1 EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Digital NOTAM Preliminary Business Case Edition Number : 1.1 Edition Date : 15/10/2009 Status : Draft Intended for : EATM Stakeholders EUROPEAN AIR TRAFFIC MANAGEMENT

2

3 DOCUMENT CHARACTERISTICS TITLE Digital NOTAM Preliminary Business Case Publications Reference: ISBN Number: Document Identifier Edition Number: 1.1 Abstract Edition Date: 15/10/2009 This document contains the Digital NOTAM Preliminary Business Case. It provides a qualitative analysis of the benefits and it specifies constraints with regard to the implementation cost. The document structures the currently available information that has been validated with a set of representative Digital NOTAM stakeholders, primarily ANSPs, airlines, data integrators, EAD through workshops and direct discussions. The information contained in this document is based on expert judgement. Digital NOTAM Keywords AIXM AIM AIS Pedro CRUELLAS, CND/CoE/AIM/AI Eduard POROSNICU, CND/CoE/AIM/AI Authors Contact(s) Person Tel Unit STATUS, AUDIENCE AND ACCESSIBILITY Status Intended for Accessible via Working Draft General Public Intranet Draft EATM Stakeholders Extranet Proposed Issue Restricted Audience Internet ( Released Issue Edition: 1.1 Draft Page 1

4 DOCUMENT APPROVAL The following table identifies all management authorities who have successively approved the present issue of this document. AUTHORITY NAME AND SIGNATURE DATE Network Development COM & AIM Manager Martin ADNAMS 04/09/2009 Head of AIM Paul BOSMAN 04/09/2009 Digital NOTAM Project Manager / Author Eduard POROSNICU 04/09/2009 Author Pedro CRUELLAS 04/09/2009 Page 2 Draft Edition: 1.1

5 DOCUMENT CHANGE RECORD The following table records the complete history of the successive editions of the present document. EDITION NUMBER EDITION DATE REASON FOR CHANGE PAGES AFFECTED Internal working draft versions All /09/2009 First public release Digital NOTAM Workshop All /10/2009 Updated based on feedback from Workshop and AI Team - Edition: 1.1 Draft Page 3

6 Publications EUROCONTROL Headquarters 96 Rue de la Fusée B-1130 BRUSSELS Tel: +32 (0) Fax: +32 (0) Page 4 Draft Edition: 1.1

7 Contents DOCUMENT CHARACTERISTICS...1 DOCUMENT APPROVAL...2 DOCUMENT CHANGE RECORD...3 EXECUTIVE SUMMARY...7 CHAPTER 1 The need for Digital NOTAM Problem statement Strategic fit - SESAR...10 CHAPTER 2 Digital NOTAM Overview Objective Scope Approach Project Planning...16 CHAPTER 3 Business Case Process Purpose The generic Business Case Process Digital NOTAM Business Case Specifics...18 CHAPTER 4 Digital NOTAM Benefits Introduction Benefit potential Short term ( ) Medium term ( ) Long term (after 2020) Benefit quantification Introduction Initial Benefit Quantification Relation between data provision increments and data usage phases...23 CHAPTER 5 Implementation costs Introduction Cost Categories Cost related considerations Cost centres Costs to be supported in the different phases Short Term Costs Medium Term Costs Long Term Costs...31 Edition: 1.1 Draft Page 5

8 CHAPTER 6 Conclusion and Recommendations...32 ANNEX 1 Digital NOTAM Benefits...34 A1.1 Introduction...34 A1.2 Benefits...34 A1.2.1 Benefit mechanism diagram A1.2.2 Process streamline...35 A1.2.3 Data management...35 A1.2.4 Data quality...35 A1.2.5 Data representation / conversion...36 A1.2.6 Data filtering capability...37 A1.2.7 Airline Operational Centers...37 A1.2.8 Common ATM picture (CDM enabler)...38 A1.2.9 Pre-flight briefing...38 A Information accessibility for VFR flyers...39 A Airports operations / predictability...40 A In-flight operations...40 A ANSP efficiency...41 A Network Manager Efficiency...42 A Airline Ops Efficiency / Military Ops Efficiency...42 A Flight Efficiency...43 A Fuel consumption...43 A Safety...43 A Capacity...44 ANNEX 2 Cost Benefit Analysis Model...45 DEFINITIONS AND ACRONYMS...47 Figure 1 - Number of NOTAM issued world-wide (EAD data)...10 Figure 2 The Digital NOTAM environment...12 Figure 3 - Benefit mechanism in the short term...20 Figure 4 - Benefit mechanism in the medium term...21 Figure 5 - Benefit mechanism in the long term...21 Figure 6 Digital NOTAM Cost Categories...24 Figure 7 Example of a graphical PIB...39 Page 6 Draft Edition: 1.1

9 EXECUTIVE SUMMARY This document contains the Digital NOTAM Preliminary Business Case. It provides a qualitative analysis of the benefits and it specifies constraints with regard to the implementation cost. The document presents the currently available information, which is based on expert judgment and on results of the Digital NOTAM Trial that took place in The improvements and benefits have been validated with a set of representative Digital NOTAM stakeholders, primarily ANSPs, airline operational centres, data integrators, service providers and the EAD, through workshops and direct discussions. Originally intended for use by the pilot, the NOTAM is used to varying degrees by the whole of the ATM community. It is a structured message with a free text component, rendering it sometimes difficult for human and almost impossible for machine interpretation, resulting in issues of safety, quality and efficiency. In turn, these impact on the capacity and efficiency of the ATM system. Statistical data indicates that there is a sharp increase in the number and the complexity of NOTAM issued worldwide. The total of NOTAM messages issued in Europe and worldwide has more than doubled between 2000 and This has an increasingly negative impact on the capability of the ATM system actors to effectively process and use this information in a timely way. In consequence, a fundamental change in the concepts used for the collection, management, promulgation and use of the NOTAM information is required. Without a significant change, the situation will progressively become unmanageable over the next decade. The Digital NOTAM concept proposes to evolve from the provision of text NOTAM messages towards the provision of structured data, based on the Aeronautical Information Exchange Model (AIXM) version 5. The introduction of digital NOTAM will remove the historical split between NOTAM and AIP data. All AIS products (AIP, NOTAM, AIP Amendments, charts, pre-flight information bulletins, etc.) will be generated from a coherent data source, which comprises both "static" and "dynamic" information. All the information will be available in the same digital format and from a single source. Digital NOTAM will support the SESAR goals of providing a composite, single picture of the ATM environment (System Wide Information SWIM), available to all on the ground and in the air. This is required to support applications such as 4 D trajectory, medium/short term conflict detection, future flight plan, etc. The provision of Digital NOTAM is specified as an IP 1 objective (IS-0204) of the European ATM Masterplan, with an initial operational capability by end The do-nothing is not an option. The increasing number of NOTAM messages and the fact they can not be automatically interpreted would seriously jeopardise the SESAR goal of providing a composite, single picture of the ATM environment, available to all, which is fundamental to the entire SESAR ATM Target Concept. The Digital NOTAM project is in line with the Eurocontrol mission, which includes the harmonisation of the air navigation services in Europe, in particular by enabling safety and efficiency gains in the ATM system. The qualitative analysis has shown that, in the short term ( ), Digital NOTAM will ensure improved data quality and better data management, which results in system-wide economies. Input forms will allow originators (such as airports) to pre-encode the information, reserving the NOTAM operators for non-routine and supervisory roles. This will improve ANSP efficiency and the integrity of the data chain, as required by ICAO and in accordance Edition: 1.1 Draft Page 7

10 with the European Single European Sky regulations. Low-cost solutions will improve the accessibility of the VFR community to critical information, such as through the graphical depiction of temporary airspace reservations, thus reducing the risk of airspace infringements and the workload of controllers. The Digital NOTAM concept is equally applicable to civil and military information. The provision of the data updates in a common digital format will improve the civil-military systems interoperability and will support the flexible airspace usage process. In the medium term ( ), Digital NOTAM will enable enhanced pre-flight briefing (graphical visualisation, improved filtering capabilities). More importantly, it will enable the development of new services merging data from different domains (airport, meteo, flow management, etc). This will support the provision of aeronautical information updates in flight. Information will be transmitted by data link services for incorporation into devices such as Electronic Flight Bag (EFB) and advanced navigation displays. These are expected to be standard equipment in the next generation of commercial, business and potential general aviation aircraft. Overall, this will lead to benefits in terms of safety, ANSP efficiency, flight efficiency (so contributing to fuel savings and the environment) and airline operations efficiency. Similar conclusions have been drawn in other ICAO regions, in particular by the United States Federal Aviation Administration (FAA), where Digital NOTAM are planned to become operational by The analysis has also confirmed the concept of implementing Digital NOTAM through an incremental approach, which is expected to reduce the implementation cost. Investment has already been made in fundamental infrastructure elements such as the EAD and National systems, PENS, data link, digital static data, etc. Digital NOTAM will make use of these and will increase the return on those investments. It will also provide the essential means to realise the SESAR goal for the single composite situation picture, a cornerstone of the whole concept of operations. Page 8 Draft Edition: 1.1

11 CHAPTER 1 The need for Digital NOTAM 1.1 Problem statement A NOTAM is a notice, distributed by means of telecommunication, containing information about a change in aeronautical facilities, services, procedures or hazards, the timely knowledge of which is essential to personnel concerned with flight operations. Created more than 60 years ago, it is based on structured messages with a free text component. An example is provided below: EBBRYNYN (A1143/02 NOTAMN Q) EBBU/QOBCE/IV/M/A/000/999/5027N00427E002 A) EBCI B) C) EST E) CRANE ERECTED 25M AGL - 200M AMSL AT 1200M ARP ON A MAG BRG OF 40 DEG. AND AT 450M RIGHT SIDE OF THR25. NO ICAO MARKINGS. CAUTION ADVISED. ) The ATM system is increasingly relying on automated systems at all levels, which depend on correct and up-to-date information in order to perform their functions. However, the content of a database, be it on-board, at the airport or in an ATC system, may be superseded by NOTAM. The task of remembering which information is overridden becomes the pilot s or controller s burden. In the search for efficiency and capacity, the ATM system is becoming more dynamic year after year. This is also reflected by a sharp increase in the number of NOTAM issued in Europe and world-wide, as depicted in Fig. 1. The effort spent by the data originators, NOTAM offices, service providers and end users in order to manage and use/comply with this increasing mass of text is constantly growing. If no action is taken, the risk of economic loss, incidents or even accidents due to information overload will increase to unacceptable levels in the next decade. There have already been examples of such incidents in Europe and worldwide. The current system is driven by manual processes to ensure NOTAM accuracy and provide a way for humans to correct NOTAM entry errors. The system relies heavily on postsubmission quality control. Although supposed to be human readable, there are frequent complains from pilots, especially from general aviation, that NOTAM text is hard if not impossible to decipher for the non-expert. Due to the current limited information filtering capabilities of the text NOTAM format, Preflight Information Bulletin (PIB) that pilots have to consult before the flight are in the range of pages for an internal European flight. In consequence, "most info given in flight paperwork is user hostile", quote Captain Rocky Stone, Chief Technical Pilot, United Airlines during the AIM Congress of Yet the probability of pilots not being aware of important and pertinent NOTAM is increasing. Edition: 1.1 Draft Page 9

12 NOTAM Trends 700,000 Number / year 600, , , , , ,000 Europe (L+E+B) Pacific (A+N+Y) Asia (R+V+W+Z) Russia + Central Asia (U) Africa (D+F+G+H) Mid Asia (O) North America (C+K+P) South + Central America (M+S+T) TOTAL Figure 1 - Number of NOTAM issued world-wide (EAD data) Overall, the current text NOTAM system no longer satisfies the ATM needs for timely and accurate aeronautical information updates. NOTAM are poised to become digital, in order to respond to these needs, through the application of modern data processing technologies. 1.2 Strategic fit - SESAR The SESAR target concept relies on 5 key features: Optimised Trajectory Management, which introduces a new approach to airspace design and management, reducing the constraints of airspace organisation to a minimum and introducing into the core of the concept the Business Trajectory; Collaborative planning, which is continuously reflected in the Network Operations Plan; a dynamic rolling plan for continuous operations, which ensures a common view of the network situation; Full integration of airport operations as part of ATM; New separation modes to allow for increased safety and capacity; System information management, which will integrate all ATM business related data; an environment which connects all ATM stakeholders, aircraft as well as ground facilities; supporting CDM processes to exploit the power of shared information. What is common to each of these key features is a reliance on accurate and timely information. The SESAR ATM Target Concept states that fundamental to the entire ATM Target Concept is a net-centric operation based on a powerful information handling network for sharing data. It also states that the SWIM environment will shift the ATM architecture paradigm from message exchange to information publishing/using/contributing. The basic information of ATM is the so-called static data published in the AIP of a State, amended for temporary and/or short notice changes through NOTAM. Without the means to provide accurate, unambiguous and timely data, it is doubtful if the SESAR goal of providing a composite, single picture of the ATM environment, available to all, can be met. The Digital NOTAM will support the realisation of this goal. The provision of digital NOTAM will fill the increasing gap that exists between the static view of the ATM system, as available in most decision making systems today, and its actual status. Page 10 Draft Edition: 1.1

13 This will enable the machines that assist the human actors to provide a common and accurate view of the aeronautical 4D environment, which is central to SESAR. It will support 4D trajectories, common decision making processes and the required safety, efficiency and capacity gains. The Digital NOTAM is an IP 1 project for the European ATM Masterplan (Implementation Step IS0204). Edition: 1.1 Draft Page 11

14 CHAPTER 2 Digital NOTAM Overview Objective The Digital NOTAM project objective is to evolve from the provision of text NOTAM messages towards the provision of structured data, based on the Aeronautical Information Exchange Model (AIXM) version 5. There are four main roles in the European NOTAM data chain, as indicated in Fig.2. International NOTAM NOTAM Providers Request for clarification End Users NOTAM Request clarification / NOTAM feed-back NOTAM proposal NOTAM Storage (local, regional EAD) NOTAM Data Originators Request for clarification Service Providers Tailored data/product (example: PIB) NOTAM Storage Figure 2 The Digital NOTAM environment The definitions of these roles and the main changes are mentioned in the table below, together with the actors that play these roles. Role Actors performing the role What will change Data Originator = the first organisation or person that becomes aware of or that initiates the change, including those involved in the transmission of the information to the NOTAM Provider role. Airport operators Air Navigation Service Providers (ANSP) Procedure/Airspace designers National Authorities including Military Etc. Increased delegation for the pre-encoding of the information in digital format, eventually using standard input forms provided by the NOTAM Provider organisations. Increased data connectivity with the NOTAM provider organisations. NOTAM Provider = the Civil NOTAM offices Static data management moves Page 12 Draft Edition: 1.1

15 organisations that are given authority for NOTAM promulgation in accordance with the ICAO Annex 15. They also act as storage nodes of the international NOTAM network. Service Provider = an organisation which uses NOTAM and other data in order to provide custom services/data to the Airspace users. End User = organisations and persons that use either the NOTAM message or a custom product in order to take operational actions/decision. Military NOTAM offices Airports that have full delegation for SNOWTAM promulgation. Etc. ARO/Briefing EAD Commercial Flight Service Providers (CFSP) ATC organisations that relay NOTAM information to aircraft in flight Airlines Operational Centres (AOC) that provide flight planning and briefing services for their own pilots and to clients airlines; Etc. Airlines General aviation Military / Air Force Air traffic controllers Etc. to AIXM 5.1. Capability to receive, process and issue NOTAM in digital format. Increased requirements for compliance with end user requirements for data completeness and availability. Increased use of graphical input and visualisation tools. Increased automatic ingestion of the data from the NOTAM providers. Decreased human workload for the processing of the information. Increased requirements for the provision of graphical products, for use in pre-flight and in-flight (EFB) Increase competition with new service providers. Increased use of graphical devices for the consultation of the information. Increased accessibility to data about the actual ATM system status. Increased data filtering capabilities. Increased support from automatic devices. Decreased workload The characteristics of a digital NOTAM include: Electronically distributable - the information can be directly transmitted and incorporated into other computer systems without manual intervention; Geo-referenced - the information can be automatically plotted on a chart; Temporal - the effective time can be computer interpreted; Linked to static data - the change is cross-referenced to the baseline information; Transformable the information can be converted into any graphical or textual output, including the existing ICAO NOTAM format; Query Enabled - a computer system can use complex queries to select temporary and last minute updates of interest based on user-specified criteria.. The Digital NOTAM concept has been developed jointly by EUROCONTROL and the Federal Aviation Administration of the United States (FAA). It proposes a modern approach to dynamic aeronautical information management, which is fully in line with the ATM SESAR Master Plan IP2 needs and with the airspace user expectations. Edition: 1.1 Draft Page 13

16 2.1.2 Scope The primary scope of the Digital NOTAM project is the information published as NOTAM messages, according to the ICAO Standards and Recommended Practices (SARPS). The same concept can be applied to aeronautical information of similar nature, such as airspace reservations and Conditional Routes (CDR) opening/closure, traffic flow restriction updates (Electronic Route Availability Document - erad), etc, which are currently provided through alternative means Conditional Route Availability Message (CRAM) and Central Flow Management Unit (CFMU) notifications. The Digital NOTAM concept is equally applicable to both civil and military aeronautical information. The business case analysis encompasses the whole NOTAM data chain, from originator to the end user. All equipments, people and processes involved in this chain are included in the scope of the project. However, the current project does not include the provision of Digital NOTAM in flight, through data link. It only includes those applications on-board the aircraft that receive their latest update just before take-off, while the aircraft is still at the airport. While it is generally agreed that the provision of Digital NOTAM in-flight will bring benefits for the safety and efficiency of air navigation, the information available to date about such applications is insufficient for a cost/benefit analysis of this area, in isolation from other datalink projects. It is also certain that Digital NOTAM up-link will require significant infrastructure investments and aircraft equipment enhancements. Digital NOTAM will support such applications, but it will not be the single reason for such investments. Specific data-link projects that include on-board applications (such as 4D trajectories, digital/graphical taxi clearances, etc.) are expected to cover this area Approach In order to migrate from the current Text NOTAM messages towards the Digital NOTAM data, changes are required on both the data provision side and on the data usage side. The Digital NOTAM provision capability will be implemented on the existing European AIS infrastructure, which essentially consists of national systems and a centralised European AIS Database (EAD). Increased delegation for the pre-encoding of the data in digital format will be given to the information originators (airports, military airspace users, national authorities, etc.) Data provision increments Digital NOTAM will be introduced gradually, as an additional service and data encoding format. The justification for an incremental approach is based on the following reasons: The digital NOTAM trial executed between demonstrated that a subset of the NOTAM events (navaid unserviceable, airspace reservation, route closure, temporary obstacle, airport/runway usage restriction/closure, snow conditions, etc.) account for up to 80% of the messages issued by the European Civil Aviation Conference (ECAC) Member States. For the purpose of integrity, security and data handling, Digital NOTAM will be processed by computers and in their raw state will not be readable by pilots, controllers and other operational people. End users need software to turn the Digital NOTAM data into meaningful text and graphics or to trigger automatic processes. Such software will be tailored to the end user needs as almost each category of Digital NOTAM would need specific processing routines. For example, digital data about a temporary restricted area will be interpreted and used differently from data about a displaced threshold or about a changed approach procedure. This requires specific investments on the end user side. Thus, even if the providers would make all NOTAM available digitally in the short term, the end users would need time in Page 14 Draft Edition: 1.1

17 order to adapt to the new format. The consultation with the end users has demonstrated that they have certain priorities with regard to the NOTAM that should be provided and could be used digitally. These priorities are being documented in the Digital NOTAM Event Specification, which is developed in cooperation with the project stakeholders through a dedicated Focus Group. Two major increments are foreseen on the data provision side: A first increment (the initial Digital NOTAM operational capability) will be implemented between It will include the features and events described in version 1 of the Digital NOTAM Event Specification, expected to be finalised by May For these, the information currently promulgated by NOTAM will be available as encoded data, fully structured and constrained according to the AIXM 5.1 specification. The NOTAM that are not covered in the first increment will also be provided in AIXM format. However, instead of structured properties, the current NOTAM text will be included as text Note on the affected feature. This will avoid the situation where the end user would have to work with two sources of information: digital NOTAM for certain events and text NOTAM for remaining ones. A second increment (the full Digital NOTAM operational capability) will be implemented between It will include the rest of features and events for which there is an operational need for fully structured information. This will avoid that significant investment are made for digitising certain complex NOTAM types, without resulting in a real use of the digital format. The content of the second increment will be defined based on the operational experience gained with the first increment. This will be done through the second version of the Digital NOTAM - Event Specification Data usage phases Because of the changes required in the data processing capabilities of the end users, the realisation of the Digital NOTAM benefits will take place in three phases: Short term ( ) the most visible benefit will be the improved quality of the aeronautical data provided by NOTAM. End users will increasingly be able to exploit the digital NOTAM data, as systems are enhanced/replaced. Airport surfaces contamination status, work in progress areas, closed runways and taxiways will be presented graphically in the pre-flight process. Information about restricted airspace and temporary obstacles will be available in graphical format, with positive effects on the safety of VFR operations; Medium term ( ) the most visible benefit will be the increased ability of pilots, dispatchers and air traffic controllers to exploit/maximise the opportunities offered by the timely information available in digital format The current text based Pre-flight Information Bulletins (PIB) and similar material will be enhanced and progressively replaced with graphical views. The airport side and the en-route side will be presented as an interactive map, with the elements of significance being displayed graphically. Many end users will have the capability to receive the digital NOTAM before departure and have it displayed on board in devices such as Electronic Flight Bags (EFB). In particular, class 1 and class 2 EFB (portable devices) will be used in this phase; Long-term (after 2020) a significant group of end users will have the capability to receive and use digital NOTAM on board, in installed EFB (class 3) devices and navigation displays (available on the latest aircraft generations), through updates at the gate and in-flight data link. Traditional text NOTAM messages will continue to be issued for as long as necessary to support the current systems and users. However, the primary information will be the digital Edition: 1.1 Draft Page 15

18 data, from which the (legacy) text NOTAM message will be generated through software. The operational requirements and the concepts used in air navigation and air traffic management will keep evolving in future. The AIXM model and the Event Specification will need to reflect these changes. However, these future evolutions are considered outside the scope of the current project Project Planning The following diagram shows the current Digital NOTAM implementation planning and its main milestones. ID Task Name Q4 Roadmap approved by the 1 key stakeholders 2 Increment 1 - preparation Increment 1 3 implementation approved Increment 1 4 implementation Data usage phase 1 5 improved data quality Data usage phase 2 6 ground applications 7 Increment 2 - preparation Increment 2 8 implementation approved Increment 2 9 implementation Data usage phase 3 10 data update in flight Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q Q3 Q4 Q1 Q2 Q3 Q4 Q1 Decision Type Date Description Roadmap agreed Dec 2009 Digital NOTAM workshop participants support the proposed roadmap. AI Team supports the provision of a Working Paper to the SCG, as a first concrete step towards the implementation of Digital NOTAM. Increment 1 Implementation agreed June 2010 Digital NOTAM Increment 1 implementation to be supported by the EUROCONTROL SCG and OCG and reflected in an ESSIP/LSSIP objective. Increment 2 Implementation agreed June 2014 Digital NOTAM Increment 2 implementation to be supported by the EUROCONTROL SCG and OCG and reflected in an ESSIP/LSSIP harmonisation objective. Page 16 Draft Edition: 1.1

19 CHAPTER 3 Business Case Process 3.1 Purpose The formal process, described in section 3.2, includes a number of iterations which will continue until all the information required to produce a full Business Case is available. As an initial stage, the main objective of this document is therefore to provide a qualitative benefit analysis for the Digital NOTAM implementation and to indicate constraints with regard to the implementation costs. The document also identifies the elements that are required to continue with the next steps in the formal process. 3.2 The generic Business Case Process The Digital NOTAM Business Case process provides a framework for conducting a meaningful discussion about the Digital NOTAM implementation with the stakeholders concerned, primarily ANSPs, airports, data integrators and airlines. The Business Case may support decision making but does it imply any implementation commitment has been taken. The main objective of the Business Case is to provide the appropriate information in order to enable stakeholders to make an informed decision about the Digital NOTAM implementation. The Business Case will also support planning and decision making within the Eurocontrol Agency. This document is the first step of the iterative business case process as depicted on the next page. This first step contains a qualitative benefit analysis, which confirms the potential for benefits in the Digital NOTAM project and enable the identification of the validation required in order to obtain the final benefit and cost data. Based on the preliminary general models, ANSP, airports, data integrators and airline generic models would be developed if considered necessary. This would enable specific ANSPs, airports, data integrators and airlines to perform their own local business case and support their implementation decisions. Guidance material explaining how to use these models would in such cases also be produced. A common deployment plan (which may contain options) is required in order to obtain realistic benefit and cost estimates for all the specific models. If different specific business cases make inconsistent assumptions the business cases will have no credibility. Edition: 1.1 Draft Page 17

20 1. Preliminary Models 2. Generic ANSP/Airport Model 3. Specific ANSP/Airport Models 6. Analysis 7. Business Case 4. Generic Airline / CFSP Model 5. Specific Airline / CFSP Models The Business Case process will provide each stakeholder with the means to make an informed decision on the implementation of the Digital NOTAM project. More details about the Cost Benefit Analysis Model is provided in Annex Digital NOTAM Business Case Specifics For the Digital NOTAM Business case, it is difficult to make a full quantitative analysis of the benefits. Nevertheless, there is agreement among the concerned Stakeholders that Digital NOTAM will improve the safety of the air navigation, which is not possible to estimate as a financial gain. There is also agreement that Digital NOTAM will improve the efficiency of the aeronautical information processing in the ATM system. However, certain aspects will be hard to quantify, such as: the potential to develop new ATM services, especially through the transmission of the data on board the aircraft, through data link. Although it is a general agreement among the airlines and service providers that this will improve the safety and efficiency of airline operations, the exact financial benefit is hard to estimate at this stage; the availability of digital NOTAM data and digital aeronautical information in general will reduce the investment requirement for entering the market of aeronautical service provision. Increased competition is expected to lower the cost of the current service providers and to bring to life innovative products that are not even designed today. Thus, it is difficult to provide a classical return of investment diagram for the digital NOTAM project, in which the cost would be compared with the benefit expressed in monetary values. Instead, it is proposed to consider an incremental approach, in which: the investment made by the data originator and ANSP for the provision of digital NOTAM and pre-flight briefing systems enhancements is limited, in each phase, to a certain proportion of the regular AIS provision cost. That amount will be in the range of the regular upgrades that are needed on the AIS systems; the commercial flight service provider and end user investments to be made based on local cost/benefit analysis. Page 18 Draft Edition: 1.1

21 CHAPTER 4 Digital NOTAM Benefits 4.1 Introduction The purpose of this section is to identify the potential benefits that can be expected from the implementation of the Digital NOTAM concept. In order to do so, for each service an estimate is provided for the maximum benefit achievable in an environment ideally suited to the service. For this first benefit quantification step it has not been considered how many of those environments exist in Europe and what other local constraints on the realisation of the benefit may exist. This will be the subject of the next step where specific environments will be considered. The benefit areas considered in this document are the ones identified in the Digital NOTAM Benefit Mechanisms that can be found in ANNEX 1. The Benefit Mechanisms are causality diagrams that describe the changes that a service introduces in the ATM environment and how those changes lead to benefits. It should be noted that the mechanisms leading to the benefits are in many cases still assumptions that need to be validated. However, expert judgement has already been applied to the assumptions to ensure a first selection of the most likely mechanisms and associated benefits. A first draft of the Benefit Schema was internally produced and it was afterwards reviewed and refined through workshops with different stakeholders. Three workshops were held: the first one with internal Eurocontrol staff; the second one attended by ANSP representatives; the third one attended commercial service providers and helicopter manufacturer representatives. In addition, direct discussions took place with the operational departments of two major European airlines and with two flight service provider companies. Digital NOTAM Trials are also being executed in order to validate some of these benefits. 4.2 Benefit potential This section provides an overview table for the benefits identified for the Digital NOTAM project. The benefits of each of the phases mentioned in Data usage phases is analysed separately further down. The definitions of all the benefits mentioned here are provided in ANNEX 1. Edition: 1.1 Draft Page 19

22 4.2.1 Short term ( ) The Digital NOTAM benefit mechanism for the short term is represented graphically Fig.3. On this figure, the identifiers (Ax.x.x) indicate the corresponding sub-section of ANNEX 1, where that particular improvement or benefit is discussed in detail. ANSP Efficiency (A1.2.13) Network Manager Efficiency (A1.2.14) AOC operations (A1.2.7) Airline Ops Efficiency Military (A1.2.15) Ops Efficiency Process streamline (A1.2.2) Data Quality (A1.2.4) Common ATM picture (A1.2.8) Flight Efficiency (A1.2.16) Fuel consumption (A1.2.17) Digital NOTAM Data management (A1.2.3) Data representation (A1.2.5) Pre-flight Briefing (A1.2.9) Information accesibility by VFR (A1.2.10) Safety (A1.2.18) Figure 3 - Benefit mechanism in the short term The most visible improvement will be the increased quality of the aeronautical data promulgated through text NOTAM messages. A digital NOTAM is not a simple conversion of the current message into a new, more structured format. The focus is to put in place the data management tools that enable full automatic processing and validation, ensuring the provision of correct, complete and up-to-date data to the end users. Data will be captured in digital format from its earliest stage, with the support of standard input forms. This will increase the efficiency of the information processing chain at all levels (data originator, NOTAM office, service provider, end user). The majority of the end users will still work with the text NOTAM messages. An increasing number of end users will be able to exploit the digital NOTAM data. Airport surfaces contamination status, work in progress areas, closed runways and taxiways will be presented graphically in the pre-flight process. Information about restricted airspace and temporary obstacles will be available in graphical format, with positive effects on the safety of VFR operations. The characteristic of this phase is that the major part of the investment is made on the data provider side, but mostly through regular system upgrades Medium term ( ) The Digital NOTAM benefit mechanism for the short term is represented graphically in the following figure. The improvements and benefits that are new in this phase are highlighted with thick lines. The most visible improvement will be the increased ability of pilots, dispatchers and air traffic controllers to exploit/maximise the opportunities offered by the timely information available in digital format. The current text based Pre-flight Information Bulletins (PIB) will be enhanced with graphical views. In the final steps, the airport side and the en-route side will be presented as interactive maps, with the elements of significance being displayed graphically. Page 20 Draft Edition: 1.1

23 ANSP Efficiency (A1.2.13) Network Manager Efficiency (A1.2.14) AOC operations (A1.2.7) Airline Ops Efficiency Military (A1.2.15) Ops Efficiency Process streamline (A1.2.2) Data Quality (A1.2.4) Common ATM picture (A1.2.8) Flight Efficiency (A1.2.16) Fuel consumption (A1.2.17) Digital NOTAM Data management (A1.2.3) Data representation (A1.2.5) Pre-flight Briefing (A1.2.9) Data filtering capability (A1.2.6) Information accesibility by VFR (A1.2.10) Safety (A1.2.18) Airport operations / predictability\ (A1.2.11) Capacity (A1.2.19) Figure 4 - Benefit mechanism in the medium term Many end users will have the capability to receive the digital NOTAM data at the gate, just before departure, and have it displayed by devices such as Electronic Flight Bags (EFB). In particular, portable devices (class 1 and class 2 EFB)_will use digital NOTAM in this phase Long term (after 2020) The Digital NOTAM benefit mechanism for the long term is represented graphically in the following figure. ANSP Efficiency (A1.2.13) Network Manager Efficiency (A1.2.14) AOC operations (A1.2.7) Airline Ops Efficiency Military (A1.2.15) Ops Efficiency Process streamline (A1.2.2) Data Quality (A1.2.4) Common ATM picture (A1.2.8) Flight Efficiency (A1.2.16) Fuel consumption (A1.2.17) Digital NOTAM Data management (A1.2.3) Data representation (A1.2.5) Pre-flight Briefing (A1.2.9) Data filtering capability (A1.2.6) Information accesibility by VFR (A1.2.10) Safety (A1.2.18) Airport operations / predictability\ (A1.2.11) Capacity (A1.2.19) In-flight operations (A1.2.12) Figure 5 - Benefit mechanism in the long term The improvements that are new in this phase are highlighted with thick lines. A significant group of end users will have the capability to receive and use digital NOTAM at Edition: 1.1 Draft Page 21

24 the gate, just before departure. Progressively, in-flight updates through data link will be implemented. It is expected that installed (class 3) EFB will have the capability to receive digital NOTAM and other information through data-link, offering to the pilot up-to-date information about the ATM system status. This will increase the safety and efficiency of flight operations. 4.3 Benefit quantification Introduction For the Quantification of Benefits the following three values are used: Code For numerically quantifiable benefits For benefits that cannot be quantified numerically 1 Between 0 and 5% Small 2 Between 5 and 10% Significant 3 Between 10 and 20% Major Initial Benefit Quantification The table below presents an initial non-numerical estimation of the benefits. These will remain to be validated through case studies and test implementations. The benefits identified on this table are the maximum benefit achievable in an environment ideally suited to the service. These environments do not exist in all European States. ANSP Efficiency increase Network Manager Efficiency increase Airline Ops Efficiency increase Military Ops Efficiency increase Benefit Explanation Validation Flight Efficiency Increase Mainly based on the possibility to increase the level of automation in the NOTAM processing and to streamline the NOTAM processes. Also due to reception of pre-encoded digital data from the originators. Based on the possibility to increase the level of automation in the NOTAM processing and better data quality. Based on the better data quality, improved pre-flight briefing and for dynamic in-flight profile changes Based on the better data quality, improved pre-flight briefing and for dynamic in-flight profile changes when flying as GAT. Resulting from better flight planning, reduction of avoidance margins that are currently due to poor data quality (such as for imprecise obstacle or restricted area information). Possibility to exploit routing possibilities that today remain hidden due to the difficulty to identify the real useful information hidden in text messages Page 22 Draft Edition: 1.1

25 Fuel consumption decrease Benefit Explanation Validation Safety increase 2 Capacity 1 1 Due to the flight efficiency increase. By reducing or eradicating the ambiguity of the NOTAM information; through increased situation awareness for pilots and controllers. There will be an improvement in the awareness of the VFR pilots and a reduction in airspace infringements. Due to improvements in airport operations and predictability brought forward by the increased situational awareness of the different actors Relation between data provision increments and data usage phases There is a certain correlation between the three benefit phases (short, medium and long term) and the two data provision increments described in the previous section. However, the scope of Increment 1 is estimated to cover the critical data needs of the end users on both short and medium term. The second increment will improve the return of the investment, but will not change the nature of the benefits due to additional data becoming available. This situation is represented graphically in the following diagram. Phase 1 Phase 2 Phase Benefits due to first increment Benefits due to second increment Edition: 1.1 Draft Page 23

26 CHAPTER 5 Implementation costs 5.1 Introduction The purpose of this section is to identify the cost elements that can be expected from the implementation of the Digital NOTAM Programme. A cost structure is built based on the expected final architecture and the main costs associated to the ATM environment change are identified. At the present stage of the Business Case development, the exact implementation costs have not been determined. The overall objective of the Digital NOTAM project is to limit the implementation cost to a level that is in the range of the regular AIS system upgrades. 5.2 Cost Categories The following figure summarizes the categories for the costs that can be expected for the implementation of the Digital NOTAM. Figure 6 Digital NOTAM Cost Categories Page 24 Draft Edition: 1.1

27 The following table provides a description of the different categories. User related System related Cost category Production of new procedures Training Testing, rehearsals, roll out Hardware Software developments Connectivity Description The digital NOTAM will change the way to create, process and distribute the NOTAM data. This implies that new procedures will have to be developed, in order to control this new way of working. Such procedures will concern all Stakeholders directly involved with the NOTAM processing. Staff at the different Stakeholders will have to be trained on the new procedures to be applied concerning NOTAM processing and on the new facilities (hardware, software) that will be required to handle such digital NOTAMs. As for the roll out into operations of any new facility, testing and rehearsals will have to be performed. This requires, in addition of the actual execution, planning and management of such actions. Ground systems: The support of digital NOTAMs will require additional system capacity (CPU, memory, disk) compared with the current requirements (e.g. in order to support an enhanced graphical representation). Therefore, it may require new hardware to be purchased or a hardware upgrade of existing systems. Air systems (for the long term phase): Aircraft equipment may be needed or retrofitted in order to get digital NOTAM messages and process them. Software developments will be required in order to take full profit of all potential advantages, improvements and benefits that the digital NOTAM can bring (e.g. data quality, data management, merge of data from different domains, development of new services). The digital NOTAM messages will certainly be much longer than current NOTAM. Furthermore, they will be coded in XML. This will make that traditional communication systems being actually used for the NOTAM exchange (i.e., AFTN) will not be able to support the digital NOTAM. Therefore, current systems exchanging NOTAM through AFTN will have to implement other connectivity solutions in order to be able to exchange the digital NOTAM. There should not be a cost increase for users who are currently accessing the static data in digital format through the EAD network. Edition: 1.1 Draft Page 25

28 5.2.1 Cost related considerations Digital NOTAM is not an isolated project. It is part of the general transition from AIS to AIM, for which an ICAO Roadmap has been published. It also occurs in the European Single European Sky (SES) context, which includes the Aeronautical Data Quality (ADQ) interoperability regulation. The cost of certain elements of the Digital NOTAM implementation have to be shared with the other AIS/AIM data automation projects. For example, the implementation of AIXM 5.1 for static data management is mandatory in order to provide the baseline information for the Digital NOTAM provision. As a minimum, this must cover the static data features which are needed in order to support the first Event Specification increment, such as obstacle. But the ICAO Annex 15 also requires the provision of digital data for obstacles (point, line, polygon). Thus, the provision of VerticalStructure (obstacle) data in AIXM 5.1 is needed for both Digital NOTAM and Annex 15 requirements. Therefore, the cost of this has to be split between the two projects. Similar considerations apply for the provision of AIXM 5.1 data as means of compliance with the ADQ Rule. There cost level codes are used later in this section in order to provide a qualitative indication about the importance of the cost that is associated to each cost category. Three values are used: Code Meaning 1 Small 2 Significant 3 Major These will be replaced with more exact figures as the business case development evolves. In order to put the values into perspective, the annual total cost for AIS provision of the Eurocontrol Member States, based (Central Route Charges Office CRCO) data is provided. This was between M per year, for the last three years. 5.3 Cost centres Each of the actors involved in the NOTAM data chain will have to make investments, according to the roles that they play: NOTAM originators will be required to implement tools and procedures that enables them to pre-encode the data sent to the NOTAM offices; NOTAM provider organisations (ANSPs or EAD) will be required to implement tools and procedures that allow them to manage the Digital NOTAM data and generate the NOTAM text form the digital ones; Service providers (ANSPs or CFSPs) will be required to invest into tools and procedures that allows them to parse the incoming digital NOTAM and check them for compliance with the local requirements; AOCs using the services from CFSPs will not need to make any significant investment on short to medium term, as they will simply benefit from improved services. AOCs dealing directly with NOTAM will be required to invest into tools and procedures that allows them to parse the incoming digital NOTAM and check them for compliance with the local requirements; Pilots will not need to follow new training in the short term. They may need to follow training in the medium-long term in order to benefit from improved services offered to them; Aircraft will not require any upgrade on short term. On medium to long term, the Page 26 Draft Edition: 1.1

29 airlines will invest into EFB devices that can display digital NOTAM and, later, in data link services that allow such updates to be received and processed in flight. 5.4 Costs to be supported in the different phases Short Term Costs The main costs in this phase will have to be supported by the cost centres represented in the following figure. EAD NOTAM Providers NOTAM Originators The following table provides an initial list of activities to be performed, classifying them per cost category and cost unit. Cost Centre Cost Category Activity NOTAM Originators Training Participation to training sessions NOTAM Originators NOTAM Providers (*) NOTAM Providers (*) NOTAM Providers (*) Testing, rehearsal, roll out Production of new procedures Training Testing, rehearsal, roll out Participation to testing, rehearsals and roll out Preparation of new procedures - Preparation of training sessions to teach the AIS staff about new procedures, new software. - Participation to training sessions, etc - Management activities to perform testing, rehearsals, roll out. - Actual participation to testing and rehearsals. - - Actual roll out. Edition: 1.1 Draft Page 27

30 Cost Centre Cost Category Activity NOTAM Providers (*) NOTAM Providers (*) NOTAM Providers (*) EAD Hardware Software Connectivity Production of new procedures Purchase of new hardware or upgrade of existing one Purchase of new software Connectivity upgrades or new connectivity to be performed Preparation of new procedures EAD Training - Preparation of training sessions to teach the EAD staff about new procedures, new software. - Participation to training sessions, etc EAD Testing, rehearsal, roll out - Management activities to perform testing, rehearsals, roll out. - Actual participation to testing and rehearsals. - - Actual roll out. EAD Hardware Purchase of new hardware or upgrade of existing one EAD Software Purchase of new software EAD Connectivity Connectivity upgrades or new connectivity to be performed (*) This applies to NOTAM providers owning and managing their own NOTAM system. The States (more than 60% of the total European NOTAM offices) that use the EAD ECIT solution for NOTAM production (INO) will automatically get a Digital NOTAM capable system through the EAD migration. The EAD is committed to implement the first increment of the Digital NOTAM project by end 2011, in the limits of the budget available for the EAD evolution. In order to evaluate the development costs of the Digital NOTAM provider interface and the impact on the EAD subsystems, prototyping activities are taking place. The following table provides a qualitative indication of the different cost categories in this phase (aggregation of the same cost categories in the different cost centres). User related System related Cost category Code Production of new procedures 2 Training 3 Testing, rehearsals, roll out 2 Hardware 1 Software developments 3 Connectivity 1 Page 28 Draft Edition: 1.1

31 Another cost that might be incurred by the EAD service is related to the conversion of the text NOTAM in digital format for the non-migrated States. Such a service might be required for an intermediate period, until all the European States provide the Increment 1 Digital NOTAM and only if there is a real need from the end users. The service might be limited to certain event categories (for example, only temporary restricted areas, so that an overall live map of the European airspace reservations can be maintained). However, such a service would require a business case of its own and it is not included in the overall Digital NOTAM cost/benefit analysis Medium Term Costs The costs in this phase will have to be supported by the cost centres represented in the following figure. AOC Pilots EAD ANSP / CFSP Briefing Service NOTAM Providers NOTAM Originators The activities to be performed in this phase will be the following: A similar list as the one provided in the previous short term cost section. This will be due to the implementation of the second data increment. Such implementation will require the same sort of activities to be performed. It can be nevertheless expected that the cost of these activities in this medium term phase will be significantly lower than in the short term phase (the second data increment will concern an additional number of events that will have to be properly coded by Digital NOTAM); The ones presented in the following table, concerning the investments to obtain significant benefits from the Digital NOTAM. Cost Centre Cost Category Activity ANSP / CFSP Briefing Service Hardware Purchase of new hardware or upgrade of existing one Edition: 1.1 Draft Page 29

32 Cost Centre Cost Category Activity ANSP / CFSP Briefing Service ANSP / CFSP Briefing Service Software Connectivity Purchase or development of new software Connectivity upgrades or new connectivity to be performed ANSP / CFSP Briefing Service ANSP / CFSP Briefing Service ANSP / CFSP Briefing Service Production of new procedures Training Testing, rehearsal, roll out Preparation of new procedures - Preparation of training sessions to teach staff about new procedures, new software. - Participation to training sessions, etc - Management activities to perform testing, rehearsals, roll out. - Actual participation to testing and rehearsals. - - Actual roll out. AOC(*) Hardware Purchase of new hardware or upgrade of existing one AOC(*) Software Purchase or development of new software AOC(*) Connectivity Connectivity upgrades or new connectivity to be performed AOC(*) Production of new procedures Preparation of new procedures AOC Training - Preparation of training sessions to teach staff about new services, procedures, new software. - Participation to training sessions, etc AOC Testing, rehearsal, roll out - Management activities to perform testing, rehearsals, roll out. - Actual participation to testing and rehearsals. - - Actual roll out. Pilots Training Participation to training sessions (*) This applies to AOCs owning and managing their own AIM / NOTAM system. The following table provides a qualitative indication of the different cost categories in this phase (aggregation of the same cost categories in the different cost centres). Cost category Code Page 30 Draft Edition: 1.1

33 User related System related Cost category Code Production of new procedures 1 Training 2 Testing, rehearsals, roll out 1 Hardware 1 Software developments 3 Connectivity Long Term Costs Long term costs are not included in the present edition of the document. Anyway, they will concern mainly the costs related to the transmission of the digital NOTAM on board of the aircraft in flight, through data link. Edition: 1.1 Draft Page 31

34 CHAPTER 6 Conclusion and Recommendations The result of this qualitative analysis shows that the Digital NOTAM has the potential to bring significant benefits for the ATM system: ANSP will be able to improve the quality of the data and of their services, such as pre-flight briefing; Flight service providers will be able to reduce the NOTAM processing effort and to develop new services for their clients; Airlines will get better data and improved information services; the likelihood of missing important information, which could be a contributing factor to an accident or could cause economical losses, will be reduced; The accessibility of information for VFR flyers will be improved, which will reduce the risk of airspace infringements or collision with obstacles; Airports will have the possibility to make more actual information available to airline operational centres with regard to the actual status of the facility, with positive impact on capacity; Finally, Digital NOTAM will also provide the essential means to realise the SESAR goal for the single composite situation picture, a cornerstone of the whole concept of operations. The introduction of digital NOTAM will remove the historical split between NOTAM and AIP data. All AIS products (AIP, NOTAM, AIP Amendments, charts, pre-flight information bulletins, etc.) will be generated from a coherent data source. This will significantly improve the quality of the information. This does not require any investment on the end user side, but could bring significant system economies. Once the service providers will make the necessary investments for using directly the new Digital NOTAM format, the quality of services such as pre-flight briefing will be significantly improved. Devices such as Electronic Flight Bags (EFB) will be updated just before the flight with the latest information available. In the long term, Digital NOTAM will support the provision of information updates in flight, through data link. However, this requires significant investments in avionics and the cost / benefit analysis of this phase is not possible at present. The current indications obtained through this qualitative analysis lead to a conclusion that the payback period for the Digital NOTAM can be a relatively long one (between 10 to 15 years). Nevertheless, the do-nothing is not an option. The increasing number of NOTAM messages and the fact they cannot be automatically processed would seriously jeopardise the SESAR goal of providing a composite, single picture of the ATM environment, available to all, which is fundamental to the entire SESAR ATM Target Concept. Therefore, it is recommended to proceed with the implementation phase, focusing first in the identification of approaches that can reduce the costs that will be required. Page 32 Draft Edition: 1.1

35 Edition: 1.1 Draft Page 33

36 ANNEX 1 Digital NOTAM Benefits A1.1 Introduction This Annex contains a detailed description of the benefits mechanism, as presented in section 4.2 Benefit potential. A1.2 Benefits A1.2.1 Benefit mechanism diagram. The following diagram shows the overall benefit schema, as resulting from the union of the benefits in each of three phases. ANSP Efficiency (A1.2.13) Network Manager Efficiency (A1.2.14) AOC operations (A1.2.7) Airline Ops Efficiency Military (A1.2.15) Ops Efficiency Process streamline (A1.2.2) Data Quality (A1.2.4) Common ATM picture (A1.2.8) Flight Efficiency (A1.2.16) Fuel consumption (A1.2.17) Digital NOTAM Data management (A1.2.3) Data representation (A1.2.5) Pre-flight Briefing (A1.2.9) Data filtering capability (A1.2.6) Information accesibility by VFR (A1.2.10) Safety (A1.2.18) Airport operations / predictability\ (A1.2.11) Capacity (A1.2.19) In-flight operations (A1.2.12) Page 34 Draft Edition: 1.1

37 A1.2.2 Process streamline The introduction of digital NOTAM will remove the historical split between NOTAM and AIP data. NOTAM are just a component of the aeronautical information package provided by the States. Frequently, they need to refer to the AIP data or to an AIP Supplement, which is not always at hand and may not be applicable to the route of intended flight. All products (AIP, NOTAM, AIP Amendments, charts, pre-flight information bulletins, etc.) will be generated from a coherent data source, which comprises both "static" and "dynamic" information. All the information will be available in the same digital format and from a single source. This will enable a more logical / better workflow in treating static and dynamic data inside the ANSP, which will be visible in the internal processes. The digital NOTAM will allow to have faster data updates (automatic processing, less human interventions), therefore contributing to a more dynamic environment, providing more on-time and dynamic info to all parties involved, as envisaged by SESAR. A1.2.3 Data management Digital data management capabilities will become fully applicable to the NOTAM information. Currently, this is limited to the NOTAM metadata (series, number, validity, etc.) and to the qualifiers (Q line), but does not include the actual information, which is described by the NOTAM text. This improvement concerns the whole data chain, from the origination of digital NOTAMs, i.e., entering the information into the system up to the end user. Information contained in digital NOTAM is much more suitable for automatic processing, which will facilitate the data management understood in a large sense. For some actors, especially information originators, the digital NOTAM introduction will require having a much higher degree of computer support in order to be able to enter the information into the system. This computer support will, from the source, ensure that the information that is entered is compliant and consistent with standardized data models and so, facilitate the automated processing of this information in the rest of the process chain. For example, the unavailability of a critical navaid could immediately trigger the unavailability of a certain approach procedure. Obviously, this requires proper change impact procedures to be defined and encoded in the system. But this is a once-only effort, which enables an automatic process to take place in all similar situations. The characteristics of the digital NOTAM (geo-enabled, time-enabled, query-enabled, standard data model and formats) will facilitate the execution of other data management activities. As example, the digital NOTAM will make easier to: determine the applicability of the information contained in the digital NOTAM; determine the temporal validity of the information; facilitate the data life cycle; etc. The digital NOTAM will also contribute to improve the data traceability (important in case of incident / accident investigations). The digital NOTAM will also make it possible to dynamically request / get the static data that is needed for interpreting the dynamic information, to facilitate the detection and correction of potential inconsistencies. A1.2.4 Data quality The current system is driven by manual processes to ensure NOTAM accuracy and provide a way for humans to correct NOTAM entry errors. The system relies heavily on postsubmission quality control. Edition: 1.1 Draft Page 35

38 Thanks to the inherent automatic processing, the information contained in a digital NOTAM is much more suitable for automatic checks (automatic data validation, automated crosschecking with other data sources), which can ensure better compliance with ICAO standards and recommended practices and improved coherence and correctness. A new Event Specification will be developed for this purpose, stating minimal data requirements and validation procedures for the provision of digital NOTAM. The current text NOTAM will be automatically generated form the digital NOTAM, which will ensure both consistency between the two and better text NOTAM. The text of the traditional NOTAM will be formulated in the same way for similar events, as it will be the result of computer algorithms. It will also be possible to automatically generate translations in the national languages, without the risk of corruption experienced when the translation is done by operators. Automatically generated text NOTAM will eliminate discrepancies between the Q code and the E field content, errors in coordinates, identifiers, etc. as currently experienced. By its nature, aeronautical information is geographically related and even of geometrical expression (airport surfaces, routes, airspace, etc.). The part of the NOTAM message that can today be interpreted automatically is limited to position and radius of influence. This seriously undermines the efforts to present the NOTAM information graphically. Knowing the information filtering limitations and to be on the safe side, the NOTAM originators tend to overestimate the radius of influence. This either causes the NOTAM to be included in briefings for flights that are totally outside the really impacted area or requires additional workload on the end user side, to manually eliminate certain NOTAM from the information package provided to flight crews. The digital aeronautical data is frequently suitable for immediate graphical representation. The digital NOTAM will enable visual checks by human operators. This will eliminate the risk of mistyped or missing data, which is a common problem of the current text NOTAM. It is expected that the digital NOTAM will push different States to increase data consistency (e.g. the visual checks will easily highlight border inconsistencies between States). The data integrity will be also improved as result of the better data management. In particular, the possibility to receive data in digital format from the originator, to process and to transmit it to the next intended through a fully controlled digital system will remove the "media breaks" (from paper to electronic, from electronic to NOTAM text, from NOTAM text to electronic format) that affect the integrity of the data today. A1.2.5 Data representation / conversion Although supposed to be human readable, there are frequent complaints from pilots, especially from general aviation, that NOTAM text is frequently hard if not impossible to decipher for the non-expert. End user difficulties due to this aspect, especially for VFR flyers, have been discussed in a series of Airspace Infringement Workshops held in EUROCONTROL. Most digital NOTAM data is suitable for automatic conversion into other formats, as required by the end user. These can be graphical formats or custom formats defined by the end user. This increases the accessibility of the information and reduces the time and effort spent by the end user for such conversion. NOTAM can contain applicability schedules such as TSA active APR , , ,. Hard to read and sometimes even ambiguous, such schedules are based on the human interpretation which is almost impossible for automated systems. Even more, the temporal information is not always presented in the NOTAM D field. Sometimes, supplementary applicability information is provided in the free text description, which makes the interpretation even more difficult. Digital NOTAM will radically improve the possibilities of representing such data into calendar/schedule formats that are optimized for human interpretation or into digital data that can be used for automatic impact assessment. Page 36 Draft Edition: 1.1

39 The digital NOTAM will rely on standardized data models and formats (i.e. AIXM), which are based on ISO standards from the series. The same standards are currently applied in the development of information models for other domains, in particular weather (WXXM). This enables the use of common service concepts, such as Web Feature Services (WFS) for querying and retrieving both AIS and MET data. Therefore, the information available in the digital NOTAMs will be easily merged and combined with other information from different domains like ATFCM, ATC, AOC, Meteo, etc. This is important, for example, for the provision of integrated briefing and can lead to a range of new services being defined and developed. A1.2.6 Data filtering capability The end user is empowered to access the information when necessary. More data can be taken on board the aircraft for example, because the structured data is more suitable for adhoc filtering and use, when deviating from the planned trajectory is required. Today, most of the effort spent in pre-flight by the PIB provider is to tailor the data for the planned trajectory. This is because the only thing given to the pilot is a paper PIB bulletin. In case of serious deviation from the flight trajectory, the pilot can miss NOTAM information affecting the new trajectory. With digital NOTAM, the pilot could get data for a wider area to carry on board. This will not affect the PIB phase because only the relevant information will be presented. The rest of the data will stay there, just in case. Another aspect is that today the NOTAM publisher estimates the radius of impact of a NOTAM. It is a single value "one size fits all", which is obviously not an efficient approach, but it's the only possibility that we have today, with the NOTAM text. With digital NOTAM, the end user is empowered to make this judgment himself. There is no need for an "impact estimation" by the NOTAM publisher, because the end user can automatically filter the data in much more detail and decide what is important for his flight. A1.2.7 Airline Operational Centers By improving the quality and the availability of the information, digital NOTAM will reduce the number of situations when the end user receives incomplete or inconsistent information and needs to go back to the originator in order to validate the information or to request additional clarification. Examples of such situations can be found today on the AIS Agora, the forum for AIS professionals. The reduction in the number of end user inquiries will have a positive effect on the workload of the airline operational departments. An incident where missing a NOTAM caused a significant cost for an airline is described below. At a European airport, the runway 01L/19R closure between 22 of June and 31 of July was notified by and A-series NOTAM, three months in advance of the occurrence and it was available in PIBs. For some reason, the event was (even) published twice. The NOF cancelled the first NOTAM, with information that the same information that was presented in A0093/09 also in presented in A0211/09. The information was also broadcasted on ATIS. The airline claimed they did not have this information and planned for departure on the longest runway at the airport 01L/19R. It is not clear when exactly they became aware of that the planned runway wasn't available, but they had already loaded fuel when they found out. To be able to use the available (shorter) runway for take-off they had to remove fuel, which caused delay and cost. It also forced them to re-fuel en route to reach their destination. Another example of recurrent decrease of efficiency is due to obstacle NOTAM that do not provide the exact position of the obstacle. This is the case for almost 50% of the NOTAM concerning obstacles! The analysis made by a flight service data provider shows the significant negative impact that such imprecise obstacle NOTAM can have on operations. In this example, the obstacle was published as TEMPORARY CRANE, 292 MSL, 4232 FEET SW OF RWY 7R. This forces the conservative operator to account for it in their takeoff performance calculations, simply because they cannot be sure whether the obstacle is or is Edition: 1.1 Draft Page 37

40 not within the obstacle accountability area. Without the obstacle, the performance calculation for a certain aircraft shows that it is possible to takeoff on Rwy 25R at maximum structural takeoff weight (396.9 tonnes) at temperatures up to nearly 32C. With the obstacle it is not possible to takeoff at maximum structural takeoff weight at any temperature. At a nominal takeoff temperature of 15C the maximum takeoff weight reduction is more than 10 tons! In the short term, the increased data quality of the text NOTAM will lower the effort made by the Flight Service Data Providers for the manual input of the data, as all required information will be ready available in the NOTAM message. In the medium term, it will be possible to eliminate the manual data input activities and replace that with automatic parsing of the Digital NOTAM information. Automatic data quality checks will ensure that the ingested data satisfies the specific requirements of the user and will flag the data that requires additional manual checking. The digital NOTAM will improve the use of the airspace network. Today, the AOC has to work with several information sources (AIP, NOTAM, CRAM, RAD) and several formats (text, ADEXP, erad, etc.). All this information can be hardly exploited by the AOC. This will change with the digital NOTAMs, they will make this information easier to process by automated systems. With current NOTAM, area restrictions (e.g. for military) are notified with a circle, so they give the centre and radius. With digital NOTAMs, the actual restricted area shape can be notified / published. This can have implications in terms of better flight efficiency (by increasing air capacity). A1.2.8 Common ATM picture (CDM enabler) The status of the route network (active restrictions, temporary open routes, traffic flow restrictions) are currently promulgated through a mixture of NOTAM and more dedicated network messages (AUP/UUP, CRAM, etc.). This multitude of formats (text for NOTAM, text and ADEXP for CRAM, etc) make it difficult for the end user to use the information. The digital NOTAM will make all this information available in a single format, independent from the messages by which such information is currently published. Eventually, the Airspace Data Repository (ADR) will act as a single source which will improve the accessibility of the information. This will allow to be better exploited in the network management function. Furthermore, the digital NOTAM will improve civil / military cooperation through digital data exchanges, such as envisaged by the easm process. In this process, military airspace requests become immediately visible to Airspace Management Cells and to CFMU for cross border coordination. The airspace allocations and the tactical changes are visible to both civil and military actors. Finally, the data is collected for Key Performance Indicators (KPI) computation and analysis, which can lead to improvements in the airspace sharing process between civil and military users. In the end, this will support the SESAR goal of creating a single composite image of the ATM system, available to all actors. A1.2.9 Pre-flight briefing One of the most clear and radical improvement that is enabled by digital NOTAM is in the area of pre-flight information operations, both at ARO and by AOC). Today 20,000 NOTAM (on average) are in force at any moment world-wide. Many of these are given to flight crews for pre-flight briefing resulting in Pre-flight Information Bulletin (PIB) in the range of pages for an internal European flight. Due to the current limited information filtering capabilities of the text NOTAM format, between 40% and sometimes up to 90% of the information given in PIB has no direct impact on the Page 38 Draft Edition: 1.1

41 flight for which it was provided Yet the probability of pilots not being aware of important and pertinent NOTAM is increasing In the case of pre-flight information bulletins, it will become possible to take into consideration human factors in the design of the pre-flight briefing process, such as: prioritise information by criticality; organise information by item concerned (runway, gate, etc.); use upper/lower case as appropriate; embed graphics where appropriate ("a picture is a thousand words") or even do a full graphical PIB; better filtering capabilities compared to what can be currently achieved (this will stop the information overload and the time spent on analysing irrelevant information). Figure 7 Example of a graphical PIB This includes the provision of digital/graphical briefing packages for upload on Electronic Flight Bag (EFB) devices. The data will be refreshed just before departure, for example using airport wireless connections. The main advantage will be that much more data will be available for the pilot, in case that a change in a flight circumstances requires a radical re-routing. The only missing data will be the updates that take place after the departure from the gate. This will be covered later, as described in A In-flight operations. A Information accessibility for VFR flyers The current NOTAM messages are difficult to read and interpret for the VFR flying community. For example, NOTAM can announce temporary restricted areas and which the pilot needs to manually plot on a map in order to evaluate the impact on the flight trajectory. This is very time consuming and error prone, which often results in airspace infringements. As stated by a representative of the recreational flying community: Whilst it is not impossible for a Microlight or any other private recreational pilot to read and understand NOTAMS many are put off the task by the unfriendly way in which they are presented and a lack of understanding of technical terminology. The Digital NOTAM will radically improve this situation, allowing graphical visualization of the information and integration of these graphics in the navigation tools used by general aviation. This will result from the digital NOTAM capability for being converted into tailored text and Edition: 1.1 Draft Page 39

ADQ Regulators Working Group

ADQ Regulators Working Group ADQ Regulators Working Group Common Understanding 01/2013 Application of the provisions of Commission Regulation (EU) 73/2010 to NOTAM Edition: 1.4 Date: 20 October 2016 Reference: ARWG CU 01/2013 ARWG

More information

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management User Forum 2011 AIM/EAD Evolutions Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management The European Organisation for the Safety of Air Navigation EAD General Concept

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011) IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) ATIEC 2017 Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) Content AIXM usage - current and future Interoperability Digital NOTAM AIXM intended use AIXM 2.1/3.3/4.5 - developed for the EAD (European

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

Development of the Global AIM Strategy (AIM Projects)

Development of the Global AIM Strategy (AIM Projects) Development of the Global AIM Strategy (AIM Projects) Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline Status-quo: ICAO AIM provisions

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

Simone Gabriele. Digital NOTAM The Digital Age for Air Navigation

Simone Gabriele. Digital NOTAM The Digital Age for Air Navigation Simone Gabriele Digital NOTAM The Digital Age for Air Navigation Outline What is Digital NOTAM? Why Digital NOTAM? Data Model & Event Specification Static & Dynamic Data Integration Digital NOTAM Implementation

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL From AIS to AIM Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL AIS-AIM Study Group Active from 2008-2015 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance

More information

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015 10+ years of EAD: picking the low-hanging fruit guido HAESEVOETS EAD Customer Management 29/01/2015 10+ years of EAD Principles EUROCONTROL operates and manages the EAD on behalf of its Member States,

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

MIDAD Project IDS Vision

MIDAD Project IDS Vision MIDAD Project IDS Vision Cairo July, 2013 Ramy El-Jabi Outline MIDAD Scope Solution High Level Architecture IDS Air Navigation Suite Proposed Implementation Schedule 2 MIDAD Scope Drawbacks related to

More information

Technical Resources - Automation European AIS Database (EAD)

Technical Resources - Automation European AIS Database (EAD) Technical Resources - Automation European AIS Database (EAD) Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA) and Air Navigation Service Providers (ANSPs)

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL DOCUMENT CHARACTERISTICS LE EUROCONTROL Guidance for Military Aeronautical Information

More information

Curriculum for AIM Training Module 2: ARO Officer

Curriculum for AIM Training Module 2: ARO Officer Curriculum for AIM Training Module 2: ARO Officer 1. THE AERONAUTICAL INFORMATION SERVICES The general objectives are to enable students to: Appreciate how the aeronautical information services function;

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/9 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

AIS-AIM Study Group Working Status

AIS-AIM Study Group Working Status International Civil Aviation Organization AIS-AIM Study Group Working Status Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline Development and Implementation of AIS

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member SWIM: An ANSP Perspective Jan-Philipp LAUER, MSc CANSO AIMWG SC Member ICAO Interregional APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Agenda

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Airspace User Forum 2012

Airspace User Forum 2012 Airspace User Forum 2012 AIS Services: EAD evolutions Guido HAESEVOETS EAD Client & Migration Manager Airspace/AIS Management European AIS base (EAD) EAD is a service provided and owned by EUROCONTROL

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member SWIM: An ANSP Perspective Jan-Philipp LAUER, MSc CANSO AIMWG SC Member ICAO Interregional APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Agenda

More information

Managing Aeronautical Data

Managing Aeronautical Data ATC Global Beijing Philippe MERLO Director Air Traffic Management 13 September 2016 Todays Agenda ICAO AIS AIM Roadmap From AIS to AIM to SWIM : a revolution underway Where we are today Initial tests completed

More information

EUROCONTROL SPECIFICATIONS SYNOPSIS

EUROCONTROL SPECIFICATIONS SYNOPSIS EUROCONTROL EUROCONTROL SPECIFICATIONS SYNOPSIS n EUROCONTROL Specification of Interoperability and Performance Requirements for the Flight Message Transfer Protocol (FMTP) n EUROCONTROL Specification

More information

Aeronautical METeorology in Europe

Aeronautical METeorology in Europe Aeronautical METeorology in Europe Weather Information Modelling Activities Dennis Hart Aeronautical Information Management Division EUROCONTROL European Organisation for the Safety of Air Navigation Overview

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014 EUROCONTROL Centralised Services Workshop Peter Matern CS#5 EAIMS 5 March 2014 European AIS Database (EAD) A EUROCONTROL Service of which the provision of the service is outsourced, a real partnership

More information

AIXM/WXXM CONFERENCE 2010

AIXM/WXXM CONFERENCE 2010 AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM

More information

AMXM Airport Mapping picking-up SWIM

AMXM Airport Mapping picking-up SWIM Global Information Management AMXM Airport Mapping picking-up SWIM Presented By: Sam Van der Stricht Date: August 25, 2015 AMDB Applications EUROCAE / RTCA Applications: Moving Map Routing Runway Safety

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

The Importance of AIM and the Operational Concept

The Importance of AIM and the Operational Concept Global Harmonization Through Collaboration The Importance of AIM and the Operational Concept Presented By: Michael Hohm International Civil Aviation Organization Date: August 28, 2012 Flightplan Background

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach

More information

Avitech GmbH AIXM Capabilities & Experiences

Avitech GmbH AIXM Capabilities & Experiences Avitech GmbH AIXM Capabilities & Experiences Werner Schwarze Regional Sales Director Dakar/04. October 2016 Avitech Introduction Avitech GmbH of Germany, is a key piece in Indra ATM being the unique provider

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Official Journal of the European Union L 146/7

Official Journal of the European Union L 146/7 8.6.2007 Official Journal of the European Union L 146/7 COMMISSION REGULATION (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Aeronautical Information Management

Aeronautical Information Management Aeronautical Information Management NOTAM Activities Introduction Presented to: By: Barry C. Davis Date: May 3, 2011 What s AIM? Dynamic, integrated management of aeronautical information services safely,

More information

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

30 SEP - 02 OCT, 2014

30 SEP - 02 OCT, 2014 EASTERN CARIBBEAN AERONAUTICAL INFORMATION MANAGEMENT (AIM) FAMILIARIZATION WORKSHOP TRINIDAD AND TOBAGO AVIATION AUTHORITY COMPLEX PORT OF SPAIN, TRINIDAD AND TOBAGO, 30 SEPTEMBER TO 2 OCTOBER 2014 30

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/9-SN/12 20/04/2014 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) NINETH MEETING Tokyo, Japan, 21 to 25 April 2014 Agenda Item 4 Aeronautical

More information

Optimizing trajectories over the 4DWeatherCube

Optimizing trajectories over the 4DWeatherCube Optimizing trajectories over the 4DWeatherCube Detailed Proposal - SES Awards 2016 Airbus Defence and Space : dirk.schindler@airbus.com Luciad : robin.houtmeyers@luciad.com Eumetnet : kamel.rebai@meteo.fr

More information

AIRSAW TF Status Report

AIRSAW TF Status Report AIRSAW TF Status Report ODIAC 24 - Brussels Patrick BOURDIER The AIRSAW Task Force Created by ODIAC in February 1998 Terms of Reference approved by ODT 20 + Members including operational experts representing

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Operations Control Centre perspective. Future of airline operations

Operations Control Centre perspective. Future of airline operations Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/14 27/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG/2) Rome Italy, 4 to 8 May 2015 Agenda Item 4 : Active

More information

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2 Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY 12 th Meeting of Arabian Sea-Indian Ocean ATS Coordination Group ASIOACG/12) & 8 th Meeting of Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE/8) New Delhi, India, 20-21 September 2017

More information

Future Automation Scenarios

Future Automation Scenarios Future Automation Scenarios Francesca Lucchi University of Bologna Madrid, 05 th March 2018 AUTOPACE Project Close-Out Meeting. 27th of March, 2018, Brussels 1 Future Automation Scenarios: Introduction

More information

MET matters in SESAR. Dennis HART

MET matters in SESAR. Dennis HART MET matters in SESAR Dennis HART Implementing the Single European Sky Performance Safety Technology Airports Human factor -Performance scheme -Performance Review Body -EASA -Crisis coord. cell European

More information

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Operational Efficiency of Dynamic Navigation Charting Benefits such as improved

More information

EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach

EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION XXX Specification CEM Enclosure 1 EUROCONTROL Specification for Time Based Separation (TBS) for Final Approach DOCUMENT IDENTIFIER : EUROCONTROL-SPEC-XXX

More information

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 The D-AIM Project and Trials Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 D-AIM Background Cooperation between LFV (Swedish Airports and Air Navigation Services)

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework

More information

Information Management towards SWIM

Information Management towards SWIM Information Management towards SWIM World ATM Congress 2015 Future ATM Generation Philippe Sacré Senior Expert Telecommunications Madrid, 10 March 2015 Today s Agenda SWIM - Introduction SWIM State of

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC)

Paradigm SHIFT. Eurocontrol Experimental Centre Innovative Research June, Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) 1 Paradigm SHIFT Eurocontrol Experimental Centre Innovative Research June, 2005 Laurent GUICHARD (Project Leader, ATM) Sandrine GUIBERT (ATC) Khaled BELAHCENE (Math Mod., Airspace) Didier DOHY (ATM, System)

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

QMS for AIS/MAP Service Implementation Workshop

QMS for AIS/MAP Service Implementation Workshop TITLE DP-9 QMS for AIS/MAP Service Implementation Workshop AIS to AIM transitions: The AFI challenges The global evolution from AIS to AIM capability is considered an essential and over-arching objective

More information

The benefits of satcom to airlines. Prepared by Helios for

The benefits of satcom to airlines. Prepared by Helios for The benefits of satcom to airlines Prepared by Helios for contents INTRODUCTION 3...What is satcom? 4..the evolution of satcom Atc benefits 5.benefits from datalink applications in oceanic ATC 6.SATCOM

More information

AIXM Coding guidelines for the ICAO data sets

AIXM Coding guidelines for the ICAO data sets AIXM Coding guidelines for the ICAO data sets Eduard POROSNICU DECMA/STR/SWM July 2018 Context Restructured Annex 15 Digital data sets AIP Obstacles Terrain Airport Mapping Instrument Flight Procedures

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager

Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager Final Project Report Document information Project Title Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number 09.49 Project Manager Deliverable Name Deliverable

More information

Global Information Management. Status Report: AIXM

Global Information Management. Status Report: AIXM Global Information Management Status Report: AIXM Presented By: Allen Proper, FAA Date: August 25, 2015 Content AIXM versions in use AIXM Change Control Board activity FAA perspective AIXM 4.5 Published:

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

Airspace Infringement Survey 2007

Airspace Infringement Survey 2007 Airspace Infringement Survey 2007 Vladimir Grigorov, COMPASS IS 24 January 2008, Brussels Why the survey? Occurrence reports do not enable in-depth analysis of causal and contributory factors! To ask those,

More information

European Aviation Safety Agency. Opinion No 10/2017

European Aviation Safety Agency. Opinion No 10/2017 European Aviation Safety Agency Opinion No 10/2017 Transposition of provisions on electronic flight bags from ICAO Annex 6 RELATED NPA/CRD: 2016-12 RMT.0601 EXECUTIVE SUMMARY The objective of this Opinion

More information

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016 ICAO ATFM SEMINAR Dubai, UAE, 14 December 2016 ICAO ATFM Seminar Session 2.2: ATFM Sub-regional and Regional Solutions Brian Flynn EUROCONTROL Network Manager Directorate 12 th December 2016 Central Flow

More information

OVERVIEW OF THE FAA ADS-B LINK DECISION

OVERVIEW OF THE FAA ADS-B LINK DECISION June 7, 2002 OVERVIEW OF THE FAA ADS-B LINK DECISION Summary This paper presents an overview of the FAA decision on the ADS-B link architecture for use in the National Airspace System and discusses the

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Civil-Military Cooperation. Advanced Flexible Use of Airspace Civil-Military Cooperation Advanced Flexible Use of Airspace Need for Airspace data sharing and collaboration Network Manager Military Civil Airlines Military Operational Requirements for the Use of Airspace

More information

ACI EUROPE POSITION PAPER

ACI EUROPE POSITION PAPER ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has

More information

Analysis of en-route vertical flight efficiency

Analysis of en-route vertical flight efficiency Analysis of en-route vertical flight efficiency Technical report on the analysis of en-route vertical flight efficiency Edition Number: 00-04 Edition Date: 19/01/2017 Status: Submitted for consultation

More information

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking SESAR RPAS Definition Phase Results & Way Forward Denis Koehl Senior Advisor SESAR Joint Undertaking Brussels - December 2 nd 2014 Content The Rationale The EC Mandate Requirements & Challenges SESAR RPAS

More information

VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection

VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection The FANS Group 8703 Yates Drive, suite 125 Westminster, Colorado 80031 www.fans-group.aero 877.710.7932

More information

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline NCLB-AIM Workshop (Cairo, Egypt, 11-13 September 2017) Your complete AIS/AIM Training baseline Outline Who we are? ATALIS Your complete AIS Training baseline AIS/AIM Training courses We are here since1932

More information