ICAO EXPERT GROUPS PROPOSAL

Size: px
Start display at page:

Download "ICAO EXPERT GROUPS PROPOSAL"

Transcription

1 CANSO

2 ICAO EXPERT GROUPS PROPOSAL CANSO Global ATM Operations Conference Chris Dalton Chief, ATM Section, Air Navigation Bureau CANSO

3 ANB Proposal NGAP FRMSTF ICSG MPSG HPSG CFCG INTEGRATION OPERATIONS Flight Operations FLIREC WG ATM Operations WTSG Instrument Trajectory Based Flight Procedures Operations PBN WG Airspace Capacity RPAS and Operations Efficiency Operations Aerodrome Design & Operations Design WG Cargo Safety Dangerous Goods SAS WG ATMR WG Ops WG ENABLERS Communications Navigation Surveillance Op. Data Link WG Data Com Infra WG Voice Com WG Freq. Spec. Mgt. WG ASTAF System Wide Information Management AIS-AIMSG Meteorology SADISOPSG WAFSOPSG IVATF IAVWOPSG SPECIALTY Airworthiness Safety Management Accident Investigation AIMSG CANSO March

4 ANC Proposal NGAP FRMSTF ICSG MPSG HPSG CFCG INTEGRATION Air Navigation System Integration Remotely Piloted Aircraft Systems Integration OPERATIONS Flight Operations FLIREC WG ATM Operations WTSG Trajectory Based Operations IFP WG Airspace Capacity and Efficiency Operations Net. Ops. WG Aerodrome Design & Operations Design WG SAS WG Ops WG ENABLERS Frequency Spectrum Management Communications Navigation Surveillance Op. Data Link WG PBN WG ASTAF Data Com Infra WG Voice Com WG System Wide Information Management AIS-AIMSG Meteorology SADISOPSG WAFSOPSG IVATF IAVWOPSG SPECIALTY Airworthiness Dangerous Goods Safety Management CANSO March

5 PANEL Aerodrome Design and Operations Panel (ADOP) ANB Proposal (Appendix D of AN-WP/8849) WORKING GROUP Design Working Group (DESIGN WG) Operations Working Group (OPS WG) Accident Investigation Panel (AIP) Accident Investigation Panel-Accident Investigation Methodology Group (AIMSG) Airworthiness Panel (AIRP) Air Traffic Management Operations Panel (ATMOPSP) Communications Panel (CP) Air Traffic Management Requirements and Performance Working Group (ATMRP WG) Separation and Assurance Working Group (SAS WG) Wake Turbulence Study Group (WTSG) Data Communication Infrastructure Working Group (CDI WG) Frequency Spectrum Management Working Group (FSM WG) Operational Data Link Working Group (OPDL WG) Voice Communication Working Group (VOICECOM WG) Cargo Safety Panel (CSP) Dangerous Goods Working Group (DG WG) Flight Operations Panel (FLTOPSP) Flight Recorder Working Group (FLIREC WG) Instrument Flight Procedures Panel (IFPP) Performance-based Navigation Working Group (PBN WG) Meteorology Panel (METP) International Airways Volcano Watch Operations Group (IAVWOPSG) Meteorological Aeronautical Requirements & Info. Exchange Project Team (MARIE-PT) Satellite Distribution System Operations Group (SADISOPSG) World Area Forecast System Operations Group (WAFOPSG) CANSO 12 March

6 PANEL ANB Proposal (Appendix D of AN-WP/8849) WORKING GROUP Navigation Panel (NP) Remotely Piloted Aircraft Operations Panel (RPAOP) Safety Management Panel (SMP) Surveillance Panel (SP) System wide Information Management Panel (IMP) Airborne Surveillance Task Force (ASTAF) Aeronautical Information Systems Aeronautical Information Management Study Group (AIS-AIMSG) CANSO 12 March

7 Proposed Expert Groups Transition Plan 2014 DEVELOPMENT PREVIOUS ACTIVITIES ANC/ANB Council Safety Informal Briefing (Jan 20) COMMUNICATIONS: EXPERTS P/ANC Letters to Current Panel Members (Mid March) Council Comprehensive briefing on Panel Modernization and Work Programme Restructure (May 2) Comprehensive briefing on proposed Safety & Air Navigation work programme to the ANC (Jan 23) ANC Working Paper on Safety and Air Navigation work programme (Mar 11) General Letter to Panels for Advisers & Observers (Mid March) COMMUNICATIONS: STATES Generic State Letter on Panels (Mid March) Specific State Letters for Panels Completion of Panel Modernization and Work Programme Restructure (June 30) For Affected & New Groups Update of the new restructured Safety and Air Navigation Work Programme (31 Dec) Progressive implementation of new Panel Structure, ToR and deliverables (Continuing) For Affected & New Groups CANSO

8 Deliverables during the last Triennium (2013) Annex 1 Annex 3 Annex 4 Annex 6 Annex 8 Annex 10 Annex 11 Annex 13 Annex 14 Annex 15 Annex 18 Annex 19 DOC 9284 DOC 9365 DOC 9379 DOC 9481 DOC 9766 DOC 9859 DOC 9992 DOC 9993 DOC 9995 DOC 9997 DOC 9998 CANSO 12 March

9 CANSO March DRAFT - FOR DISCUSSION PURPOSE ONLY 9

10 CANSO March DRAFT - FOR DISCUSSION PURPOSE ONLY 10

11 CANSO

12 ikit Deliverable Breakdown Example ikit ROI-4: Improve safety performance at or in the vicinity of aerodromes ikit 2016: Enhancing Safety at Aerodromes ROI : Reduction of runway excursions through the use of a global reporting format for effective runway surface condition assessment and friction reporting Phase 1 Annex 3: Provisions for accommodating new global reporting format in relation to METAR/SPECI Annex 6, Part I: Technology for runway safety (on-board equipment) provisions Annex 8: Aircraft performance SARPs for new global reporting format Annex 14, Volume I: Harmonization of runway surface condition assessment and reporting Annex 15: Provisions for promulgating runway surface conditions using new global reporting format PANS-ATM: Procedures and phraseologies to address transmittal of runway surface conditions Training elements 12-Mar-14 12

13 Benefits Transparency Tool for prioritization Plain language Clear message in terms of ROI Easy for implementation CANSO 12-Mar-14 13

14 CANSO

15 CANSO

ICAO Air Navigation Panels, Work Programme

ICAO Air Navigation Panels, Work Programme APIRG/17-IP/4IP/4 ICAO Air Navigation Panels, Study Groups and Task Forces Work Programme G. DE LEON International Civil Aviation Organization SEVENTEENTH MEETING OF THE AFI PLANNING AND IMPLEMENTATION

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/21 Business case Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of Business

More information

Providing the Context Air Navigation Integrated Work Programme

Providing the Context Air Navigation Integrated Work Programme Providing the Context Air Navigation Integrated Work Programme Michael Hohm Technical Officer, Airspace Management & Optimization IMP Secretary International Civil Aviation Organization (ICAO) 26 January

More information

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting International Civil Aviation Organization ICAO Updates 13 th COSCAP-NA Steering Committee Meeting ICAO Updates Airworthiness Manual DOC 9760 Annex 1 Pilot Upper Age Annex 2 Remotely Piloted Aircraft Annex

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Accept, Sir/Madam, the assurances of my highest consideration.

Accept, Sir/Madam, the assurances of my highest consideration. Tel.: +1 514-954-8219 ext. 6107 Ref.: SP 73/1 IND/15/7 6 March 2015 Subject: Invitation to the First Meeting of the Meteorology Panel (METP/1), to be held from 20 to 24 April 2015 Action Required: Confirm

More information

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2.

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2. 15/ 2/13 INTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG)) SEVENTH MEETING Bangkok, Thailand, 18 to 22 March 2013 Agenda Item 3: Follow-up of IAVWOPSG/6 conclusions STATUS OF FOLLOW-UP OF

More information

2018 Annex Amendments

2018 Annex Amendments 2018 Annex Amendments TOPICS Introduction of remote pilot licence and the provision for the regulation of RPAS licensing to support international flights operating under IFR Amendment as a result of proposed

More information

ICAO UPDATE. (Presented by the Secretariat)

ICAO UPDATE. (Presented by the Secretariat) International Civil Aviation Organization 29/05/15 CAR/SAM Planning and Implementation Regional Group (GREPECAS) Third Meeting of the Programmes and Projects Review Committee (PPRC/3) (Mexico City, Mexico,

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March RPAS Panel. Leslie Cary, RPAS Programme Manager, ICAO Randy Willis, RPAS Panel Chairman

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March RPAS Panel. Leslie Cary, RPAS Programme Manager, ICAO Randy Willis, RPAS Panel Chairman REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 RPAS Panel Leslie Cary, RPAS Programme Manager, ICAO Randy Willis, RPAS Panel Chairman 1 RPAS Panel Objective Facilitate the safe, secure and

More information

AIXM/WXXM CONFERENCE 2010

AIXM/WXXM CONFERENCE 2010 AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM

More information

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1. International Civil Aviation Organization IVATF/2-WP/21 10/6/11 WORKING PAPER INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF) SECOND MEETING Montréal, 11 to 15 July 2011 Agenda Item 5: Report of the International

More information

ICCAIA CNS-ATM Committee Report to Council

ICCAIA CNS-ATM Committee Report to Council ICCAIA CNS-ATM Committee Report to Council (Montréal, Canada 16 May 2017) Committee organization & administration Update on Committee activities Issues for information and/or decision T. Murphy CNS-ATM

More information

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG MID Region AIM SG/2 AIS-AIM Study Group 31 August 2015 Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG AIS-AIM Study Group Active since end 2008 Objectives Global strategy/roadmap for the transition from

More information

New ICAO Runway Safety Provisions

New ICAO Runway Safety Provisions New ICAO Runway Safety Provisions Yong Wang Chief, Airport Operations and Infrastructure, ANB/ICAO Flight Plan Assembly Resolution on Runway Safety Overview of ICAO Documentation New ICAO Provisions Ongoing

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20 NPF/SIP/2011-WP/20 Aerodrome Safety Saulo Da Silva International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1

More information

SAMPLE TEMPLATE APPENDIX 3.5C-1

SAMPLE TEMPLATE APPENDIX 3.5C-1 APIRG/19 Appendix 3.5 C1-C3 SAMPLE TEMPLATE APPENDIX 3.5C-1 AIR NAVIGATION REPORT FORM (ANRF) ASBU METHODOLOGY Regional and National planning for all ASBU Modules REGIONAL/NATIONAL PERFORMANCE OBJECTIVE

More information

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) AIS-AIMSG/9-SN/12 20/04/2014 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG) NINETH MEETING Tokyo, Japan, 21 to 25 April 2014 Agenda Item 4 Aeronautical

More information

MEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG

MEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG International Civil Aviation Organization METPWGMOG/8/SN/19 30/10/18 STUDY NOTE MEETING OF THE METEOROLOGY PANEL (METP) WORKING GROUP MOG EIGHTH MEETING Wellington, New Zealand, 12 to 14 ember 2018 Agenda

More information

International Civil Aviation Organization. (Presented by the Secretariat) Adopted and approved amendments to ICAO Annexes and PANS

International Civil Aviation Organization. (Presented by the Secretariat) Adopted and approved amendments to ICAO Annexes and PANS International Civil Aviation Organization 28/01/2017 Middle East Air Navigation Planning and Implementation Regional Group Sixteenth Meeting (MIDANPIRG/16) (Kuwait, 13 16 February 2017) Agenda Item 3:

More information

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide AIM WG: Contributing to ATM Success Roland Baumann Head Planning & Development AIM skyguide AIM Contributing to ATM Success change of the value proposition towards ATM Information Management Services the

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

Elie El Khoury ICAO Regional Officer ATM/SAR Middle East Office Cairo/

Elie El Khoury ICAO Regional Officer ATM/SAR Middle East Office Cairo/ Remotely Piloted Aircraft Systems (RPAS) Elie El Khoury ICAO Regional Officer ATM/SAR Middle East Office Cairo/23 2016 Outline ICAO RPAS Programme Team Background RPAS Panel UA vs RPA Next steps Regional

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

ICAO Initiatives on Global Tracking

ICAO Initiatives on Global Tracking ICAO Initiatives on Global Tracking Nancy Graham Director, Air Navigation Bureau, ICAO Expert Dialogue on Real-time Monitoring of Flight Data, including the Black Box the Need for International Standards

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

ASBU modules mapped to Work Programme

ASBU modules mapped to Work Programme APTA Airport Accessibility 8-Jan-15 Page 1 of 29 B0 APTA 1162 Annex 10 - Vol I / Completed 265 Annex 10 - Vol I / Standards on SBAS Cat I 30-Jun-10 ROI-8-2016-1 Completed 1163 Annex 11 / 1159 PANS-ATM

More information

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES Air Law and ATC Procedures Subject: Classroom Instruction: YES (Workshop) Appr. # of Instruction Hrs: 3 Internal Examination: YES ITSS (online) / Offline International Law: Conventions, Agreements and

More information

Montreal, 15. (Presented SUMMARY

Montreal, 15. (Presented SUMMARY DGP-WG/2011-IP/4 18/10/12 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, 15 to 19 October 2012 Agenda Item 6: Other business REGULATORY FRAMEWORK FOR REMOTELY PILOTED AIRCRAFT

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

Implementation Planning and Support Section (Safety)

Implementation Planning and Support Section (Safety) Implementation Planning and Support Section (Safety) http://www.icao.int/safety/implementation 39 th Assembly, Montreal, Canada 27 September 7 October 2016 21 September 2016 2 Needs Analysis / Validation

More information

International Civil Aviation Organization. Runway and Ground Safety Working Group

International Civil Aviation Organization. Runway and Ground Safety Working Group International Civil Aviation Organization Runway and Ground Safety Working Group Third Meeting (RGS WG/3) (Cairo, Egypt, 19-22 September 2016) Agenda Item 3: Implementation of Aerodrome Safety Priorities

More information

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018 AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO

More information

Remotely Piloted Aircraft Systems (RPAS)

Remotely Piloted Aircraft Systems (RPAS) Remotely Piloted Aircraft Systems (RPAS) Seminar LACAC/FAA/IATA on Unmanned Aircraft Systems (UAS) and Fatigue Risk Management Systems (FRMS) (Santo Domingo, Dominican Republic, July, 2016) ICAO NACC Regional

More information

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN Vince Galotti Deputy Director, Safety Standardization & Infrastructure Air Navigation Bureau International Civil Aviation Organization

More information

RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE. Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014

RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE. Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014 RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014 ..THIS MORNING THE BIG and now the small picture. TOPICS CURRENT : ANNEX 14 VOL 1 PROVISIONS RELATED TO RUNWAY

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

RMT.0464 ATS Requirements

RMT.0464 ATS Requirements RMT.0464 ATS Requirements Fabio GRASSO EASA ATM/ANS Regulations Officer 8th FISO Seminar 06.09.2017 TE.GEN.00409-001 ATS provision in EU legislation - Today EU Member States obligations towards the Chicago

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) ATM SG/4-WP/22 22/04/2018 International Civil Aviation Organization MIDANPIRG Air Traffic Management Sub-Group Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018) Agenda Item 6: ATM Safety Matters

More information

Safety Management 1st edition

Safety Management 1st edition Annex 19 Safety Management 1st edition ISM Integrated Safety Management 10 June 2013 initial version Page 1 Why a new Annex? Page 2 Why a New Annex? The ICAO High-level Safety Conference (HLSC) held in

More information

The Legal Framework for RPAS/UAS Suitability of the Chicago Convention and its Annexes

The Legal Framework for RPAS/UAS Suitability of the Chicago Convention and its Annexes The Legal Framework for RPAS/UAS Suitability of the Chicago Convention and its Annexes 27 May 2013 Page 1 Non-Lawyers 27 May 2013 Page 2 Lawyers 27 May 2013 Page 3 Is the Chicago Convention Suitable? م

More information

Regional implementation ASBU Bn-AMET

Regional implementation ASBU Bn-AMET Regional implementation ASBU Bn-AMET Christopher Keohan Regional Officer Air Navigation Systems Meteorology EUR/NAT ICAO RO Vienna/13 October 2015 Global Air Navigation Plan Aviation System Block Upgrade

More information

Regional Capacity Building

Regional Capacity Building Regional Capacity Building Capt. Pu Fang Hui Assosiate Safety Oversight Officer International Civil Aviation Organization (ICAO) Asia and Pacific office 17th SCM / 9-12 May 2017 - Busan State obligation

More information

What is safety oversight?

What is safety oversight? What is safety oversight? ATM SAFETY MANAGEMENT SYSTEM AUDITORS SEMINAR FOR CAR/SAM REGIONS Mexico City, Mexico, 05-09 December 2005 ICAO Universal Safety Oversight Audit Programme /USOAP Safety oversight

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East

International Civil Aviation Organization. Regional Aviation Safety Group - Middle East RASG-MID/5-WP/10 16/5/2016 International Civil Aviation Organization Regional Aviation Safety Group - Middle East Fifth Meeting (RASG-MID/5) (Doha, Qatar, 22-24 May 2016) Agenda Item 3: Regional Performance

More information

ICAO Annex 14 Standards and Aerodrome Certification

ICAO Annex 14 Standards and Aerodrome Certification ICAO Annex 14 Standards and Aerodrome Certification Punya Raj Shakya Regional Officer Aerodromes and Ground Aids, ICAO Asia/Pacific Regional Office (Bangkok) ICAO Workshop for Pacific Island States, 12-15

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

FIJI AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Republic of Fiji

FIJI AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Republic of Fiji FIJI AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Republic of Fiji ISO 9001/2015 CERTIFIED Tel: (679) 6721 555; Fax (679) 6721 500 Website: www.caaf.org.fj

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need

More information

Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST)

Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST) International Civil Aviation Organization Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST) Protocol Question (PQ) updates Module 5 bis 1 Module Objective

More information

Manual of Radiotelephony

Manual of Radiotelephony Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments

More information

AMOs approval and global recognition Status update

AMOs approval and global recognition Status update AMOs approval and global recognition Status update 2017 ARSA Annual Repair Symposium Washington DC, 16-17 March Capt. Miguel Marin Acting Chief, Operational Safety Section Overview ICAO 101 Status update

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Legal regulations in transport policy

Legal regulations in transport policy Air Legal regulations in transport policy Lecture 2 Anna Kwasiborska, PhD Air Flying is becoming easier and cheaper, with new airlines, more routes and hundreds of services connecting large numbers of

More information

Amendment 13 to Annex 14, Volume I

Amendment 13 to Annex 14, Volume I Amendment 13 to Annex 14, Volume I Yong Wang Chief, Airport Operations and Interoperability, ICAO Council Adoption 22 February 2016 Fifth meeting of its 207th Session Effective on 11 July 2016 Applicable

More information

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL From AIS to AIM Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL AIS-AIM Study Group Active from 2008-2015 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance

More information

International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety

International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety 28/05/2012 International Civil Aviation Organization First Meeting of the RASG-MID Steering Committee (RSC/1) (Cairo, Egypt, 18 20 June 2012) Agenda Item 2: Global Developments related to Aviation Safety

More information

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,

More information

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project Presented by Mohammad Al Dossari Director Air Navigation & Aerodromes Department General Civil Aviation Authority United Arab

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/14 27/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG/2) Rome Italy, 4 to 8 May 2015 Agenda Item 4 : Active

More information

Appendix A REQUEST FOR AUTHORIZATION FORM

Appendix A REQUEST FOR AUTHORIZATION FORM Appendix A REQUEST FOR AUTHORIZATION FORM Note. For details on completing this form, and for definitions of acronyms and abbreviations, see section on Information Required for the Assessment of Authorization

More information

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the

More information

ICAO Universal Safety

ICAO Universal Safety ICAO Universal Safety Oversight Audit Programme Overview of the ICAO Universal Safety Oversight Audit Programme - USOAP - Outline The National Safety Oversight System The Universal Safety Oversight Audit

More information

UPCOMING AMENDMENTS TO ANNEX 14 VOLUME I

UPCOMING AMENDMENTS TO ANNEX 14 VOLUME I UPCOMING ADCI TF/1-PPT/4 AMENDMENTS TO ANNEX 14 VOLUME I Joseph CHEONG, Technical Officer, Aerodromes Section, ICAO Montreal MAKING OF A SARP MAKING OF A SARP MAKING OF A SARP MAKING OF A SARP MAKING OF

More information

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March Detect and Avoid. DI Gerhard LIPPITSCH. ICAO RPAS Panel Detect & Avoid Rapporteur REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 Detect and Avoid DI Gerhard LIPPITSCH ICAO RPAS Panel Detect & Avoid Rapporteur Remotely Piloted Aircraft Systems (RPAS) Symposium, 23 25 March

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. ICAO Update Information Paper 1 (IP-1)

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. ICAO Update Information Paper 1 (IP-1) COSCAP South Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 26 th COSCAP-SA STEERING COMMITTEE MEETING ICAO Update Information Paper 1 (IP-1) (Presented by the

More information

United for Aviation Technology Services. Training Calendar

United for Aviation Technology Services. Training Calendar a United for Aviation Technology Services Training Calendar 2015-2016 Content 1 2 About United ATS Our Services 9 030 Aeronautical Meteorological Services 050 Air Traffic Control & Search and Rescue Services

More information

Global Operational Data Link Doc 10037

Global Operational Data Link Doc 10037 Global Operational Data Link Doc 10037 Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017 Prepared

More information

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS AFI Region Project Description Programme Title of the Project Start End Aeronautical Meteorology (B0-AMET PFF Project Facilitators: ICAO

More information

International Civil Aviation Organization Vacancy Notice

International Civil Aviation Organization Vacancy Notice International Civil Aviation Organization Vacancy Notice POSITION INFORMATION Post Title: Technical Officer, Personnel Licensing Vacancy Notice: 2018/25/P 102622 Level: P-4 Posting Period: 9 May 2018 10

More information

MID-SST/3-PPT/5 USOAP CMA UPDATE

MID-SST/3-PPT/5 USOAP CMA UPDATE MID-SST/3-PPT/5 USOAP CMA UPDATE 1 Outline 1) Critical Elements (CEs) 2) USOAP CMA Components a) Collection of Safety Information b) Determination of State Safety Risk Profile c) Prioritization and Conduct

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

Basic Building Block (BBB) Framework DRAFT APRIL 2018

Basic Building Block (BBB) Framework DRAFT APRIL 2018 Basic Building Block (BBB) Framework DRAFT APRIL 2018 METEOROLOGY MET BASIC MODULES AND ELEMENTS MET AERODROME METEOROLOGICAL OFFICE METEOROLOGICAL WATCH OFFICE Flight Briefing Service Met. Observation

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

MID Region Air Navigation Strategy

MID Region Air Navigation Strategy MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules

More information

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) APIRG/21 WP5/6 AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) Agenda Item 3: Performance Framework for Regional Air Navigation Planning

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information