1 SOUTH DAKOTA TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE) CORSON CAMPBELL WALWORTH ZEIBACH DEWEY POTTER SULLY HUGHES HAAKON JACKSON STANLEY JONES LYMAN TRIPP BENNETT MELLETTE TODD Projects in the Region July 23, 2013 Prepared by: SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION DIVISION OF PLANNING & ENGINEERING OFFICE OF PROJECT DEVELOPMENT 700 BROADWAY AVENUE PIERRE, SOUTH DAKOTA 57501
2 .
3 South Dakota Transportation Improvement Program Public Meeting Report Report Date 5/31/2013 # Project Number PCN County Length Route Location of Project Type of Improvement Fiscal 1 NH-P 0013(26) 045U Beadle 84.0 SD25 Clark SD26 Huron Area Hand SD45 Hughes SD47 Hyde US14 Kingsbury US14E Miner US14W Spink US PP 000S(213) 01VM Brow n 0.0 BNSF crossings from Big Replace Crossbuck Signs Corson Day Edmunds Grant Perkins Roberts Stone to Lemmon 3 P 1804(41) U Campbell 9.2 SD1804 SD Fm Pollock to the Mill & AC Resurfacing North Dakota State Line 4 BRO 8011(01) 00B9 Campbell N & 6.1 E of Herreid Structure & Approach Over Spring Creek Grading 5 NH 0012(171)180 03QG Corson 0.1 US12 US Mi W of the Slide Repair SD20 Jct 6 P 0073(53)252 01RP Corson 0.0 SD63 SD S North Dakota Deck Overlay, Approach NH 0012(150)105 01RQ SD73 State Line over BNRR; Slabs, Bent Repair, Bridge P 0063(42)252 02HG US12 US E of Perkins Co Line over Br Hay Ck, 6.7 E of Perkins Co Line over Hay Ck &.2 NW of SD20 Over the Grand Rive; SD63, Str.s 0.9 & 1.8 N of McLaughlin Over a Creek and Over Oak Creek Rail, Approach Guardrail, Approach Pavement, Joint Modification 7 NH-P 0032(16) 0461 Corson Dew ey 89.2 SD1806 SD20 Mobridge Area SD47 Ziebach SD63 US212 8 P 6427(04) 02DL Corson 5.0 Fm 10S of US12 at Keldron, S 1 mi. on 215 Ave., W 1 mi. on 112 St, and S 3 mi. on 214 Ave. Grading and Gravel Surfacing P 0063(38)240 00LH Corson 0.0 SD63 SD S of NH 0012(162) A SD65 McLaughlin Over the P 0065(12) Q US12 Grand River; US NW of SD20 over the Grand River & at the Missouri River Bridge On The E Bank; SD S of US12 Over White Shirt Creek 10 P 0032(17) 046T Dew ey 27.7 SD1804 SD20 Mobridge Area Ziebach 11 NH-P 0033(18) 046E Gregory Jackson SD240 SD44 Winner Area SD47 Mellette SD49 Todd US183 Tripp US83 Scour Protection (Bank Stabilization); Erosion Repair On The East Bank Berm; Scour Protection & Column Repair Rout & Seal PublicMeeting.rpt 1
4 12 BRO 8028(06) 6378 Haakon N & 1.8 W of Philip Over Structure & Approach Grindstone Creek Grading 13 NH-P 0031(30) 046A Hughes 30.9 SD20 Hyde SD34 Area Potter US14 14 NH-P 0031(31) 046U Hughes 31.0 SD1804 US14 Area Sully US14E US14W US83 US83N US83S Rout & Seal 15 NH 014B(170)232 04D0 Hughes 1.1 US14B US14B - Fm 4th Street to 3 Lane Reconstruction US14 in 16 IM 0903(91) K Jackson 15.5 I90E I90 - EBL, Fm W of the PCCP Jones Jones/Jackson County Line to W of Exit IM 0903(90) L Jackson 15.5 I90W I90 - WBL, Fm W of the PCCP Jones Jones/Jackson County Line to W of Exit P 0044(150) Jackson 0.0 SD44 SD E of US 18 Deck Overlay, Bridge Rail P 0044(150) C Mellette over Thunder Creek; SD44 Retrofit, Approach Tripp E of US18 over W Branch Thunder Creek; SD E of SD 73 Over Pass Creek; SD Mi W of SD63 Over Corn Creek Guardrail, & Approach Pavement, Zone Paint; Deck Overlay, Approach Guardrail, & Approach Pavement; Deck Overlay, Bridge Rail Retrofit, Approach Guardrail, Approach Pavement & Berm Repair 19 IM 0904(54) Jones 0.0 I90E I90 - SD248 Murdo & Zone Painting US83S Interchange 20 IM 0904(58)208 03VV Jones 21.5 I90E I90 - Winner Area Replace Interstate Fence MRM P 0248(09) C Jones 19.5 SD248 SD248 from Murdo to 0.3 Rout & Seal Miles West of the US83 JCT 22 IM 0905(103) G 21.6 I90E I90 - Winner Area Replace Interstate Fence MRM P 0047(97)42 02ZM 22.0 SD47 SD47 - Fm S of Iona to N Erosion and Land Slide of SD49/SD47 Repair 24 BRO 8043(08) N & 5.9 E of Kennebec Structure & Approach Over Medicine Creek Grading 25 P 0273(06)61 038X 12.7 SD273 SD273 - Fm I90 to Mill & AC Resurfacing; SD1806; Str 0.2 N of I90 at Bridge Rail, Pedestrian Rail Kennebec over Medicine Ck 26 NH 0083(63) Mellette 0.0 US83 US S of SD44E Over Horse Head Creek Deck Overlay, Joint Modification, Bridge Rail Retrofit, Approach Guardrail, Approach Pavement & Zone Paint P SRTS(44) 04P3 Mellette 0.0 Wood P.E., Non Infrastructure and Construct New Sidew alk 28 NH 0014(186)225 03J4 Stanley 0.9 US14 US14 - Fm the W City Drainage Improvements Limits of Ft W 29 BRF 6301(05) 6749 Tripp E & 1 N of Millboro Structure & Approach Over Keyapaha River Grading 30 P 0031(27) 041U Areaw ide Various Locations in the Culvert Repair Area PublicMeeting.rpt 2
5 31 PH 000S(253) 02AY Regionw ide 0.0 Various Locations on the Durable Pavement Marking State System in the Region 32 P 000S(00)019 02DS Regionw ide 0.0 Various Locations in the Region County Pavement Marking State = 60%, $0.025 Local = 40%, $0.017 = $ PH 0030(16) 04GL Regionw ide 0.0 Region Cooridor Signing PH 0030(15) 04GG Regionw ide 0.0 Region Rumble Strips & Signing Upgrades 35 IM Z403(14) 03VR 0.0 on the Dynamic Message Boards Interstate System 36 P 000S(282) 02RT 0.0 FY Bridge Inspection Costs 37 P 000S(307) 03BX 0.0 Bridge Painting PH 000S(260) 02AD 0.0 Public Roads Traveled Preliminary Engineering for Conducting Road Safety Audit Review s (RSAR) 39 PH 0000(50) 02AE 0.0 Public Traveled Roads Preliminary Engineering for Roadw ay Safety Improvement 40 HS 4701(16)14 02CU 0.0 Local Government Traffic Engineering Services Performed by the SDDOT Traffic & Safety Engineer PH 000S(308) 03V6 0.0 Various Locations Curve Delineation P 000S(284) 02U2 0.0 Wetland Mitigation Banking P DBEC(19)14 02U0 0.0 DBEC Certification DBEC Certification Services for Services for CY CY 44 SS FY13(02) 02U1 0.0 DBE Supportive Services DBE Supportive Services for CY14 for CY14 45 RETR FY14(01) 02NJ 0.0 Various Recreation Trails Projects 46 BR NBIS(29) 02DZ 0.0 Bridge Inspections, Scour SS FY14( ) 04LE 0.0 On The Job Training and Support Services For FY Anticipated funding for FY On The Job Training and Support Services (OJT/SS) Work Program PS 000S(326) 04CE 0.0 Preliminary Engineering for Railroad Safety Projects 49 PS 000S(327) 04CF 0.0 Inventory Compilation & IM-P Z410( ) 04DE 0.0 Funding for ESS Installation and Operation 51 IM-P Z412(14) 04DF 0.0 Funding for Mobile Data Collection Operation 52 PP 000S(274) 02ME 0.0 DM&E Fm MN Stateline to Rapid City, Onida to Blunt, Redfield to Mansfield, & Huron to Yale. Replace Railroad Crossing Crossbuck Signs BRO 8004(01) 6750 Bennett W & 3 S of Martin Structure & Approach Over a Creek Grading PublicMeeting.rpt 3
6 54 NH-P 0032(19) 048K Campbell 84.6 SD10 Rout & Seal 2015 Corson SD130 Mobridge Area McPherson SD1804 Potter SD271 SD65 US12 US83 US83N US83S 55 NH-P 0032(18) 047Q Corson Dew ey SD1804 SD20 Mobridge Area McPherson SD47 SD63 Ziebach SD73 US12 US BRO 8016(08) 01DN Corson 0.2 Structure 2.4E & 9.7S of Structure & Approach McIntosh over White Shirt Grading Creek 57 NH-P 0031(32) 047T Haakon Hughes 67.8 SD1804 SD73 Area US14 Potter US14E Sully US14W US83 US83N US83S 58 P 0073(00)92 02VG Haakon 0.5 SD73 SD73 - Through Phillip Curb Ramp Upgrades and Sidew alk, Lighting and Retaining Wall 59 P 0034(154) E Hughes 18.1 SD34 SD34 - Fm the Tw in Bridges to the Hughes/Hyde County Line Mill & AC Resurfacing; Str Replacement (RCBC); Appr Grading; Overlay, Membrane & Asphalt Pipe Repair IM 0903(103)152 03VW Jackson 0.0 I90E I90 - Cross-Overs At MRM Construct Cross-Overs Jones & & Ramp Crossovers at Exits 163 & P 0033(20) 048C Jackson Jones 84.9 SD248 SD44 Winner Area SD47 Mellette SD63 Todd 62 NH 0073(67)37 048T Jackson 33.0 SD73 SD73 from the Rout & Seal Bennett/Jackson County Line to the SD248 JCT 63 P 1806(12) Z Stanley 25.6 SD1806 SD Fm SD273 to East of US83; SD1806, Str SE Jct US 83 over Antelope Ck Mill & AC Resurfacing, Pipe Repair, Erosion Repair, & Deck Overlay and Approach Guardrail & Approach Pavement Over Antelope Ck BRO 8048(03) 02DY Mellette 0.2 Structure 18.9N & 0.8W of Structure & Approach Cedar Butte over the Grading White River 65 P 0020(117)254 02R9 Potter 0.7 SD20 SD20 - Fm 148th Street to S of 7th Ave in Hoven Urban Grading, Curb & Gutter, Roadw ay Lighting, Sidew alk, ADA Upgrades. Storm Sew er. AC Surfacing PublicMeeting.rpt 4
7 66 NH-PH 0018(177)104 02QC Shannon 20.2 SD391 US18 - From Pine Ridge to Shoulder Widening, Mill & 2015 P 0391(06) 02NH US18 SD391; SD391 - From the AC Resurfacing, & Nebraska State Line to the Replace Str.s (RCBC) Jct w ith US18 SD391 - Mill & AC Resurfacing P 6316(06) 03QD Sully 10.0 From US83 at Agar, W 10, Fog Coat mi. on 176 St. to SD1804/293 Ave. 68 NH 0018(172)230 02RV Todd 0.5 US18 US W Tripp Co Grading, PCC Surfacing, & Line over White Horse Ck Structure Replacement 69 BRF 6140(08) 01DX Tripp 0.2 Structure 2.9N of Witten Structure & Approach over Cottonw ood Creek Grading 70 P 6477(04) 04AD 4.0 From US12 at Glenham, N 4 mi. on Glenham Road (Co. Rd 325) to the N county line Process In-Place & Asphalt Surface Treatment P 0032(15) 041T Areaw ide 0.0 Various Locations in the Culvert Repair Mobridge Area 72 P 0032(20) 049K Areaw ide 0.0 Various Locations on the Culvert Repair Standing Rock Indian Reservation 73 NH-P 0032(21) 049L Areaw ide 0.0 Various locations on the Culvert Repair Cheyenne River Indian Reservation 74 PH 0030(10) 02MR Regionw ide 0.0 Various locations on the Durable Pavement Marking State System in the Region 75 P 000S(00)022 02SS Regionw ide 0.0 Various Locations in the Region County Pavement Marking $ State funds at 60/40 (State - $0.025, County - $0.017) 76 PH 0030(17) 04GU Regionw ide 0.0 Region Cooridor Signing PH 0030(18) 04GQ Regionw ide 0.0 Region Rumble Strips & Signing Upgrades 78 P 000S(290) 02RU 0.0 FY 2015 Bridge Inspection Costs 79 PH 000S(287) 02PQ 0.0 Guardrail Replacement PH 000S(288) 02N4 0.0 Public Traveled Roads Preliminary Engineering for Conducting Road Safety Audit Review s (RSAR) 81 HS 2701(14)15 02N5 0.0 Local Government traffic engineering services performed by the SDDOT Traffic & Safety Engineer PH 000S(289) 02N6 0.0 Public Traveled Roads Preliminary Engineering for Roadw ay Safety Improvement 83 PH 000S(309) 03V7 0.0 Various Locations Curve Delineation P 000S(285) 02U3 0.0 Wetland Mitigation Banking P DBEC(20)15 02U5 0.0 DBEC Certification DBEC Certification Services for Services for CY2015 CY SS FY14(02) 02U4 0.0 DBE Supportive Services DBE Supportive Services for CY15 for CY15 87 RETR FY15(01) 02VF 0.0 Various Recreation Trails Projects 88 BR NBIS(31) 02T3 0.0 Bridge Inspections, Scour PublicMeeting.rpt 5
8 89 SS FY15( ) 04LF 0.0 On The Job Training and Anticipated funding for Support Services FY2015 On The Job (OJT/SS) Work Program Training and Support Services (OJT/SS) Work Program 90 PS 000S(328) 04CL 0.0 Inventory Compilation & PS 000S(329) 04CM 0.0 Preliminary Engineering for Railroad Safety Projects 92 P 0073(65)9 03AA Bennett 0.0 SD248 SD73-3 S of Martin over P 0248(08)173 03AB Jackson SD73 the Little White River; SD W & 0.4 E of Belvidere over Brave Bull Creek Epoxy 93 P 0073(68)0 04E1 Bennett 12.3 SD73 SD73 - Fm the Nebraska Mill & AC Resurfacing & State Line to the South Pipe Repair City Limits of Martin 94 P 1804(44)391 04FF Campbell SD1804 SD Through Pollock Replace Existing Lighting P 1806(06)365 02A7 Corson 0.0 SD1806 SD mi N of P 0012(152)187 02A6 Potter US12 US12; US12 - Missouri P 0212(149)208 02A8 US212 River Bridge at Mobridge; US212 - Missouri River Bridge at Forest City 96 IM 0903(97) G Jackson Jones 0.0 I90E I90W I90 - Structure 3.0 Mi E of the Draper Interchange Over 282 Ave, Over County Rd, 2.3 SE of SD63 Intch: Over County Rd, Draper Intch Substructure Work Epoxy 97 IM 0903(101)153 03W4 Jackson 10.6 I90E I90 - EBL, From East of Exit 152 at Kadoka to East of Exit 163 at Belvidere Remove & Replace PCC Surfacing, Edge Drains, Inslope Flattening, Pipe Repair, Extend Culvert IM 0904(57) E Jones 8.5 I90W I 90 - WBL Fm 3 mi W of PCC Surfacing Murdo to 3 mi W of Draper 99 P 1804(42)269 03A9 Sully 0.0 SD1804 SD N of the Epoxy Hughes Co Line over Okobojo Creek 100 BRF 6498(05) 6770 Sully E & 7.4 S of Onida Structure & Approach Over Medicine Creek Grading 101 NH 0018(176) G Todd 2.5 US18 US18 & US83 in Mission Urban Grading, PCC 2016 NH 0083(71)21 039J US83 Surfacing, Storm Sew er, Curb & Gutter, ADA Upgrades, Sidew alk, Traffic Signals, Roadw ay Lighting 102 PH 0083(70)0 03B2 Todd 12.4 US83 US83 - From the Nebraska Shoulder Widening, Spot State Line to south of Grading & AC Surfacing Mission of Shoulders 103 P 6497(04) 02DN Todd 4.0 Fm 2N & 7W of Olsonville, S 4 mi. on 269 Ave. betw een 293 St. & 297 St. Heavy Roadw ay Shaping, Base Course, Gravel Surfacing, Magnesium Chloride P 6139(09) 04LK Tripp 28.5 From 0.6S of US 18 in Crack Seal, Patching, Chip P 6302(03) 04LL Winner, S 17.5 mi. on 315 Ave. to 296 St. (FA 6139); From 310 Ave., 5W of Jct. of 296 St./315 Ave., E 11 mi. to US183/321 Ave. (FA 6302) Seal, Fog Coat, Intersection Improvementt 105 P 0033(15) 041V Areaw ide Various Locations in the Culvert Repair Winner Area PublicMeeting.rpt 6
9 106 P 0031(28) 0423 Areaw ide Various Locations in the Culvert Lining and Mobridge Area 107 P 0031(29) 042G Areaw ide Various Locations in the Culvert Repair Area 108 PH 0030(11) 03B5 Regionw ide 0.0 Various locations on the Durable Pavement Marking State System in the Region 109 P 000S(00)011 03DH Regionw ide 0.0 Various Locations in the Region County Pavement Marking $ State funds at 60/40 (State - $0.025, County - $0.017) 110 PH 0030(19) 04H0 Regionw ide 0.0 Region Cooridor Signing P 000S(322) 03A0 0.0 FY 2016 Bridge Inspection Costs 112 PH 000S(294) 03B8 0.0 Public Traveled Roads Preliminary Engineering for Conducting Road Safety Audit Review s (RSAR) 113 PH 000S(295) 03B9 0.0 Local Government traffic engineering services performed by the SDDOT Traffic & Safety Engineer PH 000S(296) 03BA 0.0 Public Traveled Roads Preliminary Engineering for Roadw ay Safety Improvement 115 PH 000S(310) 03V8 0.0 Various Locations Curve Delineation PH 000S(311) 03VF 0.0 Guardrail Replacement P 000S(318) 03AU 0.0 Wetland Mitigation Banking P DBEC(21)16 03AS 0.0 DBEC Certification DBEC Certification Services for Services for CY2016 CY SS FY15(02) 03AT 0.0 DBE Supportive Services DBE Supportive Services for CY16 for CY RETR FY16(01) 03AV 0.0 Various Recreation Trails Projects 121 BR NBIS(33) 03F0 0.0 Bridge Inspections, Scour PS 000S(330) 04CT 0.0 Inventory Compilation & PS 000S(331) 04CU 0.0 Preliminary Engineering for Railroad Safety Projects 124 P 1804(45) Campbell 33.8 SD1804 SD Fm N of Mill & AC Resurfacing Mobridge to Pollock 125 NH 0012(175)106 03UA Corson 0.0 SD63 US12 - Str.s 6.7 E of the NH 0212(161)135 03UC Dew ey US12 Perkins Co Line Over Hay P 0063(46)146 03UD Haakon US212 Ck & 1.3 E of Morristow n P 0063(45)144 03WC Ziebach Over Hay Ck.; US212 - Str.s 0.5 W of Dupree Over Bear Ck & 1.8 E of the Ziebach Co Line Over Little Bear Ck; SD63 - Str 1.7 N of the Haakon Co Line Over Dupree Ck; SD63 - Str 0.5 S of the Ziebach/Haakon Co Line Over Hermaphrodite Ck Scour Proteection 126 BRF 6259(06) 03GU Dew ey 0.2 Structure 0.5E of White Structure & Approach Horse, over a creek SN Grading BRF 6235(05) 03H2 Hughes 0.2 Structure 3.3W & 11.2S of Structure & Approach Harrold, on 318 Ave., over Grading a creek SN PublicMeeting.rpt 7
10 128 IM 0903(102)112 03W0 Jackson 19.7 I90W I90 - WBL, From the Jct. Mill & AC Resurfacing Pennington w ith US 14 to the East Jct. w ith SD IM 0903(104)153 03W6 Jackson 10.5 I90W I90 - WBL, From East of Exit 152 at Kadoka to East of Exit 163 at Belvidere Remove & Replace PCC Surfacing, Edge Drains, Inslope Flattening, Pipe Repair, Extend Culvert IM 0904(50)189 00GL Jones 8.4 I90E I90 - EBL Fm 3 Mi W of Exit PCC Surfacing Murdo) to 3 Mi W of Exit 201 (Draper) 131 P 0083(74)56 036E Jones 11.4 US83 US83 - Fm N. of the Mellette/Jones Co. Line to south of Murdo Grading, Replace Structure (Bridge) Over Horse Creek, Interim Surfacing P 0047(105)44 03U5 0.0 SD47 SD47 - Str.s 5.5 N of the Gregory County Line Over Waterhole Ck & 7.3 S of I90 Over the White River Replace Structure (RCBC); Scour Protection NH 0083(75)39 03UE 0.0 SD44 US83 - Str.s 2.3 S of NH 0018(183)247 03UF Mellette SD47 SD44E Over a creek & 3.1 NH 0183(22)2 03UG Tripp SD49 N of the Mellette Co Line P 0044(181)257 03UH US18 Over Horse Ck; US18 - P 0047(106)52 03UJ US183 Str.s 3.9 E of US183 Over P 0049(04)35 03UK US83 Big Hollow Ck & 2 SE of Winner Over W Branch of Thunder Ck; US183 - Str 2.2 N Of the Neb State Line Over the Keya Paha River; SD44 - Str 4 E of US18 Over Thunder Ck; SD47 - Str 5.3 S of SD49 Over Bull Ck; SD49 - Str 7 S oh Hamill Over a creek Scour Protection 134 IM 0904(59)210 04D I90E I90W I90 - EBL & WBL, Fm West of the East Jct. w ith US83 to East of the Jct w ith SD47 Shoulder Improvement, Ramp Improvements PH 8054(05) 02UK Potter 0.0 Various County, City, & Signing & Delineation Tow nship Roads in Potter County 136 P 0033(16) 042A Areaw ide Various Locations in the Culvert Lining Winner Area 137 PH 0030(13) 03UU Regionw ide 0.0 Various locations on the Durable Pavement State System in the Marking Region 138 P 000S(00) D Regionw ide 0.0 Various Locations in the Region County Pavement Marking $ State funds at 60/40 (State - $0.025, County - $0.017) 139 PH 0030(20) 04H3 Regionw ide 0.0 Region Cooridor Signing P 000S(320) 03U4 0.0 FY 2017 Bridge Inspection Costs 141 PH 000S(317) 03V4 0.0 Public Traveled Roads Preliminary Engineering for Conducting Road Safety Audit Review s (RSAR) 142 PH 000S(312) 03V0 0.0 Local Government traffic engineering services performed by the SDDOT Traffic & Safety Engineer PH 000S(314) 03V1 0.0 Public Traveled Roads Preliminary Engineering for Roadw ay Safety Improvement Program 144 PH 000S(313) 03V9 0.0 Various Locations Curve Delineation PublicMeeting.rpt 8
11 145 PH 000S(315) 03VA 0.0 Various Locations Guardrail Replacement PH 000S(316) 03VC 0.0 Various Locations Intersection Improvement P 000S(321) 03WQ Wetland Mitigation Banking SS FY16 (02) 03WT DBE Supportive Services DBE Supportive Services for CY17 for CY P DBEC(22)17 03WR DBEC Certification DBEC Certification Services for Services for CY2017 CY RETR FY17(01) 03WV 0.0 Various Recreation Trails Projects 151 BR NBIS(34) 03WU 0.0 Bridge Inspections, Scour SS FY17( ) 04LH 0.0 On The Job Training and Support Services (OJT/SS) Work Program Anticipated funding for FY2017 On The Job Training and Support Services (OJT/SS) Work Program SS FY17( ) 04LH 0.0 On The Job Training and Support Services (OJT/SS) Work Program Anticipated funding for FY2017 On The Job Training and Support Services (OJT/SS) Work Program PublicMeeting.rpt 9
Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects
Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning
More information02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.
02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 1 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 24832(04) 6 CO RD 5.000 0 0 0 3,657,000 3,657,000 ALFALFA CO. RD. ON EW-25 FROM 1.0 MI. W. OF ALFALFA
More informationI-94 East Corridor Performance
Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationWichita Falls MPO - MTP Project List 1 of 6
Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationCulpeper District. Albemarle County Monthly Report. September 2012
Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationCurrent Corridor Characteristics
Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationCulpeper District. Albemarle County Monthly Report December 2011
Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed
More informationMost people notice when ODOT builds something
ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationDISTRICT/ATP 7 Data Input Worksheet DRAFT STIP June 29, 2018 Red is changes from previous ATIP
DISTRICT/ATP 7 Data Input Worksheet DRAFT STIP 2019-2022 June 29, 2018 Red is changes from previous ATIP Seq # Rte_Sys Projnum #Year Agency MPO Description Program Fund 1 STIP 1 BB TRF-0028-19A 2019 MANKATO
More informationAnnual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)
Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationPlanning & Development Group
Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationFY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars
FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue
More informationBID RESULTS. May 12, Award Date May 19, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS May 12, 2016 Award Date May 19, 2016 COMMISSION DISTRICT 1 Bob Ruwart - Commissioner Job 1 Federal Project NHPPI-I806199 involving grading, draining, milling plant mix and concrete, placing
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationBirmingham City Centre Vision for Movement
Birmingham City Centre Vision for Movement Wes Sedman - Centro Commissioning Team Laying the foundations for a vibrant and liveable global city Birmingham Big City Plan - A City Centre Masterplan A vision
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationHancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34
Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 214-217 PREPARED BY THE SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION DIVISION OF PLANNING/ENGINEERING PROJECT
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationFY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
1037 BB TRF-0028-18A 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT OPERATING ASSISTANCE FTA 1,800,000 - - 532,000 - - 1,268,000 1038 BB TRF-0028-18B 2018 MANKATO SECT 5307: CITY OF MANKATO RR TRANSIT
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationBID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner
BID RESULTS April 14, 2016 Award Date April 21, 2016 COMMISSION DISTRICT 1 Job 1 Federal Project HSIP-B151109 involving installing Shur-Tite delineators and miscellaneous work at various locations in Transportation
More informationODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationProject ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK
More informationCAPITAL IMPROVEMENT PLAN
CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationFY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area
KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationMoDOT Southwest District
Barry County Route 37: Add right-turn lane at Route 60 in Monett Route 60: Rehabilitate westbound bridge over railroad in Monett Route D: Resurface pavement between Route 248 and Route 265/413 in Crane
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationSpecification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE
Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:
More information2015 June Non-Ad Valorem Recap 5/27/2015
BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 183 192 $ 51,840.00 - - 183 192 4 BROWARD COUNTY GARBAGE $ 270.00 665 869 $ 234,630.00 2-667 869 5 BROWARD
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationKDOT announces approved March bids
IMMEDIATE RELEASE April 10, 2018 For more information: Kim Stich 785.296.3585 KDOT announces approved March bids The Kansas Department of Transportation announces approved bids for state highway construction
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationPublic Service Department MONTHLY REPORT November 2017
- Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects
More informationAdditional Economic Development Strategy submissions- Klickitat County
Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION
Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationKansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:
Page 1 of 20 518045 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 012340 FOUNDATION STABILIZATION (SET PRICE) 4 025323 MOBILIZATION 5
More information2015 Proposed Non-Ad Valorem Recap 08/05/15
BL BELMONT LAKES CDD $ 4,200.00 42 42 $ 176,400.00 - - 42 42 1 BROWARD COUNTY GARBAGE $ 270.00 184 193 $ 52,110.00 - - 184 193 4 BROWARD COUNTY GARBAGE $ 270.00 665 871 $ 235,170.00 2-667 871 5 BROWARD
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationGulf Coast MPO Obligated Projects
Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road
More informationTRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 8, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 027 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationVillage of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY
Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800
More informationComposite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover
Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area
More informationCity of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019
City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure
More informationDISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION
OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 3 2013 CONSTRUCTION PROGRAM SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationTEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES
TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES January 2018 Table of Contents Page List of Figures... ii List of Tables... iii Introduction... 1 Purpose of the Report... 3 TxDOT s El Paso District:
More informationCVRPC FY 13 Project Priorities (Bridge, Roadway, Bike & Ped., Park & Ride) - 3/29/11
FY 13 Transportation Priorities Central Vermont State & Town Bridge Projects STOWE LAMO ILLE CO. ELMORE ELMORE LAMOILLE CO HARDWICK CALEDONIA CO WALDEN S TOWE BOLTON CHITTENDEN C O WORCESTER 17 WOODBURY
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationDISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION
ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR
More informationCanada and Alberta announce 33 new infrastructure projects
January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke
More informationCITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager
CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:
More informationSection 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3
Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3
More informationTRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE October 12, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 167 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationCurrent Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications
Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway
More informationSTREET CONSTRUCTION PROGRAM SUMMARY CALENDAR YEAR 2018 / 2019 FISCAL YEAR Street From To Construction Type Cost Estimate
CALENDAR YEAR 2018 / 2019 FISCAL YEAR 2019 Grandview & University Roundabout Grandview & University Intersection Street / Intersection Reconstruction 900,000 TSF, ICAAP, STP 850,000 East-West Corridor
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationMichigan s Engineering Safety Program for Local Roadways
Michigan s Engineering Safety Program for Local Roadways Local Road Safety Peer Exchange October 2018 Timothy J. Gates, Ph.D., P.E., P.T.O.E. Michigan State University Andrew Ceifetz, P.E. WSP For More
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationWI SR Title and Work Description Region County Ad Date Range
Advance Schedule of Projects These contracts are planned for advertisement by the Washington State Department of Transportation for December 1, 2014 through November 30, 2015. Please note the advertisement
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More information2018 Capital Improvement Budget Department Summary by Funding Source
Department Summary by Funding Source Department Bonds State Federal Other Total Fire 3,470 - - 290 3,760 Health & Human Services 217 - - 75 292 Information Technology - - - 5,937 5,937 Library 590 - -
More informationMEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator
AGENDA ITEM 1A MEMORANDUM DATE: January 17, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator Sue Polka, Interim Asst. Public Works Director/City
More informationMoDOT Southwest District
Barry County Route 39: Pavement sealing between Route 248 near Jenkins and Stone County line Route 60: Add eastbound through lane and right turn lane at Route 37 in Monett Route VV: Bridge replacement
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationHighways: Interstate. Highways: State Highways
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) ST. JOHNS COUNTY Highways: Interstate 4392931 I-95 SB(SR9) DURBIN CREEK BRIDGE
More informationProject Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon
Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More information