INTRODUCTION, PROJECT HISTORY, AND SETTING

Size: px
Start display at page:

Download "INTRODUCTION, PROJECT HISTORY, AND SETTING"

Transcription

1 INTRODUCTION, PROJECT HISTORY, AND SETTING PURPOSE OF THIS ENVIRONMENTAL IMPACT REPORT The California Environmental Quality Act ( CEQA ) (California Public Resources Code [ PRC ], Section ) states that the purpose of an environmental impact report ( EIR ) is to identify the significant effects of a project on the environment, to identify alternatives to the project, and to indicate the manner in which those significant impacts can be mitigated or avoided. A detailed description of the proposed John Wayne Airport ( JWA or the Airport ) General Aviation Improvement Program ( GAIP, or Project ) is provided in Section 3.0, Project Description, of this Program EIR. The GAIP requires approval of certain discretionary actions by the County of Orange ( County ). For purposes of complying with CEQA, the County is the Lead Agency for the GAIP. This Program EIR is intended to provide the environmental information necessary for the County to make a final decision on the requested entitlements for the GAIP. Additionally, this EIR is also intended to support discretionary reviews and decisions by other agencies. In accordance with Section 15121(a) of the State CEQA Guidelines, this EIR is an informational document that will inform public agency decision makers and the general public of (1) the significant environmental effects of the GAIP; (2) possible ways to minimize the significant effects; and (3) reasonable alternatives to the GAIP. Decision makers are required to consider the information in the EIR in determining whether to approve, deny, or modify the GAIP. TYPE OF ENVIRONMENTAL IMPACT REPORT AND STANDARDS OF ADEQUACY UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT This EIR has been prepared in accordance with CEQA (PRC, Section et seq.) and the State CEQA Guidelines (Title 14, California Code of Regulations [CCR] Section et seq.). Section of the State CEQA Guidelines defines the standards of adequacy for an EIR as follows: An EIR should be prepared with a sufficient degree of analysis to provide decision makers with information which enables them to make a decision which intelligently takes account of environmental consequences. An evaluation of the environmental effects of a proposed project need not be exhaustive, but the sufficiency of an EIR is to be reviewed in the light of what is reasonably feasible. Disagreement among experts does not make an EIR inadequate, but the EIR should summarize the main points of disagreement among the experts. The courts have looked not for perfection but for adequacy, completeness, and a good faith effort at full disclosure. This Draft EIR is intended to serve as a Program EIR under CEQA. Section of the State CEQA Guidelines states, where individual projects are, or a phased project is, to be undertaken JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-1

2 and where the total undertaking comprises a project with significant environmental effect, the Lead Agency shall prepare a single program EIR for the ultimate project as described in Section Relevant portions of Section of the State CEQA Guidelines describe a program EIR as follows: (a) General. A program EIR is an EIR which may be prepared on a series of actions that can be characterized as one large project and are related either: (1) Geographically, (2) As logical parts in the chain of contemplated actions, (3) In connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program, or (4) As individual activities carried out under the same authorizing statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways. (b) Advantages. Use of a program EIR can provide the following advantages. The program EIR can: (1) Provide an occasion for a more exhaustive consideration of effects and alternatives than would be practical in an EIR on an individual action, (2) Ensure consideration of cumulative impacts that might be slighted in a case-by-case analysis, (3) Avoid duplicative reconsideration of basic policy considerations, (4) Allow the Lead Agency to consider broad policy alternatives and program-wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems or cumulative impacts, and (5) Allow reduction in paperwork. (c) Use with Later Activities. Subsequent activities in the program must be examined in the light of the program EIR to determine whether an additional environmental document must be prepared. (1) If a later activity would have effects that were not examined in the program EIR, a new Initial Study would need to be prepared leading to either an EIR or a Negative Declaration. (2) If the agency finds that pursuant to Section 15162, no new effects could occur or no new mitigation measures would be required, the agency can approve the activity as being within the scope of the project covered by the program EIR, and no new environmental document would be required (3) An agency shall incorporate feasible mitigation measures and alternatives developed in the program EIR into subsequent actions in the program. (4) Where the subsequent activities involve site specific operations, the agency should use a written checklist or similar device to document the evaluation of the site and the activity to determine whether the environmental effects of the operation were covered in the program EIR. 2-2 JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

3 (5) A program EIR will be most helpful in dealing with subsequent activities if it deals with the effects of the program as specifically and comprehensively as possible. With a good and detailed analysis of the program, many subsequent activities could be found to be within the scope of the project described in the program EIR, and no further environmental documents would be required. ENVIRONMENTAL REVIEW PROCESS REVIEW OF AN EIR The County, as the Lead Agency (and project proponent), which has the principal authority for approving the GAIP, along with other public agencies with direct interest in the GAIP (e.g., responsible and trustee agencies), may use this Program EIR in their decision-making or permitting processes and will consider the information in this Program EIR in combination with other information that may be presented during the CEQA process. In addition, this Program EIR provides the analysis in support of the Mitigation Program that will be implemented as part of the GAIP, if approved. In accordance with CEQA, public agencies are required to make appropriate findings for each potentially significant environmental impact identified in the EIR if they decide to approve a project. If the EIR identifies significant environmental impacts that cannot be mitigated to a less than significant level through the adoption of mitigation measures or project alternatives, the Lead Agency (and responsible agencies using this CEQA document for their respective permits or approvals) must decide whether the benefits of the proposed project outweigh any identified significant environmental effects that cannot be mitigated to below a threshold of significance. If the agency decides that the project benefits outweigh the unavoidable impacts, then the agency (Lead Agency or responsible agency) is required to adopt a Statement of Overriding Considerations, which states the reasons that support its actions. The Lead Agency s actions involved in implementation of the GAIP are described in Section 3.0, Project Description. Other agencies that may have discretionary approval over the GAIP, or components thereof, including responsible and trustee agencies, are also described in the Project Description ISSUES TO BE ADDRESSED IN THE PROGRAM EIR In accordance with Section 15063(a) of the State CEQA Guidelines, the County prepared an Initial Study ( IS ) for the GAIP and determined that the GAIP may have a significant effect on the environment; as such, an EIR is required for the GAIP. In compliance with Section of the State CEQA Guidelines, the County oversaw preparation of the Notice of Preparation ( NOP ) of the Draft Program EIR for the GAIP, which was distributed to 75 individuals or agencies on March 30, 2017, to the State Clearinghouse and other public agencies for the required 30-day review and comment period. In addition, notices regarding the availability of the NOP on the JWA website were sent to all the lessees at the Airport; and the NOP was posted on the JWA website, as well as the County of Orange Public Works website. The NOP and distribution list are provided in Appendix A. JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-3

4 A Scoping Meeting was held on April 12, 2017, from 6:00 to 8:00 PM at the JWA Administrative Office in the Airport Commission Meeting Room to facilitate agency and public review and comment on the GAIP. A hand-out, which provided an overview of the GAIP to be evaluated in the Program EIR and a list of frequently asked questions, was distributed at the scoping meeting. Comment cards were available for attendees to submit at the meeting or mail to JWA staff. Approximately 30 people attended the scoping meeting (28 people signed the sign-in sheet). A total of 13 comment letters were received during the 30-day NOP review period. Table 2-1 provides a summary matrix of the issues raised in the NOP comment letters. The comments received on the NOP by the County, the handout made available at the Scoping Meeting, and signin sheet are included in Appendix A of this Program EIR. TABLE 2-1 SUMMARY MATRIX OF NOTICE OF PREPARATION COMMENTS Comment Category Agency/Individual (Date) Project Definition/Process Project Alternatives Aesthetics Air Quality/Health Risk Cultural/Scientific Resources Greenhouse Gas Emissions Hazards/Hazardous Materials Hydrology/Water Quality Land Use/Planning Noise Transportation/Traffic Tribal Cultural Resources Utilities/Service Systems State Agencies Governor s Office of Planning and Research, State Clearinghouse and Planning Unit (March 30, 2017) a Native American Heritage Commission (April 5, 2017) X X Regional Agencies Orange County Sanitation District (April 7, 2017) X Orange County Transportation Authority (May 1, 2017) X South Coast Air Quality Management District (April 20, 2017) X X Local Agencies City of Costa Mesa (April 12, 2017) X X X City of Costa Mesa (April 28, 2017) X X X 2-4 JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

5 TABLE 2-1 SUMMARY MATRIX OF NOTICE OF PREPARATION COMMENTS Project History and Setting Agency/Individual (Date) City of Irvine (April 20, 2017) City of Newport Beach (April 25, 2017) City of Orange (April 26, 2017) Organizations Caribou Industries, Inc. (April 17, 2017) Individuals b Scott Cutshall (April 12, 2017) Jim Mosher (May 1, 2017) a b Project Definition/Process Project Alternatives Aesthetics Air Quality/Health Risk Cultural/Scientific Resources Comment Category Greenhouse Gas Emissions Hazards/Hazardous Materials Hydrology/Water Quality Land Use/Planning X Noise X X X X X X X X X X The letter from the Governor s Office of Planning and Research, State Clearinghouse and Planning Unit verified receipt of the NOP and provided a listing of the agencies that the document was forwarded to. Listed in the order of the date received. X Transportation/Traffic X Tribal Cultural Resources Utilities/Service Systems The scope of the EIR is based on the findings of the IS and input received from the agencies and the public as part of the scoping process. The EIR addresses all potential significant effects identified in the Environmental Checklist, as well as several topical areas that the County decided to include in the EIR, although the IS determined the GAIP would have no significant impacts. JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-5

6 Based on the NOP and related Environmental Checklist, as well as the comments received by the County on those documents, this EIR analyzes the following environmental topics: Aesthetics Air Quality Cultural and Scientific Resources Greenhouse Gas Emissions Hazards and Hazardous Materials Land Use and Planning Noise Transportation/Traffic Tribal Cultural Resources Utilities and Service Systems Water Quality The following issues were assessed as No Impact or Less Than Significant Impact in the IS/NOP; therefore, in accordance with Section of the State CEQA Guidelines, these issues were identified in the NOP as topical areas that would not receive further evaluation in the EIR 1 : Aesthetics: JWA is located in an urbanized area of the County with no scenic resources on or adjacent to the Airport. All GAIP modifications would be located within the Airport boundaries. Therefore, no impacts to a scenic vista or scenic highway would occur (Environmental Checklist question 1[a]). There are no designated or eligible State or local scenic highways within the vicinity of the Airport. There are also no historic buildings adjacent to the Airport site (Environmental Checklist question 1[b]). Agriculture and Forestry Resources: The GAIP would not result in any impacts to farmlands listed as Prime, Unique, or of Statewide Importance based on the 2014 Orange County Important Farmland Map prepared by the California Department of Conservation (Environmental Checklist question 2[a]). The proposed Project would not result in pressures to convert farmlands to other uses, and the proposed Project site is not within a Williamson Act contract (Environmental Checklist question 2[b]). No part of the GAIP site or adjacent areas is zoned forest land, timberland, or timberland zoned for Timberland Production, nor would the GAIP result in the loss of forest land or conversion to non-forest use (Environmental Checklist questions 2[c] through 2[e]). Air Quality (odors): The GAIP does not propose any land uses or modification to operations that would result in the creation of odors. The existing operations at the Airport involve minor odor-generating activities such as airplane exhaust; however, these types of odors are typical of an airport and would not create an odor nuisance pursuant to South Coast Air Quality Management District s ( SCAQMD s ) Rule 402 or extend beyond the limits of the Airport (Environmental Checklist question 3[e]). Biological Resources: The GAIP would not result in any direct habitat removal or modification to habitat that supports candidate, sensitive, or special status species listed by the California Department of Fish and Wildlife and/or the U.S. Fish and Wildlife Services (Environmental Checklist questions 4[a] and 4[b]). No designated wetlands or jurisdictional waters are located on the Airport property. The GAIP would also not result in indirect impacts to downstream resources because the GAIP would not change the water 1 The IS/NOP identified aesthetics as a topic not receiving further evaluation in the Draft Program EIR. However, a comment was received during the NOP review period requesting an evaluation of the aesthetic impacts of the Project. Therefore, the potential impact to the overall character of the Airport as viewed from surrounding uses (Environmental Checklist question 1[c]) and light and glare effects (Environmental Checklist question 1[d]) will be evaluated in the Draft Program EIR. 2-6 JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

7 characteristics or discharge points for flows leaving the Airport (Environmental Checklist question 4[c]). The GAIP would not interfere with the movement of any native resident or migratory wildlife species or impede the use of native wildlife nursery sites, as the GAIP does not adversely affect any waters supporting marine life and does not alter the existing Wildlife Hazard Management Plan ( WHMP ) or introduce other elements that would increase the potential for aircraft collisions with migratory birds (Environmental Checklist question 4[d]). The GAIP would not result in removal of trees; thus, the GAIP would not conflict with a tree preservation policy and would not impact nesting birds through removal of vegetation (Environmental Checklist question 4[e]). The GAIP would not interfere with the goals of the Natural Community Conservation Plan/Habitat Conservation Plan ( NCCP/HCP ) because it does not substantially impact habitat, species, or uses of the Upper Newport Bay Ecological Reserve. The GAIP would not substantially change the noise or other characteristics that would have the potential to jeopardize local populations of wildlife species and other target species covered under the NCCP/HCP or designated sensitive habitats (Environmental Checklist question 4[f]). Geology and Soils: No earthquake faults are identified on the GAIP site, and the GAIP site is not located within a designated Alquist-Priolo Earthquake Fault Zone. The northern portion of the Airport site (i.e., north of Runway 20R and the long-term and employee parking areas north of I-405) is subject to liquefaction; however, this area would not be affected by the GAIP improvements. The Airport site is flat and would not be subject to landslides (Environmental Checklist questions 6[a] through 6[d]). The GAIP does not propose any physical improvements that would require an alternative wastewater disposal system; therefore, no soils impacts related to septic tanks or alternative wastewater disposal systems would occur (Environmental Checklist question 6[e]). Hazards and Hazardous Materials (hazardous materials sites; airport land use plans; private airstrips; emergency evacuation plan; wildlands): The closest Cortese List site is approximately 1 mile southwest of the Airport; therefore, the GAIP would not expose the public to hazardous materials associated with the sites on the Cortese List (Environmental Checklist question 8[d]). No private airstrips are in the vicinity of the GAIP site, and the GAIP would not require an amendment to the Airport Environs Land Use Plan prepared for JWA (Environmental Checklist questions 8[e] and 8[f]). The GAIP would not impair or interfere with implementation of the emergency evacuation plan because it would not alter the types of facilities on site or access to the Airport (Environmental Checklist question 8[g]). The GAIP is located in an urbanized area and is not adjacent to wildlands (Environmental Checklist question 8[h]). Hydrology (groundwater; drainage patterns; flood hazard areas; flooding; inundation): The Airport does not provide for groundwater recharge and does not use groundwater. As a result, the GAIP would not involve any activities that would alter groundwater supplies (Environmental Checklist question 9[b]). The improvements associated with the GAIP would not substantially change the quantity of storm water or the points of discharge of runoff from the Airport to off-site areas; downstream drainage patterns would not be changed (Environmental Checklist questions 9[c] and 9[d]). The northern portion of the airfield is subject to potential flooding; however, this portion of the Airport is not an area used for general aviation, and the County has implemented several improvements to reduce flooding and ponding conditions at the Airport. Therefore, structures that may be constructed as part of the GAIP would not be subjected to a 100-year flood hazard. Additionally, the Airport is not in proximity to water bodies JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-7

8 that would result in exposure to flooding as a result of failure of a levee or dam, nor would it be subject to inundation by seiche, tsunami, or mudflow (Environmental Checklist questions 9[g] through 9[j]). Land Use and Planning (divide an established community; habitat conservation plan/natural community conservation plan): The GAIP does not propose any physical improvements that would extend beyond the Airport limits or changes that would substantially modify the interface of the Airport with the surrounding land uses; therefore, it would not physically divide an established community (Environmental Checklist question 10[a]). The GAIP would not substantially change the noise or other characteristics; and would not jeopardize local populations of species covered under the NCCP/HCP; and, therefore, would not conflict with provisions of an approved local, regional, or State habitat conservation plan (Environmental Checklist question 10[c]). Mineral Resources: The JWA site does not have significant existing or potential mineral or energy resources within its boundaries (Environmental Checklist questions 11[a] and 11[b]). Noise (groundborne vibration, private airstrips): Groundborne vibration has not been identified as noticeable outside the Airport property; mass grading or blasting would not be required for implementation; and no part of the GAIP would change the Airport s vibration-generation potential. Therefore, the GAIP would not result in excessive groundborne vibration (Environmental Checklist question 12[b]). JWA is a commercial airport, and no private airstrips are in the vicinity of the GAIP site (Environmental Checklist question 12[f]). Population and Housing: The GAIP does not propose any development that would increase the population in the study area or within Orange County, nor would the GAIP be expected to have an effect on the population projections for Orange County because it would not provide infrastructure improvements that would lead to population increase. No housing is present on the GAIP site; therefore, the GAIP would not result in the displacement of people or housing (Environmental Checklist questions 13[a] through 13[c]). Public Services: The response times from the Orange County Fire Authority (OCFA) facilities to the Airport would remain unchanged, and the GAIP would not result in the need for new or upgraded fire protection facilities. The GAIP would not result in the addition of new access points to the airfield or changes in the nature of the Airport operations and, therefore, would not result in an increased demand for police protection services. The GAIP would not result in development of any residential units and, therefore, would not create an increased demand on schools, neighborhood and regional parks, or other public facilities, such as libraries. (Environmental Checklist questions 14[a][i] through 14[a][v]). Recreation: The GAIP would not generate an increase in population or provide development that would result in increased usage of existing neighborhood and regional parks. No physical deterioration would occur to existing recreational facilities as a result of GAIP implementation (Environmental Checklist questions 15[a] and 15[b]). Transportation/Traffic (air traffic; hazards due to design features/incompatible uses; inadequate emergency access; conflict with policies, plans, and programs): The GAIP may result in an incremental increase in certain types of general aviation flights 2-8 JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

9 and facilitate the transition to newer aircraft operating at the Airport; however, it would not change the air traffic patterns or result in a substantial safety risk due to an increase in operations (Environmental Checklist question 16[c]). The GAIP does not propose any substantial modifications to the Airport access points that would alter the operations of the off-site circulation network. Therefore, the GAIP is not anticipated to result in impacts associated with design features; emergency access would not be impeded; and there would be no conflict with policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities (Environmental Checklist questions 16[d] through 16[f]). Utilities and Service Systems (storm water drainage facilities; sufficient landfill capacity; compliance with statutes and regulations): The Airport site is fully developed, and storm drains have been sized to accommodate storm flows in compliance with applicable standards. Changes to the quantity or flow rates of runoff from the Airport are not anticipated (Environmental Checklist question 18[c]). Any increased solid waste generated at the Airport would be able to be accommodated with the current landfill capacity and would comply with existing regulations pertaining to solid waste (Environmental Checklist questions 18[f] and 18[g]) EIR REVIEW AND APPROVAL PROCESS This Draft Program EIR was prepared under the direction and supervision of the County of Orange/JWA and will be circulated for a 45-day public review and comment period, as mandated by the State CEQA Guidelines (14 California Code of Regulations [CCR] 15105). On September 26, 2018, as part of the public review period, there will be a public meeting. The meeting will be held at 5:30 P.M. at the JWA Administrative Offices, in the Airport Commission hearing room. The address for the JWA Administrative Offices is listed below. The meeting will provide the public an opportunity to provide input on the EIR and to ask questions about the GAIP. At any time during the public review period, written comments concerning the adequacy of the document can be submitted by interested public agencies and members of the public to: John Wayne Airport Attn: Lea Choum, JWA Project Manager 3160 Airway Avenue Costa Mesa, California or via to EIR627@ocair.com After the public review comment period, written responses to all written comments received during the public review period pertaining to environmental issues will be prepared as part of the Final Program EIR. As required by CEQA, responses to comments submitted by responsible public agencies will be distributed to those agencies for review at least 10 days prior to consideration of the Final EIR by the Orange County Board of Supervisors. A public meeting before the Orange County Airport Commission regarding the GAIP will be held. The Airport Commission will also make a recommendation on the proposed GAIP to the Board of Supervisors. The Orange County Board of Supervisors is the decision-making body for the proposed GAIP. The Board of Supervisors will consider whether to certify the Final Program EIR and to adopt findings relative to the proposed GAIP s environmental effects. It will then consider whether to approve or deny the proposed GAIP. JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-9

10 The Federal Aviation Administration ( FAA ) is the agency responsible for regulation of all aspects of civil aviation. 2 As such, any modifications to the airfield facilities would be considered a federal action. If the Board of Supervisors approves the proposed GAIP, improvements on the airfield (e.g., Fixed Base Operators ( FBO ) buildings, roadway realignment, fuel farm) would require modification to the Airport Layout Plan and thus would be considered a federal action and require approval by the FAA. Additionally, implementation of the General Aviation Facility ( GAF ) would require approval by U.S. Customs and Border Protection ( CBP ). As federal actions, approvals by the FAA and CBP will be subject to the National Environmental Policy Act ( NEPA ). NEPA requires each Federal agency to disclose to the interested public a clear, accurate description of potential environmental impacts associated with proposed Federal actions. This Program EIR has been prepared pursuant to CEQA; however, information contained in this document may also be used in the GAIP NEPA documents, which would be prepared pursuant to FAA and CBP standards. PROJECT HISTORY General aviation activities were started on what ultimately became JWA by aviation pioneer Eddie Martin, who founded the airfield. From 1923 to 1939, the Airport operated as a privately owned general aviation facility. JWA became a publicly owned facility in After serving as a military base during World War II, it was returned by the federal government to the County. A passenger terminal was built in 1967 but was demolished in 1994 after a new terminal and parking structure facilities opened in Through all of the improvements, the County remained committed to maintaining both general aviation and commercial aviation uses. In 2016, general aviation accounted for the majority of JWA's total aircraft operations (takeoffs and landings). The level of general aviation at the Airport has varied over the years with a high of 503,829 operations 3 in 1991 and a low of 174,726 in However, general aviation has consistently represented the majority of operations at the Airport. In 2016, the most recent year with complete information, there were 192,800 general aviation operations, which represents nearly 67 percent of the Airport's total number of operations (JWA 2017a). Although general aviation accounts for the majority of JWA's total aircraft operations, over the past approximately 25 years, there has been an overall decline ( percent) in general aviation aircraft based at JWA (JWA 2017b). Historical general aviation trends have shown a consistent decline in single-engine aircraft since 1980 at the Airport. Multi-engine piston aircraft experienced a sharp decline in the early 1990s and have continued to decrease, although at a slower rate; turbine-powered aircraft (turbo prop and jet) experienced variable growth at the Airport. Business jet operations steadily increased from 2003 to 2006, where it tapered to around 25,000 in annual operations and has remained relatively stable since then (AECOM 2018). A number of factors led to the proposed comprehensive update of JWA s general aviation facilities. General aviation services and facilities at the Airport have not been comprehensively 2 Federal Aviation Regulations ( FARs ), part of Title 14 of the Code of Federal Regulations ( CFR ), are rules that prescribe the FAA as governing all aviation activities in the United States. 3 The number of operations includes air taxi operations. An air taxi is an aircraft certificated for commercial service available for hire on demand. An operation is defined as either a takeoff or landing, each counting as one operation JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

11 studied since 1990; and the character of general aviation has changed significantly since that time including, but not limited to (1) the introduction of new aircraft into, and other changes within, the general aviation fleet; (2) the advanced age of some of JWA's general aviation structures and resultant need for improvements; (3) the need to ensure compliance with FAA requirements related to proximity of buildings to taxiways and runways; and (4) the fact that a number of general aviation-related long-term leases have expired or are nearing expiration. 4 In 2015, a series of meeting and outreach efforts were conducted by Airport staff with the general aviation tenants and stakeholders to identify issues the general aviation community would like addressed and priorities for making improvements. Input was received from: Atlantic Aviation Martin Aviation Orange County Sheriff s Department Sunrise Aviation Harmic Air Orange County Flight Center McHone Southcoast Associates Signature Flight Support 4 West Coast Charters Southern California Pilots Association Executive Hangars Jay s Aircraft Maintenance 4 After meeting with stakeholders, planning goals and objectives were developed by the Airport and a preliminary planning process was established (see Sections 1.4 and 3.3 for the planning objectives) for the process of evaluating and planning for the future needs of the general aviation community at the Airport through a comprehensive GAIP. As part of the preliminary assessment, three primary options for general aviation improvements were evaluated. At the request of the Orange County Airport Commission, a subsequent third party assessment of these alternatives was performed. The review focused on the alternatives (1) conformance with FAA Airport Design standards to the extent feasible; (2) operational characteristics such as ground taxi flows and potential impacts to the air traffic controllers; (3) conformance with building height restrictions and with the Code of Federal Regulations (specifically Title 14, Part 77 [ Part 77 ]); and (4) layout requirements for efficient and effective operation of the FBO facilities. The alternative that JWA staff recommended for further evaluation as the proposed GAIP was supported by the third party assessment. ENVIRONMENTAL SETTING GENERAL SETTING County Setting The Airport is an unincorporated County island surrounded by the cities of Newport Beach, Costa Mesa, and Irvine. An extensive arterial highway and freeway system surrounds the Airport, providing access from several locations. Freeway access to the Airport is provided via Interstate 4 Interim leases were awarded on February 14, 2017, to Atlantic Aviation and ACI Jet that extend through December 31, ACI Jet replaced Signature Flight Support as a full service FBO at the Airport. Additionally, on May 9, 2017, the lease for Jay s Aircraft Maintenance was extended to December 31, The Limited Service FBO Martin Aviation lease, which includes the Lyon Air Museum, is a long-term lease that extends through year 2036; therefore, this area is not part of the GAIP. JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-11

12 ( I ) 405, State Route ( SR ) 55, and SR 73. Arterial access to the terminal area is from MacArthur Boulevard and Campus Drive. Arterial access to the uses on the west side of the Airport is from Red Hill Avenue and Paularino Avenue. Orange County is a highly urbanized setting. It is the third-most populous county in California, with about 3 million residents and the sixth-most populous county in the United States. In 2015, it is estimated the annual payroll for all sectors in Orange County was over $80.7 billion (U.S. Census). John Wayne Airport JWA serves both domestic and international destinations, with flights to Canada and Mexico. In 2016, over 10 million passengers were served. JWA is the only airport in Orange County that provides commercial passenger and air-cargo service and is the primary provider of general aviation services and facilities in the County (JWA 2017c). Fullerton Municipal Airport is also a general aviation airport in Orange County with capacity for 600 aircraft. Currently, 230 aircraft are based out of the Fullerton Municipal Airport. Facilities at the Airport include two runways: a 5,701-foot main runway and a 2,887-foot general aviation runway. The existing taxiway system is composed of three parallel and a number of exit taxiways, which facilitate the movement of aircraft while on the ground at JWA. Runway use at the Airport is based on aircraft size, with commercial aircraft and large jets using Runway 20R and smaller general aviation aircraft primarily using Runway 20L. With winds predominantly coming from the ocean, aircraft depart to the south and arrive from the north about 95 percent of the time with slight variations from year to year. The flow reverses with departures to the north primarily during Santa Ana wind conditions. A remain overnight ( RON ) parking apron for commercial aircraft is located primarily south of the passenger terminal with some RON positions also located at the north end of the terminal building. The south apron area also serves all-cargo aircraft and cargo staging during all-cargo operating hours. The north RON area is shared with the north commuter terminal. The terminal building is one contiguous building encompassing 730,505 square feet and providing 20 passenger loading bridges. Commuter holdroom areas are located at the north and south ends of the concourses, at Gates 1A, 1B, and 1C and Gates 22A, 22B, and 22C, respectively. Access to the commuter aircraft is from the tarmac and not via a passenger loading bridge. The Airport has two fuel storage facilities, or fuel farms one for commercial airliners and the other for general aviation. 5 The commercial fuel farm is located in the northwest area of the Airport and consists of three aboveground storage tanks containing Jet A fuel. An underground hydrant fuel system pumps fuel directly from the fuel farm to aircraft parked at the passenger terminal building, which is more operationally efficient and environmentally beneficial than using refueling trucks. The general aviation fuel farm is located in the southeast area of the Airport and consists of five underground storage tanks, which provide Jet A fuel and avgas. Fuel 5 Wickland Pipelines LLC is currently constructing a new pipeline and two new fuel tanks on the west side of the Airport for the storage of Jet-A fuel. This will be located next to the commercial fuel farm. The new fuel tanks and pipeline are identified as a cumulative project in Section 4.0 of this Program EIR JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

13 is delivered to parked general aviation aircraft using refueling trucks operated by the full-service FBOs. In March 2014, an Economic Impact Study was prepared for JWA. The Airport makes a substantial contribution to the regional economy. The annual direct impacts of ongoing operations at JWA and of spending by visitors arriving at JWA were estimated to be 22,000 direct jobs (or 19,500 direct full-time equivalent jobs), earning approximately $790 million in direct wages and salaries. Direct employment generated $1.5 billion in direct gross domestic product and $2.8 billion in direct economic output in the regional economy annually (InterVISTAS). JWA sustains itself financially through fees and charges without receiving any support from Orange County s general fund. The airport generates revenues to various levels of government. In 2012, taxes paid by passengers, employers and employees at JWA totaled $231 million. The majority of the amount collected (73 percent) accrued to the State, followed by the federal government (21 percent), with 6 percent going to local government. General aviation is the major source of landings and take-offs at the Airport. Combined, airlines, airline support services and general aviation is the largest category for employment at the Airport (InterVISTAS) GENERAL AVIATION FACILITIES Historic aerial photography indicates that the overall size and layout of the general aviation facilities have remained mostly unchanged for more than 20 years (AECOM 2018). It is estimated that as many as 750 aircraft parking spaces existed in Since then, no parking areas have been added to increase aircraft storage capacity, while a few areas have been reduced or replaced by buildings and development, effectively decreasing the total number of aircraft parking spaces available at the Airport when compared to previous years. Exhibit 2-1 depicts the portion of the Airport dedicated to predominately general aviation uses and Exhibit 2-2 provides a conceptual facilities layout for the existing facilities. General aviation services currently provided at the Airport include the following: Aircraft handling/support (fueling, cleaning, catering) Ground transportation/customer parking Aircraft storage (hangars and tie-downs) Flight schools/training/rental Aircraft charter Aircraft maintenance JWA is the home base for more than 480 private general aviation aircraft including helicopters and single-engine, multi-engine, and turbine aircraft. Currently (2017), JWA has two full-service FBOs (Atlantic Aviation and ACI Jet) and two limited service FBOs (Martin Aviation and Jay s Aircraft Maintenance). The full service FBOs provide aircraft fueling services, supplies, aircraft maintenance, flying lessons, and other services at the Airport. The Airport is also home to three flight schools (Sunrise Aviation, Orange County Flight Center [OCFC], and Revolution Aviation). JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-13

14 Airport Property Boundary Potential Laydown Areas Potential Development Area 405 Main St UV 55 Red Hill Ave Baker St MacArthur Blvd M Airport Way D:\Projects\LAN\0102\MXDs\EIR\ex_Aviation_Area_ mxd Santa Ana Ave Campus Dr Jamboree Rd Aerial Source: ESRI 2016 General Aviation Improvement Program Area at JWA John Wayne Airport General Aviation Improvement Program ² 1, ,200 Feet Exhibit 2-1

15 D:\Projects\LAN\0102\GRAPHICS\EIR\ex_Conceptual_Layout_Facilties_Existing_ ai Conceptual Facilities Layout - Existing Facilities John Wayne Airport General Aviation Improvement Program 12 Source: AECOM 2018 Exhibit Feet

16 In addition to 379 general aviation tie-down/hangar spaces leased by the County, tie-down and hangar spaces are also provided by FBOs and other lease holders at the Airport (JWA 2016). In addition to the aircraft storage facilities operated directly through the County, Martin Aviation, South Coast Associates, Executive Hangars, and the two full service FBOs have an additional 30 apron spaces, 111 T-Hangars, 35 box hangars, and 31 spaces in 5 large conventional/community hangars (Atlantic Aviation has 3, Martin Aviation has 1, and ACI Jet has 1) for based aircraft. Furthermore, Martin Aviation has three large conventional/community hangars, and Jay s Aircraft Maintenance has four additional box hangars used temporarily for maintenance work and not used to store based aircraft. 6 Table 2-2 summarizes the distribution of the existing aircraft parking/storage facilities at the Airport. A more detailed discussion of the existing general aviation facilities at the Airport is provided in the General Aviation Facility Requirements Technical Report (AECOM 2017). This includes a discussion of which facilities are County owned and which facilities are owned by the various leaseholders at the Airport. TABLE 2-2 EXISTING PARKING/STORAGE FACILITIES AT JOHN WAYNE AIRPORT Parking/Storage Facility Type County Atlantic Aviation ACI Jet Martin Aviation Executive Hangars South Coast Hangars Jay s Aircraft Maintenance Apron spaces Tie-down spaces Box hangars * Large conventional/ community hangars Partially* 1 3* T-hangars Shade Structures Total spaces/ Hangars Source: AECOM, Notes: 1) Transient parking/storage facilities are highlighted with an asterisk (*). 2) The T-hangars owned by the County are managed by Executive Hangars. In addition to the terminal and airfield area, the County of Orange/JWA owns property south of the Airport, which serves as a clear zone and has been developed as a golf course. Long-term and employee parking is located north of I SURROUNDING LAND USES The area surrounding the Airport is generally urban in character and is located within the cities of Newport Beach, Costa Mesa, Santa Ana, and Irvine. Although the formerly unincorporated area of Santa Ana Heights was fully annexed into the City of Newport Beach in 2008, several unincorporated areas remain in the vicinity of the Airport. The majority of land surrounding the Airport is already developed, generally in accordance with the adopted land use plans and policies of the relevant local jurisdictions. As discussed below, the County developed a Land Use 6 Brief descriptions of the various types of hangar facilities is provided in Section of this Program EIR JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

17 Compatibility Program ( LUCP ) for areas south of the Airport where existing residential uses experienced higher noise levels than those normally considered compatible with residential land uses. This resulted in the transition of some residential uses to non-noise sensitive uses. Surrounding land uses include the following: In the City of Newport Beach, RS-D (Single-Unit Residential Detached), RM (Multiple-Unit Residential), OS (Open Space), CO-G (General Commercial Office), PR (Parks and Recreation), and CG (General Commercial) in the Santa Ana Heights community to the south, and AO (Office Airport), CO-G (General Commercial Office), CG General Commercial, MU-H2 (Mixed Use Horizontal) and PF (Public Facilities) in the Airport Area to the east Business Park uses north of Interstate ( I ) 405 in the City of Irvine and along MacArthur Boulevard, north of Campus Drive in the Irvine Business Complex ( IBC ) Recreation and open space uses at the end of the runways south of the Airport in unincorporated Orange County and in the City of Newport Beach Industrial park uses west of the Airport between Red Hill Avenue and JWA in the City of Costa Mesa An important natural reserve and habitat to the south of the Airport, commonly known as the Upper Newport Bay Ecological Reserve or Back Bay, in the City of Newport Beach Land Use Compatibility Program On February 23, 1972, the County adopted Resolution No , which designated JWA to have a noise problem, as that term is defined in Section 5020 of the California Noise Standards (21 CCR Sections 5000 et seq.). If an airport has been designated by a county to have a noise problem, no incompatible uses with a Community Noise Equivalent Level ( CNEL ) value of 65 decibels ( db ) can be located inside the noise contour line unless the airport proprietor has applied for or received a variance pursuant to the California Noise Standards. 7 In 1984, to address the noise problem, the County of Orange prepared the LUCP for areas south of the Airport and included portions of what was then unincorporated Santa Ana Heights and certain neighborhoods within the City of Newport Beach. The purpose of the LUCP was to: (1) establish a program to achieve land use compatibility between projected noise levels at JWA and land uses in all affected areas; (2) develop a long-range plan for the unincorporated Santa Ana Heights area; and (3) ensure conformance with CCR Title 21, the Orange County General Plan, and Airport Land Use Commission policies. The LUCP included an acoustical insulation program for homes in the Santa Ana Heights area (previously an unincorporated island, subsequently annexed into Newport Beach). The program, identified as the Acoustical Insulation Program ( AIP ), provided sound attenuation for the residences projected to be within the 65-CNEL contour and exposed to aircraft noise levels in 7 A variance is essentially an administrative procedure that is included in the California Noise Standards to allow an airport proprietor to develop and implement programs to reduce the noise impact area around the airport. JWA has been granted five variances from Caltrans, Aeronautics Division, as follows: November 1974, December 1976, March 1979, July 1982, and June The County currently has a pending variance application with Caltrans consistent with the requirements of the California Noise Standards. JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM 2-15

18 excess of 65 CNEL. Over 400 residences have been acoustically insulated and the owners have granted avigation easements to the County as the proprietor of JWA. In addition to the AIP, the County adopted the Santa Ana Heights Specific Plan ( SAHSP ), which provided for the conversion of the residential area along Birch Street to Acacia Avenue to a business park. Noise Monitoring Program As part of its ongoing efforts to operate JWA in a manner sensitive to the residents who live under the approach and departure corridors, the County of Orange has developed one of the most stringent access and noise abatement programs in the country. See also discussion in Section To obtain data on the noise characteristics of Airport operations, the County has established a sophisticated Airport Noise Monitoring System ( ANMS ), which monitors aircraft noise levels and obtains accurate data regarding aircraft flight tracks and fleet mix. The noise levels of all commercial aircraft operations and many general aviation operations are recorded at 10 permanent noise monitoring station ( NMS ) around the Airport as part of the ANMS. The locations of the NMS are shown on Exhibit 4.7-7, provided in Section 4.7, Noise. That exhibit also shows the boundaries of the local jurisdictions. Three of the NMS are located in Santa Ana Heights (1S, 2S, and 3S), which has been annexed by the City of Newport Beach; four are located in the City of Newport Beach (4S, 5S, 6S, and 7S), one is located in Irvine (8N), one is located in Santa Ana (9N), and one is located in Tustin (10N). The data from the ANMS is combined with data from other sources to permit precise noise modeling. Radar trackings and noise levels measured at the NMS have produced very accurate depictions of flight tracks. Further, both CNEL and Single Event Noise Exposure Level ( SENEL ) are monitored and calculated each day and for each aircraft. The JWA Access and Noise Office is primarily responsible for monitoring compliance with and enforcing County/JWA regulations regarding aircraft noise and operational restrictions. REGULATORY SETTING PRIMARY AGENCIES WITH REGULATORY AUTHORITY The regulation of airports and aircraft is subject to a wide range of federal, State, and local statutes and regulations. The federal government exercises authority over much of the aviation field, including a complete preemption of the regulation of aircraft in flight undertaken for noise control or noise reduction purposes. In brief, all regulatory authority over procedures used in the operation of aircraft in flight and the control and use of the navigable airspace of the United States is exclusively federal. In addition, the federal government has regulatory authority related to aircraft and aircraft engine emissions. The State of California is presently limited in its regulation of aircraft noise to the application and enforcement of the California Noise Standards (which are a regulatory structure adopted by the California Department of Transportation ( Caltrans ) under the authority of provisions of the California Public Utilities Code and which appear in Title 14 of the California Code of Regulations). The State also utilizes the provisions of the California Public Utilities Code to establish countywide Airport Land Use Commissions ( ALUCs ) to set land use compatibility standards for 2-16 JOHN WAYNE AIRPORT GENERAL AVIATION IMPROVEMENT PROGRAM

2.0 INTRODUCTION, PROJECT HISTORY, AND SETTING

2.0 INTRODUCTION, PROJECT HISTORY, AND SETTING 2.0 INTRODUCTION, PROJECT HISTORY, AND SETTING 2.1 PURPOSE OF THIS The California Environmental Quality Act ( CEQA ) (California Public Resources Code [ PRC ] 21002.1) states that the purpose of an environmental

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

AESTHETICS REGULATORY SETTING. Federal. State/Regional. Federal Aviation Regulations Part 77. State Aeronautics Act

AESTHETICS REGULATORY SETTING. Federal. State/Regional. Federal Aviation Regulations Part 77. State Aeronautics Act AESTHETICS This section discusses GAIP-related impacts to aesthetics and visual quality at John Wayne Airport ( JWA or the Airport ). The term aesthetics is used to denote visual character of Airport facilities

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Feasibility Study Federal Inspection Service Facility at Long Beach Airport Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration County of Santa Clara Department of Planning and Development Planning Office County Government Center, East Wing, 7 th Floor 70 West Hedding Street San Jose, California 95110-1705 (408) 299-5770 FAX (408)

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. February 14, 2017

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. February 14, 2017 RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA February 14, 2017 WHEREAS, the County of Orange ( County ), through the Board of Supervisors ( Board ), is the owner and operator of

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Milbrae 450 Poplar Avenue Milbrae, California 94030 Wednesday, June 4, 2014 5:45 p.m. to 6:45 p.m. PDT The FAA typically uses the airport

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION 3.0 PROJECT DESCRIPTION 3.1 PROJECT LOCATION The Project would be implemented at John Wayne Airport, Orange County ( JWA or the Airport ) in an unincorporated area of Orange County. Although the Airport

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #4 June 8 & 9, 2016 Agenda 1. Study Process 2. Noise Complaint Patterns 3. Proposed Overflight Areas (AOA) 4. Proposed Land

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

SUTTER COUNTY. General Plan Update Technical Background Report

SUTTER COUNTY. General Plan Update Technical Background Report SUTTER COUNTY General Plan Update Technical Background Report February 2008 SUTTER COUNTY GENERAL PLAN UPDATE TECHNICAL BACKGROUND REPORT PREPARED FOR: SUTTER COUNTY PREPARED BY: PBS&J IN PARTNERSHIP

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY 19 April 2016 Dave Full, RS&H Katie van Heuven, Kaplan Kirsch & Rockwell TODAY S PRESENTATION ACRP Update Overview

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon.

Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon. Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon. On September 24, 2013, the Board of County Commissioners

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Appendix A - Definitions

Appendix A - Definitions Appendix A - Definitions Aeronautical Activity Any activity conducted at airports which involves, makes possible, or is required for the operation of aircraft, or which contributes to or is required for

More information

General Aviation Land Use Planning

General Aviation Land Use Planning Our team. General Aviation Land Use Planning PURDUE ROAD SCHOOL - 2017 Presented by: Maria Muia, Ph.D., Senior Aviation Planner Woolpert, Inc. Brian Payne, Director Columbus Airport Nick Isenberg, Project

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Master Plan & Noise Compatibility Study Update

Master Plan & Noise Compatibility Study Update Working Document-Subject to Change, March 2010 Master Plan & Noise Compatibility Study Update (14 CFR Part 150) TECHNICAL ADVISORY COMMITTEE March 24, 2010 Working Document-Subject to Change, March 2010

More information

AIR TRANSPORTATION ELEMENT

AIR TRANSPORTATION ELEMENT AIR TRANSPORTATION ELEMENT Sonoma County Permit and Resource Management Department 2550 Ventura Avenue Santa Rosa, CA 95403 Adopted by Resolution No. 08-0808 of the Sonoma County Board of Supervisors September

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management

MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management MESA COUNTY DEPARTMENT OF PUBLIC WORKS Administration - Building - Engineering Road and Bridge Traffic - Planning - Solid Waste Management 200 S. Spruce St. P.O. Box 20,000 Grand Junction, Colorado 81502-5022

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Airport Master Plan Update

Airport Master Plan Update Duttchessss Countty Airrporrtt Masstterr Plan Updatte Airport Master Plan Update Final Report Dutchess County Airport Town of Wappingers, New York C&S Engineers, Inc. 499 Col. Eileen Collins Blvd. Syracuse,

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 COUNTY OF INYO REQUEST FOR QUALIFICATIONS For Airport Environmental Services Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018 County of Inyo Public Works Department P.O.

More information

AIRPORTS POLICY 28, AIRPORTS:

AIRPORTS POLICY 28, AIRPORTS: AIRPORTS POLICY 28, AIRPORTS: It is the policy of Washington County to protect the function and economic viability of existing public use airports, while ensuring public safety and compatibility between

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options City Council Meeting: May 24, 2017 Agenda Item: 8.A

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

Comparison Between Old and New ALUC Plans

Comparison Between Old and New ALUC Plans A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,

More information

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the

More information

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP.

This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5 TRAFFIC AND CIRCULATION This section evaluates the projected traffic operations and circulation impacts associated with the proposed upgrade and expansion of the LWRP. 4.5.1 Environmental Setting Existing

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Scoping Meeting LAX Landside Access Modernization Program

Scoping Meeting LAX Landside Access Modernization Program Welcome Scoping Meeting LAX Landside Access Modernization Program Thursday, February 19, 2015 5:00 p.m. to 8:00 p.m. Proud Bird Restaurant 11022 Aviation Boulevard Los Angeles, CA 90045 Welcome Scoping

More information

City of Upland, California September 2014 Draft

City of Upland, California September 2014 Draft Cable Airport Land Use Compatibility Plan City of Upland, California September 2014 Draft Cable Airport Land Use Compatibility Plan September 2014 Draft Prepared for City of Upland, California Prepared

More information

FRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951)

FRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951) FRENCH VALLEY AIRPORT (F70) 37600 Sky Canyon Dr. Murrieta, CA Phone: 951-600-7297 Riverside FAA FSDO Complaint Line: (951) 276-6701 Visit the F70 website for additional information regarding the airport

More information

BOARD OF AIRPORT COMMISSIONERS -

BOARD OF AIRPORT COMMISSIONERS - 0 OF1 Los Angeks World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS - Meeting Date: O'IAA.A.)1.Alk-Tort/uQA212J`s-- Approved by: Samantha Bricker - Deputy Executive Director 11/16/2017 11-Pleviewed

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

Presented by Long Beach City Attorney s Office Michael Mais, Assistant City Attorney February 17, 2015

Presented by Long Beach City Attorney s Office Michael Mais, Assistant City Attorney February 17, 2015 Presented by Long Beach City Attorney s Office Michael Mais, Assistant City Attorney February 17, 2015 1 In existence since 1923 Covers 1166 acres Surrounded by a mix of commercial, industrial and residential

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

LAX Plan September 29, 2004

LAX Plan September 29, 2004 LAX Plan September 29, 2004 LAX Plan Table of Contents 1. PURPOSE OF THE PLAN.....1 1.1 Use of the Plan. 1 1.2 Vision.....1 1.3 The LAX Plan Area.. 2 2. GOALS AND OBJECTIVES......2 3. POLICIES AND PROGRAMS

More information

Chapter One PROJECT DESCRIPTION

Chapter One PROJECT DESCRIPTION Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information