1 FINAL REPORT Opportunities and Constraints Report + Waterfront Trail Feasibility Study (Port Hope to Cobourg)

2 Report Waterfront Trail Feasibility Study (Port Hope to Cobourg) PREPARED BY: Dan Campbell, BA Project Manager VERIFIED BY: Will McCrae, P.Eng. Project Director CIMA+ 55 King Street East Bowmanville, ON K9A 5K7 September 17, 2015

3 Table of contents 1. Project Background The Waterfront Trail County Road 2 Environmental Assessment Planning Process and Opportunity Statement Preferred Alternative Solution Preferred Design Alternative Timing of Implementation Study Purpose Context Opportunities and Constraints Provincially Significant Wetlands Carr s Marsh PSW Peter s Rock PSW Gage Creek and Municipality of Port Hope Connection Town of Cobourg Connection Railways Flood Plain and Erosion Hazards Land Use and Ownership Accessibility Considerations Estimated Costs Conclusions & Next Steps Integration with the County Road 2 EA and Phasing Short Term Integration: Phase II-a and Phase II-b Medium Term Integration: Phase III Long-term Integration: Phase IV & Phase V Beyond the Completion of County Road 2 Upgrades Recommended Next Steps i

4 List of Figures Figure 1: The Waterfront Trail in Ontario... 1 Figure 2: Preferred Design Cross-Section (Rural)... 4 Figure 3: Preferred Design Cross CPR Bridge Structure... 4 Figure 4: Alternative Shoreline Alignment... 6 Figure 5: Limits of Carr s Marsh PSW... 7 Figure 6: Carr s Marsh looking south from Bob Carr Road right-of-way... 8 Figure 7: Example wetland viewing platform (Port Hope Waterfront Trail)... 8 Figure 8: Limits of Peter's Rock PSW... 8 Figure 9: Peter's Rock PSW... 9 Figure 10: Gage Creek Area Figure 11: Mouth of Gage Creek Figure 12: View Across Gage Creek North of Mouth Figure 13: Cobourg Parks Master Plan excerpt Figure 14: CN Rail Corridor Figure 15: Looking south from County Road 2 CPR overpass Figure 16: Land use map: Hamilton Township Official Plan (annotated) Figure 17: Existing Waterfront Trail in Port Hope South of Sculthorp Marsh List of Appendices Appendix A: Appendix B: Conceptual Trail Alignment Map Cost Estimates ii

5 1. Project Background 1.1 The Waterfront Trail Northumberland County Road 2 between The Town of Cobourg and the Municipality of Port Hope currently forms part of the original 270 km long section of the Waterfront Trail that now follows the Ontario shores of Lake Ontario, Lake Erie, Lake St. Clair as well as the Niagara, Detroit and St. Lawrence Rivers. Established in 1995 the Waterfront Trail now consists of 1,400 kilometres of pathway (21%), neighbourhood streets (21%) and rural roadways (58%). County Road 2 from Hamilton Road to Rogers Road is currently part of the 58% of the Waterfront Trail that follows a rural roadway. Trail facilities for cyclists and pedestrians on County Road 2 are currently provided in the form of paved shoulders on both sides of the roadway. There are no separated pathway/trail facilities along or parallel to this portion of County Road 2. Figure 1: The Waterfront Trail in Ontario Northumberland County Road 2 Kingston Toronto Map adapted from: Waterfront Regeneration Trust, State of the Waterfront Trail (2013) Since 1995 the Waterfront Regeneration Trust (WRT) has been working with partners that include waterfront municipalities, conservation authorities and senior levels of government to improve the Waterfront Trail towards the legacy goal for the Trail, which is to become a dedicated off-road path as close to the water s edge as possible. The WRT s 2013 State of the Waterfront Trail report recognizes that utilizing road infrastructure has been a key component of the trail s growth, which has allowed it to connect sixty-eight waterfront communities. However, a survey of participants in the 2013 Great Waterfront Trail Adventure found that: + 59% would like to see the trail move-off road + 90% would like the trail to be closer to the water s edge In this regard, there are currently 140 projects planned or underway to improve the Waterfront Trail and the associated waterfront landscapes. 1

6 1.2 County Road 2 Environmental Assessment Upgrades along County Road 2, which are currently being planned by the County of Northumberland, constitute one of the 140 projects that are proposed or underway along the Waterfront Trail. In 2010, the County initiated a Municipal Class Environmental Assessment (Class EA) Study to examine alternatives to address future transportation needs along the County Road 2 corridor between: + Hamilton Road in the Municipality of Port Hope; and + William Street in the Town of Cobourg Planning Process and Opportunity Statement HDR itrans was retained by the County to undertake the Class EA Study following the guidelines for a Schedule C project in accordance with the Municipal Class Environmental Assessment documentation published by the Municipal Engineers Association (MEA) in June 2000 and amended in 2007, 2011 and The Class EA Study examined existing conditions within the study area and evaluated solutions for transportation improvements along the County Road 2 corridor to provide a strategy that: + Improves Accessibility: Provides safe, economic and efficient movement of people and goods and is supportive of all modes of transportation + Promotes Sustainability: Preserves the natural integrity of the County Road 2 corridor and promotes active transportation + Respects Culture: Maintains the rural character of the communities + Creates a Complete Street: Creates an opportunity to escalate the current status of County Road Preferred Alternative Solution Broadly, the preferred solution developed during Class EA Study involves widening County Road 2 to a three-lane cross section and incorporating a two-way centre left turn lane to facilitate turns to and from County Road 2. Reflecting public and agency input received during the EA Study, the alternative solution also incorporates: + an off-road multi-use trail along the rural section; + a bicycle and/or multi-use trail along the urban section; + maintenance of the existing 1.5-metre-wide paved shoulders in the rural section; and + traffic calming at key intersections Preferred Design Alternative Several design alternatives were subsequently examined in detail to determine a preferred method for implementing the preferred solution described above. The preferred design alternative 2

7 incorporates the following improvements as detailed Section 5.11 of the County Road 2 Class EA Environmental Study Report. RURAL SECTION + A road widening along the north side of County Road 2 to accommodate a centre two-way left turn lane from Hamilton Road to Lovshin Road / New Amherst Boulevard. The turning lane will facilitate turning movements on and off of County Road 2. + A 1.5-metre-wide paved shoulder from Hamilton Road to Lovshin Road / New Amherst Boulevard. + A 3.0-metre off-road, multi-use trail from Hamilton Road to Lovshin Road / New Amherst Boulevard. + One roundabout at the Theatre Road intersection to promote traffic calming and reduce vehicular speeding. + Lowering the posted speed from 80 km/h to 70 km/h to further reduce vehicular speeding. + Relocation of the Burnham Market s access onto Apple Orchard Boulevard. URBAN SECTION + A road widening along the north side of County Road 2 to accommodate a four-lane cross section from Lovshin Road / New Amherst Boulevard to Rogers Road that will match the existing four-lane cross section between Rogers Road and William Street / Burnham Street metre on-road bike lanes between Lovshin Road / New Amherst Boulevard and Rogers Road. + A 1.5-metre concrete sidewalk on the south boulevard of County Road 2 from Lovshin Road / New Amherst Boulevard to Rogers Road. + A 3.0-metre off-road, multi-use trail on the north side of County Road 2 from Rogers Road to Strathy Road to provide a connection from an existing trail on the east side of Strathy Road to the Waterfront Trail that continues south along Rogers Road. STRUCTURES + Rehabilitation of the CPR Bridge Structure. + A separate multi-use trail structure south of the CPR Bridge Structure + A separate multi-use trail structure south of County Road 2 over Gages Creek Cross-sections for the preliminary preferred design developed for the EA are graphically illustrated in Figure 2 & Figure 3 below. 3

8 Figure 2: Preferred Design Cross-Section (Rural) Figure 3: Preferred Design Cross CPR Bridge Structure 1.3 Timing of Implementation Considering the 6km length of the project and financial limitations, the Class EA Study for County Road 2 recommends that construction of the preferred design be implemented in phases progressing from east to west. Rehabilitation of the CPR Bridge was identified as high priority (Phase I) and improvements are now substantially complete. Phase II is divided into two portions to support growth in the developing areas in the east part of Cobourg: + Phase II-a: Multi-use Trail Construction from Strathy Road to Rogers Road, with pavement rehabilitation, but no road widening. + Phase II-b: Widening to 4-lanes from Rogers Road to Lovshin Road with bicycle lanes and sidewalks. Any pedestrian or cycling facilities constructed as part of Phase II will constitute an improvement to the existing Waterfront Trail route on County Road 2 and will also form an important component of the local active transportation network in the northeast part of the Cobourg urban area. As a result, the shorter-term implementation of Phase II multi-use trail/sidewalk/bicycle lane improvements will have both immediate and long-term value regardless of the ultimate location of the Waterfront Trail west of Lovshin Road. 4

9 The County Road 2 Class EA Study also notes that the design of the roadway improvements proposed for Phases III, IV & V will not be impacted by the decision to implement the Waterfront Trail at a location other than along County Road Study Purpose While feasible, the construction of the multi-use trail along County Road 2 described in the Class EA Study will represent a significant investment for the County and may not result in a facility that is consistent with the ultimate objectives for the Waterfront Trail. Maintaining the Waterfront Trail along County Road 2 will result in several less-than-ideal outcomes, including: + Separation from the Lake Ontario waterfront and associated natural landscapes + Proximity to the busy and higher speed County Road 2 corridor + Connections to the Cobourg and Port Hope urban areas along high-volume urban arterial roadways that are not directly linked to the existing waterfront routes and waterfront amenities in both communities In this regard, an alternative alignment for the Waterfront Trail that follows the Lake Ontario shoreline between Port Hope and Cobourg rather than County Road 2 has the potential to offer significant benefits by providing a facility that is: + Better aligned with the overall objectives of the Waterfront Trail as set-out by the WRT + More attractive to users of all skill levels from a safety perspective + Able to offer a greater diversity of attractions for recreational users, both local residents and tourists + Easier to connect to the waterfront trails, parks and other public open spaces that already exist in the communities of Port Hope and Cobourg Given the foregoing, the County has initiated this feasibility study to examine, at a conceptual level, the feasibility of an alternative alignment. The objective of this report is to examine the opportunities and constraints associated with the shoreline alternative to provide: + An overview of the feasibility of a shoreline-orientated alignment that can be incorporated into the conclusion of the County Road 2 Class EA Study. + Guidance relative to the studies and consultative process that will be required if this alternative is pursued further. While this study will examine the feasibility of an alternate alignment for the Waterfront Trial, it is recognized that public input into the County Road 2 Class EA Study has highlighted the value of the existing paved shoulders along County Road 2. Specifically, the existing paved shoulders provide experienced and confident cyclists with a direct route that can be better maintained year-round for commuting use between communities and longer distance sport cycling. In this regard, a key assumption of this study is the future retention of the paved shoulders on County Road 2 as described in the Class EA Study. 5

10 3. Context Land use south of County Road 2 is primarily agricultural with larger parcels fragmented by the CNR and CPR railways and to a lesser degree by the overhead hydro corridor. The CNR corridor separates the southern section of most parcels from the northern portions that are actively used for agriculture. Sections of these parcels south of the CNR corridor are not actively farmed and consist primarily of coastal wetlands, small forested areas and other natural geographic features that present several unique challenges for trail development. The Waterfront Trail alignment oriented along the Lake Ontario shoreline is most consistent with previous local planning for creation of a recreational trail facility and, based on a high-level review, a shoreline oriented alignment appears technically feasible, although it will require significant time and coordination with stakeholders and approving agencies to complete the planning, negotiation and design required to make it a reality. Figure 4 below identifies the study area and the alternative shoreline alignment is shown in green. Figure 4: Alternative Shoreline Alignment 4. Opportunities and Constraints The following sections provide discussion on the opportunities and constraints associated with the natural and built geographic features in the study area as well as the social, cultural and economic considerations that will impact potential alternative alignments. 4.1 Provincially Significant Wetlands There are two identified Provincially Significant Wetlands (PSWs) within the study area: Peter s Rock PSW and Carr s Marsh PSW (see Figure 4 above). Limited trail development is permitted in both evaluated and unevaluated wetlands if the mitigation of impacts is demonstrated through an environmental impact study. 6

11 4.2 Carr s Marsh PSW The extent of the Carr s Marsh PSW is delineated by the hatched lines shown in Figure 5 below. This marsh is comprised of 42.4 hectares of marsh and swamp with minimal open water area. It is one of the few intact coastal wetlands in the area and is also a designated Area of Natural and Scientific Interest (ANSI). Portions of the marsh are owned by the Ganaraska Region Conservation Authority (GRCA) and managed as a wildlife reserve. Public access to the wildlife reserve is not encouraged. Carr s Marsh PSW provides habitat to a variety of species including: + Least Bittern (nationally threatened species) + Caspian Tern & Black Tern (provincially significant) + Passerine, shorebird and raptor stopover site of significance in the district + Amphibian and fish species (breeding location), as well as other wildlife in conjunction with adjacent uplands The Pineridge Broadcasting Inc. property located adjacent to the northeast corner of the marsh has some potential with regard to providing trail access for the shoreline alignment via Bob Carr Road. Lands on this property are higher in elevation, previously disturbed and suitable for construction of parking and trailhead facilities; however, land acquisition or an agreement with the property owner would be required. Figure 5: Limits of Carr s Marsh PSW OPPORTUNITIES + Previously disturbed high-ground on the Pine Ridge Broadcasting site may provide opportunity for facilities and amenities such as a trailhead and parking area, interpretive/educational displays and an elevated viewing platform. 7

12 CONSTRAINTS + Connections for wildlife to adjacent forested uplands need to be preserved. + The trail should be aligned north of PSW to avoid sensitive habitat and minimize environmental impacts. + Trail alignment through or near the PSW would require intrusive and expensive boardwalk construction and should be avoided. The photographs provided below depict potential views and the type of viewing facilities that may be associated with a trailhead on the Pine Ridge Broadcasting site. Figure 6: Carr s Marsh looking south from Bob Carr Road right-of-way Figure 7: Example wetland viewing platform (Port Hope Waterfront Trail) 4.3 Peter s Rock PSW Peter s Rock PSW encompasses a small area of open water on the shoreline of Lake Ontario that is separated from the main lake by a barrier beach. The Peter s Rock PSW was evaluated in 1991 and has an area of 2.52ha composed of 28% swamp and 72% marsh. The PSW spans the entire area between the Lake Ontario shoreline and the CNR corridor. The 1991 evaluation notes that Peter s Rock is a feeding habitat for two provincially significant species: Black Tern and Black-crowned Night Heron. The limits of the Peter s Rock PSW are illustrated in Figure 8. Figure 8: Limits of Peter's Rock PSW 8

13 CONSTRAINTS + The open water portion of the Peter s Rock PSW, which directly abuts the CNR will require the trail to be oriented on the south side of the PSW. + The south side of the PSW is separated from the Lake Ontario beach be a narrow (10 metre ±) strip of trees and woody vegetation similar to the shoreline south of the Sculthorp Marsh PSW in Port Hope. As a result, a trail through this section will likely require construction of a boardwalk on footings to minimize impacts and provide stability. + The boardwalk will require 15 20m clear span section at the location of the outlet from the Peter s Rock PSW into Lake Ontario. Canadian National Railway Peter s Rock PSW Potential Boardwalk Segment Outlet Figure 9: Peter's Rock PSW 9

14 4.4 Gage Creek and Municipality of Port Hope Connection Whether located along County Road 2 or Lake Ontario shoreline Waterfront Trail facilities that are separated from County Road 2 will require a new crossing structure over Gage Creek. South of County Road 2, Gage Creek runs roughly parallel to the eastern boundary of Port Hope and is the main tributary for a watershed of approximately 50 square kilometres. The creek is home to 22 identified fish species, including native Brook Trout, and is monitored by the GRCA. There are several wetland areas east of Gage Creek. These wetlands have not been evaluated under the Provincial wetland classification system. Figure 10: Gage Creek Area The existing Port Hope Waterfront Trail provides access to the area from the west with a north-south leg that follows the west bank of the creek before terminating at the CNR corridor. The Waterfront alignment would require construction of a pedestrian/multi-use bridge to span Gage Creek; however, a suitable location for bridge construction would need to consider potentially sensitive wetlands to the east of the creek as well as active morphology of the creek mouth. OPPORTUNITIES + The existing Port Hope Trail that follows the west bank of Gage Creek north of the Lake Ontario shoreline and provides access to more stable crossing locations upstream of the creek mouth. + A small parking area and open space provide the opportunity for a trail head and gateway features at the crossing of Gage Creek and several large public parking areas further west are connected by the existing trail. CONSTRAINTS + The barrier beach at mouth of Gage Creek creates a dynamic environment that is not suitable for a bridge crossing due to the changing configuration of the creek mouth and surrounding beaches. + CNR corridor limits opportunities for north-south connections. + Unevaluated wetlands east of Gage Creek may require construction of boardwalk to connect the trail back to the waterfront from a more northerly crossing point. 10

15 Figure 11: Mouth of Gage Creek Figure 12: View Across Gage Creek North of Mouth 11

16 4.5 Town of Cobourg Connection The Town of Cobourg s Parks Master Plan identifies the current configuration of the Waterfront Trail where it enters the westerly town limits along County Road 2 (Elgin Street West). The Plan also recognizes westerly extensions of the open space system and associated trail network westerly from the Town boundary along the waterfront and the along the former Grand Trunk rail corridor. The preferred routing for a shoreline oriented trail connection is illustrated in the Master Plan as following Pebble Beach Drive and King Street West easterly to Monks cove and the rest of the existing open space network. The excerpt from the Parks Master Plan (below) shows the two alignments as part of the town s open space network with arrowheads extending to the west, south of Elgin Street West. The alignment closest to the shoreline would potentially extend west from Pebble Beach Drive connecting the Waterfront Trail westerly through lands immediately inside of the west Cobourg boundary that are owned by interested land developers. OPPORTUNITIES + Can incorporate planning for trail facilities into approval of development proposals for properties within the Cobourg boundary + An initial loop connecting Kerr Street and Pebble Beach may be possible utilizing the north-south road allowance between Lot 24 & Lot 25 Figure 13: Cobourg Parks Master Plan Excerpt CONSTRAINTS + Private residential property in Hamilton Township immediately west of Cobourg boundary may limit potential for a continuous linkage westerly from future development within the Town of Cobourg town limits. 12

17 4.6 Railways As noted, both the CPR and CNR mainlines run through the study area (see Figure 4 above). Land north of the CNR corridor is largely agricultural. There is limited land area between the CNR corridor and the Lake Ontario shoreline, and much of this area is comprised of wetlands. Construction of a multi-use trail in proximity to the CNR corridor would provide a means to bypass, at least in part, the wetland areas and minimize the need for construction of boardwalk; however, other constraints exist. CN Policy for their Rails with Trails program requires: Figure 14: CN Rail Corridor + no use of the rail right of way metre (50 ft.) minimum separation between the railway and an adjacent trail (measured from the centreline of the nearest track) metre (6 ft.) high fencing separating the railway and trail + all other approvals in place before applying to CN for approval OPPORTUNITIES + Partner with railway to upgrade north-south access routes and formalize controls at both the CPR and CPR level crossings: As part of future development in the southeast portion of Cobourg the informal trail that has emerged in the unopened road allowance between Lot 24/Lot 25 could be upgraded to formalize a north-south connection to the trail/linear park system along Kerr Street Bob Carr Road is already upgraded to a reasonable condition that could be further formalized to provide a smoother surface, improved level crossings and access to a potential trailhead parking area south of the CNR. Extension of the Kerr Street trail along the hydro corridor to Bob Carr road may provide further looping opportunities. The extension of the Theater Road right-of-way is currently unopened south of County Road 2 and occupied primarily by a drainage ditch that flows south to Carr s Marsh. If additional access is considered necessary along the middle section of the trail there may be potential to create a linkage in the Theater Road right-of-way. The former road allowance between Lot 34 and Lot 35 is now owned by the CNR and was upgraded to facilitate equipment access for clean-up activities in response to the train derailment that occurred several years ago. + Determine if there is an opportunity to reduce fencing requirements if the trail is separated from the track by natural features or a certain distance. 13

18 CONSTRAINTS If the waterfront trail is located adjacent to the Lake Ontario shoreline: + Trail loops and access roads will require crossings over both railways as per railway policy and Transport Canada s RTD10 specification + Setback requirements will confine trail alignment to the south of Peter s Rock PSW where the corridor between the lake and the railway is narrowest + Fencing requirements will increase project costs + Separation requirements will limit the opportunity to take advantage of the swath cleared for the railway to mitigate the trail s impact on natural features. 4.7 Flood Plain and Erosion Hazards The majority of the shoreline land south of the CNR is located within the flood plain and the setback from the Lake Ontario erosion limit. In this regard trail construction will likely have to be limited to the basic linear facilities and fill placement will likely have to be limited to the greatest extent possible with an emphasis on cut-fill balance. Furthermore crossing structures on water courses will have to be sized to prevent upstream flood plain impacts, particularly with respect to water surface elevations at the CNR corridor. In certain locations such as adjacent to the Peter s Rock PSW boardwalk structures will have to be design to resist erosion to a reasonable degree and cost benefit analysis will likely be required to determine the value of providing erosion protection vs. accepting risk of facility disruption. 4.8 Land Use and Ownership Publicly owned land along the waterfront is limited to a narrow parcel within the limits of Carr s Marsh that is owned by the Township of Hamilton. Adjacent to this parcel and immediately to the west is the parcel owned by the GRCA that is managed as a wildlife reserve rather than a conservation area that is actively used by the public. Within the study limits, there are five private landowners south of the CNR corridor. All land south of CNR is isolated and largely undeveloped with the exception of a single residential development at the east end of the study area that was recently approved by Hamilton Township. Future development of these lands is also constrained by official plan policies and zoning provisions. The majority of the land north of the CNR is currently in use for active agricultural purposes. Figure 15: Looking south from County Road 2 CPR Overpass 14

19 Figure 16: Land use map - Hamilton Township Official Plan (annotated) CPR Agricultural Port Hope Significant ANSI Flood Plain CNR Cobourg Significant Wetland OPPORTUNITIES + Current planning documents preclude significant development along a future shoreline alignment but do allow for development of trail facilities. + The Environment Canada Ecological Gifts Program offers a win-win land transfer opportunity with significant tax benefits to landowners who donate land or a partial interest in land to a qualified recipient such as the GRCA, the Northumberland Land Trust or the Nature Conservancy of Canada (Ontario branch). The recipient will then ensure that the land s biodiversity and environmental heritage are conserved in perpetuity. This may be one avenue through which the County is able to initiate a land acquisition strategy. CONSTRAINTS + It is understood that preserving privacy and opportunities for private recreation is a priority among current land owners. + Land acquisition, either by Northumberland County, the Township of Hamilton or through Environment Canada s Ecological Gifts Program, will have to be an evolving and carefully managed process. It should be noted that this process can be time consuming and would require coordinated and ultimately successful negotiations to ensure all property owners are on board. 4.9 Accessibility Considerations In accordance with Section 80.9 of the Accessibility for Ontarians with Disabilities Act (AODA), new trails must: + Provide minimum clear width of 1.0 metres and minimum clear height of 2.1 metres + Provide a minimum clear width at entrances of 0.85 metres to 1.0 metres + Include adequate edge protection with a 50 millimetre height when located near water or dropoffs 15

20 + Have a firm and stable surface (packed granular is acceptable) + Incorporate clear, informative trailhead signage + Incorporated accessible rest areas and amenities into the trail design in accordance with s.80.8 of the AODA Boardwalks and ramps are subject to additional requirements under the AODA (s80.12 & s80.13). For longer trails, an accessible loop may be desired by the community. 5. Estimated Costs Establishing a shoreline alignment for the Waterfront Trail between Port Hope and Cobourg will require the construction of approximately 5.9km of trail. Since paved shoulders on Country Road 2 will provide a paved route for cyclists requiring a smooth surface the it is anticipated that the shoreline alignment can be constructed with a 3.0m width and a packed granular surface (e.g. limestone screenings) on a compacted granular base. In locations where the soil and terrain conditions are not suitable for granular trail construction a boardwalk-type trail supported on piles will likely be required. Anticipated locations requiring boardwalk construction include: + Wetland area east of Gage Creek where a connection must be established between the stable crossing location over Gage Creek southerly to the stable strip of land located behind the Lake Ontario beach. + Adjacent to the Peter s Rock PSW where the trail must be located between the PSW and Lake Ontario due to the close proximity of the CNR line to the PSW s northern edge. In addition to the boardwalk sections of the trail the portion of the trail that will run through Lots 34 and 35 immediately east of Gage Creek will be somewhat complex to construct due to the relatively narrow strip of stable land that exists between Lake Ontario beach and the unevaluated wetland areas to the north. In this location design and construction of the trail will have to be more context sensitive to avoid significant disturbance to the trees and other vegetation in the area. An approach similar to that used west of Gage Creek (in Port Hope) to construct the existing trail between the beach and the Sculthorp Marsh PSW will likely be required (See Figure 17). This might involve narrowing the trail surface and or constructing an at-grade boardwalk on shallow footings to minimize disturbance due to excavation. Table 1 below summarizes the estimated costs associated with planning, designing and Figure 17: Existing Waterfront Trail in Port Hope South of Sculthorp Marsh 16

21 constructing the east-west portions of the main trail. This cost estimate does not include costs associated with: + Property acquisition; + north-south connections/loops; and + major programming or amenity type features. In total, construction costs are estimated at $3.3million (2014 dollars). Soft costs include engineering work associated with a Schedule B EA, detailed design and construction inspection as well as permit fees and are estimated at an additional $605,000 for a total estimated cost of approximately $3.9million. Table 1: Summary of Estimated Costs Location Estimated Costs (2014 $) Section Description From/To Length per Const. Soft Total (m) m A Cobourg Connection West End of Ravensdale Road to West Cobourg Boundary ,000 56, , B C D Carr's Marsh Area Peter's Rock Wetland Area Gage Creek Area West Cobourg Boundary Augustine Creek Augustine Creek to Lot 33/34 Boundary Lot 33/34 Boundary to Gage Creek (Incl. Crossing) 2,530 1,248, ,000 1,466, , , ,000 1,010, , , ,000 1,120, Total 5,910 3,348, ,000 3,953,000 Appendix A includes a map illustrating the conceptual alignment of the shoreline Waterfront Trail that forms the basis for the cost estimates above. Detailed cost estimates for each section of trail are included in Appendix B. 6. Conclusions & Next Steps Based on the high-level review, described herein, a shoreline oriented alignment for the Waterfront Trail between Port Hope and Cobourg appears technically feasible. However, given the challenges involved, it will take significant time and co-operation to complete the planning processes, negotiations and design work required to make such a trail a reality. In particular, the lack of available public land along the shoreline presents a significant challenge. In this regard, the concept alignment and rational presented in this report should be considered representative of a vision that may take many years to implement and will likely be subject to refinement as opportunities are explored and better understood. The following sections provide a detailed discussion of how future planning for the shoreline alignment can be integrated into: + The finalization of the County Road 2 EA 17

22 + The phased implementation of planned improvements along County Road 2 over the next 20 years + Future planning activities separate from the County Road 2 EA 6.1 Integration with the County Road 2 EA and Phasing Given the long timelines and potential complexities that may be associated with the County s opportunity to access shoreline land for trail construction purposes it is considered prudent that the County continue to include the construction of a separate multi-use pathway in the preferred solution identified in the County Road 2 Class EA Study. However, the EA documentation should include provisions to allow the County to continue working to establish a shoreline alignment as an alternative to implementing the multi-use pathway along County Road 2. The figure included in Appendix C illustrates the planned phasing of the County Road 2 improvements in conjunction with a flow chart that details the decision making process that can be used to determine where the Waterfront Trail will be constructed as the project progresses Short Term Integration: Phase II-a and Phase II-b As outlined in Section 1.3, the pedestrian and cycling facilities planned for Phase II-a and Phase II-b of the County Road 2 improvements (east of Lovshin Road) are required regardless of the ultimate location selected for the Waterfront Trail. As a result, Phase II of the planned improvements on County Road 2 can be implemented without the need for a final decision regarding location of the Waterfront Trail. This will provide the County with a 5-10 year window of time during which some or all of the next steps detailed in Section 6.2 can be completed. If agreements can be reached regarding land acquisition/access during the 5-10 year time horizon the County will then be in position to undertake a Schedule B EA specific to the shoreline alignment of the Waterfront Trail. The Schedule B EA planning process would involve more detailed site investigations and consultation with the public and agencies to develop a preliminary design for the shoreline alignment complete with documentation of the mitigating measures required to minimize impacts on the natural and social environment. If completed and approved the Schedule B EA would provide the basis for the County to formally focus all future Waterfront Trail construction along the shoreline with the scope of future phases of the County Road 2 improvements modified to exclude the multi-use pathway west of Loveshin Road. Future integration between the County Road 2 improvements and the construction of the shoreline Waterfront Trail would then be limited. Subject to the availability of funds, this would allow for the full length of the trail to be completed before the road improvements are implemented completely between Port Hope and Cobourg Medium Term Integration: Phase III If all feasibility challenges, primarily land access, cannot be resolved prior to the start Phase III of the County Road 2 improvements there will still be opportunities to explore implementing a portion of the shoreline trail with beneficial connections. Specifically, if the multi-use pathway is constructed along County Road 2 through the limits of Phase III it will improve access to the Burnham Farm Market for 18

23 pedestrians and cyclists. Furthermore, it will create an opportunity to develop an eastern trail loop connecting the route on County Road 2 to the Cobourg waterfront areas via Bob Carr Road. The following outlines the key considerations that would need to be addressed by the County in cooperation with Hamilton Township and the Town of Cobourg to implement an eastern trail loop. + Integrate the trail loop into the planning and design for the future development of the lands south of the CNR in the west end of Cobourg (west of the existing Pebble Beach subdivision). + Obtain access and/or acquire property for a route across Property L owned by Hamilton Township and Property M, which is privately owned. Ideally, to support future shoreline trail development, this access would allow the tail to be routed south of the CNR. However, if it was easier to obtain access for a route located north of the CNR or north of the CPR this should be considered. The east-west routing of the trail across properties L and M should also consider options to utilize any existing railway crossings that might be approved through the efforts of others. + Upgrade existing crossings over the CNR and CPR tracks along Bob Carr Road if the east-west property access allows the trial to be routed south of the CNR or along the road allowance between Lot 24 and Lot 25 if property access requires the trail to be routed north of the CNR and/or CPR. + Complete the requirements of a Schedule A environmental assessment as part of the planning, design and permitting of the trail loop. + Formalize trail facilities in the Bob Carr Road right-of-way potentially including fencing and other delineation along boundaries with private property. While implementing Phase III of the County Road 2 improvements, and potentially the eastern trail loop, the County will have another 5 year window to continue pursuing the next steps listed in Section 6.2 in an effort to overcome the identified challenges and potentially develop a shoreline land acquisition strategy that provides greater certainty prior to implementing Phase IV Long-term Integration: Phase IV & Phase V If agreements can be reached regarding shoreline land acquisition/access during the 5-10 year time horizon of Phase III improvements on County Road 2 the County will be in position to revist the shoreline Waterfront Trail planning process prior to starting Phase IV. This would involve undertaking a Schedule B EA specific to the shoreline alignment, completing more detailed site investigations and consultation with the public and agencies to develop a preliminary design for the shoreline alignment complete with documentation of the mitigating measures required to minimize impacts on the natural and social environment. If completed and approved the Schedule B EA would provide the basis for the County to formally focus all future Waterfront Trail construction along the shoreline with the scope of future County Road 2 improvements modified to exclude the multi-use pathway west of Theater Road. Future integration between the County Road 2 improvements and the construction of the shoreline Waterfront Trail would then be limited. 19

24 Should it not be possible to reach an agreement for shoreline land access prior to the start of Phase IV it will likely be impractical to consider not completing the Waterfront Trail as a multi-use pathway along County Road 2. As part of Phase V opportunities to create a western loop connecting to the existing facilities along the Lake Ontario shoreline in Port Hope should be explored Beyond the Completion of County Road 2 Upgrades If shore line land access issues remain unresolved and the planned County Road 2 upgrades are completed without construction of a shoreline trail the County and its member municipalities will still have the opportunity to consider exploring opportunities a parallel shoreline facility if desired. Because this will be 20+ years in the future it will be beyond the planning horizon of many existing land use plans. As such it is likely that the most effective means of planning for a future shoreline facility will be through integration with the development of future land use plans and policy. 6.2 Recommended Next Steps Given the current situation, this challenge may only be overcome as land ownership and land-use evolve over the long-term. Working towards the long-term vision of a shoreline alignment the County should: + Maintain an open dialogue with relevant land owners to identify and discuss mutually beneficial opportunities for land acquisition by the County or land transfer to supportive third parties such as the Nature Conservancy of Canada or the GRCA, should such opportunities arise. + Work in partnership with the GRCA to undertake any baseline existing conditions environmental inventories within the study area should opportunities for land access arise. + Work closely with member municipality s to ensure that planning approvals for properties within the study area incorporate provisions to support the short-term and long-term development of the shoreline alignment and any necessary connecting links. + Work closely with member municipalities to protect and plan for north-south connections and access routes that will allow loops to be established and provide opportunities for maintenance or emergency access. + Engage in preliminary discussions with CNR/CPR to identify a process for including railway approvals in a future Municipal Class EA. + Jointly with GRCA engage in preliminary discussions with Ministry of Natural Resources to further refine options for trail construction adjacent to the two Provincially Significant Wetlands. + Integrate Port Hope to Cobourg waterfront trail considerations into future local and county-wide official plans as those documents are updated to consider planning horizons further into the future that may involve the expansion of urban boundaries and accompanying land use designation changes. 20

25 Report: Waterfront Trail Feasibility Study APPENDIX A Conceptual Trail Alignment Map

26 HAMILTON ROAD BOB CARR ROAD ( ( ( ( N LEGEND Conceptual Trail Alignment Trail Type Granular LOT 1 LOT 1 ( MUNICIPALITY OF PORT HOPE A LOT 35 HAMILTON TOWNSHIP G a g e C COUNTY ROAD 2 LOT 35 B r e e k INDEX OF SHORELINE PROPERTIES Identifier C C Address/Locations LOT 34 LOT 34 D D k L a O e Ow ner LOT 33 LOT 33 a n t E o i r Total LOT 32 MOORE SERVICE ROAD ( E LOT 32 P e t e r ' s R o c k W e t l a n d Area (ha) South of CNR A Lot 35 (w est) Hunco Farms Limited B Lot 35 (centre) Hunco Farms Limited C 7083 County Road 2 Raymond Lane D Lot 34 Hunco Farms E 7169 County Road 2 Harris McKeen F 7373 County Road 2 Lloyd McKeen G Lot 31 (east), Lot 30, Lot 29 Hunco Farms H Lot 30 Hunco Farms I Lot 29 Hunco Farms J Lot 27 GRCA K Lot 27 Pine Ridge Broadcasting L Lot 26 Tow nship of Hamilton M 7875 County Road 2 Roger Mahabir F F F LOT 31 ( LOT 31 A u g u s t i n e C r e e k AUGUSTINE ROAD ( (( ( ( ( ( ( ( COUNTY ROAD 2 ( ( ( ( ( ( ( ( (( ( ( ( CANADIAN NATIONAL RAILWAY ( (( THEATRE ROAD SOUTH LOT 30 LOT 29 LOT 28 LOT 27 CANADIAN PACIFIC RAILWAY ( ( ( ( ( ( ( ( (( I LOT 30 G LOT 29 LOT 28 H LOT 27 G G (( ( ( H ( ( (( H ( (( ( ( C a r r ' s ( ( ( ( ( ( ( ( ( ( ( ( (( ( ( M a r s h J I ( K ( ( ( APPLE ORCHARD ROAD ( ( ( ( ( ( (( ( ( ( LOT 26 LOT 24 LOT 25 ( (( ( ( ( ( ( (( ( M ( (( (( ( HAMILTON TOWNSHIP TOWN OF COBOURG LOT 26 LOT 25 L M ( ( L M ( ( (( COUNTY ROAD 2 ( ( ( ( (( ( ( ( ( ( ( ( ( ( ( ( ( ( LOVSHIN ROAD LOT 24 LOT 23 LOT 23 CLIENT SCALE: PROJECT NAME: SHEET TITLE: SUB TITILE: PROJECT No: DRAFTER: APPROVER PORT HOPE TO COBOURG WATERFRONT TRAIL FESIBILITY STUDY CONCEPTUAL SHORELINE WATERFRONT TRAIL ALIGNMENT & MAJOR ENVIRONMENTAL FEATURES S. MAY D. CAMPBELL Context Sensitive Boardwalk ( Trail Water Course Crossing Municipal Boundary Overhead Transmission Line (( ( (( Wetland Railway Existing Railway Crossing Watercourse Area of Natural & Scientific Interest Evaluated Not Provincially Significant Evaluated Provincially Significant Not Evaluated DESIGNER APPROVER FOR DISCUSSION PURPOSES D. CAMPBELL W. McCRAE meters 1:15,000 CLIENT FILE No: --- DRAWING No: A1 DATE: SHEET No: 08/01/ of 1

27 Report: Waterfront Trail Feasibility Study APPENDIX B Cost Estimates

28 Benchmark Estimate of Shoreline Waterfront Trail Construction 08/01/2015 Part 'A' Cobourg Connection Trail Construction Unit Quantity Estimated Unit Cost Estimated Devlopment Costs a) 3.0m Wide Granular m 915 $ $ 210, b) Context Sensitive Section m 0 $ $ - c) 3.0m Wide Board Walk m 0 $ $ - Watercourse Crossings a) Minor Culvert ea 0 $ 15, $ - b) Major Culvert ea 0 $ 25, $ - c) Pedestrian Bridge ea 0 $ 250, $ - Fencing $ 10, $ - a) 1.8m High Railway Safety Fence m 225 $ $ 33, b) 1.2m High Trail Edge Fence m 90 $ $ 8, General Items a) Environmental Protection and Sediment Controls LS 100% $ 10, $ 10, b) Staging and Access LS 100% $ 5, $ 5, c) Bonds, Securities and Maintenances LS 2.5% $ 267, $ 6, d) Contingency LS 10.0% $ 267, $ 26, Total Construction $ 300, Soft Costs a) Environmental Assessment LS 5% $ 300, $ 15, b) Engineering & Design LS 5% $ 300, $ 15, c) Construction Inspection LS 7.5% $ 267, $ 20, d) Permit Fees LS 100.0% $ 5, $ 5, Total Soft Costs $ 55, Total Cost $ 355,831.25

29 Benchmark Estimate of Shoreline Waterfront Trail Construction 08/01/2015 Part 'B' Carrs Marsh Area Trail Construction Unit Quantity Estimated Unit Cost Estimated Devlopment Costs a) 3.0m Wide Granular m 2320 $ $ 533, b) Context Sensitive Section m 210 $ $ 72, c) 3.0m Wide Board Walk m 0 $ $ - Watercourse Crossings a) Minor Culvert ea 0 $ 15, $ - b) Major Culvert ea 4 $ 25, $ 100, c) Pedestrian Bridge ea 0 $ 250, $ - Fencing a) 1.8m High Railway Safety Fence m 1900 $ $ 285, b) 1.2m High Trail Edge Fence m 420 $ $ 37, General Items a) Environmental Protection and Sediment Controls LS 100% $ 60, $ 60, b) Staging and Access LS 100% $ 20, $ 20, c) Bonds, Securities and Maintenances LS 2.5% $ 1,108, $ 27, d) Contingency LS 10.0% $ 1,108, $ 110, Total Construction $ 1,247, Soft Costs a) Environmental Assessment LS 5% $ 1,247, $ 62, b) Engineering & Design LS 5% $ 1,247, $ 62, c) Construction Inspection LS 7.5% $ 1,108, $ 83, d) Permit Fees LS 100.0% $ 10, $ 10, Total Soft Costs $ 217, Total Cost $ 1,465,365.63

30 Benchmark Estimate of Shoreline Waterfront Trail Construction 08/01/2015 Part 'C' Peters Rock Wetland Area Trail Construction Unit Quantity Estimated Unit Cost Estimated Devlopment Costs a) 3.0m Wide Granular m 880 $ $ 202, b) Context Sensitive Section m 0 $ $ - c) 3.0m Wide Board Walk m 465 $ $ 279, Watercourse Crossings a) Minor Culvert ea 0 $ 15, $ - b) Major Culvert ea 2 $ 25, $ 50, c) Pedestrian Bridge ea 0 $ 250, $ - Fencing a) 1.8m High Railway Safety Fence m 880 $ $ 132, b) 1.2m High Trail Edge Fence m 0 $ $ - General Items a) Environmental Protection and Sediment Controls LS 100% $ 60, $ 60, b) Staging and Access LS 100% $ 30, $ 30, c) Bonds, Securities and Maintenances LS 2.5% $ 753, $ 18, d) Contingency LS 10.0% $ 753, $ 75, Total Construction $ 847, Soft Costs a) Environmental Assessment LS 5% $ 847, $ 42, b) Engineering & Design LS 5% $ 847, $ 42, c) Construction Inspection LS 7.5% $ 753, $ 56, d) Permit Fees LS 100.0% $ 20, $ 20, Total Soft Costs $ 161, Total Cost $ 1,008,837.50

31 Benchmark Estimate of Shoreline Waterfront Trail Construction 08/01/2015 Part 'D' Port Hope Connection Trail Construction Unit Quantity Estimated Unit Cost Estimated Devlopment Costs a) 3.0m Wide Granular m 0 $ $ - b) Context Sensitive Section m 820 $ $ 282, c) 3.0m Wide Board Walk m 300 $ $ 180, Watercourse Crossings a) Minor Culvert ea 1 $ 15, $ 15, b) Major Culvert ea 0 $ 25, $ - c) Pedestrian Bridge ea 1 $ 250, $ 250, Fencing a) 1.8m High Railway Safety Fence m 0 $ $ - b) 1.2m High Trail Edge Fence m 184 $ $ 16, General Items a) Environmental Protection and Sediment Controls LS 100% $ 60, $ 60, b) Staging and Access LS 100% $ 40, $ 40, c) Bonds, Securities and Maintenances LS 2.5% $ 844, $ 21, d) Contingency LS 10.0% $ 844, $ 84, Total Construction $ 950, Soft Costs a) Environmental Assessment LS 5% $ 950, $ 47, b) Engineering & Design LS 5% $ 950, $ 47, c) Construction Inspection LS 7.5% $ 844, $ 63, d) Permit Fees LS 100.0% $ 10, $ 10, Total Soft Costs $ 168, Total Cost $ 1,118,353.75

32 Report: Waterfront Trail Feasibility Study APPENDIX C Phasing Considerations and Decision Making Process

33 HAMILTON ROAD ( BOB CARR ROAD ( ( ( ( N Trail Completion Design & Construction of Shoreline Trail Land Acquisition for Shoreline Trail LOT 21 LOT 1 LOT 1 ( MUNICIPALITY OF PORT HOPE A Monitor for LOT Opportunities 35 to LOT 34 Implement Complete or Partial Shoreline Trail HAMILTON TOWNSHIP G a g e COUNTY ROAD 2 LOT 35 B C r e e k INDEX OF SHORELINE PROPERTIES Identifier C C Possible Western Loop Address/Locations LOT 34 D D k L a Road Completion Road/Trail LOT 33 Completion O e Owner LOT 33 a n t E o i r Total Proceed with LOT 32Phase V of County Road 2 Including LOT 31 Multi Use Trail MOORE SERVICE ROAD ( E LOT 32 P e t e r ' s R o c k W e t l a n d Area (ha) South of CNR A Lot 35 (w est) Hunco Farms Limited B Lot 35 (centre) Hunco Farms Limited C 7083 County Road 2 Raymond Lane D Lot 34 Hunco Farms E 7169 County Road 2 Harris McKeen F 7373 County Road 2 Lloyd McKeen G Lot 31 (east), Lot 30, Lot 29 Hunco Farms H Lot 30 Hunco Farms I Lot 29 Hunco Farms Proceed with Phase V of County Road 2 Excluding Multi Use Trail Add Western Loop with a Connection to County Road 2 Along ROW between Lot 34/35 J Lot 27 GRCA K Lot 27 Pine Ridge Broadcasting L Lot 26 Tow nship of Hamilton M 7875 County Road 2 Roger Mahabir yrs yrs PHASE V F F F ( LOT 31 A u g u s t i n e C r e e k AUGUSTINE ROAD ( LOT 30 (( ( ( ( ( ( ( COUNTY ROAD 2 G ( ( ( ( ( (( ( ( ( CANADIAN NATIONAL RAILWAY G G ( (( THEATRE ROAD SOUTH CANADIAN PACIFIC RAILWAY LOT 29 Proceed with Phase IV of County Road 2 Excluding Multi Use Trail (( ( ( (( ( ( ( ( (( LOT 28 H ( ( ( H ( H ( (( ( ( ( ( ( ( ( ( ( ( ( ( ( (( ( ( ( (( LOT 27 ( ( Carr's Marsh J LEGEND Conceptual Trail Alignment Trail Type Granular I Context Sensitive Boardwalk I ( APPLE ORCHARD ROAD K ( ( ( ( (( ( ( ( Trail Water Course Crossing Proceed with Phase III of County Road 2 Excluding Multi Use Trail ( ( ( ( L ( (( L ( (( ( ( ( LOT 26 ( ( ( ( ( ( M M ( (( M (( ( Municipal Boundary HAMILTONTOWNSHIP ( ( (( TOWN OF COBOURG LOT 25 ( ( ( ( (( ( ( ( ( ( ( ( Wetland Overhead Transmission Line Railway Existing Railway Crossing Watercourse ( ( ( ( ( ( (( ( (( LOVSHIN ROAD Yes EA Approval? NEW AMHERST BLVD LOT 24 COUNTY ROAD 2 Area of Natural & Scientific Interest Evaluated Not Provincially Significant Evaluated Provincially Significant Not Evaluated Undertake Schedule B EA for Shoreline Alignment Assess Options for LOT 29 Proceed with Identified LOT 27 Proceed with No LOT Partial 30 Shoreline Phase IV of LOT 28 Shoreline Phase LOT 26 III of LOT 25 LOT 24 LOT 23 Trail Crossing County Road 2 No Feasibility County Road 2 Assess Options for Parcels A, B, & Including Multi Challenges Including Multi No Partial Shoreline C Use Trail Resolved? Use Trail Feasible? Trail Crossing No Parcels L & M Add Eastern Loop Only with a Connection Yes Feasible? Yes to County Road 2 Yes Along Bob Carr Road PHASE IV PHASE III PHASE II-b Summary of Shoreline Feasibility Challenges Shoreline land required is privately owned and not currently accessible Railway co-operation Availability of financial resources See Section 6 for additional detail. Possible Eastern Loop 10-15yrs Yes 5-10 yrs Alternate Routing for Eastern Loop CL IENT ROGERS ROAD LOT 23 LOT 22 PROJECT NAME: SHEET TITLE: SUB TITILE: SCALE: PROJECT No: DRAFTER: S. MAY APPROVER DATE: DESIGNER APPROVER LOT 22 No PORT HOPE TO COBOURG WATERFRONT TRAIL FESIBILITY STUDY FOR DISCUSSION PURPOSES CLIENT FILE No: DRAWING No: SHEET No: STRATHY ROAD LOT 21 CONCEPTUAL SHORELINE WATERFRONT TRAIL ALIGNMENT PHASING CONSIDERATIONS D. CAMPBELL Yes D. CAMPBELL W. McCRAE meters 1:15,000 Identified Shoreline Feasibility Challenges Resolved? PHASE II-a yrs A1 02/04/ of 1

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Port Bruce. Interim Management Statement

Port Bruce. Interim Management Statement Port Bruce Interim Management Statement Port Bruce Interim Management Statement August 3, 1999 This Port Bruce Provincial Park Interim Management Statement provides direction for the custodial management

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS 3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the

More information

Presentation Overview

Presentation Overview DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services Lafourche Parish Government REQUEST FOR QUALIFICATIONS Landscape Architectural Services Bayou Lafourche Parish Multi-Use Path Feasibility Study Phase 1 And Bayou Lafourche Parish Multi-Use Path Feasibility

More information

Economic Development and Tourism

Economic Development and Tourism SECTION 4 SECTION 4 Economic Development and Tourism 4. Economic Development and Tourism Tourism plays a very important role in Niagara s economy, providing employment and generating business for support

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

County of Peterborough Active Transportation Master Plan

County of Peterborough Active Transportation Master Plan The TMP developed a conceptual AT/cycling network for Peterborough County that identified both on-road and off-road (trail) AT facilities. This was a coarse network based on the existing trails and off-road

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Pinellas County Environmental Lands

Pinellas County Environmental Lands Pinellas County Environmental Lands In addition to traditional parks and recreation facilities, Pinellas County owns and manages a system of environmental lands that provides specialized resource-based

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report

MARSHALL Subdivision. Township of Springwater, County of Simcoe. Traffic Brief for: Ontario Inc. Type of Document: Final Report MARSHALL Subdivision Township of Springwater, County of Simcoe Traffic Brief for: 489469 Ontario Inc. Type of Document: Final Report Project Number: JDE 1521 Date Submitted: October 19 th, 2016 10 / 19

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Whitemouth Falls Provincial Park. Draft Management Plan

Whitemouth Falls Provincial Park. Draft Management Plan Whitemouth Falls Provincial Park Draft Management Plan Whitemouth Falls Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural...

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR

More information

Watchorn Provincial Park. Management Plan

Watchorn Provincial Park. Management Plan Watchorn Provincial Park Management Plan 2 Watchorn Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 3 3.1 Natural... 4 3.2 Recreational... 4 3.3 Additional

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Cavan Monaghan Trail Master Plan. Prepared by Otonabee Conservation for The Township of Cavan Monaghan

Cavan Monaghan Trail Master Plan. Prepared by Otonabee Conservation for The Township of Cavan Monaghan Cavan Monaghan Trail Master Plan Prepared by Otonabee Conservation for The Township of Cavan Monaghan June 2010 Acknowledgements Thank you to the following individuals and organizations for their assistance

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

A number of goals were identified during the initial work on this Big Lake Transportation Plan. C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

CORNWALL WATERFRONT PLAN 2007

CORNWALL WATERFRONT PLAN 2007 CANAL LANDS CANAL LANDS Page 58 Introduction This chapter details areas of possible development or redevelopment, and lands to be protected from any form of development in the Canal Lands area. As outlined

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail

More information

FINCH HYDRO CORRIDOR TRAIL PROJECT

FINCH HYDRO CORRIDOR TRAIL PROJECT FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

Boyne Valley Provincial Park. Interim Management Statement

Boyne Valley Provincial Park. Interim Management Statement Boyne Valley Provincial Park Interim Management Statement January 20, 1995 REGIONAL DIRECTOR'S APPROVAL STATEMENT This Interim Management Statement will provide interim direction for the management of

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

RUSHMORE CONNECTOR TRAIL PROPOSAL

RUSHMORE CONNECTOR TRAIL PROPOSAL PURPOSE AND NEED Background The U.S. Forest Service, Black Hills National Forest (Forest Service) has received a special use permit application from the State of South Dakota Department of Game, Fish and

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 15.1.1 Harbour East-Marine Drive Community Council December 3, 2015 TO: SUBMITTED BY: Chair and Members of Harbour East - Marine Drive Community

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

November 11, 2009 BY  . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr. November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank

More information

4.0 Context for the Crossing Project

4.0 Context for the Crossing Project 4.0 Context for the Crossing Project This section provides background information about key features of the North Douglas Crossing project area, and opportunities and constraints. This information is important

More information

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011

ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY. Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Final Report OCTOBER 2011 ALBANY-HUDSON ELECTRIC TRAIL FEASIBILITY STUDY Prepared for: Town of East Greenbush 225 Columbia Turnpike Rensselaer, New York 12144

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What has been decided? What are the details of the plan? What

More information

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE 1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Bayview Escarpment. Interim Management Statement

Bayview Escarpment. Interim Management Statement Bayview Escarpment Interim Management Statement Bayview Escarpment Provincial Nature Reserve Interim Management Statement January 15, 1995 REGIONAL DIRECTOR'S APPROVAL STATEMENT This Interim Management

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5 2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

Brampton, Ontario REQ. no.: PLANNING, DESIGN & DEVELOPMENT COMMITTEE

Brampton, Ontario REQ. no.: PLANNING, DESIGN & DEVELOPMENT COMMITTEE ftorontoand REGION rv~ Conservation for The Living City May 22,2009 2I22V,5L CFN 42397 CLERK S DEPT. Mr. Peter Fay City Clerk, City of Brampton MAY 2 7 2008 2 Wellington Street West Brampton, Ontario REQ.

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF

More information

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses Office of the Clerk John D. Leach Director of Customer and Legislative Servicesffown Clerk 905-727-3123 ext. 4771 jleach@aurora.ca Town of Aurora 100 John West Way, Box 1000 Aurora, ON L4G 6J1 August 14,

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Conservation Area Management Statement

Conservation Area Management Statement Conservation Area Management Statement Miller Creek Wildlife Area Resolution #: Approval: Issue Date: Date of Last Revision: Table of Contents 1. Purpose....... 1 2. Property Description...... 1 2.1. Legal

More information