1 Lane Cove Tunnel Overview Report Lane Cove Gore Hill Corridor M2 Mowbray Road West LANE COVE TUNNEL Epping Road ringybark Creek Longueville Road Gore Hill Freeway Willoughby Road Falcon

2 F R O M T H E M I N I S T E R Sydney s north-west has transformed in the last 20 years to become one of the fastest growing areas in the metropolitan region. The growth of the northern suburbs has placed increasing pressure on key regional roads such as Epping Road and the Gore Hill Freeway, which are reaching capacity. We need an integrated transport solution to create better road and public transport links. The Lane Cove Tunnel offers a solution freeing up citybound traffic and returning streets to residents living along the route. It is part of Action for Transport the Carr Government s ten-year plan to deliver new rail, bus and road links. The Lane Cove Tunnel would complete a missing link in the Sydney orbital road network, delivering valuable travel-time savings to motorists and reducing fuel, freight and vehicle operating costs for businesses. It would also allow for significant improvements to public transport services throughout Epping, East Ryde, Lane Cove, Willoughby, Artarmon and North Sydney. The Government has prepared an Overview Report to consult the community about the Lane Cove Tunnel. I welcome your comments on this major project, which will provide lasting benefits for Sydney residents. Carl Scully MP MINISTER FOR TRANSPORT MINISTER FOR ROADS C O N T E N T S Introduction 3 Need for the Project 4 Transport Planning 6 Project Objectives 7 Lane Cove Tunnel Proposal 8 Connections 10 Alternatives Considered 12 Ventilation and Air Quality 15 Environmental Issues 16 Transport Improvements 18 Public Transport 20 Epping Road 21 Community Involvement 22 Consultation Process 23 2

3 INTRODUCTION The Lane Cove Tunnel would provide a 3.4 km freeway standard connection via twin, two-lane tunnels to reduce traffic congestion in the Lane Cove, Willoughby, North Sydney and Ryde council areas. The NSW Government is committed to improving Sydney s transport network and has developed Action for Transport 2010 a fully funded ten year construction plan for new rail, bus and road links. Action for Transport 2010 includes the proposed Lane Cove Tunnel, a new road link between the M2 Motorway at East Ryde and the Gore Hill Freeway at Artarmon. The Lane Cove Tunnel link has been extensively examined since the opening of the Gore Hill Freeway in The opening of the M2 Motorway in 1997 has provided added impetus for a link. The Lane Cove Tunnel would provide a 3.4 km freeway standard connection via twin, two-lane tunnels to reduce traffic congestion in the Lane Cove, Willoughby, North Sydney and Ryde council areas. The Minister for Roads, Mr Carl Scully established the M2 Epping Road Task force, with the mayors of Lane Cove, Willoughby, North Sydney and Ryde representing all local government areas affected by the proposal. The RTA consulted community groups on each of the options developed by the task force. The task force concluded that a modified option H3A was preferred. This option is also preferred by the RTA and has been further developed for this Overview Report to enable community consultation to occur prior to the development of an EIS. A longer community consultation process is part of the NSW Government s more extensive planning procedures used for all planned major transport and road projects, including the Parramatta Rail Link, the Liverpool to Parramatta Bus-only Transitway and the Cross City Tunnel. This report is the next stage in the consultation process and outlines the preferred option. Options The Roads and Traffic Authority has investigated six options for the Lane Cove Tunnel: Option H1 a long tunnel from the Lane Cove River under Mowbray Road West to the Gore Hill Freeway. Option H2 a short tunnel from Sam Johnson Way under Mowbray Road West to the Gore Hill Freeway. Option H3 a long tunnel from the Lane Cove River under Epping Road to the Gore Hill Freeway. Option H3A two short tunnels, one from the Lane Cove River to the western side of ringybark Creek and the second from the eastern side of ringybark Creek to the Gore Hill Freeway. Option H4 a short tunnel from Johnston Crescent under Epping Road to the Gore Hill Freeway. Option H5 a short tunnel from Tantallon Road under Epping Road to the Gore Hill Freeway. 3

4 NEED FOR THE PROJECT Sydney is Australia s largest population centre, commercial and industrial development making it a key economic centre in the Asia-Pacific region. Today there are more than four million vehicles on NSW roads, with more than 50 per cent of vehicles located in Sydney. The expanding commercial centres of Chatswood, Leonards, North Sydney and North Ryde generate significant jobs growth. An efficient and accessible road network is critical for further business growth in the region. In particular, the north-west region is one of the fastest growing population centres in the greater metropolitan area. More efficient public transport links are needed to encourage less car usage and improve Sydney s air quality. The NSW Government recognises that integrated road and transport improvements are needed along Sydney s north-west and northern corridors for commuters, businesses and local residents. The Government s Action for Transport 2010 includes the construction of the Parramatta Rail Link, a $1.4 billion, 27 km heavy rail link from Parramatta to Chatswood via Epping. The Parramatta Rail Link is the longest rail line to be built in Sydney since the Blacktown to Richmond line was constructed in It will link universities, The lack of a freeway-standard connection causing congestion on Epping Road and Mowbray Road West. 4

5 NEED FOR THE PROJECT hospitals and business centres along the route. For more details on this project see: For local motorists, traffic congestion along Epping Road and Mowbray Road West is making short journeys to shops, schools and other community facilities increasingly difficult and time consuming. Heavy traffic volumes make it harder for residents living along Epping Road and Mowbray Road West to enter or leave their driveways safely. Busy roads make it more hazardous for local pedestrians and shoppers to cross the street and increase the risk of accidents for cyclists. High traffic volumes increase noise levels and reduce air quality in residential areas. Traffic delays also impact on local businesses wishing to access customers and suppliers. In addition access to essential services such as Royal North Shore Hospital has become more difficult during peak times. Reducing congestion along Epping Road would improve public transport. North-facing ramps to and from the Warringah Freeway at Falcon reet were once planned as part of the Gore Hill Freeway, but were never built. This has increased congestion along the at North Sydney and surrounding local areas. 5

6 TRANSPORT PLANNING Local Area Improvements The RTA in consultation with local councils and the community will develop Local Area Improvement Plans (LAIP) to optimise local traffic improvements as part of EIS process. The process will: Include Lane Cove, Willoughby, North Sydney and Ryde council areas. Maximise benefits to local communities. Be part of the EIS process. Improve amenity and access in local areas. Between 1981 and 1991, Sydney s population grew by 12 per cent but was overtaken by 14 per cent growth in car ownership and 20 per cent growth in car use. The NSW Government is rebuilding the public transport system to encourage the community to use it more often, to reduce traffic congestion and improve air quality. Action for Transport 2010 sets out a plan to deliver a more integrated public transport system well into the next century. Initiatives such as transit lanes and bus priority measures increase bus patronage and help to improve air quality. The Lane Cove Tunnel would provide further opportunities to expand these public transport improvements. The Lane Cove Tunnel provides the missing link in Sydney s orbital road network and will alleviate these problems caused by traffic congestion along the route. Completion of the Lane Cove Tunnel would enable Local Area Improvement Plans for public transport and traffic improvements to be developed to maximise benefits arising from less through traffic on Epping Road and surrounding local streets, including opportunities for better bike access. Bus patronage has increased dramatically with the introduction of transit lanes and bus priority measures. These initiatives have improved Sydney s air quality. Above is the highly successful transit lane on the harbour bridge. Route of the Parramatta to Chatswood Rail Link. 6

7 PROJECT OBJECTIVES The LCT would provide reduced travel times to important job centres including North Ryde, Chatswood, Leonards, North Sydney and Macquarie Centre. The preferred option for the Lane Cove Tunnel and transport improvements would: Reduce traffic congestion along Epping Road and Mowbray Road West. Improve travel times for freight, commercial and private vehicles. Make traffic conditions safer for local pedestrians and cyclists. Improve access to health and education services such as Royal North Shore Hospital, Macquarie University, Macquarie Shopping Centre and Chatswood Shopping Centre. Improve access to jobs in business centres at North Sydney, Lower North Shore, Leonards, Artarmon, North Ryde, Chatswood and Lane Cove. Improve public transport links, including transit lanes on Epping Road and the Gore Hill Freeway. Reduce through traffic in local streets. Provide more residential parking, bus bays and landscaping. Reduce the impact of traffic on local streets, improving air quality and reducing noise. Objectives The Lane Cove Tunnel would: reduce traffic volumes on surface roads provide a missing link in Sydney s orbital road network improve public transport in north western Sydney improve conditions for buses, cyclists and pedestrians reduce travel times for motorists, freight and business vehicles improve local amenity manage and contain the trend for traffic growth in the corridor minimise or prevent adverse environmental impacts minimise any construction impacts minimise any visual impacts be developed in consultation with the local communities. 7

8 L A N E C O V E The Proposal Key elements include: twin two-lane tunnels between the M2 at East Ryde and the Gore Hill Freeway at Artarmon Entrance at Epping Road Direct M2 link to the western tunnel portal. Epping Road eastbound traffic would access the tunnel portal via a merge lane. An exit ramp would enable westbound traffic to join Epping Road after the tunnel exit. upgrade interchange at /Gore Hill Freeway /Longueville Road upgrade the intersection of Epping Road and Mowbray Road West Epping Road reduced from six to four lanes, reinstate right turns and parking transit lanes on Epping Road widen Gore Hill Freeway with the addition of a transit lane in each direction north facing ramps to and from the Warringah Freeway at Falcon reet Magdala Park M2 Main Portals Chatswood War Memorial Athletics Field Vent ack Apollo Pl Sirius Rd Blackman Park Lane Cove National Park ringybark Creek Orion Rd Avian Cres Fitzsimmons Hinkler Cres Epping Rd Sam Johnson Mars Rd Avalon Av Avian Cres Way Alder Ave Cullen Willandra Mowbray Park Moore Ulm Hatfield Mowbray Rd West Merinda Hallam Ave Barwon Rd Mindarie Pinaroo Batten Ck Reserve Hart Farran Kullah Pde Johnston Cres Fraser Garling Hallam Ave Munroe Centennial Ave Burns Bay Rd Tantallon Rd Mooney Girraween Av Garling Chats Golf C Hart R Epping Road/Mowbray Road West A signalised intersection at Epping Road and Mowbray Road West would maintain all movements between the two roads, but not between Mowbray Road West, the tunnel and M2. Western Tunnel Portals Tunnel portals would be located on Epping Road, east of the Mowbray Road West and Epping Road intersection. Twin Two-Lane Tunnels (3.4km long) arting just east of Mowbray Road West/Epping Road intersection, the tunnels would continue southeast beneath Epping Road and ringybark Creek to Longueville Road, joining the Gore Hill Freeway east of the Pacific Highway. 8

9 TUNNEL PROPOSAL wood ourse Connection Eastbound A single lane eastbound tunnel departs near Parklands Avenue and continues along the northern side of Longueville Road and connects to the loop road around the Northview apartments ( ) and joins the Pacific Highway at the intersection with the Gore Hill Freeway. N Eastern Tunnel Portals The eastern tunnel portals are located on the Gore Hill Freeway east of the. Cost The Lane Cove Tunnel is estimated to cost $550 million funded by a toll. Only traffic using the tunnel and the new ramps at Falcon reet would be tolled proposed to be about $2 and $1. Electronic tolling would be used. Subject to planning approval the project would open in Elizabeth Pde Felton Av Gordon Cr Elizabeth Pde Arding Canberra Sutherland Coolaroo Rd Finlayson Kyong Centennial Ave Epping Rd Burns Bay Rd Coolaroo Rd Greenlands Rd Gay Dalrymple Av Karola Roslyn Karilla Av Moola Pde Kurri Parklands Rd Landers Rd Birdwood Av Parklands Av Longueville Rd Ferndale Park Dalrymple Av Nundah Little Beaconsfield Rd Murray Kara Phoenix Ralston Burley Ralston Sharland Av Mowbray Rd West Murray okes Mafekin Kimberley Helen Portal Gatacre Rd Alison Av Goodchap Rd Huxtable Av Norton La Bowen Helen French Kitchener Rd Portal Alto Pl Broughton Rd Hampden Rd Elizabeth Main Portals Gore Hill Fwy Marden Hotham Pde Artarmon Connection Westbound Traffic from the wishing to travel westward in the tunnel would enter via a ramp at Broughton Road on the eastern side of the Pacific Highway. The ramp would loop clockwise and enter a tunnel east of Alto BMW ( ) and connect to the westbound main tunnel. Gore Hill Freeway The Gore Hill Freeway widened to create a Transit Lane in each direction from the to Warringah Freeway. Widening only on the northern side of the Freeway. 9

10 CONNECTIONS Mowbray Road Connections The connections at the western end of the tunnel are designed to: link the M2 to the tunnel maintain Epping Road links provide access from Epping Road to the tunnel in both directions. Connections The connections at the eastern end of the tunnel would: link with the Gore Hill Freeway east of the provide access to the via a loop on-ramp from Broughton Road and a loop off-ramp behind the Northview apartments provide a new right hand turn from the existing Longueville Road off-ramp onto the merge eastbound traffic on Longueville Road with the Pacific Highway on-ramp widen the Pacific Highway from Howarth Road to Longueville Road by an additional lane provide a right turn lane from the Pacific Highway to the tunnel on-ramp. Features of the preferred Lane Cove Tunnel option include: The Mowbray Road West A signalised intersection at Mowbray Road West is retained, enabling alldirection traffic movements between Mowbray Road West and Epping Road. This intersection would be relocated east along Epping Road. There would be no direct connection between Mowbray Road West and the M2 Motorway or the Lane Cove Tunnel. A new bridge for Epping Road built over the Lane Cove River, north of the existing bridge to enable the construction of tunnel portals and a new eastbound carriageway. Entry to the tunnel would grade down from the eastern end of the Lane Cove River Bridge. Entry and exit ramps constructed at the Pacific Highway are located mostly in tunnel to limit surface impact. An exit tunnel under the north-west corner of the and Longueville Road. Additional landscaping to improve the urban amenity at the juncture of the tunnel entrances at the Pacific Highway and the Gore Hill Freeway. New noise attenuation structures to extend the current design theme adopted along the Gore Hill Freeway. Traffic along Mowbray Road West would be reduced by the tunnel. The access between the and the tunnel is direct and easy for motorists. 10

11 CONNECTIONS New Falcon reet ramps would reduce traffic in local streets. Falcon reet New north facing ramps from Falcon reet to the Warringah Freeway. Access to the freeway for Military Road traffic via ramps to reduce through traffic in residential areas. Opportunity for a bus lane eastbound on Falcon reet from the existing off ramp to Ben Boyd Road. Cyclists travelling south on Warringah Freeway would cross the off ramp and continue south at a dedicated ramp crossing or access Falcon reet via the new off ramp. Cyclists from Falcon reet wishing to travel north on the Warringah Freeway would access the northbound shoulder on its western side by the existing stairs and ramp from Falcon reet. Gore Hill Freeway Widened on the north side from the to Merrenburn Avenue at Crows Nest by the addition of a transit lane in each direction contained within the existing road reserve, except at the cutting near Naremburn shopping area. The southbound transit lane tunnelled under Willoughby Road to avoid impacts on Naremburn shops. Widening the freeway at Artarmon to enable tunnel traffic to merge more efficiently with existing traffic to and from the and Longueville Road. Widening the freeway combined with the Falcon reet north-facing ramps to reduce the amount of ratrunning through the local streets of North Sydney and Crows Nest local streets. Buses and high occupancy cars would benefit from travel time savings by using the transit lanes. Falcon reet Ramps The new ramps will: minimise North Sydney/Crows Nest/ Leonards congestion enable southbound traffic from the Warringah Freeway to access Falcon reet and Military Road Gore Hill Freeway Key features of the Gore Hill Freeway upgrade are: transit lanes which bypass merging / Epping Road/ tunnel traffic widening on the north/eastern side of Gore Hill Freeway between Reserve Road and Merrenburn Avenue widen viaduct by a bridge with noise walls transit lanes initially designated as T2 lanes, changed to T3 or Bus Lane as demand requires. 11

12 ALTERNATIVES CONSIDERED Lane Cove National Park Tunnel Route Options N Magdala Park M2 Main Portals Chatswood War Memorial Athletics Field ringybark Creek Epping Rd Scheme H3 Mowbray Park Scheme H1 Mowbray Rd West Batten Ck Reserve Scheme H3A Centennial Ave Burns Bay Rd Chatswood Golf Course Centennial Ave Epping Rd Blackman ParkBurns Bay Rd Rd Elizabeth Pde Longueville Rd Ferndale Park Mowbray Rd West Portal Hampden Rd Elizabeth Artarmon Main Portals Gore Hill Fwy Portal Preferred Option 1 H3A-Epping Road Option 2 H3-Epping Road Tunnel Route Options The envelope of the tunnel route options lie between Epping Road (H3) and Mowbray Road West (H1). The preferred route H3A is generally under Epping Road. Legend Option 3 H1-Mowbray Road West Most Preferred Less Preferred Capital Cost Property Effects Construction Vibration Environmental Effect Air Quality Community Support Unacceptable Mowbray Road West Intersection Two arrangements for the Mowbray Road West and Epping Road Intersection were considered: Option 1: All movements at Mowbray Road West would be allowed to Epping Road at a signalised intersection. There would be no access from the M2 or tunnel to Mowbray Road West. Preferred Option 1 All Movements at Mowbray Road West Option 2 Close Mowbray Rd West Mowbray Road West Intersection Capital Cost Business Amenity Residential Amenity Maintaining Private & Public Transport Access Noise Reduction Community Support Legend Most Preferred Less Preferred Unacceptable Option 2: Mowbray Road West would be closed in a cul-de-sac at Epping Road. 12

13 ALTERNATIVES CONSIDERED Preferred Option 1 Narrow Epping Road Reinstate Right Hand Turns Epping Road Treatment Epping Road Treatment Two options for Epping Road were considered: Option 2 Maintain Epping Road Tidal Flow No Right Hand Turns Financial Viability Improve Community Access Property Effects Maintaining Private & Public Transport Access Noise Generation Visual Amenity Legend Most Preferred Less Preferred Unacceptable Narrow Epping Road and reinstate right hand turns Maintain Epping Road and no right hand turns. Interchange Pacific Hwy N Transit Lane The preferred location for tunnel entrance/exit to the is at Broughton Road (entry only) and Loop Road (exit only). Burley Entry/Exit Preferred Loop Road Exit Portal Preferred Broughton Rd Entry Main Portals Portal Alto Pl Entry/Exit Transit Lane Legend Tunnel Route Portal Minor Roads considered as alternative entry/exit routes to tunnel Burley reet entry/exit was not selected due to the high cost and impact of property acquisition and high noise levels. Pacific Hwy Surface roads Preferred Option Tunnel Entry at Broughton Rd and Exit at Loop Road Interchange Option 2 Tunnel Entry/Exit at Alto Place Legend Option 3 Tunnel Entry/Exit at Burley reet Capital Cost Easing Congestion Property Effects Maintaining Private & Public Transport Access Noise Reduction Visual Amenity of Intersection Most Preferred Less Preferred Unacceptable 13

14 ALTERNATIVES CONSIDERED Lane Cove National Park N Vent ack Position M2 Main Portals a Park Chatswood War Memorial Athletics Field E(w) Apollo Pl Sirius Rd ringybark Creek Orion Rd Avian Cres Fitzsimmons Hinkler Cres Epping Rd Sam Johnson Mars Rd F(w) Avalon Av Avian Cres Way Alder Ave Cullen Willandra Mowbray Park Moore Ulm Hatfield Mowbray Rd West Merinda Hallam Ave Barwon Rd Mindarie Pinaroo Batten Ck Reserve Centennial Ave Burns Bay Rd Chatswood Golf Course Centennial Ave Epping Rd Blackman ParkBurns Bay Rd Hart Farran Kullah Pde Johnston Cres Fraser Garling Hallam Ave Munroe Tantallon Rd Mooney Girraween Av Garling Hart Rd Elizabeth Pde Felton Av Gordon Cr Elizabeth Pde Arding Canberra Sutherland Coolaroo Rd Finlayson Kyong Coolaroo Rd Greenlands Rd Gay Moola Pde Dalrymple Av Karola Roslyn Karilla Av Landers Rd Kurri Parklands Rd Birdwood Av Parklands Av Longueville Rd Ferndale Park Dalrymple Av Nundah Little Beaconsfield Rd Murray Ralston Burley Ralston Kara Phoenix Sharland Av Mowbray Rd West Murray okes Mafekin Kimberley Helen Gatacre Rd Alison Av Huxtable Av Norton La Portal Goodchap Rd Bowen Helen French C(e) Kitchener Rd Portal Alto Pl Broughton Rd Hampden Rd Elizabeth Main Portals Gore Hill Fwy Marden F(e) E(e) Hotham Pde Artarmo Three possible options for tunnel ventilation are: Asingle vent stack near the main western portal at E(w) or F(w) A single vent stack near the eastern portal at C(e), E(e) or F(e) Both a western and eastern stack but smaller versions. Legend Options for Vent acks Preferred Option 1 E(w) South of Shell Service ation Western Vent ack Position Legend Option 2 F(w) Sam Johnson Way Most Preferred Air Quality Accessibility Environment Habitat Eastern Vent ack Position Aesthetics Present Use Sensitivity of Surroundings Costs Least Preferred Unacceptable Option 3 E(e) Marden (West) Option 4 F(e) Marden (East) Legend Option 5 C(e) Pacific Hway (Gore Hill) Most Preferred Less Preferred Air Quality Accessibility Environment Habitat Aesthetics Present Use Sensitivity of Surroundings Costs Unacceptable 14

15 VENTILATION AND AIR QUALITY Diagram representing ventilation system. The tunnels would be mechanically ventilated to maintain air quality in the tunnels and in the surrounding areas, consistent with other current road tunnel projects in NSW. The ventilation system would be designed to meet stringent air quality goals set by the Department of Urban Affairs and Planning (DUAP) on advice from the Environment Protection Authority (EPA). Fresh air would enter the tunnel at portals or through fresh air inlets. Emitted air would be discharged through a vent stack. There are three options for tunnel ventilation: 1. A single stack near the main western portal south of Epping Road 2. A single stack at Marden, Artarmon 3. Both (1) and (2) but smaller stacks. Based on initial air dispersion modelling current air quality goals would be easily achieved and additional air treatment systems would not be required to meet health goals. An examination of possible air treatment systems and emerging world s best practice in tunnel ventilation will be undertaken during the preparation of the EIS. The currently preferred option, subject to a full environmental assessment, is a single stack near the western portal south of Epping Road. Further air dispersion modelling will be undertaken during the early stages of the EIS process to confirm that the ventilation system proposed would achieve the set goals. Further community consultation will occur before a decision is taken on the preferred option for the ventilation stack s location. The preferred western vent stack would be located to the south of the Shell Service Centre. The top of the stack would be about 20 m above the Epping Road surface. 15

16 ENVIRONMENTAL ISSUES Conybeare Morrison The new Eastern Distributor is a good example of urban design improvements. Urban Design The construction of the Lane Cove Tunnel would enable improvements in urban design in areas along the route. Ramps and tunnel portals would be designed to complement the built and natural environment. New road connections and entryways to the tunnel would be located in a landscaped setting using colours of local shales and sandstones where possible. Reducing through traffic along Epping Road would better accommodate local traffic, public transport, cyclists and pedestrians by integrating Epping Road into the local surroundings at the Lane Cove shopping precinct, parks and Tantallon Oval. Intense planting would be used as visual barriers and relief. Local Environment The Lane Cove Tunnel would be located along the densely populated residential and commercial areas of northern Sydney. The local environment is characterised by urban development along ridgelines and plateau areas. Bushland is present along deeper creek lines such as ringybark Creek and foreshore areas of the Lane Cove River. The EIS will provide a comprehensive assessment of all environmental issues. 16 Social Effects People living in the vicinity of the proposed Lane Cove Tunnel have a strong sense of community and identity. Many residents actively participate in community affairs and have contributed to the development of the Lane Cove Tunnel proposal to date. Recreational and community facilities and services within the area are extensive and include Lane Cove shopping precinct, large areas of bushland and the Lane Cove River, neighbourhood centres and sporting facilities. Parks within the area include Tantallon Park, Batten Reserve, ringbark Creek

17 ENVIRONMENTAL ISSUES Goodlet Reserve and Helen reet Reserve. The Lane Cove Tunnel would provide the opportunity to reunite Lane Cove North and Lane Cove for residents living between Centennial Avenue and Longueville Road. Natural Environment and Heritage The area surrounding the Proposal is largely an urban environment. Aquatic habitats within the corridor include ringybark Creek, a small lake south of Epping Road and north of Sam Johnson Way, and the Lane Cove River on the western boundary of the corridor. Terrestrial habitats are also present including bushland areas along the Lane Cove River National Park, Batten Creek Reserve and ringybark Creek. These natural areas are habitats for a number of species including those protected by ate and Commonwealth legislation. There are many aboriginal sites, heritage items and conservation areas within the Lane Cove and Willoughby areas. The EIS will assess the need for any measures to mitigate adverse impacts. Air Quality The Lane Cove Tunnel would reduce traffic congestion and improve air quality along Epping Road and Mowbray Road West where traffic levels would decrease. Public transport improvements will improve air quality. For further information about air quality see Ventilation and Air Quality (page 15). Noise The Lane Cove Tunnel would reduce traffic noise along the route with through traffic placed in tunnel. A number of residential, commercial and industrial areas lie in close proximity to the proposed eastern and western portals of the tunnel and the access ramps on Falcon reet and the. These areas may experience some noise impact during the construction and operational phases of the project. The future environmental assessment phase would include an extensive noise and vibration monitoring program during the construction and operational phases. An environmental management plan would be prepared detailing noise and vibration monitoring measures to ensure goals are complied with during all phases of the project. 17

18 TRANSPORT IMPROVEMENTS Delhi Road Delhi Road Right hand turns along Epping Road Reinstate right hand turns and parking along Epping Road Lane Cove National Park N M2 Main Portals Chatswood War Memorial Athletics Field Mowbray Park Mowbray Rd West Chatswood Golf Course Ferndale Park Hampden Rd Magdala Park ringybark Creek Epping Rd Batten Ck Reserve B Centennial Ave Epping Rd Mowbray Rd West Portal Elizabeth Brand Centennial Ave Burns Bay Rd Blackman ParkBurns Bay Rd Longueville Rd B Main Portals Gore Hill Fwy Transit Lanes along Epping Road Dedicated Cycle Lane Extending from Mowbray Road West to Moore reet. Cycle Lane A lane from Moore reet to Centennial Avenue could be provided where car parking was not required. Dedicated Cycle Lane The lane from Centennial Avenue to Longueville Road would be dedicated to cyclists. Benefits Improved public transport. Improved travel times and access for local residents. New arrangements along Epping Road and the Gore Hill Freeway would improve bus access and provide safer routes for cyclists and pedestrians. Improved quality of life for residents due to improved amenity and reduction in local traffic noise and air pollution. Regional environmental improvements through reduced noise and improved air quality. 18

19 TRANSPORT IMPROVEMENTS Transit Lanes along widened Gore Hill Freeway Cyclists use Transit Lane shoulder from to Warringah Freeway. The Proposal Key features include: transit lanes east and westbound on Epping Road from to west of Lane Cove River transit lanes east and westbound on the Gore Hill Freeway from Pacific Highway to the Warringah Freeway Hampden Rd Artarmon Oval Artarmon Rd Transit Lane Enforcement Bays bus bays on Epping Road to improve transit lane travel times Herbert Ella Herbert Dalleys Rd Christie Dalleys Rd Chandos Willoughby Rd Willoughby Rd Albany Warringah Fwy Warringah Brook Merrenburn Ave Fwy Miller bus priority signals on Epping Road at Centennial Avenue and Longueville Road cycle facilities on Epping Road from Mowbray Road West to improve local roads through traffic calming or closures Transit Lane Enforcement Bays Alexander Ernest Falcon Cammeray Golf Course Merlin Falcon reet north facing ramps would reduce traffic in Crows Nest and North Sydney. Leonards Park Merlin Miller Warringah Fwy Alfred Legend B Transit Lanes Bus Priority Signalised Intersections Work with Local Councils to develop Local Area Improvement Plans Berry Arthur Walker Mount Alfred 19

20 PUBLIC TRANSPORT Rail Services The Parramatta Rail Link will begin operation in 2006 and will provide vital extra capacity to the CityRail network, allowing more services to be introduced between Western Sydney and the CBD. Five new train stations will be built at Macquarie University, Macquarie Park, Delhi Road in North Ryde, UTS Ku-ring-gai and a new Rosehill-Camellia station. This improvement to public transport would encourage usage of buses and ease the future pressure on our roads. Buses ate Transit and private bus operators provide more than 480 bus services every week along the Lane Cove-Gore Hill corridor and in Ryde, Baulkham Hills and Castle Hill. The Lane Cove Tunnel would reduce travel times on existing bus routes as traffic congestion eases. It would allow new commuter bus services to be introduced on the Lane Cove Tunnel or Epping Road and the upgraded Gore Hill Freeway Transit Lanes. The tunnel would also allow additional bus priority measures to be implemented. Cyclists and Pedestrians Reduced through traffic on Epping Road would make it safer for pedestrians. The needs of pedestrians will be considered in detail during the design for each area. Cyclists currently using the M2 access Epping Road via the Delhi Road on/off ramps. It is proposed that this arrangement be maintained. Cyclists using the Gore Hill Freeway would join Epping Road without crossing on/off ramps. The transit lane crossing would be marked for cyclists at on/off ramps. On the Gore Hill Freeway cyclists would use the road shoulder next to the transit lane. Access to the Lane Cove Tunnel by cyclists and pedestrians would be prohibited for safety reasons. 20

21 EPPING ROAD The Lane Cove Tunnel would reduce through traffic on Epping Road and create opportunities for improved public transport links, transit lanes and enhanced local amenity. Epping Road would be designed to include a cycleway where car parking is not required, new bus stops and additional landscaping. Further Opportunities Redesign Epping Road streetscape, allow on-street parking, landscaping and improved public transport. Improve access across Epping Road, especially at Longueville Road, Elizabeth reet and Johnston Crescent. Maintain and widen existing footpaths where possible. Introduce bike lanes or parking lanes along Epping Road. Improved bike access to bushland and creek areas behind Tantallon Oval and ringybark Creek and a safer route for cyclists to Macquarie University. Reunite the local community currently divided by through traffic on Epping Road. Opportunities on Mowbray Road West for councils to introduce further local traffic calming measures. 21

22 COMMUNITY INVOLVEMENT akeholder, local council and community consultation has been an important element in the development of the preferred option for the Lane Cove Tunnel. Traffic around schools remains a major concern of both the community and the RTA. In February 1997, the community was asked by the RTA to comment on schemes for improvements to Epping Road at Lane Cove. The response indicated considerable support for a longer tunnel. The Minister for Roads, the Hon Carl Scully MP set-up the M2-Epping Road Task Force comprising the mayors of Lane Cove, Willoughby, North Sydney and Ryde Councils to further examine tunnel options. Six tunnel schemes were placed on public display in early The schemes involved long and short tunnel options along the Mowbray Road West or Epping Road corridors. Community feedback was obtained through discussions with the task force, public meetings and a questionnaire. Further opportunities for community involvement would continue throughout the Environmental Impact Assessment phase of the project. The consultation process indicated support for: A long tunnel. Preference for a western vent stack. No restrictions to traffic movements between Mowbray Road West and Epping Road. Narrow Epping Road to four lanes (two through lanes in each direction). Reinstate right hand turns along Epping Road. Minimise any environmental impacts. The Lane Cove Tunnel Overview Report will provide the basis for the next stage in community discussion and the development of the EIS. 22

23 CONSULTATION PROCESS INPUTS Community and akeholder Consultation Public display, questionnaire and public feedback STAGES Feasibility udy Analysis of issues Justification of proposal Development of tunnel scheme Traffic studies Economic analysis Councils Asked for comments Route rategy Summary Report Preliminary environmental studies for key issues. Refinement of design Public Display Questionnaire and public feedback Preparation of Environmental Overview Report Selection and development of preferred scheme. Outline of preferred scheme and key environmental issues Outline opportunities for further community and stakeholder consultation The Current age We are here Community and akeholder Consultation Public meetings, letters and telephone hotline, public display, questionnaire and Public Feedback Written Comments Public meetings, letters and telephone hotline, public display, questionnaire and public feedback The Next ep More Consultation This Environmental Overview Report outlines the preferred scheme for the Lane Cove-Gore Hill Corridor. The Roads and Traffic Authority will seek public, business and local government comment on the preferred scheme before proceeding to the next stage. Please complete and return the attached questionnaire by End February 2000 Preparation of Environmental Impact atement Preparation of EIS on preferred scheme EIS Exhibited 2000 APPROVALS RTA Review of Submissions and Proposal Review of proposal in light of submissions received Department of Urban Affairs and Planning Assessment by Department of Urban Affairs and Planning of proposal Project Approval Consideration for Approval by Minister for Urban Affairs and Planning, subject to any conditions 23

24 HAVE YOUR SAY Your comments on the proposed Lane Cove Tunnel would be greatly appreciated by the RTA. After you have read this Overview Report please fill out the short questionnaire below. Do you think the proposed Lane Cove Tunnel will benefit your local area? Please give your comments: YES NO Do you support the proposed scheme? Please give your comments: YES NO Do you think the proposal can be improved? If yes, please give your suggestions. YES NO

25 Do you have any other comments? Name: Address Telephone: (optional) FOLD ALONG DOTTED LINE Please return your comments by end of February Displays can be viewed from 23 December 1999 to 11 February 2000 at: Your local library or the following Council Chambers: Lane Cove Municipal Council Willoughby City Council 48 Longueville Rd, Lane Cove 31 Victor, Chatswood Ryde City Council North Sydney Council Blaxland Rd, Ryde 200 Miller, North Sydney To return this Questionnaire fold in the places indicated and seal. Mail your completed questionnaire (no stamp needed) to the address below or contact us on: Telephone: Fax: Internet: FOLD ALONG DOTTED LINE Postage Paid Lane Cove Tunnel Reply Paid 67 Roads and Traffic Authority PO Box 558 Blacktown NSW 2148

26 This Document was produced by: Hyder Consulting on behalf of the Roads and Traffic Authority

How is air quality managed. in Sydney s road tunnels?

How is air quality managed. in Sydney s road tunnels? How is air quality managed in Sydney s road tunnels? The Sydney Orbital Network includes over 160 kilometres of surface roads, tunnels, bridges and underpasses. There are five main tunnels along the network;

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown 0 5 10 15 20 Kilometres Penrith Blacktown Parramatta Liverpool Bankstown Campbelltown accessibility outcomes Legend Outcomes targeted in Western Sydney are: public transport that is accessible throughout

More information

Northern Beaches Transport Action Plan

Northern Beaches Transport Action Plan Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

4 Transport projects underway in Western Sydney

4 Transport projects underway in Western Sydney 4 Transport projects underway in Western Sydney About this chapter This chapter provides an overview of the Australian and NSW government s significant investments in road, bus and rail infrastructure

More information

Why the. Building for growth. West Metro. is vital

Why the. Building for growth. West Metro. is vital Information summary West Building for growth World class public transport solutions for high demand challenges can transform the way a global city like Sydney lives, works and breathes. Sydney s busiest

More information

Planning Approval Consistency Assessment Form

Planning Approval Consistency Assessment Form Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro

More information

SEARs strategic context and project need

SEARs strategic context and project need 3 Strategic context and project need This chapter describes the strategic context of the project within the State and national planning policy framework, and explains the need for the project, across national,

More information

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project. 70 Merivale Street PO Box 2001 South Bank QLD 4101 Ph: 07 3846 5191 Email: janinew@businesssouthbank.com.au www.businesssouthbank.com.au ABN 28 285 012 048 21 May 2018 The Right Honourable Lord Mayor Councillor

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN Western Parkland City 2 Transport for NSW Future Transport Strategy and Greater Sydney Services and Infrastructure Plan Western

More information

For personal use only

For personal use only asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.

More information

Description of routes in this timetable. Route 258. Route 285. Route 289. Route 533. Route 534. Bus Timetable

Description of routes in this timetable. Route 258. Route 285. Route 289. Route 533. Route 534. Bus Timetable Description of routes in this timetable Route 258 Lane Cove Industrial to Chatswood via Mowbray Road. Service operates peak hours. Route 285 Lane Cove Industrial to City - Wynyard via Freeway. Service

More information

PCAL Case Study Retail Areas: Rouse Hill Town Centre

PCAL Case Study Retail Areas: Rouse Hill Town Centre PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub

More information

STAKEHOLDER AND COMMUNITY ENGAGEMENT

STAKEHOLDER AND COMMUNITY ENGAGEMENT STAKEHOLDER AND COMMUNITY ENGAGEMENT CHAPTER FIVE 5 Stakeholder and community engagement This chapter provides an outline of the consultation carried out on the project, and how this has influenced the

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX CUMULATIVE IMPACTS CHAPTER TWENTY-SIX 26 Cumulative impacts This chapter provides an assessment of the potential cumulative impacts as a result of the project, and identifies mitigation measures to minimise

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct. Newtown Glebe Macdonaldtown Pyrmont Ultimo Sydney International Convention, Exhibition & Entertainment Precinct Sydney Education & Health Erskineville Figure 3: Global Sydney Waterloo Second Harbour Crossing

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree

More information

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above. Iain Macleod Project Manager Victoria Road upgrade Roads and Traffic Authority PO Box 743 Drummoyne NSW 1470 e : Victoria_Road_Info@rta.nsw.gov.au 21 February 2008 RE: Victoria Road upgrade (RTA December

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Overview. Draft North District Plan. November Local Government Areas: Hornsby Hunter s Hill Ku-ring-gai. Lane Cove Mosman Northern Beaches

Overview. Draft North District Plan. November Local Government Areas: Hornsby Hunter s Hill Ku-ring-gai. Lane Cove Mosman Northern Beaches Draft North District Plan Overview November 2016 Local Government Areas: Hornsby Hunter s Hill Ku-ring-gai Lane Cove Mosman Northern Beaches North Sydney Ryde Willoughby Snapshot of the North District

More information

waterview connection Completing the Western Ring Route the Waterview Connection

waterview connection Completing the Western Ring Route the Waterview Connection waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

LOCATION + SPACE THE PARK 5 TALAVERA ROAD, MACQUARIE PARK

LOCATION + SPACE THE PARK 5 TALAVERA ROAD, MACQUARIE PARK LOCATION + SPACE THE PARK 5 TALAVERA ROAD, MACQUARIE PARK OVERVIEW 2 Make the smart move Macquarie Park is a lively business community, home to some of Australia s leading companies. The area is a dynamic

More information

BARANGAROO. Integrated Transport Plan

BARANGAROO. Integrated Transport Plan BARANGAROO Integrated Transport Plan BARANGAROO Integrated Transport Plan DISCLAIMER While every reasonable effort has been made to ensure that this document is correct at the time of printing, the State

More information

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly

More information

North District Plan OVERVIEW

North District Plan OVERVIEW OUR GREATER SYDNEY 2056 Revised Draft North District Plan OVERVIEW Hornsby Hunter's Hill Ku-ring-gai Lane Cove Mosman Northern Beaches North Sydney Ryde Willoughby Snapshot of the North District today

More information

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system. Moving Brisbane Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system. From roads and river crossings, to buses and bikes, Moving Brisbane addresses every component

More information

Industry briefing NOVEMBER 2017

Industry briefing NOVEMBER 2017 Industry briefing NOVEMBER 2017 SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start

More information

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022 A Co-operative venture of the municipalities of: Cockburn, East Fremantle, Fremantle, Kwinana, Melville & Rockingham Tuesday, 5 December 2017 Enquiries: Mick McCarthy 9364 0631 Our Ref: Federal Budget

More information

Department of Environment, Climate Change & Water NSW. Stakeholder feedback

Department of Environment, Climate Change & Water NSW. Stakeholder feedback Department of Environment, Climate Change & Water NSW Stakeholder feedback 1 Stakeholders group Blue Gum High Forest Group Guardians of Lane Cove NP Sydney Metropolitan Wildlife Service Ku-ring-gai Historical

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

The State of Transport in Macquarie Park

The State of Transport in Macquarie Park The State of Transport in Macquarie Park 31st August 2015 Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

M54 to M6/M6 Toll Link Road Public consultation

M54 to M6/M6 Toll Link Road Public consultation to M6/M6 Toll Link Road Public consultation 15 September 2017 to 13 October 2017 Contents Introduction 4 5 Why do we need this scheme? 6 Previous consultation 7 8 Modified options 9 Option B West 10 Option

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April Infrastructure Priority List Infrastructure Priority List Printed as at 28 April 2018 1 High Priority Projects High Priority Projects are potential infrastructure solutions for which a full business case

More information

QUALITY + SPACE BINARY CENTRE 3 RICHARDSON PLACE, NORTH RYDE, NSW

QUALITY + SPACE BINARY CENTRE 3 RICHARDSON PLACE, NORTH RYDE, NSW QUALITY + SPACE BINARY CENTRE 3 RICHARDSON PLACE, NORTH RYDE, NSW OVERVIEW 2 A positive outlook Binary Centre offers modern office suites overlooking Lane Cove River and the National Park in North Ryde.

More information

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE 1 2 4 3 BUSINESS PARK 8 Parkview Drive, Sydney Olympic Park OFFICE SPACE available FOR LEASE Imagine a workplace within a world class business park providing an ambiance which promotes greater productivity

More information

Review of Revised District North Plan

Review of Revised District North Plan Review of Revised District North Plan Future of the North District Summary: More focus on jobs growth in Macquarie Park, Chatswood, St Leonards and North Sydney Less focus on excessive increases in housing

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected

More information

Launceston and Tamar Valley Traffic Vision

Launceston and Tamar Valley Traffic Vision Launceston and Tamar Valley Traffic Vision A MAJORITY LIBERAL GOVERNMENT WILL: Address growing congestion issues in the Launceston and Tamar Valley road network Provide high productivity freight movement

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

M4 Junctions 3 to 12 Smart motorway

M4 Junctions 3 to 12 Smart motorway Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has DRAF 31 March 2017 Greater Sydney Commission Draft District Plans PO Box 257 Parramatta NSW 2124 By email: engagement@gsc.nsw.gov.au Dear Sir/Madam We write on behalf of our client, Toga Property Group,

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August

More information

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Environmental Volunteering

Environmental Volunteering Environmental Volunteering in the Greater Sydney region 2012 In 2012, the value of the work of environmental volunteers surveyed in Sydney was $5.96 Million. Putty St Albans Lithgow Gosford Katoomba Penrith

More information

The Coalition s Policy to Build Melbourne s East West Link

The Coalition s Policy to Build Melbourne s East West Link 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First 2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

POSITIVE + OUTLOOK MICROSOFT CAMPUS 1 EPPING ROAD, NORTH RYDE, NSW

POSITIVE + OUTLOOK MICROSOFT CAMPUS 1 EPPING ROAD, NORTH RYDE, NSW POSITIVE + OUTLOOK MICROSOFT CAMPUS 1 EPPING ROAD, NORTH RYDE, NSW OVERVIEW 2 Opportunity Microsoft Campus offers high quality office space with excellent exposure to Epping Road. The estate is ideally

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

The Coalition s Policy

The Coalition s Policy The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

New Runway Project. Connecting people and places. Supporting business. Engaging with community

New Runway Project. Connecting people and places. Supporting business. Engaging with community New Runway Project Perth is investing in an important piece of infrastructure for Western Australia. The new runway will see Perth continue to connect lives, businesses and communities to a world full

More information

Appendix 8 Sawston Greenway Review

Appendix 8 Sawston Greenway Review Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Draft City Centre Transport Proposals

Draft City Centre Transport Proposals Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Monthly Traffic Update

Monthly Traffic Update Brisbane Airport Corporation Monthly Traffic Update PAGE 1 ISSUE 26 DECEMBER 2009 Northern Access Road Project opens 3 December Brisbane Airport Corporation (BAC) is pleased to announce that after two

More information

STRATEGIC + LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW

STRATEGIC + LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW STRATEGIC + LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW OVERVIEW 2 Opportunity Campus Business Park is one of the Inner West s premier industrial estates, ideally suited to the corporate

More information

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia First Steps Towards Sustainable Operation of Road Tunnels George Mavroyeni Australia Road Tunnel Operations First steps towards sustainable operation of road tunnels Available on PIARC website here PIARC

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information