Annual Listing of Projects with Federal Funding Obligated for Federal Fiscal Year 2016
|
|
- Beverly Shepherd
- 5 years ago
- Views:
Transcription
1 Atlanta Regional Commission Annual Listing of Projects with Federal Funding Obligated for Federal Fiscal Year 2016 On December 4 th, 2015, President Obama signed into law the Fixing America s Surface Transportation Act (FAST Act) which allocates federal funding for surface transportation programs over fiscal years 2016 through Per 23 U.S.C. 134(j)(7)(B) of FAST Act, states and Metropolitan Planning Organizations (such as the Atlanta Regional Commission) must publish annual lists of projects where federal funds were obligated. Specifically, states and MPOs must produce: An annual listing of projects, including investments in pedestrian walkways and bicycle transportation facilities, for which Federal funds have been obligated in the preceding year shall be published or otherwise made available by the cooperative effort of the State, transit operator, and metropolitan planning organization for public review. 1 To address this requirement, this report lists all transportation projects in the Metro Atlanta MPO boundary that were obligated during Federal Fiscal Year 2016 (October 1, 2015 September 30, 2016). One of the requirements of FAST Act is that government spending on transportation must become more transparent to State and Local Officials, as well as the public. The obligated list of projects must be developed through a cooperative effort with the metropolitan planning organization (MPO), state and public transportation operators responsible for tracking project authorizations and obligations spent during the immediately preceding fiscal year. Obligation is defined as the Federal government s legal commitment to pay the Federal share of a project s cost. An obligated project is one that has been authorized by the federal agency and funds have been obligated. Projects for which funds have been obligated are not necessarily initiated or completed in the program year, and the amount of the obligation will not necessarily equal the total cost of the project. For FTA projects, obligation occurs when the FTA grant is awarded. For FHWA projects, obligation occurs when a project agreement is executed and the State/grantee requests that the funds be obligated. Please contact Patrick Bradshaw at pbradshaw@atlantaregional.com Courtland St NE, Atlanta, GA U.S.C. 134(j)(7)(B)
2 PROJECT FEDERAL S AR LIVABLE CENTERS INITIATIVE (LCI) STUDIES - FY 2016 Special Studies Atlanta Regional Commission PE M230 $1,000,000 AR COUNTY COMPREHENSIVE TRANSPORTATION PLAN ASST PROG - FY 2016 Planning PE M230 $2,250,000 AR TRANSPORTATION DEMAND MGT EMPLOYER SERVICES PROG - FY 2016 Preliminary Engineering Atlanta Regional Commission PE L400 $3,463,783 AR RESHARING & REGIONAL TDM PROGRAMS - FY Miscellaneous s Atlanta Regional Commission PE L400F $4,100,000 AR LUMP SUM REGIONWE SIGNAL UPGRADE PROGRAM Signals CST Z400S $10,240,800 AR INCENT MANAGEMENT & SUPPORT PROGRAM STATEWE - FY 2016 ATMS/ITS CST Z001 $8,000,000 AR LUMP SUM REGIONAL TRAFFIC SIGNAL OPTIMIZATION Signals CST Z240 $18,800,000 AR TOWING & RECOVERY INCENTIVE PROGRAM (TRIP) - FY 2016 Miscellaneous s CST L400S $400,000 AR ADVANCED TRAFFIC INCENT MANAGEMENT (TIM) - FY 2016 Preliminary Engineering PE L240 $360,000 AR-450A BELT LINE CORROR FM LINDBERGH CENTER TO 10TH ST/MONROE DR Atlanta Development Authority PE M301 $856,374
3 PROJECT FEDERAL S AR-450C BELT LINE CORROR FROM GLENWOOD AVE TO UNIVERSITY AVE Atlanta Development Authority PE M230 $740,000 AR-450C BELT LINE CORROR FROM GLENWOOD AVE TO UNIVERSITY AVE Atlanta Development Authority PE Z301 $1,500,000 AR-490A ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST Transit Facilities Atlanta PE Z230 $2,800,000 AR REGIONAL TRANSIT VISION UPDATE Planning Atlanta Regional Commission SCP Z230 $500,000 AR GRTA - XPRESS BUS MAINTENANCE & REHABILITATION Transit Projects Atlanta Regional Commission CST Z230 $1,391,263 AR AR AR-957A SR 400; INC CD LNS FM ROSWELL RD TO ASHFORD DUNWOODY SR 400; INC CD LNS FM ROSWELL RD TO ASHFORD DUNWOODY SR 400; INC CD LANES & ABERNATHY ROAD INTERCHANGE Interchange ROW M001 $42,520,000 Interchange ROW M230S $40,000,000 Interchange CST M001 $17,568,160 AR-ML I-75/I-575 MANAGED LANES IN COBB & CHEROKEE Managed Lanes CST Z001 $40,000,000 AT SR 8/US 29 FROM CS 520/BOULEVARD DR/MONROE DR TO SR 10 - LCI Atlanta Development Authority ROW Z230 $1,720,000
4 PROJECT FEDERAL S AT SR 141/PTREE RD CORR IMP FM SHADOWLWN AVE TO MAPLE DR - LCI Median Work Buckhead C ROW M230 $1,252,800 AT TRANSIT REAL TIME ARRIVAL INFORMATION PILOT PROGRAM Miscellaneous s Atlanta CST L400 $300,000 AT SR ABANDONED CSX RAILROAD IN WEST ATLANTA Bridges PE Z240 $640,000 AT UNIVERSITY AVE SCOPING STUDY Special Studies Atlanta SCP Z230 $160,000 AT AT AT LENOX ROAD CORROR SCOPING STUDY MTOWN ATL COMMUNICATIONS & DETECTION VARIOUS LOCS 15TH STREET EXTENSION FROM SR 9 TO CS 673/WILLIAMS STREET Special Studies Atlanta SCP L230 $200,000 Signals CST Z230 $752,000 Roadway Project Atlanta PE Z230 $188,625 BA SR CR 97/ED HOGAN ROAD Barrow County CST M230 $1,082,400 BA SR 316/US SR 81 Interchange ROW M001 $6,536,000 BA SR MDLE OCONEE RIVER 5 MI NE OF STATHAM Bridges PE M240 $200,000
5 PROJECT FEDERAL S CH-020A SR 20 FROM I-75/BARTOW TO I- 575/CHEROKEE Widening PE Z001 $3,809,067 CH SR BOARD TREE CREEK Bridges PE L1C0 $180,722 CH SR BOARD TREE CREEK Bridges PE M240 $75,917 CH CHEROKEE COUNTY COUNTYWE SIGNAL TIMING PROJECT Signals Cherokee County CST M400 $700,000 CH CH CL-020A CL-020A CL HOLLY SPRINGS INDUSTRIAL DRIVE EXTENSION STUDY NOONDAY CREEK TRAIL CONNECTOR FEASIBILITY STUDY- SCOPING ONLY CR 1337/FLINT RIVER RD FM GLENWOOD DR TO KENDRICK RD - GRTA CR 1337/FLINT RIVER RD FM GLENWOOD DR TO KENDRICK RD - GRTA GODBY ROAD FROM CR 246/SOUTH HAMPTON ROAD TO SR 314 Special Studies Holly Springs SCP L230 $160,000 Special Studies Cherokee County SCP M301 $96,000 Widening Clayton County CST M230 $930,088 Widening Clayton County CST M230S $2,860,000 Widening Clayton County CST Z230 $3,233,914 CL CONLEY ROAD EXTENSION FEASIBILITY STUDY Special Studies Clayton County PE L230 $280,000
6 PROJECT FEDERAL S CL-AR I-75 NB CD SYSTEM FROM SR 331 TO I-285 Ramp ROW Z001 $1,480,000 CO SR SR 120 ALT Marietta CST M400 $1,084,679 CO SR 3/US SR 120 ALT Marietta ROW L400 $798,800 CO SR CS 4538/WINDY HILL ROAD Operational Cobb County CST Z240 $1,581,920 CO ROTTENWOOD CREEK TRAIL FM ALUMNI DR TO FRANKLIN RD - I Marietta PE M301 $400,000 CO SR 280 FROM WINDY HILL ROAD TO CONCORD ROAD - CORROR STUDY Special Studies Smyrna SCP Q23 $120,000 CO CCT - FIXED ROUTE BUS REPLACEMENT Transit Projects Cobb County CST Z230 $1,391,263 CW SR CR 74/PYLANT ST & CR 74/PYLANT DEAD OAK CREEK Senoia PE M230 $120,000 CW SENOIA MULTI-USE PATH FM IVY TO SEAVY - PATH FORWARD PROGRAM Senoia PE M301 $140,000 CW SR BEAR CREEK 3.5 MI SE OF MORELAND Bridges PE Z240 $400,000
7 PROJECT FEDERAL S CW CW CW-AR SR 34 FROM I-85 SB RAMP TO SR 34 BYPASS JACKSON; JEFFERSON; CLARK & BULLSBORO TRAFFIC SEGMENT STUDY CR 103/POPLAR ROAD - NEW INTERCHANGE Roadway Project PE L230 $320,000 Special Studies Newnan SCP 33C $75,000 Interchange Coweta County CST M001 $24,037,641 DK SR SR 42 PE M240 $800,000 DK CR 5149/KEY RD & CR 78/CONSTITUTION ENTRENCHMENT CREEK Bridges Dekalb County CST Z230 $1,287,999 DK ST AVE; 2ND ST; 4TH ST & LYNBURN DR IN TUCKER - PH II - LCI Dekalb County ROW Z230 $575,000 DK CS 796/ROCKBRGE ROAD FROM ALLGOOD ROAD TO ROWLAND ROAD Widening Dekalb County ROW LY20 $296,000 DK WESTSE CONNECTOR STUDY Special Studies Dunwoody SCP L230 $200,000 DK MEDICAL CTR TO DUNWOODY MARTA BIKE/PED &TRANSIT CONNECTIVITY Dekalb County CST Z230 $3,300,000 DK MEDICAL CTR TO DUNWOODY MARTA BIKE/PED &TRANSIT CONNECTIVITY Dekalb County ROW Z230 $541,985
8 PROJECT FEDERAL S DO CR 817/LEE ROAD/SOUTH SWEETWATER RD - I - GRTA Widening Douglas County PE L230 $453,600 DO SR 5 FROM CS 736/STEWART PKWY TO CS 857/CONCOURSE PKWY Roadway Project Douglas County PE L230 $81,114 DO SR 6/US 278 FROM I-20/DOUGLAS TO GARRETT ROAD/COBB Roadway Project Douglas County CST L400 $1,504,590 FA CR 360/MCINTOSH FLINT FAYETTE/SPALDING CO LINE Bridges Fayette County CST Z230 $2,559,327 FA CR 875/SR 85 CONN; CR 359/BROOKS ROAD & CR 364/EBENEZER ROAD Resurface & Maintenance Fayette County CST L230 $745,600 FA WEST FAYETTEVILLE PATH FROM SR 54 TO CS 894/LESTER ROAD Fayette County PE M301 $320,000 FA SR WHITEWATER CREEK Bridges PE Z240 $400,000 FA SR 74 FROM SR 14/US 29 TO SR 54 - CORROR STUDY Special Studies Fayette County SCP L230 $312,000 FN-232B FN SR LITTLE FULTON/CHEROKEE COUNTY LINE SR 9 FROM SR 120 TO CHATTAHOOCHEE RIVER IN ROSWELL Bridges ROW L1C0 $936,000 Widening Roswell PE Z001 $400,000
9 PROJECT FEDERAL S FN SR 9 FROM SR 120 TO CHATTAHOOCHEE RIVER IN ROSWELL Widening Roswell PE Z230 $800,000 FN CS 243/SANDY SPRINGS CIR FM HAMMOND TO MT VERNON - PH II-LCI Sandy Springs ROW Z230 $2,160,000 FN-281A SR 120; MCGINNIS FERRY RD &STATE BRGE RD-ITS SYS EXPANSION ITS Johns Creek CST Q92 $468,320 FN SR 9 FROM VERNON WOODS DRIVE TO CHASTAIN DRIVE ITS Sandy Springs CST L400 $1,241,474 FN-288A CS 107/BARNWELL ROAD FROM SR 140 TO CS 2511/NIBLICK DRIVE Turn Lanes Johns Creek PE Q92 $166,680 FN-288A CS 107/BARNWELL ROAD FROM SR 140 TO CS 2511/NIBLICK DRIVE Turn Lanes Johns Creek PE Z230 $80,000 FN SR 120 FM CS 65/JONES BRGE RD TO CS 79/PARSON RD- II Multi-use Trail Johns Creek CST M230 $2,640,000 FN SR 120 FM CS 65/JONES BRGE RD TO CS 79/PARSON RD- II Multi-use Trail Johns Creek CST Q92 $2,724,028 FN JOHNS CREEK CITYWE ITS SYSTEM EXPANSION ITS Johns Creek CST M400 $1,416,847 FN CS 9284/WINDWARD PKWY FROM SR 400 TO SR 9 IN ALPHARETTA Widening Alpharetta PE Z230 $800,000
10 PROJECT FEDERAL S FN CS 262/HAMMOND DR FM SR 9 TO BARFIELD RD - FEASIBLITIY STUDY Special Studies Sandy Springs SCP L230 $240,000 FN PATH 400 TRAIL EXT FROM LORANS DR TO SANDY SPRINGS CL Sandy Springs PE Z230 $144,000 FN PATH 400 TRAIL EXT FROM LORANS DR TO SANDY SPRINGS CL Sandy Springs PE Z301 $496,000 FS CR 1374/BUTNER CR 1386/STONEWALL TELL ROAD Roundabout Fulton County ROW LY10 $35,400 FS SR 3 FM CS 8028/SOUTH CENTRAL AVE TO CS 3118/NORTH AVE - LCI Hapeville CST Z230 $1,365,247 FS CLEVELAND AVE; SYLVAN RD; VIRGINIA AVE & NORMAN BERRY DRIVE Resurface & Maintenance East Point CST Z230 $1,828,000 FS GLOBAL GATEWAY CONNECTOR Multi-use Trail College Park PE M301 $535,626 FS SR 14/US CSX #638610Y 2.6 MI NE OF UNION CITY Bridges PE L050 $400,000 FS-AR SR 74/SENOIA ROAD Interchange Fairburn PE Z230 $681,600 FT SR SETTINGDOWN CREEK 6 MI N OF CUMMING Bridges PE M240 $240,000
11 PROJECT FEDERAL S FT SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS Passing Lanes Forsyth County PE HY20S $113,170 FT SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS Passing Lanes Forsyth County PE LY20S $126,830 FT SR 369 FM CHEROKEE COUNTY LINE TO HIGHTOWER CIRCLE-TRUCK LNS Passing Lanes Forsyth County PE M230 $800,000 GW-099C SR 13 FROM CS 1120/SAWNEE AVE/GWINNETT TO SR 347/HALL Widening Buford CST Z240 $8,093,014 GW CONNECTOR ST FROM HEWATT RD TO BRITT DR; INC PARKWOOD RD Roadway Project Highway 78 C ROW Z230 $2,000,000 GW CS 1178/SOUTH LEE ST FM SR 13 TO CS 1086/WEST MORENO STREET Buford CST M230 $3,116,784 GW SR 13 FROM CR 613/SIMPSON CIR TO CR 9010/N BERKELEY LAKE RD Gwinnett County ROW L230 $368,000 GW I-85 FM N OF CR 134/HAMILTON MILL ROAD TO N OF SR 211 Widening PE L050 $3,028,480 GW SR PEACHTREE INDUSTRIAL BLVD Operational CST Z001 $367,200 GW SR PEACHTREE INDUSTRIAL BLVD Operational CST Z230 $840,420
12 PROJECT FEDERAL S GW ROGERS CHATTAHOOCHEE RIVER - PEDESTRIAN BRGE Bridges Duluth PE M301 $400,000 GW SR 141 FM CHATTAHOOCHEE RIVER TO HOLCOMB BRGE RD STUDY Special Studies Peachtree Corners SCP Q23 $200,000 GW INNOVATION DISTRICT MULTI-USE TRAIL STUDY Special Studies Peachtree Corners SCP M301 $120,000 GW GCT - PURCHASE PARATRANSIT VEHICLES Equip. Purchase Gwinnett County CST Z230 $427,563 GW-AR HOSPITAL DRIVE CONNNECTOR ROAD - LCI PROJECT Roadway Project Duluth CST M230 $1,182,370 HE CR 824/JODECO CR 661/BLACKHALL ROAD Henry County ROW L400 $208,000 LUMP M-AR-274B SR 155 FM HAMPTON-LOCUST GROVE/BILL GARDNER TO STONEY BROOK MARTA - BUS PROCUREMENT - REPLACEMENT Turn Lanes ROW MS30 $1,944,000 Equip. Purchase MARTA CST Z230 $1,391,263 M-AR AVONDALE MARTA STATION INTERMODAL FACILITY Transit Facilities MARTA CST Z230 $4,000,000 NE-099B CR 653/COVINGTON CR 181/FLAT SHOALS ROAD Newton County ROW L400 $456,000
13 PROJECT FEDERAL S NE PR 1/FRONTAGE YELLOW RIVER 2 MI W OF COVINGTON Bridges PE Z240 $400,000 NE NE NE SR DRIED INDIAN CREEK IN COVINGTON ACCESS I-20 FM E OF CROWELL RD TO W OF HAROLD DOBBS RD CR 511/BROWN BRGE SHOALS CRK; INC REALIGNMENT Bridges SCP Z240 $200,000 Realignment Newton County PE L230 $320,000 Bridges Newton County PE L230 $189,652 PA DALLAS BATTLEFIELD TRAIL - II Dallas PE M301 $300,000 PA RO RO SR 61 FROM SR 6BU TO CS 811/COOPER PLACE SCOPING STUDY SALEM GATE EXT FROM OLD COVINGTON HWY TO FLAT SHOALS ROAD CR 66/SIGMAN RD SR LIGHTING Special Studies Dallas SCP Q23 $60,000 Roadway Project Rockdale County PE L230 $800,000 Lighting Rockdale County PE Z230 $560,000 RO CR 505/HONEY CREEK SNAPPING SHOALS CREEK Bridges Rockdale County PE Z230 $240,000 RO-AR SR 138/SR 20 INTERCHANGE RECONSTRUCTION & WENING Interchange PE Z001 $3,533,059
FY TIP Administrative Modifications 1st Quarter of 2013 (Processed March 15, 2013)
ARC AR 074A AR 074 2013 TBD 0012580 Project Title Project Title Programming Changes Notes PRIORITIZED REGIONWE SIGNAL UPGRADE PROGRAM PHASE 1 AR 074 2014 0012581 AR 074B AR 074 2015 TBD 0012582 PRIORITIZED
More informationISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS
Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 DATE: August 27, 2014 ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS FROM: Tom Worthan, TAQC Chairman
More informationFinal Project Funding Recommendations (2012 Solicitation Cycle)
Final Project Funding Recommendations (2012 Solicitation Cycle) Last Mile Connectivity Program General Operations and Safety Program Operations and Safety Program This document contains final recommendations
More informationYOGA STUDIOS OF METRO ATLANTA (alphabetical)
YOGA STUDIOS OF METRO ATLANTA (alphabetical) Active Sol Yoga 200 Bennett St NW Atlanta 30309 (404) 236-9642 All Life Is Yoga 27 Waddell St Suite D Atlanta 30307 (404) 491-9027 Ashtanga Yoga Atlanta 27
More informationISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE /2015 COMPREHENSIVE REVIEW - PHASE 2
Draft for approval by TCC on 4/3; TAQC on 4/9 and ARC on 4/22/15 DATE: April 22, 2015 ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE - 2014/2015 COMPREHENSIVE REVIEW - PHASE 2 FROM: Tom Worthan,
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department
More informationCOUNTY WIDE PROJECTS CURRENT SPLOST FUNDING
CAPITAL S IV - LIST Updated thru July 17, 2018 COUNTY WIDE S SP4001 911 Radio Replacement County 7,000,000 (440,000) 6,560,000 624,000 7,184,000 6,224,329 959,671 IN PROGRESS SP4002 Airport FBO 1,000,000-1,000,000-1,000,000
More informationAmerican Job Center Finder
American Job Finder Job Finder Name Address Phone Hours Gainesville, Rockdale Resource Gwinnett WIA Resource Waycross, City of Atlanta Development Agency Newnan, Athens, Cartersville, Carrollton, Thomasville,
More informationHighways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway
More informationHotel Shuttle Pickup Schedule
Contents Hotel Shuttle Pickup Schedule... 2 Designated Hotels (organized alphabetically)... 2 Designated Hotels (organized by cluster)... 7 Shuttle Hubs... 7 Blue Cluster... 7 Brown Cluster... 7 Gold Cluster...
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationLPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike
LPA Location Federal Funds Awarded to LPA Allen County Allen County Bridge #271: South County Line Road over St Marys River $1,091,200.00 Boone County On CR 500W, approximately 750' South of Middle Jamestown
More informationMARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016
MARTA & City of Atlanta Sales Tax Referendums 1 MARTA & City of Atlanta Sales Tax Referendums Public Hearings May 25 & 26, 2016 June 1 & 2, 2016 MARTA & City of Atlanta Sales Tax Referendums 2 Guiding
More informationRavinia. Row. STAN WILLIAMS / M c NEILL STOKES /
I. EXECUTIVE SUMMARY NAI Brannen Goddard is pleased to present, a 3.43-acre generational property in Central Perimeter. The property is strategically located on Ashford Dunwoody Road with billboard visibility
More informationO.C.G.A GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session ***
O.C.G.A. 15-6-3 GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session *** TITLE 15. COURTS CHAPTER 6. SUPERIOR COURTS ARTICLE 1. GENERAL
More informationAPPENDIX C TRANSPORTATION PLANNING DOCUMENTS
APPENDIX C TRANSPORTATION PLANNING DOCUMENTS 5151 FLYNN PARKWAY, SUITE 404 CORPUS CHRISTI, TEXAS 78411 TEL: 361.884-0687 FAX: 361-884-8529 EMAIL: ccmpo@cctxmpo.us www.corpuschristi-mpo.org July 19, 2013
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION
Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout
More informationHighways: Interstate. Highways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ALACHUA COUNTY Highways: Interstate 4230716 I-75(SR121)WILLISTON RD SR222(NW
More informationPlan 2040 Mini-Retreat Supplemental Material
Plan 2040 Mini-Retreat November 12th, 2009 Plan 2040 Process Overview ARC Board Retreat 11/12/09 1 Regional Assessment Consistent Themes Theme 1: Develop solutions that address the social, environmental
More informationHighways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL
More informationCENTURY SPRINGS EAST AND WEST LAKE FOREST DRIVE, ATLANTA, GA 30328
CENTURY SPRINGS EAST AND WEST 6000-6100 LAKE FOREST DRIVE, ATLANTA, GA 30328 UPSCALE OFFICES. DOWNSCALE COMMUTE. Located just outside Atlanta s Central Perimeter area lie Century Springs East and West.
More informationTENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS
Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department
More informationFarmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)
F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.:
More informationProfessional Providers Near You
Professional Providers Near You Please note: not all providers offer all services. Please confirm what services are offered with the provider. WILLIAMSON EYE CARE 2175 C WEST COUNTY LINE RD (770)920-0007
More informationMARTA SERVICE CHANGES
MARTA SERVICE CHANGES Effective April 14, 2018 Several of MARTA's bus routes are being modified to improve overall service and on-time performance. The following changes will go into effect on Saturday,
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationFY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area
KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive
More informationSPLOST I - PROJECT LIST
ACCT. BUILDING CAPITAL S 4106101 DEVELOPMENTALLY DISABLED TRAINING CENTER 1 500,000 464,962 464,962 - COMPLETE 4108802 FIRE STATION 12 (NEW) 1 350,000 610,358 610,358 - COMPLETE 4107700 JAIL POD 1 2,650,000
More informationEvansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects
Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning
More informationCOMMERCIAL MIXED-USE OFFICE. Bullsboro Road. E Broad Street KEY DEVELOPMENT HIGHLIGHTS
FOR SALE ± 43 ACRES 690 & 34 Poplar Road, GA Development Opportunity COMMERCIAL MIXED-USE OFFICE 8 Poplar Road Downtown SITE 9 E Broad Street Bullsboro Road Lower Fayetteville Road Poplar Road Crossing
More informationCumberland CIRCULATOR 2017 Press Kit
Cumberland CIRCULATOR 2017 Press Kit Getting around Cumberland just got easier. Table of Contents About Page 3 Route Names & Symbols Page 4 Operating Hours & Fare Page 5 Circulator Blue Page 6 Circulator
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationCOMMUNITY APPEARANCE INDEX (Formerly: Litter Index) CITY OF ATLANTA 2014
COMMUNITY APPEARANCE INDEX (Formerly: Litter Index) CITY OF ATLANTA 2014 Keep Atlanta Beautiful has completed its ninth Litter Index and fourth Community Appearance Index, an expansion of the Litter Index,
More informationTENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County
SR-33 No Projects Under Development in Blount County PIN: 118351.00 FROM OLD KNOXVILLE PIKE TO EAST LINCOLN ROAD Length - 0.6 (Intersection Improvements and Signals) SR-33 US-411 PIN: 118422.00 INTERSECTION
More informationHighways: Interstate. Highways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE
More informationAPPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS
APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the
More informationNEWS REPORT NO February 19, 2010
NEWS REPORT NO. 5069 February 19, 2010 News Report Contents: GDOT Supplement No. 3 December 11, 2009 Letting GDOT Awards January 22, 2010 Letting GDOT Supplement No. 1, No. 2, and No. 3 January 22, 2010
More informationEXECUTIVE SUMMARY FALL Introduction. Findings
EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe
More informationFY Transportation Improvement Program Funding Summary: Local Match for Federal Funds
CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel
More informationGulf Coast MPO Obligated Projects
Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road
More information2017 LIST OF PRIORITY PROJECTS
0 LIST OF PRIORITY PROJECTS Adopted April, 0 Amended August, 0 by the Lake~Sumter MPO GOVERNING BOARD Coverage of Fiscal Years 0/ through 09/0 Prepared by the Lake~Sumter Metropolitan Planning Organization
More informationFLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years
Bay County Citizen s Plan Tentative Work Program Fiscal Years 2019-2023 The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, including Title VI of the
More informationROTARY CLUB OF ALBANY #4104 chartered March 1, 1917 Sponsored by the Rotary Club of Macon
ROTARY CLUB OF ALBANY #4104 chartered March 1 1917 Sponsored by the Rotary Club of Macon Thursdays 12:00pm Doublegate Country Club 3800 Old Dawson Road Albany GA 31721 Rotary Club of Albany https://albanyrotary.com
More informationWednesday, January 10 6:30-8:00 p.m. Adamsville Rec Center 3201 MLK Jr. Drive SW Atlanta, GA 30311
YOU RE INVITED IT S YOUR TURN TO DRIVE THE CONVERSATION ABOUT BUS SERVICE CHANGES MARTA will be holding community meetings and public hearings for feedback and comments for proposed bus service modifications
More informationAtlanta. Description: I-285N NS 100ft E/O Tilly Mill Rd F/W - 1. TAB Panel ID: City: DORAVILLE Latitude:
000300 - Atlanta Description: I-285N NS 100ft E/O Tilly Mill Rd F/W - 1 TAB Panel ID: 37261 City: DORAVILLE Latitude: 33.906 Media Type: Bulletin State: GA Longitude: -84.277 Display Dimensions: 14' x
More informationGwinnett County, Georgia Department of Planning & Development
Gwinnett County, Georgia Department of Planning & Development CDP2005-00360 RECEIVED ON : 12/27/2005 ISSUED ON : 06/13/2006 DIST/LL/PARCEL : 3002 035 COMMISSION DISTRICT : 3 2.10 DISTURBED ACRES : 2.38
More informationAPPENDIX A: Planning Consistency Checklist
APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:
More informationHousing Market Update U.S. and Southeast Federal Reserve Bank of Atlanta February 24, 2011
Brad Hunter Chief Economist/ National Director of Consulting (561) 573-8351 bhunter@metrostudy.com Housing Market Update U.S. and Southeast Federal Reserve Bank of Atlanta February 24, 2011 There is no
More information02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.
02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationAssessment of Travel Trends
I - 2 0 E A S T T R A N S I T I N I T I A T I V E Assessment of Travel Trends Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: AECOM/JJG Joint Venture Atlanta, GA October 2011 General
More informationOctober 16, 2015 NEWS REPORT NO. 5137
NEWS REPORT NO. 5137 October 16, 2015 News Report Contents: GDOT Awards September 18, 2015 Letting GDOT Apparent Low Bidders October 16, 2015 Letting 2160 Satellite Blvd., NW Suite 100 Duluth, GA 30097
More informationPresented By: Deputy Executive Director February 17, 2011
TRANSPORTATION PROJECT PRIORITIZATION Presented By: Camelia Ravanbakht, Ph.D. Ca e a aaba t,.. Deputy Executive Director February 17, 2011 OVERVIEW 2034 Long-Range g Transportation Plan (LRTP) Process
More information2015 Renew Atlanta Infrastructure Bond & TSPLOST Program Master Schedule
Renew ATL Horizontal / Transportation City-Wide Signals R.01.01.001.001 14th St @ Howell Mill DESIGN 2020.Winter 2020.Spring CW-03 R.01.01.001.002 Alston Dr @ Candler Rd CONST PROCURE 2019.Fall 2020.Spring
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationAtlanta Urban New Construction & Proposed Multifamily Projects 2Q18
2Q18 ID PROPERTY UNITS 2 Broadstone Ridge 277 4 Modera Sandy Springs 313 13 Hanover Perimeter 384 Total Lease-Up 993 16 Cortland Decatur East 288 17 Reserve at the Ballpark Phase II, The 275 18 Adley at
More informationFY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars
FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue
More informationDIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018
DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES
More informationTable 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects
Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY QUINCY QUINCY INTERSECTION
More informationAtlanta Urban New Construction & Proposed Multifamily Projects 3Q18
3Q18 ID PROPERTY UNITS 1 Cortland Decatur East 288 3 Novel Perimeter 320 5 Morningside Atlanta by Windsor Phase II 50 6 Kirkwood, The 232 7 Huntley, The 267 8 Broadstone Ridge 277 10 AMLI Buckhead 400
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location
North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Project Title/Location Project Sponsor Improvement Type Source of Funds HIGHWAYS
More informationHartsfield Jackson Update prepared for:
Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationAtlanta Urban New Construction & Proposed Multifamily Projects 1Q18
1Q18 ID PROPERTY UNITS 5 Broadstone Ridge 277 7 Modera Sandy Springs 313 9 Hanover Perimeter 384 16 Stadium Walk 309 Total Lease-Up 1,283 18 E. Co House 288 19 Reserve at the Ballpark Phase II, The 275
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationFY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council
Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund
More informationWichita Falls MPO - MTP Project List 1 of 6
Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS
More informationSTAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6
STAFF REPORT SUBJECT: RSTP& LSTP Fund Balances MEETING DATE: February 7, 2008 AGENDA ITEM: 6 RECOMMENDATION: STAFF CONTACT: Receive an update on programmed funds from the Regional Surface Transportation
More informationAPPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY
APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location
STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationTRANSPORTATION IMPROVEMENT PROGRAM. This Year s Document: FY 2017/ /22 Effective October 1, 2017 September 30, 2018
TRANSPORTATION IMPROVEMENT PROGRAM This Year s Document: FY 2017/18 2021/22 Effective October 1, 2017 September 30, 2018 And Priorities for Next Year s Document What is the TIP? Transportation projects
More informationThe Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).
The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number
Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance
More informationCOVINGTON COUNTY Century 4 89 Gonzalez 10 Pensacola INTERSTATE De Funiak Springs INTERSTATE Chipley Escambia Bay
55 137 31 153 COVINGTON Century 89 Gonzalez Pensacola 1 1 5 De Funiak Springs 78 90 Chipley Escambia 281 12 85 Eglin Air Force Base 87 19 East 76 71 Marianna 18 13 a l co a s Fort Walton Beach 33 20 85
More informationDevelopment Cases Received
Gwinnett County Department of Planning & Development Development Cases Received From 6/21/2017 to 6/27/2017 Commercial Development CASE NUMBER: CDP2017-00134 ADDRESS : 6385 PEACHTREE IND BLVD, PEACHTREE
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION
Burlington Bispham Street Bridge over Rancocas Creek (DB # D0806) OTHER CON $1.000 $1.000 $0.000 N/A $1.000 Hanover Street Bridge over Rancocas Creek, CR 616 (DB # D9902) STP-STU CON $3.240 $0.000 $0.000
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationAtlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas
Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas Matthew Hampton Oregon Metro February 25 th, 2013 Early experience with transportation Our region Charting a Different
More informationAbernathy Road Project Completed Early
www.peachpass.com FEBRUARY 2013 Abernathy Road Project Completed Early From left, UPS Vice President Chuck Altimari, Sandy Springs Mayor Eva Galambos, Perimeter CIDs President and CEO Yvonne Williams,
More informationThe First State Bank 4806 N. Henry Blvd. Stockbridge, GA (770)
Bank Owned Properties listed are subject to change without notice. For a current listing, contact the listing realtor, or contact The First State Bank at the number shown above. All parties interested
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since
More informationPublic Informational Meeting
Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives
More informationAnnual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)
Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION
FY 20162025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM DVRPC FY 2017 Authorized and Unauthorized Projects (All funds $ millions) Burlington Arney's Mount Trail, Phase 1 (DB #D1713) TAP CON $3.000 $3.000
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
North Front Range Transportation & Air Quality Planning Council (NFRT & AQPC) Current Amendment or Modification STIP ID Title/Location HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On
More informationMost people notice when ODOT builds something
ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what
More informationCVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11
FY 13 Transportation Priorities Central Vermont State & Town Bridge Projects STOWE LAMO ILLE CO. ELMORE ELMORE LAMOILLE CO HARDWICK CALEDONIA CO WALDEN S TOWE BOLTON CHITTENDEN C O WORCESTER 17 WOODBURY
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationRoute 58 Corridor Development Fund
Route 58 Corridor Development Fund Appropriation Act Item 447 B.3 (Special Session I, 2006) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation
More informationDRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015
DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015 Existing/ RSTP Allocation Recommended Ashland 103393 Trolley line trail:ii Existing 1,100,000-500,000 600,000 - - - 1,100,000
More information*DATES ARE SUBJECT TO CHANGE*
Renew ATL 15-Jul-15 A 19-Feb-23 Horizontal / Transportation 15-Jul-15 A 19-Feb-23 City-Wide 08-Oct-15 A 19-Feb-23 Signals 16-Oct-15 A 30-Jun-20 R.01.01.001.001 14th St @ Howell Mill 16-Nov-18 19-Mar-20
More informationAtlanta Urban New Construction & Proposed Multifamily Projects 4Q18 LEGEND. Source: Yardi Matrix
Atlanta Urban New Construction & Proposed Multifamily Projects ID PROPERTY 1 2 4 5 6 7 8 10 11 12 13 15 16 17 18 19 20 21 22 23 24 29 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 54 55 57 58 59 61
More information