Contents. 1. Introduction Proposed Development Consultation Strategy Analysis of Responses Conclusion..

Size: px
Start display at page:

Download "Contents. 1. Introduction Proposed Development Consultation Strategy Analysis of Responses Conclusion.."

Transcription

1 1

2 Contents 1. Introduction Proposed Development 4 3. Consultation Strategy Analysis of Responses Conclusion Appendices 29 2

3 1. Introduction 1.1 This report is written in support of Transport for Greater Manchester s (TfGM) full planning application for the development of a new bus station, formation of a single bus concourse, redesign of carriageways and public realm on the site of the current Wigan Bus Station. The site is located to the north of Wigan Rail Stations, adjacent to New Market Street and parallel to Hallgate/Market Street on either side. 1.2 The purpose of this report is to record the consultation that TfGM carried out prior to submitting the full planning application. It describes the bus station scheme and the early design proposals, which formed the basis for consultation. It sets out the methods used to engage with stakeholders and members of local communities and summarises the responses that have influenced the submitted proposals. 1.3 The consultation took place between 23 rd November and 20 th December Proposed development 2.1 Wigan Bus Station is a key component of plans to grow and regenerate Wigan town centre which will also benefit the wider borough. The development will provide a substantial improvement in facilities, making public transport, cycling and walking more attractive options. In turn this will increase access to jobs, learning and leisure opportunities. The new bus station will support the Council s strategy to deliver significant growth in the local economy over the next decade and ensure people are able to take advantage of job opportunities and enjoy an excellent quality of life. More information about Wigan s economic strategy is available at The key benefits of the scheme The Wigan Bus Station scheme is also part of Greater Manchester s strategy to develop a strong and prosperous economy and contribute to making Greater Manchester a cleaner, safer and more attractive place to visit, live and work. The benefits of the project are: Improved accessibility into and across the town to employment, education, leisure, retail and other travel modes; Significant contribution to the regeneration of Wigan Town Centre by delivering a new, more attractive bus station that complements the wider town centre development; 3

4 Higher levels of personal safety for public transport users through a staffed and well-lit concourse, which includes CCTV recording and monitoring, and reduced person-vehicle conflict; Improved customer satisfaction, as a result of the improved facilities and passenger information. 2.3 Proposals under consultation A summary of the proposed changes to redevelop Wigan Bus Station is listed below: Change the layout of the bus station from three island platforms with drive on, drive off (DIDO) arrival and departure to a single, modern covered concourse building with 19 drive in reverse off (DIRO) stands to enable the consolidation of the bus bays into one covered concourse building, locating the stands closer together to reduce walk times for passengers changing between buses and other modes of transport; The covered concourse will improve passenger comfort and weather protection with improved passenger information; The new bus station design will use space more efficiently, accommodates the current bus services (average 85 departures per hour) and has capacity for 152 departures an hour, allowing for potential growth; Improved vehicular and pedestrian access to and from New Market Street/Frog Lane by improving the existing junction; Encourage more people to use public transport by upgrading the facilities e.g. bus information screens, café, Wi-Fi internet access; New toilet facilities which includes accessible toilets, Changing Places and baby change facilities; Reducing the number of pedestrian crossing points across the site from 14 to two; Improve access to and from The Galleries and wider town centre by improvements to Lever Street (covered) and Queens Pass, whilst maintaining the existing routes. 4

5 3. Consultation Strategy 3.1 Transport for Greater Manchester (TfGM) carried out public and stakeholder consultation between 23 rd November and 20 th December Aims and Objectives The aims and objectives of the consultation on proposals for the Wigan Bus Station were: To ensure that a wide range of people, including stakeholders, had the opportunity to hear about the new scheme and put forward their views; and To ensure that community engagement activities were fully accessible, informative and of relevance to the participants. 3.3 TfGM is continuing to work to achieve the following objectives: To ensure that information is fed back to communicate the final scheme design to stakeholders and the wider community in an effective way; To ensure that stakeholders and the wider community are kept up to date during the construction period and informed about temporary bus service arrangements; and To raise the profile of the scheme and create a sense of community ownership and community pride. 3.4 Feedback from the consultation has allowed TfGM to address any concerns about the proposals as the detailed design is developed. All feedback received has been carefully considered and responses have been issued to those queries raised during consultation. 3.5 Following the submission of the planning application, Wigan Council as the local planning authority, will notify stakeholders about the full planning application. This will provide a further opportunity for residents, local businesses and other local stakeholders to comment on the updated proposals through Wigan Council s planning process. The updated version of the plans will be available at and on Wigan Council s website as part of the planning application. 3.6 Work is expected to start on Wigan Bus Station in 2017 and be open for use in Methodology The consultation on Wigan Bus Station took place between 23 rd November 20 th December Consultation activity was designed to reach four main audiences: Councillors; 5

6 Councillors; The general public; Current and potential future bus station users; and Stakeholder groups e.g. local businesses, Wigan and Leigh College, The Deanery Church of England High School and Sixth Form College and Wigan Borough Clinical Commissioning Group. 3.9 Consultation with Councillors At the start of the consultation period Councillors were invited to a briefing event on the proposals for the bus station, held at the Town Hall on 24 th November The consultation leaflet and additional information was also circulated to Wigan Councillors who are members of the Transport for Greater Manchester Committee shortly before the public consultation began. Stakeholder Date Details Transport for Greater Manchester Committee Wigan Members 18 th November 2015 TfGMC s Wigan members were briefed by and received a copy of the public consultation leaflet Wigan Councillors 24 th November 2015 Councillors were invited to attend a member s briefing at the Town Hall by TfGM Project Manager James Nairn and Robert Owen from Wigan Council 3.10 Public consultation The consultation was promoted to local residents through a number of channels: 3.11 Consultation leaflets A total of 6,411 leaflets were distributed across Wigan. The leaflet provided information on the proposals, artist s impressions of the early designs, details of the public events and how to submit views to the consultation. A copy of the consultation leaflet is provided in Appendix A. 4,666 leaflets were distributed to all properties within an 800 metre radius of Wigan Bus Station 6

7 site on 20th November A map showing where the leaflet was posted is included in Appendix B. Many members of the public expressed a desire to have access to the online consultation form rather than a hard copy. On 23rd November, 100 leaflets were provided to students and staff at an initial meeting with Wigan and Leigh College. A link to the online consultation form was also provided. On 24 th November, 50 leaflets were placed in the Travelshop for members of the public to pick up and collect. On 25th November, 40 were leaflets provided to the Wigan Walking and Equestrian Forum. A link to the online consultation form was also distributed to the members of the forum. On 26th November at an initial meeting with Wigan Borough Clinical Commissioning Group, 100 leaflets were provided to be distributed to NHS surgeries across the borough. An additional 50 were provided on 7 th December. On 2nd December, 40 leaflets were distributed to businesses in Wigan Town Centre. At the public event held on Friday 4 th December, 30 leaflets were distributed to vendors within Wigan market. On Friday 11 th December, 500 leaflets were distributed to public buildings across Wigan borough. This included 100 to Wigan Library, 50 to Wigan Wallgate rail station, 50 within the Travelshop of Wigan North Western rail station and an additional 100 to the Travelshop in Wigan Bus Station. A total of 535 leaflets were handed out to members of the public at the seven public events held across Wigan town centre Public events Seven public consultation events were held during the consultation period to enable the local community to speak directly to Transport for Greater Manchester staff. A variety of accessible venues were chosen for the events during the week, at weekends, in the day and during the evening to enable as many people as possible to participate in the consultation. Transport hubs and the shopping centre were also chosen due to their potential to reach people 7

8 coming into the town centre from all parts of Wigan borough and further afield. This aim was achieved as can be seen from the post codes of people who completed a response form (see section 4.4). The events were promoted via the consultation leaflet, TfGM s website, posters, media releases and social media. Wigan Library Thursday 26 th November 2015, pm Grand Arcade Shopping Centre Saturday 28 th November 2015, 10.00am 5.00pm Wigan Wallgate Rail Station Monday 30 th November 2015, pm Thursday 3 rd December 2015, am Wigan Market Hall, New Market Street Friday 4 th December, 10.00am 5.00pm (attended by a British Sign Language interpreter) Wigan Bus Station Tuesday 8 th December, 10.00am 5.00pm Saturday 12 th December, 10.00am 5.00pm 3.13 TfGM s presence at each venue was indicated by two pull-up banner stands showing the early designs for Wigan Bus Station and featuring bullet points for the main benefits to public transport users. Two/three members of TfGM staff attended each event to give people copies of the leaflet, answer any questions, listen to and record any comments and to remind people they could submit comments up until 20 th December by post, or through the website. Website Information about the Wigan Bus Station and the consultation was provided on dedicated web pages on the TfGM website: The website provided an opportunity for respondents to submit their views to the consultation via an online form, which asked the same questions as the printed form in the leaflet. The consultation was advertised on the home page of the TfGM website enabling visitors to the site to click through to the information about the bus station and the online form to submit 8

9 views to the consultation process. The website featured large print and easy read versions of the consultation information. The website also featured a British Sign Language video which explained the proposals and how to submit comments. During the consultation period, TfGM recorded the following number of visits to its Wigan Bus Station pages: Content of the website page Introductory information about Wigan Bus Station Number of unique visits 2,116 British Sign Language video 10 Frequently asked questions about Wigan 166 Bus Station In addition, TfGM also logged the following number of clicks and downloads: Description of content Wigan Bus Station advert on the home page of the TfGM web site Number of unique clicks or downloads Wigan Bus Station consultation form Posters at Wigan Bus Station and Wigan bus stops Twenty-five large posters and 250 smaller bus information posters were put up at Wigan Bus Station and bus stops across the borough from 19 th November. The posters informed people that a new bus station was being planned for Wigan, the time and place of the public events and the website address to read about the plans and submit views to the consultation. The posters are shown in Appendix C Media releases To help launch the public consultation and ensure high levels of awareness, TfGM and Wigan Council officers briefed a reporter for the Wigan Evening Post and Wigan Observer, on November 23 rd. This resulted in coverage in both papers later that week 9

10 A media release was also issued by TfGM on 25 th November to promote the consultation. As well as being published on the TfGM website, articles were published in Bus and Coach Buyer UK and Place North West Social media TfGM and Wigan Council used Twitter, Facebook, YouTube and LinkedIn to promote the consultation for the Wigan Bus Station. From 23rd November 20 th December, 18 tweets were posted from TfGM s twitter account. TfGM also used Facebook (five times) and Linked In (once) as well as publishing a sign language video on YouTube to share the news that the consultation was underway Response mechanisms Respondents to the consultation were provided with a range of response mechanisms to submit their comments on the proposals. These included: Public events: seven public events were held during the consultation period Telephone: by calling wiganbusstation@tfgm.com The TfGM website Post: to the freepost address, TfGM Wigan Bus Station, Freepost, Manchester, M1 3BG, RRHE-RKUU-KSJY Section four of this report details the responses to the consultation received via each of these channels Consultation with Stakeholders Staff from Transport for Greater Manchester arranged seven meetings with stakeholder groups during the consultation period. A summary of the groups, dates of meetings and their operations are listed on the next page; Stakeholder Date Details Disability Design Reference Group (DDRG) 12 th November 2015 TfGM s DDRG act as a specialist consultation group to help develop accessible barrier-free designs which comply with (and 10

11 often exceed) legislation and best practice standards. Bus Operators Liaison Group 13 th November 2015 Attendees from; Stagecoach Arriva First Group Cumfy Bus National Express Wigan and Leigh College 24 th November 2015 Wigan and Leigh College offers part-time, full-time education and career guidance to 13, year olds within the borough Town Centre Management Board 25 th November 2015 TfGM provided access to information and offered the opportunity to meet with local business representatives Wigan Youth Zone 26 th November 2015 Wigan Youth Zone offers recreational, professional and personal development opportunities for young people from across the borough Wigan Borough Clinical Commissioning Group 26 th November 2015 and 15 th December 2015 Wigan Borough Clinical Commissioning Group is the statutory body responsible for commissioning local health services in Ashton, Leigh and Wigan. The borough CCG helped to distribute leaflets to NHS surgeries across Wigan borough. Stakeholder Date Details The Deanery Church of England High School and Sixth Form College 15 th December 2015 The Deanery Church of England High School and Sixth Form College is a coeducational secondary school and sixth form for pupils across Wigan. 11

12 A presentation was given to pupils and a question and answer session held. Wigan Access Committee 6 th January 2016 The Wigan Access Committee allows councillors and local businesses the opportunity to discuss investment opportunities and local government decisions for the borough of Wigan. The committee indicated they were unable to convene until January TfGM gave a presentation followed by handing out additional leaflets and material as per the public consultation Additional stakeholders consulted included: Stakeholder Wigan Shopmobility Wigan Town Centre Business and Retail Forum Wigan Taxi Association Wigan Cycle User Group Walkers and Equestrian Forum Details TfGM spoke to staff and supplied information/survey forms for service users TfGM spoke to staff and supplied information/survey forms for service users and businesses TfGM spoke to primary point of contact and supplied information/survey forms TfGM spoke to staff and supplied information/survey forms TfGM supplied information/survey forms to forum users 12

13 4. Analysis of Responses 4.1 Feedback from Councillors and Stakeholders During the consultation period meetings were organised with a wide range of stakeholders. The feedback received is summarised below. Stakeholder Councillors Disability Design Reference Group Bus Operators Design of the bus station Facilities Further comments Design of the bus station Facilities Further comments Design of the bus station Facilities Summary of feedback Advised that the boundary fences needed to be sufficient for the neighbouring properties, also advised that we should look for a greater presence for the bus station on Market Street with a protruding canopy No comments provided. Urged that disruption is kept to a minimum with appropriate screening Largely positive Welcomed proposals for Changing Places Asked for lessons learnt from previous similar schemes to be taken into consideration - concerns raised around signage, contrast and wayfinding and TfGM are developing a signage strategy taking these into account. Also raised question on greater integration between rail stations Positive about the plans would like to see a greater number of layover spaces. TfGM will consider this option (See appendix D for letter of support from Stagecoach GM) Suggested the presence of an Arriva desk within the new waiting facility Stakeholder Wigan and Leigh College Summary of feedback No specific comments. Generally supportive. 13

14 The Deanery Church of England High School and Sixth Form College Wigan Access Committee Facilities Design Further comments Facilities Broadly supportive of the need to modernise existing facilities, enquired about the provision of Wi-Fi and public toilets. Questions regarding how buses will turn around, how the doors will open, if there will be a second floor to the bus station and if the enhanced access area will go ahead. Other questions focused on the potential disruption. Discussions took place regarding how TfGM could involve pupils in the project development at an appropriate stage i.e. public art The Access Committee was broadly supportive of the scheme designs, proposals and the facilities being provided. Design Would like to see more taxi rank provision than on the current designs Further comments Requested the presence of a staff member from early evening onwards Regular briefing sessions have been held with TfGM s own Bus Station Staff to gain operational input within the design, to ensure they were able to advise on the bus station proposals and answer any queries. 4.2 Public Feedback In total 182 responses to the consultation were received via the Transport for Greater Manchester Wigan Bus Station survey form (paper copies and through the website). This level of feedback is comparable to similar consultation exercises recently carried out for other bus stations and interchanges in Greater Manchester. The method by which they were submitted is shown in the table below. Comments gathered at the seven public consultation events have also been recorded in question 2. It was decided that an additional seven-day window should be provided for members of the public to respond, to allow responses to be received by post in view of the Christmas holidays. As a result, all responses received by members of the public up to and including Monday 28 th December are included within these figures. 14

15 Source of responses Public responses Paper response form returned by post 134 Online response form Telephone 0 Total 182 The analysis of the public feedback received has been split into the following sections that follow the format of the consultation questionnaire: What are your views on the proposed new Wigan Bus Station? This includes responses submitted via the formal consultation form (either by post or via the TfGM website) and views expressed at the six public events held across Wigan. About you to understand which part of the community participated in the consultation. 15

16 4.3 Question 1: How important are each of these facilities to you? (Please rate 1 5, with 5 being the most important) The scores that all respondents gave have been added together to show which facilities were most important to people who responded, out of a maximum 910 (182 respondents x 5) Facility Total score A covered bus station and seated waiting area Improved security 721 New fully accessible toilets, including 716 baby changing facilities Bus information screens 714 The proposed layout of the new bus station Easy access to bus station staff 623 A ticket and information outlet 617 Café/coffee shop 586 Retail/Newsagents 477 ATM/Cash machine 450 Wi-Fi internet access 440 Cycle storage facilities Question 2: How would you use the new bus station: as a starting point, end point or changing point for your journey? Not all respondents answered this question and some people said they would use the bus station for two or all of the possible answers. The responses received are shown below. How would you use the new bus station? Total Changing point 66 End point 116 Starting point

17 Question 3: What are your views on the proposed design of the new facility? Over 300 comments were received about the design, layout and features of the new bus station from members of the public via the survey forms. The comments are summarised in the table below. In addition, fifty-two comments were recorded at the seven public events. These comments are also recorded below. Comment Detail Number of people who commented via the survey form Generally Positive Plans look good Generally negative Waste of money Safety and CCTV Comments included much needed investment and about time Many of those who were supportive of the scheme proposals thought the plans looked good and a new bus station was just what Wigan needs Comments here varied but several felt there was nothing wrong with the existing bus station Some respondents felt the scheme represented a waste of money for reasons such as it works fine and one asked why are you doing this when there s a recession on? Many who responded thought the proposed new bus station would be safer i.e. I would feel safer here late at night Number of people who commented at a public event Total number of comments

18 Comment Detail Number of people who commented via the survey form Nothing wrong with it now Nice design Size Buses reversing Integration (poor) Roofing and shelter All of those who responded about the scheme being a waste of money suggested there was nothing wrong with the existing facilities Of those who were generally positive about the proposals, several focused on the design of the proposed bus station. Comments included This looks really modern and I really like the design in the pictures Comments and queries included Will there be enough room for passengers within this concourse? and Will there be enough room for all the buses? Two respondents in particular asked if the public concourse needed to be wider Several respondents asked if the idea of buses reversing was safe Respondents questioned why the bus station wasn t moving closer to the railway station/s Many supported the idea of a single roof to protect from the elements Number of people who commented at a public event Total number of comments

19 Comment Detail Number of people who commented via the survey form Public toilets Of those who discussed the future provision of public toilets, all focused on the poor state of the existing toilets. One individual at an event said: I don t mind paying 20p for clean toilets. Of all those written responses regarding the toilets, three asked Will the Future disruption Lighting Heating Enhanced pedestrian access Just what Wigan needs toilets be free? Three formal respondents asked about the potential disruption. Each of them asked what will happen to the buses? All of those who mentioned lighting of the new facility were positive, including It looks really bright and airy Members of the public asked about heating and how multiple opening doors would insulate heat. Two members of the public at an event felt the design should reflect Huddersfield station s one exit, one entry system for boarding Of those who referred to the Enhanced pedestrian access marked on the plan, queries included What is being done with the enhanced access and Do not demolish any buildings Four people used the phrase just what Wigan needs in their responses Number of people who commented at a public event Total number of comments

20 Comment Detail Number of people who commented via the survey form Hope it lives up to expectations Taxi provision Cycle storage Access to Frog Lane Bus station foundations Consultation Roofing Environmentallyfriendly measures Three respondents said I hope this lives up to expectations within the consultation form Responses here included Where will taxis go? and There is nothing for taxis on the designs Three people discussed cycle storage, with one asking Will it be covered with protection from the rain? Enquiries asked Will access to Frog Lane be improved? Responses/queries asked if it was true that the station is sinking Two people wrote that the consultation was pointless because you re going to do it anyway Two respondents suggested the roof of the bus station should be extended toward the neighbouring shopping centre Two respondents asked if enough was being done to accommodate environmentally-friendly aspects within the design Number of people who commented at a public event Total number of comments

21 4.4 Profile of respondents To help understand which parts of the community took part in the public consultation, we asked respondents to give their gender, age group, details of health problems or disabilities and ethnic background. The profile of respondents is shown below. Question 4: Please tell us your home postcode A large number (160) gave their post code as shown below. Post code/area Total per area Wigan - WN1 54 Wigan - WN6 27 Wigan - WN2 20 Wigan - WN3 20 Wigan - WN5 19 Wigan - WN4 6 Warrington - WA3 3 Bolton BL7 2 Manchester City Centre - M1 1 Southport - PR8 1 Bolton BL6 1 Warrington - WA1 1 Leigh - WN7 1 Chelmsford - CM17 1 Wigan - M46 1 Bolton - BL5 1 Tyldesley M29 1 Total number of people

22 Question 5: What is your main means of travel to/from Wigan Town Centre? The most popular mode of travel to/from Wigan Town Centre by respondents was the bus (110 people, 61%). The chart below shows the respondents main means of travel to and from the town centre. 20, 11% 3, 2% Mode of transport 14, 8% 30, 16 % 4, 2% 110, 61% Bus Rail Coach Taxi Car On foot Question 6: If travelling to or from Wigan by train, which station are you most likely to use? The most commonly used station was shown to be Wigan Wallgate, with 108 of the 163 (66%) respondents who answered this question indicating this was their most commonly used station. Number of people using each station 55, 34% 108, 66% Wallgate North Western 22

23 Question 7: Are you male or female? The gender split was fairly balanced, 104 respondents were male (57%) and 78 were female (43%), as shown in the pie chart below. Number of respondents by gender 78, 43% 104, 57% Male Female Question 8: Which age group are you in? In terms of age groups, the largest number of respondents were aged between (68 people, 37% of respondents). The breakdown of respondents by age group is shown below. Number of respondents by age range 22, 12% 1, 1% 12, 7% 26, 14% 68, 37% 53, 29% Under years years years years 75+ years 23

24 Question 9: Do you have any long-term illness, health problem or disability which may limit your daily activities? 50 out of the 182 people (27%) who participated in the consultation indicated they had a longterm illness, health problem or disability. The remaining respondents answered no, preferred not to disclose or left this section blank. The types of disability or impairment are indicated below. Disability Total Percentage of people who completed the survey form Mobility issues 21 12% Arthritis 11 6% Autism 5 3% Heart problems 4 2% Blind 2 1% Angina 2 1% Depression 2 1% Asthma 2 1% Cancer 1 <1% Question 10: What ethnic group do you belong to? The survey form allowed respondents to describe their ethnic group in their own words. Of the 153 respondents who completed this section, the most common ethnic group given was White British. The breakdown of respondents by ethnic group is shown in the pie chart below. Number of respondents by ethnicity 3, 2% 1% 1% 1% 1% 1% 14, 9% 55, 36% 22, 15% 21, 14% 28, 18% 2, 1% White British British White European Prefer not to say White English English Caucasian Anglo-Irish Church of England Mixed-race White/Black African Christian 24

25 If you wish to be kept informed of the development of this scheme, please give your contact details One hundred-and-eight people expressed their wish to be kept informed of the development and gave their contact details (either a postal or address). 25

26 5. Conclusion There was significant support for the proposed design and facilities of the new bus station for Wigan, as well as some constructive feedback and criticism. Many people welcomed the investment as well as the modern design. They particularly liked the fact that the new facility will provide more shelter and seating, offer a more attractive first impression of the town and improved security measures. In terms of critical comments, the issue most frequently mentioned was value for money, with people questioning why money was being spent on a new bus station when the existing facility already served its purpose. Future communications about the bus station will need to highlight that the bus station is being funded by the Government s Local Growth Fund and not by Wigan Council and that this money could not be diverted to provide Council services or towards other projects. Communication around the scheme should also emphasise the need to update the existing, outdated facilities. A relatively small number of comments focused specifically on the design of the facility itself. There was a concern that the building concourse was not large enough to meet demand and whether the proposed new station would be able to accommodate the same number of bus services per hour. As a result of this feedback, the design has now been amended to provide a wider concourse area at specific points. Clarity on the capacity, where requested, has been provided. The proposed facility can accommodate 152 bus movements per hour (BMPH) taking in account future growth projections. The current average BMPH is 85. This has been conveyed to those who queried the size and capacity of the proposed facility during the consultation. It is therefore considered that the proposals should progress based on what was presented to the public during consultation. 26

27 6. Appendices Appendix A Wigan Bus Station Consultation leaflet, page 1 of 6 27

28 28

29 29

30 30

31 31

32 32

33 Appendix B Map showing properties where the Wigan Bus Station consultation leaflet was distributed 33

34 Appendix C Wigan Bus Station Posters used at Wigan Bus Station and bus stops across Wigan 34

35 35

36 Appendix D Letter of support from Stagecoach Manchester 36

CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY

CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY CONSULTATION PROCESS AND FEEDBACK - EXECUTIVE SUMMARY This executive summary presents a brief overview of the public and stakeholder consultation on proposals to optimise the Doncaster bus network, undertaken

More information

Local public consultation

Local public consultation «Name» - «TitlePosition» «Organisation» «Add1» «Add2»«Add3»«Add4» «Add5» «Postcode» 8 January 2019 Dear «u_name» Wigan Post Office 28 Wallgate, Wigan, WN1 1AD Local public consultation I m writing to let

More information

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015 Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Southsea Flooding and Coastal Erosion Risk Management Scheme

Southsea Flooding and Coastal Erosion Risk Management Scheme Southsea Flooding and Coastal Erosion Risk Management Scheme Public Consultation Report 3 rd November 29th December 2014 TABLE OF CONTENTS 1 INTRODUCTION... ERROR! BOOKMARK NOT DEFINED. 1.1 Purpose of

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Analysis and report NWA Social Research 1 Contents Page No. A. Summary of Main Findings...

More information

Glasgow Queen Street Station Redevelopment research

Glasgow Queen Street Station Redevelopment research Glasgow Queen Street Station Redevelopment research May 2015 Contact: Sultana Idris, Insight Team, Transport Focus Fleetbank House, 2-6 Salisbury Square, London, EC4Y 8JX Tel: 0300 123 0860 Email: Sultana.Idris@transportfocus.org.uk

More information

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction

More information

Investing in Greater Manchester transport 2017/2018

Investing in Greater Manchester transport 2017/2018 TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects

More information

National Station Improvement Programme. Uckfield Station Final report

National Station Improvement Programme. Uckfield Station Final report National Station Improvement Programme Uckfield Station Final report January 2010 National Station Improvement Plan Uckfield Station Summary Report Passenger Focus April 2009 Prepared by:... Approved by:...

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

National Station Improvement Programme. Halifax Station - Final report

National Station Improvement Programme. Halifax Station - Final report National Station Improvement Programme Halifax Station - Final report January 2010 National Station Improvement Plan Halifax Station Summary Report Passenger Focus April 2009 Prepared by:... Approved by:...

More information

The Future of Street Lighting in Leeds November 2017 to January 2018 Public Consultation Document

The Future of Street Lighting in Leeds November 2017 to January 2018 Public Consultation Document The Future of Street Lighting in Leeds November 2017 to January 2018 Public Consultation Document Should we turn off more street lights between midnight and 5:30 am? If so, how should we decide which ones

More information

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands The Adelaide City Council invites engagement from the community about Feedback on an event licence application for the Park Lands Project Summary The Adelaide City Council has received an application from

More information

1 Executive Summary. 2 Introduction

1 Executive Summary. 2 Introduction 1 Executive Summary As part of Network Rail s planning application submission to London Borough of Southwark for London Bridge station, Network Rail has publicised its proposals and exhibited the plans

More information

Creating a community for aspiring expats

Creating a community for aspiring expats Creating a community for aspiring expats Background Liberate Media began working with PSS in April 2014. The family-run business, with over three decades of experience in international removals and shipping

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Weymouth Promenade Lighting

Weymouth Promenade Lighting Weymouth Promenade Lighting Dorset Coastal Connections Community Consultation Summary 1. Background The Weymouth Promenade Lighting project will create a new artist-designed lighting scheme along Weymouth

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey Spring 2006 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

Community Sports Hub

Community Sports Hub The Adelaide City Council invites engagement from the community about Project Summary Council is seeking your feedback on a draft agreement to enable the South Australian Cricket Association (SACA) to

More information

Royal Parks Stakeholder Research Programme 2014

Royal Parks Stakeholder Research Programme 2014 1 Royal Parks Stakeholder Research Programme 2014 Park profile: Greenwich Park (Waves 1-3) January 2015 Technical note 2 This slide deck presents findings from three waves of survey research conducted

More information

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway

Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway Presentation to BRT UK Technical Visit to Leigh to Ellenbrook Guided Busway Welcome Introductions: Anthony Murden Project Sponsor Adam Price Project Manager Martin Shier - Bus Partnerships Delivery Manager

More information

East Midlands Rail Franchise Public Consultation

East Midlands Rail Franchise Public Consultation Scarborough Leeds York Manchester Liverpool Doncaster Sheffield Barton-on -Humber Crewe Chesterfield Matlock Worksop Lincoln Mansfield Grimsby Cleethorpes Skegness Stoke-on-Trent Derby ottingham Grantham

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: Huntingdon Road, Cambridge June 217 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...

More information

Statement of Community Consultation. Trans Pennine Upgrade: Statement of Community Consultation (SoCC)

Statement of Community Consultation. Trans Pennine Upgrade: Statement of Community Consultation (SoCC) Trans Pennine Upgrade: Statement of Community Consultation (SoCC) February 2018 Section 47(1) of the Planning Act 2008 states that the promoter of a proposed Development Consent Order (DCO) application

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: Hills Road, Cambridge June 2017 0 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...

More information

The resignalling scheme

The resignalling scheme & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m

More information

DRAFT. NHS Lanarkshire Board. Communications Strategy

DRAFT. NHS Lanarkshire Board. Communications Strategy DRAFT NHS Lanarkshire Communications Strategy 2013-2018 Author: Approved by: Date of approval: Date of review: Calvin Brown Divisional Communications Manager NHS Lanarkshire Board TBC TBC Draft 1 NHS Lanarkshire

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain s rail

More information

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire.

1.1. The purpose of this report is to seek approval for the adoption and publication of the Sports Pitches Strategy for East Dunbartonshire. REPORT FOR EDLC BOARD Report Title: EDC Pitches Strategy Update Contact Officer: Mark Grant (0141 777 3146) Date: 30 th March 2016 Agenda Item No: 5 Report No: EDLCT/52/15/MG 1.0 PURPOSE 1.1. The purpose

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

The Millennial Traveller 2018

The Millennial Traveller 2018 The Millennial Traveller 2018 Counter Intelligence Retail Counter Intelligence Retail is the travel retail industry s leading agency, with services covering areas including research, category development

More information

M621 Junctions 1 to 7 Improvement Scheme Public Consultation Report

M621 Junctions 1 to 7 Improvement Scheme Public Consultation Report M621 Junctions 1 to 7 Improvement Scheme March 2018 Ref: 551464 Table of Contents Executive summary... 4 1 INTRODUCTION... 7 1.1 1.2 1.3 1.4 PURPOSE OF THE REPORT... 7 BACKGROUND TO THE SCHEME... 7 OPTION

More information

In your area. Stonebroom to Clay Cross LA09. June Introduction

In your area. Stonebroom to Clay Cross LA09. June Introduction June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton

More information

In your area. Pinxton to Newton and Huthwaite LA08. June Introduction

In your area. Pinxton to Newton and Huthwaite LA08. June Introduction June 2018 www.hs2.org.uk In your area Pinxton to Newton and Huthwaite LA08 to Chesterfield and Sheffield Westhouses Blackwell Newton M1 South Normanton to Leeds Hilcote 28 Pinxton Huthwaite A38 HS2 Phase

More information

opyright East Riding of Yorkshire Cou

opyright East Riding of Yorkshire Cou STATEMENT OF COMMUNITY INVOLVEMENT NOVEMBER 2009 EASTERN PARK & RIDE HULL ENGLAND & LYLE LTD MORTON HOUSE MORTON ROAD DARLINGTON DL1 4PT T: 01325 469236 F:01325 489395 opyright East Riding of Yorkshire

More information

Environment Committee 24 September 2015

Environment Committee 24 September 2015 Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Leicester Square Action Plan Summary

Leicester Square Action Plan Summary Leicester Square Action Plan Summary The Leicester Square Action Plan was developed by Westminster City Council, together with the Leicester Square Association, the Metropolitan Police Service, and the

More information

Scotchbarn Lane, Prescot Accessibility Statement

Scotchbarn Lane, Prescot Accessibility Statement Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Middlesbrough Football Club Access Statement 2018/19

Middlesbrough Football Club Access Statement 2018/19 Middlesbrough Football Club Access Statement 2018/19 Welcome to The Riverside Stadium Home of Middlesbrough Football Club Middlesbrough Football Club is fully committed to providing equal access to all

More information

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement

Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain

More information

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Bartlett Square Welcome. Investment Framework. London Airport Ltd 1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local

More information

Minutes. Bus & Coach Working Group. Meeting title / subject: Bus & Coach Working Group. Date: 26 November Venue: Compass Centre, Heathrow

Minutes. Bus & Coach Working Group. Meeting title / subject: Bus & Coach Working Group. Date: 26 November Venue: Compass Centre, Heathrow Meeting title / subject: Date: 26 November 2014 Venue: Compass Centre, Heathrow Attendees: Name Organisation Peter Bradley (chairman) TFL Bridie Sullivan HAL Geeta Odedra HAL Matthew Wooll First Berkshire

More information

Haworth Tr T avel Plan r 10th February 2006

Haworth Tr T avel Plan r 10th February 2006 Haworth Travel Plan 10th February 2006 Haworth Travel Plan has been prepared for: Contents 1 Why have Haworth Travel Plan?... 3 2 Who will benefit from Haworth Travel Plan?... 4 3 What actions will be

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

Access Statement for Touchstones Rochdale

Access Statement for Touchstones Rochdale Access Statement for Touchstones Rochdale This access statement does not contain personal opinions as to our suitability for those with access needs, but aims to accurately describe the facilities and

More information

Park Here & Play pop-up pavilion at Victoria Gardens, Leeds

Park Here & Play pop-up pavilion at Victoria Gardens, Leeds Park Here & Play pop-up pavilion at Victoria Gardens, Leeds Front page Photograph - DLA Design Photograph - McCloy+Muchemwa Re-imagining Victoria Gardens, Leeds Leeds City Council, Leeds Art Gallery and

More information

F I N A L R E P O R T. Prepared for. MetroWest Phase 2. May CH2M Burderop Park Swindon Wilts SN4 0QD

F I N A L R E P O R T. Prepared for. MetroWest Phase 2. May CH2M Burderop Park Swindon Wilts SN4 0QD F I N A L R E P O R T HENBURY RAIL STATION LOCATION CONSULTATION Prepared for MetroWest Phase May CHM Burderop Park Swindon Wilts SN QD Contents Section Executive Summary Page i. Introduction..... MetroWest

More information

Train Stations are not just arrival and departure locations

Train Stations are not just arrival and departure locations Train Stations are not just arrival and departure locations The Railway Study Association Mike Goggin 31 October 2017 Contents Introduction to Steer Davies Gleave The Passenger The Neighbour & Non-Traveller

More information

Member-led Review of Cycling Infrastructure

Member-led Review of Cycling Infrastructure Member-led Review of Cycling Infrastructure Survey Results: A1 Cambridge to Royston June 17 cambridgeshire.gov.uk Contents 1. Introduction... 3. About you... 3.1 Age... 3. What is your gender?... 3.3 Do

More information

Cambridge Folk Festival. Information Sheet for Disabled People

Cambridge Folk Festival. Information Sheet for Disabled People Cambridge Folk Festival 27 30 July 2017 Cherry Hinton Hall Grounds Promoted by Cambridge Live Information Sheet for Disabled People 1 General Information The Festival takes place outdoors within 36 acres

More information

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London

Come on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets

More information

East Street Farnham. Statement of Community Involvement Update. Crest Nicholson Regeneration Ltd and Sainsbury s Supermarket Limited

East Street Farnham. Statement of Community Involvement Update. Crest Nicholson Regeneration Ltd and Sainsbury s Supermarket Limited East Street Farnham Statement of Community Involvement Update Crest Nicholson Regeneration Ltd and Sainsbury s Supermarket Limited Contents 1. EXECUTIVE SUMMARY 2 2. PUBLIC CONSULTATION 3 3. FEEDBACK &

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm Item. 11 Report title: Ward(s) or groups affected: From: Classification: Open Date: 22 September 2011 Decision Taker: Camberwell Community Council Grove Vale parking consultation East Dulwich, South Camberwell

More information

Update on implementation of Taking Revalidation Forward recommendations

Update on implementation of Taking Revalidation Forward recommendations Agenda item: 7 Report title: Report by: Action: Update on implementation of Taking Revalidation Forward recommendations Judith Chrystie, Assistant Director, Registration and Revalidation Judith.Chrystie@gmc-uk.org,

More information

Minutes. Steering Group. Apologies: Description: Action

Minutes. Steering Group. Apologies: Description: Action Meeting title / subject: Meeting 2014 Date: 11 th June 2014 Venue: Compass Centre, Heathrow Attendees: Name Organisation Simon Earles Heathrow Airport Limited Theo Panayi Heathrow Airport Limited Bob Castelijn

More information

Getting Here Our address is:

Getting Here Our address is: Accessibility Guide for King Richard III Visitor Centre (October 2018) Email: info@kriii.com Telephone: 0300 300 0900 Website: www.kriii.com Contact for accessibility enquiries: Rachel Ayrton Welcome The

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

Station Travel Plan Malton, Scarborough & Seamer

Station Travel Plan Malton, Scarborough & Seamer Introduction What is a Station Travel Plan? The Department for Transport defines as Station Travel Plan as: A strategy for managing the travel generated by your organisation, with the aim of reducing its

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

Lorg Wind Farm. Addendum To Pre-Application Consultation Report

Lorg Wind Farm. Addendum To Pre-Application Consultation Report Lorg Wind Farm Addendum To Pre-Application Consultation Report November 2015 Lorg Wind Farm Pre-Application Consultation Report Addendum Contents 1. Introduction... 1 Summary of Non-Statutory Consultation...

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers ASHTON GATE SPORTS & CONVENTION CENTRE A New Home For Bristol Flyers THE VISION I n 2016 Ashton Gate/ Bristol Sport delivered the 45m redevelopment of the home of Bristol City FC and Bristol Bears Rugby.

More information

What is Transport Focus? The Insight Plan. Insight Plan

What is Transport Focus? The Insight Plan. Insight Plan Insight Plan 2018-19 March 2018 Insight Plan 2018-19 What is Transport Focus? We are the independent, statutory, consumer watchdog for Britain s rail passengers, bus, coach and tram passengers in England

More information

2015 British Columbia Parks. Visitor Survey. Juan De Fuca Park. China Beach

2015 British Columbia Parks. Visitor Survey. Juan De Fuca Park. China Beach 2015 British Columbia Parks Visitor Survey Juan De Fuca Park China Beach 1 Contents Introduction 3 Methodology 3 Limitations 3 How this report is organized 3 Part 1 - Visitor Satisfaction 4 Part 2 - Visitor

More information

CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE. November 2011

CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE. November 2011 CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE November 2011 TERMS OF CONTRACT Unless otherwise agreed, the findings of this study remain the copyright of Beaufort Research Ltd and may not be quoted, published

More information

TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (APPLICATION AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES 2006

TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (APPLICATION AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES 2006 Rule 10(2)(d) TRANSPORT AND WORKS ACT 1992 THE TRANSPORT AND WORKS (APPLICATION AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES 2006 THE MIDLAND METRO (WOLVERHAMPTON CITY CENTRE EXTENSION) ORDER REPORT SUMMARISING

More information

Disabled spectators guide National Arena Filip II Macedonian, Skopje

Disabled spectators guide National Arena Filip II Macedonian, Skopje Disabled spectators guide National Arena Filip II Macedonian, Skopje Centre for Access to Football in Europe UEFA Super Cup Final 2017 8 August 2017 Supported by Contents Getting around the City... 3 The

More information

More reliable journeys arriving in May 2018 Our Great North Rail Project between Preston and Blackpool March 2017

More reliable journeys arriving in May 2018 Our Great North Rail Project between Preston and Blackpool March 2017 More reliable journeys arriving in May 2018 Our Great North Rail Project between Preston and Blackpool March 2017 Keeping you informed Follow us on Twitter Welcome to the first edition of a new regular

More information

M56. New Junction 11a Summary of the consultation report

M56. New Junction 11a Summary of the consultation report M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Manchester Arena Accessibility Guide

Manchester Arena Accessibility Guide Manchester Arena Accessibility Guide Manchester Arena is committed to disability awareness and takes an inclusive approach when providing a service to our customers. This guide is designed to assist patrons

More information

Annual Member Survey. Innovation & Renewal. Sydney Michael Hughes Managing Director Research & Consulting

Annual Member Survey. Innovation & Renewal. Sydney Michael Hughes Managing Director Research & Consulting Annual Member Survey Sydney 2017 Innovation & Renewal Michael Hughes Managing Director Research & Consulting Objectives - Growth & Revenue & Innovation - Event & Group Trends - Investment - Economic Development

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn 2005 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES ISBA ANNUAL CONFERENCE ISBA ANNUAL CONFERENCE 2018 SPONSORSHIP OPPORTUNITIES Wednesday 9 and Thursday 10 May 2018 The Brighton Centre Supporting independent schools Access bursars and senior support staff

More information

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is June 2018 www.hs2.org.uk In your area Manchester Piccadilly Station MA08 High Speed Two (HS2) is A57(M) A5067 Manchester A5103 A5067 Newton Street Piccadilly A34 A665 Store Street A6 Manchester Sheffield

More information

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South. Welcome Recent aerial view of the site with Griffin Park, the existing stadium, in the background. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium

More information

Timetable Change Research. Re-contact survey key findings

Timetable Change Research. Re-contact survey key findings Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable

More information

Mystery shop of the Assisted Passengers Reservation Service (APRS) offered to rail passengers with disabilities

Mystery shop of the Assisted Passengers Reservation Service (APRS) offered to rail passengers with disabilities Mystery shop of the Assisted Passengers Reservation Service (APRS) offered to rail passengers with disabilities Summary of research conducted in London and the South East October 2007 2 Contents Page 1.

More information

in Southwark: EXECUTIVE SUMMARY a survey and report

in Southwark: EXECUTIVE SUMMARY a survey and report Taxicard in Southwark: a survey and report 2002-2003 EXECUTIVE SUMMARY Taxi art displayed in a shopping centre Research into the London Borough of Southwark s Taxicard Scheme Alistair Beattie and Daniel

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership EAST SUFFOLK LINES Stations Investment Plan Produced by the East Suffolk Lines Community Rail Partnership Updated February 2016 1. Introduction 1.1 This document (originally produced in 2010, updated in

More information

LCFC ACCESS STATEMENT

LCFC ACCESS STATEMENT LCFC ACCESS STATEMENT Updated: June 2017 CONTENTS HOW TO GET TO KING POWER STADIUM... WHILE YOU RE AT KING POWER STADIUM... VIEWING AREAS... ACCESSIBLE TOILETS... FACILITIES AT KING POWER STADIUM... 3

More information

SPONSORSHIP OPPORTUNITIES

SPONSORSHIP OPPORTUNITIES ISBA ANNUAL CONFERENCE 21-22 May 2019 Manchester Central Convention Complex ISBA ANNUAL CONFERENCE 2019 SPONSORSHIP OPPORTUNITIES Tuesday 21 and Wednesday 22 May 2019 Manchester Central Convention Complex

More information

Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019

Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019 Persons with reduced mobility, hidden and non-hidden disabilities Users Guide January 2019 January 2019 V7 Page 1 Contents Our Customer Commitment... 2 Service level agreement... 3 1. Booking process...

More information

Report To: Scrutiny Committee Date: 1 March Claire Onslow Head of Tourism & Economic Development

Report To: Scrutiny Committee Date: 1 March Claire Onslow Head of Tourism & Economic Development Agenda Item No: Report Title: Report No: Benchmarking Tourist Information Centres Report To: Scrutiny Committee Date: 1 March 2012 Lead Councillor: Ward(s) Affected: Report By: Cllr Tony Nicholson All

More information

Passengers with Reduced Mobility Policy.

Passengers with Reduced Mobility Policy. Passengers with Reduced Mobility Policy. CONTENTS Passengers with reduced mobility (PRM) policy Page 1 Passenger Notification Process how to book assistance Page 2 Statutory EU Service Level Agreements

More information

Regulating through Revalidation: Initial Impact, Emerging Findings and Future Evaluation

Regulating through Revalidation: Initial Impact, Emerging Findings and Future Evaluation Regulating through Revalidation: Initial Impact, Emerging Findings and Future Evaluation Judith Chrystie Assistant Director - Policy, Information & Change Registration and Revalidation Directorate Presentation

More information

Making Rail Accessible Helping our Older and Disabled Guests

Making Rail Accessible Helping our Older and Disabled Guests Making Rail Accessible Helping our Older and Disabled Guests Provisional from 5th January 2015 to 31st March 2015 sleeper.scot 2 CALEDONIAN SLEEPER: MAKING RAIL ACCESSIBLE Contents 1. Serco is proud to

More information

Bus Passenger Survey

Bus Passenger Survey March 2012 Contents 1 Foreword 3 2 Key findings 4 3 Results by area Merseyside PTE (Merseytravel) South Yorkshire PTE Transport for Greater Manchester (TfGM) West Yorkshire PTE (Metro) Tyne & Wear PTE

More information

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is June 2018 www.hs2.org.uk In your area Stourton to Hunslet LA17 High Speed Two (HS2) is to Leeds M621 HUNSLET A639 STOURTON M621 A61 M1 A63 A639 M1 HS2 Phase 2b to Birmingham the Government s planned new

More information