1 Massport Study Team Evaluation of CAC Noise Study Alternatives October 2010
2 Massport s Evaluation Team Aviation Planning Capital Programs Aviation Operations Environmental Permitting Consultation with FAA BOS ATCT
3 NOTE This is a preliminary review only. It is intended to provide Massport s comments on certain BLANS Overflight Noise Study proposals. This analysis is not intended to be a commitment by Massport to implement any of the proposed alternatives discussed. The implementation of any final recommendation(s) that may result from the BLANS Study and accepted by Massport for potential implementation will be subject to: FAA review and approval; requisite federal and state environmental and regulatory review and approval; eligibility for and availability of federal funding; Massport s capital budget process; and approval by the Massport Board.
4 MPA Evaluation Team Review 1. Single Engine Taxiing (Alternative G N) 2. Limit Reduced Thrust (G F) 3. Holding Pad(s) (G J) 4. Run up Enclosure (G I)
5 1. Single Engine Taxiing Overview FAA has expressed concerns related to single engine taxiing and runway incursions particularly related to pilot work load and reducing heads down time on active taxiways/runways Massport will not take any action that will contribute to runway incursions Massport supports the use of single engine taxiing when safe to do so, voluntary and under the control of the pilot in command To be consistent with safety concerns but meet above goal (and the Airfield Improvements Projects MEPA section 61 commitment) Massport has issued letters of support and conducted informal surveys of single engine taxiing at Boston Logan MIT Survey of Single Engine Taxiing at Boston Logan Taxi Procedures and Fuel Efficiency Report: A Survey of Airline Pilots at Boston Logan, March 2010 A Survey of Airline Pilots Regarding Fuel Conservation Procedures for Taxi operations, March 2010 MIT Survey confirms that airlines are utilizing single engine taxiing extensively at Logan.
6
7 Single Engine Taxiing (Cont.) Massport will send letters to airlines on the use of single engine taxiing when safely appropriate. New updated letters will be sent this fall. Letters will be targeted to chief pilots with requests that they be shared with line pilots. The MIT survey and JetBlue Case Study highlights that short taxi distances and inclement weather reduce the likelihood that single engine taxiing will be used by pilots. The survey also shows that single engine taxiing is more prevalent during the arrival phase of flight. As a result, Massport will tailor the message to the airline pilot community regarding the optimal use of single engine taxiing at Logan to reflect these operational realities. Massport will also continue to track the use of single engine taxiing through periodic surveying of the airlines. The periodic surveys will continue to the extent that the information provided contributes to the overall understanding of the use of this procedure. In the spirit of achieving the intent of the CAC proposal, Massport is supporting an ongoing NextGen type research being conducted at Boston Logan by the FAA s PARTNER/MIT initiative (Massport is an active member of PARTNER). This research involves optimizing taxiing strategies for the FAA Airport Traffic Control Tower (ATCT) to reduce ground delays, which in effect can reduce emissions and noise exposure levels. Boston Logan is hosting the research team this summer and Massport is looking forward to any tangible benefits that may result from this work. Massport will share the final report with the CAC and will continue to support ongoing assessment and application of this strategy. Massport will include the results of the MIT single engine taxiing survey in the 2009 EDR (fall of 2010).
8 Runway Status Lights at BOS An Additional Layer of Safety, focused on BOS hot spots Integrated into ASDE X, auto mated, direct visual queue to pilot Does NOT replace existing safety procedures or physical design requirements Consistent with best practice of maximizing pilot heads up in the a/c movement area
9 Single Engine Taxiing Deploy Engine Furthest from Community Goal to benefit Bayswater, Constitution Beach & Court Road Neighborhoods Focus on north end of airfield Based on airline procedures and engine manufacturer requirements, pilot favor a specific engine to shut off/keep on Start #1 first, single engine taxi on #1. On taxi in, after a 2 or 3 minute cool down and temperature stabilization, we shut down #2. [major BOS airline procedure] For safety pilots should not be undergoing an engine startup or shutdown procedure immediately before takeoff or after landing
10 2. Limiting Reverse Thrust Pending Further Review from Project Consultant Literature review Use at other airports FAA and Massport has expressed safety and efficiency concerns Reducing breaking capability Limiting use during dry field conditions Voluntary and at the discretion of the pilot in command Conflict with LAHSO operations? Increase runway occupancy time Massport views this alternative, from a safety and operational perspective, similar to the single engine taxiing alternative May express support to airlines subject to safety, air carrier procedures and pilot discretion
11 3. Hold Pad Alternatives SOURCE: Ricondo & Associates
12 Massport s Study Team Findings Study Team Conclusions Recommended for further analysis option #1 and/or #4 and feasibility of modifying taxiway layout at intersection of Romeo, Mike and November in lieu of Option 6. Not Recommended Options 5, 2 and 3. These options provide limited capability capacity to park aircraft. Option 3 needs extensive mitigation (move ASR 9, capped fill area) and requires runway crossings. SOURCE: Ricondo & Associates
13 Taxiway Modification to Achieve Intent of Hold Apron North of R15L/R33R Connect Twy Nov 1 to Twy Mike RE align Twy Romeo to allow aircraft to turn early to Mike/Nov Remove portion of Romeo north of re alignment Go to FAA Presentation Example Concept Only
14 4. Run up Enclosure (s) Study Team Conclusions Logan has severely constrained apron areas Weather/wind variability limits efficiency of GRE which is fixed by function Sites that may work only accommodate limited aircraft size and continue to involve crossing active runways SOURCE: Ricondo & Associates
15 Alternative to Run up Enclosure Proposed by Study Team Utilize R32 Turn around Apron Area as Preferred Location Preserves operational flexibility regardless of the wind direction Minimizes crossings at midfield of airport Achieves CAC intent by further removed from north end of airfield Shipping Channel and Conley Terminal/Industrial Park provide buffer for communities south of the airport Will need to be evaluated from a single event noise perspective and engine blast area Massport will evaluate earlier start time for run up Go to FAA Presentation
Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory
MIT Lincoln Laboratory Partnership for AiR Transportation Noise and Emissions Reduction Hamsa Balakrishnan, R. John Hansman, Ian A. Waitz and Tom G. Reynolds! hamsa@mit.edu, rjhans@mit.edu, iaw@mit.edu,
More informationMassport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016
Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV
More informationBoston Logan. Airport Noise Study
Boston Logan International Airport Boston Logan Airport Noise Study Level 3 Screening Analysis December 2012 Prepared by Ricondo & Associates, Inc. Prepared for Federal Aviation Administration in collaboration
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM April 10 th 2017 1 Agenda Recap Potential Mitigation Response to Stakeholder Questions Next Steps 2 Recap 3 Background Master Plan considered the runway
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationFederal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004
Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationOverview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015
Overview of Boston Logan Operations and Noise from Overflights Presentation to Massport Board March 19, 2015 Contents How the Airport Operates Massport s Noise Abatement Program for Logan Recent Trends
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationOffice of Airport Safety and Standards
Office of Airport Safety and Standards Airport Lighting Program To: By: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee Michael O Donnell, Director Office
More informationBoston Logan International Airport Operational Overview
Boston Logan International Airport Operational Overview Presentation to the Massport Community Advisory Committee June 8, 2017 Updated 12/07/17 Content Overview of Logan Runway Designations Runway Configurations
More informationMassport CAC Meeting December 07, 2017
Massport CAC Meeting December 07, 2017 12/07/2017 Massport CAC 1 Agenda 1. Welcome and Introduction of New Members [5 minutes] 2. Public Comment [10 minutes] 3. Approval of the Minutes of the October 12,
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationMassport and FAA RNAV Pilot Study Overview Public Briefing. February 22, 2017 State Transportation Bld. Boston, MA
Massport and FAA RNAV Pilot Study Overview Public Briefing February 22, 2017 State Transportation Bld. Boston, MA As of 02/10/2017 Agenda Welcoming Remarks Tom Glynn (Massport CEO) David Carlon (Massport
More informationProject Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures
VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues
More informationWatertown Airplane Noise Meeting
Watertown Airplane Noise Meeting July 25, 2017 Myron Kassaraba Town of Belmont Rep, Massport CAC 1 Topics June Stats & Construction Update 33L RNAV SID & RNAV Study Runway Selection Overnight Procedure
More informationFuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits
Fuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits Megan S. Ryerson, Ph.D. Assistant Professor Department of City and Regional Planning Department of Electrical and Systems
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationUpdate on the Aspen/Pitkin County Airport Improvements
Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationFAA s Modernization Plans
FAA s Modernization Plans Ron Stroup Chief System Engineer for Airborne and Ground System Integration Phone: 202 385-7186 Email: ronald.l.stroup@faa.gov Agenda Introduction My background Overview of the
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More informationAirport Characterization for the Adaptation of Surface Congestion Management Approaches*
MIT Lincoln Laboratory Partnership for AiR Transportation Noise and Emissions Reduction MIT International Center for Air Transportation Airport Characterization for the Adaptation of Surface Congestion
More informationL1408 S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD
MASSACHUSETTS PORT AUTHORITY STRATEGIC AND BUSINESS PLANNING DEPARTMENT LOGAN OFFICE CENTER SUITE 200S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS L1408 S1, RUNWAY INCURSION
More informationFAA Office of Airport Safety and Standards
FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationAirport Master Plan Update June 15, 2017
Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe
More informationNoise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority
Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,
More informationDate Start End Next Meeting Next Time Prepared By Company 10/24/2018 6:00PM 8:05AM 4/25/2019 6:00pm B. Wallace PWM
Date Start End Next Meeting Next Time Prepared By Company 10/24/2018 6:00PM 8:05AM 4/25/2019 6:00pm B. Wallace PWM Attended By Mike Foley Westbrook Representative Patricia Whyte South Portland Representative
More informationGRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan
GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationSession Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions
Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry
More informationPre-Submission Consultant Briefing January 12, 2016
Pre-Submission Consultant Briefing January 12, 2016 L1408-S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD GEOMETRY ANALYSIS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MA L.G. HANSCOM FIELD,
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationEvaluation of Strategic and Tactical Runway Balancing*
Evaluation of Strategic and Tactical Runway Balancing* Adan Vela, Lanie Sandberg & Tom Reynolds June 2015 11 th USA/Europe Air Traffic Management Research and Development Seminar (ATM2015) *This work was
More informationMinneapolis-St. Paul International Airport (MSP)
2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the
More informationAppendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update
Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on
More informationKSBP HIGH. San Luis County Rgnl Airport San Luis Obispo, California, United States
Diagram #1: Runway 29 Departure Guide All Aircraft Categories / Runway 29 p. 1 of 8 Diagram #2: Runway 11 Departure Guide All Aircraft Categories / Runway 11 p. 2 of 8 NOISE ABATEMENT PROCEDURES by Whispertrack
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationBurlington ATCT Standard Operating Procedures
This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationKVNY HIGH. Van Nuys Airport Van Nuys, California, United States
Diagram #1: Van Nuys Abatement and Curfew Regulation Page 1 Aircraft Categories: A, B & C / All Runways p. 1 of 20 Diagram #2: Van Nuys Abatement and Curfew Regulation Page 2 p. 2 of 20 Diagram #3: Van
More informationSPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2
- Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity
More informationTAXIBOT. May Technical Partner
TAXIBOT May 2017 TaxiBot Concept Pilot Controlled taxiing without aircraft engines running Aircraft engines turned on at taxi end shortly before take-off Major savings in aircraft fuel consumption Significant
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation
More informationPhase 1 PROJECT CONSULTANT SCOPE OF SERVICES AMENDMENT #1 FOR BOS/TAC REVIEW
Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES AMENDMENT #1 FOR BOS/TAC REVIEW September 30, 2005 Project Consultant Amendment #1 DRAFT FOR BOS/TAC REVIEW 9/30/2005 TABLE OF CONTENTS 1 STUDY DESIGN... 3
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationFIRST PUBLIC WORKSHOP
Lambert-St. Louis International Airport Master Plan & 14 CFR Part 150 Noise Compatibility Plan Update FIRST PUBLIC WORKSHOP February 12 th 2009 Why prepare a Master Plan Update Now? Last full Master Plan
More informationNoise Oversight Committee
Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation
More informationNOISE ABATEMENT PROCEDURES
1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions
More informationKBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack
Diagram #1: p. 1 of 5 Diagram #2: p. 2 of 5 OVERVIEW Bellingham International Airport (BLI) is a full service commercial airport located in Whatcom County, approximately 3 miles N.W. of the city limits
More informationBuchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives
More informationENVIRONMENT ACTION PLAN
ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationWELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY
WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology
More informationExecutive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationName of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:
Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,
More informationHarvey Field Airport. Planning Advisory Committee & Public Open House. April 1, Comment Responses
Harvey Field Airport Planning Advisory Committee & Public Open House April 1, 2015 Comment Responses In an effort to respond to comments received at both the Planning Advisory Committee (PAC) meeting and
More informationFUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010
FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationINITIAL ENVIRONMENTAL REVIEW. Boston-Logan Runway 4 Left Area Navigation (RNAV) Visual Flight Procedure Test
INITIAL ENVIRONMENTAL REVIEW Boston-Logan Runway 4 Left Area Navigation (RNAV) Visual Flight Procedure Test FAA Order 7400.2 Appendix 5 (Modified) ======================================================================
More informationFAA NextGENProgram & NEAR Laboratory. Massood Towhidnejad, PhD Director of NEAR lab
FAA NextGENProgram & NEAR Laboratory Massood Towhidnejad, PhD Director of NEAR lab www.near.aero towhid@erau.edu U.S. Air Traffic System World s Most Demanding 689M Passengers/Year 36B Pounds of Cargo/Year
More informationACTION TRANSMITTAL
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationState of the Airport Robert S. Bowen, Executive Director October 18, 2018
Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing
More informationHead-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations
Head-up Guidance & Vision Technologies Enabling Safer and More Efficient Airline Operations March, 2017 2017 Rockwell 2017 Collins. Rockwell Collins. Agenda > HGS Introduction > HGS Value Safety & Economics
More informationLAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012
LAX Specific Plan Amendment Study (SPAS) Update December 3, 2012 Response to the Draft Environmental Impact Report Draft EIR Release and Public Comment Official Comment Period was July 27, 2012 through
More informationAppendix A. Meeting Coordination. Appendix A
Appendix A Meeting Coordination Appendix A Philadelphia International Airport Noise Compatibility Program Update FAR Part 150 Noise Compatibility Program Update Report Prepared by: DMJM Aviation AECOM
More informationWyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO
Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis
More informationAirport Safety Management Systems: Integrating Planning Into the Process
Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for
More informationProcedure Design Concepts for Logan Airport Community Noise Reduction
Procedure Design Concepts for Logan Airport Community Noise Reduction R. John Hansman rjhans@mit.edu Technical support from MIT students, HMMH, and Massport RNAV Track Concentration 2010 2015 2 Noise Complaints
More informationKJFK Runway 13R-31L Rehabilitation ATFM Strategies
Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal KJFK Runway 13R-31L Rehabilitation ATFM Strategies
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationMemorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:
Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel