DAILY PERFORMANCE REVIEW Friday, 19 th October 2012
|
|
- Brice Oliver
- 6 years ago
- Views:
Transcription
1 DAILY PERFORMANCE REVIEW Friday, 19 th October 2012 SENIOR OPERATING OFFICER S SUMMARY Overall a good day for our customers with only a few minor incidents to spoil their travelling experience. The Jubilee suffered a VCC failure at Wembley Park just after published SOT which delayed start up by 25 minutes, the line ran on the remained 2 VCC s in the area till COT. Just before the morning peak 116 points failed to normalise on the MET at Watford, but this was cleared with signalling releases. Mid-morning Southwark station briefly closed with a Fire Alert, but after the call points had been reset the stn re-opened. And finally, mid-evening the District Line was held E/ at whilst the TP apprehended suspects from an incident outside Sloane Square station. Jubilee Piccadilly akerloo Central Waterloo & City EXCESS PLATFORM WAIT TIME / HEADWAY / ADVERTISED GOOD SERVICE Actual excess Platform Wait Time Target excess Platform Wait Time Headway proxy (%) Advertised good service (%) UNSCHEDULED TRAIN CANCELLATIONS SNAPSHOTS 06:00 1 / 30 1 / :00 1 / 75 5 / 48 6 / :00 0 / :00 1 / 68 1 / :00 1 / 76 1 / 50 2 / :00 1 / 44 1 / :00 1 / 29 1 / % trains across snapshots (per line) TOTAL UNSCHEDULED TRIP CANCELLATIONS TOTAL SCHEDULED Complete Trips CANCELLED Part Trips CANCELLED No Data No Data H&C Circle District Network Totals Network % (Trains in Service) % Complete No Data A trip is defined as a journey between scheduled termination points in one direction. Notes: line (09.00) all cancellations attributed to point failure at Watford. TOP FIVE INCIDENTS Time Line Location Reason Delay I- NACH Owner Circle Police incident COO Watford Point failure 46 9 APD Jubilee Wembley Park Signalling computer failure 25 1 TLL Jubilee Southwark Fire alert 14 1 COO Page 1 of 5
2 JUILEE Wembley Park signalling computer failure severe delays Owner TLL Summary Staff train 326 unable to be routed to depot. Impact First passenger train delayed by 14 minutes southbound, 25 minutes northbound. Subsequent severe delays Wembley Park to Stanmore. I-NACH 1 Stalled trains None Response Work underway to reset VCC2. Staff train worked to depot in RM Shunt signal MG59 failed to clear for T First passenger train departs southbound 14 minutes late train 326 passes signal MG59 at danger All trains held, whilst reset of VCC2 is carried out Reset of VCC2 completed. Running on just 2 computers instead of 3. Recovery Severe Delays from Wembley Park to Stanmore, first northbound just departing 25 minutes late Good Service. VCC2 computer defective - reset remaining with two of three computers until EoT. Repair programmed for EoT. (DAP/CMK/PD) None Southwark fire alert station closure Owner - COO Summary Station closed and evacuated following the operation of two call points. Impact Station closed I-NACH 1 Stalled trains Nil Response Fire brigade and fire engineers requested to attend oth call-points reset by station staff Fire brigade issue an all clear. Recovery Station open. Two call-points were operated maliciously by persons unknown - reset by station staff. Fire engineers attended as a precaution. (NT) None. NORTHERN Nil PICCADILLY - Nil AKERLOO - Nil CENTRAL / WATERLOO & CITY - Nil VICTORIA - Nil Page 2 of 5
3 CIRCLE / HAMMERSMITH & CITY police incident severe delays Owner - COO Summary Inner Rail Circle line train 212 held outside pending arrival of TP to remove robbery suspect from train. Impact Initial Service Alert issued. District line severe delay status, Circle line minor delay status at conclusion of the incident I-NACH 19 Stalled trains Incident train 212 held outside Response TP requested to attend Train held on approach to the station, 1 officer in attendance awaiting back up Cab of train in platform awaiting TP officers, NIRM en route Full team of officers and staff in situ Train berthed halfway in platform. TP join train to apprehend suspects Train fully berthed Train service resumes. Recovery District line severe delays, Circle minor delays District line minor delays to eastbound service, good service to the rest of the line Circle line good service District line good service. Robbery involving large sum of money outside Sloane Square station, with two suspects confirmed as having decamped onto train 212. Train held outside and once back up officers arrived, the train was brought into the platform and officers removed into custody two suspects. (PD) None. DISTRICT - Nil METROPOLITAN Watford point failure part suspension Owner APD Summary No.116 points failed to normalise, after passage of train 455 from No.21 sidings Impact Line suspended between Moor Park and Watford I-NACH 9 Stalled trains Northbound train 421, from until no customer issues. Response Technical Officer despatched from Rickmansworth by car. Operator of train 455 changed ends to confirm shunt move completed Signalling release attempted Unable to clear southbound signal JP Train 421 commences wrong direction move to Croxley Train 455 applies procedure at signal JP Wrong direction move completed and train 455 berthed - no customer issues Signalling release taken, train 421 arrives at Watford after testing route Recovery Minor delays to Watford branch Good service Points failed to normalise cleared after signalling releases for further investigation. (CMK) None. Page 3 of 5
4 OTHER NOTEWORTHY USINESS ISSUES Upgrades Nil Power Nil TAC Nil Connect Nil Ticketing Nil ORR injury notifications There were eight instances of passenger injury notified to the Office of Rail Regulation. CUSTOMER SERVICE CENTRE Comments at: akerloo 1 Piccadilly Central 1 C&H 1 District 1 W&C Jubilee 1 Unspecified 1 There were no key themes GENERAL / FORTHCOMING ISSUES / WEATHER OUTLOOK Weather Outlook: : After any mist or fog patches clear it will be a largely dry and bright day with plenty of sunshine and light winds. It will become increasingly cloudy through the late afternoon, with outbreaks of rain possible late on. Night: Outbreaks of rain a likely during the evening, especially over eastern parts of the network. The rain will push away to the east, and then it should be largely dry with some clear spells through the night. Widespread mist and fog is likely to form overnight. Sunday: the mist and fog will gradually clear by midday, leaving a largely dry but cloudy day with some sunny spells. However some patchy light rain and drizzle may affect southern areas of the network through the afternoon. Sunday Night: Outbreaks of light rain and drizzle are likely to spread across the network during the evening and last for much of the night. Come dawn it should be dry but rather cloudy Weekend engineering work suspensions: Circle District H&C Service suspended, and Sunday. Earl s Court to Edgware Road and arking to Upminster, and Sunday aker Street to Hammersmith from 23:00 Sunday. aker Street to Aldgate, and Sunday. Tooting roadway to Morden, and Sunday. Highbury & Islington to rixton, and Sunday. ERU LUE LIGHT DEPLOYMENT Time Line Location Reason for Deployment Time On Site NONE * Time saving calculated against standard ERU response vehicle (if deployed) Resumption Time (Wheels turning) Time Saving* (in minutes if known) POLICE MEDIC DEPLOYMENT Ambulance Resumption Time Time Line Location Reason for Deployment Time On Site arrival time (Wheels turning) Stockwell Assault victim on platform N/A Page 4 of 5
5 LIFTS & ESCALATORS Lifts* Jubilee Canary Wharf (2) defective, Piccadilly Russell Square (2) defective, akerloo Central Queensway (2) defective, C&H Kings Cross (6) defective, District Earl s Court (4) defective, *lifts in bold are on Step Free Routes Escalators FORTHCOMING EVENTS EVENT LOCATION DAY / TIME Frieze Art Fair Concert: Michael Jackson The Immortal World Tour TUC March & Rally Tottenham v Chelsea Crystal Palace v Millwall Fulham v Aston Villa West Ham v Southampton Watford v Peterborough Charlton v arnsley Concert: Kelly Clarkson QPR v Everton Concert: Jolin Tsai Regents Park The O2 Form up: Embankment (near lackfriars bridge) Route: Embankment ridge St. Whitehall Cockspur Pall Mall Regent St. (south) - Piccadilly - Hyde Park Corner Hyde Park Rally: Hyde Park White Hart Lane Selhurst Park Craven Cottage oleyn Ground Vicarage Road The Valley Wembley Arena Loftus Road Stadium Wembley Arena Sat & Sun 12:00-19:00 Sat & Sun 18:30-23:00 Form Up: 11:00 March: 12:00 Rally: 13:30-16:00 EXPECTED ATTENDANCE 15,000 over the day NEAREST STATIONS Regents Park 17,000 North Greenwich 100,00 estimated but could be up to 250,000 36,000 12:45 13:00 15:00 24,000 15:00 22,000 15:00 15:00 26,000 19:30 Sunday 16:00 Sunday 19:00 lackfriars, Temple, Embankment, Westminster, Charing Cross, Piccadilly Circus, Green Park, Hyde Park Corner, Marble Arch Seven Sisters, (Greater Anglia to White Hart Lane) 26,000, (Southern to Selhurst) C Putney ridge 35,500 Upton Park, Plaistow 13,000 19,000 13,000 London Overground to Watford High Street North Greenwich, (then bus) or Charing Cross or London ridge, (South Eastern to Charlton) Wembley Park, Wembley Central or Chiltern Railways to Wembley Stadium Shepherds ush Market, White City, Wood Lane Wembley Park, Wembley Central or Chiltern Railways to Wembley Stadium Note. Platform Wait Time EJT Proxy measures the average time (secs) customers wait for a train over and above the timetabled wait time. Headway % of trains that pass through a defined measuring point within two scheduled headways of the previous train. Train Cancellations Number of trains not in service at the time of the snapshots Percentage Good Service % of core traffic hours (defined as , Monday and , Sunday) that a line is advertised to customers as operating a good service. (Note Waterloo & City core hours are Monday ). Disclaimer - Indicative NACH (I-NACH) scores are an initial calculation made by the NOC immediately after an incident and may differ from the final figure which is calculated by the Service Performance Information team. CAT A A Page 5 of 5
DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012
DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012 SENIOR OPERATING OFFICER S SUMMARY A good day for our customers, with just a few minor incidents during the day. Before SOT a cracked rail was found
More informationLondon Underground. Performance report. Period /12 (16 October 12 November 2011) MAYOR OF LONDON. Transport for London
London Underground Performance report 8 11/1 (16 October 1 November 11) MAYOR OF LONDON Transport for London Contents Page 1. Introduction, context and overview of period 3. Network performance summary
More informationJubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill
Jubilee and Metropolitan Lines Jubilee: Waterloo to Stanmore Metropolitan: Aldgate to Harrow-on-the-Hill Saturday 16 th to Sunday 17 th January 2016 Headlines Jubilee: West Hampstead to Stanmore Metropolitan:
More informationprime residential investment
prime residential investment EXECUTIVE SUMMARY EXECUTIVE SUMMARY Rare opportunity to acquire a self-contained freehold block of 14 high quality flats in the heart of Kensington The block comprises 5 x
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013
Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes
More informationAvoiding stairs Tube guide
London Underground Avoiding stairs Tube guide Showing all Tube and DLR stations where you can use lifts, escalators or ramps between the street and the platform January 2016 MAYOR OF LONDON A B C D Heathrow
More informationCASE STUDY. Transport For London
CASE STUDY Transport For London It s good to work with people who care as much as I do. The level of professionalism was immense. It was an intense, exciting time that produced an exceptional result. Roberto
More information164 Buckingham. Palace Road, London. The Strand, London. Bryanston Street, London W1H 7EH Princess Square, 30 Leinster Gardens, 49 Queensborough
All Hotels Nearest Pick Hotel Name Location Underground UpTime 164 Buckingham Palace, London Victoria Coach Station SW1W 9TP Victoria 8.45am Amba Hotel Charing The Strand, London Cross WC2N 5HX Charing
More informationLONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication
LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)
More informationOut of Station Interchanges (October 2010)
Station NLC Exit station Operator Station NLC Entry station Operator Maximum Permitted Interchange Time 502 Aldgate LU 7490 Fenchurch Street NR 40 508 Archway LU 1524 Upper Holloway NR 20 511 Baker Street
More informationTrack Access Control and Signaller telephone numbers are available from the websites shown below.
ENGINEERING NOTICE NO. 15/18 15th JANUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE MONDAY NIGHT/TUESDAY, 15th/16th JANUARY Track Access Control and Signaller telephone numbers are available
More informationNational Rail Performance Report - Quarter /14
A London TravelWatch report The voice of transport users National Rail Performance Report - July 2014 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling
More informationTHE GENERAL STRIKE OF 1926
THE GENERAL STRIKE OF 1926 By Antony Badsey-Ellis In the 1920s labour disputes were common in Britain. The most significant of these was the General Strike, which lasted for nine days from midnight on
More informationTrack Access Control and Signaller telephone numbers are available from the websites shown below.
ENGINEERING NOTICE NO. 340/17 6th DECEMBER 2017 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE WEDNESDAY NIGHT/THURSDAY, 6th/7th DECEMBER Track Access Control and Signaller telephone numbers are available
More information18th Annual Conference and AGM 4th November Let s get Real. COT Headquarters London. Sponsored by:
18th Annual Conference and AGM 4th November 2011 Let s get Real COT Headquarters London Sponsored by: Introduction The title of this year s conference started off as a wry comment on how we could follow
More informationMEETING REPORTS THE ALDWYCH BRANCH
MEETING REPORTS THE ALDWYCH BRANCH by Antony Badsey-Ellis, joint author with Mike Horne of the forthcoming book of this name. A report of the LURS meeting at All Souls Club House on 9 December 2008 The
More informationDear Parent(s) TRANSPORT TO THE SCHOOL SITE
July 2017 TO PARENTS OF YEAR 7 AND NEW SIXTH FORM STUDENTS ATTENDING JFS FROM SEPTEMBER 2017 Dear Parent(s) TRANSPORT TO THE SCHOOL SITE I write with details of transport arrangements to the School, effective
More informationGovia Thameslink Railway consultation on December 2015 timetable - APTU response
Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014
Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport
More informationT H E B U C K I N G H A M S U I T E
THE BUCKINGHAM SUITE THE BUCKINGHAM SUITE Situated on the 44th floor of The Tower, One St George Wharf, The Buckingham Suite is one of London s superior residences and one of the world s most magnificent
More informationProfile west. Impressive modern office environment. Excellent national and international access.
Profile west Impressive modern office environment. Excellent national and international access. At 52,990 sq ft (4,923 sq m ) Profile West is a landmark building which provides an impressive modern office
More informationNEWS AND NOTES NEW SIGNALLING
NEW SIGNALLING NEWS AND NOTES Above: L18 transferring to Hammersmith for CBTC testing on 2 June 2018, passing through Wood Lane on the westbound. It, and L17 on the east end, are the first (1969 Metro-Cammell-built)
More informationBoard meeting
Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To
More informationOperational Performance
Customer Services, Operations, and Safety Committee Board Action/Information Item III-A January 10, 2008 Operational Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationEFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017
EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017 Travel Plan Wembley Stadium will be hosting the English Football League (EFL) Final between Manchester United F.C. and Southampton F.C. on Sunday 26 th February
More informationUNIQUE CENTRAL LONDON FREEHOLD INTEREST
INVESTMENT SUMMARY UNIQUE CENTRAL LONDON FREEHOLD INTEREST 128 King Henry s Road London NW3 3ST 1.76 ACRES IN PRIME CENTRAL LONDON INVESTMENT SUMMARY 128 KING HENRY S ROAD Prime location in one of London
More informationThe best office building in Harrow. 3,304 sq ft 15,163 sq ft
The best office building in Harrow 3,304 sq ft 5,63 sq ft 2 minutes from london marylebone by train and just 9 mins from Baker street by tube HARROW: grade a location, grade a offices Metropolitan Line
More informationDaily Incident/Fire Log April 2011
INSTITUTIONAL SAFETY POLICE DEPARTMENT One University Boulevard Saint Louis, MO 63121-4400 Telephone: 314-516-5155 Daily Incident/Fire Log April 2011 April 1, 2011 UMSL Police took report #11-139. A stealing
More informationNational Rail Performance Report - Quarter /16 (January-March 2016)
National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role
More information10 reasons why the UK needs Crossrail 2 now
10 reasons why the UK needs Crossrail 2 now 10 reasons why the UK needs Crossrail 2 now Unlocking economic growth Crossrail 2 will support the strong economy our nation needs Creating jobs, boosting skills
More informationCENTRAL LINE VICTORIA LINE
ENGINEERING NOTICE NO. 35/18 4th FEBRUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE SUNDAY NIGHT/MONDAY, 4th/5th FEBRUARY Track Access Control and Signaller telephone numbers are available from
More informationExperiencing London Theatre January 4-14, 2018
Center for International Education Nexus Center, Suite 145 (516) 877 3487 cie@adelphi.edu EMERGENCY CONTACT INFORMATION Experiencing London Theatre January 4-14, 2018 U.S. Embassy in England 24 Grosvenor
More informationHigh quality refurbished offices adjacent to Canary Wharf
High quality refurbished offices adjacent to Canary Wharf 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and flexible office accommodation
More informationTRANSLATION & INNOVATION HUB WHITE CITY, LONDON W12
TRANSLATION & INNOVATION HUB WHITE CITY, LONDON W12 A TRANSLATION & INNOVATION HUB WHITE CITY, LONDON W12 B OFFERING A VARIETY OF AFFORDABLE, FLEXIBLE, SHORT AND LONG TERM TENANCY OPTIONS FOR COMPANIES
More informationLONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018
LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018 Parkland Walk Site of Former Crouch End Station Travel Arrangements We will be catching the 9.20 am train from Biggleswade. A one-day travel card
More informationBRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT
BRAND NEW FULLY-FITTED OFFICES OPPOSITE STATION AVAILABLE TO RENT 2,800 SQ FT Stratosphere Tower is a spectacular 36 storey tower located in the heart of Stratford, providing a luxurious collection of
More informationHigh quality refurbished offices adjacent to Canary Wharf
High quality refurbished offices adjacent to Canary Wharf Image of remodeled entrance 3 the building The South Quay Building has undergone an extensive refurbishment programme, offering high quality and
More informationLondon and Crossrail 2. Chris Moores Transport for London
London and Crossrail 2 Chris Moores Transport for London 1 Contents 2 1 The region needs Crossrail 2 2 Crossrail 2 can be more than just a railway 3 Planning and Delivering Crossrail 2 Issues facing London
More informationGoing underground on London Underground
ESL ENGLISH LESSON (60-120 mins) 30 th June 2011 Going underground on London Underground Most people who visit London tend to try out the London Underground. Going on the tube is an experience in its own
More informationWORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT
WORK WATERFRONT SUITES AVAILABLE FROM 9,00 TO 25,542 SQ FT WATERFRONT WATERFRONT IS ONE OF TWO GRADE A HEADQUARTERS BUILDINGS WHICH FORM HAMMERSMITH EMBANKMENT. THROUGH ITS FULL HEIGHT GLAZING & IMPRESSIVE
More informationYour Travelcard only needs to be valid for Zone One. Nearest tube stations. Circle Line (yellow line) Victoria Line (blue line)
Local information for Johnson House Johnson House You are situated in Belgravia, which is in Zone 1 of Central London. Located to the northwest is Hyde Park, which offers various sports and leisure opportunities.
More informationA PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT
A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT VANTAGE LONDON A 12-STOREY OFFICE BUILDING CONVENIENTLY LOCATED OFF JUNCTION 1 OF THE M4 WHICH BENEFITS FROM DIRECT ACCESS INTO CENTRAL
More informationUNDERGROUND NEWS INDEX 2017
UNDERGROUND NEWS ISSN 0306-8617 INDEX 2017 Issues 661 672 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 834 INDEX TO 2017 ISSUES OF UNDERGROUND NEWS Page entries marked * are, or include,
More informationMystery shop of rail ticket retailing research summary
Mystery shop of rail ticket retailing research summary March 2007 Mystery shop of rail ticket retailing research summary Introduction The latest results of the Passenger Focus National Passenger Survey
More informationRailway performance and subsidy statistics
Railway performance and subsidy statistics Standard Note: SN/SG/2199 Last updated: 2 October 2013 Author: Matthew Keep Social and General Statistics Section This Note provides data and commentary relating
More informationAccessible Transport The London 2012 Legacy. Mark Dyer Olympic Delivery Authority
Accessible Transport The London 2012 Legacy Mark Dyer Olympic Delivery Authority Agenda Introduction Improving public transport infrastructure Best use of existing infrastructure Complementary modes Better
More informationGTR 2018 timetable proposals
GTR 2018 timetable proposals Wednesday 16 November 2016 Phil Hutchinson - Head of Strategic Planning and team Thameslink Programme and GTR The GTR franchise was created to deliver the Thameslink Programme.
More informationST JOHN S WOOD LONDON
1 HAMILTON TERRACE ST JOHN S WOOD LONDON CGI 2 EXECUTIVE SUMMARY 85 Hamilton Terrace offers the opportunity to create an exceptional luxury house in a prime St. John s Wood location. 0.28 acre plot (1,150
More informationHIGH QUALITY OFFICES TO LET HAMMERSMITH LONDON W6 8DA
HIGH QUALITY OFFICES TO LET HAMMERSMITH LONDON W DA, to, sq. ft. ( to, sq. m) Please visit shortlands.london for more information Shortlands is a landmark office Tower totalling, sq ft with ground floor
More informationHave a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft
Have a look and explore something new 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft London Arches Wood Lane Discover new character retail, restaurant and bar space in West London The White City Area
More informationSECTION 2: PART A. SERVICE SPECIFICATION FOR Route Nos. 9 & N9
SECTION 2: PART A SERVICE SPECIFICATION FOR Route Nos. 9 & N9 CONTENTS Page 1. Tenders Required 2 2. Proposed Changes 2 3. Terminals 2 4. Days of Operation 3 5. Vehicle Type 4 6. Frequencies 5 7. Minimum
More informationPolicy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)
Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a
More information2018 VIRGIN MONEY LONDON MARATHON ROAD CLOSURE INFORMATION PLEASE READ THIS LEAFLET CAREFULLY
ROAD CLOSURES SUNDAY APRIL 08 VIRGIN MONEY LONDON MARATHON ROAD CLOSURE INFORMATION PLEASE READ THIS LEAFLET CAREFULLY Grosvenor Place Green Park Hyde Park Buckingham Palace Victoria Regent Street Piccadilly
More informationLand for Sale near Watford, Hertfordshire Land on Old House Lane, Kings Langley, Hertfordshire, WD4 8RS
v1.0 01727 701303 www.vantageland.co.uk Land for Sale near Watford, Hertfordshire Land on Old House Lane, Kings Langley, Hertfordshire, WD4 8RS Arable land for sale with investment potential well situated
More informationBusiest night of the year for 999 ambulance staff in London
Home Skip Navigation Cookies Accessibility Contact Us Search Go About us Calling 999 Working for us Talking with us News Health professionals Getting involved Location: Home News News releases and statements
More informationKick off will be at 17:00, with this event not being subject to extra time and penalties. Event timings are as follows:
2018 FIFA World Cup Russia Qualifier England vs Lithuania, Sunday 26 th March 2017 Travel Plan Wembley Stadium will be hosting 2018 FIFA World Cup Russia Qualifier between England and Lithuania on Sunday
More informationONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH
ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH The building offers an occupier the chance to relocate their headquarters to one of the most prominent sites in London and benefit from unrivalled
More informationEDITED PRESS RELEASES TRANSPORT FOR LONDON LONDON UNDERGROUND
Restoration of landmark façade complete at King s Cross St. Pancras 7 September 2006 Renovation of the Grade 1 listed, 130 year old Gothic façade at St. Pancras station has received a major boost with
More informationFACT SHEET. For everything London
Computer generated image is indicative only For everything London New high specification 1, 2 and 3 bedroom apartments in a classic London location: Argo House, Kilburn Park Road is a fantastic choice
More informationWorkplace Population: Key Facts
: Key Facts May 2014 Introduction Friday 23 rd May saw release 5.2 of 2011 Census data. Included in this release were the first statistics on the workplace population and the first data provided at the
More informationThe Harleian, a beautiful end
London WC Introduction The Harleian, a beautiful end of terrace building, is named after former resident Robert Harley, the 1st Earl of Oxford. Robert Harley 1707 1753 Robert Harley, 1st Earl of Oxford
More informationTRANSLATION & INNOVATION HUB. An Exceptional
TRANSLATION & INNOVATION HUB White City, London W12 An Exceptional Opportunity EXECUTIVE SUMMARY An Exceptional Opportunity A landmark Grade A office development situated in the White City Opportunity
More informationWessex Route and South Western Railway Transport Focus Meeting. Tuesday 9 January 2018
Wessex Route and South Western Railway Transport Focus Meeting Tuesday 9 January 2018 / Agenda 1. Performance 2. T-12: provision of information 3. Compensation process, awareness, resourcing 4. Industrial
More informationEnjoy a breath of fresh air in the city at Westfield Waterside.
Natural city living Enjoy a breath of fresh air in the city at Westfield Waterside. Linden Homes new collection of apartments and townhouses has an advantageous location between the picturesque River Wandle
More informationAlbany NY Red Light Camera Locations and Activation Dates 1 Central Avenue & Colvin Avenue
Albany NY Red Light Camera Locations and Activation Dates 1 Central Avenue & Colvin Avenue Westbound 8/28/2015 2 Central Avenue & Henry Johnson Boulevard Eastbound 2/16/2016 1. Description of the locations
More informationCentral London Suicide Bombings 7 th July 2005
London Ambulance Service NHS Trust Central London Suicide Bombings 7 th July 2005 David Whitmore DIMC RCSEd Senior Clinical Advisor to the Medical Director London Ambulance Service NHS Trust London Ambulance
More informationSound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode
January 217 Service Performance Report Ridership ST Express Sounder Tacoma Link Link Paratransit Jan-16 Jan-17 % 1,433,7 1,3,33 4.9% 331,27 7,121 98,411 3,633 Total Boardings by Mode 363,6 74,823 1,76,914
More informationFACT SHEET. For everything London
Computer generated image is indicative only For everything London New high specification 1, 2 and 3 bedroom apartments in a classic London location: Argo House, Kilburn Park Road is a fantastic choice
More informationSCHEDULE 8: PERFORMANCE REGIME. 1 Interpretation
SCHEDULE 8: PERFORMANCE REGIME 1 Interpretation 1.1 Definitions In this Schedule 8 and its Appendices 1 and 2, unless the context otherwise requires: Applicable Timetable means, in respect of a day, that
More informationForest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)
Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park
More informationPolicing Plan London South area 13/14
Policing Plan London South area 13/14 London South foreword incidents of live cable theft, with a 30% reduction in recorded offences. Notifiable crime overall fell by 3% against a backdrop of a 5.4% increase
More informationPublic transport in London
Contents Public transport in London Information for travelling on Tube, buses, Docklands Light Railway (DLR), Tramlink, Riverboat and Overground services. Christmas Eve, Saturday 24 December 2 Christmas
More information10 STRATTON STREET MAYFAIR W1
10 STRATTON STREET MAYFAIR W1 II 1 10 STRATTON STREET MAYFAIR W1 2 3 10 Stratton Street provides 41,571 sq ft of comprehensively refurbished Grade A accommodation arranged over garden, ground and seven
More informationNational Rail Passenger Survey Autumn 2013 Main Report
National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers
More informationELEPHANT PARK BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme
@ BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme @ INTRODUCING @ @ VITAL STATISTICS HOMES S London borough of Southwark 58 10 1,
More informationDocument Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail
Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail Table of Contents Glossary of this Rule... 4... 6... 6... 7... 7... 7... 8... 8... 8... 8... 9... 9...
More informationAce Café Meeting Point POSTCODE: NW10 7UD
Ace Café Meeting Point POSTCODE: NW10 7UD Getting here: Ace Café is found just alongside the North Circular between the Hangar Lane gyratory (A40) to the south and Ikea to the north (A404). From the west
More informationLondon Bridge station opens upgrade works
On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news
More informationSpot the Difference: How to tell when two things are the same (and when they re not!)
Spot the Difference: How to tell when two things are the same (and when they re not!) Raymond Vozzo School of Mathematical Sciences Undergraduate Seminar May 2010 Outline Introduction Topology Category
More informationService Guidelines. Operated By:
Service Guidelines Operated By: Effective Date: November 26, 2018 Table of Contents 1. SERVICE PARAMETERS... 2 1.1 Passenger Program Qualifications... 2 1.2 Service Hours... 2 2. SCHEDULING A TRIP... 2
More informationUpdate on the Thameslink programme
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts
More informationACCESS STATEMENT 2016/17
ACCESS STATEMENT 2016/17 3. INTRODUCTION 4. PUBLIC TRANSPORT 9. CAR PARKING 11. STADIUM ENTRANCES 12. STAND ENTRANCES AND VIEWING AREAS 15. TICKET OFFICE 16. MERCHANDISE 18. RADIO COMMENTARY 19. MEDICAL
More informationLONDON TOM MASTERS JOE BINDLOSS, STEVE FALLON, VESNA MARIC
discover LONDON TOM MASTERS JOE BINDLOSS, STEVE FALLON, VESNA MARIC 2 BLOOMSBURY TO REGENT'S PARK (p153) THE WEST END (p51) WESTMINSTER & MAYFAIR HYDE PARK (p85) & SOUTH KENSINGTON (p177) CLERKENWELL,
More informationSHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason
SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason The first indication seen was the Quad-Royal (poster size) tube map displayed at stations with text adjacent to Shoreditch stating that the station
More informationPRIVATE & EXCLUSIVE YOUR OWN PRIVATE ENTRANCE ON STRATTON STREET
THE STRATTON SUITE Extensively refurbished and centrally located, this exclusive self-contained suite within Devonshire House comprises approximately 13,800 sq ft of grade A office accommodation on the
More informationEvent Date 22 April Venue: University of London Senate House Malet Street London WC1E 7HU
Agenda and Venue Information Event Date 22 April 2016 Venue: University of London Senate House Malet Street London WC1E 7HU 020 7862 8000 Page 1 of 7 Forward Welcome to the SITS Trainers Network Spring
More informationModule TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014
GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents
More informationexceptional opportunity to occupy a prime office floor in the heart of covent garden
exceptional opportunity to occupy a prime office floor in the heart of covent garden the building 25 bedford street is a striking building located on the west side of bedford street, at its junction with
More informationTHE ENTIRE GRADE A SIXTH FLOOR AVAILABLE NOW
THE ENTIRE GRADE A SIXTH FLOOR AVAILABLE NOW THREE FURTHER FLOORS AVAILABLE Q1 2017 5,400 SQ FT (502 SQ M) 39,530 SQ FT (3,672 SQ M) WESTMINSTER CATHEDRAL ZIG ZAG BUILDING NEW SCOTLAND YARD 55 VICTORIA
More informationP R I N C E S H O U S E L O N D O N
PRINCES HOUSE LONDON ...when a man is tired of London, he is tired of life; for there is in London all that life can afford. SAMUEL JOHNSON A CITY LIKE NO OTHER Culturally vibrant, colourfully cosmopolitan,
More informationThe good loo guide GOOD LOO GUIDE 359
The good loo guide GOOD LOO GUIDE 359 This chapter brings together the information we have on accessible toilets/loos in central London, which is scattered through the guide, and relates them to a map.
More informationBROOKLYN HEIGHTS POLICE BLOTTER 08/01/18 Assisted Valley View PD with a traffic stop on I-480 W/B. Advised parties at basketball court no dogs allowed in park; same complied. 08/02/18 Observed three parties
More informationTRIP PARTICIPANT LIST
TRIP LEADER FORMS TRIP PARTICIPANT LIST Complete this form for all advertised club trips with copies to the club Trip Coordinator prior to the trip. Trip Name Location(s) Date(s) Trip Leader Ground Charlie
More informationBaltimore Ravens Egress Study
Baltimore Ravens Egress Study Presented by: Matt Snare, P.E., PTOE Amy Jackson, P.E. April 19, 2016 Agenda History of Ravens in Baltimore Traditional Traffic Studies vs. Stadium Work Ravens Egress Study
More informationLondon Underground Digital Campaign
London Underground Digital Campaign donated by ExterionMedia All proceeds to Railway Children London Underground Digital Advertising Helping Railway Children ExterionMedia are auctioning a two week campaign
More informationOur stakeholder newsletter, features business updates, news from our local communities and performance analysis.
2018 timetable consultation update Changes at stations: update Govia Railway Stakeholder Newsletter Period February 3 2016-2017 Our stakeholder newsletter, features business updates, news from our local
More informationNetwork Rail. Making Rail Accessible: Guide to Policies and Practices. November 2017
Network Rail Making Rail Accessible: Guide to Policies and Practices November 2017 0 Operator s Strategy Across our managed stations, Network Rail will consider accessibility issues and plan how we meet
More informationAnglia Winter Key Route Strategy (KRS) 2017/18
Anglia Winter Key Route Strategy (KRS) 2017/18 This is an overview of the train service plan should Key Route Strategy be declared. The principle of the KRS is to ensure we can run a service during conditions
More informationTHE ENTIRE GRADE A SIXTH FLOOR NOW AVAILABLE SIXTH FLOOR 21,845 SQ FT (2,030 SQ M)
THE ENTIRE GRADE A SIXTH FLOOR NOW AVAILABLE SIXTH FLOOR 21,845 SQ FT (2,030 SQ M) WESTMINSTER CATHEDRAL ZIG ZAG BUILDING NEW SCOTLAND YARD 55 VICTORIA STREET LONDON EYE HOUSES OF PARLIAMENT THE HOME OFFICE
More informationBognor Regis Camera Club - Practical Visit Open House London
Bognor Regis Camera Club - Practical Visit Open House London Saturday 20 th September Open House occurs just one weekend a year and is the only chance to see inside some of London s most amazing buildings.
More information