DCN 8434 I I. Phone
|
|
- Jonah Nichols
- 6 years ago
- Views:
Transcription
1 2 3 LE XOR Staff Summary Sheet To Action Signature (Surname), Grade, Date To Action 1 Signature (Surname), Grade, Date COORD Robert Saxer, Col, 21 Nov XPP ~COORD l~oordination Not Received COORD Fox, Mai Gen. 26 Nov 03 5 XOO SC & 8.- COORD H.Disbrow. 2 Dec 03 Grade and Surname of Action Officer Lt Col Kapellas Subject symbol S AFEBB 1. Purpose. Seeks joint EBXOO signature on Joint Strike Fighter (JSF) Requirements memorandum (Tab 1) to the Chairman, Education and Training Joint Cross Service Group (JCSG). Phone Package (Blue) Joint Strike Fighter Minimum Beddown Requirements S-ry Suspense Date 25 November 2003 SSS Date 4 November Background. During 24 September 2003 nfrastructure Steering Group (SG) meeting, SG chairman, Mr. Michael Wynne, DUSD(AT&L), proffered to "claim credit" for work previously accomplished on site selection for the JSF. This provides new direction to the JCSG's Flight Training subgroup assigned the task of selecting the initial training base for the JSF within the Base Realignment and Closure process. Not availing use of previously accomplished work will add significant workload to this subgroup, and enable erroneous conclusions due to the limited time to accomplish the selection. Minimum beddown requirements provided are the approved work of the JSF Joint Program Office's Joint Working ntegrated Process Team. 3. Recommendation. XOO sign the memorandum at Tab 1. MCHAEL A. AMONE, P.E. Deputy Assistant Secretary (Basing & nfrastructure Analysis) Tabs 1. Memp JSF Requirements 2. BBP JSF Minimum Beddown Requirement A- r~nn W, StZf~ummary sneet uocument n racwaee ( ~LU'ELFP M~nlmum treaaown R c a u i r e m e a t ~. o b d ~ QUEST Template Version 4.0 ~ ~ ~ 0 8
2 DEPARTMENT OF THE AR FORCE WASHNGTON DC OFFCE OF THE ASSSTANT SECRETARY 9 DEC 2003 MEMORANDUM FOR CHARMAN, EDUCATON & TRANNG JONT CROSS SERVCE GROUP SUBJECT: Joint Strike Fighter Requirements During deliberations at the 24 September 2003 nfrastructure Steering Group (SG), the SG chairman, Mr. Michael W. Wynne proffered that we "claim credit" for work previously accomplished concerning Joint Strike Fighter site selection. To that end find attached the minimum requirements for beddown and basing of the Joint Strike Fighter. u~ri~adier General, USAF Director, Operations and Training DCS, Air and Space MCHAEL A. AMONE, P.E. Deputy Assistant Secretary (Basing & nfrastructure Analysis) Attachment: JSF Minimum Beddown Requirements cc: Joint Strike Fighter Program Office HQ AETC/DO/XP
3 BULLET BACKGROUND PAPER ON JONT STRKE FGHTER MNMUM BEDDOWN REQUREMENT PURPOSE - To list the minimum beddown requirements for the Joint Strike Fighter (JSF) - The requirements listed below are provided by the JSF Joint Program Office's Joint Working ntegrated Process Team RUNWAY -- Two or more parallel runways available for safe recovery of aircraft -- Runway dimensions of 9,000' X 200' to allow for multi-ship formations takeoffflandings -- Field elevation less than 1,000' MSL -- Existing compatible instrument approach equipmentjfacilities -- Single or crossed runway with growth potential for a second parallel runway -- Emergency recovery runway within 50 NM of the main operating base -- Minimum runway dimensions of 8,000' X 150' -- Field elevation between 1,000'-3,000' MSL -- Ability to install required instrument approach equipment and allied support PARKNG -- Parking for 140 aircraft -- ArmDearm areas large enough to support 12 aircraft at each end of runway -- Parking for 75 aircraft but expandable to 140 aircraft Lt Col Kapellas/SAF/EBB/ October 2003
4 -- Armem areas; no pads but appropriate land available to construct pads to meet mission needs AUXLARY FELD OPERATONSCARRER OPERATONS -- Auxiliary Field within 50 NM of main operating base hour operations; Field Carrier Landing Practice (FCLP) capable -- Field elevation less than or equal to 1,000' MSL -- Distance to aircraft carrier less than 600 NM -- Auxiliary Field greater than 50 NM away from main operating base is unacceptable hour operations and FCLP capable -- Field elevation between 1,000'-3,000' MSL -- Distance to aircraft carrier greater than 600 NM is unacceptable ARSPACElRANGE -- More than 3 Low Level routes with entry points within 90 NM of the main operating base; unlimited access 5 days a week -- Simulated Flameout pattern available at both the main operating base and aux field -- Distance to training area less then 120 NM --- Airspace is ACMT/TACTS capable, supersonic approved, and approved to drop chaff and flares -- Air-to-air range areas greater than or equal to 3,200 square miles with 4 areas available for simultaneous use. --- Altitude block available from the surface to 50K -- Air-to-ground range area is larger than 1,600 square miles and collocated with or beside a MOA; area is split into 4 operating areas for simultaneous use --- Altitude block from surface to more than 30K
5 --- Live weapons delivery capable with impact scoring system and threat emitters -- More than one Low Level Route within 90 NM of the main operating base; with limited access -- Simulated Flameout pattern available at either the main operating base or auxiliary field -- Air refueling track within 120 NM and 250 NM of main operating base -- Distance to training areas greater than 120 NM but less than 150 NM from main operating base -- Air-to-air range area between 1,800 and 3,200 square miles --- Altitude block available from surface to more than 25K -- Air-to-ground range area between 250 and 1,600 square miles not collocatedfbeside a MOA --- Altitude block from the surface to not less than 20K --- Can deliver inert weapons and has limited threat emitters, no scoring system WEATHER -- Days where weather is better than 3,000' cloud cover and 3 miles visibility --- Main operating base (at least 300 days), aux field (at least 250 days), range (at least 250 days) -- Days where weather is better than 3,000' cloud cover and 3 miles visibility --- Main operating base (at least 200 days), aux field (at least 200 days), range (at least 200 days) ENVRONMENTAL -- Emissions within attainment -- Noise less than or equal 65 DNL with no residential development
6 -- Emissions maintenance or non-attainment with mitigation options -- Noise at 66 to 75 DNL with residential development RECOMMENDATON - None; for information only
7 JSF Minimum Requirements 4-Letter Coordination Record Previous Coord To S AFEB J AF/LEP AFKPPC AFKORC AFJXOOT SAFAQPF Action Non-concur Non-concur Signature (Surname), Grade, Date Wright, Col, 3 Oct 03 Bmett, Col, 3 Oct 03 Allgood, GS-14,6 Oct 03 Blan, Lt Col, 6 Oct 03 Hoeferkamp, Lt Col, 9 Oct 03 Comments - (Critical) Draft letter must be revised to clearly lay out JSF minimum basing criteria, and provide an explanation of the data contained in the spreadsheets. Addressed - (Substantial) Suggest add XOR Coord to SSS Added - (Admin) "responsible" misspelled in last line of paragraph two. Changed - Spreadsheet is unclear Addressed Current Coord To S AFEB J AF/LEP AFKPPC AFKORC AF/XOOT Action, w/ comment wit comment Signature (Surname), Grade, Date Coordination Not Received Eng, GS-15,14 Nov 03 Barrett, Col, 6 Nov 03 Dittmer, Col, 14 Nov 03 Hershev. Colonel, 20 Nov 03 Comments See below JAdrnin) XOO secretary requests removal of Mai Gen (S) Peterson signature block S AFAQPF Coordination Not Received
8 - (Substantive) ARSPACEmANGE Section: Due to airspace limitations, desired "altitude block available form the surface/floor to 50K" could lead to acceptance of MOAATCAA without a low altitude capability (floor significantly greater than 500' AGL). Suggest delete 4Woor'' from minimum and desired requirements (Changed) - (Substantive) RUNWAY Section: f ~1,000' MSL is the desired runway elevation, the minimum requirement should be ~3,000' MSL, not 1,000' to 3,000' MSL (The minimum reauirement is to have a field elevation less than 3,000' MSL and the desired requirement of less than 1.000' MSL--this is portraved as a value between 1,000' and 3,000' MSL in the minimum reuuirement section) - (Adrnin) ARSPACE/RANGE Section: A "full scale weapons delivery" capable range might mot necessarily include live delivery capability. f live delivery is desired, suggest replace "full scale" with "live'' and leave "inert" weapons in the minimum requirements (Chanced to "live") - (Admin) AUX FELDjCARRER OPS Section: Having desired requirement of aux field w/in 50 NM and min requirement of not more than 50 NM is essentially the same thing. Suggest either delete the desired requirement bullet or decrease the desired requirement. Same comment for distance to carrier requirement (600 NM) (Chan~ed to reflect distanced greater than 50 NlW600 NM are unacceptable)
Proposed Establishment of and Modification to Restricted Areas; Fort Sill, OK
This document is scheduled to be published in the Federal Register on 10/19/2015 and available online at http://federalregister.gov/a/2015-26499, and on FDsys.gov 4910-13 DEPARTMENT OF TRANSPORTATION Federal
More informationSafety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.
Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation
More informationNextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures
NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationAmendment of Restricted Areas R-3004A and R-3004B and Establishment of R-3004C;
This document is scheduled to be published in the Federal Register on 09/25/2017 and available online at https://federalregister.gov/d/2017-20435, and on FDsys.gov 4910-13 DEPARTMENT OF TRANSPORTATION
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationPublic Comment on Condor MOA Proposal
Public Comment on Condor MOA Proposal Michael Wells, Lt. Colonel (retired) P.O. Box 274 Wilton, ME 04294 20 November, 2009 1. As a retired Air Force Lt. Colonel, squadron commander, F-15 Instructor Pilot,
More informationAirspace Establishment Project Frequently Asked Questions Permanent SUA and Environmental Assessment March 2019
OVERVIEW OF PERMANENT SPECIAL USE AIRSPACE ESTABLISHMENT AND MODIFICATIONS AT MARINE AIR GROUND TASK FORCE TRAINING COMMAND, TWENTYNINE PALMS, CA 1. What is Special Use Airspace (SUA)? Special Use Airspace
More informationICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration
ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date:
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationWhat Is The 29Palms Training Land Acquisition and Airspace Establishment Project Frequently Asked Questions Airspace Related July 2015
MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps
More informationDEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION ADOPTION OF ENVIRONMENTAL IMPACT STATEMENT AND FAA RECORD OF DECISION FOR
DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION ADOPTION OF ENVIRONMENTAL IMPACT STATEMENT AND FAA RECORD OF DECISION FOR Establishment of the Powder River Training Complex Located in Montana,
More informationII.J. 14 CFR and Publications
References: 14 CFR Parts 1, 61, 91; NTSB Part 830; AC 00-2; FAA-H-8083-25; POH/AFM; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should
More informationUniversity Architect & VP for Facilities Policy & Procedure #30
University Architect & VP for Facilities Policy & Procedure #30 TITLE: OBJECTIVE AND PURPOSE RESPONSIBILITY USE OF CHARTER AIRCRAFT FOR RESEARCH PURPOSES To set forth procedures governing the chartering
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationB GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:
2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus
More informationRecommendations for Northbound Aircraft Departure Concerns over South Minneapolis
Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationHOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004
HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division Letter of Agreement Revised: July 25, 2004 Effective: July 25, 2004 Purpose Scope This Letter of Agreement (LOA) establishes operating
More informationFresno Area Mid-Air Collision Avoidance Program (MACA) California Air National Guard 144 th Fighter Wing, Fresno, CA
Fresno Area Mid-Air Collision Avoidance Program (MACA) California Air National Guard 144 th Fighter Wing, Fresno, CA As of March 2013 Mid-Air Collision Avoidance This briefing contains material that can
More informationUSA Near-Term Progress for Closely Spaced Parallel Runways
2005 The MITRE Corporation. All rights reserved. USA Near-Term Progress for Closely Spaced Parallel Runways Wakenet 2 Europe November 30, 2005 This is the copyright work of The MITRE Corporation, and was
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes
More informationMemorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:
Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel
More informationAppendix H. Civilian Airfield Analysis
NAS Whidbey Island Complex Growler DEIS, Volume 2 November 2016 Appendix H Civilian Airfield Analysis H-1 Appendix H NAS Whidbey Island Complex Growler DEIS, Volume 2 November 2016 This page intentionally
More informationWhat Is The Proposed 29Palms Training Land Acquisition and Airspace Establishment Project? Frequently Asked Questions Airspace Related June 2014
MARINE CORPS / DEPARTMENT OF THE NAVY SUBMIT SPECIAL USE AIRSPACE PROPOSALS TO THE FEDERAL AVIATION ADMINISTRATION TO MEET MARINE EXPEDITIONARY BRIGADE TRAINING REQUIREMENTS 1. Why has the Marine Corps
More informationAppendix A. Meeting Coordination. Appendix A
Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM
More informationPUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006
PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing
More informationDCA Airport Noise. MWAA WG Dec 15, 2016
DCA Airport Noise MWAA WG Dec 15, 2016 BACKGROUND FAA Next Gen noise Analyzed on macro level Data below 3K Ft under estimated community level impacts Primary focus has been on departure procedures 1 part
More informationMarch 2016 Safety Meeting
March 2016 Safety Meeting AC 61 98C Subject: Currency Requirements and Guidance for the Flight Review and Instrument Proficiency Check Date: 11/20/15 AC No: 61-98C Initiated by: AFS-800 Supercedes: AC
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement 21 SEPTEMBER 2017 MAINTENANCE EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM F-15A/B/C/D
More informationSubmission to NSW Koala Strategy Consultation Process. March 2017
Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationPBN/TF/7 DRAFT Appendix D to the Report D-1
DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.
More informationTERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office
TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator
More informationLarge Airtanker Scenario (Scenario 1: Regional Fire)
Large Airtanker Scenario (Scenario 1: Regional Fire) ABN 96 105 736 392 Level 5 / 340 Albert Street EAST MELBOURNE VICTORIA 3002 AUSTRALIA tenders@nafc.org.au Copyright 2012, All rights reserved. Copyright
More information4.2 AIRSPACE. 4.2 Airspace. Supplemental Draft Environmental Impact Statement August 2008 Military Training Activities at Mākua Military Reservation
4.2 AIRSPACE 4.2.1 Impact Methodology Impacts on airspace use were assessed by evaluating the potential effects of the proposed training activities on the principal attributes of airspace use, as described
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE MANUAL 13-215 VOLUME 1 11 FEBRUARY 2019 Nuclear, Space, Missile, Command, and Control AIRFIELD OPERATIONS DATA SYSTEMS COMPLIANCE WITH THIS PUBLICATION
More informationBoston Logan. Airport Noise Study
Boston Logan International Airport Boston Logan Airport Noise Study Level 3 Screening Analysis December 2012 Prepared by Ricondo & Associates, Inc. Prepared for Federal Aviation Administration in collaboration
More informationImpact of Equipage on Air Force Mission Effectiveness
Impact of Equipage on Air Force Mission Effectiveness Presentation at ICCRTS 28 September 2006 Slide 1 Background On 3 April 1996 a military version of the Boeing 737 crashed in Dubrovnik, Croatia Sec.
More informationPacific Project. CPWG/8 - WP/6 Appendix A
Pacific Project CPWG/8 - WP/6 Pacific Project Objective This project aims to substantially improve operational efficiency and environmental outcomes on the major air traffic flow between North America
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationMidAir Collision Avoidance (MACA) Program. Luke Air Force Base, Arizona TRAINING THE WORLD S BEST F-35 & F-16 FIGHTER PILOTS!
MidAir Collision Avoidance (MACA) Program Luke Air Force Base, Arizona TRAINING THE WORLD S BEST F-35 & F-16 FIGHTER PILOTS! JANUARY 2017 Page i Luke AFB - MACA Program Dear Fellow Aviators, Midair collisions
More informationPowder River Training Complex Commonly Asked Questions September 15, 2010
Powder River Training Complex Commonly Asked Questions September 15, 2010 QUESTION: Why is this expansion needed? Answer: Realistic and effective training. Twenty years ago, enemy surface-to-air threats
More informationRegular Board Meeting August 4, 2015
Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationFresno Area Mid-Air Collision Avoidance Program (MACA)
Fresno Area Mid-Air Collision Avoidance Program (MACA) 144 th Fighter Wing California Air National Guard Fresno, CA 1 This pamphlet is courtesy of the 144 th Fighter Wing located at the California Air
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 11-201 30 NOVEMBER 2018 Flying Operations FLIGHT INFORMATION PUBLICATIONS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 241 61 Grange Road, Elk Grove Village October 3, 215 through October 19, 215 USH8-ILH55-ILS28 Visit the O Hare Noise webpage on the
More informationChapter 6. Nonradar. Section 1. General DISTANCE
12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG
More informationUAS Program. Todd Graetz Director, Technology Services UAS Program / Advanced Train Operations 1
UAS Program Todd Graetz Director, Technology Services UAS Program / Advanced Train Operations 1 The elements of the program Business requirements Line of Sight (LOS) Implementation Applications Data/product
More information40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS
40 BEALEAFBI11-250 1 OCTOBER 2012 Chapter 8 RQ-4 OPERATIONS 8.1. CERTIFICATE OF AUTHORIZATION. Pilots will comply with each COA and LOA in effect between Beale and other Air Traffic Control (ATC) facilities.
More informationNew Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together
Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th
More informationHQ AFSVA/SVPAR. 1 May 2009
HQ AFSVA/SVPAR Annual Certified Flight Instructor (CFI) Exam 1 May 2009 (Required passing score: 80%) (Supplement with 2 local CFI specific questions) Please do not mark on booklet 1 Annual Certified Flight
More informationFlying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance
Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline
More informationDECISIONS ON AIR TRANSPORT LICENCES AND ROUTE LICENCES 4/99
UNITED KINGDOM CIVIL AVIATION AUTHORITY DECISIONS ON AIR TRANSPORT LICENCES AND ROUTE LICENCES 4/99 Decision of the Authority on its proposal to vary licence 1B/10 held by British Airways Plc and licence
More information[Docket No. FAA ; Directorate Identifier 2005-NM-056-AD; Amendment ; AD ]
[Federal Register: June 7, 2006 (Volume 71, Number 109)] [Rules and Regulations] [Page 32811-32815] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr07jn06-3] DEPARTMENT OF
More informationACTION: Notice of a new task assignment for the Aviation Rulemaking Advisory Committee
This document is scheduled to be published in the Federal Register on 09/18/2015 and available online at http://federalregister.gov/a/2015-23433, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationJune 2009 BOI DOC 3-1
Draft Environmental Assessment for Proposed Airspace Changes for Paradise East and Paradise West Military Operations Areas (MOAs) at Mountain Home Air Force Base (MHAFB) Idaho June 2009 BOI070850106.DOC
More informationLEYELOV I I ... ** L 8. I *~~~~~...i DATA PACKAGE IVM, 8~ AIRPORT IMPROVEMVENT TASK FORCE DELAY STUDIES
R DAO99 871 PEAT MARWICK MITCHELL AND CO SAN FRANCISCO CALIF F/S 1/2 NEW YORK AIRPORTS DATA PACKAGE NUMBER A, JOHN F KENNEDY INTERN--ETC(U) DEC 79 DOT-FA77WA- 3961 INCLASSIFI ED NL ED LEYELOV I I DATA
More informationMr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation
Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER 30TH SPACE WING 30TH SPACE WING INSTRUCTION 13-205 2 OCTOBER 2006 Certified Current 18 September 2017 Space Missile Command and Control RESTRICTED AREA/DANGER ZONE ENTRY ACCESSIBILITY:
More informationAtlanta NextGen PBN Activities
Atlanta NextGen PBN Activities Presentation to: Name: Date: EWG Ops SC Meeting Jim Arrighi RNAV/RNP Group Jim Allerdice A80 May 18, 2010 0 0 Atlanta Performance Based Navigation Project Planning Seven
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationSITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL
******************************************** * Federal Airways & Airspace * * Summary Report * ******************************************** File: User Assigned File Name Latitude: NAD83 Coordinate Longitude:
More informationLunch & Learn Webinar: CAPR 70-1 Overview
Civil Air Patrol Lunch & Learn Webinar: CAPR 70-1 Overview Presenter John Moose Desmarais Director of Operations National Headquarters Rules of Engagement Members in the field will be in listen only mode.
More informationAppendix B. Comparative Risk Assessment Form
Appendix B Comparative Risk Assessment Form B-1 SEC TRACKING No: This is the number assigned CRA Title: Title as assigned by the FAA SEC to the CRA by the FAA System Engineering Council (SEC) SYSTEM: This
More informationFeasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures
Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures Implications of a Pilot Survey and Laboratory Simulations Dr. Anand M. Mundra
More informationEdmund Averman, Attorney, AGC-210. Response to Request for Interpretation of 14 C.F.R (b)
Federal Aviation Administration Memorandum Date: May 23, 2017 To: From: Prepared by: Subject: Jo 1. S(:, 9~~~irector, Flight Standards Service, AFS-1. f~feca. Pete;, Assistant Chief Counsel for Regulations,
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 2198 5N67 Rochefort Lane, Wayne May 9, 218 through June 3, 218 USH6-ILH49-ILS25 Visit the O Hare Noise webpage on the Internet at
More informationAeronautics Math. Douglas Anderson Arellanes Junior High School Santa Maria-Bonita School District
Aeronautics Math Douglas Anderson Arellanes Junior High School Santa Maria-Bonita School District Description: We will review aircraft weight and balance and use our knowledge of equations to determine
More informationNOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018
NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationFACTUAL REPORT AVIATION
Aircraft Registration Number: N235BW Occurrence Date: Occurrence Type: 0/0/2003 Accident Most Critical Injury: Minor Investigated By: NTSB Location/Time Nearest /Place Melbourne Zip Code Local Time Time
More informationReview of Airport Noise Issues East Airfield Development Area
Review of Airport Noise Issues East Airfield Development Area Orlando International Airport April 21, 2011 Agenda Review of Meeting Minutes from April 21 When last we met Airport Noise 101 Cyrus Callum
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 2117 5843 N. Christiana Avenue, Chicago July 14, 217 through August 2, 217 USH5-ILH15-ILS8-CHI39 Visit the O Hare Noise webpage on
More information** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **
Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth, TX 76137 Issued Date: 05/16/2011 Aeronautical Study No.
More informationSafety and Airspace Regulation Group
Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the
More informationAmendment Docket No. FAA ; Directorate Identifier 2002-NM-12-AD
Page 1 2009-26-03 BOEING Amendment 39-16138 Docket No. FAA-2009-0911; Directorate Identifier 2002-NM-12-AD PREAMBLE Effective Date (a) This AD becomes effective February 1, 2010. Affected ADs (b) None.
More informationAviation Noise and Emissions Symposium February 27, 2018
National Aeronautics and Space Administration Aviation Noise and Emissions Symposium February 27, 2018 Chuck Johnson Senior Advisor for UAS Integration on behalf of Dr. Parimal Kopardekar Senior Technologist
More informationEstablish the Delta Military Operations Area Environmental Assessment
Establish the Delta Military Operations Area Environmental Assessment January 2010 Acronyms and Abbreviations degree F degree Fahrenheit µg/m 3 micrograms per cubic meter 11 AF 11 th Air Force 3 WG 3 rd
More informationNAVIGATION: CHARTS, PUBLICATIONS, FLIGHT COMPUTERS (chapters 7 & 8)
NAVIGATION: CHARTS, PUBLICATIONS, FLIGHT COMPUTERS (chapters 7 & 8) LONGITUDE AND LATITUDE 1. The location of an airport can be determined by the intersection of lines of latitude and longitude. a. Lines
More informationPORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016
PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project
More informationmsp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010
MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September
More informationNOISE ABATEMENT PROCEDURES
1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions
More informationACTION: Notice of new task assignment for the Aviation Rulemaking Advisory Committee
This document is scheduled to be published in the Federal Register on 08/14/2013 and available online at http://federalregister.gov/a/2013-19739, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION
More informationDEPARTMENT OF HOMELAND SECURITY. U.S. Customs and Border Protection. 19 CFR Part 122. CBP Dec
This document is scheduled to be published in the Federal Register on 09/26/2014 and available online at http://federalregister.gov/a/2014-22939, and on FDsys.gov 9111-14 DEPARTMENT OF HOMELAND SECURITY
More informationLetter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008
Letter of Agreement Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Purpose: This Letter of Agreement (LOA) outlines standard operating policies and procedures to
More informationSPEED RALLY NAVIGATION CHALLENGE RULES AND REGULATIONS
SOUTH AFRICAN POWER FLYING ASSOCIATION SPEED RALLY NAVIGATION CHALLENGE RULES AND REGULATIONS Revision 3 Dec 2018 1 TABLE OF CONTENTS 1 AIMS FOR FUN FLYING...2 2 GENERAL RULES...3 3 COMPETITION DETAILS...4
More informationA Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures
A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures Dr. Ralf H. Mayer Dennis J. Zondervan Albert A. Herndon Tyler Smith 9 th USA/EUROPE Air Traffic Management
More informationCONSTRUCCIONES AERONAUTICAS, S.A. (CASA)
Page 1 2008-09-22 CONSTRUCCIONES AERONAUTICAS, S.A. (CASA) Amendment 39-15503 Docket No. FAA-2007-0048; Directorate Identifier 2007-NM-181-AD PREAMBLE Effective Date (a) This airworthiness directive (AD)
More informationNASA s Air Traffic Management Research Shon Grabbe SMART-NAS for Safe TBO Project Manager. Graphic: NASA/Maria Werries
NASA s Air Traffic Management Research Shon Grabbe SMART-NAS for Safe TBO Project Manager Graphic: NASA/Maria Werries 1 Why is aviation so important? The air transportation system is critical to U.S. economic
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 2114 5516 N. Neenah Avenue, Chicago July 12, 217 through August 9, 217 USH5-ILH19-ILS1-CHI45 Visit the O Hare Noise webpage on the
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 299 93 Wilshire Avenue, Elk Grove Village June 27, 217 through July 1, 217 USH8-ILH55-ILS28 Visit the O Hare Noise webpage on the
More informationChapter 1 Introduction and Project Overview
Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier
More informationValidation Plan & Objectives. Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017
Validation Plan & Objectives Maik Friedrich, DLR PJ05 Braunschweig, 22 of November 2017 Validation Plan Overview of Remote Tower Activities in SESAR 2020 2 Remote Tower PJ.05 DLR (AT-One) Remotely Provided
More informationCOVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization
COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in
More informationExplanatory Note to Decision 2015/001/R. Update of CS ADR-DSN.D.260 Taxiway minimum separation distance CS-ADR-DSN Issue 2
Update of CS ADR-DSN.D.260 Taxiway minimum separation distance CS-ADR-DSN Issue 2 RELATED NPA/CRD 2014-21 RMT.0591 29.01.2015 EXECUTIVE SUMMARY The purpose of this amendment of Certification Specifications
More information