APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

Size: px
Start display at page:

Download "APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY"

Transcription

1 APPENDIX A DATA COLLECTION BIBLIOGRAPHY

2 APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed as part of the study and preparation of this report. It is organized by the agency that either prepared the report or for whom the report was prepared. CALIFORNIA STATE TRANSPORTATION AGENCY (CSTA) California Freight Mobility Plan, by CSTA, dated December CALIFORNIA TRANSPORTATION COMMISSION (CTC) DOCUMENTS 2014 SHOPP As of June 2014 Close-Out, California Transportation Commission, date June California Transportation Commission (CTC) State Transportation Improvement Program (STIP) CALTRANS DOCUMENTS Route Concept Report for Route I-680, SCl M0.00 to CC 25.4, by Caltrans, dated April 10, TCCR Corridor #10: Interstate 680 South (Alameda I-580 to Santa Clara US-101) Map, by Caltrans and MTC, dated July 9, High Occupancy Vehicle (HOV) Lane Master Plan Update, Final Summary Report, by DKS Associates for MTC, Caltrans and the California Highway Patrol Golden Gate Division, dated March Caltrans Deputy Directive Number DD-64-R1, Complete Streets-Integrating the Transportation System, by Caltrans, dated October California HOV/Express Lane Business Plan 2009, by Kimley-Horn and Associates, Inc. for Caltrans, dated May 15, 2009.

3 Caltrans 2010 Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians, by Caltrans, Alta Planning+Design, Cambridge Systematics, dated Improving Freeway Operations Using Real-Time Adaptive Ramp Meters-A Case Study for I- 680 Southbound Corridor in Alameda County, California, by Kittleson & Associates, Inc and Caltrans, dated approx Caltrans District 4 Final 12/1/11 Transportation System Development Plan, by Caltrans, dated December 1, Final 2013 Ten-Year State Highway Operation and Protection Program Plan, by Caltrans, dated March 5, SHOPP State Highway Operation and Protection Program, fiscal Years through , by Caltrans, California State Transportation Agency, dated March 20, Caltrans Memorandum on Amendments to the 2014 SHOPP, by Caltrans, dated June 11, Interstate 680 Ramp Metering Project from US 101/I-680 Separation to Scott Creek Road Undercrossing Flyer, by Caltrans, dated approx Caltrans District 4 I-680 Southbound Express Lane Project Public Information Caltrans Right-of-Way Record Drawings Entire Corridor from Route 101 to Scott Creek Road Caltrans As-Built Drawings (May 14, 2012) Ramp Metering Project from /101 Separation to Scott Creek Road Undercrossing (as advertised-not as-built) (June 2, 2008) CA 237 to Grimmer Blvd UC SB Express Lanes 04-2R5504 (February 15, 2006) Rte 101/I-680/I280 Connectors Structures Retrofit (October 24, 2005) Maintenance Vehicle Pullouts at Various Locations (June 13, 2005) Cover Sheet and E-1, E-17 & 18 for Jackson Ave on-ramp TOS (June 20, 2005) Cover Sheet, X-1 to X-3, L-6, C-6, D-6 Median Widening at Jackson Ave

4 (October 22, 2003) CA 237 to Mission San Jose Separation SB Sound Walls (January 22, 2001) CA 237 to Scott Ck Rd Median and Outside Widening (July 22, 1996) Scott Ck Rd to Mission Boulevard Structure Widenings (January 13, 1992) King Rd to Sunset Ave NB and SB Sound Walls (January 14, 1991) Capitol Ave to Trimble Rd NB and SB Sound Wall (November 8, 1971) Cover Sheet, X/A to X/C, Sheet and Line Index, C/1 & C/9, PE-G/5, E-12, Structural Plans for Jackson Ave UC. VTA DOCUMENTS Pedestrian Technical Guidelines, A Guide to Planning and Design For Local Agencies in Santa Clara County, by Community Design+Architecture, Inc., for VTA, dated October 2, Community Design & Transportation (CDT) Program, A Manual of Best Practices for Integrating Transportation & Land Use, by VTA, dated Santa Clara Countywide Bicycle Plan, by VTA, dated August Santa Clara Valley Transportation Plan 2040, by VTA, dated Santa Clara Valley Transportation Authority (VTA) BRT Strategic Plan Final Report, by ARUP, dated March VTA Short Range Transit Plan FY , by VTA, dated C810 CELR Pedestrian Improvements Plans, Issued for QA-QC Review, by VTA, dated October 12, Noise Reduction Screening Program Retrofit Noise Barrier Study, by LSA Associates, Inc., dated January VTA Memorandum on Complete Streets in Santa Clara County, by VTA, dated September 6, VTA Memorandum on One Bay Area Grant (OBAG): Location Program Development-Criteria, by VTA, dated October 4, 2012.

5 Bicycle Technical Guidelines, A Guide for Local Agencies in Santa Clara County, by VTA, dated Revision 2 adopted December 13, VTA Memorandum on Pedestrian Access to Transit Plan-Existing Conditions Report, by VTA, dated August 28, VTA Short Range Transit Plan FY , by VTA, dated August Draft Final Valley Transportation Plan 2040, by VTA, dated VTA Memorandum on Countywide Bicycle Plan Update-Scoping Discussion, by VTA, dated January 29, COUNTY OF SANTA CLARA DOCUMENTS Santa Clara County General Plan, , Santa Clara County, dated December 20, Comprehensive County Expressway Planning Study, County Expressway Bicycle Accommodation Guidelines, by County Roads and Airports, dated Revised August Comprehensive County Expressway Planning Study Implementation Plan, by County Roads and Airports, dated August Comprehensive County Expressway Planning Study Implementation Plan Summary, by County Roads and Airports, dated August Comprehensive County Expressway Planning Study, 2008 Update, by County Roads and Airports, dated March Draft PSR-PDS for I-680/Montague, by Mark Thomas Inc. for County Roads and Airports, dated May Santa Clara Bicycle Map, by County Roads and Airports, dated approx CITY OF MILPITAS DOCUMENTS City of Milpitas General Plan, by City of Milpitas, dated January City of Milpitas Bikeway Master Plan Update, Final Plan, by Alta Planning+Design, dated June 2009.

6 City of Milpitas Bike Map 2009, by Alta Planning+Design, dated Milpitas Transit Area Specific Plan, by Dyett & Bhatia, dated June 2008, Amended December City of Milpitas Zoning Map, by City of Milpitas, dated October CITY OF SAN JOSE DOCUMENTS Envision San Jose 2040 General Plan, City of San Jose, dated August San Jose Bike Plan 2020, by City of San Jose, dated November 17, City of San Jose General Plan Land Use Maps METROPOLITAN TRANSPORTATION COMMISSION DOCUMENTS San Francisco Bay Area HOV Lane Master Plan, by DKS Associates and Metropolitan Transportation Commission for ITE International Conference, August Transportation 2035 Plan for the San Francisco Bay Area Final, by Metropolitan Transportation Commission, dated April MTC Bay Area Express Lanes Final Before Ramp Metering Technical Memorandum Santa Clara County I-680 Ramp Metering Implementation Plan, by Fehr & Peers, for MTC and Caltrans, dated May 28, Draft MTC Regional Goods Movement Plan, Task 2C-Infrastructure, Services, and Demographic/Freight Flow Trends, by Cambridge Systematics, Inc., dated December ALAMEDA COUNTY TRANSPORTATION COMMISSION DOCUMENTS I-680 Southbound Express Lane Annual Report FY , by Alameda County Transportation Commission.

7 I-680 Southbound Express Lane Annual Report FY , by Alameda County Transportation Commission. Alameda County Transportation Commission Countywide Goods Movement and Collaborative Plan BAY AREA INFRASTRUCTURE FINANCING AUTHORITY (BAIFA) DOCUMENTS Bay Area Express Lane Network Fact Sheet, by BAIFA, dated October 28, SPUR SAN JOSE CITY SPUR Report Freedom to Move, by SPUR San Jose City, dated July

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions

More information

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

SANTA CLARA COUNTY I-280 CORRIDOR STUDY SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study

More information

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan

Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

Bay Area Express Lane System

Bay Area Express Lane System Alameda County Transportation Commission Alameda County Technical AdvisoryCommittee March 5, 2013 Presented by Lisa Klein Metropolitan Transportation Commission 1 Bay Area Express Lane System 550 miles

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

Cell: (408) Release MA June 25, 2012

Cell: (408) Release MA June 25, 2012 VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara

More information

Traffic Analysis Final Report

Traffic Analysis Final Report SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on

More information

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605. ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6

STAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6 STAFF REPORT SUBJECT: RSTP& LSTP Fund Balances MEETING DATE: February 7, 2008 AGENDA ITEM: 6 RECOMMENDATION: STAFF CONTACT: Receive an update on programmed funds from the Regional Surface Transportation

More information

Managing Mobility: Engineering an Express Lane Network

Managing Mobility: Engineering an Express Lane Network Managing Mobility: Engineering an Express Lane Network ITS Bay Area November 20, 2014 Peter Lee, P.E. Principal, Program Delivery Metropolitan Transportation Commission MTC Wears Many Hats Metropolitan

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

Public Informational Meeting

Public Informational Meeting Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives

More information

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN CALIFORNIA DEPARTMENT OF TRANSPORTATION CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN Prepared by Division of Traffic Operations Office of Traffic Management Submitted to Federal Highway

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee November 17, 2015 Ports O Call Area Redevelopment Ports O Call Area Redevelopment Implementation Schedule

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

Regional Measure 2 Regional Traffic Relief Plan

Regional Measure 2 Regional Traffic Relief Plan LEGAL TEXT OF REGIONAL MEASURE 2 Regional Traffic Relief Plan Subject to approval on March 2, 2004, by the voters of Alameda, Contra Costa, Marin, San Mateo, Santa Clara and Solano counties and the city

More information

3 Level of Service Results: Freeways and Arterials

3 Level of Service Results: Freeways and Arterials 3 Level of Service Results: Freeways and Arterials This section presents a summary of LOS results for the freeways, ramps and arterials (Tier 1 and Tier 2 CMP network). In general, the number of congested

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

Fremont-South Bay Corridor

Fremont-South Bay Corridor Fremont-South Bay Corridor Jnt~rimDefinition and Capital Cost Report Alternatiyes 1 through 4 prepared for Metropolitan Transportation Commission by DKS Associates and associated consultants January 19,

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report Revision No. 20170501-1 of Sonoma Agenda Item Summary Report Agenda Item Number: 37 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To:

More information

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA

RELATED SANTA CLARA SANTA CLARA, CALIFORNIA. RELATED SANTA CLARA Santa Clara, CA RELATED SANTA CLARA SANTA CLARA, CALIFORNIA RELATED SANTA CLARA Santa Clara, CA JUNE 2016 APPROVAL TIMELINE RELATED SANTA CLARA Santa Clara, CA 1 ACRES PARKS & OPEN SPACE (40% OF TOTAL SITE) PARCEL 3 PARK

More information

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS National Scenario Planning Peer Exchange July 10, 2012 2012, All Rights Reserved. 1 MAG Transportation

More information

FY Transportation Improvement Program. Ozarks Transportation Organization

FY Transportation Improvement Program. Ozarks Transportation Organization FY 2019-2022 Transportation Improvement Program Ozarks Transportation Organization LRTP TIP Construction TIP Transportation Improvement Program 4 year program of capital and non-capital surface transportation

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST

More information

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center Committee Members Present: Alex Amoroso Al Boro John Dupar Phil Frank Steve Kinsey Joan Lundstrom for Larry

More information

TTAC MINUTES. Thursday, May 1, 2014 Solvang City Hall Solvang CA 9:00 a.m. Santa Barbara Metropolitan Transit District

TTAC MINUTES. Thursday, May 1, 2014 Solvang City Hall Solvang CA 9:00 a.m. Santa Barbara Metropolitan Transit District TTAC MINUTES Thursday, May 1, 2014 Solvang City Hall Solvang CA 9:00 a.m. TTAC Voting Members Present Rose Hess James Winslow Mike Luther Dennis Delzeit Browning Allen (Chair) Shad Springer Chris Sneddon

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

FASTRAK PROGRESS REPORT

FASTRAK PROGRESS REPORT FASTRAK PROGRESS REPORT OCTOBER DECEMBER 212 The FasTrak Progress Report is prepared on a quarterly basis and is regularly distributed with the FasTrak Project Management Team (PMT) agenda and notice.

More information

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities DATE: February 3, 2017 ISSUE SUMMARY: Regional Trail Plan FROM: Mike Alexander, Director, Center for Livable Communities IMPORTANCE: In May 2016, ARC adopted the active transportation component of the

More information

Update on Route 1 Efforts

Update on Route 1 Efforts County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

MADERA COUNTY TRANSPORTATION COMMISSION EXECUTIVE MINUTES

MADERA COUNTY TRANSPORTATION COMMISSION EXECUTIVE MINUTES MADERA COUNTY TRANSPORTATION COMMISSION EXECUTIVE MINUTES Date: Wednesday, Time: 3:00 P.M. Place: Madera County Government Center, Board of Supervisor Chambers Members Present: Members Absent: Policy Advisory

More information

Route 58 Corridor Development Fund

Route 58 Corridor Development Fund Route 58 Corridor Development Fund Appropriation Act Item 447 B.3 (Special Session I, 2006) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

FASTRAK PROGRESS REPORT

FASTRAK PROGRESS REPORT FASTRAK PROGRESS REPORT JANUARY MARCH 213 The FasTrak Progress Report is prepared on a quarterly basis and is regularly distributed with the FasTrak Project Management Team (PMT) agenda and notice. A copy

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Caltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management

Caltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management District 5 Highway 1 near Big Sur in Monterey County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system to enhance California s economy and livability.

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-032 WHEREAS, The San Francisco Municipal Transportation Agency has proposed the installation of parking and traffic modifications

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER December 6, 2013 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items: On Wednesday, the ribbon was cut to signal

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Van Ness Avenue

More information

SACRAMENTO I N T E R N A T I O N A L A I R P O R T. Request for Proposals Opportunities for Commercial Development. Open House March 7, 2018

SACRAMENTO I N T E R N A T I O N A L A I R P O R T. Request for Proposals Opportunities for Commercial Development. Open House March 7, 2018 SACRAMENTO I N T E R N A T I O N A L A I R P O R T Open House March 7, 2018 Request for Proposals Opportunities for Commercial Development Terminal B, Sacramento International Airport Sacramento: A Regional

More information

Introduction. Project Overview

Introduction. Project Overview Washington Blvd./Andora Widening Project Community Open House & Public Scoping Meeting Summary Wednesday, September 21, 2016 6:00 7:30 p.m. Vencil Brown Elementary School, Roseville Introduction On Wednesday,

More information

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP

Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion. Darren Henderson, AICP Congestion Pricing The Latest Weapon the U.S. War on Traffic Congestion Darren Henderson, AICP Today s s Discussion How bad is congestion? What has been done about it? What else can be done? How Bad is

More information

Self-Guided Tour for the Mission Park to Mission Canyon Multimodal Improvement Project

Self-Guided Tour for the Mission Park to Mission Canyon Multimodal Improvement Project Self-Guided Tour for the Mission Park to Mission Canyon Multimodal Improvement Project This tour can be taken by vehicle, walking, or bicycling; however, walking is the preferred method in order to stop

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

BART TRANSIT INTEGRATION PLAN

BART TRANSIT INTEGRATION PLAN BART TRANSIT INTEGRATION PLAN DRAFT EXISTING CONDITIONS REPORT VTA Santa Clara Valley Transportation Authority BART TRANSIT INTEGRATION PLAN DRAFT Existing Conditions and Context Report November 2014 Nelson\Nygaard

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City

More information

I-680 HOV Direct Access Ramps Project

I-680 HOV Direct Access Ramps Project I-680 HOV Direct Access Ramps Project Scoping Meeting Summary April 2013 I-680 HOV Direct Access Ramps Project Scoping Meeting Summary Table of Contents I. PROJECT DESCRIPTION... 3 II. NOTICING AND PUBLICITY...

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

5 REGULAR MATTERS 5A. Review of the I-580 Eastbound HOV Lane Project Monthly Status Report Page 5

5 REGULAR MATTERS 5A. Review of the I-580 Eastbound HOV Lane Project Monthly Status Report Page 5 I-580 EXPRESS LANE POLICY ADVISORY COMMITTEE Commission Chair Mark Green, Mayor Union City Commission Vice Chair Scott Haggerty, Supervisor District 1 AC Transit Greg Harper, Director Alameda County Supervisors

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS APPENDIX C TRANSPORTATION PLANNING DOCUMENTS 5151 FLYNN PARKWAY, SUITE 404 CORPUS CHRISTI, TEXAS 78411 TEL: 361.884-0687 FAX: 361-884-8529 EMAIL: ccmpo@cctxmpo.us www.corpuschristi-mpo.org July 19, 2013

More information

Human Environment. 2.1 Land Use

Human Environment. 2.1 Land Use Human Environment 2.1 Land Use This section is a summary of the analysis documented in the Community Impact Assessment (CIA) prepared for this project (ICF International 2014a). The report is available

More information

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018

Charlotte Regional Express Lane Facilities: I-485 and US 74. North Carolina Turnpike Authority March 21, 2018 Charlotte Regional Express Lane Facilities: I-485 and US 74 North Carolina Turnpike Authority March 21, 2018 NC Turnpike Authority Overview Created in 2002 by the General Assembly Authorized to design,

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

SANDAG s Regional Transportation Plan

SANDAG s Regional Transportation Plan SANDAG s Regional Transportation Plan Oceanside 5 Camp Pendleton Carlsbad P A C C I I F I C C O O C C E E A A N N 472 398 76 Encinitas 399 78 Solana Beach 472 Vista 15 San Marcos 399 399 470 610 Escondido

More information

Update of MDX Open Road Tolling

Update of MDX Open Road Tolling Update of MDX Open Road Tolling Citizens Transportation Advisory Committee September 11, 2013 About MDX MDX is an agency of the state created by the State Legislature and the County Commission to assure

More information

DRAFT PLAN & DRAFT EIR

DRAFT PLAN & DRAFT EIR DRAFT PLAN & DRAFT EIR April 27, 2017 Transportation Authority of Marin Meeting Matt Maloney, MTC Principal Planner Plan Bay Area 2040 establishes a 24-year regional vision for growth and investment. Image

More information

Los Angeles County One Gateway Plaza 213 Metropolitan Transportation Authority Los Angeles, CA me

Los Angeles County One Gateway Plaza 213 Metropolitan Transportation Authority Los Angeles, CA me Los Angeles County One Gateway Plaza 213 Metropolitan Transportation Authority Los Angeles, CA 90012-2952 me 58 REGULAR BOARD MEETING July 23, 2009 SUBJECT: STATE LEGISLATION ACTION: ADOPT STAFF RECOMMENDED

More information

Imperial County Transportation Commission OVERVIEW. March 2015

Imperial County Transportation Commission OVERVIEW. March 2015 Imperial County Transportation Commission OVERVIEW March 2015 ICTC Roles and Responsibilities The ICTC was established under Senate Bill 607 (Ducheny) approved in 2009 and became effective January 1, 2010

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

GCTD Technical Advisory Committee (TAC) 10:00 a.m. - Wednesday, July 18, 2018 Gold Coast Transit District - Board Room.

GCTD Technical Advisory Committee (TAC) 10:00 a.m. - Wednesday, July 18, 2018 Gold Coast Transit District - Board Room. GCTD Technical Advisory Committee (TAC) 10:00 a.m. - Wednesday, July 18, 2018 Gold Coast Transit District - Board Room Meeting Summary TAC Members Present: David Fleisch, County of Ventura; Sergio Albarran,

More information

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR APPENDIX J MODIFICATIONS PERFORMED TO THE TOR This appendix summarizes the modifications that were performed in years 2012 and 2017 to rectify calculation errors that were observed in the data presented

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION COASTAL CONSERVANCY Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION File No. 07-037-02 Project Manager: Michelle Jesperson RECOMMENDED ACTION: Authorization

More information

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway

More information

Latest Mile Marker Released

Latest Mile Marker Released District 5 Looking north at US/101 Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information