re:port Building a better harbor together inside A Community Newsletter from the Port of Long Beach Fun this Middle Harbor Summer See Page 4 Page 7

Size: px
Start display at page:

Download "re:port Building a better harbor together inside A Community Newsletter from the Port of Long Beach Fun this Middle Harbor Summer See Page 4 Page 7"

Transcription

1 A Community Newsletter from the Port of Long Beach re:port Summer 2014 Building a better harbor together See Page 4 inside Moving On Page 2 Port Operations Page 3 Bridge Work Page 6 Harbor Tours Page 8 Middle Harbor The jobs and careers created by the project Page 4 Fun this Summer A close-up on Port community events Page 7

2 The Port's maintenance staff relocated to 725 Harbor Plaza, above. Meanwhile, the Port's administrative staff moved out near the Long Beach Airport, below. Harbor Department Makes Double Move Employees of the Port of Long Beach moved into not one, but two new buildings recently. A majority of the Harbor Department clerical, engineering and planning personnel moved into new Interim Administrative Offices near Long Beach Airport, while members of the Department s Maintenance Division made the shift to a new, permanent home within the Port. Right across the street from the Port s old admin headquarters on Harbor Plaza, the new Maintenance Facilities were built. The old Maintenance Yard was in the way of the Gerald Desmond Bridge Replacement Project. The old yard, at 1400 W. Broadway, west of Pico Avenue, has been demolished to allow construction to begin on the new bridge. Maintenance Division workshops, offices, garages, storage areas, vehicle-washing bays and refueling stations have found a new home at 725 Harbor Plaza, a half-mile west of the Queen Mary. This new state-of-the-art complex earned a gold level certification in the Leadership in Energy and Environmental Design green building program. Buildings that are LEED certified meet internationally recognized green standards. These buildings are energy-efficient, water-conserving, and environmentally friendly. One of the reasons for the LEED achievement is the new maintenance complex s solar array, which is the third-largest in Long Beach at 323 kilowatts. A bigger move for Harbor Department staffers was the one to the new Interim Administrative Offices near the Long Beach Airport and next to the Marriott Hotel, at 4801 Airport Plaza Drive. The Port Administration Building on Harbor Plaza, opened in 1960, was found to be seismically unsafe and inadequate for the Department s needs. Moving a work force of more than 300 people was no easy task. The move took place over four weekends during February and March. This is the Port s fourth administration building, said Jamilla Vollmann, Capital Projects Coordinator for the Harbor Department. After spending more than 50 years in the previous structure, it was time to go. But the new home is temporary. The Long Beach Board of Harbor Commissioners is committed to returning to a headquarters in downtown Long Beach, close to the Port. Did you know the Port has the third largest solar array in Long Beach? 1. Long Beach Convention Center: 750 kw 2. Long Beach City College: 400 kw 3. Port Maintenance Facilities: 323 kw Page 2 Port of Long Beach Summer 2014

3 WHAT PORT? IS THE More than just cranes and ships, the iconic Port of Long Beach is a key economic engine for Southern California and critical to the world trade ecosystem. PORT OF LONG BEACH 101 #2 $180 BILLION 4,000 Busiest port in the U.S. Worth of cargo is imported through the port annually Ships dock at the port each year Although a public agency, the Port s operations are not supported by tax dollars. Instead, its revenues come from leasing marine terminals. PORT INVESTMENTS $4 BILLION Ongoing infrastructure investment Focus on sustainability 81% Education From scholarships to internships and field trips, the port is a strong supporter of education in the community. Community Outreach Family-friendly events and harbor tours are just two of many ways the Port stays connected with Long Beach residents. Emissions reduction since TEUs Goods are transported in shipping containers measured in TEUs (twenty-foot equivalent units) ON THE WEB: For a humorous look at Port operations, go to: Port of Long Beach Summer 2014 Page 3

4 Workers install rebar that will reinforce concrete at the Middle Harbor Terminal Redevelopment Project. Dani Rupel digs her new career. Getting Their Hands Dirty at Jobs They All Love Local workers building careers at Middle Harbor Zach Kidman was a part-time martial arts instructor when a friend told him about an apprenticeship opportunity to become an electrician. The lifelong resident of Long Beach jumped at the chance. Today he is working on the Middle Harbor Redevelopment Project in the Port of Long Beach and gaining experience in his new career. It s challenging, you learn something new every day. It s a lot better than working in an office, said Kidman, right before he scaled a refrigerated container stacking structure to complete wiring for lighting fixtures. The $1.3 billion Middle Harbor construction project is transforming two of the Port's oldest terminals into one state-of-the-art container terminal equipped with advanced technology. Kidman is one of the thousands of workers many of whom live in Long Beach employed either as an apprentice like Kidman or a journeyman in their longstanding line of work. Under direction of the Long Beach Board of Harbor Commissioners, the Harbor Department has sought ways to make sure Long Beach residents experienced hands and beginners have the opportunity to find jobs at the project. The Port teamed with the Pacific Gateway Workforce Investment Network and the Los Angeles/Orange Counties Building & Construction Trades Council to provide opportunities to area residents like Kidman who are willing to start a new career in the construction trades. They teach you everything, it s all hands on, school and training, said Kidman, who is working his way through a five-year apprenticeship. Andy Becker, a site supervisor for Dynalectric, the firm employing electricians like Kidman, said the International Brotherhood of Electrical Workers apprenticeship Page 4 Port of Long Beach Summer 2014

5 A welder works on steel framing at one of Middle Harbor's new structures. Construction workers lay rails for stacking cranes. program is for those who don t mind starting at the bottom, getting their hands dirty and working outdoors. Michelle Cummings of Long Beach is working on her apprenticeship with the International Union of Operating Engineers as a heavy equipment operator at Middle Harbor. She learned about the IUOE program at a job fair. She s nearly one year into a threeyear program to become a full union member. In between scrambling in and out of trenches to measure grade angles one recent day, she said she loves the work and she likes working in her town at Middle Harbor. I had always seen big heavy equipment, and I was fascinated by it. I always wanted to operate it, Cummings said. This is one of the most desirable places to be. Everybody wants to work out here. Dani Rupel would agree. Rupel is an apprentice heavy equipment operator. About two years ago, the Long Beach resident was doing 3-D design work on swimming pools and landscaping, but was looking for something more her speed. I m not an office girl, Rupel said. Working the backhoe and also surveying the layout for excavation is much more her kind of work. So much so, that it s not even like work. I really haven t worked a day in my life since I started doing this, said Rupel, clad in hardhat, safety glasses and reflective vest. The Board of Harbor Commissioners has approved three Project Labor Agreements for Middle Harbor. The PLAs set goals for the hiring of workers from Los Angeles and Orange counties at fair wages. And in order to focus on Long Beach residents, the Port in January 2014 created the Middle Harbor Community Partner designation to recognize those companies that hire workers from the Port s city. The top performer in that program was the Manson Construction/ Connolly Pacific joint venture, which is constructing wharf and backlands, with 16.4 percent of all working hours being completed by Long Beach workers. Several other companies have also earned the Community Partner designation. We designed the Community Partner program to recognize those companies who have done the most for workers from Long Beach and encourage others to follow their lead, said the Port s Acting Director of Construction Management, Suzanne Plezia. ON THE WEB: For information on job and apprenticeship opportunities, go to or Or call Pacific Gateway Workforce Investment Network at (562) 570-WORK. Port of Long Beach Summer 2014 Page 5

6 With the razing of ramps from the 710 Freeway, construction will move ahead on the foundations for the replacement bridge. Ramps to Terminal Island Demolished to Make Way for Replacement Bridge Before a new bridge goes up, a few things need to come down. For the Gerald Desmond Bridge Replacement Project, that includes the southbound Long Beach (Interstate 710) Freeway connector ramp to westbound Ocean Boulevard. This is the stretch of roadway that connects the southbound 710 to the existing bridge, said John Pope, Community Relations Manager for the Port of Long Beach. We've spread the word so drivers know to plan ahead. The work started on May 10 and involves demolishing the existing ramp to make way for a wider connector with a more gradual rise. The new connector will reopen with the completion of the first half of the new bridge. During the next two-and-a-half years, all vehicles normally using the connector are being diverted onto surface streets at the Pico Avenue/ Piers B, C, D, E off-ramp. Traffic bound for Terminal Island will head south on Pico Avenue to the westbound Ocean Boulevard on-ramp. Traffic headed for Piers B, C, D and E will continue south on Pico Avenue. Those headed for Terminal Island, Wilmington and San Pedro can bypass the closure entirely by using existing options that include Anaheim Street, the Terminal Island (State Route 103) Freeway, SR-47, and the Harbor (I-110) Freeway. The work has no impact on southbound I-710 lanes into downtown Long Beach. With detour routes clearly marked, and electronic message boards and restriped lanes delineating route changes, traffic continues to move smoothly. LEGEND CLOSURE Inner Harbor The Port of Long Beach Ocean Blvd. E Anaheim St. W 9th St. Pico Ave. Queens Way Pico Ave. Los Angeles River The Queen Mary Ave. Magnolia W W Shoreline Dr E STAY CONNECTED For real-time traffic reports, video and text alerts for Port construction closures and detours throughout the harbor complex, download a free mobile app developed by the Port of Long Beach. The app includes audio updates in English and Spanish. To download, go to Page 6 Port of Long Beach Summer 2014

7 Great Sand Sculpture Contest Aug at. Come enjoy our Port-sponsored Summer Beach Party events: Long Beach Municipal Band Concerts July-Aug. various parks. Tiki Beach Festival Aug Like, Follow, Subscribe Connect with us for the latest Port updates, news and events by liking, following, subscribing and signing up for our s at polb.com/subscribe, or on social media: Facebook.com/portoflb YouTube.com/portoflongbeach Movies on the Beach June to September Mother's Beach, Appian Way below Second Street, 5101 E. Ocean Blvd. Pirate Invasion of the Belmont Pier June Belmont Pier, Ocean Blvd. and Livingston Drive 4th of July Party on the Pier Belmont Pier Love Long Beach Festival July Kids Fishing Rodeo Aug. 1 Great Sand Sculpture Contest Aug Tiki Beach Festival Aug K9 Fest Sept View our Beach Party video! #POLBbeachparty Port of Long Beach Summer 2014 Page 7

8 4801 Airport Plaza Drive, Long Beach, CA PRSRT STD U.S. ECRWSS POSTAGE U.S. POSTAGE PAID LONG BEACH, CA PERMIT NO 5069 Doug Drummond Rich Dines Lori Ann Farrell Susan E. Anderson Wise Lou Anne Bynum President Vice President Commissioner Commissioner Commissioner 55% R E C Y C L E D SUSTAINED FOREST PAPER PRODUCT *********ECRWSSEDDM**** Postal Customer We want to hear from you! Please give us your feedback in a short readership survey at: Join the Fun Port Offers Free Harbor Tours Guests are getting up-close views of massive cargo ships, the Middle Harbor construction project and other fascinating aspects of the workings of the Port of Long Beach during this year s Harbor Tours. The free tours, held four times a month from now through early November, embark from Shoreline Village in downtown Long Beach. The tours allow the public to see much of the Port complex from a fresh perspective off the deck of a boat. Port staff members narrate the 90-minute expeditions, offering insights and little-known facts about the Port and the harbor. It s a behind-the-scenes look at the Port that the public can t otherwise get, Port Communications Director Michael Gold says. There s really no better way to see the Port than from the water. And as Gold emphasizes, no two tours are the same. Sometimes we see wildlife dolphins, sea lions, pelicans, he says. Other times it s all about ship traffic and barges. This year, the Port will offer cruises on the first and third Saturdays at 10 a.m., and the second and fourth Thursdays at 7:30 p.m. The nighttime excursion is otherwise known as the sunset tour. Day or night, the Harbor Tours are the best way to see and understand the Port of Long Beach, which is North America s second-busiest container seaport, regularly welcoming the largest ships that are more than three football fields long. WHAT: Harbor Tours WHEN: First and third Saturday mornings, and second and fourth Thursday evenings through early November WHERE: Board the boat at Shoreline Village in downtown Long Beach HOW: Make a reservation at on the first Monday of each month for the following month s tours Page 8 Port of Long Beach Summer 2014

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

Come see how the Port of Long Beach is improving the

Come see how the Port of Long Beach is improving the A Community Newsletter From The Port of Long Beach Fall 2006 Free Port boat tours will be offered, along with many other activities, at the Oct. 7 Green Port Open House. See, Learn, Discover Open House

More information

Come to Our. Birthday Party! Saturday, June 25. Live entertainment, family friendly activities and more. See Page 3. A Century in Photos

Come to Our. Birthday Party! Saturday, June 25. Live entertainment, family friendly activities and more. See Page 3. A Century in Photos Centennial Celebration re:port Spring 2011 A Community Newsletter from the Port of Long Beach 100 Come to Our th Birthday Party! Saturday, June 25 Live entertainment, family friendly activities and more.

More information

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018 California Los Angeles County Chapter PORT OF LOS ANGELES January 16, 2018 2 #1 Container Port in the Americas Container Volume Twenty-foot Equivalent Units (TEUs) 9.3 million TEUs in 2017 8.8 million

More information

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018 Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018 Port of Los Angeles at a Glance Founded in 1907 Non-taxpayer supported Business port model 4,300

More information

re:port Bridge of the Future inside Green Ships Beyond the Waterfront A Community Newsletter from the Port of Long Beach

re:port Bridge of the Future inside Green Ships Beyond the Waterfront A Community Newsletter from the Port of Long Beach A Community Newsletter from the Port of Long Beach re:port Fall 2012 Bridge of the Future Construction will begin soon on a new span to replace the aging Gerald Desmond Bridge. The new bridge will improve

More information

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS

More information

CLOSE WINDOW. September 2002

CLOSE WINDOW. September 2002 CLOSE WINDOW September 2002 AROUND THE PORT... Importers shipped record volumes in July driving up the total number of cargo containers shipped through the Port of Long Beach to a best-ever 451,917 container

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

Port of San Diego Overview and Updates. September 2017

Port of San Diego Overview and Updates. September 2017 Port of San Diego Overview and Updates September 2017 Port of San Diego Jurisdiction 34 miles of waterfront 2,403 acres of land 3,535 acres of water Port Tidelands Coronado San Diego National City Chula

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS For Immediate Release January 2, 2018 Contact: Charles H. Pannunzio (424) 646-5260 JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS Access to Parking Structure 4 from the Upper/Departure

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

CLOSE WINDOW. July 2002

CLOSE WINDOW. July 2002 CLOSE WINDOW July 2002 AROUND THE PORT... With the arrival of four ship-to-shore cranes in June bringing the total number of gantry cranes at Pier T to 10, the first 288 acres of the Port of Long Beach

More information

Office of Economic and Small Business Development. Sandy-Michael McDonald, Director. June 26, 2017

Office of Economic and Small Business Development. Sandy-Michael McDonald, Director. June 26, 2017 Office of Economic and Small Business Development Sandy-Michael McDonald, Director June 26, 2017 1 OESBD Directly Supports the County Commission s Values Ensuring economic opportunities for Broward s diverse

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

Train to Plane Connection Construction of the Burbank Airport North Metrolink Station

Train to Plane Connection Construction of the Burbank Airport North Metrolink Station Train to Plane Connection Construction of the Burbank Airport North Metrolink Station Community Meeting - March 13, 2017 1 Community Meeting Agenda 6:00 6:30 PM Open House 6:30 7:15 PM Presentation 7:15

More information

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament. Major Transport Infrastructure Projects Forth Replacement Crossing Principal Contract Project Office King Malcolm Drive, Rosyth KY11 2DY Steve Farrell Clerk to the Rural Economy and Connectivity Committee

More information

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information

More information

CLOSE WINDOW. December 2002

CLOSE WINDOW. December 2002 CLOSE WINDOW December 2002 AROUND THE PORT... After more than six years with the Port of Long Beach, Harbor Commissioner John E. Kashiwabara has announced his retirement effective Jan. 31. Kashiwabara

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017 2017 Work and Launch of the Next Phase Information meeting, Montréal-Ouest September 14, 2017 2 Presentation Outline Work progress Launch of the next phase Mitigation measures Dismantling Communications

More information

The Port of Seattle. page 2

The Port of Seattle. page 2 The Port of Seattle The Port of Seattle plays a key role in bringing international trade and travel to the Pacific Northwest. The Port provides maritime and airport operations for the greater Seattle area.

More information

FY Year End Performance Report

FY Year End Performance Report Overall Ridership Big Blue Bus carried 18,748,869 passengers in FY2014-2015, a 0.3% reduction from the year prior. This negligible reduction in ridership represents the beginnings of a reversal from a

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO PORTMIAMI: AN EVOLVING GLOBAL GATEWAY PORT MISSION PortMiami s goal is to operate

More information

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017

Regional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017 Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make

More information

First rail. August 2011

First rail. August 2011 August 2011 First rail A downtown resident showed his son in early August the first completed section of embedded track on Fourth Street in front of the Farmer s Market. During July, the Central Corridor

More information

US and Seattle perspective on shore power for cruise ships

US and Seattle perspective on shore power for cruise ships US and Seattle perspective on shore power for cruise ships Michael McLaughlin, Director, Cruise and Maritime, Port of Seattle at the Workshop Sustainable Energy Supply & Innovative Solutions for Emission

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries

Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries The Los Angeles Chapter of the Society of Allied Weight Engineers is proud to host the 39th Southwest

More information

The Airport. p a g e 2

The Airport. p a g e 2 The Airport The Santa Barbara Airport is owned and operated by the City of Santa Barbara, Airport Department, and has provided commercial and general aviation transportation to the region for more than

More information

STRATEGIC ALLIANCES BETWEEN PORTMIAMI AND ITS CRUISE AND CARGO PARTNERS

STRATEGIC ALLIANCES BETWEEN PORTMIAMI AND ITS CRUISE AND CARGO PARTNERS STRATEGIC ALLIANCES BETWEEN PORTMIAMI AND ITS CRUISE AND CARGO PARTNERS Richard de Villiers Assistant to the Deputy Port Director AAPA Conference, February 5-7, 2013 Merida, Mexico MIAMI-DADE COUNTY GOVERNMENT

More information

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director

CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION TO: FROM: SUBJECT: ATTACHMENTS: June 1,2017. Aaron Kunz, Deputy Director CITY OF BEVERLY HILLS TRAFFIC & PARKING COMMISSION June 1,2017 TO: FROM: SUBJECT: ATTACHMENTS: Traffic & Parking Commission Aaron Kunz, Deputy Director North Santa Monica Boulevard Reconstruction Project

More information

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee November 17, 2015 Ports O Call Area Redevelopment Ports O Call Area Redevelopment Implementation Schedule

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Port Everglades Overview

Port Everglades Overview Port Everglades Overview Broward County Charter Review Infrastructure Subcommittee June 7, 2017 Steven M. Cernak, P.E., PPM Chief Executive & Port Director Jurisdictional Area Located in the cities of:

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

The Port of Seattle. Record Sales in Dining & Retail

The Port of Seattle. Record Sales in Dining & Retail The Port of Seattle The Port of Seattle plays a key role in bringing international trade and travel to the Pacific Northwest. The Port provides maritime and airport operations for the Puget Sound Region.

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009 Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board

More information

ORDINANCE NO WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City

ORDINANCE NO WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City SPONSOR: Janet Venecz Councilwoman at Large ORDINANCE NO. 9227 AN ORDINANCE AMENDING ORD. 8081 AS IT RELATES TO PROJECT WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City of Hammond

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

NEXT STOP NEWS September Extended Light Rail Service for Folsom Live

NEXT STOP NEWS September Extended Light Rail Service for Folsom Live NEXT STOP NEWS September 2016 Extended Light Rail Service for Folsom Live Folsom Live returns for 2016 on Saturday, September 24. This year s venue features ten bands on four outdoor stages. The festivities

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update 1 Port Everglades 2014 Master/Vision Plan Update Public Meeting May 28, 2014 2 Agenda Port Everglades Mission Project Background 2014 Master/Vision Plan Update Process Status of 2009 5-Year Master Plan

More information

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019 Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform

More information

NDG-Westmount Neighbourhood Committee. November 16, 2015

NDG-Westmount Neighbourhood Committee. November 16, 2015 NDG-Westmount Neighbourhood Committee November 16, 2015 2 Feedback on previous questions Order-in-Council 890-2010 - condition 8 The ministère des Transports must : Establish a buffer zone at the foot

More information

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015 Port Everglades: Making The Last Mile Count AAPA Annual Convention November 3, 2015 Port Everglades Overview Enterprise Fund of Broward County Government Operations are supported 100% by user fees; no

More information

daily maintenance and management of the park. This 1.3 mile section of the Brooklyn

daily maintenance and management of the park. This 1.3 mile section of the Brooklyn MacDonald 1 Ryan MacDonald Brooklyn Bridge Park Conservancy Summer 2016 The Brooklyn Bridge Park is a not for profit corporation that is in charge of the daily maintenance and management of the park. This

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017

Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 1 Project Overview Design-Build Contractors: Mainline - Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

Press Release. April 27, 2017

Press Release. April 27, 2017 Press Release April 27, 2017 Skanska USA Celebrates Grand Opening of Queens-Bound Span of New Kosciuszko Bridge Project s completion marks the first major bridge constructed in New York City in more than

More information

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar A construction truck drives along the newly paved westbound 60 freeway Lemon Avenue on-ramp in City of

More information

Sidewalk. Summer Kids Camp

Sidewalk. Summer Kids Camp Sidewalk Toronto Summer Kids Camp October 2018 Contents About Kids Camp 05 Curriculum 07 Detailed Program 09 Campers Reflections 13 4 About Kids The Sidewalk Toronto Summer Kids Camp was created for children

More information

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Neighbourdhood Committee NDG-Westmount. October 16, 2017 Neighbourdhood Committee NDG-Westmount October 16, 2017 2 Presentation Outline Requests from Committee members Feedback on questions Green strip consultations Work update and obstacles Work progress Phase

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot

More information

LA Waterfront Annual Program Update March 29, 2012

LA Waterfront Annual Program Update March 29, 2012 LA Waterfront Annual Program Update March 29, 2012 WILMINGTON WATERFRONT Approved Project Approved Project Welcome Update on the LA Waterfront Program Accomplishments Projects Underway Projects in Planning

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns

More information

TEMPE BEACH PARK - RECOMMENDATIONS

TEMPE BEACH PARK - RECOMMENDATIONS TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.

More information

HARBOR ±10,000 SF CENTER FREE-STANDING SAN PEDRO RETAIL AVAILABLE 233 N. HARBOR BLVD SAN PEDRO, CA BEACON POTENTIALLY UP TO PACIFIC OCEAN

HARBOR ±10,000 SF CENTER FREE-STANDING SAN PEDRO RETAIL AVAILABLE 233 N. HARBOR BLVD SAN PEDRO, CA BEACON POTENTIALLY UP TO PACIFIC OCEAN PACIFIC OCEAN FREE-STANDING SAN PEDRO RETAIL AVAILABLE SAN PEDRO PUBLIC MARKET PORT OF LOS ANGELES DOWNTOWN HARBOR DOWNTOWN SAN PEDRO POTENTIALLY UP TO ±10,000 SF Divisible to Many Sizes HARBOR BEACON

More information

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6 15 th Revised Page 25 ISSUED: NOVEMBER 27, 2017 EFFECTIVE: JANUARY 1, 2018 DOCKAGE (I) (C)(GS) 410 Except as otherwise provided herein, or as otherwise specified in Leases, Operating and Berthing Agreements

More information

WCNA 30 NEWS REGISTRATION A NOTE ABOUT WEDNESDAY, 2 JULY 2003

WCNA 30 NEWS REGISTRATION A NOTE ABOUT WEDNESDAY, 2 JULY 2003 WCNA 30 NEWS For the most recent updates or to download additional copies of this update, go to www.na.org. Get ready to celebrate 50 years!! The miracle of recovery has been proving itself in the lives

More information

G Street Undercrossing. City Council Meeting Date: November 3, 2008

G Street Undercrossing. City Council Meeting Date: November 3, 2008 G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan

More information

DOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018

DOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018 DOWNTOWN SANTA MONICA Market Report Edition: First Quarter, 2018 ABOUT DOWNTOWN SANTA MONICA, INC. Downtown Santa Monica is a dynamic, urban environment located on the bluffs overlooking the Santa Monica

More information

Regional Connector Transit Project Community Leadership Council

Regional Connector Transit Project Community Leadership Council Regional Connector Transit Project Community Leadership Council Grand Av Arts/Bunker Hill Station & Flower St/Financial District Committees May 9, 2017 1 COMMUNITY LEADERSHIP COUNCIL UPDATE 2 CLC Executive

More information

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,

More information

Port News Monthly Issue

Port News Monthly Issue Lázaro Cárdenas Port www.puertolazarocardenas.com.mx October 2008. Vol. 3 Port News Monthly Issue New cranes for the Container Terminal in order to improve operations: LCTPC LÁZARO CÁRDENAS PORT. October,

More information

FOR LEASE AIRPORT PROFESSIONAL CENTER FITCH AVENUE IRVINE, CALIFORNIA ±3,695-6,859 SF CREATIVE OFFICE SUITES AVAILABLE

FOR LEASE AIRPORT PROFESSIONAL CENTER FITCH AVENUE IRVINE, CALIFORNIA ±3,695-6,859 SF CREATIVE OFFICE SUITES AVAILABLE FOR LEASE AIRPORT PROFESSIONAL CENTER 17838-17880 FITCH AVENUE IRVINE, CALIFORNIA ±3,695-6,859 SF CREATIVE OFFICE SUITES AVAILABLE JOE WINKELMANN 949 724 5704 joe.winkelmann@colliers.com MICHAEL HARTEL

More information

Head to University Avenue and save!

Head to University Avenue and save! April 2011 Head to University Avenue and save! Liberty Tax Service at 1731 University Ave. W. in is offering a special for first-time customers who drive through the construction zone to get their taxes

More information

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL 04.01.14 HKS I Urban Design Studio Summary of Outreach Purpose of Stakeholder Outreach Identify and engage

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

SECTION TWENTY-THREE * INCENTIVES GENERAL RULES AND REGULATIONS DEFINITIONS INTERMODAL CONTAINER DISCOUNT PROGRAM

SECTION TWENTY-THREE * INCENTIVES GENERAL RULES AND REGULATIONS DEFINITIONS INTERMODAL CONTAINER DISCOUNT PROGRAM First Revised Page... 203 Original Page... 203 DEFINITIONS INTERMODAL CONTAINER DISCOUNT PROGRAM Actual IPI Rate Reduction is the amount of the monetary reduction assessed against affirmatively claimed

More information

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access

More information

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation

More information

Opportunities in Non-Container Trade and the Expanding Cruise Industry

Opportunities in Non-Container Trade and the Expanding Cruise Industry Opportunities in Non-Container Trade and the Expanding Cruise Industry AAPA Commissioners Seminar Steven Cernak, Port Director Port of Galveston San Francisco, CA May 18, 2005 The Port Industry Is a highly

More information

Annual Port Review. June 22, 2016

Annual Port Review. June 22, 2016 Annual Port Review June 22, 2016 2 Port Everglades by the Numbers (FY2015 unless indicated) #1 Seaport in Florida by Revenue - $153 million #1 Container Port in Florida - (#10 in U.S.) by volume 1,060,507

More information

Port Everglades. Presented to FMPOAC Freight Committee. July 23, 2015

Port Everglades. Presented to FMPOAC Freight Committee. July 23, 2015 Port Everglades Presented to FMPOAC Freight Committee July 23, 2015 Port Overview Dania Beach Fort Lauderdale Hollywood Broward County Municipal Services District Port Everglades Overview Enterprise Fund

More information

2017 STAKEHOLDER REPORT

2017 STAKEHOLDER REPORT 2017 STAKEHOLDER REPORT MESSAGE FROM THE CHAIR On behalf of the Halifax Port Authority (HPA) and its Board of Directors, we want to applaud the entire port community on making 2017 a record-breaking year

More information

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT 1 WE ARE A CATALYST FOR COMMERCE WE ARE CREATING THE CAPACITY FOR GREATNESS WE ARE DRIVING PRODUCTIVITY Q & A Attracting growth, fostering development,

More information

Thames River APPENDIX. Heritage Park Plan. A report prepared by the Yale Urban Design Workshop

Thames River APPENDIX. Heritage Park Plan. A report prepared by the Yale Urban Design Workshop Thames River Heritage Park Plan A report prepared by the Yale Urban Design Workshop School of Architecture, Yale University New Haven, Connecticut, 2015 APPENDIX 01 Letters of Support 02 Water Taxi Thames

More information

KENTUCKY VENUES ANNUAL REPORT

KENTUCKY VENUES ANNUAL REPORT KENTUCKY VENUES ANNUAL REPORT 2017 Venues Entertainment Events Agriculture PEOPLE. PLACE. PURPOSE. Since 1938, the Kentucky State Fair Board has worked consistently and creatively to bring the people of

More information

DE LA PLATA OCEANSIDE, CA

DE LA PLATA OCEANSIDE, CA 4128 INVESTMENT OR OWNER/USER OPPORTUNITY AT RANCHO DEL ORO TECHNOLOGY PARK AVENIDA DE LA PLATA HENRY ZAHNER 760.889.7943 hzahner@voitco.com Lic. #00887367 RICKY JAMES 951.322.0082 rjames@voitco.com Lic.

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

tie lines May 2005 The Port of Long Beach s monthly newsletter

tie lines May 2005 The Port of Long Beach s monthly newsletter tie lines May 2005 The Port of Long Beach s monthly newsletter AROUND THE PORT... Facing major infrastructure, environmental and security projects, the Long Beach Board of Harbor Commissioners voted preliminary

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

All closures this week happen at night, including full closures of Mesa and I-10

All closures this week happen at night, including full closures of Mesa and I-10 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

Textile and Apparel Importer Trade and Transportation Conference

Textile and Apparel Importer Trade and Transportation Conference Textile and Apparel Importer Trade and Transportation Conference January 9, 2013 Los Angeles County Orange County Port of Long Beach Port of Los Angeles San Pedro Bay Port Complex Autos TRAPAC - 173 Pasha

More information

Regenerating Business. AAPA Partnerships in Planning & Development February 25, 2008

Regenerating Business. AAPA Partnerships in Planning & Development February 25, 2008 Regenerating Business AAPA Partnerships in Planning & Development February 25, 2008 Port of Everett s Mission The Port adopted its first new mission statement since 1989 in September 2007. It reads, Responsibly

More information

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational

More information

PLEASE READ Proposal for Sustainable Service

PLEASE READ Proposal for Sustainable Service IMPORTANT PLEASE READ 019 Proposal for Sustainable Service 019 Service Change Proposal IMPLEMENT A SUSTAINABLE NETWORK Everett Transit completed its Long Range Plan in May, and the plan was adopted by

More information

FALL OPEN HOUSE NOVEMBER 5 & 6, 2016

FALL OPEN HOUSE NOVEMBER 5 & 6, 2016 FALL OPEN HOUSE NOVEMBER 5 & 6, 2016 The Company Store on November 5, 2016 The South Bay Historical Railroad Society has hosted one of the highest attended Open House Activities on record. There were over

More information

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS The Summer of 2010 has been a time of tremendous progress for the Amtrak/FEC Corridor project and its goal of restoring

More information

EFFECTIVE MESSAGE DEVELOPMENT BRAND AWARENESS. Andria Muniz-Amador Director, Public Affairs and Marketing

EFFECTIVE MESSAGE DEVELOPMENT BRAND AWARENESS. Andria Muniz-Amador Director, Public Affairs and Marketing EFFECTIVE MESSAGE DEVELOPMENT BRAND AWARENESS Andria Muniz-Amador Director, Public Affairs and Marketing PortMiami is located in one of the most diverse, multi-lingual cities in the U.S. - MIAMI PORTMIAMI

More information

2008 Oceanside to Annapolis

2008 Oceanside to Annapolis Guidelines Equipment Advice Rules 2008 Oceanside to Annapolis GEAR 2008 Page 1 To RAAM Racers and Crew, Preparations for RAAM 2008 are well under way. It s going to be another great race this year! We

More information