1 Youth Corps Project Report BUREAU OF LAND MANAGEMENT COLORADO STATE OFFICE FISCAL YEAR 2013 Colorado Youth Corps Association 1

2 Table of Contents Program Summary 3 Individual Project Summaries Colorado River Valley Field Office Red Hill, Gypsum, Bocco Trail Construction 5 Little Snake Field Office Vista Trail Construction 7 Royal Gorge Field Office Midland Hills Trail Construction 10 San Luis Valley Field Office Shriver-Wright Trail Project 12 2

3 Program Summary In fiscal year 2014 the Bureau of Land Management funded four youth corps projects in Colorado. Two of the projects were conducted as America s Great Outdoors projects, with one involving multiple project partners. In addition, the remaining two projects were funded by individual field offices. WORK COMPLETED 10 weeks of work were conducted on 4 trail projects in FY 2013 YOUTH CORPS CREWS 3 of 10 CYCA accredited youth corps worked on BLM projects in corpsmembers worked on BLM projects in youth were between the ages of and worked 80 hours or more 2,364 hours of direct labor were provided by corpsmembers in hours were spent in environmental education as part of the project work CORPSMEMBER DEMOGRAPHICS Ethnicity 56% male 44% female 82% White 18% Non-White or Hispanic 82% Mixed or Other 18% Native American Education 43% currently enrolled in high school 33% graduates of 2 or 4 year colleges 10% some college 8% Other 5% high school graduates 1% achieved or are working toward GED Age 41% between % % 25 and older AMERICORPS EDUCATION AWARDS 19 corpsmembers earned AmeriCorps Education Awards Corpsmembers earned $30,9011 in AmeriCorps Education Awards. The awards can be used for college or trade school. 3

4 Program Summary, cont. WORK RESULTS SUMMARY 5.37 miles of trail constructed 1.14 miles of trail maintained 4.08 miles of trail closed/re-vegetated.53 miles of corridor cleared 1 acre of weeds removed 78 bushes planted 59 cairns piled 7 signs installed 84 feet of rock wall installed 13 French drains installed 1 bag of trash picked up SPONSOR FEEDBACK Upon project completion, projects sponsors were sent a Sponsor Evaluation Form. Included in the form was a request for satisfaction ratings and feedback on the corps performance. Satisfaction ratings were based on a scale of 1 to 5, with 1 = Unsatisfied and 5 = Very Satisfied. Of the 13 completed projects: 100% of sponsors said they would use a youth corps crew in the future 100% of sponsors were either Very Satisfied or Satisfied with the crew s performance The average crew rating for all projects was 5.0 Project sponsors were also asked to judge the lasting effect of their project on the community. 10+ years 4 projects 4

5 Red Hill, Gypsum, Bocco Trail Maintenance Colorado River Valley Field Office Youth Corps: Rocky Mountain Youth Corps Number of Weeks: 3 Project Dates: 6/9/13 6/15/13 and 9/22/13 10/2/13 PROJECT SUMMARY Trail construction in the midland hills trail system. The final two days of the project were completed after the government shut down per the request of the sponsor. PROJECT ACCOMPLISHMENTS 4 miles of trail constructed 4 miles of trail re-vegetated/closed 2 signs installed 1 bag of trash picked up SPONSOR FEEDBACK Overall Satisfaction Rating: (5 being very satisfied): 5 Benefits of project will last: More Than 10 Years Is it likely you would use the services of the youth corps again if available? Yes. Greg Wolfgang What worked well in your partnership with the youth corps? The youth corps group was very hard working and flexible. The crew was willing to change their work schedule and adapted to challenging weather and coordinating with a 3rd party contractor. Greg Wolfgang How can the youth corps work to improve its performance? I am very happy with how this project turned out, I don't have any areas for improvement. Greg Wolfgang 5

6 Red Hill, Gypsum, Bocco Trail Maintenance Colorado River Valley Field Office 6

7 Vista Trail Construction Little Snake Field Office Youth Corps: Steamboat Springs Community Youth Corps Number of Weeks: 4 Project Dates: 6/17/13 6/21/13 and 7/29/13 8/16/13 PROJECT SUMMARY The Vista Trail is part of the America s Great Outdoors Program proposal, a BPS project submittal, and the 65 Million Years in 65 Miles self-guided tour. The approximately 6 mile hiking trail would provide scenic overlooks of the Axial Basin within the Little Yampa Canyon SRMA in a juniper forest environment. The trail would connect to a proposed youth/group campground. The Vista Trail would provide one of many recreational infrastructures that are lacking in an area located only 30 miles from the city of Craig, and 15 minutes from the towns of Maybell and Lay. Trail Construction: Phase 1 Construction of approximately 1 mile of trail from the trailhead parking to the handicapped parking area. Construction would also include installation of one interpretive panel. Trail Construction: Phase 2 Construction of approximately 1/2 mile of ADA accessible trail with gravel. Trail Construction: Phase 3 Construction of approximately 2 miles of trail to BLM Road Anticipated construction for around 4 miles would be 4 weeks. The 2 miles to group campground would be completed upon development of the campground. PROJECT ACCOMPLISHMENTS.26 miles of trail constructed.88 miles of trail improved/maintained.36 miles of corridor cleared 1 acre of weeds removed 59 piles of cairns constructed 3 signs installed SPONSOR FEEDBACK Overall Satisfaction Rating: (5 being very satisfied): 5 Benefits of project will last: More than 10 years Is it likely you would use the services of the youth corps again if available? Yes. Gina Robison What worked well in your partnership with the youth corps? Good communication between all parties. Gina Robison How can the youth corps work to improve its performance? Better understanding of working in hot conditions and having more knowledge of heat related injuries and how to prevent. Gina Robison What worked well in your partnership with the youth corps? I love working with the Steamboat Springs Community Youth Corp. I find the quality of work and their dedication is just as good as that of the older groups. Gina Robison Continued 7

8 Vista Trail Construction Little Snake Field Office PROJECT PHOTOS 8

9 Vista Trail Construction Little Snake Field Office PROJECT PHOTOS 9

10 Midland Hills Trail Construction Royal Gorge Field Office Youth Corps: Southwest Conservation Corps Los Valles Number of Weeks: 1 Project Dates: 9/23/13 9/27/13 PROJECT SUMMARY Trail construction in the Midland Hills trail system. PROJECT ACCOMPLISHMENTS.37 miles of trail constructed.26 miles of trail improved/maintained 400 feet of trail re-vegetated/closed 929 feet of corridor cleared 30 bushes planted 84 feet of rock wall installed 13 French drains installed 2 signs installed SPONSOR FEEDBACK Overall Satisfaction Rating: (5 being very satisfied): 5 Benefits of project will last: More Than 10 Years Is it likely you would use the services of the youth corps again if available? Yes. Linda Skinner What worked well in your partnership with the youth corps? Flexibility in planning a project is great in this partnership. There wasn't much pre-planning on this project so when the crew arrived, we walked the project areas and prioritized the tasks. The crew was not real experienced at trail building but the crew leaders brought them up to speed quickly. The project areas were somewhat scattered on different trails. They focused on each section to completion and then moved to the next task. They used their time effectively by splitting the group if the task didn't need as many people. The group adapted extremely well to working with volunteers that came up for one day. My priority was to include the local volunteers and create community and the crew was amazing. Everyone enjoyed the day and accomplished a lot of work. Linda Skinner How can the youth corps work to improve its performance? Maintain your standards in hiring ambitious hard-working youth. Linda Skinner General Comments: The group completed a reroute and improved water drainage that will sustain the trails for many years. Linda Skinner Continued 10

11 Midland Hills Trail Construction Royal Gorge Field Office PROJECT PHOTOS The crew had camera problems so work photos from the project are not available. 11

12 Shriver-Wright Trail Project San Luis Valley Field Office Youth Corps: Southwest Conservation Corps Los Valles Number of Weeks: 2 Project Dates: 6/23/13 7/6/13 PROJECT SUMMARY The Shriver-Wright trail project is located at the Shriver-Wright State Wildlife Area near Monte Vista, CO. It is the State s newest SWA, dedicated to watchable wildlife and all things related to the Rio Grande River. The project is being conducted as an America s Great Outdoors project with multiple partners, including: Colorado Parks and Wildlife, Monte Vista School District, Volunteers for Outdoor Colorado, SCC-LV and a few other NGO s. The SCC-LV portion will include leading volunteer students from the local schools to build trail in the SWA for one week. Additionally, an SCC-LV crew will spend one week performing trail maintenance in the Rio Grande National Forest. PROJECT OUTCOMES 70 Monte Vista middle school students participated in a volunteer service/education day at the Shriver- Wright SWA. There were a total of five stations that student groups rotated between: one station focused on trail work; another was an overview of the Shriver-Wright Memorial Wildlife Area; the remaining three stations were ecology focused including birding and bird ID from Flying Wild, fishing and fish ID, and Sweepnet Exploration with macroinvertebrate ID. The stations were led by 2 or 3 SCC crew leaders with CPW, VOC, BLM, RIGHT folks mixed in as needed. One week of trail work in the Rio Grande National Forest will be completed in calendar year PROJECT ACCOMPLISHMENTS.74 miles of trail constructed 48 bushes planted SPONSOR FEEDBACK Overall Satisfaction Rating: (5 being very satisfied): 5 Benefits of project will last: More than 10 years Is it likely you would use the services of the youth corps again if available? Yes. Sean Noonan What worked well in your partnership with the youth corps? Very solid relationship with SCC. Sean Noonan How can the youth corps work to improve its performance? keep doing what you're doing. Sean Noonan Continued 12

13 Shriver-Wright Trail Project San Luis Valley Field Office PROJECT PHOTOS 13

14 Shriver-Wright Trail Project San Luis Valley Field Office PROJECT PHOTOS 14

15 SUBMITTED BY: Jennifer Freeman Executive Director

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments Summary In 2015, CMC launched a new Stewardship Team program and hired a crew of young (25 and under), natural resource professionals to increase capacity of public land management agencies and coordinate

More information

Kit Carson-Challenger Ridge Trail Project

Kit Carson-Challenger Ridge Trail Project Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated

More information

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015

Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Summary Shelf Road Recreation Area 2015 BLM Annual Report of Rocky Mountain Field Institute Stewardship Under BLM Agreement L12AC20483 November 19, 2015 Managed by the BLM Royal Gorge Field Office, Shelf

More information

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 - Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 Prepared by: Andy Riter, Program Coordinator, and Joe Lavorini,

More information

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013 Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013 Rock wall construction with gabion baskets, East Elk 2013 RMYC Garfield County Crews - End of Session Rocky Mountain

More information

Environment and Natural Resources Trust Fund 2017 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2017 Request for Proposals (RFP) Project Title: Total Project Budget: $ Environment and Natural Resources Trust Fund 2017 Request for Proposals (RFP) Floating Classroom: Connecting 20,000 Youth to Minnesota Waterways Category: Proposed

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary 120 Village Square #9, Orinda, California 94563 www.conservationvip.org info@conservationvip.org Tel: (925) 228-5946 A Non-Profit 501c3 Tax Exempt Organization Volunteer Project Report for May 14-20, 2017

More information

Q1 Did you know that Salt Lake City has a Trails & Natural Lands Program?

Q1 Did you know that Salt Lake City has a Trails & Natural Lands Program? Q1 Did you know that Salt Lake City has a Trails & Natural Lands Program? Answered: 1,457 Skipped: 9 Yes No ANSWER CHOICES Yes No RESPONSES 56.97% 830 43.03% 627 TOTAL 1,457 1 / 31 Q2 My primary reason

More information

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails.

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails. The Idaho Trails Association (ITA) is a non-profit 501(c)3. Mission Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails. Purpose To facilitate the active enjoyment of Idaho

More information

Bob Marshall Wilderness Foundation

Bob Marshall Wilderness Foundation About the Bob Marshall Wilderness Complex Considered by many to be the crown jewel of the wilderness preservation system, the Bob Marshall Wilderness Complex located in Northwestern Montana, is the third

More information

Planning and Managing Tourism in Protected Areas

Planning and Managing Tourism in Protected Areas Planning and Managing Tourism in Protected Areas Mobile Seminar - September 10-25, 2013 CENTER FOR PROTECTED AREA MANAGEMENT AND TRAINING Introduction The Mobile Seminar on Planning and Managing Tourism

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

2019 Work Week Crew. Schedule and Descriptions

2019 Work Week Crew. Schedule and Descriptions 2019 Work Week Crew WAWONA WW1 Mariposa Grove Restoration and Invasive Plant Removal June 2 June 8 YOSEMITE VALLEY YV1 Washington Column Climber s Trail Rehabilitation June 9 June 15 YV2 Weed Warriors/

More information

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer Item 14 DATE: January 19, 2017 TO: FROM: THROUGH: SUBJECT: WCA Governing Board Johnathan Perisho, Project Manager Mark Stanley, Executive Officer Item 14: Consideration of a resolution to accept an acquisition

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014 Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014 OPEN SPACE MATTERS: Boise s First Reserve Master Plan Julia Grant Foothills and Open Space Manager City of Boise Ellen Campfield

More information

2016 Trails Maintenance and Operating Costs

2016 Trails Maintenance and Operating Costs 2016 Trails Maintenance and Operating Costs Motorized Trails Maintenance for motorized trails comes from vehicle registration fees and a portion of the federal Recreation Trails Program (RTP) funds. The

More information

Projects Awarded GOCO Funding in Mesa County

Projects Awarded GOCO Funding in Mesa County Grant Type Fiscal Year Open Space 2016 Project Sponsor Project Title Grant Amount Rocky Mountain Elk Foundation Bull Creek Conservation Easement Acres Conserved $269,500.00 523.89 Open Space 2016 Mesa

More information

March 14, SUBJECT: Public input to the Bureau of Land Management, Gunnison Field Office, Travel Management Plan

March 14, SUBJECT: Public input to the Bureau of Land Management, Gunnison Field Office, Travel Management Plan March 14, 2019 Delivered via email to ewaters@blm.gov Elijah Waters Field Manager BLM Gunnison Field Office Gunnison, CO 81230 SUBJECT: Public input to the Bureau of Land Management, Gunnison Field Office,

More information

2012 Colorado Planning & Management Region Report

2012 Colorado Planning & Management Region Report INTRODUCTION 2012 Colorado Planning & Management Region Report The San Luis Valley in south central Colorado is the largest alpine valley in North America, bordered on the east by the Sangre de Cristo

More information

USGS Efforts to Consolidate Geospatial Data in the Federal Government

USGS Efforts to Consolidate Geospatial Data in the Federal Government ++ 1 USGS Efforts to Consolidate Geospatial Data in the Federal Government An overview of USGS trails collaborations and updates. Date 5/31/2017 Greg Matthews + Introduction USGS The following slides provide

More information

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions!

10/25/2013. What is the SCORP?! 2013 Local Government Survey 2013 Statewide Public Survey Advisory Group Priority Areas Your Suggestions! COLORADO OUTDOOR RECREATION TRENDS RESULTS FROM THE SCORP AND STATEWIDE Colorado Outdoor Recreation Resource Partnership September 2013 PRESENTATION What is the SCORP?! 2013 Local Government Survey 2013

More information

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Peter Axelson. Beneficial Designs, Inc. Minden, NV Peter Axelson Beneficial Designs, Inc. Minden, NV Arroya Sit Ski Mono Ski Dynamic Seating Spring Assist Cross Country Ski Hand Bike Adaptive Canoe Seating Available from Chosen Valley Canoe Accessories

More information

U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application

U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application U.S. Army Corps of Engineers Fiscal Year 2013 Handshake Program Application Please review instructions before completing application! Corps Lake/Project Name:Rathbun Lake/ North Shore Trail Handshake Proposal

More information

South Colony Basin Recreation Fee Proposal

South Colony Basin Recreation Fee Proposal South Colony Basin Recreation Fee Proposal Purpose and Need for Collecting Fees in South Colony Basin: Forest Service appropriated funds have not been sufficient to maintain current recreational services

More information

Central Wasatch Visitor Use Study STEVEN W. BURR, PH.D. AND CHASE C. LAMBORN, M.S. INSTITUTE FOR OUTDOOR RECREATION AND TOURISM UTAH STATE UNIVERSITY

Central Wasatch Visitor Use Study STEVEN W. BURR, PH.D. AND CHASE C. LAMBORN, M.S. INSTITUTE FOR OUTDOOR RECREATION AND TOURISM UTAH STATE UNIVERSITY Central Wasatch Visitor Use Study STEVEN W. BURR, PH.D. AND CHASE C. LAMBORN, M.S. INSTITUTE FOR OUTDOOR RECREATION AND TOURISM UTAH STATE UNIVERSITY Utah State University s Institute for Outdoor Recreation

More information

MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS

MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS PAU L P U R M A N M I N N E S OTA D E PA R T M E N T O F N AT U R A L R E S O U R C E S, PA R K S & T R A I L S L EG 5/15/2016 1 A

More information

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS 13 REGIONAL TOURISM T he County of Mariposa s recreation needs and facilities fall within two categories: regional tourism and local recreation. This Element focuses on regional tourism issues related

More information

BOISE RIDGE TO RIVERS FOURTH QUARTER PARTNERSHIP MEETING DEPARTMENT OF PARKS AND RECREATION TUESDAY, JULY 25 TH :00 A.M.

BOISE RIDGE TO RIVERS FOURTH QUARTER PARTNERSHIP MEETING DEPARTMENT OF PARKS AND RECREATION TUESDAY, JULY 25 TH :00 A.M. BOISE RIDGE TO RIVERS FOURTH QUARTER PARTNERSHIP MEETING DEPARTMENT OF PARKS AND RECREATION TUESDAY, JULY 25 TH 2017 8:00 A.M. Partners present: Sara Arkle, Boise City Parks and Recreation (City); Doug

More information

Projects Awarded GOCO Funding in El Paso County

Projects Awarded GOCO Funding in El Paso County Grant Type Fiscal Year Sponsor Title Grant Amount Acres Conserved Inspire 2016 City of Colorado Springs Out the Door Pikes Peak! $75,000.00 0 Parks 2016 Colorado State Parks 2016 City of Manitou Springs

More information

The Frank Church River of No Return Wilderness

The Frank Church River of No Return Wilderness ALLIANCE FOR WILDERNESS EDUCATION AND STEWARDSHIP PO Box 2667, Bellingham, WA 98227-2667 Tele: 360-927-1804 Fax: 360-527-9679 bradt@wildernessalliance.org www.wildernessalliance.org STEWARDS OF AMERICA

More information

FREMONT ADVENTURE RECREATION

FREMONT ADVENTURE RECREATION FREMONT ADVENTURE RECREATION YEAR END REPORT 2017 Fremont Adventure Recreation Contributor Opportunities 2018 1 MISSION FAR s mission is to promote a culture of community and healthy living through human-powered

More information

PARKS CONNECTING PEOPLE WITH NATURE R.J. CARDIN, DIRECTOR MARICOPA COUNTY PARKS AND RECREATION DEPT.

PARKS CONNECTING PEOPLE WITH NATURE R.J. CARDIN, DIRECTOR MARICOPA COUNTY PARKS AND RECREATION DEPT. PARKS CONNECTING PEOPLE WITH NATURE R.J. CARDIN, DIRECTOR MARICOPA COUNTY PARKS AND RECREATION DEPT. BUCKEYE HILLS PARK AGREEMENTS: Department enters into Special Use Permit to allow Arizona State Rifle

More information

S Central Coast Heritage Protection Act APRIL 21, 2016

S Central Coast Heritage Protection Act APRIL 21, 2016 STATEMENT OF GLENN CASAMASSA ASSOCIATE DEPUTY CHIEF, NATIONAL FOREST SYSTEM U.S. FOREST SERVICE U.S. DEPARTMENT OF AGRICULTURE BEFORE THE UNITED STATES SENATE COMMITTEE ON ENERGY AND NATURAL RESOURCES

More information

Backpacking and Hiking LEAVE NO TRACE

Backpacking and Hiking LEAVE NO TRACE Backpacking and Hiking LEAVE NO TRACE Activity Plan Hiking Series ACTpa014 Project Skills: Learn the seven principles of Leave No Trace (LNT) Develop a skit that demonstrates LNT principles Life Skills:

More information

All About Ecotourism. Special thanks to Rosemary Black Charles Sturt University, Australia 1. Tourism largest business sector in the world economy

All About Ecotourism. Special thanks to Rosemary Black Charles Sturt University, Australia 1. Tourism largest business sector in the world economy All About Ecotourism By: Ed Krumpe & Rosemary Black, Charles Sturt University, Australia Tourism largest business sector in the world economy Impact Directly Employs 98 million & Generates $2 trillion

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

2017 Citizen's Survey

2017 Citizen's Survey 2017 Citizen's Survey Welcome to the 2017 City of Palm Coast Citizen's Survey It won t take much of your time to make a big difference! Please help us shape the future of Palm Coast and help make decisions

More information

National Scenic Byways Program US Department of Transportation

National Scenic Byways Program US Department of Transportation 1 2 National Scenic Byways Program US Department of Transportation Abstract The Cowlitz-Wahkiakum Council of Governments in partnership with Cowlitz, Skamania and Lewis Counties and the U.S. Forest Service,

More information

Economic Impact of Rock Climbing in the Nantahala and Pisgah National Forests

Economic Impact of Rock Climbing in the Nantahala and Pisgah National Forests Economic Impact of Rock Climbing in the Nantahala and Pisgah National Forests JA MES N. M A PLES, PhD MICH A EL J. BR A DLEY, PhD Image Credit: Justin Costner Report submitted to Outdoor Alliance on August

More information

Tourism and Recreation Directions and Challenges

Tourism and Recreation Directions and Challenges Tourism and Recreation Directions and Challenges Norma Nickerson, Director Institute for Tourism & Recreation Research College of Forestry and Conservation University of Montana What is the Economic contribution

More information

Comanche National Grassland, Timpas Unit

Comanche National Grassland, Timpas Unit Comanche National Grassland, Timpas Unit Heritage Resources More than 540 sites are eligible for listing on the National Register of Historic Places (NRHP) by Forest Service staff and/or the Colorado State

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018

PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018 PALO CORONA REGIONAL PARK MPRPD BOARD MEETING AUGUST 8, 2018 ACKNOWLEDGEMENTS AGENCIES AND ORGANIZATIONS The Trust for Public Land Big Sur Land Trust Santa Lucia Conservancy California State Parks Point

More information

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project R-16-26 Meeting 16-06 March 9, 2016 AGENDA ITEM AGENDA ITEM 6 Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project GENERAL MANAGER S RECOMMENDATIONS 1. Direct

More information

Creating a User-Driven Long-Distance OHV Trail Through Partnering

Creating a User-Driven Long-Distance OHV Trail Through Partnering Joseph Raffaele Outdoor Recreation Planner U.S. Bureau of Land Management Yuma, Arizona Creating a User-Driven Long-Distance OHV Trail Through Partnering BLM is a multiple-use land management agency within

More information

Summer 2013 Dalton Highway Recreation Study

Summer 2013 Dalton Highway Recreation Study Summer 2013 Dalton Highway Recreation Study Implications for Recreation and Visitor Services Planning Peter J Fix School of Natural Resources and Extension University of Alaska Fairbanks OLLI Session 2

More information

Raystown Lake Handshake Awards

Raystown Lake Handshake Awards Handshake Awards Allen Gwinn Park Ranger 2/24/2011 U.S. US Army Corps of of Engineers BUILDING STRONG 2004 Old Logger s Trail Wayside Exhibits 2006 NWTF Habitat Restoration 2008 Raystown Conservation Education

More information

Margaret N. Rees University of Nevada, Las Vegas,

Margaret N. Rees University of Nevada, Las Vegas, Get Outdoors Nevada Public Lands Institute 6-30-2011 Nevada Interagency Volunteer Program: Helping Hands Across Public Lands Phase II: Quarterly Progress Report, Period Covering April 1, 2011-June 30,

More information

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for AUBURN LAKE TRAILS FIRE SAFE COUNCIL ACTIVITIES Prepared for Inclusion in the: EL DORADO COUNTY FIRE SAFE COUNCIL Community Wildfire

More information

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA Equestrian Trails, Inc. Corral 357 P.O. Box 1026 Trabuco Canyon, CA 92678 http://saddlebackcanyonriders.com/ President: James Iacono... 714-612-1789 January 14, 2016 Orange County Transportation Authority

More information

U.S. Army Corps of Engineers Fiscal Year 2017 Handshake Program Application

U.S. Army Corps of Engineers Fiscal Year 2017 Handshake Program Application U.S. Army Corps of Engineers Fiscal Year 2017 Handshake Program Application Please review instructions before completing application! Corps Lake/River Project Name: Pearson Skubitz Big HIll Lake District

More information

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES

LAND FOR SALE SUBDIVISION LAND: SFR DEVELOPMENT LAND OF ±100 HOMES Ave 13 1/2, Madera, CA PROPERTY FEATURES SALE PRICE: $1,795,000 PRICE PER LOT: $18,505 PRICE PER SF: $2.35 LOT SIZE: 17.48 Acres APN #: 034-151-018 & -019 ZONING: PUD 6,000 R-1 Residential MARKET: City Of Madera PROPERTY FEATURES Shovel-ready

More information

Adopt a Trail Blue Ridge Parkway

Adopt a Trail Blue Ridge Parkway Adopt a Trail Blue Ridge Parkway THANK YOU Thank You for volunteering to maintain a trail with the Adopt-A-Trail program! You are helping to keep these trails open for public use and enjoyment. We couldn

More information

November 11, Subject: Public Scoping Meeting November 9, 2016 Public Comments and Response. Dear Ken:

November 11, Subject: Public Scoping Meeting November 9, 2016 Public Comments and Response. Dear Ken: November 11, 2016 Mr. Ken Nichols City and Borough of Juneau Juneau International Airport Planning, Design and Construction 1873 Shell Simmons Dr., Ste. 200 Juneau, Alaska 99801 Subject: Public Scoping

More information

COLORADO PARKS AND WILDLIFE DIVISION

COLORADO PARKS AND WILDLIFE DIVISION COLORADO PARKS AND WILDLIFE DIVISION RTP Funding Rescission, Grant Funding Recommendations Nick Dellaca 02/01/2019 TOPIC PREPARED BY DATE ACTION INFORMATION DRAFT FINAL X ITEM ITEM X_ COPY COPY PURPOSE:

More information

Tourism Impacts and Second Home Development in Coastal Counties: A Sustainable Approach

Tourism Impacts and Second Home Development in Coastal Counties: A Sustainable Approach Tourism Impacts and Second Home Development in Coastal Counties: A Sustainable Approach Brunswick, Currituck and Pender Counties, North Carolina (Funded by North Carolina Sea Grant) Center for Sustainable

More information

TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS

TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS TAYLOR CANYON RANCH COLORADO - ROUTT COUNTY - STEAMBOAT SPRINGS Tucked up against the steep valley shaped by Mt. Pau and rising to the Routt National Forest, Taylor Canyon Ranch is an easily accessible,

More information

Regional Collaboration for Natural Heritage Tourism on the Lower Mississippi River

Regional Collaboration for Natural Heritage Tourism on the Lower Mississippi River Regional Collaboration for Natural Heritage Tourism on the Lower Mississippi River Alan W. Barton Ashford University G. Reid Bishop Belhaven University Project Summary The Mississippi River Field Institute

More information

Lewis and Clark Recreation Area

Lewis and Clark Recreation Area Lewis and Clark Recreation Area Bicycle/Pedestrian Trail Also part of the Pierson Ranch Recreation Area trail Type of trail: Walking, biking and rollerblading Trail surface: Asphalt Rated: Mostly flat.

More information

Mission & Goals Stewardship Partnerships University of Idaho Wilderness Lecture 18 February 2014 Mission

Mission & Goals Stewardship Partnerships University of Idaho Wilderness Lecture 18 February 2014 Mission Mission & Goals Stewardship Partnerships University of Idaho Wilderness Lecture 18 February 2014 Mission 2 1 Who We Are: 501(c)3 non-profit wilderness stewardship organization Non-political non-advocacy

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Connecting Over 11,000 Students to the Boundary Waters Category: C. Environmental Education ENRTF ID: 124-C

More information

Lewis and Clark National Historic Trail

Lewis and Clark National Historic Trail National Trails System Land and Water Conservation Fund FY2014 Lewis and Clark National Historic Trail Total LWCF Request: $ 3,130,000 Project Name Agency District # Tracts Acres Total Cost Columbia River

More information

Maryland State Parks Diversity and Inclusion Efforts: Staff Perspectives and Media Reporting

Maryland State Parks Diversity and Inclusion Efforts: Staff Perspectives and Media Reporting Maryland State Parks Diversity and Inclusion Efforts: Staff Perspectives and Media Reporting Natalia Buta, Ph.D. Associate Professor, Frostburg State University University System of Maryland Objectives

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

5th Level Subagency Report. OSD, Agencies and Activities DIRECTOR CLINICAL SPT

5th Level Subagency Report. OSD, Agencies and Activities DIRECTOR CLINICAL SPT 5th Level Subagency Report OSD, Agencies and Activities This 2017 Federal Employee Viewpoint Survey Report provides summary results for your subagency, including comparisons to your department or agency.

More information

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,

April 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

City of Sierra Madre STUDY AREA PROFILE

City of Sierra Madre STUDY AREA PROFILE City of Madre STUDY AREA PROFILE STUDY AREA ID #112 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM

More information

Rogue River Access and Management Plan Draft Alternatives

Rogue River Access and Management Plan Draft Alternatives Rogue River Access and Management Plan Draft Alternatives The Rogue River Access and Management Plan was initiated in December, 2011 and is being led by Jackson County Parks (JCP) and Oregon Department

More information

$850,000 Awarded to 20 Organizations

$850,000 Awarded to 20 Organizations $850,000 Awarded to 20 Organizations The Conservation Alliance is pleased to fund the following organizations to support their efforts to protect wild lands and waterways for their habitat and recreation

More information

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Bear Creek Watershed Restoration Project Final Project Report December 21, 2016 Dedicated to the conservation and stewardship of public lands in Southern Colorado Rocky Mountain Field Institute 815 South

More information

Rating: 5.0 (scale of 1-10)

Rating: 5.0 (scale of 1-10) 95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017 Parks, Recreation, and Community Services Mission: The mission of the City of Rio Rancho s Department of Parks, Recreation, & Community Services is to create and maintain spaces and activities that grow

More information

TWO NIGHT AGENDA. Wednesday Oct Big Ideas, Big Goals Who wants to eat the cake?

TWO NIGHT AGENDA. Wednesday Oct Big Ideas, Big Goals Who wants to eat the cake? TWO NIGHT AGENDA Wednesday Oct. 27 - Big Ideas, Big Goals Who wants to eat the cake? Survey and background info Case studies Promising projects Thursday Oct. 28 - Making it Real Who wants to help make

More information

APPENDIX A: Survey Instruments

APPENDIX A: Survey Instruments Three different surveys were conducted during the research phase of the NCHA Trails Study. One questionnaire was designed for elected officials and user groups (general public). The other two questionnaires

More information

Internship Announcement. Mount Rainier National Park. NPS Academy Internships 6 Positions. Please Respond By March 1, 2019

Internship Announcement. Mount Rainier National Park. NPS Academy Internships 6 Positions. Please Respond By March 1, 2019 NPS Academy Mount Rainier National Park Internship Announcement Mount Rainier National Park NPS Academy Internships 6 Positions Please Respond By March 1, 2019 The Northwest Youth Corps (NYC), in partnership

More information

State Park Visitor Survey

State Park Visitor Survey State Park Visitor Survey Methods, Findings and Conclusions State s Department of Recreation, Park and Tourism Management surveyed state park visitor and trip characteristics, and collected evaluations

More information

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012 Conservation Volunteers International Program 120 Village Square #9 Orinda, California 94563 USA www.conservationvip.org A Non-Profit 501c3 Tax Exempt Organization CST 2089890-40 Volunteer Project Trip

More information

National Park Friends Alliance Meeting Fall 2017: Acadia National Park AGENDA

National Park Friends Alliance Meeting Fall 2017: Acadia National Park AGENDA National Park Friends Alliance Meeting Fall 2017: Acadia National Park Hosted by: Friends of Acadia Acadia National Park National Park Foundation October 17-19, 2017 AGENDA DAY ONE TUESDAY, OCTOBER 17

More information

Cedar Rapids Area Convention and Visitors Bureau Visitor Study

Cedar Rapids Area Convention and Visitors Bureau Visitor Study Cedar Rapids Area Convention and Visitors Bureau Visitor Study 2003-2004 University of Northern Iowa Sustainable Tourism & The Environment Program www.uni.edu/step Project Directors: Sam Lankford, Ph.D.

More information

Tourism Impacts and Second Home Development in Pender County: A Sustainable Approach

Tourism Impacts and Second Home Development in Pender County: A Sustainable Approach Tourism Impacts and Second Home Development in Pender County: A Sustainable Approach (Funded by North Carolina Sea Grant) Center for Sustainable Tourism Division of Research and Graduate Studies East Carolina

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

Central Cascades Wilderness Strategies Project

Central Cascades Wilderness Strategies Project Central Cascades Wilderness Strategies Project Wilderness is Unique What makes designated Wilderness different from other national forest lands? Wilderness Act of 1964 to assure that an increasing population

More information

Royal Gorge Far Out Trail to Le Point

Royal Gorge Far Out Trail to Le Point Royal Gorge Far Out Trail to Le Point Direction to trailhead: From East Ridge Campground: Drive west from Canon City on US 50 to County Road 3A, the entrance road to the Royal Gorge Park. Turn left onto

More information

Pompeys Pillar. National Monument

Pompeys Pillar. National Monument Pompeys Pillar BLM National Monument Pompeys Pillar Interpretive Center Billings Field Office National Landscape Conservation System FY 2010 Manager s Report Pompeys Pillar National Monument FY2010 Manager

More information

TRAIL STEWARDSHIP VOLUNTEER VALUE $41, VOLUNTEERS VOLUNTEER HOURS MILES IMPROVED

TRAIL STEWARDSHIP VOLUNTEER VALUE $41, VOLUNTEERS VOLUNTEER HOURS MILES IMPROVED TRAIL STEWARDSHIP 2017 VOLUNTEERS 58 VOLUNTEER VALUE $41,951.56 VOLUNTEER HOURS 2217 MILES IMPROVED 26 MWA Trail Stewardship in 2017 This summer, Volunteer Trail Crews continued Montana Wilderness Association

More information

PERITO MORENO NATIONAL PARK

PERITO MORENO NATIONAL PARK SUSTAINABLE TRAIL DEVELOPMENT AND EDUCATION IN PATAGONIA: PERITO MORENO NATIONAL PARK 2018 SUSTAINABLE TRAIL CONFERENCE, STONEWALL RESORT, WV PRESENTED BY JED TALBOT, OBP TRAILWORKS, LLC SUMMARY OF THE

More information

Chapter 8: Colorado Plateau State Highway 141, Dove Creek to Naturita

Chapter 8: Colorado Plateau State Highway 141, Dove Creek to Naturita State Highway 141 Dove Creek to (61 miles) Summary: Highway 141 heads north from US Highway 491 about two miles northwest of the town of Dove Creek. Initially, the highway runs through gently rolling farming

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014

DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014 DELIVERING REAL ECONOMIC BENEFITS THROUGH TRANSPORT PARTNERSHIPS ANDREW CLEAVES MARCH 2014 Overview Our international experience is that public transport works best when it is delivered in Partnership

More information

CITY OF BULLHEAD CITY

CITY OF BULLHEAD CITY CITY OF BULLHEAD CITY COUNCIL COMMUNICATION MEETING DATE: June 7, 2016 SUBJECT: Bullhead City River Access- City streets/rights of ways DEPT OF ORIGfN: Office of the City Manager DATE SUBMITTED: May 30,2016

More information