Company name: Western Power Electricity Compliance Manual Datasheet - Distribution Indicators 2016/17
|
|
- Meredith King
- 5 years ago
- Views:
Transcription
1 Economic Regulation Authority (WA) Company name: Western Power Electricity Compliance Manual Datasheet - Distribution Indicators 2016/17 IMPORTANT NOTICE FOR ELECTRICITY DISTRIBUTION LICENSEES Licensees should refer to the Electricity Distribution Licence Performance Reporting Handbook for information on the definitions of electricity distribution indicators, listed in these datasheets. Page 1 of 11
2 Distributor: Western Power Reporting Period: 2016/17 Network Reliability Indicator No. Reference Description NQR 1 NQR 2 NQR 3 NQR 4 NQR 5 NQR 6 Sch 1(5), item 5 Sch 1(5), item 5 The number of premises of small use customers to which the supply of electricity has been interrupted for more than 12 hours continuously The number of premises of small use customers to which the supply of electricity has been interrupted more than the permitted number of times, as is defined in section 12(1) {of the NQ&R Code} For each discrete area, the average length of interruption of supply to customer premises expressed in minutes Sch 1(11)(a), item 11(a) For each discrete area, the average number of interruptions of supply to customer premises Sch 1(11)(b), item 11(b) For each discrete area, the average percentage of time that electricity has been supplied to customer premises Sch 1(11)(c), item 11(c) For each discrete area, the average total length of all interruptions of supply to customer premises expressed in minutes Sch 1(11)(d), item 11(d) REFER TABLE 1 (below) REFER TABLE 1 (below) REFER TABLE 6 REFER TABLE 6 REFER TABLE 6 REFER TABLE 6 NQR 7 Overall SAIDI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 8 NQR 9 Distribution Network (Planned) SAIDI by Total Network, CBD, Urban, Short Rural and Long Rural Distribution Network (Unplanned) SAIDI by Total Network, CBD, Urban, Short Rural and Long Rural Page 2 of 11
3 Network Reliability Indicator No. Reference Description NQR 10 Normalised distribution network SAIDI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 11 Overall SAIFI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 12 NQR 13 NQR 14 Distribution Network (Planned) SAIFI by Total Network, CBD, Urban, Short Rural and Long Rural Distribution Network (Unplanned) SAIFI by Total Network, CBD, Urban, Short Rural and Long Rural Normalised distribution network SAIFI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 15 Overall CAIDI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 16 NQR 17 Distribution Network (Planned) CAIDI by Total Network, CBD, Urban, Short Rural and Long Rural Distribution Network (Unplanned) CAIDI by Total Network, CBD, Urban, Short Rural and Long Rural NQR 18 Normalised distribution network CAIDI by Total Network, CBD, Urban, Short Rural and Long Rural Page 3 of 11
4 NQ&R - Network Reliability - Table 1 Perth CBD and Description Discrete Area Total Network the urban Other areas of areas the State combined Interruptions for more than 12 hours Number of premises interrupted continuously (Sch 1 section 5(a) NQ&R Code) Number of interruptions 43,794 1,625 More than the permitted number of interruptions (Sch 1 section 5(b) NQ&R Code) Premises interrupted more than 9 times in a year Premises interrupted more than 16 times in a year 7,166 3,344 - Network Reliability - Table 2 Description Discrete Area Total Network CBD Urban Short Rural Long Rural Overall SAIDI Distribution Network (Planned) Distribution Network (Unplanned) Normalised Distribution Network Overall SAIFI Distribution Network (Planned) Distribution Network (Unplanned) Normalised Distribution Network Overall CAIDI Distribution Network (Planned) Distribution Network (Unplanned) Normalised Distribution Network Page 4 of 11
5 Complaints Indicator No. NQR 19 NQR 20 NQR 21 Reference Sch 1(6) clause Sch 1(7) clause Sch 1(8) Description Total number of complaints received {that Part 2 or an instrument made under section 14(3) of the NQ&R Code has not been, or is not being, complied with} Total number of complaints received from customers in each of the discrete areas {that Part 2 or an instrument made under section 14(3) of the NQ&R Code has not been, or is not being, complied with} Total amount spent in addressing complaints {that Part 2 or an instrument made under section 14(3) of the NQ&R Code has not been, or is not being, complied with} other than by way of payment under sections 18 and 19 {of the NQ&R Code} Basis of Reporting Number Percentage Value ($) NQR 22 Total number of technical QoS complaints 2,245 NQR 23 Total number of technical QoS complaints that are low supply voltage complaints 156 NQR 24 Percentage of technical QoS complaints that are low supply voltage complaints 6.9% NQR 25 Total number of technical QoS complaints that are voltage dip complaints 18 NQR 26 Percentage of technical QoS complaints that are voltage dip complaints 0.8% NQR 27 Total number of technical QoS complaints that are voltage swell complaints 20 NQR 28 Percentage of technical QoS complaints that are voltage swell complaints 0.9% NQR 29 Total number of technical QoS complaints that are voltage spike complaints 6 NQR 30 Percentage of technical QoS complaints that are voltage spike complaints 0.3% NQR 31 Total number of technical QoS complaints that are waveform distortion complaints - NQR 32 Percentage of technical QoS complaints that are waveform distortion complaints 728 REFER TABLE 3 (below) $320,470 NQR 33 Total number of technical QoS complaints that are TV or radio interference complaints 80 NQR 34 Percentage of technical QoS complaints that are TV or radio interference complaints 3.6% NQR 35 Total number of technical QoS complaints that are noise from appliances complaints - NQR 36 Percentage of technical QoS complaints that are noise from appliances complaints NQR 37 Total number of technical QoS complaints that are other complaints 1,965 NQR 38 Percentage of technical QoS complaints that are other complaints 87.5% Page 5 of 11
6 Complaints Indicator No. Reference Description Breakdown of technical QoS complaints into the likely cause of problem that caused the complaint separated into: Network equipment faulty - Total Number Basis of Reporting Number Percentage Value ($) 150 Network equipment faulty - Percentage Network interference by NSP equipment - Total Number 4 6.7% Network interference by NSP equipment - Percentage 0.2% NQR 39 Network interference by another customer - Total Number Network interference by another customer - Percentage Network limitation - Total Number Network limitation - Percentage % 37.3% Customer internal problem - Total Number 230 Customer internal problem - Percentage 10.2% No problem identified - Total Number No problem identified - Percentage Environmental - Total Number Environmental - Percentage Other - Total Number % 1.2% Other - Percentage 5.6% NQ&R - Complaints - Table 3 Number of Complaints Discrete Area Received Perth CBD 2 Urban areas other than the Perth 419 CBD All other areas of the State 307 Total 728 Page 6 of 11
7 Compensation Payments Indicator Reference No. NQR 40 Description The number of payments made, and the total amount paid under section 18 of the NQ&R Code clause Sch 1(9) Basis of Reporting Number Percentage Value ($) 601 $12,020 $12,020 is indicative of $20 statutory payments. Western Power pays customers $50 i.e. an additional ex-gratia payment of $30 per occurrence. Total exgratia payments were $18,030 NQR 41 The number of payments made, and the total amount paid under section 19 of the NQ&R Code clause Sch 1(9) 13,289 $1,063,120 There were 13,289 payments of $80 made during 2016/17, totalling $1,063,120, for supply interruptions exceeding 12 hours Page 7 of 11
8 Network and Asset Information Indicator Reference No Description Basis of Reporting Number Percentage NQR 42 Number of metered supply points by feeder category (CBD, urban, short rural and long rural), reported against the categories of residential and non-residential customers and sub-transmission, high voltage and low voltage REFER TABLE 4A (below) NQR 43 Number of unmetered supply points, by type of feeder (CBD, urban, long rural and short rural) REFER TABLE 4B (below) NQR 44 NQR 45 Energy delivered (GWh) by type of feeder (CBD, urban, long rural and short rural) reported against the categories of residential and non-residential customers and subtransmission, high voltage and low voltage Line lengths by type of feeder (CBD, urban, long rural and short rural) reported against the categories of underground and overhead line categories and sub-transmission, high voltage and low voltage REFER TABLE 4C (below) REFER TABLE 5A (below) NQR 46 Number and total capacity of transformers, separated into sub-transmission and distribution REFER TABLE 5B (below) NQR 47 Total distribution losses (%) 3.23 NQR 48 Size of network service area (sq km) 255,064 NQR 49 Number of poles 778,561 NQR 50 Peak demand (MW) 2,988 Distribution poles only This is 15% lower than the 2015/16 Peak demand value (3,515MW) and is attributed to a moderate summer Page 8 of 11
9 CBD Urban Rural Short Rural Long 5,520 3,273 2,247 N/A 55 5, , ,610 67,804 N/A , , ,691 18,757 N/A ,314 96,848 77,188 19,660 N/A 51 96,797 Numbers across the feeder categories may have a different distribution from the previous year due to annual feeder assessment and reclassification Network & Asset Information - Table 4B Number of Un-metered Supply Points Total No. CBD Urban Rural Short Rural Long ,810 3,035 1,002 Network & Asset Information - Table 4A Number of Metered Supply Points Total No. By type of customer By supply voltage Feeder Category Residential Nonresidential ST HV LV Network & Asset Information - Table 4C Energy delivered (GWh) By type of customer By supply voltage Feeder Category Total GWh Residential Nonresidential ST HV LV CBD Urban Rural Short Rural Long ,063 3,492 5,572 2,432 6,631 2,994 1,298 1, ,068 1, Numbers across the feeder categories may have a different distribution from the previous year due to annual feeder assessment and reclassification Page 9 of 11
10 Business Descriptors - Table 5A Line length (km) Feeder Category CBD Urban Rural Short Rural Long By supply voltage Total km Underground Overhead ST HV LV N/A ,749 15,597 7,153 N/A 6,133 16,616 18,046 7,018 11,028 N/A 10,028 8,019 52,917 3,070 49,847 N/A 50,177 2,739 Numbers across the feeder categories may have a different distribution from the previous year due to annual feeder assessment and reclassification Business Descriptors - Table 5B Transformer Type Sub-transmission Distribution Number of Transformers N/A 68,560 Total capacity of Transformers N/A 10,104 MVA Page 10 of 11
11 Table 6 - Reliability Description The average length of interruption of supply to customer premises expressed in minutes The average number of interruptions of supply to customer premises The average percentage of time that electricity has been supplied to customer premises: The average total length of all interruptions of supply to customer premises expressed in minutes: Clause No. Discrete Area 2013/ / / /17 Sc1 (11)(a) Sc1 (11)(b) Sc1 (11)(c) Sc1 (11)(d) Perth CBD The urban areas other than the Perth CBD All other areas of the State Perth CBD The urban areas other than the Perth CBD All other areas of the State Perth CBD The urban areas other than the Perth CBD All other areas of the State Perth CBD The urban areas other than the Perth CBD All other areas of the State % % % % % % % % % % % % ,000 1, Page 11 of 11
Network Quality and Reliability of Supply Code
Network Quality and Reliability of Supply Code 2016/17 Performance Report Prepared by: Audited by: Asset Service Delivery Qualeng Left blank intentionally CS10#5323926 2016/17 Page 1 of 28 CONTENTS Contents
More information2016 SCE Reliability Review. November 27 th, 2017 Irwindale, California
2016 SCE Reliability Review November 27 th, 2017 Irwindale, California 1 Meeting agenda Overview of SCE Reliability definition and measurement SCE s 2016 Reliability performance How to obtain local reliability
More informationPart 9 MAINTENANCE MANUAL. Distribution Construction Standards Handbook
Part 9 MAINTENANCE MANUAL Distribution Construction Standards Handbook General Notes: The Maintenance Manual (MM series) is a collection of drawings for superseded construction standards. These can be
More information2016/17 Water, Sewerage and Irrigation Performance Data Report
2016/17 Water, Sewerage and Irrigation Performance Data Report March 2018 DRAFT - Water, Sewerage and Irrigation Performance Report 2016/17 4th Floor Albert Facey House 469 Wellington Street, Perth Mail
More informationHOUSEHOLD TRAVEL SURVEY
HOUSEHOLD TRAVEL SURVEY Household Travel Survey i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 SUMMARY OF TRAVEL... 2 2.1 All-Day Travel Patterns... 2 2.1.1 Automobile Availability... 2 2.1.2 Trip
More informationManaging Director of Transmission. Report for the year 2012
Managing Director of Transmission Report for the year 2012 Introduction (1) Special Condition 2I of SP Transmission s licence requires it to appoint a Managing Director of Transmission (MDT) to be responsible
More informationOperational Performance
Customer Services, Operations, and Safety Committee Board Action/Information Item III-A January 10, 2008 Operational Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationCompliance Document for New Zealand Building Code for Backcountry Huts
Compliance Document for New Zealand Building Code for Backcountry Huts Prepared by the Department of Building and Housing Department of Building and Housing 2009 This Compliance Document is protected by
More informationApproval of Limited Facilities Camping Interim Policy 1
Strategic policy Approval of Limited Facilities Camping Interim Policy Corporate Plan reference: A smart economy A prosperous, high-value economy of choice for business, investment and employment - Strong
More informationCircuit Reliability Review
Circuit Reliability Review Orange District 3 January 2017 1 Providing Safe, Reliable, and Affordable Power is modernizing the power grid to meet the changing needs and expectations of our customers and
More informationNotification to Suppliers
Notification to Suppliers Engagement of Auditors Regarding Certification for the PSO Levy Reference CER/17/021 Date Published 22/02/2017 Closing Date N.A. Executive Summary In the 2016/17 Public Service
More informationNorthfield to Ingle Farm #2 66 kv Sub transmission line
Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER
More informationSUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012
SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions
More informationBlack Start Ancillary Service Schedule
1. Glossary and Interpretation 1.1 Glossary: In this Ancillary Service Schedule, unless the context otherwise requires, the following definitions apply: Availability Fee means the monthly availability
More informationnortheast group, llc Sub- Saharan Africa Electricity Metering: Market Forecast ( ) May group.com
northeast group, llc Sub- Saharan Africa Electricity Metering: Market Forecast (2014 2024) May 2014 www.northeast- group.com Sub- Saharan Africa Electricity Metering: Market Forecast (2014-2024) Sub- Saharan
More informationPerformance of Wind Farms in Thailand
Performance of Wind Farms in Thailand Based on Mott MacDonald s in country experience Sasaraj Laoharatchapruek Bangkok, 06 June 2018 Sasaraj Laoharatchapruek Renewable Energy Consultant Bangkok Based Experience
More informationSTATUTORY INSTRUMENTS. S.I. No. 856 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC CONTROL STANDARDS) ORDER, 2004
STATUTORY INSTRUMENTS S.I. No. 856 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC CONTROL STANDARDS) ORDER, 2004 PUBLISHED BY THE STATIONERY OFFICE DUBLIN To be purchased directly from the GOVERNMENT PUBLICATIONS
More informationTelephone Fax
John C. Frain Director Regulatory Strategy & Revenue Policy P.O. Box 1475 Baltimore, Maryland 21203-1475 Telephone 410.470.1169 Fax 410.470.8022 www.bge.com john.frain@bge.com Via Electronic Filing April
More informationAtt. A, AI 46, 11/9/17
Total s San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 Date: 11/8/17 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity
More informationc. 5~AL ~ Gulf Power Report 03/01/2019 March 1, 2019 Mr. Adam Teitzman, Commission Clerk Florida Public Service Commission
Report One Energy Place. Pensacola, Florida 32520 Gulf Power Company cc: Gulf Power Company Russell Badders, Esq. Florida Public Service Commission Mr. Thomas Ballinger, Director, Division of Engineering
More informationINDEMNITY APPLICATION FORM
INDEMNITY APPLICATION FORM The following forms may only be completed by pilots and aircraft based at Gloucestershire Airport. Operator indemnity refers to all operators and flying schools/clubs that will
More informationCENSUS OF INDIA Tahsil Profile. PART- I Provisional Population Totals,2011. Total Male Female. Total Male Female
District Pune Tahsil Pune City PART- I Provisional Population Totals,211 Number of administrative units CENSUS OF INDIA 211 Tahsil Profile Administrative units Number of Villages Number of Statutory Towns
More informationREGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective
REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I General provisions Article 1 Objective This Regulation sets out rules on the operation of remotely piloted aircraft with
More informationMEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE
MEETING THE CHALLENGES OF FLOODS AND BUSHFIRES THE Energex EXPERIENCE Presenters: Colin Lee & Russell Gordon, ENERGEX 1 November 18 th 2015 2 ENERGEX S Footprint Electricity distributor SEQ $12B+ assets
More informationCairns Airport Aircraft Noise Information Report. Quarter (July to September)
Cairns Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 19 December 2012 Airservices Australia. All
More informationFacilities to be provided to passengers by airlines due to denied boarding, cancellation of flights and delays in flights.
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS AIR TRANSPORT ISSUE I, DATED EFFECTIVE: 01.08.2016 File
More informationQuarterly Performance Measurement Report
Quarterly Performance Measurement Report Department: Aviation Section: Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department
More informationCircuit Reliability Review
Circuit Reliability Review Newport Beach January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationDate: 11/6/15. Total Passengers
Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service
More informationVAR-501-WECC-3 Power System Stabilizer. A. Introduction
A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions
More informationCARNES CROSSROADS COMMUNITY ASSOCIATION, INC. CARNES CROSSROADS GREEN BARN RENTAL AGREEMENT
CARNES CROSSROADS COMMUNITY ASSOCIATION, INC. CARNES CROSSROADS GREEN BARN Address: 207 1 st Avenue Summerville, SC 29486 RENTAL AGREEMENT PLEASE PRINT LEGIBLY: Printed Name of Applicant: E-mail address/es:
More information1 YORK REGION TRANSIT/ VIVA SYSTEM PERFORMANCE
Report No. 6 of the Transportation Services Committee Regional Council Meeting of June 23, 2011 1 YORK REGION TRANSIT/ VIVA SYSTEM PERFORMANCE The Transportation Services Committee recommends: 1. Receipt
More information2013/2014 Membership Application
Caravan Industry Association Western Australia ACT NOW 2013/2014 Membership Application Membership of CIAWA Key benefits are: Free advertising for all Members in the Annual Caravan and Camping Guide Best
More informationCertification Memorandum. Guidance to Certify an Aircraft as PED tolerant
Certification Memorandum Guidance to Certify an Aircraft as PED tolerant EASA CM No.: CM-ES-003 Issue 01 issued 23 August 2017 Regulatory requirement(s): CS 23.1309(b)(1), CS 25.1309(a)(1), CS 27.1309(a),
More informationPart 5 Low Voltage Underground DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK
DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK HB01-2007 Drawing Register Number Revision Description U08-01 E Mini Pillar, Installation Guide with 3Ph supply Arrangement U08-02 A Mini Pillar 240V Supply
More informationCircuit Reliability Review
Circuit Reliability Review Beverly Hills January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCivil Aviation Order (Exemption from the provisions of the Civil Aviation Regulations 1988 certain ultralight aeroplanes) Instrument 2015
I, MARK ALAN SKIDMORE AM, Director of Aviation Safety, on behalf of CASA, make this instrument under regulation 11.160 of the Civil Aviation Safety Regulations 1998, subregulations 5 (1) and 5 (1A) of
More informationCircuit Reliability Review
Circuit Reliability Review Tustin January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and
More informationSubject: Flight Duty Time and Flight Time Limitations Cabin Crew
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENT SECTION 7 FLIGHT CREW STANDARDS TRAINING AND LICENSING
More informationCircuit Reliability Review
Circuit Reliability Review Pico Rivera January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Apple Valley January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Westminster January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationRunway 35 South & West (Jet) Departure Flight Path Amendment
Environmental Assessment Runway 35 South & West (Jet) Departure Flight Path Amendment Canberra Airport Airservices Australia 1 of 8 Environment Assessment Runway 35 South & West (Jet) Departure & North
More informationAurizon Network Public Quarterly Performance Report. 4th Quarter 2017/18 April - June 2018
Public 4th Quarter 2017/18 April - June 2018 Performance Measures - Data This report is published in compliance with s obligations under clause 10.3.4 of its 2016 Access Undertaking. Performance Measure
More informationComparison Between Old and New ALUC Plans
A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,
More informationAurizon Network Public Quarterly Performance Report 2nd Quarter 2017/18 October - December 2017
Public 2nd Quarter 2017/18 October - December 2017 Version issued 10/9/2018, including correction to Performance Measure 7 data Performance Measures - Data This report is published in compliance with s
More informationCircuit Reliability Review
Circuit Reliability Review Rosemead January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Cerritos January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationMATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose
1. Purpose This document outlines the transfer capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as
More informationCENTRE TRANSPORT BUSINESS
THE OF CENTRE TRANSPORT BUSINESS PROSPECTUS 26-28 July 2013 PERTH CONVENTION & EXHIBITION CENTRE PERTH TRUCK AND TRAILER SHOW BIGGER THAN EVER! 26-28 July 2013 Following on from a massive show in 2011,
More informationNZQA unit standard version 2 Page 1 of 7. Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance
Page 1 of 7 Title Apply knowledge of aircraft radio systems to the certification of aeronautical maintenance Level 6 Credits 30 Purpose This knowledge-based unit standard is one of a series intended for
More informationcommunication tower means a tower or structure built to support equipment used to transmit communication signals;
Ontario Ministry of Natural Resources Subject Communication Tower Sites on Crown Land Compiled by - Branch Lands & Waters Section Land Management Policy PL 4.10.02 Replaces Directive Title Communication
More informationCircuit Reliability Review
Circuit Reliability Review South El Monte January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a
More informationGENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS 1 APPLICABILITY 1.1 Wiener Kongresszentrum Hofburg Betriebsgesellschaft m.b.h. (Hofburg Vienna) operates the congress centre Hofburg on the premises of the Vienna Hofburg.
More informationCircuit Reliability Review
Circuit Reliability Review Thousand Oaks January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationM A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose
1. Purpose This document outlines the Transfer Capability on MATL Path 83 for both long-term capability and for current seasonal capabilities adjusted for known System Operating Limits (SOLs), such as
More informationCircuit Reliability Review
Circuit Reliability Review Orange District 3 January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationUSE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION
luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),
More informationCircuit Reliability Review
Circuit Reliability Review Buena Park January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Simi Valley January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Lancaster January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More information24-26 July 2015 PERTH CONVENTION & EXHIBITION CENTRE 2015 PROSPECTUS THE CENTRE TRANSPORT BUSINESS
24-26 July 2015 PERTH CONVENTION & EXHIBITION CENTRE 2015 PROSPECTUS THE CENTRE OF TRANSPORT BUSINESS 2015 PERTH TRUCK AND TRAILER SHOW THE CENTRE OF TRANSPORT BUSINESS - 24-26 JULY 2015 The Perth Truck
More informationCircuit Reliability Review
Circuit Reliability Review Ventura District 1 January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationCircuit Reliability Review
Circuit Reliability Review El Monte January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationSHIV Green Energy : SPECIALIST FOR :
Bird Spike Guard SHIV Green Energy : SPECIALIST FOR : Manufacturing, Supply & Erection of Materials for 11kv to 400kv Lines & Sub-Station, i. e. Silicon Rubber Insulator Disc, Pin, Post, Isolator, D.O.
More informationCircuit Reliability Review
Circuit Reliability Review Rancho Cucamonga January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationCircuit Reliability Review
Circuit Reliability Review City of Orange January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a
More informationCircuit Reliability Review
Circuit Reliability Review La Habra January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationSample Terms & Conditions for special authorization licences
Sample Terms & Conditions for special authorization licences This package can be used as a technical reference when applying to the Passenger Transportation Board for special authorization to operate passenger
More informationCertification Specifications and Acceptable Means of Compliance for Aircraft Noise CS-36
European Aviation Safety Agency Certification Specifications and Acceptable Means of Compliance for Aircraft Noise Amendment 3 29 January 2013 CONTENTS (general layout) AIRCRAFT NOISE PREAMBLE BOOK 1 NOISE
More informationCircuit Reliability Review
Circuit Reliability Review Ventura District 2 January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationFlight Duty Time and Flight Time Limitations Cabin Crew
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI CIVILAVIATIONREQUIREMENT SECTION 7 FLIGHT CREW STANDARDS TRAINING AND LICENSING
More informationREVISION OF REG. 1371/2007 ON RAIL PASSENGERS RIGHTS AND OBLIGATIONS: THE POSITION OF PUBLIC TRANSPORT OPERATORS AND ORGANISING AUTHORITIES
NOVEMBER 2017 REVISION OF REG. 1371/2007 ON RAIL PASSENGERS RIGHTS AND OBLIGATIONS: THE POSITION OF PUBLIC TRANSPORT OPERATORS AND ORGANISING AUTHORITIES In the European Union, UITP brings together more
More information1987 SUMMER USE SURVEY OF MINNESOTA STATE PARK VISITORS
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp (Funding for document
More informationNational Broadband Network
National Broadband Network Patrick Flannigan - Head of Construction Disclaimer This document sets out NBN Co s proposals in respect of certain aspects of the National Broadband Network. The contents of
More informationCircuit Reliability Review
Circuit Reliability Review Fontana January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and
More informationCircuit Reliability Review
Circuit Reliability Review Covina January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and
More informationGood Neighbour Guide A guide to being a good neighbour in Peachland
District of Peachland Good Neighbour Guide A guide to being a good neighbour in Peachland 1 Introduction to the Guide Good neighbours make great neighbourhoods. We each play a role in enhancing our neighbourhoods
More informationThe United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin
The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin INTRODUCTION THE COUNTRY Tanzania covers 945,234 sq. km made up 942,832
More informationCircuit Reliability Review
Circuit Reliability Review Yorba Linda January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationEuropean Aviation Safety Agency
TCDS.R.125 Page 1 of 10 European Aviation Safety Agency EASA TYPE-CERTIFICATE DATA SHEET SA 341 G SA 342 J Type Certificate Holder: AIRBUS HELICOPTERS Aéroport International Marseille Provence 13725 Marignane
More informationCircuit Reliability Review
Circuit Reliability Review Diamond Bar January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationMELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016
MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016 MEETING THE CHALLENGE OF POPULATION GROWTH 24 14.4 12.6 MELBOURNE METRO
More informationCircuit Reliability Review
Circuit Reliability Review Kern District 2 January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a
More informationTRANSPORTATION SERVICE Actual
PERFORMANCE REPORT-THIRD QUARTER VISION TO DELIVER REGIONAL MULTI-MODAL TRANSPORTATION SERVICES AND INFRASTRUCTURE IMPROVEMENTS THAT SIGNIFICANTLY AND CONTINUALLY INCREASE TRANSIT MARKET SHARE. MISSION
More informationHugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via
Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia 5000 Lodged via email consultation@electranet.com.au. Friday, 21 July 2017 Dear Mr Klingenberg, RE: Eyre Peninsula
More informationCircuit Reliability Review
Circuit Reliability Review Huntington Beach January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationCircuit Reliability Review
Circuit Reliability Review Orange District 2 January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationCircuit Reliability Review
Circuit Reliability Review Victorville January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Desert Hot Springs January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to
More informationThe 95 contemporary Guest Bedrooms and Suites are well appointed with all the necessary facilities to ensure a comfortable stay.
At the Mullingar Park Hotel every gathering is a special occasion. 'Your guests are our guests'. Whether you are organising a small meeting, a national or international conference, exhibition, gala event
More informationCircuit Reliability Review
Circuit Reliability Review Cypress January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and
More informationCircuit Reliability Review
Circuit Reliability Review Alhambra January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review Murrieta January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationThe Electric Power System
The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:
More informationCircuit Reliability Review
Circuit Reliability Review Corona January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and
More informationElectric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts
Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationCircuit Reliability Review
Circuit Reliability Review Placentia January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationCircuit Reliability Review
Circuit Reliability Review El Segundo January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean
More informationPuerto Rico Convention Center August Exhibit Agreement COMPANY NAME: CONTACT PERSON: MAILING ADDRESS:
COMPANY NAME: CONTACT PERSON: MAILING ADDRESS: CITY: ZIP CODE: TELEPHONE: CELL PHONE: FAX: EMAIL: A 50% nonrefundable deposit will be required upon signing the agreement. Full payment for the booth space
More information