A Master Plan is one of the most important documents that can be prepared by an Airport.

Size: px
Start display at page:

Download "A Master Plan is one of the most important documents that can be prepared by an Airport."

Transcription

1 The Master Plan

2 A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport site. The Master Plan also contains an environment strategy that describes how environmental issues associated with airport activities will be managed. A Master Plan is a statutory document under the Airports Act As part of the planning framework, GCAPL is required to prepare an Airport Master Plan every five years detailing the twenty-year strategic direction for the Airport. While the regulatory driver for the Master Plan is important, GCAPL sees the 2017 Master Plan as a key document for the community and local and state governments. It provides a clear direction for the future planning of airport facilities and acts as an important link to other planning strategies for the locality of the Airport and the region. The Master Plan describes future land uses, types of permitted development, environmental impacts and noise, including the Australian Noise Exposure Forecast (ANEF). 2.1 REGULATORY FRAMEWORK Gold Coast Airport, being a federally-leased, core-regulated airport, is subject to the planning framework prescribed in the Airports Act. The Airports Act and associated Regulations are the statutory controls for ongoing regulation of development activities on airport land, for both aeronautical and non-aeronautical purposes. The Federal Department of Infrastructure and Regional Development (DIRD) is responsible for administering the Airports Act. Section 70 of the Airports Act requires there be a final Master Plan for the Airport that has been approved by the Federal Minister for Infrastructure and Transport (the Minister). The purpose of a Master Plan is: a) To establish the strategic direction for efficient and economic development at the Airport over the planning period of the plan b) To provide for the development of additional uses of the Airport site c) To indicate to the public the intended uses of the Airport site d) To reduce potential conflicts between uses of the Airport site, and to ensure that uses of the Airport site are compatible with the areas surrounding the Airport e) To ensure that operations at the Airport are undertaken in accordance with relevant environmental legislation and standards f) To establish a framework for assessing compliance at the Airport with relevant environmental legislation and standards g) To promote continual improvement of environmental management at the Airport. 13

3 The Master Planning process is controlled by a range of Commonwealth legislation regarding: Environmental management Airspace protection Land use planning and development controls Building and construction approval processes Pricing and quality of service monitoring. In addition to the Airports Act and associated Regulations, applicable environmental and cultural heritage provisions that can affect the Airport s operation include the Environment Protection and Biodiversity Conservation Act 1999 (Cth) and the Aboriginal and Torres Strait Islander Heritage Protection Act 1984 (Cth). Airspace administration and regulation is undertaken by the Civil Aviation Safety Authority (CASA) and Airservices Australia in accordance with the Airspace Act 2007 (Cth) and the Civil Aviation Act 1988 (Cth). Airport safety considerations are administered by CASA through the Civil Aviation Act 1988, the Civil Aviation Safety Regulations 1998 (Cth) and the Civil Aviation Regulations Appendix A outlines the requirements for an Airport Master Plan under s. 71 of the Airports Act and provides a reference guide to how each legislative requirement has been addressed in the Master Plan. While the Airports Act only requires a Master Plan for the federally-leased component of the Airport land, this Master Plan also includes proposed development on the land leased in New South Wales and freehold owned Mallaraba Car Park in order to provide a more holistic description of future airport developments. The Mallaraba Car Park and New South Wales lease area is shown in Figure 3.4. Development and land management within these areas falls outside the jurisdiction of the Airports Act. Gold Coast Airport has a curfew in operation from 11:00 pm to 6:00 am daily (Queensland time) under the Air Navigation (Coolangatta Airport Curfew) Regulations While most aircraft operations are prohibited during this period, there is provision to operate emergency aircraft, some small jets, propeller-driven aircraft, freight aircraft and a limited number of domestic jets. 14 Gold Coast Airport 2017 Master Plan

4 Master Plan Drafting and Approvals Process Prepare Preliminary Draft Gold Coast Airport 2017 Master Plan Public Consultation Prepare Draft Master Plan Minister Decision Final Gold Coast Airport 2017 Master Plan Figure 2.1 Master Plan Drafting and Approvals Process

5 2.2 MASTER PLAN PROCESS In developing a Master Plan, GCAPL is required to publish a preliminary draft Master Plan and provide the opportunity for public comment. Consultation is to occur with state and local governments, airport stakeholders and the community. Prior to the public comment period of the Master Plan, state and local governments were notified of the intention to submit a draft Master Plan to the Minister, a requirement under s. 79 of the Airports Act. GCAPL made available copies of the preliminary draft Master Plan and invited members of the public and local stakeholders to provide comment. Following consultation, comments received during the public comment period will be collated, reviewed and given due regard in preparing the draft Master Plan. GCAPL submitted a draft Master Plan, along with a certificate of public comment, to the Minister for a decision. The Minister is required to reach a decision within 50 business days with the option to extend the statutory period by a further 10 business days if required. Where the Minister neither approves nor refuses to approve the draft Master Plan within 50 business days of receiving necessary documents and information, the Minister is taken to have approved the draft Master Plan. GCAPL will continue to engage with the community and industry stakeholders after the formal master planning period. The final Master Plan was published following Ministerial approval. The process for preparation of the Master Plan is shown in Figure MASTER PLAN CONSULTATION During preparation of the preliminary draft Master Plan, GCAPL established a formal consultation program with a wide range of government, industry and community representatives. This consultation was crucial in developing the various Master Plan components. During the statutory 60 business day public comment period of the preliminary draft Master Plan, a much wider group of stakeholders and the public was engaged through a range of forums, publications and public notices. To satisfy the requirements under s. 80 of the Airports Act, GCAPL consulted with the following stakeholders: Federal Department of Infrastructure and Regional Development Federal Department of the Environment and Energy Queensland Government Queensland Government Authorities New South Wales Government New South Wales Government authorities City of Gold Coast Council (CGCC) Tweed Shire Council (TSC) Federal members of parliament State members of parliament Local councillors Airservices Australia Civil Aviation Safety Authority Airlines Industry groups Users of the Airport Community CACG ANACC. After completion of the 60 business day public comment period, GCAPL considered the comments received and revised the draft Master Plan as required. The draft Master Plan is submitted to the Minister, together with a written statement listing the names of the persons consulted and a summary of the views expressed by the persons consulted and all comments. 16 Gold Coast Airport 2017 Master Plan

6 The Master Plan 2.4 COMMUNITY FORUMS GCAPL has a number of key community forums in place and presents regular updates to local community groups. It maintains extensive public information on the Gold Coast Airport website relating to airport operations, activities and complaint handling processes. GCAPL also works with Airservices Australia to monitor local aircraft noise complaints. GCAPL is committed to ongoing and proactive communication and engagement with the local community about airport development and growth activity and how this impacts on and supports the local community. Any major development foreshadowed by the Master Plan will be subject to separate Commonwealth approval including industry consultation and a further opportunity for public comment. 2.5 MASTER PLAN ENGAGEMENT GCAPL established the following objectives for a major community engagement program to support the release of the preliminary draft Master Plan: Raise awareness of the Master Plan by proactively engaging with key community, industry and government stakeholders while the preliminary draft Master Plan was being prepared and during the public comment period Ensure the community and stakeholders are well informed of the purpose and process of the Airport Master Plan Key stakeholders and community to be a part of the master planning process through meaningful dialogue in an informative, open, timely and responsive manner Provide opportunities for stakeholders to express their opinions on information in the preliminary draft Master Plan and provide channels for feedback Ensure feedback from the community is captured and considered in the Master Plan. A range of stakeholder engagement activities occurred during the public comment period which included: Public information sessions held in key locations across the region to inform the community and stakeholders about the Master Plan Public displays Printed copies of the preliminary draft Master Plan were available at Gold Coast Airport reception and at local council libraries GCAPL media releases, fact sheets, information brochures and Frequently Asked Questions providing information on the future planning initiatives for the Airport Information on the Gold Coast Airport website including copies of the Master Plan for download and an online feedback submission form GCAPL s Facebook and Twitter pages to promote the community consultation period and seek feedback Advertisements in local newspapers and community publications outlining the community consultation period and advising relevant forums and sessions that the community can attend to learn more Stakeholder presentations and face-to-face briefings. The Master Plan consultation stages required to fulfill the requirements of the Airports Act are outlined in Figure

7 Master Plan Public Comment and Review Process Stage 1: Prior to Public Comment During the preparation of the exposure draft Master Plan, Gold Coast Airport has consulted with a range of key stakeholders at all levels of government, local industry and statutory bodies. The purpose of consultation at this stage was to gather background and supporting information that is required to prepare the preliminary draft master plan. Stage 2: Exposure Draft Consultation with the Federal Government In June 2016, the exposure draft Master Plan was presented to the Federal Government, Department of Infrastructure and Regional Development (DIRD) prior to formal consultation. The preliminary draft Master Plan was updated prior to public consultation. Stage 3: Public Comment and Consultation Period Gold Coast Airport carried out extensive consultation with the community, key stakeholders, business community and airport operators during the 60 day statutory consultation period. This included formal presentations to CACG, ANACC and representatives of local and state governments. In addition public information sessions were held at key locations across the region. The Master Plan was provided online and in hard copy at accessible locations. Stage 4: Ministerial Review Gold Coast Airport is providing a draft Master Plan to DIRD for Ministerial approval. Stage 5: Implementation of the Master Plan Subject to approval of the 2017 Master Plan, Gold Coast Airport will continue to liaise with community and industry stakeholders. Figure 2.2 Master Plan Public Comment and Review Process 18 Gold Coast Airport 2017 Master Plan

8 The Master Plan 2.6 PREVIOUS MASTER PLANS A draft Airport Master Plan was first produced for the then Coolangatta Airport in 1994 by the Federal Airports Corporation (FAC). The introduction of the Airports Act in 1996 provided a regulatory framework for Federal-lease airport operators. The Airports Act includes the requirement for leased Federal airports to produce a new Master Plan every five years. GCAPL acquired the lease of Gold Coast Airport in 1998 and was required to submit a draft Master Plan to the Federal Minister, which received approval in Master Plans for Gold Coast Airport also received approval in 2006 and 2011 (Figure 2.3) Draft Master Plan (Federal Airports Corporation) Prior to 1998 the FAC was not required to produce an Airport Master Plan. Despite this, the FAC still produced a draft Master Plan. The draft 1994 Master Plan for the Coolangatta Airport (as it was then known) outlined a vision to continue to grow the Airport space and to improve access to and from the Airport. The Master Plan had a broad focus including land acquisition, continued expansion of airport facilities and improved vehicle access. Key opportunities identified in the 1994 Master Plan were extending the main runway south in two stages to 2,550 metres and 2,858 metres and a parallel taxiway system to support long-haul domestic and/or short to medium haul international operations Airport Master Plan The 2006 Airport Master Plan was centred on a vision for the Airport to develop a facility that met the growing needs of family, business and tourist travellers and made a major contribution to the economic and social health of the community it served. The key objectives were consistent with those identified in the 2001 Master Plan with a strong focus on providing precincts for non-aviation commercial and industrial development Airport Master Plan The vision of the 2011 Master Plan was to position the airport as a major economic generator, specifically for tourism, in the south east Queensland and northern New South Wales regions. Some of the key priorities identified for achieving this vision included: A change of use within the Terminal Precinct in the area nominated as a Business Park in the 2006 Master Plan. The change was to include aviation related facilities to accommodate the forecast demand Development of improved vehicular access from the Gold Coast Highway and a future provision for a possible rail terminus Airport Master Plan The 2001 Airport Master Plan was the first to comply with the Airports Act for Gold Coast Airport. This Master Plan was focused on Transit Oriented Development and a phased, flexible approach for terminal development, with the aim of further increasing the Airport s land and growing the Airport s functionality. A notable opportunity identified in the 2001 Airport Master Plan was the provision of a possible rail terminus adjacent to the main domestic terminal, which could eventually be incorporated into a Multi-Modal Transit Centre. 19

9 1994 Draft Airport Master Plan 2001 Airport Master Plan 2006 Airport Master Plan 2011 Airport Master Plan» Land acquisition» Runway extention» Aviation facilities» Runway extension» Phased terminal development» External road and rail connectivity» Non-aviation commercial development» Phased terminal development» External road and rail connectivity» Non-aviation commercial development» Land protection» Reallocation of land for aviation facilities» Planning for major terminal upgrade» Planning for new navigational instrumentation Figure 2.3 Master Table Plan 2.2 Cycle Master Plan Cycle MASTER PLAN This Master Plan intends to provide a strong strategic vision for Gold Coast Airport consistent with regional economic conditions and major infrastructure delivery programs while being flexible to adapt to changing conditions. The Twenty Year Airport Development Plan is depicted in Figure 2.4. The Master Plan accommodates a new access road from the Gold Coast Highway and a range of future transport linkages including the Gold Coast light rail network and Gold Coast heavy rail extension. Timing of these potential projects is subject to further detailed investigation and funding commitments, however, protecting these transport corridors is critical to preserve the future economic growth advantages of enhanced connectivity. These significant passenger transit opportunities will continue to be considered during future master planning cycles with appropriate responses incorporated based on further project feasibility assessments and funding commitments. The 2017 Master Plan builds on preceding Master Plans which are successively updated to respond to changes in economic opportunities and community and stakeholder expectations. A number of Major Development Plans (MDPs) have been approved since the 2011 Master Plan including: Southern Cross University (SCU) Building C and at Grade Car Park MDP July 2015 Instrument Landing System (ILS) MDP January 2016 Project LIFT (Let s Invest For Tomorrow) MDP February 2016 These plans have been carefully considered as they provide a detailed overview of future facilities and infrastructure outlay over the short medium term. They give a strong indication of future internal employment and visitor attractors and provide strategic direction for the whole Master Plan. 20 Gold Coast Airport 2017 Master Plan

10 Figure 2.4 Illustrative Twenty-Year Airport Development Plan

11

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Communication and consultation protocol

Communication and consultation protocol Communication and consultation protocol Airservices Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Public Consultation Paper September 2017 Summary Purpose The purpose of this paper is to seek comments through public consultation

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Gold Coast Noise Information pack June 2012

Gold Coast Noise Information pack June 2012 Gold Coast Noise Information pack June 2012 Table of Contents Purpose 2 Overview 2 Hours of Operation/Curfews 3 Runway Configuration 3 Air Traffic 4 Track Density Plot 4 Typical tracks for Wind Conditions

More information

Terms of Reference. Canberra Airport Community Aviation Consultation Group

Terms of Reference. Canberra Airport Community Aviation Consultation Group Canberra Airport Community Aviation Consultation Group February 2014 1. Name The name of the Group is Canberra Airport Community Aviation Consultation Group. 2. Background Canberra Airport was established

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN MASTER PLAN 2014 PROPOSED AIRPORT DEVELOPMENT STRATEGY 2034 Important Notice This Master Plan has been prepared by Brisbane Airport

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

GOLD COAST AIRPORT - Runway 14 southern departures trial

GOLD COAST AIRPORT - Runway 14 southern departures trial Post Implementation Review GOLD COAST AIRPORT - Runway 14 southern departures trial Version 1 Effective January 2016 Airservices Australia 2016 1 of 13 Introduction At the request of the community, Airservices

More information

Essendon Airport stakeholder engagement activities Annual Report

Essendon Airport stakeholder engagement activities Annual Report Aviation Display at EF Expo 2016 Essendon Airport stakeholder engagement activities Annual Report 2016-17 Introduction This report summarises the nature and outcomes of Essendon Airport s stakeholder engagement

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007 MASTER PLAN UPDATE Toronto Pearson International Airport City of Toronto Planning and Growth Management Committee September 5, 2007 Connecting Toronto 59 non-stop International destinations 8.5 million

More information

Sydney Airport Master Plan

Sydney Airport Master Plan Sydney Airport Master Plan This document is printed on ecostar and is manufactured from 100% post consumer recycled paper in a process chlorine free environment under the ISO 14001 environmental management

More information

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan.

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan. 4 ORDINARY MEETING 22 OCTOBER 2014 1 REEF 2050 LONG-TERM SUSTAINABILITY PLAN D Walton 8/24/18-01 #4506842v2 RECOMMENDATION: That Council endorses the attached submission on the Reef 2050 Long-term Sustainability

More information

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES Nanaimo Airport Commission (the Commission ) Nanaimo Airport ( YCD ) is owned by the Nanaimo Airport Commission, incorporated under the Canada Not-for-Profit

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

Master Plan Gold Coast Airport Master Plan 006

Master Plan Gold Coast Airport Master Plan 006 Master Plan 2006 Gold Coast Airport Master Plan 006 FORWARD On behalf of Gold Coast Airport Pty Limited (GCAPL), I am pleased to present our 2006 Master Plan which establishes a framework for the future

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

New Runway Project. Connecting people and places. Supporting business. Engaging with community

New Runway Project. Connecting people and places. Supporting business. Engaging with community New Runway Project Perth is investing in an important piece of infrastructure for Western Australia. The new runway will see Perth continue to connect lives, businesses and communities to a world full

More information

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Quarter 1 2015 (January to March) 1 Version Control Version Number Detail Prepared by Date 1 - Environment June 2015 Airservices

More information

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 1. Introduction This submission is provided to the ACCC by Regional Express Holdings Ltd in response to

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Sydney Airport is a strong supporter of the local community, working with a range of local schools, community groups, local councils and charity

Sydney Airport is a strong supporter of the local community, working with a range of local schools, community groups, local councils and charity Sydney Airport is a strong supporter of the local community, working with a range of local schools, community groups, local councils and charity organisations. Sydney s beaches are a key attraction for

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Review of brisbane Airport Noise Abatement Procedures

Review of brisbane Airport Noise Abatement Procedures Review of brisbane Airport Noise Abatement Procedures 1. Summary This document presents an overview of the findings of the review of the Noise Abatement Procedures in place for Brisbane Airport. The technical

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

Gold Coast Airport Aircraft Noise Information Report

Gold Coast Airport Aircraft Noise Information Report Gold Coast Airport Aircraft Noise Information Report Quarter 2 2014 (April to June) 1 Version Control Version Number Detail Prepared by Date 1 - Environment September 2014 Airservices Australia. All rights

More information

The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years.

The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years. The Master Plan focuses on forward planning, innovation and sustainability and is prepared every five years. Connecting People Building Opportunities 8 Brisbane Airport Corporation CHAPTERs 1, 2, 3, 4

More information

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1. 54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

Darwin Airport Aircraft Noise Information Report

Darwin Airport Aircraft Noise Information Report Darwin Airport Aircraft Noise Information Report Quarter 2 2015 (April to June) 1 Version Control Version Number Detail Prepared by Date 1 - Environment September 2015 Airservices Australia. All rights

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Liverpool John Lennon Airport Master Plan to Interim Consultation Summary October 2017

Liverpool John Lennon Airport Master Plan to Interim Consultation Summary October 2017 to 2050 October 2017 Contents Executive Summary 1. Introduction 2. Consultation Methods 3. Summary of Feedback 4. Next Steps Appendix 1. Consultation Material (Website, Leaflet, Questionnaire, Exhibition

More information

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap The Information Paper of the China s PBN implementation roadmap Table of Contents News Briefs Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures Introduction The purpose of this document is to present an overview of the findings of the review of the Noise Abatement Procedures (NAPs) in place

More information

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Sunshine Coast and Caloundra Airports Aircraft Noise Information Report Quarter 3 2015 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment December 2015 Airservices

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Canberra Noise Information Pack December 2011

Canberra Noise Information Pack December 2011 Canberra Noise Information Pack December 2011 Table of Contents Purpose 2 Overview 2 Canberra Airport 3 Hours of Operation/Noise Abatement Areas 3 Runway Configuration 3 Air Traffic 3 Track density plot

More information

Cairns Noise Information Pack. December 2011

Cairns Noise Information Pack. December 2011 Cairns Noise Information Pack December 2011 Table of Contents Purpose 2 Overview 2 Cairns Airport 3 Hours of Operation 3 Runway Configuration 3 Air Traffic 3 Track Density Plot for all aircraft operations

More information

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC)

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper April 2015 Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper

More information

Airport forecasting is used in master planning to guide future development of the Airport.

Airport forecasting is used in master planning to guide future development of the Airport. Airport Forecasts Airport forecasting is used in master planning to guide future development of the Airport. 4.1 INTRODUCTION Airport forecasting ensures development is appropriate for passengers, ground

More information

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements. Southampton Airport Masterplan FAQ 4 October 2018 Background Southampton Airport Today Q: How many passengers currently use Southampton Airport and how has this changed over the last 5 years? A: Over the

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Bankstown Airport. Master Plan 2004/05

Bankstown Airport. Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 > Foreword In December 2003, the BaCH Consortium purchased the long term leases over Bankstown Airport, together with Camden

More information

PART D: Stakeholder consultation

PART D: Stakeholder consultation PART D: Stakeholder consultation 4. Stakeholder consultation Iluka is committed to ongoing consultation with its stakeholders to achieve sustained mutual benefits for the life of the project. Ongoing

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial

More information

DRAFT PLAN OF MANAGEMENT MASSY GREENE

DRAFT PLAN OF MANAGEMENT MASSY GREENE DRAFT PLAN OF MANAGEMENT MASSY GREENE The draft Plan of Management for the Reflections Holiday Parks Massy Greene is on public exhibition from Monday, 19 November 2018 to Sunday, 6 January 2019. The plans

More information

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) May 10, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

Chapter 1: Introduction Draft

Chapter 1: Introduction Draft Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

4.2 Regional Air Navigation/Safety Developments and Achievements. Group (NAM/CAR ANI/WG) INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS (UAS)

4.2 Regional Air Navigation/Safety Developments and Achievements. Group (NAM/CAR ANI/WG) INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS (UAS) 03/05/16 Sixth Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/06) Nassau, Bahamas, 10 12 May 2016 Agenda Item 4: Accountability Report of the ICAO NACC

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Applewood Heights Community Open House

Applewood Heights Community Open House Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport Environmental Assessment Runway 14 Smart Tracking Approach Gold Coast Airport Table of Contents Introduction ` 3 Runway 14 Smart Tracking approach 3 Assessment 3 Assumptions 3 Nominated aircraft 3 How

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017 Smart Cities Plan IMPLEMENTATION Townsville City Deal April 2017 ACKNOWLEDGEMENTS The Commonwealth Government, Queensland Government and the Townsville City Council would like to thank the Townsville community

More information

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal 30 th January 2016 Local Government s critical role in driving the tourism economy January 2016 de Waal Contents Local Government can make or break tourism in their jurisdiction... 3 TNQ Tourism Vision...

More information

Air Traffic Management Services Plan

Air Traffic Management Services Plan Air Traffic Management Services Plan 2013 18 Airservices Australia 2013 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

MASTER PLAN 2010 ADDENDUM REPORT

MASTER PLAN 2010 ADDENDUM REPORT December 2013 ACKNOWLEDGEMENT This Master Plan Addendum Report has been prepared with the assistance of technical input and planning advice provided by Airport Master Planning Consultants Pty Ltd. COPYRIGHT

More information

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017. Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Submitted via online portal 2 June 2017 Dear Sir /Madam, RE: DRAFT ENVIRONMENTAL AND LIVEABILITY STRATEGY The Green Building Council

More information

Villeneuve Airport. July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure

Villeneuve Airport. July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure Villeneuve Airport July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure Purpose Villeneuve Strategic Plan Runway Extension Land Development Villeneuve Strategic Plan Consultation Consultation

More information