TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County
|
|
- Bathsheba Tucker
- 5 years ago
- Views:
Transcription
1 SR-33 No Projects Under Development in Blount County PIN: FROM OLD KNOXVILLE PIKE TO EAST LINCOLN ROAD Length (Intersection Improvements and Signals) SR-33 US-411 PIN: INTERSECTION AT FOOTHILLS MALL DRIVE/MONTGOMERY LANE, LM Length (Intersection Improvements) SR-35 US-411 PIN: SEVIERVILLE ROAD(US-411/SR-35), FROM WASHINGTON STREET TO WALNUT STREET Length (Reconstruction) SR-115 PIN: (RELOCATED ALCOA HIGHWAY), FROM HUNT ROAD INTERCHANGE, SOUTH OF AIRPORT ROAD TO EXISTING SR-115 AT SINGLETON STATION ROAD Length (Preliminary Engineering) The environmental studies are complete. SR-115 US-129 PIN: (RELOCATED ALCOA HIGHWAY), FROM SR-35(HALL ROAD), SOUTH OF AIRPORT ROAD TO PROPOSED INTERCHANGE AT TYSON BOULEVARD (IA) Length (Widen) SR-115 US-129 PIN: (RELOCATED ALCOA HIGHWAY), FROM PROPOSED INTERCHANGE AT TYSON BOULEVARD TO SR-162 (PELLISSIPPI PARKWAY) (IA) Length (Construction-New) SR-115 PIN: (RELOCATED ALCOA HIGHWAY) FROM SR-162(PELLISSIPPI PARKWAY) TO EXISTING SR-115 AT SINGLETON STATION ROAD (IA) Length (Construction-New) Page: 1
2 BLOUNT - KNOX COUNTIES SR-115 US-129 PIN: (ALCOA HIGHWAY), FROM I-140 (PELLISSIPPI PARKWAY) TO CHEROKEE TRAIL Length (Location and Environmental Study) The environmental studies are complete. SR-115 US-129 PIN: (ALCOA HIGHWAY); PELLISSIPPI PARKWAY TO SOUTH OF TOPSIDE ROAD. (IA) Length (Widen) SR-115 US-129BP PIN: INTERSECTION AT SR-73 (US-321, W. LAMAR ALEXANDER PARKWAY), LM Length (Intersection Improvements and Signals) SR-115 US-129BP PIN: FROM SR-73 (LAMAR ALEXANDER PKWY) TO SR-35 (IA) Length (Reconstruction) The planning document is underway. BLOUNT - KNOX COUNTIES SR-115 US-129 PIN: ITS EXPANSION FROM I-140 IN TO CHEROKEE TRAILS IN KNOX COUNTY (IA) Length SR-162EXT PIN: (PELLISSIPPI PARKWAY), FROM SR-33 TO SR-73 (US-321) (IA) Length (Stage Construction-New) The engineering is scheduled to begin in the 4th Quarter Calendar Year SR-333 PIN: FROM WRIGHT'S FERRY ROAD TO TVA LAB ROAD Length (Turn Lanes) The environmental studies are complete. Page: 2
3 SR-336 PIN: MONTVALE STATION ROAD TO SR-73(LAMAR ALEXANDER PARKWAY) (IA) Length (Widen) BLOUNT - SEVIER COUNTIES PIN: FOOTHILLS PARKWAY(MISSING LINK) FROM US-321 NEAR WALLAND TO US-321 NEAR WEARS VALLEY (JOINT PROJECT WITH NATIONAL PARK SERVICE) (IA) Length SIA PIN: INDUSTRIAL ACCESS ROAD(CUSICK ROAD) SERVING ALUMINUM COMPANY OF AMERICA IN ALCOA Length (Construction-New) The right-of-way and/or utility process is being performed by the local agency. SIA PIN: INDUSTRIAL ACCESS SERVING PROJECT PYTHON METEOR (Widen and Resurfacing) SIA PIN: STATE INDUSTRIAL ACCESS SERVING DENSO (Construction-New) KNOX - BLOUNT - SEVIER COUNTIES SR-71 US-441 PIN: (CHAPMAN HWY), FROM NEAR BLOUNT AVENUE TO NEAR SR-338 (BOYDS CREEK HWY) IN SEYMOUR (IA) Length (Reconstruction) The planning report is complete. LOUDON - BLOUNT COUNTIES SR-73 US-321 PIN: FROM NEAR JACKSON BEND ROAD IN LOUDON COUNTY TO WEST OF BALDWIN ROAD IN Length (Miscellaneous Safety Improvements) The environmental studies are complete. Page: 3
4 SR-334 No Projects Under Construction in Blount County FROM SR-335 TO SR-333 (RESURFACE & SAFETY) LENGTH CNR164 LET TO CONTRACT: 5/12/2017 APAC-ATLANTIC, INC. BID PRICE : $274, EST. COMPLETION DATE: SEPTEMBER, 2017 BLOUNT - MONROE - LOUDON COUNTIES SR-33 FROM MCMINN/MONROE COUNTY LINE TO BLOUNT/KNOX COUNTY LINE (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH CNR131 LET TO CONTRACT: 3/31/2017 HIGHWAY MARKINGS, INC. BID PRICE : $898, EST. COMPLETION DATE: NOVEMBER, 2017 SR-33 INTERSECTION AT DEFOE CIRCLE AND OLD KNOXVILLE PIKE (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH CNQ143 LET TO CONTRACT: 12/2/2016 WHALEY & SONS, INC. BID PRICE : $1,033, EST. COMPLETION DATE: AUGUST, 2017 Page: 4
5 COCKE COUNTY I-40 No Projects Under Development in Cocke County PIN: INTERCHANGE AT ONEIL ROAD, MM (IA) Length (New Interchange) The reevaluation for the interchange justification study is underway. COCKE COUNTY I-40 PIN: CONNECTOR ROADS TO SR-32 AND SR-73 Length (Construction-New) This project is in the early stages of development. COCKE COUNTY I-40 US-25W PIN: INTERCHANGE AT SR-9 Length (Intersection Improvements) COCKE COUNTY SR-9 US-25 PIN: (EAST BROADWAY), FROM LM 5.80 TO LM 6.30 IN NEWPORT Length (Signalization) COCKE COUNTY SR-32 US-321 PIN: FROM SR-73 AT COSBY TO WILTON SPRINGS ROAD (IA) Length (Construction-New) COCKE COUNTY SR-32 US-321 PIN: FROM NEW CAVE CHURCH ROAD TO HERITAGE BLVD IN NEWPORT (RSAR) Length (Intersection Improvements and Signals) COCKE COUNTY SR-35 US-321 PIN: (NEWPORT BYPASS), FROM SR-9 TO SAINT TIDE HOLLOW ROAD (IA) Length (Construction-New) Page: 5
6 COCKE COUNTY SIA PIN: STATE INDUSTRIAL ACCESS SERVING OAKCREST LUMBER (Reconstruction) Page: 6
7 COCKE COUNTY SR-32 No Projects Under Construction in Cocke County FROM TRAIL HOLLOW ROAD TO SR-73 (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH CNR146 LET TO CONTRACT: 5/12/2017 NEWPORT PAVING COMPANY, INC. BID PRICE : $179, EST. COMPLETION DATE: OCTOBER, 2017 COCKE COUNTY SR-32 US-321 FROM NEAR SR-73(HOOPER HIGHWAY) TO NEAR SR-73(WILTON SPRINGS ROAD) (RESURFACE & SAFETY) LENGTH CNR146 LET TO CONTRACT: 5/12/2017 NEWPORT PAVING COMPANY, INC. BID PRICE : $816, EST. COMPLETION DATE: OCTOBER, 2017 COCKE COUNTY SR-339 FROM SR-32 TO SEVIER COUNTY LINE (RESURFACING) LENGTH CNR146 LET TO CONTRACT: 5/12/2017 NEWPORT PAVING COMPANY, INC. BID PRICE : $132, EST. COMPLETION DATE: OCTOBER, 2017 COCKE COUNTY SR-73 BRIDGE OVER PIGEON RIVER, LM 4.56 (BRIDGE REPAIR) CNQ318 LET TO CONTRACT: 10/7/2016 JAMISON CONSTRUCTION, LLC BID PRICE : $960, EST. COMPLETION DATE: NOVEMBER, 2017 Page: 7
8 COCKE COUNTY SR-32 US-321 FROM SR-73(WILTON SPRINGS) TO SOUTH OF I-40 (RECONSTRUCTION) LENGTH CNP033 LET TO CONTRACT: 2/13/2015 CHARLES BLALOCK & SONS, INC. BID PRICE : $14,792, EST. COMPLETION DATE: DECEMBER, 2017 COCKE - JEFFERSON COUNTIES SR-32 US-25E BRIDGE OVER FRENCH BROAD RIVER, LM (BRIDGE REPLACEMENT) LENGTH CNM010 LET TO CONTRACT: 4/5/2013 CHARLES BLALOCK & SONS, INC. BID PRICE : $12,894, EST. COMPLETION DATE: AUGUST, 2017 Page: 8
9 JEFFERSON COUNTY I-40 No Projects Under Development in Jefferson County PIN: BRIDGE OVER FRENCH BROAD RIVER, LM (IA) Length (Bridge Replacement) JEFFERSON COUNTY SR-9 US-25W PIN: INTERCHANGE AT SR-113 (RSAR) Length (Miscellaneous Safety Improvements) The environmental studies are complete. JEFFERSON COUNTY SR-34 US-11E PIN: INTERSECTION AT NORTH CHUCKY PIKE Length (Turn Lanes with Signal) JEFFERSON COUNTY SR-35 US-411 PIN: INTERSECTION OF SR-92 / DICKEY ROAD TO GRAPEVINE HOLLOW ROAD Length (Construction-New) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year JEFFERSON COUNTY SR-92 PIN: BRIDGE OVER MUDDY CREEK, LM 3.12 Length (Bridge Replacement) JEFFERSON COUNTY SR-113 PIN: INTERSECTION AT SR-341 Length (Signalization) SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: SIMS ROAD IN SEVIER COUNTY TO GRAPEVINE HOLLOW ROAD IN JEFFERSON COUNTY Length (Right-of-Way) Page: 9
10 SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: (NEWPORT HWY.) FROM NEAR SIMS ROAD IN SEVIER COUNTY TO NEAR SR-92 (DICKEY ROAD) IN JEFFERSON COUNTY (IA) Length (Construction-New) The right-of-way and/or utility process is underway on the section from Sims Road to Grapevilne Hollow Road. Page: 10
11 JEFFERSON COUNTY I-40 No Projects Under Construction in Jefferson County BRIDGES OVER I-81 RAMPS, LM'S AND (BRIDGE REPAIR) LENGTH CNR081 LET TO CONTRACT: 8/18/2017 SOUTHERN CONSTRUCTORS, INC. BID PRICE : $1,117, EST. COMPLETION DATE: APRIL, 2018 HAMBLEN - JEFFERSON COUNTY SR-66REL NORTH OF I-81 AT SR-341 IN JEFFERSON COUNTY TO SR-160 IN MORRISTOWN (PAVING) LENGTH CNQ928 LET TO CONTRACT: 12/2/2016 APAC-ATLANTIC, INC. BID PRICE : $7,647, EST. COMPLETION DATE: JUNE, 2018 JEFFERSON COUNTY SR-92 BRIDGE OVER FRENCH BROAD RIVER, LM 9.16 IN DANDRIDGE (BRIDGE REPLACEMENT) LENGTH CNP287 LET TO CONTRACT: 10/16/2015 SIMPSON CONSTRUCTION COMPANY, INC. BID PRICE : $29,106, EST. COMPLETION DATE: APRIL, 2019 HAMBLEN - JEFFERSON COUNTY SR-66REL NORTH OF I-81 AT SR-341 IN JEFFERSON COUNTY TO SR-160 IN MORRISTOWN (STAGE CONSTRUCTION-NEW) LENGTH CNM089 LET TO CONTRACT: 5/24/2013 CHARLES BLALOCK & SONS, INC. BID PRICE : $43,048, EST. COMPLETION DATE: MAY, 2018 Page: 11
12 COCKE - JEFFERSON COUNTY SR-32 US-25E BRIDGE OVER FRENCH BROAD RIVER, LM (BRIDGE REPLACEMENT) LENGTH CNM010 LET TO CONTRACT: 4/5/2013 CHARLES BLALOCK & SONS, INC. BID PRICE : $12,894, EST. COMPLETION DATE: AUGUST, 2017 Page: 12
13 LOUDON COUNTY SR-2 US-11 No Projects Under Development in Loudon County PIN: SOUTH OF LOUDON MIDDLE SCHOOL TO NORTH OF CARTER STREET. Length (Widen) LOUDON COUNTY SR-73 US-321 PIN: FROM SIMPSON ROAD EAST TO NORTH OF SR-2(US-11) IN LENOIR CITY Length (Widen) This project is currently advertised for the October 6, 2017 contract letting. LOUDON COUNTY SR-73 US-321 PIN: INTERSECTION AT SR-2(US-11) IN LENOIR CITY Length (Intersection Improvements) This project is currently advertised for the October 6, 2017 contract letting. LOUDON - BLOUNT COUNTIES SR-73 US-321 PIN: FROM NEAR JACKSON BEND ROAD IN LOUDON COUNTY TO WEST OF BALDWIN ROAD IN Length (Miscellaneous Safety Improvements) The environmental studies are complete. LOUDON COUNTY PIN: KINGSTON STREET, INTERSECTION AT TOWN CREEK ROAD (RSAR) Length (Miscellaneous Safety Improvements) Page: 13
14 BLOUNT - MONROE - LOUDON No COUNTY Projects Under SR-33 Construction in Loudon County FROM MCMINN/MONROE COUNTY LINE TO BLOUNT/KNOX COUNTY LINE (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH CNR131 LET TO CONTRACT: 3/31/2017 HIGHWAY MARKINGS, INC. BID PRICE : $898, EST. COMPLETION DATE: NOVEMBER, 2017 LOUDON - KNOX COUNTIES SR-1 US-70 (KINGSTON PIKE); INTERSECTION AT SR-2(LEE HIGHWAY) - DIXIE LEE JUNCTION (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH CNQ313 LET TO CONTRACT: 10/7/2016 WHALEY & SONS, INC. BID PRICE : $3,496, EST. COMPLETION DATE: NOVEMBER, 2018 LOUDON COUNTY SR-73 US-321 FROM SR-2(US-11) TO EAST OF LITTLE TENNESSEE RIVER (FT LOUDOUN/TELLICO CANAL) (RECONSTRUCTION) LENGTH CNL139 LET TO CONTRACT: 6/15/2012 CHARLES BLALOCK & SONS, INC. BID PRICE : $69,361, EST. COMPLETION DATE: NOVEMBER, 2017 Page: 14
15 MONROE COUNTY SR-68 No Projects Under Development in Monroe County PIN: NORTH OF BRIDGE TO SOUTH OF SR-39 (MECCA PIKE) Length (Safety) MONROE COUNTY SR-322 PIN: FROM SWEETWATER-VONORE ROAD TO SHEPPARD ROAD(EPD) (IA) Length (Reconstruction) MONROE COUNTY SR-322 PIN: FROM SHEPPARD ROAD TO SR-72 (EPD) (IA) Length (Reconstruction) MONROE COUNTY SR-360 PIN: CULVERT AT LM 17.8 Length (Culvert Replacement) MONROE COUNTY PIN: BALLPLAY ROAD, FROM SR-360 TO SR-33 (RSA) Length (Miscellaneous Safety Improvements) The environmental studies are complete. MONROE COUNTY SR-322 PIN: FROM WEST OF SUNNEYSIDE ROAD NEAR SWEETWATER TO SR-72 Length (Location and Environmental Study) The environmental studies are complete. Page: 15
16 MONROE COUNTY SR-68 No Projects Under Construction in Monroe County FROM NEAR PARALLEL BRIDGES OVER I-75 TO NEAR BRIDGE OVER SOUTHERN RAILWAY (RESURFACE & SAFETY) LENGTH CNR151 LET TO CONTRACT: 5/12/2017 ROGERS GROUP, INC. BID PRICE : $746, EST. COMPLETION DATE: OCTOBER, 2017 MONROE COUNTY SR-33 US-411 FROM NEAR STINNETT RIDGE ROAD TO NEAR KING ROAD (RESURFACE & SAFETY) LENGTH CNR163 LET TO CONTRACT: 5/12/2017 PATTY CONSTRUCTION INC. BID PRICE : $960, EST. COMPLETION DATE: OCTOBER, 2017 MONROE COUNTY SR-322 FROM LOUDON COUNTY LINE TO SR-2 (RESURFACE & SAFETY) LENGTH CNR216 LET TO CONTRACT: 5/12/2017 ROGERS GROUP, INC. BID PRICE : $536, EST. COMPLETION DATE: OCTOBER, 2017 BLOUNT - MONROE - LOUDON COUNTY SR-33 FROM MCMINN/MONROE COUNTY LINE TO BLOUNT/KNOX COUNTY LINE (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH CNR131 LET TO CONTRACT: 3/31/2017 HIGHWAY MARKINGS, INC. BID PRICE : $898, EST. COMPLETION DATE: NOVEMBER, 2017 Page: 16
17 ROANE - CUMBERLAND COUNTIES No Projects Under Development in Roane County PIN: OLD ROCKWOOD ROAD/BLACK HOLLOW ROAD, FROM SR-299 IN CUMBERLAND COUNTY TO FURNACE AVENUE IN ROANE COUNTY Length (Miscellaneous Safety Improvements) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year ROANE COUNTY I-40 PIN: FROM NEAR MM 341 TO NEAR MM 342 IN ROANE COUNTY Length (Miscellaneous Safety Improvements) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year ROANE COUNTY SR-1 US-70 PIN: FROM SR-61(US-27) IN ROCKWOOD TO MIDTOWN Length (Location and Environmental Study) ROANE COUNTY SR-1 US-70 PIN: FROM SR-382 TO MIDTOWN (IA) Length (Widen) ROANE COUNTY SR-1 US-70 PIN: INTERSECTION AT SR-29(PINE RIDGE ROAD), LM IN HARRIMAN Length (Intersection Improvements and Signals) ROANE - MORGAN COUNTIES SR-29 US-27 PIN: FROM SR-61 IN HARRIMAN (ROANE COUNTY) TO SR-62 IN MORGAN COUNTY Length (Location and Environmental Study) The environmental studies are complete. ROANE COUNTY SR-95 PIN: CULVERT OVER BEAR CREEK, LM 4.19 Length (Widen) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year Page: 17
18 ROANE - MORGAN COUNTIES SR-29 US-27 PIN: FROM SR-61 IN HARRIMAN IN ROANE COUNTY TO NORTH OF SR-328 IN MORGAN COUNTY Length (Right-of-Way) Page: 18
19 ROANE COUNTY SR-1 US-70 No Projects Under Construction in Roane County FROM EAST OF KINGSTON AVENUE TO SR-382 (WIDEN) LENGTH CNR040 LET TO CONTRACT: 2/10/2017 CHARLES BLALOCK & SONS, INC. BID PRICE : $16,989, EST. COMPLETION DATE: AUGUST, 2019 ROANE COUNTY MARGRAVE DRIVE, BRIDGE OVER SOUTHERN R/R, LM 0.45 IN HARRIMAN (BRIDGE REPLACEMENT) LENGTH CNQ037 LET TO CONTRACT: 4/1/2016 JONES BROS., INC. BID PRICE : $1,619, EST. COMPLETION DATE: OCTOBER, 2018 ROANE - MORGAN COUNTIES SR-29 US-27 FROM SR-61 IN HARRIMAN TO SOUTH OF WHETSTONE ROAD IN MORGAN COUNTY (RECONSTRUCTION) LENGTH CNP047 LET TO CONTRACT: 2/13/2015 CHARLES BLALOCK & SONS, INC. BID PRICE : $62,793, EST. COMPLETION DATE: JULY, 2018 Page: 19
20 BLOUNT - SEVIER COUNTY No Projects Under Development in Sevier County PIN: FOOTHILLS PARKWAY(MISSING LINK) FROM US-321 NEAR WALLAND TO US-321 NEAR WEARS VALLEY (JOINT PROJECT WITH NATIONAL PARK SERVICE) (IA) Length KNOX - SEVIER COUNTY I-40 PIN: FROM NEAR STRAWBERRY PLAINS PIKE (EXIT 398) INTERCHANGE TO NEAR SR-66 (SEVIERVILLE, EXIT 407) INTERCHANGE (IA) Length KNOX - SEVIER COUNTY SR-71 US-441 PIN: (CHAPMAN HIGHWAY), FROM EVANS ROAD TO BURNETT LANE Length (Turn Lanes) KNOX - BLOUNT - SEVIER COUNTY SR-71 US-441 PIN: (CHAPMAN HWY), FROM NEAR BLOUNT AVENUE TO NEAR SR-338 (BOYDS CREEK HWY) IN SEYMOUR (IA) Length (Reconstruction) The planning report is complete. SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: SIMS ROAD IN SEVIER COUNTY TO GRAPEVINE HOLLOW ROAD IN JEFFERSON COUNTY Length (Right-of-Way) SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: (NEWPORT HWY.) FROM NEAR SIMS ROAD IN SEVIER COUNTY TO NEAR SR-92 (DICKEY ROAD) IN JEFFERSON COUNTY (IA) Length (Construction-New) The right-of-way and/or utility process is underway on the section from Sims Road to Grapevilne Hollow Road. SEVIER COUNTY SR-71 US-441 PIN: SR-35/338(US-411) TO MACON LANE Length (Reconstruction) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year Page: 20
21 SEVIER COUNTY SR-73 US-321 PIN: BUCKHORN ROAD TO SR-416 (PHASE 2)(EPD) (IA) Length (Widen) SEVIER COUNTY SR-338 PIN: (BOYDS CREEK HWY), INTERSECTION AT PITNER ROAD, LM 0.95 Length (Intersection Improvements and Signals) SEVIER COUNTY SR-339 PIN: JONES COVE ROAD TO WILHITE ROAD (PHASE 2) Length (Miscellaneous Safety Improvements) SEVIER COUNTY SR-449EXT PIN: (VETERANS BLVD), FROM SR-35 TO ROBERT HENDERSON ROAD (IA) Length SEVIER COUNTY LIC PIN: WINFIELD DUNN PARKWAY/SNYDER ROAD, FROM NORTH OF LENZ DRIVE TO NEAR HARDIN ROAD IN SEVIERVILLE Length (Realignment) A contract for construction is scheduled to be let in the 4th Quarter Calendar Year SEVIER COUNTY PIN: JAKE THOMAS CONNECTOR, FROM SR-449 TO SR-73 (US-321/441) (IA) Length (Construction-New) Page: 21
22 SEVIER COUNTY SR-449 No Projects Under Construction in Sevier County (DOLLYWOOD LANE), INTERSECTION AT SOUTH RIVER ROAD IN PIGEON FORGE (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) CNR129 LET TO CONTRACT: 3/31/2017 SUPERIOR TRAFFIC CONTROL, INC. BID PRICE : $4, EST. COMPLETION DATE: OCTOBER, 2017 SEVIER COUNTY SR-71 US-441 FROM BON AIR DRIVE TO KING BRANCH ROAD (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH CNR129 LET TO CONTRACT: 3/31/2017 SUPERIOR TRAFFIC CONTROL, INC. BID PRICE : $21, EST. COMPLETION DATE: OCTOBER, 2017 Page: 22
Weekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationSevier Crossing. New Retail Development with Lease Space Available Chapman Highway Knoxville, TN Contacts:
Sevier Crossing New Retail Development with Lease Space Available 7621 Chapman Highway Knoxville, TN 37920 Sevier Crossing New Retail Opportunity Contacts: Josiah Glafenhein (865) 206-0180 josiah@greenbrier-rea.com
More informationKNOXVILLE BEAUTIFUL FOR BUSINESS
KNOXVILLE, TENNESSEE KNOXVILLE BEAUTIFUL FOR BUSINESS Knoxville, a gateway to the Great Smoky Mountains National Park, located in East Tennessee, has something for everyone including historical tours,
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationMETROPOLITAN PLANNING COMMISSION CONSENT APPROVAL LIST SEPTEMBER 14, 2017
METROPOLITAN PLANNING COMMISSION CONSENT APPROVAL LIST SEPTEMBER 14, 2017 These items are recommended for approval on consent and are marked (*) on the Agenda. They will be considered under one motion
More informationCompany Address City State Services Website Phone 1
Company Address City State Services Website Phone 1 Email A-1 Certified Service, AA- Company Accurate Contracting Services, Advanced And 2511 Byington Solway Rd. 1001 Katherine Ave 12000 Olympic Drive
More informationDecember 2016 Property Inventory
Land December 2016 Property Inventory LISTING ID: 29773743 1,050 Acres on Harlan Mountain (Pending/Contingent) - 1,050 Acres, 7 miles outside of Tellico Plains on HWY 360 (Ballplay School Road) Tellico
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More information(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)
District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) District 2 -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts
More informationCOUNTY WIDE PROJECTS CURRENT SPLOST FUNDING
CAPITAL S IV - LIST Updated thru July 17, 2018 COUNTY WIDE S SP4001 911 Radio Replacement County 7,000,000 (440,000) 6,560,000 624,000 7,184,000 6,224,329 959,671 IN PROGRESS SP4002 Airport FBO 1,000,000-1,000,000-1,000,000
More informationIMPORTED FIRE ANT AREAS IN TENNESSEE QUARANTINED AREAS FOR YEAR 2007
IMPORTED FIRE ANT AREAS IN TENNESSEE QUARANTINED AREAS FOR YEAR 2007 NOTE: Italics indicate a new county or a change from year 2006. 1. Anderson County That portion of the county lying southeast of a line
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More information2016 Development Activity
KNOXVILLE KNOX TENNESSEE 20 Development Activity KNOXVILLE KNOX METROPOLITAN PLANNING COMMISSION Suite 403, City County Building 400 Main Street Knoxville, TN 37902 865-215-2500 contact@knoxmpc.org www.knoxmpc.org
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationRESOLUTION OF THE FAYETTE COUNTY BOARD OF EDUCATION REGARDING
RESOLUTION OF THE FAYETTE COUNTY BOARD OF EDUCATION REGARDING THE BUDGET AND FUNDING FOR THE 2015-2016 SCHOOL YEAR WHEREAS, the Fayette County Board of Education (Board) has responsibility for improving
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationSevierville, Tennessee
Interstate 40 at Exit 407 Sevierville, Tennessee Type Open Air Center with entertainment and mixed use components (retail, hotel & restaurant) Location Interstate 40 and Exit 407 (Snyder Road) Owner, LLC
More informationSevier County Natural Stakeholders
County Mr. Larry Waters Sevier County Cthse Ste 21E 125 Court Ave 865 453-6136 FAX 453-683 Supt. Highways Mr. Jonas A. Smelcer Sevier County Cthse Ste 34E 865 453-3452 Gatlinburg Mr. Mike Helton 123 Parkway
More informationSWD Sport and Wellness of Danbury (formerly Beaver Brook), 17 Starr Rd, Danbury
SWD Sport and Wellness of Danbury (formerly Beaver Brook), 17 Starr Rd, Danbury 203-743-7676 Take RT 84 East to Exit 7. Exit left onto RT 7 North. Take first exit, Federal Road, to light at bottom of exit
More informationKDOT announces approved November bids
IMMEDIATE RELEASE Nov. 27, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved November bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationFY TIP Projects TDOT
Project Name Termini Agency Phase TIP # 2017 2018 2019 2020 2017 2018 2019 2020 I-40 Interchange at SR-196 (Hickory Withe Road) TDOT NHS-2006-11 52 $12,164,568 I-240 Interchange at Airways TDOT PE-D $1,350,000
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationChapter 6 Existing and Proposed Transportation Facilities
Chapter 6 Existing and Proposed Transportation Facilities Methodology As discussed in Chapter 4, the Dixie MPO s CUBE modeling platform was used to analyze future traffic demand. The CUBE Model applied
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFY TIP Projects TDOT
Project Name Termini Agency Phase TIP # 2017 2018 2019 2020 2017 2018 2019 2020 I-40 Interchange at SR-196 (Hickory Withe Road) TDOT CONST NHS-2006-11 52 $12,164,568 I-240 Interchange at Airways TDOT PE-D
More informationGovernor Club Visits * Club Location Address Day & Time AG Date of meeting proposed Bearden Bearden Banquet Hall 5806 Kingston Pike Friday
Governor Club Visits 2015-16* Club Location Address Day & Time AG Date of meeting proposed Bearden Bearden Banquet Hall 5806 Kingston Pike Friday 12:15 Peggy Wilson Friday, July 24, 2015 Bradley Sunrise
More informationTHE RICHMOND REGION Transportation Priority Projects
Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)
More informationSecuring Tourism s Place at the Local Economic Development Table. Steve Morse, Ph.D. Director & Economist Tourism Institute Sept.
Securing Tourism s Place at the Local Economic Development Table Steve Morse, Ph.D. Director & Economist Tourism Institute Sept. 20, 2007 1 First, Welcome to Tourism professionals from Tennessee Faculty
More informationFHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date
SPECIAL COMMITTEE ON US ROUTE NUMBERING MEETING MINUTES FOR OCTOBER 17, 2013 AND REPORT TO SCOH OCTOBER 18, 2013 SHERATON DOWNTOWN DENVER, DENVER, COLORADO ADDENDUM OCTOBER 28, 2013 The meeting of the
More informationDIAMOND SPONSOR: Jewelry Television, SecureWatch,LLC. PLATINUM SPONSORS: 640 Nissan, Pilot Corporation, Ruby Tuesday
DIAMOND SPONSOR: Jewelry Television, SecureWatch,LLC PLATINUM SPONSORS: 640 Nissan, Pilot Corporation, Ruby Tuesday GOLD SPONSORS: ATC ( All Types Construction ), Advance Auto Parts, Clayton Homes Inc.,
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationWEEKLY HIGHWAY ALERT RICHMOND DISTRICT
CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected
More informationLPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike
LPA Location Federal Funds Awarded to LPA Allen County Allen County Bridge #271: South County Line Road over St Marys River $1,091,200.00 Boone County On CR 500W, approximately 750' South of Middle Jamestown
More informationSummer Camp Transportation Details
Summer Camp Transportation Details Drivers Drop off at Will-A-Way is Sunday, June 12 th between 3:00-4:30PM. We are busy preparing for your campers so please do not arrive before 3PM as the gates will
More informationFY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars
FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue
More informationProgram Project Name Project Description
Program Project Name Project Description PAVING BERLIN-BARRE CITY ***List Provided by Vermont's Agency of Transportation*** RESURFACE VT62 IN BERLIN AND BARRE CITY, BEGINNING APPROX. 0.2 MILE EAST OF THE
More informationBEDFORD COUNTY START PERIOD
BASE Bridge Rehabilitation South Loysburg Beaver Creek BASE Bridge Replacement Township Road 397 Shaffers Creek #8 BASE Bridge Replacement Ashcom Bridge BASE Bridge Replacement Buffalo Run Bridge BASE
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationEvansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects
Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning
More informationDivision I Class AAA District 1
Regular Season Standings 1 Science Hill 2 Dobyns-Bennett Division I Class AAA District 1 3 Daniel Boone 4 David Crockett 5 Tennessee 1 Science Hill 58 6 Cherokee 7 Volunteer 4 David Crockett 56 2/16/2018
More informationSOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY
SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY Section 1 Purple Alternative (Revised: January 2007) I-79 to Mon/Fayette Expressway Purple Alternative Section 1 Photo Presentation Photo Presentation The
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationLet the Adventure Begin...
Let the Adventure Begin... A day of great adventure begins with a good night s rest. In Sevierville, we know that s true. That s why we offer more than 4,000 convenient and comfortable rooms that offer
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationHappy Creek Development 2467 Happy Creek Rd. Sevierville, TN 37876
DEVELOPMENT FOR SALE - REDUCED PRICE 2467 Happy Creek Rd. Sevierville, TN 37876 PROPERTY DESCRIPTION PROPERTY OVERVIEW One of the most private and natural settings at the base of the Great Smoky Mountains,
More informationThere was no new business. The next meeting will be in Charlotte, NC, November 21, The meeting adjourned at 6:15 PM.
Special Committee on U. S. Route Numbering Louisville, Kentucky Report to SCOH - May 29, 2014 The meeting was called to order by Mark McConnell, MS at 5:10 PM in the Jockey Club Room at the Downtown Marriott
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationCompletion: August 2011 LS #321 Design LS #8
1 CIPNumber c350406 2 c350302 3 c350902 LEGEND PERMITTING/ BIDDING CHARLOTTE COUNTY UTILITIES Burnt Store Water Reclamation Facility (Expansion to 0.75 MGD) East Port Expansion Water Reclamation Facility
More informationMEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting
COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation
More informationArkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)
ROUTE: 17 COUNTY: WOODRUFF KESSER INTERNATIONAL, INC. LITTLE ROCK, AR PHILLIPS HARDY, INC. BOONVILLE, MO PATRIARCH CONTRACTING, LLC SEARCY, AR COMMON CONSTRUCTION LLC SEARCY, AR SEAGRAVES CONSTRUCTION,
More informationTennessee and North Carolina Vacation JUL 29, AUG 7, 2016 DENVER, NASHVILLE, PIGEON FORGE
Tennessee and North Carolina Vacation JUL 29, 2016 - AUG 7, 2016 DENVER, NASHVILLE, PIGEON FORGE This is what I created for us for our trip. Maybe a little bit to much but I thought it was cool and it
More informationSOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN
76 422 3 4 3 422 79 79 79 7 579 8 422 1 76 3 22 SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR 29-2 DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY Legend TIP Projects TIP Routes Major Roads ««MORRIS
More information2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW
Florida Department of TRANSPORTATION 2017 FTBA CONSTRUCTION CONFERENCE February 2-3, 2017 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW Presenter: Jim Boxold, Secretary 1 Florida s Continued Growth
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More information02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.
02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA
More informationLee County Board of County Commissioners January 24, 2017 Workshop Meeting
Lee County Board of County Commissioners January 4, 017 Workshop Meeting 1 Review Current Transportation Priorities (Tiers 1,, 3) Discuss Status of Projects 3 Discuss Ranking Recommendations 1 State of
More informationKnoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results J U LY 1 5,
Knoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results PREPARED FOR: KNOXVILLE CHAMBER THE DEVELOPMENT CORPORATION OF KNOX COUNTY J U LY 1 5,
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationPresented By: Deputy Executive Director February 17, 2011
TRANSPORTATION PROJECT PRIORITIZATION Presented By: Camelia Ravanbakht, Ph.D. Ca e a aaba t,.. Deputy Executive Director February 17, 2011 OVERVIEW 2034 Long-Range g Transportation Plan (LRTP) Process
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationCOVINGTON COUNTY Century 4 89 Gonzalez 10 Pensacola INTERSTATE De Funiak Springs INTERSTATE Chipley Escambia Bay
55 137 31 153 COVINGTON Century 89 Gonzalez Pensacola 1 1 5 De Funiak Springs 78 90 Chipley Escambia 281 12 85 Eglin Air Force Base 87 19 East 76 71 Marianna 18 13 a l co a s Fort Walton Beach 33 20 85
More informationDirections. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):
Directions IBM Recovery Center One Evertrust Plaza Jersey City, NJ 07302 1. Path Train From World Trade Center site (Downtown New York City): - Path Train service from World Trade Center site to Exchange
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationProject ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK
More informationArkansas State Highway and Transportation Department. Riverside Rotary Club North Little Rock
Arkansas State Highway and Transportation Department Riverside Rotary Club North Little Rock Monday, January 20, 2014 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile How We Compare
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationAurora Hills. Getting There
Aurora Hills Aurora Hills is neighborhood near Crystal City and Pentagon City. Ball fields, ball courts, a very short trail, and a combination ibrary/fire Station are the central pieces of a recreation
More informationAppendix 4.1 L. No-Build Project Descriptions
Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant
More informationPUBLIC LIBRARY STATISTICS: MISCELLANEOUS #Name?
- PUBLIC LIBRARY STATISTICS: MISCELLANEOUS ADAMSVILLE IRVING MEEK JR., PUBLIC LIBRARY.% No No No Yes ALAMO CROCKETT COUNTY LIBRARY.% Yes 1 No Yes Yes ALTAMONT ALTAMONT PUBLIC LIBRARY.% No No Yes Yes ARDMORE
More informationREDEVELOPMENT. PIGEON FORGE, TENNESSEE FOR LEASING / PROJECT INFO PLEASE CONTACT: Dixon Greenwood, CCIM Tim Zitzman
REDEVELOPMENT PIGEON FORGE, TENNESSEE FOR LEASING / PROJECT INFO PLEASE CONTACT: Dixon Greenwood, CCIM 865-585-2307 Tim Zitzman 865-804-4131 TABLE OF CONTENTS EXECUTIVE SUMMARY AREA MAPS AERIALS TRAFFIC
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationPerformance Measure Summary
Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationArkansas Department of Transportation JOB HWY. 49B - HWY. 242S (HELENA - WEST HELENA) (S) FEDERAL AID PROJECT STPC-9200(7)
ROUTE: 242 PHILLIPS M & T PAVING & CONST. CO., INC. FORREST CITY, AR Proposal Holders Not Submitting Bids JOB 110657 HWY. 49B - HWY. 242S (HELENA - WEST HELENA) (S) FEDERAL AID PROJECT STPC-9200(7) $525,617.91
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationFY FY 2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) North Front Range Transportation & Air Quality Planning Council
Bridge - On State System PREVIOUS ENTRY P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 SR46598 State State Highway Fund
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationKDOT announces approved March bids
IMMEDIATE RELEASE April 10, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved March bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationCapital Improvement Projects Construction Outlook
s October 5, 2018 Transportation 2018 Street Maintenance Program (Strawser Paving) S.R. 161 between Frantz Road and the Scioto River bridge Limerick Lane Bellaire Court Bellaire Avenue Manor Court Neighborhoods
More informationTennessee RV Parks and Campgrounds
1 Tennessee RV Parks and Campgrounds Coopers Landing Brief Description: Full hookup 15 Spot camping area located at entrance to Ragland Bottom State park and with 5 miles of many boat ramps on Center Hill
More informationPENNSYLVANIA SCENIC BYWAYS
PENNSYLVANIA SCENIC BYWAYS THE GREAT LAKES SEAWAY TRAIL BYWAY EFFECTIVE: 2003 DISTRICT: 1-0 COUNTY: ERIE STATE ROUTES: 0005 AND ALTERNATE 0005 SEAWAY TRAIL INCLUDES PA. ROUTE 5 AND ALTERNATE ROUTE 5 BEGINNING
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationMoDOT Southwest District
Barry County Route 37: Add right-turn lane at Route 60 in Monett Route 60: Rehabilitate westbound bridge over railroad in Monett Route D: Resurface pavement between Route 248 and Route 265/413 in Crane
More informationThursday, November 1, :30 P.M. Bear Creek Senior/Recreation Center, 54 McDonough Street, Hampton, Georgia. Meeting Agenda (See Attached Agenda)
Minutes SPLOST V Committee Thursday, November 1, 2018 6:30 P.M. Bear Creek Senior/Recreation Center, 54 McDonough Street, Hampton, Georgia The Henry Herald was notified of the meeting via email. I. Call
More informationFlorida Department of TRANSPORTATION. First Coast Expressway
Florida Department of TRANSPORTATION First Coast Expressway What is the (FCE)? Multi-lane, limited access toll expressway Connects I-10 in Duval County to I-95 in St. Johns County How does FCE connect
More information