APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS"

Transcription

1 APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the current Rural Transportation Improvement Program in order to allow feasibility or environmental clearance efforts to continue. Please note that these projects are preliminary and do not represent any commitment of construction funding, but strictly intent to pursue environmental clearance activities consistent with early project development. Consistency with the Air Quality Conformity Determination will be reexamined as alternatives are explored in these studies and environmental clearance efforts.

2 FORT WORTH DISTRICT RURAL ENVIRONMENTAL CLEARANCE PROJECTS K.2

3 THURSDAY, MARCH 25, :12:51 PM DALLAS-FORT WORTH MPO FY TRANSPORTATION IMPROVEMENT PROGRAM FORT WORTH DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 1 FORT WORTH ERATH US 67 E,R ERATH LIMITS FROM: 1.75 MILES N OF COMANCHE COUNTY LIN LIMITS TO: 1.57 MILES N OF FM 219/EX. US 67N TIP DESCRIPTION: RECONSTRUCT US 67 ON ALTERNATE LANE ROUTE NORTH AND WEST OF DUBLIN THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH ERATH US 377 E,R ERATH LIMITS FROM: BU 377J EAST OF STEPHENVILLE LIMITS TO: 5.1 MI NE OF STEPHENVILLE TIP DESCRIPTION: RECONSTRUCT ROADWAY 2 TO LANE DIVIDED THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH ERATH US 377 E,R ERATH LIMITS FROM: 5.1 MI NE OF BU377J IN STEPHENVILLE LIMITS TO: HOOD C/L TIP DESCRIPTION: RECONSTRUCT ROADWAY 2 TO LANE DIVIDED THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD US 377 E,R HOOD LIMITS FROM: ERATH C/L NE LIMITS TO: LP 26 W OF GRANBURY TIP DESCRIPTION: WIDEN 2 LANE UNDIVIDED TO LANE DIVIDED ROADWAY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD US 377 E,R GRANBURY LIMITS FROM: END OF BRAZOS RIVER BRIDGE LIMITS TO: SOUTH OF BRAZOS RIVER BRIDGE TIP DESCRIPTION: WIDEN LANE TO 6 LANE DIVIDED ROADWAY WITH INTERCHANGE AT SH 1 AND FM 51 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD US 377 E,R OTHER LIMITS FROM: US 377 S OF CRESSON, N LIMITS TO: JOHNSON CO LINE TIP DESCRIPTION: CONSTRUCT LANE LOOP AROUND CRESSON ON NEW LOCATION 10 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH HOOD US 377 E,R GRANBURY LIMITS FROM: FM 167 SOUTH LIMITS TO: END OF BRAZOS RIVER BRIDGE IN GRANB TIP DESCRIPTION: WIDEN LANE TO 6 LANE DIVIDED ROADWAY WITH INTERCHANGE AT BU 377H EAST END OF BRIDGE TO EAST FM 167 THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY FORT WORTH JOHNSON SH 171 C,E,R JOHNSON LIMITS FROM: HOOD COUNTY LINE REV DATE: 05/2009 LIMITS TO: 0.8 MI E OF INTERSECTION W/ US 377 TIP DESCRIPTION: CONSTRUCT 2 LANE ONE WAY ON SH ADD TO APPENDIX D PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.3

4 THURSDAY, MARCH 25, :12:51 PM DALLAS-FORT WORTH MPO FY TRANSPORTATION IMPROVEMENT PROGRAM FORT WORTH DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 2 FORT WORTH JOHNSON US 67 E JOHNSON LIMITS FROM: PARK ROAD 21, EAST LIMITS TO: FM 13 TIP DESCRIPTION: RECONSTRUCT 2 LANE TO LANE DIVIDED ROADWAY FORT WORTH PARKER FM 188 E WEATHERFORD LIMITS FROM: SH 171 LIMITS TO: IH 20; IN WEATHERFORD TIP DESCRIPTION: WIDEN 2 LANE TO LANE DIVIDED ROADWAY WITH RAISED MEDIAN PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.

5 DALLAS DISTRICT RURAL ENVIRONMENTAL CLEARANCE PROJECTS K.5

6 THURSDAY, MARCH 25, :12:02 PM DALLAS-FORT WORTH MPO FY TRANSPORTATION IMPROVEMENT PROGRAM DALLAS DISTRICT RURAL PROJECTS RURAL APPENDIX PROJECTS D DISTRICT COUNTY CSJ HWY PHASE CITY MPO PROJ ID PAGE: 1 DALLAS NAVARRO US 287 E,R OTHER LIMITS FROM: IH 5 LIMITS TO: FM 739 TIP DESCRIPTION: RECONSTRUCT AND WIDEN TO LANES REV DATE: 08/ THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS NAVARRO SH 31 E,R CORSICANA LIMITS FROM: 2.5 MILES WEST OF FM 2555 REV DATE: 02/2009 LIMITS TO: IH 5, 1.2 MILES SOUTH OF 15TH ST. TIP DESCRIPTION: CONSTRUCT LANE RURAL; NEW LOCATION RELIEF ROUTE (ULTIMATE LANE DIVIDED) LIMITED ACCESS FACILITY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS NAVARRO SH 31 E,R OTHER LIMITS FROM: IH 5, 1.2 MILES SOUTH OF 15TH ST LIMITS TO: SH 31, 3.2 MILES EAST OF IH 5 TIP DESCRIPTION: CONSTRUCT LANE RURAL; NEW LOCATION RELIEF ROUTE, PHASE II - (ULTIMATE LANE DIVIDED) LIMITED ACCESS FACILITY THIS PROJECT IS NOT INCLUDED IN THE 2009 AIR CONFORMITY DALLAS KAUFMAN SH 3 E,R KAUFMAN LIMITS FROM: MILES SOUTHWEST OF FM 1388 LIMITS TO: SH 23 (MULBERRY ST) IN KAUFMAN TIP DESCRIPTION: CONSTRUCT LN DIVIDED URBAN OF ULTIMATE 6 LN DIVIDED ROADWAY & OVERPASS - (NEW LOCATION) 10 DALLAS KAUFMAN SH 3 C,E,R TERRELL LIMITS FROM: GROVE ST. LIMITS TO: HIGH ST. IN TERRELL TIP DESCRIPTION: CONSTRUCT LANE DIVIDED URBAN THOR., AND RAILROAD GRADE SEPARATION STRUCTURE ON NEW LOCATION DALLAS KAUFMAN SH 3 E OTHER LIMITS FROM: SH 23 (MULBERRY ST) IN KAUFMAN LIMITS TO: FM 2578/SH 3 INTERS. IN TERRELL TIP DESCRIPTION: CONSTRUCT LN RURAL THOROUGHFARE & STRUCTURE (NEW LOCATION) DALLAS KAUFMAN SH 3 C,E,R TERRELL LIMITS FROM: AIRPORT ROAD LIMITS TO: GROVE STREET IN TERRELL TIP DESCRIPTION: CONSTRUCT LN DIVIDED URBAN THOROUGHFARE (NEW LOCATION) DALLAS KAUFMAN FM 386 C,R OTHER LIMITS FROM: FM 986 LIMITS TO: SH 3, NW TIP DESCRIPTION: CONSTRUCT NEW 2 LANE FM HIGHWAY REV DATE: 02/2009 REV DATE: 02/ PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER K.6

7 MODIFICATIONS TO APPENDIX D Projects Added to Appendix D Through Quarterly STIP Revision Cycles ENVIRONMENTAL CLEARANCE PROJECTS K.7

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026 Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway

More information

APPENDIX A: Planning Consistency Checklist

APPENDIX A: Planning Consistency Checklist APPENDIXA: PlanningConsistencyChecklist Planning Requirements for Environmental Document Approvals with Segmented Implementation Document Information: Date: 1/20/2015 Document Type: EA Document Status:

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

N O R T H T E X A S T O L L W A Y A U T H O R I T Y

N O R T H T E X A S T O L L W A Y A U T H O R I T Y N O R T H T E X A S T O L L W A Y A U T H O R I T Y On he Move NTTA Board Names New Interim Executive Director Current Assistant Executive Director of Project Delivery Gerry Carrigan Assumes New Post The

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION ALL Counties MINUTE ORDER Page 1 of 1 ALL Districts Transportation Code, 201.991 provides that the Texas Department of Transportation (department) shall develop a Unified

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013 2013 El Paso County Comprehensive Mobility Plan December 16, 2013 2013 El Paso County Comprehensive Mobility Plan Map No. Project Name 01 I-10 COLLECTOR DISTRIBUTOR LANES 02 I-10/BORDER HIGHWAY CONNECTORS

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

CRISIS COALITION. Regional Projects Analysis February 2, 2015

CRISIS COALITION. Regional Projects Analysis February 2, 2015 CRISIS COALITION Regional Projects Analysis February 2, 215 STUDY BACKGROUND Team of CRISIS Representatives, Parish Presidents and/or their Representatives, Legislators, and MPO Staff shortlisted 19 regional

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) COLUMBIA COUNTY Highways: Interstate 4424121 I-10 COLUMBIA COUNTY REST AREA

More information

DFW Connector North Airport Interchange

DFW Connector North Airport Interchange DFW Connector North Airport Interchange FUNDING APPLICATION PROJECT NARRATIVE A. Project Name: DFW Connector North Airport Interchange B. Previously Incurred Project Cost. $ 1,020,000,000 C. Future Eligible

More information

Highways: State Highways

Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) CLAY COUNTY Highways: State Highways 4135301 D2 CLAY COUNTY TRAFFIC SIGNAL

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV. 02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA

More information

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY

6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i June 22, 2015 6. HIGHWAY MATTERS A. U.S. ROUTE 58 CORRIDOR STUDY Last year, VDOT commissioned the Route 58 Corridor Study to develop a planning

More information

DFW Connector North Airport Interchange FY 2017 AND 2018 INFRA GRANT APPLICATION ATTACHMENT 1 COVER PAGE AND PROJECT NARRATIVE

DFW Connector North Airport Interchange FY 2017 AND 2018 INFRA GRANT APPLICATION ATTACHMENT 1 COVER PAGE AND PROJECT NARRATIVE DFW Connector North Airport Interchange ATTACHMENT 1 COVER PAGE AND PROJECT NARRATIVE DFW Connector North Airport Interchange: Cover Page A. Was an application for this project submitted previously? YES

More information

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces

More information

Popeye s - Abilene, Texas. Price $673,000 7% Cap Rate 8 Year Lease Length NNN Lease

Popeye s - Abilene, Texas. Price $673,000 7% Cap Rate 8 Year Lease Length NNN Lease Popeye s - Abilene, Texas Price $673,000 7% Cap Rate 8 Year Lease Length NNN Lease Summary of Salient Facts Address 841 Ambler, Abilene, Texas 7901 Price / Cap $673,000 / 7% Cap Rate Rent $3,927.65 Monthly

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016 FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1 September 28, 2016 TAC Committee Role: Internal Stakeholders To provide input on the master planning analysis from the technical and

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

Canada and Alberta announce 33 new infrastructure projects

Canada and Alberta announce 33 new infrastructure projects January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke

More information

Initiatives. Regional Mobility

Initiatives. Regional Mobility Regional Mobility Initiatives Vol. III, No. 1 February 1998 Toll Roads are a key aspect of our future regional transportation system. Faced with a growing financial shortfall to fund needed freeway system

More information

Changes in TIP projects Draft vs. Final Draft

Changes in TIP projects Draft vs. Final Draft Attachment 2 Dollars in $1,000 Key 08698 Franklin Road and Cloverdale Road Intersection Changes in TIP projects Draft vs. Final Draft RW - $1,314 UT - $1,000 CE - $341 CN - $3,675 CN - $499 09438 Caldwell

More information

HIDALGO COUNTY CLOSED LANDFILL INVENTORY

HIDALGO COUNTY CLOSED LANDFILL INVENTORY HIDALGO COUNTY CLOSED LANDFILL INVENTORY MSWLF ID FAC ID NAME SITE LOCATION PLACE OP_COMPANY 170 TX00170 CITY OF ALAMO 3 MI SE OF CITY HALL & ADJACENT TO EXISTING LANDFILL SITE ALAMO ALAMO, CITY OF 224

More information

Centennial Airport Flight school practice areas. A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club

Centennial Airport Flight school practice areas. A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club Centennial Airport Flight school practice areas A PowerPoint Presentation By Michael Shannon Chief Flight Instructor Aspen Flying Club The Denver metro area airspace is very complex and congested. Centennial

More information

A History of the Construction of the Radial Expressway System in Cook County

A History of the Construction of the Radial Expressway System in Cook County ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation

More information

Arkansas State Highway and Transportation Department

Arkansas State Highway and Transportation Department Arkansas State Highway and Transportation Department Southeast Arkansas Cornerstone Coalition Monticello, AR Tuesday, May 21, 2013 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile

More information

Treaty Oaks Ranch 323+/- Acres Hood County, Texas $1,776,500

Treaty Oaks Ranch 323+/- Acres Hood County, Texas $1,776,500 Bret Polk Mobile: (254) 965-0349 Office: (214) 361-9191 Treaty Oaks Ranch 323+/- Acres Hood County, Texas $1,776,500 LOCATION: The ranch is located in a desirable area 10+/- miles south of Granbury, Texas,

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

THE IMPACT OF THE TRANSPORTATION INVESTMENT ACT ON COLUMBUS & THE STATE OF GEORGIA GEORGIA PLANNING ASSOCIATION SEPTEMBER 27, 2017

THE IMPACT OF THE TRANSPORTATION INVESTMENT ACT ON COLUMBUS & THE STATE OF GEORGIA GEORGIA PLANNING ASSOCIATION SEPTEMBER 27, 2017 THE IMPACT OF THE TRANSPORTATION INVESTMENT ACT ON COLUMBUS & THE STATE OF GEORGIA GEORGIA PLANNING ASSOCIATION SEPTEMBER 27, 2017 RICK JONES, AICP DIRECTOR OF PLANNING COLUMBUS CONSOLIDATED GOVERNMENT

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

66th Street. Portland Ave

66th Street. Portland Ave APPENDIX A: FIGURES dd re Mi ld es le Av e D r Grand or Lynd a sh Little Bobs on e rs E m La E 64th St Blaisdell E 65th St 4-LANE DIVIDED 4-LANE UNDIVIDED; NO LEFT/RIGHT TURN LANES Bloomington 15th 14th

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011 Imagine the result Laredo Urban Transportation Study August 31 st, 2011 Bus Rapid Transit Feasibility Study Prepared for: Laredo Urban Transportation Study Prepared by: ARCADIS U.S., Inc. 2410 Paces Ferry

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for:

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for: Trans Canada Highway Corridor Management Plan inal Draft Report Prepared for: City of Duncan Cowichan Tribes Council District of North Cowichan Cowichan Valley Regional District South Coast Region of the

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

GORDON LAKE RANCH. 973 acres palo pinto county Texas

GORDON LAKE RANCH. 973 acres palo pinto county Texas GORDON LAKE RANCH 973 acres palo pinto county Texas As the Dallas Ft Worth Metroplex expands, fewer large tracts of land are available for those wanting to enjoy life outside that ever increasing circle

More information

Highways: Interstate. Highways: State Highways

Highways: Interstate. Highways: State Highways FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE

More information

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Prepared by: The University of Texas at Arlington Program in Landscape Architecture, School of Architecture and The Institute of

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

FY 2017 MAJOR PROJECT STATUS

FY 2017 MAJOR PROJECT STATUS Princeton-Hightstown Road Improvements, CR 571 MUNICIPALITY: West Windsor Twp STATUS: This is an active project. FY18 and FY19 CON will continue as scheduled. South Pemberton Road, CR 530, Phase 2 MUNICIPALITY:

More information

TABLE OF CONTENTS. 1 P age

TABLE OF CONTENTS. 1 P age TABLE OF CONTENTS PROJECT DESCRIPTION... 2 PROJECT LOCATION... 5 PROEJCT PARTIES... 8 GRANT FUNDS AND SOURCES/ USES OF PROJECT FUNDS... 8 PRIMARY SELECTION CRITERIA/ QUALITY OF LIFE... 9 RESULTS OF BENEFIT

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

CITY OF LAREDO, TEXAS CAPITAL IMPROVEMENTS FUND PROJECT BUDGET FY

CITY OF LAREDO, TEXAS CAPITAL IMPROVEMENTS FUND PROJECT BUDGET FY OPENING BALANCE - - - 7,572,445 - - REVENUES Intergovernmental Revenue: National Park Service 385,200 385,200 64,124 321,076-385,200 Texas Parks & Wildlife 668,523 668,523 88,245 580,278-668,523 Texas

More information

Recreational Use Attainability Analysis Summary of Findings & Public Comment

Recreational Use Attainability Analysis Summary of Findings & Public Comment The Neches River Above Lake Palestine, Prairie Creek, Mud Creek, and West Mud Creek Recreational Use Attainability Analysis Summary of Findings & Public Comment Texas Institute for Applied Environmental

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

Last Updated: 11/27/2017 To view network selection criteria for doctors and hospitals, visit

Last Updated: 11/27/2017 To view network selection criteria for doctors and hospitals, visit Blue Choice PPO SM A Division of Health Care Service Corporation, a Mutual Legal Reserve Company, an Independent Licensee of the Blue Cross and Blue Shield Association Search Criteria: State: TX Location:

More information

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP BONITA BEACH ROAD May 18, 2016 Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA Greg Diserio, RLA Tara Salmieri, AICP Toole Design Group Engineers Planners Landscape Architects Authors BONITA BEACH

More information

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet

CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2014-64 DATE: October 3, 2014 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor o U.S. Department Washington Division Suite 501 Evergreen Plaza of Transportation 711 South Capitol Way Olympia, Washington 98501-1284 Federa' Highway (360) 753-9480 Administration (360) 753-9889 (FAX)

More information

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years Bay County Citizen s Plan Tentative Work Program Fiscal Years 2019-2023 The Florida Department of Transportation Complies with Various Non-Discrimination Laws and Regulations, including Title VI of the

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Railroad Safety Trail

Railroad Safety Trail 2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

TOWN OF FLOWER MOUND SUMMARY OF FIVE YEAR CIP PLAN FY Amendment 3 02/19/2018

TOWN OF FLOWER MOUND SUMMARY OF FIVE YEAR CIP PLAN FY Amendment 3 02/19/2018 STREET PROJECTS PROJECT OTHER ISSUED DEBT AUTHORIZED NEW COSTS SOURCES GO's & CO's UNISSUED GO's DEBT Aberdeen Drive Phase I ( 2 Lanes FM 2499 to Lake Forest) ** $ 1,650,000 $ - $ - $ - $ - $ - $ - $ 1,650,000

More information

Southlake Villas Development

Southlake Villas Development Southlake Villas Development Visit our website at www.castledevgroup.com 1 TABLE OF CONTENTS PROPERTY DEVELOPMENT SUMMARY DEVELOPMENT SUMMARY... 3-4 PROPERTY DESCRIPTION AERIAL... 5 BIRD S EYE VIEW...

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club Arkansas State Highway and Transportation Department Rotary Club of West Pine Bluff Pine Bluff Country Club Thursday, November 7, 2013 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile

More information

OVERVIEW ADDRESS GROSS LEASABLE AREA DAILY TRAFFIC COUNT MAJOR CITIES POPULATION

OVERVIEW ADDRESS GROSS LEASABLE AREA DAILY TRAFFIC COUNT MAJOR CITIES POPULATION MARKET OVERVIEW Commerce, Georgia is an impressive commercial district located on the US 441 Heritage Highway. Shopping, restaurants and other regional attractions convey relaxed southern charm. The area

More information

Local Government or Entity with an AFA

Local Government or Entity with an AFA Local Government or Entity with an AFA County Name BOWIE BRAZORIA BRAZOS BROOKS BURLESON CALDWELL LOCAL GOVERNMENT OR ENTITY NAME ALAMO AREA COG ALAMO RMA, C/O COUNTY PW COUNTY COUNTY BOWIE COUNTY BRAZORIA

More information

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2

Wesley Chapel Area Roadway Needs Study Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2 Build-Out Analysis (Beardsley Dr/Oldwoods Ave Need Study) Project Progress Meeting 2 August 13, 2012 2:00 PM Pasco County Development Services Conference Room 1. Welcome/Introductions 2. Project Overview

More information

RARE STAND ALONE PAD WITH DRIVE-THRU ACCESSIBILITY ON

RARE STAND ALONE PAD WITH DRIVE-THRU ACCESSIBILITY ON RARE STAND ALONE PAD WITH DRIVE-THRU ACCESSIBILITY ON A v i a t i o n C r o s s i n g P r o p e r t i e s L i m i t e d the content the site the exposure the access the opportunity the design ARCHITECTURE

More information

HOMER GLEN AREA COMMUNITY PARKS

HOMER GLEN AREA COMMUNITY PARKS HOMER GLEN AREA COMMUNITY PARKS VILLAGE OF HOMER GLEN PARK PROPERTIES Owned and Maintained by the Village of Homer Glen Heritage Park 14110 W. 151 st Street This 103 acre park, located adjacent to Village

More information

Federal Communications Commission

Federal Communications Commission PSAP Text-to-9 Readiness and Certification Registry As of February 4, 205 OMB Control No. 3060-204 State PSAP ID PSAP Name County Name Title Address City State Zip Phone Phone 2 Email Text to TTY Web Browser

More information

Segment 8.1. Segment 7. Segment 8.1A. Segment 6. Segment 5. Segment 4. Segment 2 Segment 3. Segment 1. Newberg. Dundee. Dayton

Segment 8.1. Segment 7. Segment 8.1A. Segment 6. Segment 5. Segment 4. Segment 2 Segment 3. Segment 1. Newberg. Dundee. Dayton Willamette & Pacific Railroad e t t e W i l l a m R i v e r v e r Note: For Segments 3, 4, 5, and 7, one design option would be selected from among the options within that segment. Y a m h i l l R i Segment

More information

PennDOT MAJOR ROAD PROJECTS

PennDOT MAJOR ROAD PROJECTS 1 file:lancastercountyroadwork Revision #1 Page 1. Lancaster County Road Work Mar 03 through Mar 07 www.co.lancaster.pa.us/planning Prepared by LCPC - Transportation Division Notes: >Headlights: Must be

More information

Modern Streetcar Vehicles Mixed Traffic Operations 14 Stations Scalability North and West

Modern Streetcar Vehicles Mixed Traffic Operations 14 Stations Scalability North and West February 16, 2016 Modern Streetcar Vehicles Mixed Traffic Operations 14 Stations Scalability North and West WHERE WE ARE: County s Role (5) The role of Broward County will change as a result of the transition

More information

The Olathe Quiet Zone

The Olathe Quiet Zone The Olathe Quiet Zone LEARNING TO LIVE WITH THE RAILROAD AS YOUR NEIGHBOR APWA August 18, 2008 1 2 BNSF At-Grade Crossings BNSF System Track Map Emporia - 88 TPD Ft Scott - 40 TPD Southgate 8 TPD 3 BNSF

More information

PROPERTIES FOR SALE (LAND) 9015 Mountain Ridge Dr, Suite 100, Austin, TX Ph: Fax:

PROPERTIES FOR SALE (LAND) 9015 Mountain Ridge Dr, Suite 100, Austin, TX Ph: Fax: East ACC Elgin - 15 ac. 15.00 acres NEC US Hwy 290 West & County Line Rd. Elgin, TX 78621 $6.00 psf RE CL 15 +/- acre commercial land is at the signalized intersection of County Line Rd and Hwy 290 and

More information

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS

PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Part 8. Traffic Controls for Highway-Rail Grade Crossings Page 8TC-1 PART 8. TRAFFIC CONTROLS FOR HIGHWAY-RAIL GRADE CROSSINGS TABLE OF CONTENTS Page CHAPTER 8A. GENERAL...........................................

More information

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda Thursday, May 25, 2017 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016

PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016 PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 LIST OF PRIORITY PROJECTS September 8, 2016 PROJECT SELECTION AND PRIORITIZATION PROCESS OVERVIEW HIGHWAY PROJECTS: The project selection and prioritization

More information

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT APPENDIX A: Sections of regionally significant roads and highways that are in need of reconstruction. All roadway segments are between 1-20 miles in length and carry at least 5,000 average daily traffic

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

Region 1 South Florida Tamiami Trail to John Stretch Park

Region 1 South Florida Tamiami Trail to John Stretch Park Region 1 South Florida Tamiami Trail to John Stretch Park Description Dist S-N Wypt N-S Southern Terminus at US-41 (Tamiami Trail). 0.1 0.0 42-1 94.2 Oasis Visitor Center. P, PT, PW, RG,R. 1.2 0.1 94.1

More information

ANNUAL WORK PLAN

ANNUAL WORK PLAN 1 DR1601 Drainage Drainage CIP Strategy May 2016 (12 projects) 2 DR1602 Drainage Drainage CIP Strategy May 2016 (6 studies) 3 DR1603 Drainage Comprehensive Storm Water Master Plan (CSWMP) 4 FR14001 Fire

More information

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS The Town of The Blue Mountains MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY R.J. Bur nside & Associat es Limit ed Study Area Issues Traffic congestion

More information