2016 South Orient Annual Inspection & Report. June 16 19, 2017 Rail Division

Size: px
Start display at page:

Download "2016 South Orient Annual Inspection & Report. June 16 19, 2017 Rail Division"

Transcription

1 2016 South Orient Annual Inspection & Report June 16 19, 2017 Rail Division

2 . Introduction The sixteenth annual review of the South Orient rail line (SORR), operated under lease by Texas Pacifico Transportation Company (TXPF), was conducted from June 12 thru 16, Staff of TxDOT s Rail Division performed this review with TXPF senior management via a hi-rail inspection of the line. A map of the SORR is included in the appendix. Financial Review The financial performance for the calendar year January 1, 2016, through December 31, 2016 shows positive income and substantial net profit from operating the rail line. Traffic has increased since TxDOT began the rehabilitation of the east end of the line in TxDOT has continued an annual program of track rehabilitation in a generally east-to-west direction and TXPF has contributed to capital improvements in the property. As in previous years, revenues were received from the interchange of cars with connecting railroads, switching services for customers, demurrage fees assessed on shippers and receivers for loading and unloading time periods, freight car storage for other car owners, and lease revenues assigned to TXPF. Expenses were categorized as operating, general and administrative, depreciation, interest and other. Traffic Shipments due to oil and gas exploration in the region continued to make up the largest share of traffic on the line in This traffic continued to grow despite reduced prices for hydrocarbons. Inbound sand received totaled 25,262 carloads, 3,158 more than the previous year. Crude oil shipments totaled 1040 carloads for the year, an increase of 624 compared to The total carloads interchanged were 30,565, which is an 18% increase from Wheat shipments totaled 1,369 carloads, up 44% over Table 1 shows the carloads moved by commodities since 2012 as well as the percent of change in each commodity and the total percent delta over the past year. Traffic began increasing during the latter half of 2009, which is when TxDOT began the rehabilitation of the eastern portion of the line. Annual carloads averaged 2,031 from 2001 through 2009, with dramatic increases since. Traffic has grown in 2016 despite a forecast of less volume due to a drop in crude oil profit margins. Figure 1 shows the total carloads from 2012 to 2017, with 2017 being the projected annual carloads. Figure 2 shows carloads by commodity over the last 5 years and illustrates the continuing increases in sand, jump in grain, as well as the smaller variations in the other commodities.

3 Table 1: Carloads by Commodity since Annual Carloads Projected Carloads Figure 1: Total annual Carloads from 2012 to 2016 (actual) & 2017 (projected at 44,500)

4 Figure 2: Total annual Carload trends by commodity 2012 to 2016

5 Shippers and Receivers The number of businesses using rail service has increased dramatically since the rehabilitation of the line began in The list of current active shippers below is followed by pictures of some shipper facilities. MP 37 - Elm Creek Grain, grain (wheat). MP 37 - Wingate Gin, grain (wheat). MP 38 - Buddy s Plant Plus, urea, fertilizer. MP 38 - Muller Building Products, steel. MP 53 - Kasberg Grain, grain (wheat, sorghum, corn). MP 60 - Hudson Feeds, molasses. MP 63 - Gavilon-Western Tower transloading, bone meal. MP 70 - Angelo Pellets, cattle feed MP 75 - City Lumber, lumber. MP 75 - Hirschfeld Steel, steel MP (San Angelo Yard) Preferred Pipeline-Tidewater Transloading, silica sand MP (San Angelo Yard) Superior Silica Sands, silica sand MP Pattison Sand-Pinnacle Sands Facility, silica sand MP TriCoastal Trading-at Texas Tank Car, scrap MP McCoy s, lumber MP Superior Silica Sand-Texas Specialty Sand Facility transloading, silica sand MP U.S. Silica-Texas Specialty Sand Facility transloading, silica sand MP Vista Sand-Maalt transloading, silica sand MP Superior Silica Sand, large Tidewater facility under construction, silica sand MP Vista Sand-Maalt transloading, silica sand MP 791 Fairmount Santrol, silica sand

6 MP 791 Pattison Sand-at Fairmount Santrol facility, silica sand MP Cooper Natural Resources, hydrochloric acid MP CARBO Ceramics transloading facility, ceramic sand MP Pattison Sand, Titan Lansing transloading facility, silica sand MP U.S. Silica, Titan Lansing transloading facility, silica sand MP Prince Agri, Titan Lansing transloading facility, clay MP (Fort Stockton yard) Superior Silica Sand, silica sand MP (Fort Stockton yard) U.S. Silica-Texas Specialty Sand transloading, silica sand MP (Fort Stockton yard) Vista Sand, sand MP Maalt transloading facility, Big Lake

7 MP Transloading sand, Fairmount Santrol facility at Big Lake Railcar-truck sand conveyor

8 MP Tidewater facility under construction, Big Lake MP Titan Lansing transloading facility, Sulphur Jct.

9 MP Sand transloading at Fort Stockton yard The facilities that have located on the line since 2009 have experienced a steady increase in traffic as their operations become more efficient and volumes increase. TXPF is working with additional new customers who have expressed an interest in transporting freight on the line which includes additional sand and crude oil facilities, as well as mining for granite, sulphur, and zeolite at other locations. Operations and Maintenance Texas Pacifico (TXPF), the contract operator for the South Orient, is owned by Grupo México. Grupo México is also the majority owner of Ferromex, the largest main line railroad in Mexico. Ferromex connects to the west end of the South Orient via the currently disrupted rail border crossing at Presidio. TXPF s current timetable is dated July 17, 2016, and the railroad uses the General Code of Operating Rules. The increased customer base and on-going economic development efforts continue to have a significant impact on TXPF staffing. TXPF now has 56 employees in Texas, and expects that employment will increase in the future as carload volumes grow. Train crews and front-line managers work out of the San Angelo yard where the railcar storage yard and equipment servicing facilities are located. TXPF s main office is in the city of San Angelo.

10 TXPF Offices in San Angelo The line between San Angelo Junction and Fort Stockton is covered by regular train operations. East of Big Lake, two to three trains are operated in each direction daily; west of Big Lake to Fort Stockton, one train is operated in each direction daily. There are four to six crew starts per day. One crew is based at Fort Stockton and the rest are based at San Angelo. One of the San Angelo crews goes on duty at San Angelo Junction, and another crew works the yard at San Angelo. An additional crew may be based at Fort Stockton. The Fort Worth and Western Railroad delivers cars every day at San Angelo Junction, and three to four days per week there is a second delivery. The BNSF Railway also delivers cars daily at San Angelo Junction and sometimes there is a second delivery from them. Generally, more cars are interchanged with the Fort Worth and Western than with the BNSF. Texas Pacifico offers service on a car load and unit train basis and moves 286,000 grossweight-on rail carloads between San Angelo Junction and Fort Stockton. Trains now operate at 25 mph from San Angelo Junction to San Angelo (MP 2 to MP 69; MP715) and from west of San Angelo to Sulphur Junction (MP 723 to MP 869.4). The final 12 miles from Sulphur Junction to Fort Stockton have a maximum authorized speed of 10 mph. The railroad west of Fort Stockton to Presidio is not operated regularly and is classified as FRA Excepted Track. This portion of the railroad should be upgraded for regular service for the reopening of the international railroad bridge at Presidio and reestablishment of the interchange with Ferromex on the Mexican side.

11 TXPF has 29 locomotives leased from CIT. Three are MP15 model switchers, 10 are GP38 and GP40 model four axle road locomotives, and the remaining 16 are SD40, SD60 and SD90 model six axle road locomotives. The seven SD90 units are equipped for distributed power operation. Locomotive maintenance and servicing is performed by WABTEC. MP Westbound TXPF freight train led by an SD90 4,300 hp locomotive TXPF uses a number of other contractors. Balfour Beatty is the track maintenance contractor. Additional contractors are used for rehabilitation projects. Quality Signal handles signal maintenance, almost all of which is highway grade crossing signals. ASK Engineers is the bridge contractor. An ultrasonic rail flaw detector covers the line twice a year and vegetation control is performed approximately twice a year. Infrastructure Between 2009 and 2016, 114 miles of South Orient s 391 miles of line were rehabilitated by TxDOT. This program started at the east end of the line at San Angelo Junction and proceeded west to MP 777 near the Irion County-Reagan County line. The work has consisted of tie replacement, some rail replacement (mostly with continuously welded rail), new ballast, surfacing and lining, upgraded road crossings, plus bridge and culvert repair and replacement. Some of the rail which was replaced was 70, 85 and 90

12 lbs to the yard and 100 years old. The replacement rail was a minimum of 115 lbs per yard. TXPF has also performed additional rail replacement and bridge work with these limits, independently of the TxDOT work. MP 20 - CWR rail relay MP 33 - CWR rail relay

13 MP 61 - Reconstructed grade crossing MP Grade crossing in poor condition, prior to reconstruction in the program

14 TxDOT s work on the east end of the line included rehabilitation work to 30 bridges, the replacement of a structurally deficient bridge with corrugated metal pipe, the replacement of a decayed, timber box culvert with corrugated metal pipe, other drainage repairs, and the replacement of a fire-damaged bridge at MP with a concrete structure. Ties were also replaced on all open-deck bridges and on most ballasted deck bridges. MP Bridge Replaced MP Rehabilitated bridge structure

15 MP Bridge repair, replaced wooden stringers with steel girders New passing sidings have been installed in several locations to accommodate the increased volume of trains. Highway grade crossing warning devices have been upgraded at many locations. MP 42.6 west end the new Fogleman Siding (7300 LF)

16 MP new siding $34.17 million has been expended on the nine TxDOT projects between 2009 and In addition, Texas Pacifico has expended $29.8 million on other similar capital projects on the South Orient between 2012 and TXPF has expended additional funds on non-track related capital projects as well. MP 13 track rehabilitated 2017 by TXPF with 115 lbs. CWR

17 TxDOT s ninth and most recently completed rehabilitation project, executed between December 2015 and July 2016 from MP 735 to MP 776.9, covered tie replacement, additional ballast, rehabilitating road crossings, and alignment and surfacing. The cost of this project was $2.77 million. During 2016, TXPF upgraded 7.57 miles of main line track in San Angelo with welded rail and new ties for $3.97 million, and replaced ties between from MP 777 to MP 849 for $409,000. For 2017, TxDOT let a project for the rehabilitation of 53.4 miles of the main line from MP to MP The federal portion of the funding for this $5.36 million project comes from the National Freight Network Program. The project will include the replacement of 38,800 cross ties, replacement of 783 bridge ties, placement of 10,600 tons of ballast, reconstruction of 19 grade crossings, replacement of 1,112 feet of rail, and surfacing and alignment of the full 53.4 miles. The work is scheduled to be completed June, Since the bids for the MP project came in below the estimate and $4.64 million in the ask for National Freight Network Program funds are available, Rail Division is developing a project for letting in March 2018 to perform a similar rehabilitation on 37.4 miles beyond MP 810.4, pending approval by the Commission. The objective of the rehabilitation program is to have a main line that efficiently supports existing and anticipated levels of traffic and conforms to FRA Class 2 track standards. TxDOT s agreement with TXPF is that TXPF maintain the rehabilitated portion of the railroad to the upgraded condition at TXPF s expense. At present, the 137 miles of line beyond Fort Stockton has no regular service and speed is restricted to no more than 10 mph. The last revenue freight train to operate all the way to Presidio ran in On occasion, freight trains have operated on this part of the railroad in recent years. In 2016, pipe was shipped to Belding, 11 miles beyond Fort Stockton. Also in 2016, TXPF moved 596 carloads of pipe to MP 964 for an oil and gas project. This traffic required the use of the 11 miles of trackage rights between Alpine and Paisano Junction on the Union Pacific s Sunset Route main line. The tracks and signals providing access to the Union Pacific s Sunset Route main line remain in service.

18 MP Approaching westbound home signals at UP interlocking, Alpine Jct. MP Paisano Junction (South Orient curving to the left, UP straight through)

19 MP 957 Eastbound distant (approach) signal to Paisano Jct. MP South of Paisano Junction The line between Paisano Junction and the international bridge at Presidio has been subject to occasional wash outs and bridge damage. Minimal repairs and vegetation control have been made to keep the track passable by light equipment such as hi-rail vehicles. On this year s inspection trip, the full 72 miles were covered by the inspection team in two hi-rail pickup trucks.

20 MP 1019 largest bridge on South Orient: 1,224 long; 73 high Nevertheless, the section of track between MP 968 and Presidio still displays the benefit of TxDOT s rehabilitation project during 2005 and early Over 37,000 ties were installed with associated ballast and surfacing in this segment of the line.

21 MP Curved track At Presidio, the U.S. portion of the international bridge was destroyed by fire in 2008 and A portion of the Mexican part of the bridge has also been severely damaged. The International Boundary and Water Commission made improvements to the levee system in Presidio which has resulted in the tracks being buried in the levee. The entire bridge will need to be rebuilt to a higher elevation as the levee was raised nine feet since the bridge saw its last train operating over it in MP Timber Structure North of Levee

22 MP Track Buried in Levee MP Remaining structure (Mexican portion) of the international bridge Texas Pacifico is responsible for rebuilding the bridge. TXPF has developed the approved plans and specifications for the replacement bridge, and in conjunction with Ferromex, has worked the permits on the Mexican side. TxDOT has obtained the various U.S. government permits and approvals, with only the Coast Guard permit pending at the time of this report (June 2017). Bridge reconstruction is planned to start later this year, with the railroad infrastructure in place in TxDOT is coordinating project review and approval, including for the ancillary facilities required by US Customs and Border Protection (CBP) for inspecting the trains when they enter the country.

23 MP 1029 View south towards Mexico from approx. future location of CBP facility

24 MP 1029 TXPF VP Operations on South Orient property line MP 1029 View north towards Presidio Prior to establishing regular freight service and the interchange of cars with Ferromex at Presidio, rehabilitation of the track plus bridge, culvert and embankment repair will be required from Presidio to approximately 11 miles beyond Fort Stockton.

25 MP Meandering bank erosion near bridge structure MP Erosion around wooden box culvert (undertrack drainage)

26 MP Erosion at culvert Recommendations TXPF should continue to increase their customer base and aggressively pursue additional traffic. Both TXPF and TxDOT should continue to pursue funding for the rehabilitation of the line west of Sulphur Junction and the restoration of traffic across the border at Presidio. Conclusions TxDOT and TXPF have made significant investments in the improvement of the east end of the line which has increased train speeds and capacity. TXPF s pursuit of new customers has resulted in dramatic increases in traffic over the years, and their efforts to adapt to changing economic conditions have kept the South Orient Rail Line in operation and profitable. The public-private partnership between TxDOT and TXPF has revitalized a rail corridor that was slated for abandonment, resulting in improved transportation efficiency, economic development opportunities, increased employment in the region, and improved safety.

27 Appendix A. Conditions and Upgrades by Line Segment up to June 2017 B. Map of the South Orient Railroad

28 Appendix A - Conditions and Upgrades by Line Segment up to June 2017 MP 0 72 San Angelo Subdivision 1. 90# jointed, 115# CWR,136# CWR rail manufactured Miles 115#,136# CWR installed by TXPF( ) 3. 18,047 grade 5 ties installed by TXPF, ( ) 4. 8,400 grade 5 ties installed by TXPF ( ) 5. 27,500 tons of ballast placed by TXPF ( ) Miles of surfacing done by TXPF ( ) 7. 3,500 of track undercutting done by TXPF ( ) 8. 2 = #10 115# turnouts installed be TXPF(2016) 9. 64,670 ties installed by TXDOT, ( ) 10. Replaced worn rail with CWR in curves 4,5,6,24,27,28,36,39,40,41, by TXDOT ( ) grade crossings reconstructed by TXDOT, ( ) 12. Grade crossing renewals MP5.49, MP11.3. TXDOT (2016) 13. Grade crossing renewals MP6.11, MP67.16 TXPF (2016) 14. 1,393 ties replaced on open deck bridges by TXDOT, ( ) 15. Misc. bridge repairs by TXDOT, ( ) 16. Misc. bridge repairs by TXPF, ( ) miles of new 136# CWR relay, 8,000 ties, 12,000 tons of ballast between MP 7 and MP 35, TXPF (2015) 18. Bridge Management Program 29 bridges repaired between MP 4 and MP 910.9, (2015) 19. Replacement of timber stringers with HP steel stringers on multiple bridges TXPF ( ) 20. Bridge replaced with CMP culverts at MP22.4 by TXDOT. 21. Bridge replaced with CMP culverts at MP23.1 by TXPF. 22. Timber box culvert replaced with CMP culvert at MP45.5 by TXDOT LF Fogelman siding constructed by TXPF (2015) 24. Signaled crossings installed MP70.3, MP61.3 by TXDOT, ( ) 25. Ultrasound rail inspection and repairs done by TXPF, MP 0 to 882, (2015) San Angelo Yard 1. 7,685 ties installed by TXDOT, rehab 2. 4,548 tons of yard ballast installed (TXDOT) 3. Repairs to 18 yard switches (TXDOT) 4. 2,000 ties installed by TXPF (2016) switch stands replaced with ergonomic design (TXPF) 6. Wye curve track replaced with 136# rail panels (TXPF) 7. Badger Mining sand unloading facility in yard 8. Canopy installed over fuel bay, drainage improved, (2015)

29 MP Big Lake Subdivision 1. 8,324 ties installed by TXDOT, ( ) # - 131# mixed wts jointed rail between MP722 MP # - 131# mixed wts CWR between MP737 and MP Ties installed between MP715 MP (2015) 5. 12,500 Ties installed 5,000 tons of ballast, 402 LF of grade crossing renewal and 18 miles of surfacing completed by TXDOT. (2015) 6. 12,000 Ties installed 4,000 tons of ballast, 7 timber crossing s, and 18 miles of surfacing completed by TXDOT. (2016) grade crossings reconstructed with new track and concrete surfaces through San Angelo (TXDOT) 8. MP 715.8, location of SESCO superfund site adjacent to ROW ties replaced on open bridge at (TXDOT) 10. Replaced fire damaged bridge at with concrete structure (TXDOT) ties installed by TXPF, (2004) 12. Ties in good condition up to MP 757, then poor to fair condition (limited # of good) through MP Signal Crossing installed MP , 2015 (TXDOT) # CWR manufactured in 1984 (132# CWR 811 to 815) 15. 4,471 ties installed by TXPF, 2004 (MP 802 thru 855.6) # jointed rail manufactured 1912 between mp869.7 MP ,007 ties installed by TXPF, ,615 ties installed by TXPF, early rail relay by TXPF, early MP 883 to MP 962, 22 bridges repaired, Timber stringer s replaced with HP steel stringers on multiple bridges by TXPF. ( ) 22. Misc. bridge repairs on most bridges in this section. TXPF ( ) MP Alpine Subdivision 1. 90# jointed rail manufactured ,362 ties installed by TXPF, Ties in poor to fair condition between MP957 and MP ,426 ties installed between MP968 and MP1029 TXDOT Remaining ties in fair to good condition 6. MP channel north side of bridge continues deterioration. 7. 3,125 ties installed by TXPF, All rock cuts in need of drainage improvements silting in 9. Excepted track designation 10. Washouts at MP ; repaired by TXPF. (2016)

30 11. International bridge burned down south of levee, Feb 2008; north of levee, March Presidio Depot burned down February 23, 2011

31 Appendix B - Map of the South Orient Railroad

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006 of hydrologic features. A substantial proportion of the land between and north of the railroad tracks contain wetlands, as identified by the US Fish and Wildlife Service National Wetlands Inventory (NWI).

More information

NPS Form a OMB No (8-86) Expires

NPS Form a OMB No (8-86) Expires Section: F Page 247 Railroads in Minnesota, 1862-1956 Figures Railroad Roadway Edge of Right of Way Edge of Right of Way Railroad Bed Figure 1. Railroad Corridor, Young America vicinity, ca. 1915 Section:

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION BUREAU OF RAIL SERVICES FISCAL YEAR 2010 STATE RAIL PLAN APPLICATIONS ELIGIBLE FOR FUNDING

NEW JERSEY DEPARTMENT OF TRANSPORTATION BUREAU OF RAIL SERVICES FISCAL YEAR 2010 STATE RAIL PLAN APPLICATIONS ELIGIBLE FOR FUNDING Belvidere & Delaware BR&W Raritan River Bridge 14.01 Capacity Upgrade $395,000 Project Description: The Black River & Western Railroad Truss Bridge 14.01 crossing the South Branch of the Raritan River

More information

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC UPRR/TPW Crossing in Chenoa, IL Written By Michael R. Garcia, P.E. Chief, Rail Engineering Bureau of Railroads Room 302 Illinois Department of

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

Cotton Belt Corridor PE/EIS

Cotton Belt Corridor PE/EIS February 28, 2011 February 28 2011 Prepared by Stantec Consulting, Inc Table of Contents 1.0 INTRODUCTION... 1 2.0 BACKGROUND... 1 3.0 METHODOLOGY... 3 4.0 DOCUMENT REVIEW... 3 5.0 REVIEW OF THE CORRIDOR

More information

Rail /Trail Service Plan & Infrastructure Upgrade Project 14 April 2018

Rail /Trail Service Plan & Infrastructure Upgrade Project 14 April 2018 Rail /Trail Service Plan & Infrastructure Upgrade Project 14 April 2018 Immediate Challenges Ø Valuable ($360M) rail asset requires investment Ø Island population growth transportation alternatives Ø Community

More information

Port MacKenzie Rail Extension

Port MacKenzie Rail Extension Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough

More information

Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center

Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center Winnebago County Rail Authority Rail Engineering and Planning Study Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center Table of Contents 1.0 Introduction and Study

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

BACKGROUNDER Office of the Premier Government of Canada

BACKGROUNDER Office of the Premier Government of Canada 2009OTP0058-000553 March 27, 2009 BACKGROUNDER Office of the Premier Government of Canada INFRASTRUCTURE INVESTMENTS IN THE NORTH SHORE The North Shore Trade Area provides a critical connection to overseas

More information

TGS CEDAR PORT INDUSTRIAL PARK

TGS CEDAR PORT INDUSTRIAL PARK Grand Pkwy ±10,000 ACRES AVAILABLE R Loop 201 R BNSF BAYER CHEMICAL UP & TGS INDUSTRIAL PARK FM 14 05 NRG BAYTOWN WATER RESERVOIR HOME DEPOT Fisher Rd PBP EXEL CEDAR PORT WAL-MART BORUSAN MANNESMANN Borusan

More information

I Have A Problem Text and Photos by Rich Mahaney, EID Superintendent

I Have A Problem Text and Photos by Rich Mahaney, EID Superintendent I Have A Problem Text and Photos by Rich Mahaney, EID Superintendent I have a problem. I can t decide which railroad in this country to model. I like so many different railroads, their paint schemes, their

More information

Vancouver Island Rail ISLAND CORRIDOR FOUNDATION

Vancouver Island Rail ISLAND CORRIDOR FOUNDATION Vancouver Island Rail ISLAND CORRIDOR FOUNDATION June 2015 VANCOUVER ISLAND RAIL CORRIDOR June 2015 2 Railway Infrastructure Improvement Funding Total $20.9M Project - Update Regional Districts Railway

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

JOURNAL OF THE CSXT HISTORICAL SOCIETY Volume 7 Number 1

JOURNAL OF THE CSXT HISTORICAL SOCIETY Volume 7 Number 1 JOURNAL OF THE CSXT HISTORICAL SOCIETY Volume 7 Number 1 CSXTHS 2018 CONVENTION CSXTHS is not affiliated with CSX Transportation and is a nonprofit corporation chartered under the laws of Kentucky. CSX

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

South Jersey Port Corporation

South Jersey Port Corporation South Jersey Port Corporation An Agency of the State of New Jersey Rail / Port Infrastructure Enhancements Jay Jones, Deputy Executive Director South Jersey Port Corporation SJPC s enabling legislation

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy José Zozaya President, General Manager and Executive Representative Kansas City Southern de México General Overview of KCSM

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

B R O O K S S U B D I V I S I O N

B R O O K S S U B D I V I S I O N CANADIAN PACIFIC RAILWAY B R O O K S S U B D I V I S I O N - PART 2 - BROOKS TO BASSANO, ALBERTA - C. van Steenis, Chestermere, Alberta 30 Oct 2009 The Canadian Pacific Railway built the transcontinental

More information

Governor Corbett Announces State Investment in 24 Rail Projects

Governor Corbett Announces State Investment in 24 Rail Projects News for Immediate Release Nov. 9, 2012 Governor Corbett Announces State Investment in 24 Rail Projects Harrisburg Twenty-four freight-rail projects across Pennsylvania will improve businesses rail access,

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

The Holes Creek Bridge Replacement By Bradley McClelland

The Holes Creek Bridge Replacement By Bradley McClelland The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes

More information

Road log for railway features east of Thunder Bay

Road log for railway features east of Thunder Bay Road log for railway features east of Thunder Bay Routes: Notes: Highway 101 from Chapleau to Wawa via Hawk Junction and Highway 17 (Trans Canada Highway "TCH") from Wawa to Thunder Bay On the TCH there

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report SEPTEMBER 2010 Ridership Report Budget to Actual Ridership Budget Target: 2,335,906 Actual: 2,291,235 Ridership Comparison Fiscal

More information

Captions/Proof Sheets for 97 Alberta Coal Branch & related images to accompany Kodak PhotoCD and slides; A C Lynn Zelmer, photographer

Captions/Proof Sheets for 97 Alberta Coal Branch & related images to accompany Kodak PhotoCD and slides; A C Lynn Zelmer, photographer A selection of 100 35mm colour slides was sent to Kodak Australia for scanning to PhotoCD format as an experiment in c1997. Since the digital images were intended for use at a conference, appropriate images

More information

Vancouver Island Rail

Vancouver Island Rail Presentation to CRD Transportation Committee February 25, 2015 Vancouver Island Rail ISLAND CORRIDOR FOUNDATION 25 February 2015 VANCOUVER ISLAND RAIL CORRIDOR 25 February 2015 Presentation to CRD Transportation

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003.

The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003. The Ministry of Transport of Ukraine / European Commission / OTIF International Conference on Transport Law Kyiv, October, 21 22, 2003. The Report of the Minister of Transport of Ukraine the General Director

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

A Tour of the Pennsylvania & Berwind RR

A Tour of the Pennsylvania & Berwind RR 1 A Tour of the Pennsylvania & Berwind RR The Pennsylvania and Berwind Railroad is a 34.7 mile short line railroad that serves a coal, steel, and general merchandise customer base. The line is also a bridge

More information

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Vasona Light Rail Signal Design Challenges Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority Abstract The Vasona line is the most recent extension of

More information

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES #118404v1 Regional Transit Authority June 19, 2006 1 Presentation Overview Existing Public Transit Transit System Peer Comparison Recent Transit

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality Presentation to: 14 th Annual Southwestern Rail Conference Texas Rail Advocates by Judge

More information

Capital Metropolitan Transportation Authority. Monthly Performance Report

Capital Metropolitan Transportation Authority. Monthly Performance Report Capital Metropolitan Transportation Authority Monthly Performance Report AUGUST 2010 Ridership Report August 23, 2010 Budget to Actual Ridership Budget Target: 2,290,590 Actual: 2,300,796 Ridership Comparison

More information

Port of Newcastle 2016 TRADE REPORT. Port of Newcastle

Port of Newcastle 2016 TRADE REPORT. Port of Newcastle Port of Newcastle 2016 TRADE REPORT Port of Newcastle SHIP VISITS COAL 2016-1,764 2015-1,704 CRUISE 2016-9 2015-8 NON COAL 2016-485 2015-455 2,258 vessel visits in 2016 2,167 ship visits in 2015 COAL TRADE

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

The Railroad at Lake Sarah By Alton Chermak, and Brad Spencer

The Railroad at Lake Sarah By Alton Chermak, and Brad Spencer The Railroad at Lake Sarah By Alton Chermak, and Brad Spencer Much of the advertising ephemera from Lake Sarah s resort heydays in the early 1900 s makes note of the convenience of travel to the area s

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits 90 I-90 Snoqualmie Pass East September 2015 Annual Mega-Project Report Purpose of this Report The financial and schedule information in this document will assist the Office of Financial Management in meeting

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

All closures this week happen at night, including full closures of Mesa and I-10

All closures this week happen at night, including full closures of Mesa and I-10 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Current Corridor Characteristics

Current Corridor Characteristics Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018

ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT. June 7, 2018 Transportation Planning Conference June 7, 2018 ACCELERATED CONSTRUCTION LANE RENTAL FEES & A+B BIDDING DALLAS DISTRICT June 7, 2018 Dallas District Accelerated Construction Techniques Accelerated Construction Techniques commonly used by the Dallas

More information

Half-yearly Report 2013

Half-yearly Report 2013 Half-yearly Report 2013 Financial result unchanged PORT OF ROTTERDAM THROUGHPUT DECREASED SLIGHTLY Throughput in the port of Rotterdam in the first half of the year decreased by 0.9% compared to the first

More information

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project PA DEP Chapter 105 Joint Permit Application Transcontinental Gas Pipe Line Company, LLC Lancaster County APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS Atlantic Sunrise Project

More information

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Milestone: Bridge to Nowhere scheduled for demolition Aug 14 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Elected Officials Briefing

Elected Officials Briefing Elected Officials Briefing North Metro Rail Line February 12, 2015 1 Welcome and Introductions 2 Rick Clarke RTD Assistant General Manager Capital Programs 3 The RTD FasTracks Plan 122 miles of new light

More information

New Orleans Public Belt Railroad Corporation Acquisition and Operation Exemption. Public Belt Railroad Commission of the City of New Orleans

New Orleans Public Belt Railroad Corporation Acquisition and Operation Exemption. Public Belt Railroad Commission of the City of New Orleans This document is scheduled to be published in the Federal Register on 12/27/2017 and available online at https://federalregister.gov/d/2017-27931, and on FDsys.gov FR-4915-01-P SURFACE TRANSPORTATION BOARD

More information

Deterioration Factors at Girder Ends

Deterioration Factors at Girder Ends Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov January 18, 2017 Mesa Continuous for 6 weeks The following closures started

More information

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices Nasser Hossain Senior Engineer, Roads & Structural Assets, City of Sydney City of Sydney (COS) LGA The City of Sydney LGA

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

ATTACHMENT B. Reference No.

ATTACHMENT B. Reference No. ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

Tenders. Manitoba Infrastructure

Tenders. Manitoba Infrastructure Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska Crossing Canada s Other Border Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska This Presentation Highlights :! Multi-Modal Infrastructure Investment! Northern Economic

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Chapter 2: Entire US287 Corridor

Chapter 2: Entire US287 Corridor Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety APPENDIX D Lot Specific Permit Compliance & Forest Plan (FP) Requirements Porter Fork Recreation Residence Tract (Items noted were documented in compliance letter, 8/12/2005, sent to all Rec. Residence

More information

A Q&A with Nickel Plate Railroad Supervisor. Barney Andrews. Talks About His Work Experience and Recollections of the Railroad in Tipton, Indiana

A Q&A with Nickel Plate Railroad Supervisor. Barney Andrews. Talks About His Work Experience and Recollections of the Railroad in Tipton, Indiana A Q&A with Nickel Plate Railroad Supervisor Barney Andrews Talks About His Work Experience and Recollections of the Railroad in Tipton, Indiana Recorded April 13, 1998 Copyright 2013. All rights reserved.

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.

More information

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000 1716 Willowbrook Cr, Dawson Creek BC Canada For SALE $2,847,000 This is a rare find, 32 townhomes in Dawson Creek, BC. Excellent investment in a single title multi family complex. Vendor has upgraded this

More information

Connect Oregon IV Final Review Committee Final Recommendation

Connect Oregon IV Final Review Committee Final Recommendation ODOT 1A0217 Port of Portland 3R0192 Central Oregon & Pacific Railroad Project Selection, Administration, and Debt Service $ 500,000 $500,000 Air Trans Center Taxilane-Ph 3 $ 3,500,000 $ 14,800,000 $ 18,300,000

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015 Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

National Register of Historic Places Multiple Property Documentation Form

National Register of Historic Places Multiple Property Documentation Form NPS Form 10-900-b OMB No. 1024-0018 Revised Aug. 2002 Expires 12-31-2005 Multiple Property Documentation Form This form is for use in documenting multiple property groups relating to one or several contexts.

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25

BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25 Number of Words: 3,527 ABSTRACT BALLAST CLEANING TO IMPROVE DRAINAGE IN METROLINK S VALLEY SUBDIVISION TUNNEL 25 Tim Harris Track Maintenance Engineer 2704 North Garey Ave. Pomona, CA 91767 213/494-1215

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information