San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

Size: px
Start display at page:

Download "San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee"

Transcription

1 San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee November 17, 2015

2

3 Ports O Call Area Redevelopment

4 Ports O Call Area Redevelopment Implementation Schedule Sampson Way & 7th St. Intersection Improvements Town Square at 6 th Street Ports O Call Promenade and Parking

5 Ports O Call (POC) Area Implementation Schedule POC -- INFRASTRUCTURE ELEMENTS Sampson Way - 7th Street at Harbor Blvd. Intersection Improvements Promenade along Main Channel & Town Square at 6th and 7th Street Design Bid Construction Design Bid Construction POC -- DEVELOPER ELEMENTS Lease Approval Design/Due Diligence Construction Documents Construction

6 Ports O Call Area Redevelopment An Authentic & Unique Experience The LA Waterfront is the only destination in Southern California set against the background of a working trade gateway America s Port. Unique setting and assets Development district is distinctively different from any other Southern California visitor destination New build and adaptive reuse opportunities

7 Our Unique LA Waterfront

8 Our Unique LA Waterfront

9 LA Waterfront 10-year Capital Improvement Program (CIP) Approx. $200 million for new public access projects through the Public Access Investment Plan

10 Wilmington Waterfront Projects Avalon Boulevard Corridor Phase I North Wilmington Pedestrian Bridge Avalon Boulevard Corridor Phase IA South

11 San Pedro Waterfront Projects Sampson Way & 7th St. Intersection Improvements Town Square at 6 th Street Ports O Call Promenade & Parking

12 PROJECT IMPLEMENTATION LA Waterfront (San Pedro and Wilmington) FY 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 Current Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year year CIP* (millions) Sampson Way & 7th Street Intersection Improvements x x x x x $13.6 Town Square at 6th Street x x x x x $4.1 Ports O Call Promenade and Parking x x x x x $34.5 Total San Pedro Waterfront $52.2 Wilmington Waterfront Promenade and repurpose or demolition of former Catalina Freight building x x x x x x $52.7 Harry Bridges Blvd. Beautification between Island Ave. and Avalon Blvd. x x x x $17.4 Wilmington Waterfront Pedestrian Bridge x x x x $14.9 Total Wilmington Waterfront $85.0 TOTAL $137.2 POTENTIAL ADDITIONAL PROJECTS LA Waterfront (San Pedro and Wilmington) FY 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 Current Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year year CIP* (millions) Sampson Way Roadway from Harbor Blvd to SP Slip x x x x $8.5 Sampson Way South Roadway from SP Slip to 22nd Street x x x x $24.5 Total San Pedro Waterfront $33.0 Avalon Triangle Park x x x $8.9 Total Wilmington Waterfront $8.9 TOTAL $41.9

13 Other Potential Projects Sampson Way Harbor Blvd to SP Slip Avalon Triangle Park

14 Waterfront Linkages For Development Master Planning for Pedestrian, Vehicular and Alternative Modes of Public Access to the Water s Edge.

15 Waterfront Linkages: World Cruise Center

16 Waterfront Linkages: USS IOWA

17 Waterfront Linkages: Downtown Harbor

18 Waterfront Linkages: Public Events at the Downtown Harbor

19 Waterfront Linkages: CRAFTED at the Port of Los Angeles

20 Waterfront Linkages: Cabrillo Way Marina

21 Waterfront Linkages: AltaSea at the Port of Los Angeles

22 Linkage Implementation: Pedestrian Continued Promenade progress now connecting through Ports O Call

23 Linkage Implementation: Vehicular Sampson Way Roadway Project

24 Linkage Implementation: Alternatives Rubber Tire Trolley investment Bike Share concept

25 LA Waterfront Report to City Council Strategy: Build Value in Waterfront Assets Investment in Public Access Infrastructure Events & Destination Marketing Attract Private Investment

26 LA Waterfront Report to City Council Waterfront & Commercial Real Estate Division Waterfront Leasing Policy Commercial cycles for reinvestment Strategic term Waterfront Development Strategy LA Waterfront Web, Social Media & Advertising Awareness-building Outreach to Private Developers and Investors

27 Thank You!

LA Waterfront Annual Program Update March 29, 2012

LA Waterfront Annual Program Update March 29, 2012 LA Waterfront Annual Program Update March 29, 2012 WILMINGTON WATERFRONT Approved Project Approved Project Welcome Update on the LA Waterfront Program Accomplishments Projects Underway Projects in Planning

More information

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting Economic & Planning Systems, Inc. (EPS) Oakland Denver Los Angeles Sacramento February 21, 2017 Economic & Planning Systems, Inc.

More information

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018 Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018 Port of Los Angeles at a Glance Founded in 1907 Non-taxpayer supported Business port model 4,300

More information

LA Waterfront Public Sites Opportunity Analysis Community Meeting

LA Waterfront Public Sites Opportunity Analysis Community Meeting LA Waterfront Public Sites Opportunity Analysis Community Meeting Economic & Planning Systems, Inc. (EPS) Oakland Denver Los Angeles Sacramento November 29, 2016 Economic & Planning Systems, Inc. Los Angeles

More information

HARBOR ±10,000 SF CENTER FREE-STANDING SAN PEDRO RETAIL AVAILABLE 233 N. HARBOR BLVD SAN PEDRO, CA BEACON POTENTIALLY UP TO PACIFIC OCEAN

HARBOR ±10,000 SF CENTER FREE-STANDING SAN PEDRO RETAIL AVAILABLE 233 N. HARBOR BLVD SAN PEDRO, CA BEACON POTENTIALLY UP TO PACIFIC OCEAN PACIFIC OCEAN FREE-STANDING SAN PEDRO RETAIL AVAILABLE SAN PEDRO PUBLIC MARKET PORT OF LOS ANGELES DOWNTOWN HARBOR DOWNTOWN SAN PEDRO POTENTIALLY UP TO ±10,000 SF Divisible to Many Sizes HARBOR BEACON

More information

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018 California Los Angeles County Chapter PORT OF LOS ANGELES January 16, 2018 2 #1 Container Port in the Americas Container Volume Twenty-foot Equivalent Units (TEUs) 9.3 million TEUs in 2017 8.8 million

More information

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL 04.01.14 HKS I Urban Design Studio Summary of Outreach Purpose of Stakeholder Outreach Identify and engage

More information

VENTURA PORT DISTRICT

VENTURA PORT DISTRICT VENTURA PORT DISTRICT LEASING OPPORTUNITY IN VENTURA HARBOR VILLAGE LIGHTHOUSE BUILDING 1567 Spinnaker Drive #100 & #200 Ventura, CA 93001 August 21, 2017 VENTURA PORT DISTRICT LEASING OPPORTUNITY IN VENTURA

More information

Release of the Draft Environmental Impact Statement/Draft Environmental Impact Report

Release of the Draft Environmental Impact Statement/Draft Environmental Impact Report SAN PEDRO WATERFRONT PROJECT ENVIRONMENTAL REVIEW PROCESS SUMMARY OCTOBER 2008 Release of the Draft Environmental Impact Statement/Draft Environmental Impact Report The Los Angeles Harbor Department (Port)

More information

Downtown to Defiance Trolley Key Messages Jan. 2017

Downtown to Defiance Trolley Key Messages Jan. 2017 Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.

More information

PIER 44. Premiere Waterfront Retail & Restaurant Opportunities & 4625 Admiralty Way Marina Del Rey, CA 90292

PIER 44. Premiere Waterfront Retail & Restaurant Opportunities & 4625 Admiralty Way Marina Del Rey, CA 90292 Premiere Waterfront Retail & Restaurant Opportunities PIER 44 Greg Eckhardt gecko@parcommercial.com 310.395.2663 x101 LIC# 01068613 4635 & 4625 Admiralty Way Marina Del Rey, CA 90292 PIER 44 PROJECT DESCRIPTION:

More information

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

ROUTE 171 & SEAL BEACH CIRCULATOR

ROUTE 171 & SEAL BEACH CIRCULATOR ROUTE 81 & ROUTE 151 City College PCC Campus 1 6th St 81 92 93 94 151 45 Redondo Ave 46 10th St Ximeno Ave 4:AM - 12:00AM Park Ave Wilson Appian Way 5:00AM - 11:AM 5:00AM - 11:AM ROUTE 151 Beach Dr Atherton

More information

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning Final Land Development Plan (FLDP) I-579 Urban Open Space CAP Project Sports & Exhibition Authority (SEA) of the City of Pittsburgh and Allegheny County Project bounded by Chatham St. / Centre Ave. / Washington

More information

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018

PROGRESS REPORT WATERFRONT PROGRAM. Q (January - March) Highlights from Q1 2018 WATERFRONT PROGRAM PROGRESS REPORT Q1 2018 (January - March) Highlights from Q1 2018 Advanced Pier 62 Rebuild construction including completion of Pier 62 demolition in February 2018. Prepared for the

More information

1.2.1 Introduction and Project Overview

1.2.1 Introduction and Project Overview INTRODUCTION 0 0. Final EIS/EIR Organization This chapter presents background and introductory information for the proposed San Pedro Waterfront Project (proposed Project), generally located along the

More information

Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries

Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries Society of Allied Weight Engineers, Incorporated Aerospace Marine Offshore Land Vehicle Allied Industries The Los Angeles Chapter of the Society of Allied Weight Engineers is proud to host the 39th Southwest

More information

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested

More information

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

This presentation is available online.

This presentation is available online. This presentation is available online www.kosmont.com 1 1 DRAFT Kosmont Companies Real Estate and Economic Advisory public + private transactions California Golden Fund Approved EB-5 Regional Center Kosmont

More information

San Diego. Airport. AAD Rates

San Diego. Airport. AAD Rates Airport In the San Diego Airport, a network of LED Displays sized 70 are located to target passengers. LED Displays are located in the baggage claim and along the concourses. LED Displays: 29 displays

More information

BATHURST QUAY NEIGHBOURHOOD PLAN

BATHURST QUAY NEIGHBOURHOOD PLAN BATHURST QUAY NEIGHBOURHOOD PLAN December 10, 2014 Urban Strategies Inc. BA Group PLANT Architect Vermeulens Public Launch Agenda Our Team What is a Neighbourhood Plan? The Plan Process Guiding Themes

More information

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront

More information

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5 2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration

More information

444 WASHINGTON BOULEVARD

444 WASHINGTON BOULEVARD 444 WASHINGTON BOULEVARD Marina Del Rey, CA 90292 Freestanding Building Just Blocks from the Beach OFFICE/RETAIL SPACE FOR LEASE 444 Washington Boulevard, Marina del Rey, CA 90292 Property Characteristics

More information

David Martin, Director, Planning and Community Development. Karen Ginsberg, Director, Community and Cultural Services

David Martin, Director, Planning and Community Development. Karen Ginsberg, Director, Community and Cultural Services Information Item Date: March 2, 2016 To: From: Mayor and City Council David Martin, Director, Planning and Community Development Karen Ginsberg, Director, Community and Cultural Services Subject: Expo

More information

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S. Blvd Blvd Blvd EXISTING NETWORK Transit Hills Blue Metro Cabrillo 92 7 76 2 8 82 74 7 6 7 72 Poly 2 2 2 Mall 7s 3 4 4 46 8 s 3 Green Medical 2 2 76 92 73 7 9 9 94 Wilson 3 92 72 2 72 72 73 73 Norwalk Gahr

More information

Textile and Apparel Importer Trade and Transportation Conference

Textile and Apparel Importer Trade and Transportation Conference Textile and Apparel Importer Trade and Transportation Conference January 9, 2013 Los Angeles County Orange County Port of Long Beach Port of Los Angeles San Pedro Bay Port Complex Autos TRAPAC - 173 Pasha

More information

MAC Meeting. February 2, 2017

MAC Meeting. February 2, 2017 MAC Meeting February 2, 2017 Community Engagement Over 1,000 stakeholders consulted Board and Staff workshops 90 participants 9 Focus Groups (arts & culture, festivals/music, hotels, dining & beer, sports,

More information

Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements

Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements Project Scope: New City Hall New Police Department New Mixed-Use Parking Structure Community Improvements CITY HALL / POLICE DEPARTMENT / MIXED-USE PARKING STRUCTURE A R C H I T E C T S D E S I G N G R

More information

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes

More information

Home of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow

Home of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow Home of Southbank Partners Riverfront Commons Southbank Partners Covington Newport Bellevue Ft. Thomas Dayton Ludlow Riverfront Commons Fostering a vision of Northern Kentucky s Future Riverfront Commons

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information

CAE003 N ', W ' Columbia St. US 80 (and Market St.) once continued straight west from here. Continue east on Market St.

CAE003 N ', W ' Columbia St. US 80 (and Market St.) once continued straight west from here. Continue east on Market St. West to east. San Diego to Viejas Casino. CAE001 N 32 42.68', W 117 10.26' Harbor Dr and Pacific Hwy. Terminus of US 80 from 1943 to 1953. Pacific Hwy was US 101. CAE002 N 32 42.67', W 117 10.10' Harbor

More information

DOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018

DOWNTOWN SANTA MONICA. Market Report. Edition: First Quarter, 2018 DOWNTOWN SANTA MONICA Market Report Edition: First Quarter, 2018 ABOUT DOWNTOWN SANTA MONICA, INC. Downtown Santa Monica is a dynamic, urban environment located on the bluffs overlooking the Santa Monica

More information

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 Orange Line BRT Project What is the Orange Line project? 17-mile

More information

LAS VEGAS STRIP ICONIC STRUCTURES & DIGITAL MARQUEES

LAS VEGAS STRIP ICONIC STRUCTURES & DIGITAL MARQUEES Our products 1 LAS VEGAS STRIP ICONIC STRUCTURES & DIGITAL MARQUEES 12 Iconic structure overview 2 Las Vegas is home to 42.9 million annual visitors who dine, drink, sleep and spend. The famous Las Vegas

More information

INDUSTRIAL / BUSINESS PARK OPPORTUNITY

INDUSTRIAL / BUSINESS PARK OPPORTUNITY INDUSTRIAL / BUSINESS PARK OPPORTUNITY FORT MYERS, FLORIDA WHAT S INSIDE: Development Location Page 1 Opportunity Details Page 2 Development Overview Page 3 Surrounding Area Pages 4-5 Additional Information

More information

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas A C B 8 BACH TIMON BV SURFSI BV FSPRAY BURSON 5 5 5 4 5 5 BRIGPORT BRAKWATR 5 egend 4 9 0 Single Family etached Multi-Family Single Family Attached 4 5 Hotel/Hospitality Mixed-Use Restaurant/estination

More information

US 19 Sunset Point Rd to Countryside Blvd.

US 19 Sunset Point Rd to Countryside Blvd. Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started

More information

EAST-WEST STREETS 3.7

EAST-WEST STREETS 3.7 3.7 EAS-WES SREES wenty-one streets link the Central Waterfront to Seattle s downtown and the rest of the city beyond. Each of these streets has a unique character and topography, and each leads to different

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre 78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that

More information

places Mooloolaba s heart five

places Mooloolaba s heart five five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised

More information

KING STREET PILOT STUDY PUBLIC MEETING

KING STREET PILOT STUDY PUBLIC MEETING KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond

More information

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

WHY MOVE YOUR BUSINESS TO HOLLYWOOD? WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally located in 3.5 million population No personal income tax Diverse labor force and talent pool Waterfront executive

More information

RETAIL FOR LEASE. Mixed-Use Development Heart of Point Loma BELLAMAR POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

RETAIL FOR LEASE. Mixed-Use Development Heart of Point Loma BELLAMAR POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106 RETAIL FOR LEASE Mixed-Use Development Heart of Point Loma BELLAMAR POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106 POINT LOMA Bellamar Point Loma 1180 Rosecrans Street, San Diego, CA 92106 Great

More information

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY PURPOSE The purpose of this Working Draft Spatial Framework summary is to facilitate additional public and stakeholder feedback following the public meetings and reference group workshops held in November

More information

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050 (All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal

More information

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Our Future City Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Brighton & Hove the connected city. Creative, dynamic, inclusive and caring. A fantastic place to live, work and visit Objective To

More information

NORTHLAND-BELTLINE CORRIDOR

NORTHLAND-BELTLINE CORRIDOR NORTHLAND-BELTLINE CORRIDOR R E D E V E L O P M E N T S T R A T E G Y R E Q U E S T F O R Q U A L I F I C A T I O N S I N F O R M A T I O N M E E T I N G T U E S D A Y, 2 5 N O V E M B E R 2 0 1 4 AGENDA

More information

Anaheim Resort. Hotel Stay Impact

Anaheim Resort. Hotel Stay Impact Anaheim Resort What: 1,100-acre district including Disneyland Resort theme parks, Anaheim Convention Center, hotels, restaurants and shops Annual visitors: more than 25 million Employees: more than 30,000

More information

FOR LEASE MARINA LANDING SHOPPING CENTER PHASE II WALMART ANCHORED PADS AVAILABLE

FOR LEASE MARINA LANDING SHOPPING CENTER PHASE II WALMART ANCHORED PADS AVAILABLE FOR LEASE MARINA LANDING SHOPPING CENTER PHASE II WALMART ANCHORED PADS AVAILABLE CARMEL BY THE SEA MONTEREY PENINSULA AIRPORT SEASIDE SAND CITY MONTEREY PACIFIC GROVE FORT ORD REDEVELOPMENT PROJECT CAL

More information

X Respond to staff direction

X Respond to staff direction Page 1 of Report TO: Community Services Committee Corporate Services Division SUBJECT: Apeldoorn Mundalization Project Report Number: Report Date: February 17, 2010 File Number(s): Ward(s) Affected: 1

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

Brightline Overview THE ONLY PRIVATELY OWNED, OPERATED AND MAINTAINED EXPRESS INTER-CITY TRAIN SERVICE IN THE UNITED STATES

Brightline Overview THE ONLY PRIVATELY OWNED, OPERATED AND MAINTAINED EXPRESS INTER-CITY TRAIN SERVICE IN THE UNITED STATES FSITE ANNUAL MEETING BEN PORRITT, SVP, CORPORATE AFFAIRS OCTOBER 30, 2018 Brightline Overview THE ONLY PRIVATELY OWNED, OPERATED AND MAINTAINED EXPRESS INTER-CITY TRAIN SERVICE IN THE UNITED STATES Removing

More information

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel

More information

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014 Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood

More information

RETAIL FOR LEASE MIXED-USE DEVELOPMENT IN THE HEART OF POINT LOMA. Bella mar POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106

RETAIL FOR LEASE MIXED-USE DEVELOPMENT IN THE HEART OF POINT LOMA. Bella mar POINT LOMA 1180 ROSECRANS STREET, SAN DIEGO, CA 92106 RETAIL FOR LEASE MIXED-USE DEVELOPMENT IN THE HEART OF Bella mar 1180 ROSECRANS STREET, SAN DIEGO, CA 92106 Bella mar VOLTAIRE ST NARRAGANS ETT AVE CATALINA BLVD NIMITZ BLVD CHATSWORTH BLVD ROSECRANS ST

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

from boat parking lots to icons Marina Development Update Marina Development Update from boat parking lots to icons Presentation by Ed Modzelewski

from boat parking lots to icons Marina Development Update Marina Development Update from boat parking lots to icons Presentation by Ed Modzelewski Presentation by Ed Modzelewski Planning Factors for Marina Success Determine the market forces and design accordingly Ensure marina design is economically sustainable correct phases profit center identification

More information

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1 STOCKING 51 5016 CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1 CONTENTS 1. STOCKING 51 OVERVIEW 2. FLOOR PLANS & AVAILABLE SPACES

More information

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN 2015-2019 WHY MOVE YOUR BUSINESS TO HOLLYWOOD? Close to international airport and seaport Centrally

More information

PRICE RECUDED! VACANT IN 60 DAYS! 13,265 SF INDUSTRIAL BUILDING 23,087 SF OF LAND FOR SALE OR LEASE 3817 S SANTA FE AVE VERNON CALIFORNIA 90058

PRICE RECUDED! VACANT IN 60 DAYS! 13,265 SF INDUSTRIAL BUILDING 23,087 SF OF LAND FOR SALE OR LEASE 3817 S SANTA FE AVE VERNON CALIFORNIA 90058 PRICE RECUDED! VACANT IN 60 DAYS! 13,265 SF INDUSTRIAL BUILDING 23,087 SF OF LAND 3817 S SANTA FE AVE VERNON CALIFORNIA 90058 3817 S SANTA FE AVE VERNON CALIFORNIA 90058 PROPERTY HIGHLIGHTS Excellent Clear

More information

Park Plaza at the Village

Park Plaza at the Village 310 THIRD AVE. CHULA VISTA, CA 110 Now Leasing - Rare Opportunity for a Prime Restaurant Location at 3rd & F in the heart of the Village in Chula Vista Flexible size with 1800sf dedicated patio dining

More information

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016 York Region Rapid Transit Corporation City of Vaughan Committee of the Whole June 1, 2016 0 Agenda Future rapid transit projects > Yonge North Subway Extension [YNSE] > Regional Express Rail [RER] Current

More information

,000 SF 23,109 SF S SANTA FE AVENUE LOS ANGELES CALIFORNIA ,000 SF & 7,000 SF FOR SALE OF BUILDINGS ON OF LAND 2 BUILDINGS

,000 SF 23,109 SF S SANTA FE AVENUE LOS ANGELES CALIFORNIA ,000 SF & 7,000 SF FOR SALE OF BUILDINGS ON OF LAND 2 BUILDINGS FOR SALE 3819-3821 S SANTA FE AVENUE LOS ANGELES CALIFORNIA 90058 15,000 SF OF BUILDINGS ON 23,109 SF OF LAND 2 BUILDINGS 8,000 SF & 7,000 SF FOR SALE 3819-3821 S SANTA FE AVENUE LOS ANGELES CALIFORNIA

More information

San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009

San Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009 Expansion SDCCC Presentation to Mayor s Task Force June 2, 2009 Agenda The TSA/HNTB Team Experience and Lessons Learned Project Methodology Issues and Opportunities Alternative Masterplan Concepts Under

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas

Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas Atlas of a regional transportation network: Oregon Metro's Mobility Corridor Atlas Matthew Hampton Oregon Metro February 25 th, 2013 Early experience with transportation Our region Charting a Different

More information

Toronto Islands Advisory Committee Meeting May 12 th, :00 pm 4:00 pm City Hall, 2 nd Floor, Committee Room 4

Toronto Islands Advisory Committee Meeting May 12 th, :00 pm 4:00 pm City Hall, 2 nd Floor, Committee Room 4 Toronto Islands Advisory Committee Meeting May 12 th, 2016 2:00 pm 4:00 pm City Hall, 2 nd Floor, Committee Room 4 Minutes Present: Person Title Department/Organization Pam McConnell Deputy Mayor, Councillor

More information

Port of San Diego Overview and Updates. September 2017

Port of San Diego Overview and Updates. September 2017 Port of San Diego Overview and Updates September 2017 Port of San Diego Jurisdiction 34 miles of waterfront 2,403 acres of land 3,535 acres of water Port Tidelands Coronado San Diego National City Chula

More information

410 Adelaide ST WEST. Premium retail for lease

410 Adelaide ST WEST. Premium retail for lease 410 Adelaide ST WEST Premium retail for lease CBRE Limited, Real Estate Brokerage 145 King Street West Suite 1100 Toronto, ON M5H 1J8 416 362 2244 www.cbre.ca Property Details Size 920 sq.ft. 20'-0" Price

More information

Slow Down! Reducing Downtown Bloomington s Progression Speed

Slow Down! Reducing Downtown Bloomington s Progression Speed Slow Down! Reducing Downtown Bloomington s Progression Speed Neil Kopper, PE, City of Bloomington Patrick O Connor, PE, PTOE, American Structurepoint March 7, 2018 Background and Project Overview Bloomington,

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines

More information

SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION MARKET HIGHLIGHTS PROJECT HIGHLIGHTS

SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION MARKET HIGHLIGHTS PROJECT HIGHLIGHTS SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION The Shops on Palm Canyon are integrated into a mixed-use luxury resort hotel development situated along Palm Canyon Drive at Alejo Road,

More information

David Tickle, Principal, Urban Design, Hassell

David Tickle, Principal, Urban Design, Hassell David Tickle, Principal, Urban Design, Hassell August 2015 NEWCASTLE URBAN TRANSFORMATION & TRANSPORT PROGRAM REVITALISATION POTENTIAL Establishing a Vision and Objectives VISION: RE-ESTABLISH NEWCASTLE

More information

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017 Hillsborough MPO Technical Advisory Committee Monday, February 20, 2017 1 Study Purpose Support the vision for a livable, connected, and competitive downtown. Evaluate alternatives for the system s modernization

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS The Summer of 2010 has been a time of tremendous progress for the Amtrak/FEC Corridor project and its goal of restoring

More information

MASTER PLAN July 24, 2014

MASTER PLAN July 24, 2014 MASTER PLAN July 24, 2014 Vision Statement The newly expanded Rif Curaçao Seaport will enhance the island s ability to welcome guests to a vibrant and entertaining waterfront. The Rif Seaport Curaçao development

More information

Corridor Investment Projects (FY FY2012)

Corridor Investment Projects (FY FY2012) City of Long Beach, California Department of Development Services Corridor Investment Projects (FY1980 - FY2012) Building A Better Long Beach Other Corridor Investments (Pacific Coast Highway north to

More information

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018 Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018 1 GOVERNORS ISLAND IS FOR NEW YORKERS 2 WE RE MOVING TOWARDS A YEAR-ROUND, 24 HOUR COMMUNITY 3 Governors

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

NOW DIVISIBLE TO 2,500 SF

NOW DIVISIBLE TO 2,500 SF NOW DIVISIBLE TO 2,500 SF FOR LEASE 222 E. Carrillo Street, Suite 101, Santa Barbara, California 93101 HayesCommercial.com Property Overview Located in the Cabrillo Business Park, this remodeled, two-story

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 16, 2005 DATE: March 28, 2005 SUBJECTS: A. Adoption of the Fort Myer Heights North Plan. B. GP-300-04-1 Adoption of the following General

More information

WATER PETALUMA TRAIL WATER WAYS PROJECT PORTFOLIO. petalumawaterways.org OVERVIEW

WATER PETALUMA TRAIL WATER WAYS PROJECT PORTFOLIO. petalumawaterways.org OVERVIEW WATER TRAIL PROJECT PORTFOLIO OVERVIEW Thirteen miles upstream of San Pablo Bay, Petaluma is the northern point on the San Francisco Bay Water Trail, a network of access points throughout the region. Most

More information

In the Eye. From the Commodore. News from Hurricane Gulch Yacht Club

In the Eye. From the Commodore. News from Hurricane Gulch Yacht Club In the Eye News from Hurricane Gulch Yacht Club www.hgyc.org Nov./Dec. 2017 Volume 114 Issue 12 From the Commodore Well we are winding down another fun year at our Yacht Club and just where did 2017 go?

More information

Oyster Point Business Park FOR LEASE. Under New Ownership Oyster Point Boulevard, So. San Francisco CONTACT. kiddermathews.

Oyster Point Business Park FOR LEASE. Under New Ownership Oyster Point Boulevard, So. San Francisco CONTACT. kiddermathews. 375 39 Oyster Point Boulevard, So. San Francisco Under New Ownership tmason@ LIC #0032545 joec@ LIC #01366451 FEATURES Five building campus with Bay views, comprising ±404,043 SF of Office, Industrial,

More information

FOR MORE INFORMATION, PLEASE CONTACT: KEVIN FENENBOCK JACOB MUMPER COLLIERS INTERNATIONAL. Professionally owned and managed by:

FOR MORE INFORMATION, PLEASE CONTACT: KEVIN FENENBOCK JACOB MUMPER COLLIERS INTERNATIONAL. Professionally owned and managed by: FOR MORE INFORMATION, PLEASE CONTACT: Professionally owned and managed by: KEVIN FENENBOCK JACOB MUMPER EXECUTIVE VICE PRESIDENT ASSOCIATE VICE PRESIDENT LIC. 01165115 LIC. 01908862 661.253.5204 661.253.5203

More information

28,765 SF INDUSTRIAL BUILDING FOR LEASE LOS ANGELES, CA 90021

28,765 SF INDUSTRIAL BUILDING FOR LEASE LOS ANGELES, CA 90021 28,765 SF INDUSTRIAL BUILDING FOR LEASE LOS ANGELES, CA 90021 28,765 SF INDUSTRIAL BUILDING FOR LEASE PROPERTY HIGHLIGHTS Excellent Warehouse or Manufacturing Building 15th at Alameda Street 19 Clearance

More information

26 Miles Across the Sea

26 Miles Across the Sea 26 Miles Across the Sea Henry Eng FAICP Henry Eng Land Planning Services (HELPS) On Tuesday, April 17, Ralph Portmore and I participated in a unique all-day mobile workshop at the APA Conference in Los

More information

BELMOND BRAND LAUNCH

BELMOND BRAND LAUNCH BELMOND BRAND LAUNCH 1 OUR PREVIOUS BRAND STRATEGY REFLECTED THE COMPANY S EVOLUTION A diverse collection of iconic assets acquired over time Historically heavy emphasis on promoting local product identities

More information