The resignalling scheme
|
|
- Todd Booth
- 6 years ago
- Views:
Transcription
1 & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m project to redesign, resignal and relay the tracks will improve reliability and reduce delays, as well as helping the railway to cope with the increasing numbers of passengers. More than six miles of track are being relayed as well as replacing all signals, remodelling three junctions, replacing two level crossings with footbridges (at Sneinton and Trent Lane), renewing equipment at two more crossings, building a new platform at Nottingham and changing track layout at the station to cut delays. This is a huge project which has been developed over three years of careful and detailed planning. Why is this work being done? This is the biggest transformation of the railway through Nottingham since the 1960s and will provide the city with the capacity to cope with growing demand for train travel. When the layout and signalling which is the way trains are controlled were designed in the late 1960s, the number of passenger trains was very low. Now with trains to London every half hour, and services to Mansfield, Worksop, Norwich, Liverpool, Leeds and others, the railway is congested and not able to operate as efficiently as it should. In addition, the station is designed as a through station, even though all but a few trains terminate there. This work will future-proof the station and will work in conjunction with the proposed line-speed improvements and the rebuilding of the station to offer a much improved journey for passengers. Similarly, the signalling equipment is life-expired and will be replaced with modern equivalents, offering much greater reliability and efficiency. Why is the work taking place during the summer period? Traditionally, services are quieter during the summer period with less commuters and business travellers. During the five weeks chosen for Network Rail s resignalling scheme, we would have expected services to be around 15% quieter than at other times of the year. We do recognise that many passengers use our services to travel between Nottingham and Skegness over the summer holidays, and we have worked hard to maintain the best possible service we can for our passengers on this route. Train services will continue to run between Grantham and Skegness and Newark and Lincoln at all times and on 23 out of the 37 days, we will be able to run direct train services from Nottingham to Skegness. Why is the work taking 37 days? This will enable Network Rail to carry out the work in the shortest time possible. If the work had been planned to take place over weekends, as is the case with a lot of engineering work, this would have taken around a year s worth of weekend closures in and around Nottingham to complete. The information contained was correct at the time of printing in pril 2013, but may be subject to change without prior notice.
2 Train services / rail replacement bus services What is happening with train services? Between 20 July and 25 ugust, there will be no trains running to the west of Nottingham station to locations including London, Leicester, Mansfield and Derby. There will be a period of 12 days between Monday 29 July and Friday 9 ugust when we cannot run any train services to the east of Nottingham to Newark or Grantham. dditionally, there will be no trains running from Nottingham to Newark or Grantham on the last weekend of the resignalling works (24 and 25 ugust) when the final commissioning will be done. substantial timetabled bus service will be provided to link with trains at a variety of rail heads the principal ones being East Midlands Parkway in the west and Newark and Grantham in the east. Other rail heads will include lfreton and Beeston, plus express buses from Derby to Nottingham. Passengers can still plan their journeys in the same way through eastmidlandstrains.co.uk. When will the timetables be available? Timetables for each route are already available to download at eastmidlandstrains.co.uk/ nottingham. Printed copies of the timetable will be available at each station at the end of June. When can tickets be booked? Tickets will be on sale from early May and all of our normal sales points (internet, station, ticket vending machines) will have information and advice for passengers travelling to/from Nottingham between 20 July and 25 ugust. What is the best station to use to travel to London? We are advising people to travel from East Midlands Parkway station, which is located on the 453 near to Radcliffe-on-Soar power station. There are three trains an hour to/from London from this station and journey times are around 1 hour and 34 minutes. Seven buses an hour will run between Nottingham and East Midlands Parkway, or alternatively passengers can use the 1,000 space car park for the discounted price of 6 per day. There is also free parking for disabled passengers at this station. How many replacement buses will you be operating? This project has been planned for more than three years and we have worked closely with Network Rail and Nottingham City Council to make things run as smoothly as possible. comprehensive bus timetable will see buses leaving from Station Street to the west and Trent Street (for destinations in the east), with bus arrival drop offs in Canal Street and ueens Road close to the station. We are also planning for customers arriving from the west and north to be dropped off in city centre locations. Nottingham City Council will be changing the traffic flows around the station for the duration of the work and we have also worked closely with the Highways gency, local authorities and the tram operator to try to ensure that conflicts with other major works taking place around Nottingham, for example the widening work on the 453, have been minimised to ensure that rail replacement buses will run as reliably as possible. This is not just rail replacement, but a military-style operation involving hundreds of extra staff to assist passengers and a comprehensive control system to keep things flowing efficiently. During May, we will be carrying out a full test exercise of the rail replacement services so that we can ensure everything is ready in terms of bus timings, passenger drop off and pick up points plus timing for loading and unloading passengers and luggage. This test exercise will be carried out in conjunction with the Nottingham City Council Transport planners. The information contained was correct at the time of printing in pril 2013, but may be subject to change without prior notice.
3 The planned number of buses operating on each route is as follows (please note: the number of buses will increase at peak periods): East Midlands Parkway to Nottingham (for connections to London and Liverpool-Norwich services) = 7 buses an hour Beeston to Nottingham = 3 buses an hour Derby to Nottingham = 4 buses an hour lfreton to Nottingham (for connections from Northern Rail services) = 2 buses an hour Mansfield to Nottingham = 4 buses an hour Worksop to Nottingham = 1 bus an hour Grantham to Nottingham = 2 buses an hour Grantham to East Midlands Parkway = 1 bus an hour Newark Castle to Nottingham = 2 buses an hour Newark Castle to East Midlands Parkway = 1 bus an hour How will you cater for disabled passengers and passengers with bikes? We would advise any passengers requiring assistance to book ahead using our ssisted Travel Line on ( daily) or by visiting eastmidlandstrains.co.uk/ information/contact-us. Bookings can be made between 12 weeks and 24 hours ahead of travel. We have worked hard to provide as many DD compliant buses as possible and we will have extra staff available and extra vehicles on standby to help carry passengers. Our ssisted Travel team will be able to provide advice on the best route and journey and ensure that we can continue to offer our usual high standard of service. ll routes will have limited bike capacity as per East Midlands Trains current bike policy. s per the normal restrictions on rail replacement bus services, alcohol and dogs (with the exception of guide dogs) will not be permitted. Will you be offering discounts for passengers travelling during this time? Whilst we have worked hard to minimise the impact on our passengers, we do recognise that there will be inconvenience and disruption to journeys over the summer. When rail replacement takes place anywhere in the UK, ticket prices remain the same for the rail replacement as normal. We are however currently looking at ways where we can consider taking the unique step of offering discounts for travel during this 37 day period. We should have more information on this over the coming weeks. In addition, we would look to be able to offer some form of discount to season ticket holders. gain, we hope to be able to provide more information over the coming weeks. How long will the replacement bus services take? Details of the replacement bus services and the approximate journey times are included in the timetable and these can be found on our website at eastmidlandstrains.co.uk/nottingham. The information contained was correct at the time of printing in pril 2013, but may be subject to change without prior notice.
4 Where will the replacement buses be leaving from? We have worked closely with Nottingham City Council to develop the best possible bus routes, with the most convenient drop off and pick up points. map showing each of the bus stops will be published at eastmidlandstrains.co.uk/nottingham in June. What other steps have you taken to provide a better service for passengers? We have invested in additional car parking spaces at East Midlands Parkway (150 spaces) and Beeston (100 spaces) for those passengers who choose to drive to these stations to connect in with services to London. Passengers who already hold a car parking season ticket for Nottingham can use this ticket to park at either East Midlands Parkway or Beeston. We have carried out extensive passenger research at Nottingham which has been built into our service plans to help us assess how many buses we require. We have worked closely with Nottingham City Council to develop the best possible bus routes, with the most convenient drop off and pick up points for passengers. We will have around 100 East Midlands Trains and Network Rail Managers providing extra assistance to our passengers at key locations throughout the duration of the resignalling scheme. We will be providing additional cycle storage facilities at Beeston, East Midlands Parkway, Newark Castle and Grantham stations. What advice would you offer to passengers? Continue to travel with us during the summer, we will keep passengers moving and will still get them to their destinations. Passengers need to be prepared, allow additional time for their journey and check in advance of travel at eastmidlandstrains.co.uk/nottingham How can passengers find out more information? Detailed information and timetables can be found at eastmidlandstrains.co.uk/ nottingham. There is also an option to register on the website for future updates about services over the summer. Will this affect all East Midlands Trains journeys? No. The rest of our network will operate a full and normal service throughout the summer. The routes that will operate as normal include: Sheffield, Chesterfield, Derby, East Midlands Parkway, Leicester, Market Harborough, Kettering, Corby, Wellingborough, Bedford and Luton to London Liverpool to Sheffield/Chesterfield Derby to Matlock Derby to Crewe Newark to Lincoln Grantham to Skegness round three quarters of our passengers will not be affected at all by the work at Nottingham. How are you communicating all the changes to passengers? We are carrying out a comprehensive communications campaign which includes information at stations and on trains, detailed information on a dedicated webpage (eastmidlandstrains. co.uk/nottingham), letters to season ticket holders, briefings for stakeholders and businesses in affected areas, information at sales points including ticket vending machines and ticket offices and working with regional media outlets to communicate information. The information contained was correct at the time of printing in pril 2013, but may be subject to change without prior notice.
5 What s the latest information on the station redevelopment? The multi-million pound Nottingham Hub project is working alongside the resignalling and rebuild of the railway to improve the station. This will include a new southern entrance, integrated tram station above the railway, a new ticket offices, new retail outlets, a bigger concourse, fresh glazing and a new canopy on platform 6. This project will be completed in early 2014, with the tram extension to Beeston and Chilwell later that year. The three projects go together to provide Nottingham with a fantastic hub that links all modes of transport in the city. The information contained was correct at the time of printing in pril 2013, but may be subject to change without prior notice.
Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works
Don t stress over DISRUPTIONS AT NOTTINGHAM STATION 20 July 25 August Pick up this leaflet for all the information you need to travel during the re-signalling works We re helping you stay on the move TRAVEL
More informationEast Midlands Rail Franchise Public Consultation
Scarborough Leeds York Manchester Liverpool Doncaster Sheffield Barton-on -Humber Crewe Chesterfield Matlock Worksop Lincoln Mansfield Grimsby Cleethorpes Skegness Stoke-on-Trent Derby ottingham Grantham
More informationDepartment for Transport
Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House
More informationMidlands Connect Strategy: Powering the Midlands Engine
Midlands Connect Strategy: Powering the Midlands Engine March 2017 Midlands Connect Powering the Midlands Engine Sir John Peace Chairman of Midlands Engine and Midlands Connect Foreword I am honoured to
More informationNottingham. Aberdeen. Dundee. Glasgow. Edinburgh. Newcastle. Carlisle. Leeds. York. Liverpool. Sheffield. Derby. Birmingham. Amsterdam.
Aberdeen Dundee Edinburgh Glasgow Newcastle York Leeds Doncaster Manchester Liverpool Derby Nottingham Grimbsy Sheffield Lincoln Birmingham Cardiff Bristol Coventry Oxford Cambridge Stansted Airport Luton
More informationAgenda Item 5: Rail East Midlands Rail Franchise Consultation
Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by
More informationRailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements
- - Proposed Train Service Improvements TO GRIMSBY Show Your Support: www.railfair.co.uk TO SLEAFORD LINCOLN Hykeham Swinderby Collingham TO DONCASTER & THE NORTH NEWARK NORTHGATE NEWARK CASTLE TO PETERBROUGH
More informationSummary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys
Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period
More informationNational Passenger Survey TOC Report for East Midlands Trains Spring 2011
National Passenger Survey TOC Report for 11 Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 83 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne
More informationOpen Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee
Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update
More informationTrain times. northernrailway.co.uk. Nottingham to Sheffield and Leeds. 15 May 10 December Leeds. Wakefield Kirkgate. Barnsley Interchange
33 Train times 15 May 10 December 2016 Parking available Staff in attendance Bicycle store facility Bike & Go Tram Interchange stations Disabled assistance available Nottingham to Sheffield and Leeds Leeds
More informationLondon Bridge station opens upgrade works
On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationLCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017
LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The
More information33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,
East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33
More informationEast Midlands Rail Franchise Consultation. Response from the Derwent Valley Line Community Rail Partnership
East Midlands Rail Franchise Consultation Response from the Derwent Valley Line Community Rail Partnership This response has been produced by Alastair Morley, Community Rail Officer for the Derwent Valley
More informationChange for the better: Stagecoach and the East Midlands Franchise
Change for the better: Stagecoach and the East Midlands Franchise Time Destination 0001 A message from Ian Dobbs Chief Executive, Rail Division Stagecoach Group I am excited that Stagecoach has the opportunity
More informationTAKING THE NORTH FURTHER
TAKING THE NORTH FURTHER STAKEHOLDER NEWSLETTER JULY / AUGUST 2018 Dear Stakeholder Summer is here and things are definitely hotting up in terms of our transformation. The Class 185 upgrade is very close
More informationECCLES STATION NEWS JUNE 2016 NEWS
ECCLES STATION NEWS JUNE 2016 NEWS Passengers travelling through Oxenholme, Cumbria will have a smoother, more reliable journey following a weekend of upgrade work by Network Rail's orange army. Engineers
More informationWorkplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant
Workplace Parking Levies: the contribution of commuters to funding public transport Sue Flack Consultant Summary 1. 2. 3. 4. 5. Example of Nottingham, UK Use of Workplace Parking Levy Revenue Why Workplace
More informationChapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by
More informationBetter rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018
Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Nine weeks into our transformation As we approach the halfway point of our extended closure
More informationTimetable Change Research. Re-contact survey key findings
Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable
More informationMarketing Sheffield. Discount Rail Travel.
Marketing Sheffield Discount Rail Travel welcometosheffield.co.uk/conference @ConferenceSheff Make Your Booking With our partner, East Midlands Trains, we are pleased to offer discounted return rail travel
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationSTAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE
27 November 2014 STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE 140m planned investment to deliver an improved service and more personalised travel Over 25m planned spend in improving
More informationA TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES
THE MAYOR'S VISION FOR TRANSPORT A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES VISION We will build a transport system that works for everyone, connecting people to the places they want to go within the
More informationAppendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes
Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major
More informationUNLOCKING THE BRIGHTON MAINLINE
UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to
More informationMarketing Sheffield. Discount Rail Travel.
Marketing Sheffield Discount Rail Travel welcometosheffield.co.uk/conference @ConferenceSheff Make Your Booking With our partner, East Midlands Trains, we are pleased to offer discounted return rail travel
More informationJULY 2017 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick JULY 2017 NEWSLETTER 1. EMT Franchise The DfT published the East Midlands Franchise Public Consultation document on July 20 th,
More informationMaking rail accessible
Making rail ible Helping older and disabled passengers Valid from 1 October 2016 Contents 1. Introduction 3 2. Assistance for customers 3 2.1 Travelling with assistance dogs 5 2.2 Our compensation policy
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationEast Midlands Rail Franchise Public Consultation. September 2017
East Midlands Rail Franchise Public Consultation September 2017 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately
More informationTrain times. Manchester to Sheffield The Hope Valley Line. 11 December May northernrailway.co.uk. Manchester Piccadilly
23 Train times 11 December 2016 20 May 2017 Manchester to Sheffield The Hope Valley Line Manchester Piccadilly Ashburys Belle Vue Ryder Brow Reddish North Brinnington Stockport Bredbury Romiley Hazel Grove
More informationto Bristol & Cardiff crosscountrytrains.co.uk Train Times: 23 May December 2010 Nottingham Derby Birmingham Cheltenham Spa Cardiff Bristol
Nottingham Derby to Bristol & Cardiff Train Times: 23 May 2010 11 December 2010 Birmingham New Street Derby Burton-on-Trent Bromsgrove Willington Wilnecote University Water Orton Nottingham Beeston Attenborough
More informationSUSTAINABLE DEVELOPMENT PLAN 2015
LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director
More informationStrategic Transport Forum
Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH
More informationBRENT CROSS THAMESLINK
INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationChapter 21 Route window W6 West Ealing station. Transport for London
Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is
More informationInvesting in Greater Manchester transport 2017/2018
TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects
More informationEmerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine
Emerging Strategy Executive Summary November 2016 Midlands Connect Powering the Midlands Engine Foreword Sir John Peace Chairman of Midlands Engine and Midlands Connect As we get closer to the finalisation
More informationTeam London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise
Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction
More informationWELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE
PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen
More informationThis annual report covers the year from May 2013 to April 2014
Stagecoach East Midlands is the region s largest bus operator and runs local bus services in Kingston upon Hull, throughout Lincolnshire, North Nottinghamshire and South Yorkshire. Every day our staff work
More informationRIVERSIDE BUSINESS PARK / NOTTINGHAM / NG2 1AR. Last suite available 884 m² (9,515 ft²) with 33 car parking spaces TO LET
RIVERSIDE BUSINESS PARK / NOTTINGHAM / NG2 1AR Last suite available 884 m² (9,515 ft²) with 33 car parking spaces TO LET THEPROPERTY Embankment House was constructed in 1996 and has recently undergone
More informationSuffolk Chamber Transport Board Greater Anglia. 16 January 2018
Suffolk Chamber Transport Board Greater Anglia 16 January 2018 Greater Anglia update GEML Taskforce NRPS Spring 2017 results Fleet reliability and refresh initiatives Timetable improvements New trains
More informationStation Travel Plan Malton, Scarborough & Seamer
Introduction What is a Station Travel Plan? The Department for Transport defines as Station Travel Plan as: A strategy for managing the travel generated by your organisation, with the aim of reducing its
More informationStansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff
Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Includes all services between Derby and Cheltenham Spa Sunday 20 May Saturday 8 December 2018 Live train times online and on our Train
More informationSteve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd
Steve Randall FIHE Technical Manager HW Martin (Traffic Management) Ltd A453 Widening M1 Junction 24 to A52 Nottingham Project Details Project Details Widen 11.5km of existing single carriageway Project
More informationReducing traffic: a new plan for public transport
Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail
More informationNOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES.
NOTES OF A PUBLIC MEETING ON THE FUTURE OF PERSHORE S TRAIN SERVICES. BRIEF SUMMARY:- A packed meeting at Pershore Town Hall, chaired by the Mayor of Pershore, Councillor Bob Gillmor, heard that Pershore,
More informationMulti-storey station car park opens in New Year
Multi-storey station car park opens in New Year Luton s new multi-storey station car park, off Midland Road, will open on 10 January 2011, offering motorists a safer, more secure, convenient and user-friendly
More informationEast Midlands rail franchise: passengers experiences and aspirations. September 2017
East Midlands rail franchise: passengers experiences and aspirations September 2017 1 Introduction Passengers are now the majority funders of the day-to-day railway and should be at the heart of all decisions.
More informationBetter rail journeys arriving in May 2018 The Great North Rail Project between Preston and Blackpool 1 December 2017
Better rail journeys arriving in May 2018 The Great North Rail Project between Preston and Blackpool 1 December 2017 Transforming the railway a week in pictures Three weeks into our extended Preston to
More informationEAST WEST RAIL EASTERN SECTION. prospectus for growth
EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote
More informationLuxury living in the delightful Amber Valley area of Derbyshire A stunning selection of 2, 3 & 4-bedroom houses and 2-bedroom bungalows
Welcome To Holborn Place C O D N O R, R I P L E Y Luxury living in the delightful Amber Valley area of Derbyshire A stunning selection of 2, 3 & 4-bedroom houses and 2-bedroom bungalows W E L C O M E T
More informationEast Midlands rail franchise: Consultation response. October 2017
East Midlands rail franchise: Consultation response October 2017 1 Contents 1. Transport Focus... 5 2. Introduction... 5 2.1 Franchise consultation response... 7 3. East Midlands rail franchise passenger
More information95,000 sq ft of easy access
95,000 sq ft of easy access Leicester Commercial Park Immediately adjacent to the (J21) Leicester Lane LE19 4BP prime location+ The speculative development of two distribution units of 335,000 sq ft and
More informationBirmingham Connected Briefing October Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council
Birmingham Connected Briefing October 2018 Joe Green Transportation Behaviour Change Manager, Economy, Birmingham City Council A period of transformational change for the city centre and beyond Creating
More informationA NEW COMMUNITY OF 3,000 HOMES IN WELLINGBOROUGH, NORTHAMPTONSHIRE
A NEW COMMUNITY OF 3,000 HOMES IN WELLINGBOROUGH, NORTHAMPTONSHIRE R2 INTRODUCTION LOCATION R3 MASTERPLAN OPPORTUNITY MARKET NIORT WAY TECHNICAL INFORMATION SALES TERMS TENDER PROCESS / CONTACT A509 FOR
More informationLeicester. Leicester. Commercial Park. 95,978 sq ft of warehouse / distribution space
Leicester 95 95,978 sq ft of warehouse / distribution space Leicester Commercial Park Immediately adjacent to the (J21) and M69 (J3) Leicester Lane LE19 4AS prime location+ Leicester Commercial Park is
More informationJuly 2016 Briefing pack: David Higgins South Yorkshire Report
July 2016 Briefing pack: David Higgins South Yorkshire Report Overview On 7 July 2016, David Higgins, Chairman of HS2 Ltd, published a report making recommendations to Government on the station location
More informationPassenger Focus response to Department for Transport proposals for the East Midlands franchise
Passenger Focus response to Department for Transport proposals for the East Midlands franchise 7 August 2006 Passenger Focus response to the Department for Transport proposals for the East Midlands franchise
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationTrain times. northernrail.org. Sheffield to Gainsborough to Lincoln/ Cleethorpes. 13 December May Barnetby. Habrough. Brigg Grimsby Town
32 Train times 13 December 2015 14 May 2016 Parking available Staff in attendance Bicycle store facility Bike & Go Supertram Interchange stations Disabled assistance available Saturday services to Cleethorpes
More informationBENTLEY MILL WAY WALSALL WS2 0LE. Prominent retail investment with annual fixed rental uplifts
BENTLEY MILL WAY WALSALL WS2 0LE Prominent retail investment with annual fixed rental uplifts Investment Considerations WALSALL Prominent retail investment, situated just off Junction 10 of the, Walsall.
More informationMARCH 2017 NEWSLETTER
BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick MARCH 2017 NEWSLETTER 1. EMT Franchise The consultation document for the franchise should have been published at the beginning
More informationTrain times. Liverpool to Manchester Piccadilly via Warrington Central. 21 May 9 December northernrailway.co.uk
16 Train times 21 May 9 December 2017 Liverpool to Manchester Piccadilly via Warrington Central Liverpool Lime Street Edge Hill Mossley Hill West Allerton Liverpool South Parkway Hunts Cross Halewood Hough
More informationCABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A
21 Agenda Item 5 CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Purpose of the Report PART A 1. To present the
More informationOur vision Developing Nottingham Refresh Redevelop Extend
Play Shop Chat Laugh intu Broadmarsh Enjoy Create Refresh Watch 1 Our vision Developing Nottingham A three-stage plan 1 intu s vision for Nottingham is to revitalise the city centre, anchoring it with
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationEast Midlands. Route Utilisation Strategy. February 2010
East Midlands Route Utilisation Strategy February 2010 2 Foreword I am delighted to present Network Rail s Route Utilisation Strategy (RUS) for the East Midlands. This contains recommendations for a key
More information1 Executive Summary. 2 Introduction
1 Executive Summary As part of Network Rail s planning application submission to London Borough of Southwark for London Bridge station, Network Rail has publicised its proposals and exhibited the plans
More informationTrain times. northernrail.org. Liverpool to Manchester Piccadilly via Warrington Central. 13 December May 2016
16 Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Airport link Disabled assistance available Train times 13 December 2015 14 May 2016 Liverpool to Manchester
More informationValid from 1 March 2015 until further notice. Making Rail Accessible. Helping Older and Disabled Passengers. virgintrainseastcoast.
Valid from 1 March 2015 until further notice Making Rail Accessible Helping Older and Disabled Passengers virgintrainseastcoast.com 1 Contents Welcome 4 Our commitment to customers with disabilities 5
More informationTO LET. Headquarters Offices, Equinox, Island Business Quarter, City Link, Nottingham, SUMMARY
TO LET Headquarters Offices, Equinox, Island Business Quarter, City Link, Nottingham, SUMMARY n Prime location forming part of the Island Business Quarter with nearby occupiers including Virgin Active,
More informationBusiness Forum. 16 March 2016
Business Forum 16 March 2 Rebuilding London Bridge: An update Mary Jordan Business Change Manager, Network Rail London Bridge station update 2015 Platforms 4 to 9 are currently closed for redevelopment,
More informationSAT NAV: NG17 1JF Entrance to Pinxton Lane off Alfreton Road (A38)
JUNCTION 28 / Location SAT NAV: NG17 1JF Entrance to Pinxton Lane off Alfreton Road () The area is well served by public transport and only minutes from Sutton Parkway Railway Station. The (T) provides
More informationGuildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017
Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.
More informationIn your area. Stonebroom to Clay Cross LA09. June Introduction
June 2018 www.hs2.org.uk In your area to Clay Cross LA09 Midland Main Line Shirland Tupton Clay Cross A61 Stretton Midland Main Line to Chesterfield and Sheffield Pilsley A6175 HS2 Phase 2b spur Morton
More informationThe Point Roundabout Improvement Scheme
The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the
More informationThe Government s Aviation Strategy Transport for the North (TfN) response
The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering
More informationEast Midlands rail franchise - passenger research
East Midlands rail franchise - passenger research Prepared for Transport Focus Conducted: May 2017 Published: September 2017 By John Connaughton CEO john.connaughton@illuminas.com T: +44 (0)20 7909 0935
More informationEASTPOINT A L E S I D E R O A D N O T T I N G H A M N G2 3G G
TO LET EASTPOINT D A L E S I D E R O A D N O T T I N G H A M N G2 3G G 5,055 SQ FT TO LET AVAILABLE IMMEDIATELY A60 A60 A1 J27 A614 Southwell Newark-on-Trent LOCATION M1 Hucknall A6097 A46 A610 J26 Eastpoint
More informationInvesting in our local rail network June 2014
Investing in our local rail network June 2014 Bath & North East Somerset, Bristol, North Somerset and South Gloucestershire councils working together to improve your local transport MetroWest: Investing
More informationCome on board. An introduction to accessible transport in London MAYOR OF LONDON. Transport for London
Come on board An introduction to accessible transport in London MAYOR OF LONDON Transport for London Contents 4 Plan your journey 6 Help from staff 8 Learning to use public transport 9 Fares and tickets
More informationBespoke occupier solutions up to 2 million sq ft for sale/to let
Bespoke occupier solutions up to 2 million sq ft for sale/to let Unique Industrial/ Development Opportunity www.newarkgateway.co.uk CROSSROADS TO THE NORTH, SOUTH, EAST AND WEST Strategic Location ROAD
More informationCONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)
APPNDIX M2 CONNCIVIY IMPOVMNS ACHIVD BY HS2 AND HIGH SPD UK FO: MANCHS AIPO (extract from HS2 High Speed to Nowhere) Appendix M2 : Airport Page 292 Introduction & key results Page 293 imeline of comparative
More informationLlandudno Junction. Regeneration Proposals for the Future. December 2009
Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration
More informationTrain times. York to Selby and Hull and York to Sheffield via Pontefract Baghill. 21 May 9 December northernrailway.co.uk.
34 Train times 21 May 9 December 2017 York to Selby and Hull and York to Sheffield via Pontefract Baghill York Ulleskelf Church Fenton Sherburn-in-Elmet Pontefract Baghill Selby Wressle Howden Eastrington
More informationPrestigious Serviced Offices in a Magnificent Stately Home
01302 243 932 Prestigious Serviced Offices in a Magnificent Stately Home Situated In The Heart Of England With Excellent Tr avel Links Across The UK And Only 70 Minutes By R ail to London KELHAM HALL BUSINESS
More informationspace+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space
space+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space location Situated 2 miles east of Derby with excellent connections via the M1, A50 and 2 million
More informationFacilitating your future
Facilitating your future State of the art, flexible office Be inspired, connect with the best Welcome to Be inspired by and operate within a prestigious working environment offers fully furnished modern
More informationAppointment of a Non-Executive Director
Appointment of a Non-Executive Director May 2018 www.lothianbuses.co.uk CONTENTS A note from the Chair Company Background The Appointment Role Specification Person Specification Recruitment Process 3 4
More informationStannah at: Leeds Station Southern Entrance Delivering accessibility in a 20-million Network Rail upgrade
Stannah at: Leeds Station Southern Entrance Delivering accessibility in a 20-million Network Rail upgrade Passenger lift and escalator installations Stannah is the supplier and installer of choice Achieving
More informationThe case for rail devolution in London. Submission to the London Assembly Transport Committee. June Response.
Response The case for rail devolution in London Submission to the London Assembly Transport Committee Pedro Abrantes Senior Economist pteg Support Unit Wellington House 40-50 Wellington Street Leeds LS1
More informationFirstGroup plc TransPennine Express
FirstGroup plc TransPennine Express Rail franchise award Wednesday 9 December 2015 TransPennine Express awarded to FirstGroup FirstGroup is delighted to be selected by the Department for Transport (DfT)
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More information