RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA. Prepared For: Norfolk Southern Corporation

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA. Prepared For: Norfolk Southern Corporation"

Transcription

1 THE WOODSIDE CONSULTING GROUP RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Prepared For: Norfolk Southern Corporation Prepared By: The Woodside Consulting Group, Inc. September 30, Cambridge Avenue Suite 104 Palo Alto, CA (650) Fax (650)

2 TABLE OF CONTENTS I. BACKGROUND... 1 II. PASSENGER TRAIN SCHEDULES... 2 III. INFRASTRUCTURE ADDITIONS FOR 2012 AND 2017 CASES... 3 A AND 2017 ROANOKE PASSENGER TRAINS CASES... 3 B ROANOKE PASSENGER TRAINS AND INFRASTRUCTURE ADDITIONS CASE... 4 C FUTURE ROANOKE PASSENGER TRAINS AND INFRASTRUCTURE ADDITIONS CASE... 5 IV. RTC MODEL RESULTS AND FINDINGS: 2012 CASES AND 2017 CASES... 7 A. SUMMARY OF CASE DIFFERENCES... 7 B. COMPARISON METRICS... 9 C CASES... 9 D CASES i

3 LIST OF ATTACHMENTS A. Definition of RTC Model Network B. Passenger Train Schedules for Roanoke Service C Infrastructure Additions: 1. Lynchburg Roanoke Low Investment Scenario 2. Altavista District Speed Upgrades For Intermodal Trains 3. Altavista District Siding MP V236.0 V238.0, near Niagara D Infrastructure Additions 1. Blue Ridge District a. Extend siding, MP N214.5 N 218.5, from Forest Westward b. Extend Pocket Track and Relocate Crossover, about MP N256.9, Roanoke Yard 2. Piedmont Division a. Add Second Main Track on Double Wye Connecting Track, Lynchburg b. Add Second Main Track MP , Green Smothers 3. Altavista District a. Add Second Main Track MP N256.1/VC 0.0 VC1.53 and MP V240.0 V236.0, Tinker Creek east of Niagara b. Add Siding MP V217.4 V219.4, Stone Mountain c. Add Siding MP V202.6 V204.6, west of Hurt ii

4 LIST OF ATTACHMENTS (CONT D.) E. RTC Model Results: 2012 Base Case (2012A) F. RTC Model Results: 2012 Roanoke Passenger Trains Case (2012B) G. RTC Model Results: 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C) H. RTC Model Results: 2017 Future Base Case (2017A) I. RTC Model Results: 2017 Future Roanoke Passenger Trains Case (2017B) J. RTC Model Results: 2017 Future Roanoke Passenger Trains and Infrastructure Additions Case (2017C) K. RTC Model Results: 2017 Future Roanoke Passenger Trains/Mitigating Infrastructure Case (2017D) iii

5 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA I. Background In January 2013, The Woodside Consulting Group, Inc. ( Woodside ) was retained by Norfolk Southern ( NS ) to make an RTC Model Study of the network effects of adding one roundtrip passenger train daily between Lynchburg and Roanoke, VA. Our assignment was to determine, using the RTC model, if clearing the Altavista District V-Line between Roanoke and Abilene for double-stack intermodal container service would open sufficient network capacity on the Blue Ridge District to accommodate the extension of one roundtrip passenger train from Lynchburg to Roanoke without increasing freight or passenger train delay. Two levels of underlying train volumes (freight and existing Amtrak) were addressed: a 2012 Base Case (2012A) and a 2017 Future Base Case (2017A). The RTC train file for the 2012 Base Case was developed by Woodside from NS-provided October 2012 train operating data. Subsequent modifications were made to reflect operational changes in and around Roanoke Yard in early 2013 and to add a new Trash Train and Train No. 201 to the train file data. Projected growth in intermodal trains was provided to Woodside by NS for development of the 2017 Future Base Case RTC train file. Nine second frequencies of existing intermodal trains were added (two hours later, if currently scheduled to leave before 7:00 p.m., or two hours earlier, if currently scheduled to leave after 7:00 p.m.). Five intermodal trains were operated more days per week than in the 2012 Base Case and 2017 Roanoke Passenger Train Cases (2012B and 2017B) included the extension of the existing daily Washington-Lynchburg passenger train to a single roundtrip daily between Lynchburg and Roanoke doc Page 1 THE WOODSIDE CONSULTING GROUP

6 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA To model train spacing compliance with NS Operating Rule 444-1, Woodside modeled hypothetical Leader Trains for all passenger trains in the RTC network. The Leader Trains are not included in the RTC Model output statistics for any of the cases. Both the 2012 and 2017 Roanoke Passenger Trains and Additional Infrastructure Cases (2012C, 2017C, and 2017D) included the shift of five intermodal trains (Nos. 217, 218, 234, 236, and 23G) from NS s Blue Ridge District to NS s Altavista District, as specified by NS, thereby freeing up capacity on the Blue Ridge District to accommodate one roundtrip passenger train between Lynchburg and Roanoke. Because shifting Trains Nos. 217 and 218 saves approximately one hour in running time between Roanoke and the Hurt Connection, Woodside rescheduled Train No. 217 on Tuesdays and Wednesdays to about a one hour later departure in order to avoid meets of Trains Nos. 217 and 218 on the Altavista District, without impairing arrival time. The RTC Model Network defined for our Study totaled about 400 route miles plus additional lines (see Attachment A); the core routes are: - Piedmont Division, Charlottesville-Lynchburg-Danville - Blue Ridge District, Crewe-Roanoke via Lynchburg - Altavista District, Abilene-Roanoke via Altavista II. Passenger Train Schedules Passenger Train Schedules used in the RTC Model for the extension to Roanoke of existing Washington- Lynchburg Amtrak trains were provided by NS, and were based on TPC run times that assume the speed increases for the Blue Ridge District Low Investment Scenario from NS and a 3-minute dwell time at Lynchburg Station. (See Attachment B.) doc Page 2 THE WOODSIDE CONSULTING GROUP

7 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Maximum authorized speeds of 60 mph, the historic maximum speeds, were used because significant engineering and curve adjustment projects would otherwise have been required. Daily operation is projected for the single roundtrip Lynchburg-Roanoke passenger trains, although schedule times differ for weekdays and weekend days (in accordance with Amtrak s current Washington-Lynchburg schedules). The same Lynchburg-Roanoke passenger train schedules were used for both the 2012 and the 2017 Roanoke Passenger Train Cases. Passenger Train Schedule Run Times between Lynchburg and Roanoke, excluding station dwell, were 80 minutes in both directions initially in the Roanoke Passenger Trains Case (2012B and 2017B), but were reduced to 76 minutes in the 2012C, 2017C, and 2017D Cases that include Infrastructure Additions and, as such, are comparable to the run times when Amtrak last operated the service in III. Infrastructure Additions For 2012 and 2017 Cases Infrastructure Additions were made in order to operate passenger train service and to prevent deterioration in NS s train performance that would otherwise result from the operation of the Roanoke Passenger Trains. A and 2017 Roanoke Passenger Trains Cases The following infrastructure additions were made to the 2012 and the 2017 Roanoke Passenger Trains Cases (2012B and 2012C; 2017B, 2017C, and 2017D): doc Page 3 THE WOODSIDE CONSULTING GROUP

8 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA 1. At Lynchburg, a second station platform was added on southbound Track No. 2, as requested by NS. 2. At Roanoke, a passenger station track was added parallel to Track No. 1 in the vicinity of MP N258, as requested by NS. 3. At Roanoke, a maintenance facility was proposed by NS to be located south of JK. In order to reach the maintenance facility, a reverse train move out of the station track each evening and a reverse train move into the station track each morning were modeled. B Roanoke Passenger Trains and Infrastructure Additions Case In addition to the infrastructure additions listed above for the passenger train cases, the following infrastructure additions were made to the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C): 1. Between Lynchburg and Roanoke, train speeds were increased through implementation of the NS Low Investment Scenario. (See Attachment C(1).) 2. On the Altavista District, all of the tunnels were assumed to be cleared so that double-stack intermodal trains could be operated. 3. On the Altavista District, speed upgrades provided by NS were implemented to accommodate intermodal trains. (See Attachment C(2).) 4. On the Altavista District, in order to prevent deterioration in train performance departing from and arriving in Roanoke Yard, a two-mile long siding between MP V236.0 and V238.0, near Niagara, for trains to meet and pass was added by Woodside. (See Attachment C(3).) doc Page 4 THE WOODSIDE CONSULTING GROUP

9 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA C Future Roanoke Passenger Trains and Infrastructure Additions Case The 2017 Future Roanoke Passenger Trains and Infrastructure Additions Case (2017C) and the 2017 Future Roanoke Passenger Trains/Mitigating Infrastructure Case (2017D) included all of the Infrastructure Additions listed above for the 2017 Passenger Trains Case (2017B) and all of the infrastructure additions listed above for the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C). In addition, in the 2017 Future Roanoke Passenger Trains and Infrastructure Additions Case (2017C), in order to test the provision of sufficient capacity on each line segment so that the RTC Model train performance for all train groups was at least as good as the 2017 Future Base Case (2017A), a series of infrastructure additions were made: On the Blue Ridge District, the Liberty Forest Siding was extended westward from MP N214.5 to MP N (See Attachment D(1)(a).) In Roanoke Yard, the existing Pocket Track was extended eastward and a proposed crossover was moved eastward to about MP 256.9, so that a 1,000 ft. long passenger train would be in the clear after being turned on the Campbell Avenue east leg of the wye. These infrastructure additions were intended to permit simultaneous train movements through CP Eight & ½ Street using both the Pocket Track and Main Track No. 2 during the time that the Amtrak train occupies Main Track No. 1 while being wyed. (See Attachment D(1)(b).) On the Piedmont Division, at Lynchburg, a second main track was added to the Double Wye Connecting Track. (See Attachment D(2)(a).) On the Piedmont Division, a second main track was added between MP and MP 212.0, from Green to Smothers. (See Attachment D(2)(b).) doc Page 5 THE WOODSIDE CONSULTING GROUP

10 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA On the Altavista District, a second main track was added from Tinker Creek, at MP N256.1, to MP V238.0 as an extension of the Niagara Siding that was added in the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C). The infrastructure addition in this 2017C case created a 5.5-mile double track from Tinker Creek to MP V236.0, east of Niagara. (See Attachment D(3)(a).) On the Altavista District, a two-mile long siding was added between MP V217.4 and MP V219.4 at Stone Mountain. (See Attachment D(3)(b).) On the Altavista District, a two-mile long siding was added between MP V202.6 and MP V204.6, west of Hurt. (See Attachment D(3)(c).) The 2017 Future Roanoke Passenger Trains/Mitigating Infrastructure Case (2017D), however, reduces the infrastructure additions from those included in the 2017C Case. Only the following two infrastructure additions would be necessary for train performance to be comparable to 2017 Future Base Case (2017A) train performance: On the Piedmont Division, a second main track was added between MP and MP 212.0, from Green to Smothers. (See Attachment D(2)(b).) On the Altavista District, a second main track was added from Tinker Creek, at MP N256.1, to MP V238.0 as an extension of the Niagara Siding that was added in the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C), creating a 5.5-mile double track from Tinker Creek to MP V236.0, east of Niagara. (See Attachment D(3)(a).) doc Page 6 THE WOODSIDE CONSULTING GROUP

11 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA IV. RTC Model Results and Findings: 2012 Cases and 2017 Cases A. Summary of Case Differences A summary of the differences in the seven cases analyzed by Woodside is contained in Table 1, below, which shows Freight Train Volumes, Passenger Train Schedules, and Included Infrastructure Additions, by Scenario: doc Page 7 THE WOODSIDE CONSULTING GROUP

12 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Freight Trains: Table 1 Freight Train Volumes, Passenger Train Schedules, and Included Infrastructure Additions, by Scenario Roanoke Roanoke 2017 Roanoke Roanoke Passenger Trains 2017 Roanoke Passenger Trains Passenger Trains 2012 Passenger & Infrastructure Future Passenger & Infrastructure /Mitigating Base Case Trains Case Additions Case Base Case Trains Case Additions Case Infrastructure Case (2012A) (2012B) (2012C) (2017A) (2017B) (2017C) (2017D) Current Operations X X X Projected Future Operations X X X X Rerouted Intermodal Trains X X X Passenger Train Schedules 80" 76" 80" 76" 76" Passenger Train Infrastructure Additions: Lynchburg Station Platform X X X X X Roanoke Station Track X X X X X Roanoke Maintenance Facility X X X X X Blue Ridge District Infrastructure Additions: Speed Upgrades X X X Liberty-Forest Siding Extensions X Roanoke Yard Pocket Track Extension X Piedmont Division Infrastructure Additions: Double Wye, Second Main Track X Green-Smothers, Second Main Track X X Altavista District Infrastructure Additions: Cleared Tunnels X X X Speed Upgrades X X X Niagara Siding X Tinker Creek, Second Main Track X X Stone Mountain Siding X West of Hurt Siding X doc Page 8 THE WOODSIDE CONSULTING GROUP

13 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA B. Comparison Metrics Woodside s Study objective for the Roanoke Passenger Trains Cases was to add sufficient capacity on each line segment so that RTC Model train performance for all train groups (i.e., passenger, expedited, freight) was reasonably comparable to the 2012 Base Case or the 2017 Future Base Case train performance. Both of the following key metrics were analyzed: - Average train speed (mph) - Delay per 100 train miles (minutes) C Cases Attachment E contains the RTC Model results for the 2012 Base Case (2012A). Attachment F contains the RTC Model results for the 2012 Roanoke Passenger Trains Case (2012B). Attachment G contains the RTC Model results for the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C). A comparison of RTC Model train performance for the 2012 Roanoke Passenger Trains and Infrastructure Additions Case (2012C) with train performance for the 2012 Base Case (2012A) demonstrates that: Average Train Speeds are generally comparable and usually improved across all train groups for the entire RTC Model and network, although there is some variation on individual lines within the network, as shown in Table No. 2 below: doc Page 9 THE WOODSIDE CONSULTING GROUP

14 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Table No. 2 Average Train Speeds (mph) 2012 Roanoke 2012 Roanoke Passenger Trains & 2012 Passenger Infrastructure Base Case Trains Case Additions Case (2012A) (2012B) (2012C) Entire Network: Passenger Expedited Freight Averages Piedmont Division: Passenger Expedited Freight Averages Crewe Roanoke: Passenger n/a Expedited Freight Averages Altavista District: Passenger n/a n/a n/a Expedited n/a n/a 29.1 Freight Averages doc Page 10 THE WOODSIDE CONSULTING GROUP

15 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA - Delay Per 100 Train Miles is somewhat poorer across all train groups for the entire RTC Model Network, although there is some variation on individual lines, as shown in Table No. 3 below: Table No. 3 Delay Per 100 Train Miles (Minutes) 2012 Roanoke 2012 Roanoke Passenger Trains & 2012 Passenger Infrastructure Base Case Trains Case Additions Case (2012A) (2012B) (2012C) Entire Network: Passenger Expedited Freight Averages Piedmont Division: Passenger Expedited Freight Averages Crewe Roanoke: Passenger n/a Expedited Freight Averages Altavista District: Passenger n/a n/a n/a Expedited n/a n/a 1.7 Freight Averages doc Page 11 THE WOODSIDE CONSULTING GROUP

16 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Based on the detailed comparisons contained in Tables Nos. 2 and 3, Woodside found that, for 2012 train volumes, the proposed Infrastructure Additions and shifting of intermodal trains to the Alvavista District in conjunction with the operation of a daily roundtrip Roanoke Passenger Train will not permit reasonable attainment of the NS network train performance goal, because Delay Per 100 Train Miles deteriorated by ten percent for the network in its entirety. D Cases Attachment H contains the RTC Model results for the 2017 Future Base Case (2017A). Attachment I contains the RTC Model results for the 2017 Roanoke Passenger Trains Case (2017B). Attachment J contains the RTC Model results for the 2017 Roanoke Passenger Trains and Infrastructure Additions Case (2017C). Attachment K contains the RTC Model results for the 2017 Roanoke Passenger Trains/Mitigating Infrastructure Case (2017D). A comparison of RTC Model train performance for the four 2017 Cases demonstrates that: - Average Train Speeds are generally comparable across all four cases, with generally higher speeds for the two cases with more robust infrastructure additions, and across train groups for the entire RTC Model Network, although there is some variation on individual lines within the network, as shown in Table No. 4 below: doc Page 12 THE WOODSIDE CONSULTING GROUP

17 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA Table No. 4 Average Train Speeds (mph) 2017 Roanoke 2017 Roanoke 2017 Roanoke Passenger Trains & Passenger Trains/ 2017 Future Passenger Infrastructure Mitigating Base Case Trains Case Additions Case Infrastructure Case (2017A) (2017B) (2017C) (2017D) Entire Network: Passenger Expedited Freight Averages Piedmont Division: Passenger Expedited Freight Averages Crewe Roanoke: Passenger n/a Expedited Freight Averages Altavista District: Passenger n/a n/a n/a n/a Expedited n/a n/a Freight Averages doc Page 13 THE WOODSIDE CONSULTING GROUP

18 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA - Delay Per 100 Train Miles is improved for all lines in Cases 2017C and 2017D, although there is some variation in individual train groups for the entire RTC Model Network, as shown in Table No. 5 below: Table No. 5 Delay Per 100 Train Miles (Minutes) 2017 Roanoke 2017 Roanoke 2017 Roanoke Passenger Trains & Passenger Trains/ 2017 Future Passenger Infrastructure Mitigating Base Case Trains Case Additions Case Infrastructure Case (2017A) (2017B) (2017C) (2017D) Entire Network: Passenger Expedited Freight Averages Piedmont Division: Passenger Expedited Freight Averages Crewe Roanoke: Passenger n/a Expedited Freight Averages Altavista District: Passenger n/a n/a n/a n/a Expedited n/a n/a Freight Averages doc Page 14 THE WOODSIDE CONSULTING GROUP

19 RTC MODEL STUDY OF PROPOSED PASSENGER TRAIN SERVICE BETWEEN LYNCHBURG AND ROANOKE, VA The number of expedited trains increased substantially between the 2012 Base Year and the 2017 Forecast Future Year. The Run-Time Train Count for expedited trains on the entire network increased to 172 trains in the 7-day study period, a 58-train increase over the 114 expedited trains operated in the 2012 Base Case. For the Piedmont Division, 42 more expedited trains are projected in Moreover, for the Crewe-Roanoke Line, 14 additional passenger trains and 40 additional expedited trains would be operated in the 2017 forecast future year. Similarly, on the Altavista District, 44 additional expedited trains would be operated in the 2017 forecast future year. The best measure of the adequacy of the 2017 Infrastructure Cases (2017C and 2017D) to efficiently operate the Roanoke Passenger Trains and the 2017 Forecast Future Year Freight Trains is provided in Table No. 5 above. A comparison of the first two columns indicates a notable increase in Delay Per 100 Train Miles from the 2017 Future Base Case (2017A) to the 2017 Roanoke Passenger Trains Case (2017B), in which Roanoke Passenger Trains were added without infrastructure additions. However, both the 2017 Roanoke Passenger Trains and Infrastructure Additions Case (2017C) and the 2017 Roanoke Passenger Trains/Mitigating Infrastructure Case (2017D), in the third and fourth columns, generally compare favorably with the 2017 Future Base Case (2017A). Based on the detailed comparisons contained in Tables Nos. 4 and 5, Woodside found that, for 2017 forecast train volumes, shifting of intermodal trains to the Alvavista District, combined with the proposed infrastructure additions in either Case 2017C or Case 2017D, will permit reasonable attainment of the train performance goal on each NS line segment and the network in its entirety and for all train groups, despite the operation of a daily roundtrip Roanoke Passenger Train doc Page 15 THE WOODSIDE CONSULTING GROUP

20 To Washington LYNCHBURG-ROANOKE To Riverton PASSENGER TRAIN STUDY Troutville Red Hill Tye River Hamner Elma MP Applegate Angelo ROANOKE McIvor To Walton Webster Villamont Deal Forest Walke To Winston-Salem Hurt Connection Green Falwell Bocock Vabrook Catawba Crk Sdg 9536' To So. Boston Posm Terry Pamplin B36.90 Abilene=V141.4 To Richmond To Greensboro DANVILLE Fall Smothers White Star Paper MP230 Lines No line assigned Multiple lines assigned 55H Hagerstown-Roanoke 03-() Piedmont Div Mainline 55PH-55N Crewe-Roanoke 55 V Altavista Line 55 V Whitethorne District 55 N Christiansburg District 03-OM Old Mainline 55 L Durham District 55 W Roanoke Belt Line 55 R Winston-Salem District Industrial Spur Connector 03-C Cloverdale Branch Foreign 55 F Richmond Case: VA12A Base2012 RTC run: 02 August :42:07 User: Judy Roberts of Woodside Consulting Group

21 Attachment B-1 Passenger Train Schedules for Roanoke Service With No Infrastructure Improvements (Southbound) Station 171 (M-F) 147 (Sat) 145 (Sun) Washington Dp 16:50 16:00 16:50 Alexandria Dp 17:15 16:17 17:07 Burke Centre Dp 17:30 16:34 17:24 Manassas Dp 17:49 16:53 17:43 Culpepper Dp 18:24 17:27 18:17 Charlottesville Dp 19:23 18:26 19:16 Lynchburg Ar 20:36 19:39 20:29 Lynchburg Dp 20:39 19:42 20:32 Roanoke Ar 21:59 21:02 21:52 Source: Amtrak, with extension to Roanoke based on TPC run times and 10% recovery time doc THE WOODSIDE CONSULTING GROUP

22 Attachment B-2 Passenger Train Schedules for Roanoke Service With No Infrastructure Improvements (Northbound) Station 176 (M-F) 156 (SS) Roanoke Dp 6:15 8:36 Lynchburg Ar 7:35 9:56 Lynchburg Dp 7:38 9:59 Charlottesville Dp 8:52 11:13 Culpeper Dp 9:44 12:05 Manassas Dp 10:19 12:39 Burke Centre Dp 10:36 12:56 Alexandria Dp 11:05 13:21 Washington, DC Ar 11:20 13:35 Source: Amtrak, with extension to Roanoke based on TPC run times and 10% recovery time doc THE WOODSIDE CONSULTING GROUP

23 Attachment B-3 Passenger Train Schedules for Roanoke Service With Infrastructure Improvements (Southbound) Station 171 (M-F) 147 (Sat) 145 (Sun) Washington Dp 16:50 16:00 16:50 Alexandria Dp 17:15 16:17 17:07 Burke Centre Dp 17:30 16:34 17:24 Manassas Dp 17:49 16:53 17:43 Culpepper Dp 18:24 17:27 18:17 Charlottesville Dp 19:23 18:26 19:16 Lynchburg Ar 20:36 19:39 20:29 Lynchburg Dp 20:39 19:42 20:32 Roanoke Ar 21:55 20:58 21:48 Source: Amtrak, with extension to Roanoke based on TPC run times and 10% recovery time doc THE WOODSIDE CONSULTING GROUP

24 Attachment B-4 Passenger Train Schedules for Roanoke Service With Infrastructure Improvements (Northbound) Station 176 (M-F) 156 (SS) Roanoke Dp 6:19 8:40 Lynchburg Ar 7:35 9:56 Lynchburg Dp 7:38 9:59 Charlottesville Dp 8:52 11:13 Culpeper Dp 9:44 12:05 Manassas Dp 10:19 12:39 Burke Centre Dp 10:36 12:56 Alexandria Dp 11:05 13:21 Washington, DC Ar 11:20 13:35 Source: Amtrak, with extension to Roanoke based on TPC run times and 10% recovery time doc THE WOODSIDE CONSULTING GROUP

25 054 07/25/2012 BLUE RIDGE LYNCHBURG BELT LINE CONCORD-FOREST VIRGINIA PH15 PH16 PH17 PH18 PH19 PH ' 5218' 5332' 5281' 5281' MAINTENANCE T&S-02/09 S-01/11 RAIL 81NW132S 81NW132S TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5090 BANKER STEEL PH-15.2=L-0.0 RUTHERFORD (PVT) V 17.4(33.1) 15.7 DOVER KINNEY YARD LIGGATES RD C CAB-20' CURVATURE ALIGNMENT 0.5L L R R R L R 1.00 PH-16.1/0.9-KM 1.0L 1.00 PH-16.4=1.2-KM KINNEY WARDS RD US J BERKSHIRE PL R US 460 BUS, FORT AVE X BSB-111' BURTON'S CREEK CAB-24' 20.7(39.3) 18.6 TEST MILE PRIVATE E GRAVES MILL RD SR L LYNCH'BG EXWY-US T DGB-235' DREAMING CREEK CAB-20' TEST MILE OLD GRAVES MILL RD A LIBERTY TOMAHAWK CREEK CAB-20' ELEVATION MAINTENANCE SPEED (CURVE) GRADE General Reference Only - Not for Operational Purposes Sheet 55PH_15_20

26 07/25/2012 BLUE RIDGE LYNCHBURG BELT LINE CONCORD-FOREST VIRGINIA PH20 PH21 PH ' 5280' 4532' 055 MAINTENANCE T&S-02/09 S-01/11 RAIL 81NW132S 81NW132S TRAFFIC DENSITY MGT V-2-VA (BREWSTER) (39.3) 18.6 FOREST E S N W TRACK LAYOUT LINE SEGMENT 5090 ENTERPRISE DR-SR CURVATURE ALIGNMENT L R 3.2L 4.00 CITY OF LYNCHBURG BEDFORD CO HOMESTEAD DR SR B N-LINE (TO HALSEY) PH-22.36=N ELEVATION MAINTENANCE SPEED (CURVE) GRADE General Reference Only - Not for Operational Purposes Sheet 55PH_20_25

27 07/25/ BLUE RIDGE FOREST-ROANOKE VIRGINIA 5257' 5001' 5275' 5412' 5280' N215 MAINTENANCE T&S-10/11 RAIL 97NWF136S 97NWF136S 97NWF136P 97NWF136P TRAFFIC DENSITY MGT V-2-VA 20.7(39.3) 18.6 FOREST E S N W TRACK LAYOUT LINE SEGMENT 5100 CURVATURE ALIGNMENT 2.0R 3.00 N-214.5=PH HALSEY SPUR (SIDING) HALSEY SPUR THOMAS JEFFERSON RD N ELEVATION MAINTENANCE SPEED (CURVE) 60 GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_210_215

28 057 07/25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N215 N216 N217 N218 N219 N ' 5274' 5284' 5277' 5273' MAINTENANCE T&S-10/11 RAIL 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P TRAFFIC DENSITY MGT 20.7(39.3) 18.6 V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5100 CURVATURE ALIGNMENT 2.0R L L L R L R 4.00 ELKSIM FARM RD SR V RRR ELK CREEK CAB-40' 2.1L 1.9L 2.1L PRIVATE C ELKSIM FARM RD SR J RRR EVERRETT RD SR R RRR ABBOTTS CREEK CAB-14' BELLEVUE RD SR X RRR ELEVATION MAINTENANCE SPEED (CURVE) 60 (50) (50) (45) (45) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_215_220

29 058 07/25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N220 N221 N222 N223 N224 N ' 5977' 4863' 4479' 5266' MAINTENANCE T&S-10/11 RAIL 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136P TRAFFIC DENSITY MGT V-2-VA (GOODE) (39.3) 18.6 (LOWRY) E S N W TRACK LAYOUT LINE SEGMENT 5100 CURVATURE ALIGNMENT 2.1L L R L R CHESTNUT BRANCH MAB-24' GOODE RD SR E RRR 3.5L 0.5L 0.6L R R 0.5L 3.50 BIG OTTER RIVER DGO-803'(06) LOWRY RD SR RRR 3.1R 3.0L MARKHAM'S BRANCH CAB-14' TIMBER RIDGE RD ELEVATION MAINTENANCE SPEED (CURVE) (45) (45) (45) (50) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_220_225

30 059 07/25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N225 N226 N227 N228 N229 N ' 5275' 5274' 5270' 5274' MAINTENANCE T&S-10/11 RAIL 97NWF136P 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5100 CURVATURE ALIGNMENT 3.0L 3.50 PRIVATE U LITTLE RIVER CAB-50' BEDFORD CO CITY OF BEDFORD 3.2R L 4.0L R R R L 2.00 MCGEE ST SR P RRR SR BSB-173' 20.7(39.3) 18.6 BIG OTTER GROVE ST W NORTH BRIDE RD SR RRR 4TH ST DGO-26'(97) S. FORK LITTLE CAB-20' ELEVATION MAINTENANCE SPEED (CURVE) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_225_230

31 060 07/25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N230 N231 N232 N233 N234 N ' 5269' 5280' 5277' 5479' MAINTENANCE T&S-10/11 RAIL 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT (39.3) 18.6 CURVATURE ALIGNMENT 0.7R L R L L R 1.0L 1.50 CITY OF BEDFORD BEDFORD CO E ABRASIVE AVE L WHEELABRATOR BEDFORD PATTERSON MILL RD CAB-30' PRIVATE A 20.7(39.4) 18.7 COBBS MTN RD-SR G PENICKS MILL SR DGO-31' (THAXTON) PRIVATE V ELEVATION MAINTENANCE SPEED (CURVE) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_230_235

32 #1 MAINTENANCE # /25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N235 N236 N237 N238 N239 N ' 5079' 5480' 5271' 5251' T&S-10/11 T&S-04/10 T&S-04/12 RAIL #1 #2 97NWF136P 97NWF136S97NWF136P 97NWF136S 97NWF136P 97NWF136S97NWF136P 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136P 97NWF136P 97NWF136S 97NWF136S 97NWF136S 82NW132S 97NWF136S 82NW132S 82NW132S 82NW132S TRAFFIC DENSITY MGT V-2-VA TEST MILE TEST MILE 20.7(39.4) 18.7 (IRVING) (19.7#1) 18.7(19.7#2) MONTVALE E S N W TRACK LAYOUT #1 #2 LINE SEGMENT 5100 REED CREEK CAB-12' IRVING RD-SR C PRIVATE ROAD CBB-13' NESTER RD (SR 690) R IRVING RD SR RRR CIRCLE K RD SR CBB-12' GOOSE CREEK CAB-50' BEALL RD SR CAB-24' CURVATURE #1 1.0L ALIGNMENT 3.2R 2.1R 2.0L 2.2R 2.3R 2.5R 1.50 #2 ELEVATION L 1.0L R 0.5L MAINTENANCE SPEED (CURVE) (50) 60 (55) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_235_240

33 #1 MAINTENANCE # /25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N240 N241 N242 N243 N244 N ' 4210' 4888' 5536' 5320' T&S-04/10 T&S-04/12 RAIL TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5100 #1 #2 #1 #2 82NW132S 82NW132S GOOSE CRK VALLEY RD DGO-30'(09)(01) 09NW132P 12NW136P 82NW132S 82NW132S 12NW136P 82NW132S 88NWF132P 82NW132S 99NWF132P 82NW132S 88NWF132P 82NW132S 82NW132S 79NW132S 12NW136P 79NW132S 94NWF132P 79NW132S 82NW132S 79NW132S99NWF132P 79NW132S 94NWF132P 20.7(19.7#1) 18.7(19.7#2) SHREDDED PRODUCTS CO US DGB-260' VILLAMONT B GOOSE CREEK CBB-10' VILLAMONT RD SR H 99NWF132S 79NW132S PRIVATE P CURVATURE #1 3.2R 3.0L 5.1R 5.0L 4.7L 2.0R 1.2R 1.5L 1.3L 1.0R 3.0L 1.0L ALIGNMENT #2 ELEVATION R L 0.5L 0.5R R L L R R L L R L L MAINTENANCE SPEED (CURVE) (40) (40) 50 (40) (40) 50 GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_240_245

34 #1 MAINTENANCE # /25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N245 N246 N247 N248 N249 N ' 5327' 5245' 5382' 5343' T&S-04/10 T&S-04/12 RAIL TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5100 #1 82NW132S 79NW132S #2 79NW132S #1 #2 PRIVATE ROAD RRR 82NW132S 04NWF132P 82NW132S 79NW132S 05NWF132P 79NW132S 12NW136P 82NW132S 82NW132S 79NW132S 09NW132P 79NW132S 82NW132S 88NWF132P 88NWF132P 04NWF132P 02NW132P 88NWF132P 02NW132P BEDFORD CO BOTETOURT CO 79NW132S 79NW132S SR CSB-15' 05NWF132S 08NW132S 12NW136P (BLUE RIDGE) NWF132P 79NW132S 08NW132S 79NW132S PRIVATE ROAD CSB-26' 98NWF132P 20.7(19.7#1) 18.7(19.7#2) PRIVATE L ARCHWAY RD SR MAB-50' PRIVATE T 82NW132S 82NW132S PRIVATE A BRICKYARD RD SR G 82NW132S WEBSTER PRIVATE T SMITH FORD RD, CREEK DGO-94'(87)(92) CURVATURE #1 0.5R 3.1L 1.5R 1.6R 2.9L 2.3R 3.5R 3.2L 3.0R 3.2R 0.9L 1.0R 2.6L 0.6L 1.7L 2.1R 2.2R ALIGNMENT #2 ELEVATION L R R L 2.3R 3.5R L R R L R L L L R R MAINTENANCE SPEED (CURVE) (40) (40) (40) (40) (50) 60 (55) (40) (40) (40) (40) (50) (55) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_245_250

35 #1 MAINTENANCE # /25/2012 BLUE RIDGE FOREST-ROANOKE VIRGINIA N250 N251 N252 N253 N254 N ' 5418' 5211' 5301' 5260' T&S-04/10 T&S-04/12 RAIL #1 #2 82NW132S 08NW136S 82NW132S 82NW132S 01NW132P 82NW132S 82NW132S 82NW132S 01NW132P 82NW132S TRAFFIC DENSITY MGT V-2-VA E S N W TRACK LAYOUT LINE SEGMENT 5100 #1 #2 GLADE CREEK DGO-99'(85,09) BLUE RIDGE PKWY DAVIS RD-SR D GLADE CREEK DGO-90'(92)(92) PRIVATE K GLADE CREEK DGO-91'(92)(92) GLADE CREEK TGO-110'(08)(94) BOTETOURT CO ROANOKE CO GLADE CRK RD-SR S GLADE CREEK TGO-92'(96)(95) B LAYMAN RD-SR M 20.7(19.7#1) 18.7(19.7#2) BONSACK GLADE CREEK TGO-115'(95)(93) PRIVATE R ROANOKE CO CITY OF ROANOKE GLADE CREEK MSO-142'(88)(93) WATERWAY CSB-12' (BOAZ) BERKLEY RD B VINTON WATERWAY CBB-11' CITY OF ROANOKE VINTON CORP GLADE CREEK DGO-181'(94)(09) CURVATURE #1 3.0R 4.5L 0.8L 1.1L 1.6L 2.6R 2.2L 2.0R 2.2R 0.6R 0.5R ALIGNMENT #2 ELEVATION R L L L 1.2L 2.6R L R R R R MAINTENANCE SPEED (CURVE) (40) (40) (55) (55) (40) (40) (55) (55) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_250_255

36 #1 MAINTENANCE # /25/2012 CHRISTIANSBURG ROANOKE-WALTON VIRGINIA N255 N256N257 N258 N259 N ' 5309' 5280' 4899' 5799' T&S-04/10 T&S-06/00 T&S-03/05 T&S-06/00 T&S-03/99 T&S-04/12 T&S-06/10 S-06/12 RAIL TRAFFIC DENSITY MGT V-2-VA V-10-VA E S N W TRACK LAYOUT LINE SEGMENT #1 #2 #1 #2 82NW132S 82NW132S 20.7(19.7#1) 18.7(19.7#2) VINTON BERKLEY GUS NICKS BLVD PRIVATE J WATERWAY CBB-22' GLADE CREEK DGO-102'(82)(83) MIDWAY ST X 82NW132S 82NW132S N-256.1=VC-0.0 TINKER CREEK MSO-120'(09)(02) 08NW136S 08NW136S 30.0(32.2#1) 34.4(32.2#2) TINKER CREEK FURNACE CROSSING 9TH ST-HOLLINS RD L 08NW132S 05NWF132P 82NW132S 8 1/2TH ST A 93NWF132P 04NWF132P 75UU115S OH FOOT BRIDGE N /W-0.3 I E WATERWAY MAB-14' WILLIAMSON RD N PEDESTRIAN BRIDGE N-257.4=H N-257.4=W-0.0 TO HAGERSTOWN 95NWF132S 08NW132S 75UU115S 95NWF132S 77RJ132S 11NW132P 81RJ132S 1ST ST P ND ST TH ST/PARK ST D RW131S 8 & 1/2 ST PARK ST N JEFFERSON ST RANDOLPH ST COMMERCE ST 00RWF132S 10TH ST S FOOT BRIDGE(#1 MAIN) 43RW131S 95NWF132S 43RW131S 43RW131S 77RJ132S 11NW132P 81W132S 81W132S 30.3(39.2#1) 48.1(39.2#2) 93NWF132P 12NW132P 16TH ST W132S TRACK 1 ONLY 81W132S 08NW132S 81W132S 24TH ST DRIVE TO ROUND HSE CBB-18' 24TH ST F DGB-50' TRACK 2 ONLY B OVHD LINE-TRK 2 ONLY CURVATURE #1 3.0R 1.6R 1.1L 2.0L 2.5L 2.0L 5.2L 2.0L 5.1R 7.3R 8.0L 6.2R 4.2L 4.0R 3.0R 2.7R 0.3R 4.0L 3.0R 3.1L 5.0R 4.0L ALIGNMENT #2 ELEVATION 3.0R R L 2.3L 2.5L L 5.2L 2.0L 5.1R R 8.2L 6.2R 4.2L R 3.2R 0.5R 0.2L R L L L R 1.00 MAINTENANCE SPEED (CURVE) (30) (30) GRADE General Reference Only - Not for Operational Purposes Sheet 55 N_255_260

37 07/25/2012 ALTAVISTA 089 ABILENE-ROANOKE VIRGINIA V142 V143 V144 V ' 527V 5282' o ' 5271' - MAINTENANCE A T&S-11/09 RAIL TRAFFIC DENSITY MGT ti 88NWF132P 88NWF132S 98NWF 32P 88NWF132P 88NWF132S NWF132P t I _ 88NWF132S 05NWF132P 88NWF132P 88NWF132S gi (29.9) ABII;ENE V-2-VA E T N W TRACK LAYOUT (.1 L 8 o `J o-1 0,---o ' á 1 v UNE SEGMENT 5140 y w N CURVATURE ALIGNMENT ELEVATION 1 Ó 1--1 Ó Ñ O Ñ = M L1 8 8i 53 5i 53 Ll wt trlwl L CU 1/2. VE I " `d 43 OO MAINTENANCE SPEED (CURVE) 'Cr/...i.4[AA Corrr 1 Ger T27 Go MOO -a 40,..- GRADE 4 FI >I M General Reference Only - Not for Operational Purposes IN

38 V /25/2012 ALTAVISTA ABILENE-ROANOKE VIRGINIA V145 LV146 V147 Ì V149 V150 d 5283' 5275' 5274' P 5377' 5276' MAINTENANCE T&S-11/09 RAIL 88NWF132P 88NWF132P tti E 12NW138P 88NWF132P 88NWF132S 11NW136P 88NWF132P 88NWF132S NW136P % 12NW136P RI 88NWF132P B8NwF132S 01NW132P % 10NW132P 88NWF132S I 1 TRAFFIC DENSITY MGT 0.1(29.9) F 29.8 V-2-VA 0 E N W v v r. q d g < o TRACK LAYOUT y, y, o U o ô LINE SEGMENT v o `, ó g Y óu_ CURVATURE ALIGNMENT al CD K O v: r- i 53 L : r e4 ci Ó CM. Ó 5; 53 Ó ÑÑ Ó 8FileI c7 V ed sf Ñ Nei N ch O 1_ i i i i M C7 M.= M.= M Co r+ih. ELEVATION MAINTENANCE SPEED (CURVE) 40 GRADE Si $I._ General Reference Only - Not for Operational Purposes >1 M I

39 091 07/25/2012 ALTAVISTA ABILENE-ROAN0KE VIRGINIA V150 V151 V152 V153 V154 V ' m ' 4880' 5277' ft ' MAINTENANCE o T&S-11/09 S-01/12 RAIL 88NWF132S 88NWF132" 85NW132S 12NW136P 85NW132S 88NWF132S 88NWF132-85NW132S 09NV/132P 85NW132S 12NW136P 85NW132S a - TRAFFIC DENSITY MGT V-2-VA (CU6LEN) g - 0.1(29.9) f 29.8 i_ 1 WONTCKS E N W 53 i 8 F o-- TRACK LAYOUT II II. -o 1111 III.. I N. II n f--. LINE SEGMENT v i v á 1 á W Q a n í CURVATURE ALIGNMENT ELEVATION MAINTENANCE SPEED (CURVE) a3 L- q ad A CM 8 CV il I 8 CV 8 i I I I I I I Pi 8 CV I Mt 4 -_7.. I I i 1 1! I ~ GRADE 4;. ç General Reference Only - Not for Operational Purposes S si >1 S 1 w

40 ; I 07/25/2012 ALTAVISTA 092 ABILENE-ROANOKE VIRGINIA V155 V156 l V157 V158 V159 V ' ' 5281' 5283' 5284' MAINTENANCE T&S-11/09 S-01/12 RAIL 12NW138P 85NW132S 98NWF132P 85NW132S 09NW132P 85NW132S 10Nw132P 85NW132S 98NW F932P 85NW 132S TRAFFIC DENSITY MGT V-2-VA I1-0.1(29.9) -0-0.,1(29.8) n I il TER RY (PHNIX) g S P E N W 4 g g g g te g g $ g g TRACK LAYOUT ( --, o---1 '1=1 o o á á á Io á o v Q5 cs v LINE SEGMENT g m 5140 CURVATURE -- - a a w IP(-1 (7 0 g W á, N H m 4, p a 6a -c a 14 '. a, ALIGNMENT ELEVATION MAINTENANCE SPEED (CURVE) - M C Si 8 I, I,,,, Ñ i3 Ñ `ei keei C (No 4' T Re >Dc I, 40 re CI $,, i GRADE 4 gö General Reference Only - Not for Operational Purposes o 'I P. >1 0 IH

41 ' 07/25/2012 ALTAVISTA ABILENE-ROANOKE VIRGINIA V160 V161 Í V162 V163 DV164 V ' 5251' 5281' 5282' -- -R 5284' MAINTENANCE T&S-11/09 S-01/12 RAIL c) 'A 06NW136P - 12NYV NW132S 07Nw131P- 85NW132S 12NW136P 85NW132S 85NW132S 81W132S 88NWF132S 81W132S 88NWF132S TRAFFIC DENSITY MGT V-2-VA I1-0.1(29.8) 29,7 (ASPEN) E N W T- TRACK LAYOUT X X X Ì ' = X, 0 v á v gg á é á O á ` á 3 ó v LINE SEGMENT 5140 W a W W cc LIE a m a á llç A m ái w < cc d CURVATURE ALIGNMENT ELEVATION t0 Of a0 M Ñ Ó Ó A' If $$$!*..-ki-- $.-- $ d --ii-a_. 3 -$- 53-3" 2 t`/z ow 4 co - _ ---=.: (OE,EÌ? II il z`h,w s- " s. -s ; I SPEED (CURVE) m 40 GRADE 4 g gö General Reference Only - Not for Operational Purposes F. S >1 S 1

42 1 V165 07/25/2012 ALTAVISTA 094 ABILENE-ROANOKE VIRGINIA V166 LV167 V168 Ì 5282' 5299' 4654' 5879' V169 V ' - MAINTENANCE T&S-11/09 T&5-02/08 S-06/10 ci+ RAIL 88NWF132S 12NW136P 01NW132P 38NWF NW136P 88NWF132P - 88NWF132S 88NWF132P 10NW132P _ 38NWF132S 05NINF132P 12NW136P 88NWF132S 08NW132S 01NW132P NWF132S 09NW132P 05NWF132S 1 1 TRAFFIC DENSITY MGT V-2-VA E N W TRACK LAYOUT o X g g N v, g 0.1(29.8) 2.4(41.9) NAB 500K) $ g PATRICKiENRY X h d i 1,q ] g ffi X $ g! ALIGNMENT ELEVATION MAINTENANCE SPEED 4. ó..! g (V H6 Ir _: _ --.,1.r C'J - i - Si g,, 3 53 () em I I1 (CURVE) ( ) I tri 4 I Ñ I Ñ L 3., I g 6 g I-I=S $ LINE SEGMENT cc q 5140 CURVATURE. I ao i wpn? c` z ui W Zá a o Jm u. i w a GRADE gö ç 4 1 S > S General Reference Only - Not for Operational Purposes ico

43 i If I i ' 07/25/2012 ALTAVISTA 095 ABILENE-ROANOKE VIRGINIA V170 V171 V172 V173 V174 V ' 5296' 5117' 544T r,,... Ga 5285' - MAINTENANCE T&S-02i08 S-06í10 F1 %,-?is RAIL ç i 1 88NWF132P 98NWF132P 99NWF132P 88NWF NWF132P 11NW132P 88NWF132P f 88NWF132P 88NWF132S tt % 88NWF132P 09NW132P 1 1 TRAFFIC DENSITY MGT V-2-VA BROOplE.AL ix 8 iw ÓI2 m,g I - 2.4(41.9) -o-- 39,5 TEST MILE F-. p ie,i MI.E E N W 73 2 ; ó dr ñ TRACK LAYOUT o X i Y : h LINE SEGMENT W 5140 $ w á á U z áa_ x CURVATURE $ J 1 a g g Ó 4 d' $ 8 53 l'7 lm g ao f---1 Ó u3 tc Ó Ó Ñ I 1 I 1 I J 3 CO 53.- `e3.-- á3 a- m Ñ 3 I ó tó ialignment C4 íle 0 mi ELEVATION MAINTENANCE SPEED (CURVE) I 1 I 1 1 I v (35) (35) (35) (35) -. (35 GRADE `r g ó "I r- >1 to General Reference Only - Not for Operational Purposes

44 s 1 07/25/2012 ALTAVISTA 096 ABILENE-ROANOKE VIRGINIA V175 V176 I V177 V178 1 V179 V180 -a 5296' 5288' ' 5288' 5279' --- MAINTENANCE T&S-02/08 S-06/10 gi Ix íx ti RAIL 88NWF132P 1 88NWF132P 88NWF132P 88NWF132S 88NWF132P 88N F132P 88NWF132P 8811WF132S TRAFFIC DENSITY MGT V-2-VA (KEENER) (41.9) f (MELROSE) Ñ P E N W TRACK LAYOUT X X 2 - o-1 X X g.-.l á é --o gi á v LINE SEGMENT x 5140 CURVATURE ALIGNMENT ELEVATION MAINTENANCE SPEED (CURVE) W g á JJ O C7 % % Ñ O ö - _ 6,J % CO 8 W g á o// _,. z S- off Ge, -sfr G.( 8 u3 Ar!3!3 A.- - -g h. J LJ 71/z 2/lr 1 Ñ CV 3 u Ó C.1 2/2 JO W á J M - 5.] f / If," 40 c GRADE ` c.. ó PS `r $..1 P,>1 General Reference Only - Not for Operational Purposes

45 I 1 07/25/2012 ALTAVISTA 097 ABILENE-ROANOKE VIRGINIA V180 V181 V182 V183 V184,...,1 5278' 5274' 5235' -m ' 5287' V185 MAINTENANCE 4 T&S-01/10 RAIL o. 88NWF132S 07NW132P 88NWF132S! f;-i 88NWF132P 09NW132P 1oNW1a2P 88NWF132P 88NWF132S o7nw132p 88NWF132S 88NWF132P 98NWF132P % ix ' 1 88NWF132S -- ;t, 88NWF132S 88NWF132P i TRAFFIC DENSITY MGT V-2-VA (LONG I LAND) I - 2.4(41.9) F 39.5 SENFCA MARIVILLE I I E W N g LI o 5i ló á i F TRACK LAYOUT o.11 X g=i--1 X. X o v. z ó v á -- '-1: LINE SEGMENT Pre. g Ñ Ñ6 Z g w Ñ F ic. CURVATURE ALIGNMENT --- C.21-2 f (6 t'l erlg JJ. - F-.- - Ja0,E- O J Ñ 0 cd Ó N CV N M 1-1 I I I 1 i t $ N CV.-.- J 0. L_J , C7 Ó CV L ELEVATION MAINTENANCE SPEED (CURVE) I 1 I GRADE : ó c Si " General Reference Only - Not for Operational Purposes uy a$ >1 M 1 w

46 4 I I I I I I I I I I I I V186 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 '. 07/25/2012 ALTAVISTA 098 ABILENE-ROANOKE VIRGINIA V185 1 V187 V188 V189 V ' ' 529T ' 5283' MAINTENANCE T8tS-01/10 RAIL 10NW132P 88NWF132P 12NW136P - 88NWF132P 08NW132S 88NWF132P F! - 97NWF132P 97NWF132P N N % NW132P 1 1 % 96NWF132P 88NWF132P 1 88NWF132P 87NW132S - gi 87NW132S iq N t N I i TRAFFIC DENSITY MGT V-2-VA - 2.4(41.9) f- 39,5 (TAgOR) E N fw d c ig TRACK LAYOUT X o y I-o v LINE SEGMENT 5140 ó c. S CURVATURE ALIGNMENT JO CV S tg N Ei ti.e, CV CV CV NQ' S r C7 8 S 8er J J J tri iri O C7 I u S Cd C+S. CV u S 8 8 Jt1) l[ cc:. tg I 1-1 J t N [! CO ch tp al C7 a= er N tri Ñ I--I ,.41: 8 8 CV S CV S. 8 C7 u`i.- S v ELEVATION MAINTENANCE SPEED (CURVE) I I I 1 I (35) (35) f (35) (35) --111(35) (35) (35) (35) (35) (35) GRADE a i >1 M General Reference Only - Not for Operational Purposes

47 I 07/25/2012 ALTAVISTA 099 ABILENE-ROANOKE VIRGINIA I V190 V191 V192 V193 V194 V ' ' 5278' - ^ 5281' 5278' MAINTENANCE T&S-01/10 RAIL óo ôo R1 % Á -- 87NW1 aó oonwf132p 12NW 36P 87NW132S 87NW1 S 87NW132S 87NW NW132P :7NW132S 12NW1 :P 06NWF132P OONWF132P 87NW132S a % í3 Á! FI TRAFFIC DENSITY MGT V-2-VA (PERIiOWS) (41.9) f 39.5 I (MANSION) : E N W o-- g i ` d C-- g.g g TRACK LAYOUT I o I I i g I li I r4 J o LINE SEGMENT 5140 w ) 2 Q 3 w á F F Z á 0.?il 2 F 0. w W Ú z 2 6 Ñ I CURVATURE ALIGNMENT I S C7 Ñ <ort S C7 M N ci V' 11 I r-i S 8 M CV Ó I-1 Lei O Ñ -I rry 4 Ó b 8 S S SS ef fh.-,., e- 8 8 S. n1 S - S CV 8 8 CV CV O 8 8 u>.4 4 c; Lc) CV l+j 8.4 uṣ S Ñ ELEVATION I I I MAINTENANCE SPEED (CURVE) (35) (35) (35)(35) I I 40,-- GRADE $ T 4 -$I >1 M General Reference Only - Not for Operational Purposes IM

48 1 1 1 I 1 V197 i V198 j j 07/25/2012 ALTAVISTA 100 ABILENE-ROANOKE VIRGINIA V195 V196 V199 V200 a 5280' 5278' 5268' 5291' 5275' MAINTENANCE T&S-01/10 RAIL 87NW132S 87NW132S 11NW136P - 87NW132S 09NW132P 87NW132S 05MWF132P 87NW132S TRAFFIC DENSITY MGT V-2-VA (MANSION) e g 4 I (41.9) (41.8) á 39.4 DOGWOOD ALTAVIST A E N W 8 éß m C.) ó gi gei 8 8 TRACK LAYOUT LINE SEGMENT 5140 o o v Q 1 v W Q 1 vg re Q fl XX 2 pi Q vá W W Q Q A v Wi ` zz áá QaQQ r WLL711 óó. '8 Y m á a T m Wp GG áá wtá j N á d á 3 pq =W= W Ó $ iá g n m z CURVATURE ALIGNMENT 7-1 t t7 CV N 07 -:. i, Ira.... J J J a0 (J C9 CO i N N - I O N O C7 CM C7 et00 metre Cri C7uiC7 et Ó e-. N N N ELEVATION MAINTENANCE SPEED (CURVE) GRADE ím- 4 C V t V N o General Reference Only - Not for Operational Purposes ȧ, >i M 1 a)

49 V203 V L ', /25/2012 ALTAVISTA V200 V201 V ' -- ABILENE-ROANOKE ' 5280' --c----- VIRGINIA V ' 5280' MAINTENANCE d T&S-07/11 S-02/12 RAIL - 00 WF136S OONWF136P OONWF136P OONWF136P 00 WF136S OONWF136P OONWF136P OONWF136P TRAFFIC DENSITY MGT 1 I I (41.8,1a - 9.3(63.4) 39.4 A HU RT 8 V-2-VA $I E N W TRACK LAYOUT LINE SEGMENT 5140 g; $ 1 i g 8 o 1 á ii M..--, ' \ N, re W ÑÑ R II II X 7 > á 2ES R R 1 á w» á $ R ' II II `c 1S ä ó re IT >< á o-- --o X X v ti 1-1 $ A g Ì CURVATURE ALIGNMENT ó M1 ii3 i v d Ñ 5'1 CV 3i d M ó Ó c7 Óu l^7!1 LJ r lia fi? li3 8 8 ELEVATION MAINTENANCE SPEED (CURVE) - 40 GRADE ç > I General Reference Only - Not for Operational Purposes

50 I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I I I I I I 1 I I I I I I 07/25/2012 ALTAVISTA 102 ABILENE-ROANOKE VIRGINIA V205 V206 V207 V208 V209 V ' 5279' ' 5279' 5281' 1,..-- I MAINTENANCE T&S-07/11 S-02/12 RAIL OONWF136P OONWF141P g - 11NW1353 LONWFI41P OONWFI3EP OONWF141P 11NW136P OONWF141P OONWF141P OONWF140P v g g I g 97NWF136P 97NWF136P TRAFFIC DENSITY MGT V-2-VA E N W (LEpVILLE) y 2G 8 W I R R gil zv ìg o-i 1n 0, d éi I - 9.3(63.4) A O d g p O? g (4 ìg 1 AMOS BRANT TRACK LAYOUT T - I o W p 1--a á LINE SEGMENT 5140 CURVATURE ALIGNMENT rg CV d -I 8 8 J W Z Z W sw _i ó g c., cr g r,: aó.- n r..-1 I I I I L-J W s 8 8 w æ á W g w c7 W U' re co C i 8 8 W á 4i cl 8 0 M 8 8 ELEVATION MAINTENANCE SPEED (CURVE) (30) (35) (35) GRADE 4 q - o N1 I S General Reference Only - Not for Operational Purposes ItlJ

51 K 1 i I I 1 I I I I I I I /25/2012 ALTAVISTA ABILENE-ROANOKE VIRGINIA V210 V211 V212 V213 V214 V ' 5281' 5278' 5407' 5150' MAINTENANCE T&S-07/11 S-02/12 T&S-04/12 RAIL 00 0> 97NWF136P a, 97NWF136P 9710F136P 97NWF136P 97NWF136P 97NWF136P 11NW136P 97NWF136P TRAFFIC DENSITY MGT V-2-VA I 9.3(63.4) -o- 9.3(63.5) P c 54.1 A HUDDLEVON I E N W $ d Ñ 3 -ti Ñ Ni c.i Ñ i c.i Ñ 1 ai Ñ 17 ai Ñ i i g i g v v f Ñ Ñ Ñ TRACK LAYOUT X I X Y " - `-r o a.--- < 1 v,.. 0 I--o i i v v LINE SEGMENT 5140 mw 1 i W Z á coi w aq a3 c9 w z z é ` = c9 n n 3 ái ái CURVATURE ALIGNMENT P'S r- 8 C i n F.e. d g..='; ni CV 54 N I I CV CV IJ 8N Ñ Ch O II Ó 1ri-- LL L_LJ âi E3 8 8 CI, Ch CrJ C I 8 CI, $. ELEVATION MAINTENANCE SPEED (CURVE) -a 1 1 i (35) (30) (35) - GRADE Y in Ñi 0,N M General Reference Only - Not for Operational Purposes ]N

52 ì V /25/2012 ALTAVISTA V215 V216 V217 V ' 5288' 5270' ABILENE-ROANOKE VIRGINIA V T d 5290' MAINTENANCE T&S-04/12 RAIL oonwf136p 97NWF136P 12NW136P 97NWF136P 97NWF136P 1 12NW136P 97NWF136P 97NWF136P TRAFFIC DENSITY MGT V-2-VA E W N TRACK LAYOUT I 8! O $ ro Ñ ( Ñ o ó 9.3(63.5) ,2 (STONE MOUNTAIN) Ñ Ñ o `. o o, -o X v v v LINE SEGMENT 5140 Ú W >- < á w z á CURVATURE ALIGNMENT ` a 4.5 CV 8 53 M Ch I - ó 8 M 4 N i 0, b CV 01 CV ó.r u co LJ r CV C7 53 CV ó v 53 CM ELEVATION MAINTENANCE SPEED (CURVE) --=1 40-4(35) (35) -c- (35) -"-- GRADE.., N > t:1 General Reference Only - Not for Operational Purposes ]co

53 /25/2012 ALTAVISTA AgILENE-ROANOKE VIRGINIA V220 V221 V222 V223 V224 m 5279' c ' 527T 5278' 5277' V225 MAINTENANCE T&S-04/12 o T&S-02/10 S-02/12 RAIL 97NWF136S 97NWF136P 98NWF136S 98NWF136P 98NWF136P 97NWF136S 97NWF136P 98NWF136S 98NWF136P 98NWF136P TRAFFIC DENSITY MGT V-2-VA (MOFETA) r 9.3(63.5) (WESTGATE) (MEAp OR) 1124 Flj b E N W 0 Ii 8 1:1 re 3 ii c3 o---+ o o TRACK LAYOUT o o V,----o g v w á LINE SEGMENT á z el i gó 3 CURVATURE ALIGNMENT O N <Y C+) V' r S3 8 SSS i % Ñ Ñ CO,c51% Cl.4 Ó CV CV CV CV CV CV i [V c7 Ch. r- 8 Si I 1 I U C7 10 CV á3 Si 8 C`7 n W Ó Ó L_J oi I_ CV 8 53 S3 CV fá S3 cd 53 R7 ELEVATION MAINTENANCE SPEED (CURVE) 40 t 8 Ṇ Cj + GRADE 0 1 I General Reference Only - Not for Operational Purposes Iea

54 m /25/2012 ALTAVISTA ABILFNE-ROANOKE VIRGINIA V225 V226 V227 V228 V229 V ' 5069' 5280' 5276' 5282' D.- MAINTENANCE T&S-02/10 S-02/12 RAIL 98NWF136P 98NWF136S 98NWF136P 98NWF NWF136P 98NWF136P 98NWF136S 98NWF136P 98NWF136S 98NWF136P TRAFFIC DENSITY MGT V-2-VA BOAR9 MOUNTAIN (63.5) -4-54,2 GO2DVIEW E w 1 :1 g Ñ 2 id' ti g g N TRACK LAYOUT M fiji: -- Pi X - RI " Ict H=! X ii Aik A 40. á á v á á a á 1 á LINE SEGMENT 5140 ia wz z s 41 w 3 á cn á &. IL a a w z á CURVATURE ALIGNMENT ig V' 4 á Ri cc CO CO ef', 8 F-e- g t3 Ó Ó Cri LLJ I-1 _I n L_J I-J $ icv Ñ Cri - Iz=-= -" J -= 83 8 ELEVATION MAINTENANCE SPEED (CURVE) - 40 I I I I I I I I I I I I GRADE 2 cf, n 4 I3 General Reference Only - Not for Operational Purposes >, 0 1 to

55 I /25/2012 ALTAVISTA ABILENE-ROANOKE VIRGINIA V230 V231 V232 V233 V234 V ' 5023' 5664' 5152' 5280' - MAINTENANCE T&S-02/10 S-02/12 RAIL 98NWF136P 98NWF NWF136P 12NW138P 98NWF136P 98MNF136S 98NWF136P TRAFFIC DENSITY MGT V-2-VA (STEWAFFSVIL LE) (63.5) (HA DY) E N W TRACK LAYOUT p+4} o 0 8 pd Ñ Ñ r 0 o, b g er, icq Ñ iyy N ^ E o ó ` i E Ir 0, I i 4 LINE SEGMENT Y W 5140 ee R Q 0 ÿ R 0 o ó re CURVATURE ALIGNMENT 4 ci ry % cß cd cd _J -.: U i N ní N f M ri Ñ v LJ 8 8 N M O c.i v i Ó íä.- cd v m I- t_j C7 5i 53 $ % c+i id éi 8 M Csi V' N CM M 8 ELEVATION MAINTENANCE SPEED (CURVE) o 40 (35) (35) (35) (35) (35) (35) (3gr GRADE q 4 an > S General Reference Only - Not for Operational Purposes

56 r, I I I I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l l I I I I I I I I I I I I I I I I I I I I I I I I I I I,., 07/25/2012 ALTAVISTA 108 T- ABILENE-ROANOKE VIRGINIA V235 V236 V237 V238 V239 V ',=--..7, 5270' 5254' 5279' 5268' MAINTENANCE T&S-02/10 S-02/12 RAIL - 98NWF136P 98NW F136P 98NWF136P 10NW136P 98NWF136P 98NWF136P TRAFFIC DENSITY MGT V-2-VA g g - 9.3(63.5) i (NIAGARA) DEMUTH E N W P., P n 'N m IR TEST MI_E TEST MILE 4- Iz cl i > o i TRACK LAYOUT sr r--t i_--1 `J r-, 0 - o 1 LINE SEGMENT 5140 } W I- IR ó m V 0 CURVATURE ALIGNMENT % mi -I I Si C"S Of O N Cd ei I u -I u r-1 Ì F-1 I u L_i Ó N b b O Cá M CV CV e; ni fi3 k3 Ch r N c3 Ó lf r--1 Ei M ID Ó CO Lei 8 CV 8 cri 8 N ce c$ 53 F4 CM 53 Ch ELEVATION MAINTENANCE SPEED (35 (CURVE) (35) (35) (35) (30) (30) (30) (30) (30) (361p ( ) (30) (30) (30) (35) (35) (35r GRADE I M General Reference Only - Not for Operational Purposes Iw

57 109 07/25/2012 ALTAVISTA V240 V241 V242 V243 -^ 5278' r ' - ABILENE-ROANOKE 5280' 534T [ VIRGINIA I 5280' MAINTENANCE T&S-06/12 RAIL 98NWF136P 98NWF136P TRAFFIC DENSITY MGT V-2-VA E N W TRACK LAYOUT. git 51á pof 'g, 1 U d Ñ N I11 ó ( Ñ i Ñ n (38.6) 38.5 I1 $ Ñ Ñ. Mil i. --- II c. ik ó H {Y o /y. I o a i 1 t LINE SEGMENT R 6 W Q V ó N ~ 2 Z CURVATURE ALIGNMENT 4 m ici I ó u ai c+ì r i $ Si ä? $ $ $ cv ELEVATION MAINTENANCE SPEED (CURVE) - 25 GRADE,N Y R, R i o General Reference Only - Not for Operational Purposes Itn

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76 GMS35Q IPS IPS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IMS GMS11R Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke Deal GMS Hurt Connection Green GMS GMS Smothers IPN White CEN GMN GMN12R IPN IPN IPN Danville SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :33:40

77 IPS GMS35Q IPS GMS11R Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid ULN66D GMN12R TEW0TT IPN IPN Walke IPS Deal Hurt Connection Green WTS Smothers GMS GMS White CLN GMN17M MLN Danville SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:13

78 IPS GMS11R Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner TLS0TT Oak Ridge Tye River Angelo McIvor Rivermont Durmid IMN CEW TEW0TT GMS Walke GMS35Q Deal Hurt Connection Green CLS GMN Smothers GMS11R WTN ULS68K GMS GMS18M White GMN12R IPN LOCP WTN Danville MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:30

79 IPS LOCP IPS GMS35Q IPS IMS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid WTN IMN TEW0TT Walke GMS Deal Hurt Connection Green IPN GMN12R Smothers IPS White GMN17M GMN LOCP IPN IPN Danville TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:50

80 GMS35Q GMS LOCP Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge GMS11R WTS Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT IPN Walke LOCP IPS Deal IMW25G Hurt Connection Green Smothers GMN12R White IPN IPN IPN GMN17M Danville WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:08

81 GMS11R GMS35Q IPS GMS IMS IPS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill LOCP Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke WTS GMS Deal Hurt Connection Green GMN12R IPN Smothers GMS18M IPN White IPN GMN LOCP IPN MLN Danville THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:21

82 IPS IMS GMS11R Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge TEW0TT LOCP Tye River IPS Angelo McIvor Rivermont Durmid LOCP IMN GMN12R Walke Deal Hurt Connection Green ULS48Z IPS IPN GMS Smothers White IPN CEW IPN GMN17M Danville FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:33

83 IMS IPS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN IPS Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke GMS Deal Hurt Connection Green IPN Smothers White CLN GMN IPN CEN IPN GMN12R MLN IPN Danville SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:48

84 GMS11R IPS GMS11R Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN GMS35Q Tye River Angelo McIvor Rivermont Durmid TEW0TT Walke IPS GMS Deal Hurt Connection IPS IPN Green GMS18M Smothers White Danville GMN12R CEN IPN GMN17M.21X-15 SDN MLN SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :38:00

85 LOCV Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter IME IME23G Lowry Goode Forest Liberty Rutherford IMW22A IPN Campbell IMS Concord 0.15 IME Appomattox Pamplin B IMN GMS Abilene=V TLS0TT IMW25G Virso Green Bay 7.15 IMW TEW0TT CEW CEW CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :38:18

86 IPS IME IME Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont ULN66D Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell TLS0TT Concord 0.15 Appomattox Pamplin B IMW CEW IMW29G Abilene=V GMN Virso Green Bay 7.15 BurkevilleN IMW22A GMS UEW57K GMW Crewe To Norfolk SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :38:33 TEW0TT SDS IMW23Q.14-08

87 TLS0TT Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode IME23G IME234.14X-09 Forest Liberty Rutherford Campbell GMN IME23G WTN Concord 0.15 Appomattox Pamplin B Abilene=V IMN IMW GMS GMW CLE Virso Green Bay 7.15 TEW0TT BurkevilleN Crewe To Norfolk MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :38:45

88 GMN Randolph St Vinton Bonsack Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford IME Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type CEW IME24A Campbell TLS0TT IMS Concord 0.15 Appomattox IMW Pamplin B IMN Abilene=V Virso Green Bay 7.15 GMS IMW22A GMW TEW0TT CEW BurkevilleN Crewe To Norfolk TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :38:57

89 IME23G IME Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IPN Rutherford Campbell IME IMS Concord 0.15 Appomattox IMW23Q TLS0TT GMN Pamplin B Abilene=V Virso Green Bay 7.15 IMN IMW IMW25G IMW22A GMS GMW TEW0TT CLE BurkevilleN Crewe To Norfolk WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :39:08

90 IME Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IPN Rutherford Campbell GMN IME Concord 0.15 Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 BurkevilleN IMW IMN IMW22A GMS TLS0TT GMW CLE Crewe To Norfolk THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :39:21 TEW0TT CEW CLE

91 Randolph St Vinton Bonsack IPS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT IME IME IPN IME23G Bedford Big Otter Lowry Goode Forest Liberty CEW Rutherford Campbell IMS Concord 0.15 GMN Appomattox Pamplin B Abilene=V IMW25G IMW22A GMS TLS0TT GMW UEW57K Virso Green Bay 7.15 CLE TEW0TT BurkevilleN Crewe To Norfolk FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :39:31

92 IME IME23G Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale IME Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IPN Rutherford Campbell Concord 0.15 IMS Appomattox Pamplin B Abilene=V IMW23Q IMN IMW22A CEW CLE Virso Green Bay 7.15 IMW GMS GMW TEW0TT CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :39:42

93 IME IME23G.19X-14 IME Randolph St Vinton Bonsack Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell IMS Concord 0.15 IME23G Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 IMW CLE IMW22A GMS TLS0TT GMW CLE TEW0TT IMW233.21X-15 CEW IMW23Q BurkevilleN Crewe To Norfolk SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :39:53

94 LOCV Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS GMS18M CLE GMS CLE CLE Goodview Board Mtn ULE60J Moneta Stone Mountain Huddleston Amos Branch CEN GMN17M Altavista Dogwood LOCV Marysville Brookneal Vabrook/L CEW CEW CEW763.13X-07 Terry Womacks Abilene=V SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :40:10

95 LOCV Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CLN GMN17M Altavista Dogwood CEW77A Marysville Brookneal Vabrook/L UEW61J CEW CEW Terry Womacks Abilene=V SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :40:23

96 CLS LOCV GMS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE ULS68K GMS CLE GMS18M CLE CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW Altavista Dogwood Marysville Brookneal Vabrook/L CEW Terry Womacks Abilene=V MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :40:37

97 LOCV Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS CLE CLE76A ULS58Z CES Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M GMN17M Altavista Dogwood Marysville CLE Brookneal Vabrook/L Terry Womacks Abilene=V TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :40:48

98 CLE GMS LOCV Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville ULE60J CLE ULE68G CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CEN GMN17M Altavista Dogwood CEW Marysville Brookneal Vabrook/L CEW Terry Womacks Abilene=V WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :41:01

99 CLE LOCV GMS18M CLE Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood CLE Marysville Brookneal Vabrook/L CEW77A CEW UEW61J LOCV CEW Terry Womacks CEW Abilene=V THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :41:11

100 CLE LOCV GMS Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE820.18X-13 CLE ULS48Z ULS68K CLE GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW Terry Womacks Abilene=V FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :41:23

101 CLE CLE CLE Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS18M CLE CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW769.19X-13 CLN CEN Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW LOCV Terry Womacks Abilene=V SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :41:33

102 CLE CLE CLE CLE Case: VA12A Base2012 VA Project 2012 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville GMS GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood CEW Marysville Brookneal Vabrook/L Terry Womacks CEW LOCV CEW Abilene=V SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :41:46

103

104

105

106

107 GMS35Q IPS IPS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IMS GMS11R Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke Deal GMS Hurt Connection Green GMS GMS Smothers IPN White CEN GMN GMN12R IPN IPN IPN Danville SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :46:55

108 IPS GMS35Q IPS GMS11R Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid ULN66D GMN12R TEW0TT IPN IPN Walke IPS Deal Hurt Connection Green GMS WTS GMS Smothers White CLN GMN17M MLN Danville SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :47:24

109 GMS35Q IPS GMS11R Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner TLS0TT Oak Ridge Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT GMS Walke Deal Hurt Connection Green CLS GMN Smothers GMS11R WTN ULS68K GMS GMS18M White GMN12R IPN LOCP WTN Danville MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :47:48

110 IPS IPS GMS35Q IPS IMS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid WTN IMN TEW0TT Walke GMS Deal Hurt Connection Green IPN GMN12R Smothers IPS White GMN17M GMN LOCP IPN IPN Danville TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :48:03

111 GMS35Q LOCP Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner GMS11R Oak Ridge WTS Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT IPN Walke Deal IPS IPS Hurt Connection Green Smothers GMN12R GMS LOCP White IPN IPN IPN GMN17M Danville WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :48:24

112 GMS11R GMS35Q IPS IMS GMS11R IPS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge LOCP Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke WTS GMS Deal Hurt Connection Green GMN12R IPN Smothers GMS18M White IPN GMN LOCP IPN IPN MLN Danville THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :48:37

113 IPS IMS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River TEW0TT LOCP Angelo McIvor Rivermont Durmid LOCP IMN GMN12R MLN Walke Deal Hurt Connection Green ULS48Z IPS IPN GMS Smothers White IPN CEW IPN GMN17M Danville FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :48:47

114 GMS35Q IMS IPS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge Tye River IPN IPS WTN Angelo McIvor Rivermont Durmid IMN TEW0TT Walke GMS Deal Hurt Connection Green Smothers GMS18M IPN IPN White CLN GMN CEN IPN GMN12R MLN IPN Danville SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :48:58

115 GMS11R IPS GMS11R Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN GMS35Q Tye River Angelo McIvor Rivermont Durmid TEW0TT Walke IPS GMS Deal Hurt Connection IPS IPN Green GMS18M Smothers White Danville GMN12R CEN IPN GMN17M.21X-15 SDN MLN SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :49:09

116 LOCV Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter IME IME23G Lowry Goode Forest Liberty Rutherford IMW22A IPN Campbell IMS Concord 0.15 IME GMN Appomattox Pamplin B IMN GMS Abilene=V TLS0TT IMW25G Virso Green Bay 7.15 IMW TEW0TT CEW CEW CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :49:29

117 Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont ULN66D Montvale Thaxton IT Bedford Big Otter Lowry Goode IPS IME Forest Liberty Rutherford Campbell TLS0TT Concord 0.15 IME Appomattox Pamplin B IMW CEW IMW29G Abilene=V GMN Virso Green Bay 7.15 BurkevilleN IMW22A GMS UEW57K GMW Crewe To Norfolk SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :49:42 TEW0TT SDS IMW23Q.14-08

118 TLS0TT GMN Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode IME23G IME234.14X-09 Forest Liberty Rutherford Campbell IME23G WTN Concord 0.15 Appomattox Pamplin B Abilene=V IMN GMW CLE Virso Green Bay 7.15 CEW GMS TEW0TT BurkevilleN Crewe To Norfolk MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :49:54

119 Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type IME IME24A Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford IPN CEW Campbell TLS0TT GMN Concord 0.15 Appomattox IMW Pamplin B IMN Abilene=V Virso Green Bay 7.15 GMS IMW22A GMW TEW0TT CEW BurkevilleN Crewe To Norfolk TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :50:11

120 IME23G Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IMW Rutherford Campbell IME IME IMS Concord 0.15 IMW23Q GMN Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 IMN IMW25G IMW22A GMS TLS0TT GMW TEW0TT CLE BurkevilleN Crewe To Norfolk WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :50:22

121 IME Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell GMN IME Concord 0.15 Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 BurkevilleN IMW IMN IMW22A GMS TLS0TT GMW CLE TEW0TT CEW Crewe To Norfolk THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :50:32 CLE

122 IME IME Randolph St Vinton Bonsack IPS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford CEW IPN Campbell IME23G IMS Concord 0.15 GMN Appomattox Pamplin B Abilene=V IMW25G IMW22A GMS TLS0TT GMW UEW57K Virso Green Bay 7.15 CLE TEW0TT BurkevilleN Crewe To Norfolk FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :50:44

123 IME IME23G Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IPN Rutherford Campbell IME IMS Concord 0.15 Appomattox Pamplin B Abilene=V IMW23Q IMN IMW22A CEW CLE Virso Green Bay 7.15 IMW GMS GMW TEW0TT CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :50:56

124 IME23G.19X-14 IME IME Randolph St Vinton Bonsack Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell IMS Concord 0.15 IME23G Appomattox Pamplin B IMW22A GMS GMW IMW233.21X-15 Abilene=V Virso Green Bay 7.15 IMW CLE TLS0TT CLE TEW0TT CEW IMW23Q BurkevilleN Crewe To Norfolk SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :51:07

125 LOCV Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS GMS18M CLE GMS CLE CLE Goodview Board Mtn ULE60J Moneta Stone Mountain Huddleston Amos Branch CEN GMN17M Altavista Dogwood LOCV Marysville Brookneal Vabrook/L CEW CEW CEW763.13X-07 Terry Womacks Abilene=V SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :51:26

126 LOCV Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CLN GMN17M Altavista Dogwood CEW77A Marysville Brookneal Vabrook/L UEW61J CEW CEW Terry Womacks Abilene=V SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :51:42

127 CLS CLE LOCV GMS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE ULS68K GMS CLE GMS18M CLE CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW Altavista Dogwood Marysville Brookneal Vabrook/L CEW Terry Womacks IMW Abilene=V MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :51:53

128 LOCV Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS CLE CLE76A ULS58Z CES Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M GMN17M Altavista Dogwood Marysville CLE Brookneal Vabrook/L Terry Womacks Abilene=V TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :52:03

129 CLE LOCV Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville ULE60J CLE ULE68G CLE GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CEN GMN17M Altavista Dogwood CEW Marysville Brookneal Vabrook/L CEW Terry Womacks Abilene=V WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :52:13

130 CLE CLE LOCV GMS18M CLE Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE GMS GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood Marysville CEW CLE Brookneal Vabrook/L CEW77A UEW61J LOCV CEW Terry Womacks CEW Abilene=V THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :52:24

131 CLE LOCV GMS Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE820.18X-13 CLE ULS48Z ULS68K CLE GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW Terry Womacks Abilene=V FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :52:34

132 CLE CLE CLE Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS18M CLE CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW769.19X-13 CLN CEN Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW LOCV Terry Womacks Abilene=V SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :52:47

133 CLE CLE CLE CLE Case: VA12B 2012PgrNoInf VA Project 2012 New pgr trains No infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville GMS GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood CEW Marysville Brookneal Vabrook/L Terry Womacks CEW LOCV CEW Abilene=V SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :53:07

134

135

136

137

138 GMS35Q IPS IPS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge Tye River IMS GMS11R Angelo McIvor Rivermont Durmid IMN TEW0TT IPN Walke Deal GMS Hurt Connection Green Smothers GMS GMS White CEN GMN GMN12R IPN IPN IPN Danville SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :32:00

139 IPS GMS35Q IPS GMS11R Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid ULN66D GMN12R TEW0TT IPN IPN Walke Deal Hurt Connection Green GMS WTS GMS Smothers White CLN GMN17M MLN Danville SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :32:50

140 GMS35Q IPS GMS11R Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner TLS0TT Oak Ridge Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke Deal Hurt Connection Green Smothers GMS11R CLS GMN WTN ULS68K GMS GMS18M White GMN12R IPN LOCP WTN Danville MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :32:59

141 IPS GMS35Q IPS IMS IPS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River Angelo McIvor Rivermont Durmid WTN IMN GMN12R TEW0TT Walke Deal Hurt Connection Green IPS Smothers White GMN17M GMN LOCP IPN IPN Danville TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :33:09

142 GMS35Q LOCP Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge WTS Tye River GMS11R Angelo McIvor Rivermont Durmid IMN TEW0TT IPN Walke IPS Deal GMS IPS LOCP Hurt Connection Green Smothers GMN12R IPN White Danville IPN GMN17M WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :33:17

143 GMS11R GMS35Q IPS IMS IPS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge LOCP Tye River Angelo McIvor Rivermont Durmid IMN Walke WTS Deal Hurt Connection Green IPS GMS GMN12R IPN Smothers GMS18M IPN White Danville GMN LOCP IPN MLN THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :33:26

144 IPS IMS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River TEW0TT LOCP Angelo McIvor Rivermont Durmid LOCP IMN GMN12R MLN Walke Deal Hurt Connection Green IPS ULS48Z IPS IPN GMS Smothers White IPN CEW IPN GMN17M Danville FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :34:29

145 IMS IPS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN IPS WTN Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke GMS Deal GMS35Q Hurt Connection Green Smothers White CLN GMN IPN CEN IPN GMN12R MLN IPN Danville SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :34:02

146 GMS11R IPS GMS11R Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN GMS35Q Tye River Angelo McIvor Rivermont Durmid TEW0TT Walke IPS GMS Deal Hurt Connection IPN Green GMS18M Smothers White Danville GMN12R CEN IPN GMN17M.21X-15 SDN MLN SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :34:15

147 LOCV Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IMW22A GMW Rutherford Campbell IMS Concord 0.15 GMN Appomattox Pamplin B Abilene=V IMN GMS TLS0TT IME IMW25G Virso Green Bay 7.15 IMW TEW0TT CEW CEW CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:04

148 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont ULN66D Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell TLS0TT Concord 0.15 Appomattox Pamplin B IMW GMW IMW29G Abilene=V Virso Green Bay 7.15 BurkevilleN IMW22A GMS UEW57K CEW Crewe To Norfolk SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:13 IME TEW0TT SDS IMW23Q.14-08

149 TLS0TT Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell GMN Concord 0.15 WTN Appomattox Pamplin B Abilene=V IMN IMW GMS GMW IME23G CLE CLE Virso Green Bay 7.15 CEW TEW0TT BurkevilleN Crewe To Norfolk MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:24

150 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type IME24A Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty CEW Rutherford Campbell TLS0TT GMN Concord 0.15 Appomattox IMW Pamplin B IMN Abilene=V Virso Green Bay 7.15 GMS IMW22A GMW TEW0TT CEW BurkevilleN Crewe To Norfolk TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:32

151 GMN Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell IMS Concord 0.15 Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 IMN IMW IMW25G IMW22A GMS TLS0TT GMW TEW0TT BurkevilleN Crewe To Norfolk WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:41

152 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford GMN Campbell IMS Concord 0.15 Appomattox Pamplin B Abilene=V Virso Green Bay 7.15 BurkevilleN IMW IMN IMW22A TLS0TT GMS GMW CEW CEW Crewe To Norfolk THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:49 TEW0TT CLE IME23G CLE

153 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IMW CEW LOCV Rutherford Campbell IMS Concord 0.15 GMN Appomattox TLS0TT Pamplin B Abilene=V IMW25G GMS IME IME UEW57K IME23G CLE Virso Green Bay 7.15 IMW22A GMW TEW0TT BurkevilleN Crewe To Norfolk FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :35:57

154 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell Concord 0.15 Appomattox Pamplin B Abilene=V IMW23Q IMN IMW22A TLS0TT CEW CLE GMN CEW IME IME23G IMS CLE Virso Green Bay 7.15 IMW GMS GMW TEW0TT BurkevilleN Crewe To Norfolk SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:05

155 Randolph St Vinton Bonsack Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell IMS Concord 0.15 Appomattox TLS0TT Pamplin B Abilene=V Virso Green Bay 7.15 IMW IMW22A GMS GMW IME CLE TEW0TT CEW IMW233.21X-15 CEW IMW23Q BurkevilleN Crewe To Norfolk SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:13

156 IME LOCV CLE Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy CLE CLE GMS IME GMS18M GMS CLE CLE Stewartsville IME23G Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN GMN17M ULE60J Altavista Dogwood LOCV Marysville Brookneal Vabrook/L CEW CEW CEW763.13X-07 Terry Womacks Abilene=V SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:27

157 IME IME LOCV Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE IPS GMS CLE WTS GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CLN GMN17M Altavista Dogwood CEW77A CEW CEW Marysville Brookneal Vabrook/L UEW61J Terry Womacks Abilene=V SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:35

158 CLE LOCV GMS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara IME23G.13X-09 CLE IME234.14X-09 IME23G ULS68K GMS CLE GMS18M CLE CLE CLE Hardy Stewartsville Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW Altavista Dogwood IME23G CEW Marysville Brookneal Vabrook/L Terry Womacks Abilene=V MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:44

159 CLE IME LOCV Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara IPS CLE GMS CLE CLE76A ULS58Z CES Hardy CLE Stewartsville Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW IPN GMN17M Altavista Dogwood Marysville Brookneal Vabrook/L Terry Womacks Abilene=V TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :36:53

160 ULE60J CLE GMS Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE IPS ULE68G IME IME IME23G GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch IPN CEN GMN17M Altavista Dogwood CLE Marysville Brookneal Vabrook/L IMW23Q CEW LOCV CEW Terry Womacks Abilene=V WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:01

161 CLE IPS GMS CLE Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy IME CLE GMS CLE GMS18M IME23G CLE Stewartsville CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch IPN CEN Altavista Dogwood CEW IME LOCV CEW Marysville Brookneal Vabrook/L CEW77A LOCV CLE Terry Womacks Abilene=V THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:09

162 CLE CLE IME LOCV GMS IME23G Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara IPS CLE820.18X-13 CLE ULS48Z IME CLE GMS18M Hardy Stewartsville Goodview Board Mtn ULS68K CLE Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW Terry Womacks Abilene=V FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:18

163 CLE CLE CLE IME IME IME23G CLE Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW CEW769.19X-13 CLN CEN IPN Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW LOCV Terry Womacks Abilene=V SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:28

164 CLE IME23G.19X-14 CLE IME23G Case: VA12C 2012PgrInf VA 2012 New pgr trns; frt trn shifts; new infrastructure Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara IPS IME IME GMS18M GMS CLE CLE Hardy CLE Stewartsville Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW CEN Altavista Dogwood LOCV Marysville Brookneal Vabrook/L CEW Terry Womacks Abilene=V SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :37:37

165

166

167

168

169 GMS35Q IPS IPS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge GMS11R Tye River Angelo McIvor Rivermont Durmid IMN TEW0TT Walke IPSF Deal GMS Hurt Connection Green Smothers GMS IPN IPNF GMS MLNF White CEN GMN GMN12R IPNF IPN IPN IPN Danville SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :03:53

170 IPS IPSF IMS228.14f-08 GMS11R Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill GMS35Q Applegate Hamner Oak Ridge Tye River IMNF IPS IPNF Angelo McIvor Rivermont Durmid IMN227.13f-08 GMN12R IPN IPN Walke IPS Deal GMS Hurt Connection Green WTS GMS Smothers White CLN GMN17M MLN Danville SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :04:10

171 GMS35Q IMS228.15f-09 Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge IMNF TLS0TT Tye River IPS Angelo McIvor Rivermont Durmid MLNF IMN GMN12R TEW0TT Walke GMS11R Deal Hurt Connection GMN IPNF Green Smothers CLS ULS68K GMS GMS18M White IPN LOCP WTN Danville MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :04:21

172 IPS GMS35Q IPS IMS IMSF IPS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River IMNF LOCP Angelo McIvor Rivermont Durmid IMN TEW0TT Walke Deal Hurt Connection Green IPS GMN12R Smothers White GMN17M LOCP IPN IPN Danville TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :04:33

173 IPSF IPSF Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT GMS35Q LOCP Red Hill Applegate Hamner Oak Ridge LOCP IMSF Tye River GMS11R Angelo McIvor Rivermont Durmid IMNF IMN GMN12R TEW0TT IPN Walke Deal LOCP IPS Hurt Connection Green Smothers IPNF White IPN IPN IPN GMN17M MLNF Danville WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :04:43

174 IPSF IPS IPS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner LOCP Oak Ridge GMS35Q IPS IMS Tye River LOCP Angelo McIvor Rivermont Durmid IMNF IMN GMN12R IPNF TEW0TT WTS Walke IPSF Deal Hurt Connection Green Smothers White GMS11R IPN LOCP IPN IPN GMS18M IPN GMS MLN Danville THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :04:56

175 IPS IMS IMSF GMS11R Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville Red Hill Applegate Hamner Oak Ridge Tye River IPSF TEW0TT LOCP Angelo McIvor Rivermont Durmid IMN IPNF GMN12R Walke IPS Deal Hurt Connection Green GMS11R IPN IPN GMS MLNF Smothers White Danville CEW IPN FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :05:09

176 IPSF IMS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN IPS Tye River Angelo McIvor Rivermont Durmid IMNF IMN IPNF TEW0TT Walke GMS Deal Hurt Connection Green IPN MLNF Smothers White CLN GMN IPN CEN IPN GMN12R IPNF MLN IPN Danville SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :05:20

177 IPS GMS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 03-() Piedmont Div Mainline Train colors: Type Charlottesville TLS0TT Red Hill Applegate Hamner Oak Ridge IPN IMNF GMS35Q Tye River IMN227.20f-15 IPSF GMS11R Angelo McIvor Rivermont Durmid TEW0TT Walke GMS11R IPSF Deal Hurt Connection IPS IPNF IPN Green IPS Smothers White Danville GMN12R CEN IPN GMN17M.21X-15 SDN MLN SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :05:30

178 LOCV Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter IME IME23G Lowry Goode Forest Liberty IMW22A IPN IPNF Rutherford Campbell IMS IMSF Concord 0.15 IME Appomattox Pamplin B Abilene=V IMN GMS TLS0TT IMW25G CEW Virso Green Bay 7.15 IMW TEW0TT CEW CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :05:46

179 Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale ULN66D IPS IPSF IME IME Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty IMW Rutherford Campbell TLS0TT Concord 0.15 Appomattox IMN227.13f-08 GMN IMS228.14f-08 IMW29G Pamplin B IMNF Abilene=V Virso Green Bay 7.15 BurkevilleN IMW22A GMS UEW57K CEW GMW Crewe To Norfolk SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :05:57 TEW0TT SDS IMW23Q IMSF

180 TLS0TT GMN Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode IME23G IME234.14X-09 IPSF Forest Liberty Rutherford Campbell IMS228.15f-09 IMSF Concord 0.15 IME236.14f-09 IME23G WTN Appomattox Pamplin B Abilene=V IMN GMW TEW0TT CLE Virso Green Bay 7.15 CEW GMS BurkevilleN Crewe To Norfolk MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :06:09

181 Randolph St Vinton Bonsack IME Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type IPSF IME24A Webster Villamont Montvale Thaxton IT IPNF Bedford Big Otter Lowry Goode Forest Liberty IPN CEW Rutherford Campbell TLS0TT Concord 0.15 Appomattox IMW Pamplin B IMN IMNF Abilene=V Virso Green Bay 7.15 GMS IMW22A GMW IME236.15f-10 TEW0TT CEW BurkevilleN Crewe To Norfolk TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :06:20

182 IME23G Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford IPNF IME Campbell IME IMS IMSF Concord 0.15 Appomattox IMW23Q GMN Pamplin B Abilene=V Virso Green Bay 7.15 IMN IMW IMW25G IMW22A GMS TLS0TT GMW TEW0TT IMNF BurkevilleN Crewe To Norfolk WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :06:30

183 GMN Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type IPS Webster Villamont Montvale IPSF IME Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford IPN IPNF Campbell IME Concord 0.15 IME23G IMSF Appomattox Pamplin B IMW23Q.17f-11 IMN TEW0TT CEW IMS Abilene=V Virso Green Bay 7.15 BurkevilleN IMW IMW22A GMS TLS0TT GMW CLE CEW Crewe To Norfolk THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :06:42 IMNF

184 Randolph St Vinton Bonsack Webster IPS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Villamont Montvale Thaxton IT CEW IME IME IME23G Bedford Big Otter Lowry Goode Forest Liberty IMW23Q.18f-12 Rutherford Campbell IMS IMSF Concord 0.15 GMN Appomattox Pamplin B Abilene=V IMW25G IMW22A GMS TLS0TT GMW UEW57K IMNF Virso Green Bay 7.15 CLE TEW0TT BurkevilleN Crewe To Norfolk FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :06:53

185 IME Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale IME Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford IPN IME23G Campbell Concord 0.15 IMS Appomattox Pamplin B Abilene=V IMW23Q IMN IMW22A CEW CLE IMNF Virso Green Bay 7.15 IMW GMS GMW TEW0TT CEW BurkevilleN Crewe To Norfolk SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :07:05

186 IME IME23G.19X-14 IME Randolph St Vinton Bonsack Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55PH-55N Crewe-Roanoke Train colors: Type Webster Villamont Montvale Thaxton IT Bedford Big Otter Lowry Goode Forest Liberty Rutherford Campbell IME23G IMS IMSF Concord 0.15 Appomattox IMN227.20f-15 Pamplin B Abilene=V Virso Green Bay 7.15 IMW CLE IMW22A GMS TLS0TT GMW CLE TEW0TT IMW233.21X-15 IMW23Q BurkevilleN Crewe To Norfolk SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :07:14

187 LOCV Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS GMS18M CLE GMS CLE CLE Goodview Board Mtn ULE60J Moneta Stone Mountain Huddleston Amos Branch CEN GMN17M Altavista Dogwood LOCV Marysville Brookneal Vabrook/L CEW CEW CEW763.13X-07 Terry Womacks Abilene=V SATURDAY (Week 1) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :07:31

188 LOCV Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CLN GMN17M Altavista Dogwood CEW77A Marysville Brookneal Vabrook/L UEW61J CEW CEW Terry Womacks Abilene=V SUNDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :07:41

189 CLS CLE LOCV GMS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE ULS68K GMS CLE GMS18M CLE CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW Altavista Dogwood Marysville Brookneal Vabrook/L CEW Terry Womacks IMW Abilene=V MONDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :07:51

190 LOCV Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS CLE CLE76A ULS58Z CES Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M GMN17M Altavista Dogwood Marysville CLE Brookneal Vabrook/L Terry Womacks Abilene=V TUESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:02

191 CLE GMS LOCV Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville ULE60J CLE ULE68G CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN CEN GMN17M Altavista Dogwood CEW Marysville Brookneal Vabrook/L CEW Terry Womacks Abilene=V WEDNESDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:14

192 CLE LOCV GMS18M CLE Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS CLE GMS CLE CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood Marysville Brookneal Vabrook/L CEW77A CEW UEW61J LOCV CEW Terry Womacks Abilene=V THURSDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:24

193 CLE LOCV GMS Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE820.18X-13 CLE ULS48Z ULS68K CLE GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW GMN17M Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW Terry Womacks Abilene=V FRIDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:34

194 CLE CLE CLE Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville CLE CLE GMS18M CLE CLE GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEW769.19X-13 CLN CEN Altavista Dogwood Marysville Brookneal Vabrook/L CEW CEW LOCV Terry Womacks Abilene=V SATURDAY (Week 2) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:45

195 CLE CLE CLE CLE Case: VA17A Base2017 VA Project 2017 No new psgr trains Line: 55 V Altavista Line Train colors: Type South Yard (JK) Demuth Niagara Hardy Stewartsville GMS GMS18M GMS CLE Goodview Board Mtn Moneta Stone Mountain Huddleston Amos Branch CEN Altavista Dogwood CEW Marysville Brookneal Vabrook/L Terry Womacks CEW LOCV CEW CEW Abilene=V SUNDAY (Week 3) All times displayed in Eastern time RTC version: 67T L67T Run time: 02 August :08:56

196

197

NOTICE TO MEMBERS No February 5, 2003

NOTICE TO MEMBERS No February 5, 2003 NOTICE TO MEMBERS No. 2003-008 February 5, 2003 NEW EQUITY OPTION CLASSES Bourse de Montréal Inc.(The Bourse) and (CDCC) hereby inform you that at the opening of trading on Monday, February 10, 2003 the

More information

Norfolk and Western Railway

Norfolk and Western Railway Norfolk and Western Railway NORFOLK AND WESTERN RAILWAY................................................... Gen. act of VA, January 15, 1896 Trackage, June 30, 1916: 2051.280 mi. First Main track 546.328

More information

AGENDA. September 1, 2016 MEMORANDUM. Members, Transportation Technical Committee. Mark McCaskill, AICP, Director of TPO Programs

AGENDA. September 1, 2016 MEMORANDUM. Members, Transportation Technical Committee. Mark McCaskill, AICP, Director of TPO Programs 313 Luck Avenue, SW Roanoke, Virginia 24016 P: 540.343.4417 / F: 540.343.4416 rvtpo.org September 1, 2016 MEMORANDUM TO: FROM: SUBJ: Members, Transportation Technical Committee Mark McCaskill, AICP, Director

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Deck Cond CND. Crossing Type Year Built Year Recnst

Deck Cond CND. Crossing Type Year Built Year Recnst Route Route Name VA Fed Salem Bedford 24 Wyatt's Way 24 1002 2575 Big Otter River Bridge 1979 0 7 7 7 N 93.3 Y - 07/25/2006 Salem Bedford 24 Stewartsville Rd24 1003 2576 EAST FORK BEAVERDAM CRK Bridge

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

Published Counts TrafficMetrix

Published Counts TrafficMetrix Published Counts TrafficMetrix Contents Introduction... 1 TrafficMetrix Features... 1 TrafficMetrix Benefits... 1 TrafficMetrix Data... 1 File Descriptions... 2 State Abbreviations... 3 Count Type Glossary...

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

Higher Education in America s Metropolitan Areas A Statistical Profile

Higher Education in America s Metropolitan Areas A Statistical Profile Higher Education in America s Metropolitan Areas A Statistical Profile MSA Study No.2 Higher Education in America s Metropolitan Areas A Statistical Profile CONTENTS Why Metro Areas? 1 Executive Summary

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Aviation Maintenance Industry Outlook and Economic Impact

Aviation Maintenance Industry Outlook and Economic Impact Aviation Maintenance Industry Outlook and Economic Impact March 18, 2015 David A. Marcontell Vice President CAVOK, a division of Oliver Wyman 1003 Virginia Ave, Suite 300 Atlanta, Georgia 30354 Office:

More information

COMMISSIONER'S REPORT

COMMISSIONER'S REPORT INTERSTATE 255 109855 LOCATION: VARIOUS COMPANY 1 $2,785,604.37 $2,997,976.18 (NFO)PM2S-962-F17,P401 ROANOKE NHPP-962-2(104) MONTGOMERY VA 523 107360 LOCATION: VARIOUS ALLAN MYERS VA, INC. 3 $1,844,444.00

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

TXDOT AVIATION DIVISION

TXDOT AVIATION DIVISION TXDOT AVIATION DIVISION Airport Project Development & Selection Process Today s Topics Project Development Process Working with TxDOT Aviation Division Funding Sources National Plan of Integrated Airports

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

" Voting Place " " Prince William County, Virginia Gainesville Election District Voting Precincts and Voting Places EVERGREEN BATTLEFIELD ALVEY

 Voting Place   Prince William County, Virginia Gainesville Election District Voting Precincts and Voting Places EVERGREEN BATTLEFIELD ALVEY GROVETON PAGELAN LN MOUNTAIN Prince William County, Virginia Gainesville Election istrict Voting Precincts and Voting Places EVERGREEN LOGMILL JAMES MAISON HY 15 Voting Place 401 Evergreen Precinct Evergreen

More information

2009 North Carolina Visitor Profile

2009 North Carolina Visitor Profile 2009 Visitor Profile A publication of the Division of Tourism, Film & Sports Development August 2010 Division of Tourism, Film and Sports Development 2009 Visitor Profile 2009 Visitor Profile The Division

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

Summi triumphum. & bc. w w w Ó w w & b 2. Qui. w w w Ó. w w. w w. Ó œ. Let us recount with praise the triumph of the highest King, 1.

Summi triumphum. & bc. w w w Ó w w & b 2. Qui. w w w Ó. w w. w w. Ó œ. Let us recount with praise the triumph of the highest King, 1. Sequence hymn for Ascension ( y Nottker Balulus) Graduale Patavienese 1511 1. Sum Summi triumphum Let us recount ith praise the triumph of the highest King, Henricus Isaac Choralis Constantinus 1555 3

More information

Private Crossing Treatments on the North Carolina Sealed Corridor

Private Crossing Treatments on the North Carolina Sealed Corridor Private Crossing Treatments on the North Carolina Sealed Corridor Patrick Bien-aime 2013 National Highway-Rail Grade Crossing Safety Training Conference November 05, 2013 The National Transportation Systems

More information

Implementing a Perimeter Taxiway at Dallas Fort Worth International Airport: Evaluation of Operating Policy Impacts

Implementing a Perimeter Taxiway at Dallas Fort Worth International Airport: Evaluation of Operating Policy Impacts Implementing a Perimeter Taxiway at Dallas Fort Worth International Airport: Evaluation of Operating Policy Impacts S. D. Satyamurti, Ph.D., P.E. 1 and Stephen P. Mattingly Ph.D. 1 1 Department of Civil

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia Developed by Region 2000 Regional Commission In cooperation with Bedford County, Virginia City of Bedford, Virginia Virginia Department

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Robust Scheduling Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Philosophy If you like to drive fast, it doesn t make sense getting a Porsche

More information

APPENDIX A: Planning Consistency Checklist

APPENDIX A: Planning Consistency Checklist APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:

More information

National Model Railroad Association

National Model Railroad Association National Model Railroad Association Home :: Achievement Program :: Engineer - Civil Achievement Program Model Railroad Engineer - Civil The requirements for Model Railroad Engineer - Civil may look long

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

2017 Annual Service Plan

2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan Objectives Transition to a Frequent Transit Network (FTN) with a strong grid network Preparing the Viva Network Expansion Plan

More information

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor o U.S. Department Washington Division Suite 501 Evergreen Plaza of Transportation 711 South Capitol Way Olympia, Washington 98501-1284 Federa' Highway (360) 753-9480 Administration (360) 753-9889 (FAX)

More information

Nyheter i EASA NPA om Flygarbetstid (FTL)

Nyheter i EASA NPA om Flygarbetstid (FTL) EASA NPA FTL Nyheter i EASA NPA om Flygarbetstid (FTL) www.easa.europa.eu 1 Definitions Acclimatised A crew member is considered to be acclimatised to the WOCL of the time zone they are in when they have

More information

De-peaking Lufthansa Hub Operations at Frankfurt Airport

De-peaking Lufthansa Hub Operations at Frankfurt Airport Advances in Simulation for Production and Logistics Applications Markus Rabe (ed.) Stuttgart, Fraunhofer IRB Verlag 2008 De-peaking Lufthansa Hub Operations at Frankfurt Airport De-peaking des Lufthansa-Hub-Betriebs

More information

Case 3:05-cv Document 34 Filed 10/10/2005 Page 1 of 13

Case 3:05-cv Document 34 Filed 10/10/2005 Page 1 of 13 Case 3:05-cv-00391 Document 34 Filed 10/10/2005 Page 1 of 13 Case 3:05-cv-00391 Document 34 Filed 10/10/2005 Page 2 of 13 Case 3:05-cv-00391 Document 34 Filed 10/10/2005 Page 3 of 13 Case 3:05-cv-00391

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

CESSNA AIRCRAFT COMPANY

CESSNA AIRCRAFT COMPANY Page 1 2007-05-10 CESSNA AIRCRAFT COMPANY Amendment 39-14971 Docket No. FAA-2006-25261; Directorate Identifier 2006-CE-38-AD PREAMBLE Effective Date (a) This AD becomes effective on April 11, 2007. Affected

More information

Thanksgiving Holiday Period Traffic Fatality Estimate, 2017

Thanksgiving Holiday Period Traffic Fatality Estimate, 2017 Thanksgiving Holiday Period Traffic Fatality Estimate, 2017 Prepared by Research and Statistics Department National Safety Council November 13, 2017 Holiday period definition Thanksgiving is observed on

More information

Wisconsin Testing Facilities Location Facility Notes

Wisconsin Testing Facilities Location Facility Notes Wisconsin Testing Facilities Appleton Eau Claire Fond du Lac Franklin Janesville Green Bay La Crosse Madison Marinette Milwaukee New Berlin Theda Care at Work 2809 N. Park Drive Lane Appleton, WI 54911

More information

2. Proceed 3 and 3/4 miles on Fort Eustis Blvd to traffic light. Turn left on to Route 17 North (George Washington Memorial Highway).

2. Proceed 3 and 3/4 miles on Fort Eustis Blvd to traffic light. Turn left on to Route 17 North (George Washington Memorial Highway). Directions This page includes directions and key information that should be useful for first-time travelers planning a trip to Training Center Yorktown, Virginia. It includes specific directions you'll

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

A Presentation to: Project Advisory Group Meeting #6

A Presentation to: Project Advisory Group Meeting #6 A Presentation to: Project Advisory Group Meeting #6 March 25, 2015 Agenda Introductions Action items from last PAG meeting (February 25, 2015) Public involvement update Status of April public meetings

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All EX28.6 REPORT FOR ACTION Advancing Fare Integration Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All SUMMARY In July 2016, City Council considered a current state assessment

More information

SIKORSKY AIRCRAFT CORPORATION

SIKORSKY AIRCRAFT CORPORATION Page 1 2012-23-13 SIKORSKY AIRCRAFT CORPORATION Amendment 39-17269 Docket No. FAA-2012-1206; Directorate Identifier 2012-SW-021-AD PREAMBLE (a) Applicability This AD applies to Model S-70, S-70A, and S-70C

More information

Studies (C3) Faculty of Forestry (D1) SM Sigmund Samuel Library Bldg (D3) FC Faculty Club (D1) SR Sam Sorbara Hall Student Res.

Studies (C3) Faculty of Forestry (D1) SM Sigmund Samuel Library Bldg (D3) FC Faculty Club (D1) SR Sam Sorbara Hall Student Res. From www.utoronto.ca/maps.html 1 27 November 2004 From www.utoronto.ca/maps.html 2 27 November 2004 From www.utoronto.ca/maps.html 3 27 November 2004 ROSS STREET BEVERLEY STREET SPADINA AVENUE ST. GEORGE

More information

OUR U.S. FULL SERVICE OFFICES:

OUR U.S. FULL SERVICE OFFICES: HOW TO NAME US AS YOUR REGISTERED AGENT Listing the correct name and address of your Registered Agent on filings is critically important. To make sure you have the most current address for COGENCY GLOBAL

More information

VIRGINIA HISTORIC LANDMARKS COMMISSION

VIRGINIA HISTORIC LANDMARKS COMMISSION VRGNA HSTORC LANDMARKS COMMSSON SURVEY FORM Historic name Richmond, Fredericksburg & Common named C T C C Potomac Rai roa ounty own ty Prince Wi iam ounty Street address or route number See verbal boundary

More information

Overseas Visitation Estimates for U.S. States, Cities, and Census Regions: 2015

Overseas Visitation Estimates for U.S. States, Cities, and Census Regions: 2015 U.S. Department of Commerce International Trade Administration National Travel and Tourism Office Overseas Estimates for U.S. States, Cities, and Census Regions: Overseas to U.S. States, Cities, and Census

More information

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report

BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report BICYCLE AND PEDESTRIAN COUNT PROGRAM 2016 Annual Report TABLE OF CONTENTS A Message from the Mayor... 4 Data Count Reports... 5 Count Locations... 6 Count Locations Map... 7 Trail Data... 8 International

More information

RFTA REGIONAL BICYCLE, PEDESTRIAN AND TRANSIT ACCESS PLAN. Map A.7: El Jebel/Willits Existing Conditions Map. A-8 Exisiting Conditions Maps

RFTA REGIONAL BICYCLE, PEDESTRIAN AND TRANSIT ACCESS PLAN. Map A.7: El Jebel/Willits Existing Conditions Map. A-8 Exisiting Conditions Maps I F GIO ICYC, I I CC HIGH issouri Heights ew multi-use trail connects north l Jebel to general store and H- underpass G egional icycle, edestrian and ransit ccess lan eighborhood trail connects residents

More information

CREATING CONNECTIONS IN CLARINGTON

CREATING CONNECTIONS IN CLARINGTON CREATING CONNECTIONS IN CLARINGTON ANDRE MAROIS Director, RER Corridor Infrastructure Lakeshore East CHRIS BURKE Director, Service Planning, Planning & Development CLARINGTON GENERAL GOVERNANCE COMMITTEE

More information

BEFORE THE DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C. NOTICE OF TIER 1 AGREEMENTS FILING BY THE INTERNATIONAL AIR TRANSPORT ASSOCIATION

BEFORE THE DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C. NOTICE OF TIER 1 AGREEMENTS FILING BY THE INTERNATIONAL AIR TRANSPORT ASSOCIATION BEFORE THE DEPARTMENT OF TRANSPORTATION WASHINGTON, D.C. Notice of IATA Traffic Conference Actions Tentatively Exempted From Filing for Approval Docket OST-2012-0058 NOTICE OF TIER 1 AGREEMENTS FILING

More information

Wisconsin Testing Facilities

Wisconsin Testing Facilities Wisconsin Testing Facilities Appleton Eau Claire Fond du Lac Franklin Green Bay La Crosse Madison Marinette Milwaukee New Berlin Theda Care at Work 2809 N. Park Drive Lane Appleton, WI 54911 920-380-4999

More information

(U 338-E) 2015 General Rate Case A Workpapers

(U 338-E) 2015 General Rate Case A Workpapers (U 338-E) 2015 General Rate Case A.13-11-003 Workpapers Results of Operations (RO) Plant, Taxes, Depreciation Expense and Reserve, Rate Base, and Productivity SCE-10 Volume 02, Chapter I, Part 02 Revision

More information

Clarification of Implementation of Regulations and Exemption Policy With Regard to Early Implementation and Transition

Clarification of Implementation of Regulations and Exemption Policy With Regard to Early Implementation and Transition This document is scheduled to be published in the Federal Register on 09/26/2013 and available online at http://federalregister.gov/a/2013-23516, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

ME M O R I ES A R E WA I T I NG TO BE MA DE E XP LO R E W HAT S I N STORE

ME M O R I ES A R E WA I T I NG TO BE MA DE E XP LO R E W HAT S I N STORE ME M O R I ES A R E WA I T I NG TO BE MA DE E XP LO R E W HAT S I N STORE D ISCOVE R A PL ACE LI KE N O OT H E R, W H ER E L I FE LO N G MEM ORI E S A RE MA D E, T IM E T OG ET HER C OUNT S, AND G IRLHOOD

More information

NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S.

NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S. NATIONAL TOLL FACILITIES USAGE ANALYSIS RECORD-BREAKING YEAR FOR TOLL FACILITIES ACROSS THE U.S. INTRODUCTION KEY FACTS FROM THE NATIONAL TOLL FACILITIES USAGE ANALYSIS 31 TOLL AUTHORITIES from across

More information

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study STAFF REPORT ACTION REQUIRED Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study Date: August 14, 2009 To: From: Wards: Reference Number: North York Community Council

More information

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT Washington Metropolitan Area Transit Authority Department of Planning and Joint Development In Association with District of Columbia Department

More information

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013 ITS Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning Raymond Wright, P.E. City of Spokane Transportation Department 11707 East Sprague Avenue,

More information

SHENANDOAH VALLEY INDUSTRIAL MARKET Third Quarter 2017

SHENANDOAH VALLEY INDUSTRIAL MARKET Third Quarter 2017 RESEARCH & FORECAST REPORT SHENANDOAH VALLEY INDUSTRIAL Third Quarter 2017 Amazon and P&G set to Occupy Large Blocks as Construction Remains Strong Market Indicators 2018 (Projected) The summer months

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

Nova Southeastern University Joint-Use Library Agreement: Review of Public Usage

Nova Southeastern University Joint-Use Library Agreement: Review of Public Usage Exhibit 1 Nova Southeastern University Joint-Use Library Agreement: Robert Melton, CPA, CIA, CFE, CIG County Auditor Audit Conducted by: Gerard Boucaud, CISA, Audit Manager Dirk Hansen, CPA, Audit Supervisor

More information

Lower Income Journey to Work Market Share From American Community Survey

Lower Income Journey to Work Market Share From American Community Survey Lower Income Journey to Work Market Share From American Community Survey 2006-2010 Table 1: Overall National Data Table 2: Car, Truck or Van Table 3: Transit Table 4: Metrics Table 1 Work Trip Market Share:

More information

EXISTING CONDITIONS ON COLORADO S FOURTEENERS NATURAL RESOURCE MANAGER SURVEY RESULTS

EXISTING CONDITIONS ON COLORADO S FOURTEENERS NATURAL RESOURCE MANAGER SURVEY RESULTS EXISTING CONDITIONS ON COLORADO S FOURTEENERS NATURAL RESOURCE MANAGER SURVEY RESULTS A Little Background January 15, 2004 - Informal Gathering of Wilderness Managers. Survey Monkey survey developed with

More information

uickship Guide 2016 Vol. 2

uickship Guide 2016 Vol. 2 uickship Guide 2016 Vol. 2 Index Quickship Policies... 2 Aerion LED... 3 Amica LED... 4 Equation 2... 5 Equation LED... 6 Luna LED... 7 Veer LED... 8 Avenue B & 6 LED... 9 Seem 2, 4 & 6 LED... 10 Twelve

More information

Aurora Hills. Getting There

Aurora Hills. Getting There Aurora Hills Aurora Hills is neighborhood near Crystal City and Pentagon City. Ball fields, ball courts, a very short trail, and a combination ibrary/fire Station are the central pieces of a recreation

More information

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline

More information

Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports This document is scheduled to be published in the Federal Register on 10/23/2013 and available online at http://federalregister.gov/a/2013-24729, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

APPENDIX B PCJPB/CALTRAIN STANDARDS AND REFERENCES. 6.0 PCJPB Standards For Design And Maintenance Of Structures

APPENDIX B PCJPB/CALTRAIN STANDARDS AND REFERENCES. 6.0 PCJPB Standards For Design And Maintenance Of Structures CALTRAIN DESIGN CRITERIA APPENDIX B APPENDIX B PCJPB/CALTRAIN STANDARDS AND REFERENCES 1.0 PCJPB General Provisions 2.0 PCJPB Special Conditions 3.0 Caltrain Design Criteria 4.0 Caltrain Standard Drawings

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

uickship Guide 2018 Vol. 1

uickship Guide 2018 Vol. 1 uickship Guide 2018 Vol. 1 Index Quickship Policies...2 Aerion LED...3 Amica 2...4 Amica LED...5 Equation 2...6 Luna LED...7 Veer LED...8 Avenue B & 6 LED...9 Covert Lite... 10 Focus Wall Wash... 11 Seem

More information

Director: David Roark

Director: David Roark Director: David Roark Service Area: The Texas Service Center accepts and processes certain applications and petitions from individuals residing in the following states: Alabama, Arkansas, Connecticut,

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

Class A Office for Lease

Class A Office for Lease Developed by: Class A Office for Lease 120,000 SF of Office Space 200 Parking Space Garage TOTAL SQUARE FEET 120,000 TYPICAL FLOORPLATE 24,000 RSF TOTAL STORIES NINE OFFICE FLOORS FIVE PARKING SPACES 200

More information

National Fact Sheet: FY 2008

National Fact Sheet: FY 2008 The name "Amtrak" is the blending of the words "America" and "track." It is properly used in documents with only the first letter capitalized. The railroad is also known as the National Railroad Passenger

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Contact Orion at if you are not able to locate your agent.

Contact Orion at if you are not able to locate your agent. Alabama Alaska Arizona Arkansas California Colorado Connecticut Delaware District of Columbia Florida Georgia Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan

More information

uickship Guide 2017 Vol. 3

uickship Guide 2017 Vol. 3 uickship Guide 2017 Vol. 3 Index Quickship Policies... 2 Aerion LED... 3 Amica 2... 4 Amica LED... 5 Equation 2... 6 Luna LED... 7 Avenue B & 6 LED... 8 Focus Wall Wash... 9 Seem 2, 4, 4-LP & 6 LED...

More information

Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project

Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project Proposed At-grade Crossings of Officially Recognized Trails Port MacKenzie Rail Extension Project 1.0 Introduction On November 21, 2011 the Surface Transportation Board (STB) issued a final decision (Docket

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Accomplishments in 2013

Accomplishments in 2013 ATTACHMENT Maryland National Capital Park & Planning Commission Montgomery County OPTIONAL SUBMITTAL WITH BUSINESS RECYCLING PLAN AND ANNUAL REPORT Does your Company buy or use any products that contain

More information

TOURS. Day Tours from York Whitby. North York Moors. The Yorkshire Dales.

TOURS. Day Tours from York Whitby. North York Moors. The Yorkshire Dales. TOURS 2018-2019 Day Tours from York Whitby North York Moors The Yorkshire Dales Castle Howard The Lake District 01904 405341 www.mountain-goat.com1 Welcome to Yorkshire 1972 Established in 1972 Small group

More information

AVIATION MAINTENANCE INDUSTRY OUTLOOK & ECONOMIC IMPACT

AVIATION MAINTENANCE INDUSTRY OUTLOOK & ECONOMIC IMPACT AVIATION MAINTENANCE INDUSTRY OUTLOOK & ECONOMIC IMPACT MARCH 16, 2017 David A. Marcontell General Manager CAVOK, a division of Oliver Wyman 1003 Virginia Ave, Suite 300 Atlanta, GA 30354 Direct: +1 404

More information

Travel GPA Report Card - TRAVEL GPA DEMO

Travel GPA Report Card - TRAVEL GPA DEMO The following report card is based on real-time comparison to companies that match your Travel GPA. Travel period: Jan 2007 to Mar 2007 Travel GPA Score TRAVEL GPA DEMO has compiled a Travel GPA of 3.3

More information

SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts

SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts HANDLING FEES 2017 SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts Opérations department Tél : +33 2 99 29 60 04 Fax : +33 2 99 29 60 37 E-Mail : ops@rennes.aeroport.fr

More information

What is Shovel Ready Palm Beach? What is a Shovel Ready Site?

What is Shovel Ready Palm Beach? What is a Shovel Ready Site? What is Shovel Ready Palm Beach? Shovel Ready Palm Beach is one of the first programs of its kind in Florida. Under the program, the BDB identifies vacant commercial and industrial property that is Shovel

More information

Washington Metropolitan Area Transit Authority Services Utilization Study

Washington Metropolitan Area Transit Authority Services Utilization Study Washington Metropolitan Area Transit Authority Services Utilization Study Maryland House Bill 300 Table of Contents Page 2 Executive Summary Slide 3 Notes Slide 4 Metro Systemwide Fact Sheet Slide 5 How

More information