Bridge painting to Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Cockfosters depot) Protecting traction current sections: Cockfosters to Southgate, both Work carried out in collaboration with Duty depot/duty Train Manager Possession Plan No. PP-PICC-COC-DPT-BLUE-ENTRY.EXIT-SHUNT-RDS-EH LUL Possession B Oriogun (c) Northfields depot, west end Nos. 1 to 10 roads green Signal maintenance to section, including No. 29 road Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Northfields depot) Protecting traction current section: Northfields to Hounslow, WB Work carried out in collaboration with Duty depot/duty Train Manager Possession Plan No. PP-PICC-NOF-DPT-GREEN-29-RD-EH LUL Possession A Jones THURSDAY BAKERLOO LINE London Road depot, all excluding sheds Track maintenance to Protection: maintain at Danger signal BR2 (route 3) and BR4 (route 2) (north of Lambeth North) also in accordance with Rule Book Support Information (Am106) (London Road depot) Possession Plan No. PP-BKR-LRD-ALL-TH-01 A1 Timetable alterations: details in Section 3 of Traffic Circular No. 25 (2017) LUL Possession M Taylor Page 5 of 11

6 CENTRAL LINE Hainault depot Nos. 65 to 67 roads, part blue section Maintaining tamping machine to Protection: in accordance with Rule Book Support Information (Am106) (Hainault depot) Possession Plan No. PP-CEN-HAI-65 TO 67 RDS-PART BLUE SNC LUL Possession S Lynch White City sidings, Nos. 1 to 8 roads, red and green sections Track maintenance to Protection: maintain at Danger signal WCS9551 (routes 1 to 8) (White City sidings) 2. White City sidings, Nos. 9 to 16 roads, blue and yellow sections Track maintenance to Protection: maintain at Danger signal WCS9551 (routes 9 to 17) (White City sidings) Only one of the above Possessions to take place at any time Possession Plan No. PP-CEN-WHC- 1-8 OR 9-16 RDS-TH LUL Possession J Fox CIRCLE AND HAMMERSMITH & CITY LINES Hammersmith depot, all excluding Nos. 6 and 8 shed roads ATC installation to Protection: maintain at Danger signals OZ25, OZ26 and OZ27 (Hammersmith), secure normal No. 22A points (Hammersmith) also in accordance with Rule Book Support Information (Am106) (Hammersmith depot) Work carried out in collaboration with Duty depot/train Operations Standard Manager Possession Plan No. PP-HAM-DPT-ALL-(EXC. SHED RDS 6 & 8)-TH Timetable alterations: details in Section 3 of Traffic Circular No. 25 (2017) LUL Possession K Drury DISTRICT LINE Barking sidings, mauve section Signals, points, power, track inspections/maintenance and vegetation clearance Protection: maintain at Danger signal FF10 and FF11 (Upney) and secure normal No. 36 points (Barking sidings) Possession Plan No. PP-BARKING SIDINGS-MAUVE SECTION-TH-01 Timetable alterations:- details in Section 3 of Traffic Circular No. 25 (2017) LUL Possession D Choules to Lillie Bridge depot, all ATC works to Protection: maintain at Danger signals WB28 (Kensington Olympia) and WB31 (West Kensington) Possession Plan No. PP-IDS-LBD-ALL-RDS-TH LUL Possession SIMC Triangle sidings, all Signal maintenance to Protection: maintain at Danger signals ED171, ED172 and ED173 (Triangle sidings) Possession Plan No. PP-DIS-TRIANGLE SDGS-ALL-RDS-TH LUL Possession G Soper Upminster depot, blue section, Nos. 25 to 28, 30, 31, 35 Track maintenance and vegetation clearance to and 36 roads Protection: in accordance with Rule Book Support Information (Am106) (Upminster depot) Possession Plan No. PP-DIS-UPM-DPT-BLUE-SEC LUL Possession D Choules METROPOLITAN & JUBILEE LINES Neasden depot, Nos. 14 and 25 to 36 roads, brown section Signals, points and track maintenance and vegetation clearance Protection: in accordance with Rule Book Support Information (Am106) (Neasden depot) Possession Plan No. ALO-PP-NED NOR_A1 LUL Possession D Crowhurst to Page 6 of 11

7 PICCADILLY LINE Signal WR24 (South Ealing No. 1 platform) to Acton Town substation, EB local Rolling stock tests to Protection: protection key switch at signal WR3 (Northfields) to be operated maintaining signal WR3 (Northfields) at Danger in accordance with the Appendix to Rule Book 15 Possession Plan No LUL Possession D Brabham E3 MAINLINE CLOSURES REQUIRING POSSESSIONS Nil E4 SPECIAL CURRENT ARRANGEMENTS CIRCLE & HAMMERSMITH AND METROPOLITAN LINES (a) Late Current Off: (i) Late current off for Train 367 (00:59:00 ex Acton Town):- Uxbridge station to Uxbridge substation EB Uxbridge substation to Uxbridge station WB (ii) Late current off for Train 401 (00:43:00 ex Baker Street):- Harrow to Rayners Lane NB Uxbridge Preston Road to Harrow NB Local (iii) Late current off for Train 404 (01:07:00 ex Harrow-on-the-Hill):- Preston Road to Wembley Park SB Local Met Wembley Park sidings roads (iv) Late current off for Train 425 (01:02:30 ex Amersham):- Amersham to Chalfont & Latimer SB Chalfont & Latimer to Amersham NB (v) Late current off for Train 443 (00:40:00 ex Watford):- Croxleyhall to Northwood SB Local Northwood to Harrow SB Local (vi) Late current off for Train 447 (00:03:00 ex Uxbridge):- Willesden Green to Finchley Road SB Met (vii) Late current off for Train 447 (00:48:30 ex Baker Street):- Willesden Green to Neasden NB Met Finchley Road to Willesden Green NB Met Finchley Road to Marlborough Road SB Met Marlborough Road to Finchley Road NB Met Marlborough Road to Baker Street SB Met Baker Street to Marlborough Road NB Met (viii) Late current off for Train 447 (01:10:00 ex Wembley Park):- Neasden to Preston Road NB Fast Met (ix) Late current off for Train 463 (00:36:00 ex Uxbridge):- Uxbridge substation to Ickenham EB Ickenham to Eastcote EB (x) Late current off for Train 467 (01:07:00 ex Wembley Park):- Wembley Park to Preston Road NB Local Met (xi) Late current off for Train 470 (00:49:00 ex Watford):- Croxleyhall to Watford NB Watford to Croxleyhall SB (xii) Late current off for Train 472 (00:02:00 ex Aldgate):- Chorleywood to Chalfont & Latimer NB Croxleyhall to Chorleywood NB Northwood to Croxleyhall NB Local Croxleyhall to Northwood SB Main Northwood to Croxleyhall NB Main Harrow to Northwood NB Local Harrow to Northwood NB Main Preston Road to Harrow NB Fast (xiii) Late current off for Train 472 (01:22:30 ex Chesham):- Chesham Single Line Chalfont & Latimer to Chorleywood SB Chorleywood to Croxleyhall SB Page 7 of 11

8 (b) Early Current On: Preston Road to Neasden SB Fast Met... 04:45 Preston Road to Wembley Park SB Local Met... 04:45 Neasden to Willesden Green SB Met... 04:55 Willesden Green to Neasden NB Met... 05:20 Willesden Green to Finchley Road SB Met... 04:55 Finchley Road to Willesden Green NB Met... 05:20 Finchley Road to Marlborough Road SB Met... 04:55 Marlborough Road to Finchley Road NB Met... 04:55 Marlborough Road to Baker Street SB Met... 04:55 Baker Street to Marlborough Road NB Met... 04:55 Wembley Park sidings roads... 05:00 E5 ISOLATIONS OF CURRENT Nil. E6 ENGINEERING WORKS ALL LINES Stratford and North Greenwich Following several instances - between Stratford and North Greenwich - where Protection Masters have been found to be on the track prior to the passage of the last timetabled train, all PMs must note the following: The Signal Operator at Neasden Service Control Centre can be contacted on Auto to determine that the last "timetabled" train has passed through the area. RESTRICTIVE ENGINEERING WORKS The Site Person in Charge responsible for work published for Asbestos Exclusion Zones, Keep Clear Areas, Wheels Free or Areas where no other work that affects the integrity of the signalling can take place must ensure that the TAC incident desk receives confirmation, between 21:30 and 23:00, that the published work will be taking place on the shift concerned. If no confirmation is received by 23:00 TAC may disregard the restriction and other staff may be permitted to work within the affected area. Contacting the signaller when passage of last train not witnessed When contacting the signaller, because it has not been possible to witness the passage of the last train, protection staff must state the line, station, platform number and if known, the number of the last train. Do NOT contact the signaller until after the published time for traction current to be switched off. BAKERLOO LINE Marylebone and Paddington, both APD signals maintenance Lambeth North and Waterloo south end tailwall, both APD signal & points maintenance CENTRAL LINE White City platform 3, middle road Protection staff should be aware, that although White City middle road platform 3 is fed from the Park Royal to Wood Lane westbound traction current feed, the last train into the middle road platform approaches in an eastbound direction. North Acton and Hanger Lane, all APD signal maintenance Chancery Lane and Holborn, both APD signal maintenance Gants Hill and Redbridge, both APD signal maintenance Woodford and South Woodford, all APD signal maintenance Mile End headwall and Bethnal Green tailwall, WB Track renewal in tunnel section Asbestos exclusion zone. Motorised trolley will be in use. Bethnal Green headwall and Liverpool Street tailwall, WB Asbestos removal Asbestos exclusion zone. CIRCLE & HAMMERSMITH AND METROPOLITAN LINES King's Cross (Disused station) Following the discovery of discarded syringes in the area of Kings Cross disused station, staff are to be extra vigilant whilst passing through or undertaking works in that area. If any such items are identified please ensure these are reported through the EIRF system and immediately advise your manager. Page 8 of 11

9 Liverpool Street - Monitoring equipment At Liverpool Street station, on the Circle & Hammersmith and Metropolitan lines and 200m into tunnels towards Aldgate, automated survey monitoring equipment is installed, fixed to the tunnel and track to monitor movement during construction works above. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down on track and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact Jocelyn Donovan at Jocelyn.donovan@ipcmonitoring.com. REVISED TRACK ACCESS ARRANGEMENTS ALDGATE TO MOORGATE AND TOWER HILL TO WHITECHAPEL ALL As a result of a formal incident investigation into a number of recent protection irregularities, it was identified that the following enhancement to track access arrangements will be trialled on these traction current sections: Aldgate to Moorgate Inner Rail Moorgate to Aldgate Outer Rail Tower Hill to Whitechapel Eastbound Whitechapel to Tower Hill Westbound. Staff requiring access to any of these traction current sections in this complex area, must NOT contact the track access control until after the published switching off time for traction current. The track access controller will book you on once they have confirmation that the last train has cleared the area and traction current has been switched off. There is no need to contact the signaller if you do not witness the passage of the last train or trains over these four traction current sections. You must however, continue to test for traction current on all traction current sections that you will be accessing. Aldgate and Liverpool Street, all APD signals maintenance DISTRICT LINE EMERGENCY CONTACT BETWEEN NOTTING HILL GATE AND BOUVERIE PLACE Protection Masters working on the Traction Current Sections "Notting Hill Gate to Bouverie Place, both" should note the tunnel telephone lines (for emergency discharge of traction current) are controlled by the Metropolitan Service Controller at Baker Street. Staff working in this location should telephone 910 in the event of an emergency; this information should be entered in their log books. VICTORIA STATION At Victoria station, on the Victoria Line and District and Circle Line, through the platform limits and 200m into tunnels and sidings, London Underground have installed automated survey monitoring equipment fixed to the tunnel rings and track to monitor tunnel movement during the Victoria station Upgrade. In addition there are 3 instruments, mounted on podia in the Victoria line crossovers. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down in passenger circulation areas and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact David Smith on REVISED TRACK ACCESS ARRANGEMENTS ALDGATE TO MOORGATE AND TOWER HILL TO WHITECHAPEL ALL As a result of a formal incident investigation into a number of recent protection irregularities, it was identified that the following enhancement to track access arrangements will be trialled on these traction current sections: Aldgate to Moorgate Inner Rail Moorgate to Aldgate Outer Rail Tower Hill to Whitechapel Eastbound Whitechapel to Tower Hill Westbound. Staff requiring access to any of these traction current sections in this complex area, must NOT contact the track access control until after the published switching off time for traction current. The track access controller will book you on once they have confirmation that the last train has cleared the area and traction current has been switched off. There is no need to contact the signaller if you do not witness the passage of the last train or trains over these four traction current sections. You must however, continue to test for traction current on all traction current sections that you will be accessing. Upton Park and Plaistow east end TOR, both APD signals maintenance West Kensington and Kensington (Olympia) and West APD signals maintenance Kensington East Junction, all Sloane Square and South Kensington east end TOR, both APD signals maintenance East Ham substation gap and Barking No. 2 platform, EB Gospel Oak Electrification project Dust suppressant will be in use. Upminster and Barking, WB Ultrasonics/Bscan routes Keep clear. Motorised trolley will be in use. Signal EF268 (east of South Kensington) and Sloane Square, Signal maintenance EB Sloane Square and South Kensington east end TOR, WB Signal maintenance DISTRICT AND PICCADILLY LINES Earls Court and Ealing Common There have been several instances between Earls Court and Ealing Common on the West bound District Line where Protection Masters have been found to be on the track prior to the passage of the last timetabled train. PMs who are unable to determine that the last "timetabled" train has passed through the area should contact the appropriate Signal Operator. Ealing Common and Ealing Broadway/North Ealing, all Ultrasonics/Bscan routes Chiswick Park west end TOR and Acton Town east end TOR, all APD signal & points maintenance Page 9 of 11

10 Stamford Brook and Acton Town, all Ultrasonics/Bscan routes METROPOLITAN LINE HARROW ON THE HILL TO WATFORD SOUTH JUNCTION, NB MAIN Protection Masters working on the northbound main line between Harrow-on-the-Hill No. 1 platform and Watford South Junction must be aware of Chiltern Trains train movements when testing traction current. Northwick Park north end TOR and Harrow-on-the-Hill, all APD signal & points maintenance No. 37 a/b points (south of Amersham) and Nos. 31 & 32 APD signal & points maintenance sidings (north of Amersham), all Wembley Park and Northwick Park, NB local and NB fast APD signals maintenance NORTHERN LINE OLD STREET TO EUSTON (CITY) Testing of tunnel lighting circuits. All staff accessing the track should be aware that the tunnel lighting will be switched on & off during engineering hours from both Northern Lines between Old Street and Euston (City). Staff needing to access the track in this area (including platforms grounds) should ensure that they have made sufficient provision for lighting, torches, etc. to enable their works to proceed safely. Northern Line Extension at Kennington loop The next phase of the Northern Line Extension step plate junctions will be undertaken during a 10 day blockade of the Kennington Loop over the Christmas 2017 period. Track work will take place in the Kennington loop between 0045 on 23rd December 2017 and start of traffic on 2nd January During this period new points and crossings, track and signalling equipment will be installed at both the northbound and southbound sections of the Kennington loop. In preparation for the blockade, enabling works will be undertaken during engineering hours in December, which will limit access to the Kennington loop. If you are planning works which may interfere with this area, please contact David Mitchelmore (PM) davidmitchelmore@tfl.gov.uk (day shift) or FLO Duty Manager (24/7). Kings Cross and Kentish Town, both Motorised trolley will be in use. Hampstead headwall and Golders Green tunnel mouth, NB Asbestos exclusion zone. Mornington Crescent and Camden Town Nos. 1 and 2 platforms, both Mornington Crescent and Euston (CX) both Chalk Farm headwall and Hampstead tailwall, NB Asbestos exclusion zone. East Finchley Nos. 1 and 4 platforms and Archway, both Asbestos site. Clapham Common and Stockwell, both Reconditioning and track renewal Asbestos works Signal maintenance Signal maintenance Asbestos removal Asbestos works Signal maintenance PICCADILLY LINE Track Access Arrangements on the Aldwych Branch During Engineering Hours (normally 23:00 to 06:00) requests for access to the track must be made to the Piccadilly Line East Track Access Controller. During Traffic Hours (normally 06:00 to 23:00) requests for access to the track, and for current to be switched on and off, should be made to the Piccadilly Line Service Controller. Full details of these arrangements are included in the Rule Book team Local/Network Operating Procedure publication "Aldwych Branch/Station Access Procedures" TUNNEL LIGHTING TESTS - HEATHROW T5 TO HATTON CROSS (INCLUDING HEATHROW CENTRAL LOOP) Tunnel lighting will be switched on & off during engineering hours between Heathrow T5 to Hatton Cross (including Heathrow Central loop) all roads. All parties wishing to access the track during this shift are advised to make adequate provision for task lighting etc. Cockfosters and Oakwood, all Finsbury Park and Turnpike Lane, EB Motorised trolley will be in use. Heathrow Terminals 1, 2 & 3 and Heathrow Terminal 4, all Wood Green and Bounds Green tunnel mouth, EB Keep clear. Arnos Grove and Southgate, all APD signal & points maintenance Moving materials APD signal & points maintenance Rail grinder working on adjacent track Signal maintenance Page 10 of 11

11 VICTORIA LINE VICTORIA STATION At Victoria station, on the Victoria Line and District and Circle Line, through the platform limits and 200m into tunnels and sidings, London Underground have installed automated survey monitoring equipment fixed to the tunnel rings and track to monitor tunnel movement during the Victoria station Upgrade. In addition there are 3 instruments, mounted on podia in the Victoria line crossovers. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down in passenger circulation areas and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact David Smith on DELAYED ACCESS AT BRIXTON AND WALTHAMSTOW CENTRAL Access to the Brixton and Walthamstow areas is deferred until all train movements have ceased in the area. This request is a result of a Service Control General Manager instruction regarding Access / Egress to Tunnel sidings as published in the Service Control Bulletin dated 23rd December Staff who wish to book out in the area should do so after the published switch off time. WATERLOO & CITY LINE Track Access Arrangements on Sundays and Bank Holidays Staff must book on with the Track Access Controller before accessing the track during Engineering Hours and book off after completion of work. As shown in the Guide to Switching, Engineering Hours normally extends from COT Saturday until SOT Monday (unless amended by publications, which will show arrangements for Bank Holidays). The Track Access Control Centre is staffed by prior arrangement only between 07:00 and 23:00 on Sundays and Bank Holidays. For more information - +TACManagers@tube.tfl.gov.uk THE ABOVE INSTRUCTIONS MUST BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANT PROCEDURES IN THE RULE BOOK AND ITS ASSOCIATED DOCUMENTS. Margaret Rawlings for ACCESS PUBLICATIONS MANAGER Page 11 of 11

CENTRAL LINE VICTORIA LINE

CENTRAL LINE VICTORIA LINE ENGINEERING NOTICE NO. 35/18 4th FEBRUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE SUNDAY NIGHT/MONDAY, 4th/5th FEBRUARY Track Access Control and Signaller telephone numbers are available from

More information

Track Access Control and Signaller telephone numbers are available from the websites shown below.

Track Access Control and Signaller telephone numbers are available from the websites shown below. ENGINEERING NOTICE NO. 15/18 15th JANUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE MONDAY NIGHT/TUESDAY, 15th/16th JANUARY Track Access Control and Signaller telephone numbers are available

More information

Avoiding stairs Tube guide

Avoiding stairs Tube guide London Underground Avoiding stairs Tube guide Showing all Tube and DLR stations where you can use lifts, escalators or ramps between the street and the platform January 2016 MAYOR OF LONDON A B C D Heathrow

More information

Spot the Difference: How to tell when two things are the same (and when they re not!)

Spot the Difference: How to tell when two things are the same (and when they re not!) Spot the Difference: How to tell when two things are the same (and when they re not!) Raymond Vozzo School of Mathematical Sciences Undergraduate Seminar May 2010 Outline Introduction Topology Category

More information

DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012

DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012 DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012 SENIOR OPERATING OFFICER S SUMMARY A good day for our customers, with just a few minor incidents during the day. Before SOT a cracked rail was found

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013

Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes

More information

Jubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill

Jubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill Jubilee and Metropolitan Lines Jubilee: Waterloo to Stanmore Metropolitan: Aldgate to Harrow-on-the-Hill Saturday 16 th to Sunday 17 th January 2016 Headlines Jubilee: West Hampstead to Stanmore Metropolitan:

More information

UNDERGROUND NEWS INDEX 2017

UNDERGROUND NEWS INDEX 2017 UNDERGROUND NEWS ISSN 0306-8617 INDEX 2017 Issues 661 672 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 834 INDEX TO 2017 ISSUES OF UNDERGROUND NEWS Page entries marked * are, or include,

More information

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft Have a look and explore something new 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft London Arches Wood Lane Discover new character retail, restaurant and bar space in West London The White City Area

More information

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014

Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport

More information

Profile west. Impressive modern office environment. Excellent national and international access.

Profile west. Impressive modern office environment. Excellent national and international access. Profile west Impressive modern office environment. Excellent national and international access. At 52,990 sq ft (4,923 sq m ) Profile West is a landmark building which provides an impressive modern office

More information

Transport for London. Visitor Oyster card. The smart way to travel around London

Transport for London. Visitor Oyster card. The smart way to travel around London Transport for London Visitor Oyster card The smart way to travel around London What is a Visitor Oyster card? How do I use a Visitor Oyster card? A Visitor Oyster card is a smartcard pre-loaded with pay

More information

Out of Station Interchanges (October 2010)

Out of Station Interchanges (October 2010) Station NLC Exit station Operator Station NLC Entry station Operator Maximum Permitted Interchange Time 502 Aldgate LU 7490 Fenchurch Street NR 40 508 Archway LU 1524 Upper Holloway NR 20 511 Baker Street

More information

Transport for London. Visitor Oyster card. The smart way to travel around London

Transport for London. Visitor Oyster card. The smart way to travel around London Transport for London Visitor Oyster card The smart way to travel around London What is a Visitor Oyster card? How do I use a Visitor Oyster card? A Visitor Oyster card is a smartcard pre-loaded with pay

More information

CASE STUDY. Transport For London

CASE STUDY. Transport For London CASE STUDY Transport For London It s good to work with people who care as much as I do. The level of professionalism was immense. It was an intense, exciting time that produced an exceptional result. Roberto

More information

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft

Have a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft Have a look and explore something new 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft London Arches Wood Lane Discover new character retail, restaurant and bar space in London The White City Area is

More information

Dear Parent(s) TRANSPORT TO THE SCHOOL SITE

Dear Parent(s) TRANSPORT TO THE SCHOOL SITE July 2017 TO PARENTS OF YEAR 7 AND NEW SIXTH FORM STUDENTS ATTENDING JFS FROM SEPTEMBER 2017 Dear Parent(s) TRANSPORT TO THE SCHOOL SITE I write with details of transport arrangements to the School, effective

More information

THE GENERAL STRIKE OF 1926

THE GENERAL STRIKE OF 1926 THE GENERAL STRIKE OF 1926 By Antony Badsey-Ellis In the 1920s labour disputes were common in Britain. The most significant of these was the General Strike, which lasted for nine days from midnight on

More information

NEWS AND NOTES 40 YEARS TO THE AIRPORT

NEWS AND NOTES 40 YEARS TO THE AIRPORT NEWS AND NOTES 40 YEARS TO THE AIRPORT Left: On 16 December 2017, it will be 40 years since the Piccadilly Line was extended to Heathrow Airport, having previously opened to Hatton Cross on 19 July 1975.

More information

Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon

Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Visitor information Welcome to London Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Tube and central London bus maps inside

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

London Underground. Performance report. Period /12 (16 October 12 November 2011) MAYOR OF LONDON. Transport for London

London Underground. Performance report. Period /12 (16 October 12 November 2011) MAYOR OF LONDON. Transport for London London Underground Performance report 8 11/1 (16 October 1 November 11) MAYOR OF LONDON Transport for London Contents Page 1. Introduction, context and overview of period 3. Network performance summary

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

prime residential investment

prime residential investment prime residential investment EXECUTIVE SUMMARY EXECUTIVE SUMMARY Rare opportunity to acquire a self-contained freehold block of 14 high quality flats in the heart of Kensington The block comprises 5 x

More information

London Underground. The early tube lines, originally owned by several private companies, were brought together under the

London Underground. The early tube lines, originally owned by several private companies, were brought together under the 2F%2Fen.wikipedia.org%2Fw%2Findex.php%3Ftitle%3DTemplate%253AAttached_KML%252FLondon_Underground%26action%3Draw&output=classic) From Wikipedia, the free encyclopedia The London Underground (also known

More information

STATION REFURBISHMENT SUMMARY

STATION REFURBISHMENT SUMMARY STATION REFURBISHMENT SUMMARY Since the previous report was published in Underground News No.556 in April 2008, some of the station refurbishment work being undertaken by Metronet has resumed and at some

More information

Networks. CS4423. Prof. Götz Pfeiffer Semester 2 (2018/2019)

Networks. CS4423. Prof. Götz Pfeiffer   Semester 2 (2018/2019) .. Prof. Götz Pfeiffer http://schmidt.nuigalway.ie/cs4423 School of Mathematics, Statistics and Applied Mathematics NUI Galway Semester 2 (2018/2019) .. Prof. Götz Pfeiffer http://schmidt.nuigalway.ie/cs4423

More information

DAILY PERFORMANCE REVIEW Friday, 19 th October 2012

DAILY PERFORMANCE REVIEW Friday, 19 th October 2012 DAILY PERFORMANCE REVIEW Friday, 19 th October 2012 SENIOR OPERATING OFFICER S SUMMARY Overall a good day for our customers with only a few minor incidents to spoil their travelling experience. The Jubilee

More information

This is the start of an amazing journey. London is a world-class city and deserves a Tube it can be proud of. Our vision is to make that happen.

This is the start of an amazing journey. London is a world-class city and deserves a Tube it can be proud of. Our vision is to make that happen. This is the start of an amazing journey London is a world-class city and deserves a Tube it can be proud of. Our vision is to make that happen. INDEX Destinations Leisure and entertainment Public buildings

More information

FOREWORD. A 1billion investment in the Lo

FOREWORD. A 1billion investment in the Lo HACKNEY SHOREDITCH The area is home to London s largest number of start-ups, and Europe s highest concentration of tech and creative businesses. Hackney Council has also signed a partnership agreement

More information

Considering Access to Healthcare Services Bus Planning

Considering Access to Healthcare Services Bus Planning Appendix 1 Considering Access to Healthcare Services Bus Planning Transport for London Buses Directorate Network Development February 2014 The Role of Buses Buses often provide the main public transport

More information

A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT

A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT VANTAGE LONDON A 12-STOREY OFFICE BUILDING CONVENIENTLY LOCATED OFF JUNCTION 1 OF THE M4 WHICH BENEFITS FROM DIRECT ACCESS INTO CENTRAL

More information

PARKVIEW BRENTFORD PARKVIEW BRENTFORD

PARKVIEW BRENTFORD PARKVIEW BRENTFORD OPPORTUNITY TO OCCUPY A HIGHLY VISIBLE LANDMARK OFFICE BUILDING OVERLOOKING THE M4 MOTORWAY IN WEST LONDON GREAT WEST ROAD TW8 9AZ 02 HIGH PROFILE One of the most prominent buildings in West London comprising

More information

ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH

ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH The building offers an occupier the chance to relocate their headquarters to one of the most prominent sites in London and benefit from unrivalled

More information

Visitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card

Visitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card Visitor information Explore more and pay less with a Visitor Oyster card Discover your special offers and discounts Categories Simply turn up and show your Visitor Oyster card in order to enjoy the range

More information

Visitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card

Visitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card Visitor information Explore more and pay less with a Visitor Oyster card Discover your special offers and discounts Categories Simply turn up and show your Visitor Oyster card in order to enjoy the range

More information

MEETING REPORTS THE ALDWYCH BRANCH

MEETING REPORTS THE ALDWYCH BRANCH MEETING REPORTS THE ALDWYCH BRANCH by Antony Badsey-Ellis, joint author with Mike Horne of the forthcoming book of this name. A report of the LURS meeting at All Souls Club House on 9 December 2008 The

More information

LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018

LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018 LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018 Parkland Walk Site of Former Crouch End Station Travel Arrangements We will be catching the 9.20 am train from Biggleswade. A one-day travel card

More information

WORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT

WORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT WORK WATERFRONT SUITES AVAILABLE FROM 9,00 TO 25,542 SQ FT WATERFRONT WATERFRONT IS ONE OF TWO GRADE A HEADQUARTERS BUILDINGS WHICH FORM HAMMERSMITH EMBANKMENT. THROUGH ITS FULL HEIGHT GLAZING & IMPRESSIVE

More information

WELCOME TO CONNAUGHT HALL

WELCOME TO CONNAUGHT HALL WELCOME TO CONNAUGHT HALL ABOUT US 18 UNIQUE COLLEGES - ONE OUTSTANDING UNIVERSITY The University of London is a federal University. It consists of 18 self-governing Colleges of outstanding reputation,

More information

INDUSTRY HOUSE. 13,500 sq ft GIA (11,345 sq ft NIA) office/b1 space in vibrant Kentish Town FOR SALE

INDUSTRY HOUSE. 13,500 sq ft GIA (11,345 sq ft NIA) office/b1 space in vibrant Kentish Town FOR SALE INDUSTRY HOUSE K E N T I S H T O W N N W 5 2 T E 13,500 sq ft GIA (11,345 sq ft NIA) office/b1 space in vibrant Kentish Town FOR SALE Description Planning permission has been granted for a comprehensive

More information

ROYAL ARSENAL, LONDON SE18

ROYAL ARSENAL, LONDON SE18 ROYAL ARSENAL, LONDON SE18 - 8,000-30,000 SQ FT OF STUNNING OFFICE SPACE - EXCEPTIONAL CONVERTED WAREHOUSE - EXPOSED BRICK WALLS, PAINTED STEEL COLUMNS AND 4-6M CEILING HEIGHTS - 1 MINUTES WALK FROM CROSSRAIL

More information

HOW TO CELEBRATE A CENTENARY

HOW TO CELEBRATE A CENTENARY HOW TO CELEBRATE A CENTENARY It was originally planned to republish this article in either the January or May 2008 issue of Underground News, marking 145 years of the Underground but lack of space precluded

More information

Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014:

Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Morning session Theresa Magee, Wesley Estate Residents Associaton (Ealing)

More information

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE CROSSRAIL INFORMATION PAPER DEVELOPMENT OF THE CROSSRAIL ROUTE This paper explains how the Crossrail route set out in the Crossrail Bill was developed. It will be of particular relevance to those interested

More information

EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017

EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017 EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017 Travel Plan Wembley Stadium will be hosting the English Football League (EFL) Final between Manchester United F.C. and Southampton F.C. on Sunday 26 th February

More information

Below: NF 119/15 NF 120/15 NF 121/15

Below: NF 119/15 NF 120/15 NF 121/15 NEWSFLASHES Items for the Newsflashes (and Tailpieces) section of Underground News may be sent to the Editor by post and also by E-Mail, to the following address: editorun@lurs.org.uk NF 111/15 Further

More information

SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason

SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason The first indication seen was the Quad-Royal (poster size) tube map displayed at stations with text adjacent to Shoreditch stating that the station

More information

1 Tottenham Court Road 1 Holborn 1 Aldwych 1 Waterloo 1 Elephant & Castle 1 Bricklayer's Arms 1 Surrey Quays 1 Canada Water 2 Marylebone 2 Marble

1 Tottenham Court Road 1 Holborn 1 Aldwych 1 Waterloo 1 Elephant & Castle 1 Bricklayer's Arms 1 Surrey Quays 1 Canada Water 2 Marylebone 2 Marble Route Blind 1 Tottenham Court Road 1 Holborn 1 Aldwych 1 Waterloo 1 Elephant & Castle 1 Bricklayer's Arms 1 Surrey Quays 1 Canada Water 2 Marylebone 2 Marble Arch 2 Hyde Park Corner 2 Vauxhall 2 Stockwell

More information

NEWS AND NOTES NEW SIGNALLING

NEWS AND NOTES NEW SIGNALLING NEW SIGNALLING NEWS AND NOTES Above: L18 transferring to Hammersmith for CBTC testing on 2 June 2018, passing through Wood Lane on the westbound. It, and L17 on the east end, are the first (1969 Metro-Cammell-built)

More information

Board meeting

Board meeting Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To

More information

RICHMOND-UPON-THAMES

RICHMOND-UPON-THAMES -UPON-THAMES No1 Church Road provides an outstanding opportunity to LEASE HIGH quality Grade A office accommodation situated in the heart of Richmond town centre. The Property has undergone a major reconfiguration,

More information

Initial proposals for new Parliamentary constituency boundaries in London

Initial proposals for new Parliamentary constituency boundaries in London Initial proposals for new Parliamentary constituency boundaries in London Contents Summary 3 1 What is the Boundary Commission for England? 5 2 Background to the 2018 Review 7 3 Initial proposals for London

More information

100 YEARS OF THE HAMPSTEAD TUBE

100 YEARS OF THE HAMPSTEAD TUBE 100 YEARS OF THE HAMPSTEAD TUBE by Antony Badsey-Ellis, author of The Hampstead Tube A report of the LURS meeting at All Souls Clubhouse on 11 September 2007 Rather than making a selection from his recent

More information

2 longwalk Stockley Park, Heathrow UB11 1BA

2 longwalk Stockley Park, Heathrow UB11 1BA www.2longwalk.com 2 longwalk Stockley Park, Heathrow UB11 1BA Newly refurbished 48,552 sq ft headquarter office building 2 longwalk Stockley Park, Heathrow UB11 1BA 2 Longwalk offers businesses bright,

More information

MODERN OFFICES TO LET. 26/28 GROVE W6 HAMMERSMITH

MODERN OFFICES TO LET. 26/28 GROVE W6 HAMMERSMITH MODERN OFFICES TO LET. 26/28 26/28 MODERN OFFICE ACCOMMODATION IN THE HEART OF. AVAILABLE FROM 3,145 SQ FT TO 34,456 SQ FT. AN INSPIRING PLACE TO WORK. The accommodation is approached via a dramatic and

More information

Signage Re-branding Display Roll-out Programmes Commercial Fit Out. Signage & Fit-Out Specialists

Signage Re-branding Display Roll-out Programmes Commercial Fit Out. Signage & Fit-Out Specialists Signage Re-branding Display Roll-out Programmes Commercial Fit Out Signage & Fit-Out Specialists design inspire deliver The Cennox Group specialise in the delivery of signage and fit-out services for many

More information

XlirSX TO UNDERGROUND NEWS ISSUES l68

XlirSX TO UNDERGROUND NEWS ISSUES l68 XlirSX TO UNDERGROUND NEWS - 1975 ISSUES 157 - l68 ACCIDENTS COLLISIONS Ealing Common depot, multiple 93 Edgware, 19^6 kl High Barnet, sidings overrun 28.2«75 Klondyke sidings, A & 1938 stocks 27.8.75

More information

EALING CROSS 85 UXBRIDGE ROAD LONDON

EALING CROSS 85 UXBRIDGE ROAD LONDON EALING CROSS 85 UXBRIDGE ROAD LONDON IT S ALL IN A FEALING 0 EALING CROSS EIGHT FLOORS OF NATURAL LIGHT AND LOTS OF LOVELY SPACE. THIS IS EALING S MOST MODERN BUILDING. 0 FEALING DYNAMIC Less than seven

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

PROGRESS IS IMPOSSIBLE WITHOUT CHANGE

PROGRESS IS IMPOSSIBLE WITHOUT CHANGE W6 PROGRESS IS IMPOSSIBLE WITHOUT CHANGE FROM THAT LIGHTBULB MOMENT TO THE LIGHTBULBS, SOME OF THE BEST IDEAS FOR CHANGE ARE THE MOST SIMPLE. We have designed a contemporary working environment for your

More information

BEAUTIFULLY CONSIDERED ICONIC LIVING

BEAUTIFULLY CONSIDERED ICONIC LIVING BEAUTIFULLY CONSIDERED ICONIC LIVING 2 A landmark development of 115 apartments centered in the heart of Wembley. Brent Cross Shopping Centre 4 Elizabeth House is a striking residential development of

More information

The best office building in Harrow. 3,304 sq ft 15,163 sq ft

The best office building in Harrow. 3,304 sq ft 15,163 sq ft The best office building in Harrow 3,304 sq ft 5,63 sq ft 2 minutes from london marylebone by train and just 9 mins from Baker street by tube HARROW: grade a location, grade a offices Metropolitan Line

More information

Anglia Winter Key Route Strategy (KRS) 2017/18

Anglia Winter Key Route Strategy (KRS) 2017/18 Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions

More information

Stories and Rhyme Times By Day of the Week

Stories and Rhyme Times By Day of the Week Venue Day & Time Address Contact Details Watford Borders Daily at 11am and 2 pm Waterfields Retail Park, New Road, Watford, WD17 2EU 01923 256902 Brent Cross Borders Daily at 2pm Unit A Brent South Shopping

More information

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016

More information

EALING CROSS 85 UXBRIDGE ROAD LONDON

EALING CROSS 85 UXBRIDGE ROAD LONDON EALING CROSS 8 UXBRIDGE ROAD LONDON EALING CROSS EIGHT FLOORS OF NATURAL LIGHT AND LOTS OF LOVELY SPACE. THIS IS EALING S MOST MODERN BUILDING. IT S ALL IN A FEALING 0 FEALING DYNAMIC COMING SOON Less

More information

UNDERGROUND NEWS ISSN CONTENTS ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 7 LIST OF SOCIETY MEETINGS 8

UNDERGROUND NEWS ISSN CONTENTS ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 7 LIST OF SOCIETY MEETINGS 8 UNDERGROUND NEWS ISSN 0306-8617 CONTENTS MAIN INDEX 2-7 ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 7 LIBRARY EVENINGS 7 LIST OF SOCIETY MEETINGS 8 LIST OF SOCIETY VISITS & TOURS 8 CREDITED ARTICLES 8 UNDERGROUND

More information

EALING CROSS 85 UXBRIDGE ROAD LONDON

EALING CROSS 85 UXBRIDGE ROAD LONDON EALING CROSS UXBRIDGE ROAD LONDON EALING CROSS IT S ALL IN A FEALING 0 EIGHT FLOORS OF NATURAL LIGHT AND LOTS OF LOVELY SPACE. THIS IS EALING S MOST MODERN BUILDING. FEALING DYNAMIC COMING SOON Less than

More information

TRS018 Annex A. Development of Train Services for Chiltern Routes

TRS018 Annex A. Development of Train Services for Chiltern Routes TRS018 Annex A Development of Train Services for Chiltern Routes October 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role is

More information

London Transport Railways

London Transport Railways London Transport Railways The following selection of images is of the stock displayed in the Underground Centenary exhibition held at Neasden Depot, which we visited on Saturday 25 th May 1963... Sadly

More information

UNDERGROUND NEWS ISSN INDEX CONTENTS LIST OF SOCIETY MEETINGS 10

UNDERGROUND NEWS ISSN INDEX CONTENTS LIST OF SOCIETY MEETINGS 10 UNDERGROUND NEWS ISSN 0306-8617 1987 INDEX CONTENTS MAIN INDEX 2-10 LIBRARY EVENINGS 10 ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 10 LIST OF SOCIETY MEETINGS 10 LIST OF SOCIETY VISITS & TOURS 10 CREDITED

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version

More information

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential 64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole

More information

Appendix J - Q133/ 2011 Oyster Overcharging (1) Table 1: Incomplete pay as you go journeys in 2010

Appendix J - Q133/ 2011 Oyster Overcharging (1) Table 1: Incomplete pay as you go journeys in 2010 Appendix J - Q133/ 2011 Oyster Overcharging (1) Table 1: Incomplete pay as you go journeys in 2010 Month No. of Cards No. of Total incurring max journeys charged fare charges (000) ( 000) (000) January

More information

Kick off will be at 17:00, with this event not being subject to extra time and penalties. Event timings are as follows:

Kick off will be at 17:00, with this event not being subject to extra time and penalties. Event timings are as follows: 2018 FIFA World Cup Russia Qualifier England vs Lithuania, Sunday 26 th March 2017 Travel Plan Wembley Stadium will be hosting 2018 FIFA World Cup Russia Qualifier between England and Lithuania on Sunday

More information

Workplace Population: Key Facts

Workplace Population: Key Facts : Key Facts May 2014 Introduction Friday 23 rd May saw release 5.2 of 2011 Census data. Included in this release were the first statistics on the workplace population and the first data provided at the

More information

EDITED PRESS RELEASES TRANSPORT FOR LONDON LONDON UNDERGROUND

EDITED PRESS RELEASES TRANSPORT FOR LONDON LONDON UNDERGROUND Restoration of landmark façade complete at King s Cross St. Pancras 7 September 2006 Renovation of the Grade 1 listed, 130 year old Gothic façade at St. Pancras station has received a major boost with

More information

LTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation

LTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation LTW 372 Annex B Development of Train Services for Chiltern Routes Draft for consultation February 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling

More information

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL

More information

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013

Spending round 2013: The case for investment in transport. Mayor s Office, May 2013 Spending round 2013: The case for investment in transport isabel.dedring@london.gov.uk Mayor s Office, May 2013 Key messages London is the productive heart of the UK economy, supporting jobs and growth

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

BY THE MET. TO WATFORD

BY THE MET. TO WATFORD BY THE MET. TO WATFORD by Eric Stuart BACKGROUND The Metropolitan Railway is well-known for its main line to the north first to Chesham, then Aylesbury and beyond. But there are also the branches to Brill,

More information

ST JOHN S WOOD LONDON

ST JOHN S WOOD LONDON 1 HAMILTON TERRACE ST JOHN S WOOD LONDON CGI 2 EXECUTIVE SUMMARY 85 Hamilton Terrace offers the opportunity to create an exceptional luxury house in a prime St. John s Wood location. 0.28 acre plot (1,150

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

EDITED PRESS RELEASES

EDITED PRESS RELEASES EDITED PRESS RELEASES TRANSPORT FOR LONDON TRANSPORT FOR LONDON INVITES ARCHITECTS TO SUBMIT PLANS ON 55 BROADWAY 5 August 2013 Transport for London has begun the process of tendering architects to assess

More information

FACT SHEET. For everything London

FACT SHEET. For everything London Computer generated image is indicative only For everything London New high specification 1, 2 and 3 bedroom apartments in a classic London location: Argo House, Kilburn Park Road is a fantastic choice

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

Making rail accessible: helping older and disabled customers

Making rail accessible: helping older and disabled customers London Overground Making rail accessible: helping older and disabled customers November 2016 1 Contents Our commitment to you page 3 Policy summary page 4 Assistance for customers page 5 Alternative accessible

More information

TRANSPORT : PROCESS Topic Discussion. 20th July 2016

TRANSPORT : PROCESS Topic Discussion. 20th July 2016 TRANSPORT : PROCESS Topic Discussion 20th July 2016 1 TODAY S SESSION Process not solutions - masterplan currently evolving Existing & future networks Checking feedback - understanding the issues How a

More information

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London West London Economic Prosperity Board 21 March 2017 Title Orbital Rail in West London Report of Status Urgent Enclosures Officer Contact Details Amar Dave (LB Brent) Public No Appendix 1: Specification

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

UNIQUE CENTRAL LONDON FREEHOLD INTEREST

UNIQUE CENTRAL LONDON FREEHOLD INTEREST INVESTMENT SUMMARY UNIQUE CENTRAL LONDON FREEHOLD INTEREST 128 King Henry s Road London NW3 3ST 1.76 ACRES IN PRIME CENTRAL LONDON INVESTMENT SUMMARY 128 KING HENRY S ROAD Prime location in one of London

More information

18th Annual Conference and AGM 4th November Let s get Real. COT Headquarters London. Sponsored by:

18th Annual Conference and AGM 4th November Let s get Real. COT Headquarters London. Sponsored by: 18th Annual Conference and AGM 4th November 2011 Let s get Real COT Headquarters London Sponsored by: Introduction The title of this year s conference started off as a wry comment on how we could follow

More information

Potential future transport projects for London October 2016

Potential future transport projects for London October 2016 Appendix A Potential future transport projects for London October 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public, including the users

More information

North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan

North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan Honeypot Pharmacy 189 Streatfield Road, Kenton,, HA3 9DA 020 8204 4542 10:00-13.00 Closed Closed Tanna Chemist

More information

Making rail accessible: Helping older and disabled customers. October 2018

Making rail accessible: Helping older and disabled customers. October 2018 Making rail accessible: Helping older and disabled customers October 2018 Contents Our commitment to you... page 3 Policy summary... page 5 Assistance for customers... page 6 Alternative accessible transport...

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

London Underground Digital Campaign

London Underground Digital Campaign London Underground Digital Campaign donated by ExterionMedia All proceeds to Railway Children London Underground Digital Advertising Helping Railway Children ExterionMedia are auctioning a two week campaign

More information

Govia Thameslink Railway consultation on December 2015 timetable - APTU response