Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Size: px
Start display at page:

Download "Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise"

Transcription

1 Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise 23 August 2012 Table of Contents 1. Executive Summary 2. Introduction to Team London Bridge 3. Partnership working with Network Rail suggested improvements 4. Specification elements to be mandated 5. Making better use of current capacity 6. Mechanisms for managing passenger demand 7. Arrangements for Thameslink core trains during London Bridge station redevelopment Services to Gatwick and Luton airports 9. Performance information 10. Customer experience 11. Accessibility 12. Cycle strategy 13. Environmental performance 14. London Bridge arches and tunnels 15. Local employment and community engagement Team London Bridge - Registered as the London Bridge Business Improvement District Company in England No Registered Office Woolyard, 52 Bermondsey Street, London SE1 3UD

2 1. Executive Summary Team London Bridge manages the Business Improvement District (BID) that surrounds London Bridge Station. Our 410 business members employ approximately 42,000 people in north Southwark. Map of area included in the London Bridge Business Improvement District (BID) It is expected that 50-60% of these employees currently use national rail services that will be operated by the new combined Thameslink, Southern, and Great Northern franchise. In summary, our response calls for the inclusion of the following seven key issues to be addressed in the franchise specification: I. Consultation: The creation of better formal mechanisms for consultation and engagement with the business community for the entire franchise period. II. Services and timetables: Specific consultation on the changes in services and timetables required during the London Bridge Station redevelopment period III. Communications: The development with Team London Bridge, Network Rail and other relevant partners of a dedicated and unified business focused communications strategy for the period of the London Bridge Station redevelopment. IV. Capacity: Provision for the expected growth in the number of jobs in the London Bridge Area, including making it possible to increase capacity across a flattened peak and mandating first and last trains. V. Connections: Provision for at least direct two trains per hour continue to link London Bridge with Gatwick Airport, including during the station redevelopment period. VI. Accessibility: The development of a joint accessibility strategy with Team London Bridge, Network Rail, Transport for London and the London Borough of Southwark for London Bridge Station both during and after the redevelopment. 2

3 VII. Responsible strategy: The existance or creation of a Corporate Social Responsibility (CSR) programme and strategies that encourage community engagement and responsible business practices. Sections 3-15 below address these issues. 2. Introduction to Team London Bridge Team London Bridge manages the Business Improvement District (BID) that surrounds London Bridge station. Established in 2006 our area includes The Shard and London Bridge Quarter, More London Estate, the GLA and City Hall, London Bridge City and the station itself. The majority of local employees use the London Bridge interchange on a daily basis. It is estimated that 50-60% of these employees currently use national rail services that will be operated by the new combined Thameslink, Southern and Great Northern franchise. Therefore we are responding to the consultation document published 31 May 2012 so that the requirements of this rapidly growing business community are included in the consultation process. Team London Bridge engages with Network Rail and Transport for London on a number of operational and strategic transport issues. In 2011 the organisation conducted a formal business consultation and responded to the planning application to redevelop London Bridge station. The planning authority (Southwark Council) and Network Rail both valued this process and 10 of the 12 resulting recommendations have translated into formal agreements or ongoing procedures 1. Most recently our Olympic Transport Planning Service acted as a localised conduit for the Get Ahead of the Games campaign, providing bespoke travel advice for SMEs and assisting combined transport providers to communicate with key stakeholders. 3. Partnership working with Network Rail suggested improvements (Q1 in DfT document) Based on our experience to date of working with those involved with the management of London Bridge Station and the train operating companies that serve it, there could be significant improvements in partnership working. In particular we would like to see: A more coordinated approach to the communication of changes to station operations and train services during the station redevelopment period (see Section 7). The creation of a permanent stakeholder group composed of Network Rail, the relevant TOCs, Transport for London, and Southwark Council, with Team London 1 The full 12 recommendations can be found in Appendix 1 3

4 Bridge and its neighbouring BID, Better Bankside representing the business community. This group would meet every 6 months and attendance from representatives of the winning combined franchise bidder would be mandatory. Use of local BIDs (Team London Bridge and Better Bankside) in communicating appropriate messages or research. The transport planning service supplied to businesses by Team London Bridge prior to the Olympic Games provided critical targeted support for the Get Ahead of the Games campaign. 4. The Franchise Specification elements to be mandated (Q5) 4.1 Potential loss of South London suburban services The South London suburban routes are well established and therefore, we believe, are likely to be relied upon by a large percentage of the local workforce. In addition, South East London and South London are both areas that are not well catered for by the London Underground network and so more reliant on suburban train services to access other parts of the city. We would therefore urge that after the completion of re-configuration of the platforms at London Bridge Station, the winner bidder is mandated to: Ensure that there are no reductions in the number of these metro services OR Ensure that the new core Thameslink services serve any stations that see a reduction in metro services. 4.2 Making provision for growth the employee population at London Bridge London Bridge is one of the fastest growing commercial areas in the capital with an estimated 42,000 employees represented by Team London Bridge and significant increases expected in the next few years due to developments such as The Shard and London Bridge Quarter. London Bridge has been designated as an Opportunity Area in the Mayor s draft London Plan and is therefore well placed to attract further development and associated increases in jobs. Over 50% of those working in London Bridge currently commute by train. As well as the need for extra capacity at London Bridge Station, we believe this highlights the need to flatten peak demand for services for commuting purposes i.e. making it possible for people to commute earlier and later in the day. We would therefore urge that the franchise specification includes: Mandatory operation hours, with specified times for first and last trains Mandatory levels of arrivals and frequency of services at London Bridge Station over a flattened working day (e.g. 6am 10am and 4pm 9pm Monday to Friday). 4

5 5. Making better use of current capacity (Q8) We believe that one way to make better use of current capacity would be to examine the design of rolling stock, making it easier for passengers to travel without discomfort, even if they are not able to get a seat within 20 minutes. We recognise that the Department for Transport s Thameslink Rolling Stock Programme is now well underway. We would therefore like to see in the franchise specification: Requirements for the winning bidder to undertake to collect regular customer feedback on the new Thameslink rolling stock performance in terms of comfort and ability to cope with peak time demand. This could include looking at configuration of carriages in terms of the design of seating and standing areas. An undertaking that any future rolling stock procurement (for any other part of the combined franchise) is informed by this feedback. Team London Bridge would also endorse Passenger Focus recommendation to include the National Passenger Survey in the franchise specification and suggest it is in an ideal position to assist with the recruitment of customer panels for more specific research (see also Sections 6 below). 6. Mechanisms for managing passenger demand (Q9) Team London Bridge recognises the challenges to bidders of being able to predict passenger demand in terms of all aspects of the service they provide. We believe that Business Improvement Districts (BIDs) have unique access to both their member businesses and their employees. We would therefore suggest that as well as bodies such as Passenger Focus, the specification should mention Team London Bridge and other relevant BIDs as ideal conduit for the recruitment of focus group or panel survey participants, as well as direct links with land owners, and businesses. 7. Arrangements for Thameslink core trains during London Bridge station redevelopment In addition to the specification for all the combined franchise services, Team London Bridge agrees that there is a greater need for a tighter specification for Thameslink core trains during the London Bridge station redevelopment from 2015 to The following elements are particularly highlighted: The requirement that a full consultation take place on revised timetables and routing to begin as soon as possible after TOC is appointed 5

6 The need for clear and unified communications strategy (along the lines of the very successful London 2012 Get Ahead of the Games campaign) which brings together both the Network Rail and winning TOC elements A stipulation for specific resources to be allocated for both the consultation and communications strategy. Team London Bridge working with neighbouring BID Better Bankside have developed a number of dedicated information channels including popular websites, a monthly review of all development related transport alterations, a quarterly project newsletter, a monthly local news communication and a quarterly magazine. With an appropriate contribution from the winning TOC, these could be a cost effective way to reach the local business community audience. 8. Services to Gatwick and Luton airports (Q16) London Bridge is a key business location. In addition to a number of multinational companies including PwC and Ernst and Young, it is also home to large organisations such as Guy s Hospital and King s College London as well as an influential hospitality sector. This will only grow with the completion of London Bridge Quarter and the opening of facilities such as the Shangri-La hotel in The Shard. Maintaining and enhancing rail links to London s airports is crucial. We therefore would like to see in the specification the undertaking that: At least two direct trains per hour continue to link London Bridge with Gatwick and Luton airports, including during the station redevelopment period Consideration be given to how best to connect with Farrington for interchange to Crossrail and Heathrow airport post This is a key issue for the London-wide business community who is directly financing Crossrail and seeing little benefit unless close to the route itself. 9. Performance information (Q24-26) Team London Bridge supports the view put forward by Passenger Focus and others that performance information should be disaggregated by route. We would also recommend that this data is: Published monthly Made available for publication by stakeholders such as Team London Bridge in their newsletters / websites. 6

7 10. Customer experience (Q27 & Q28) A brief survey undertaken with our member business employees shortly before this response was submitted highlighted the following issues as being of greatest importance: Provision of information about train times /platforms Personal security Frequency of trains on your route Punctuality / reliability Value for money for the price of the ticket Sufficient room for passengers to sit/ stand. In addition to the points above, our previous survey work and local employee panels have indentified personal security within London Bridge Station and its surroundings as being a significant issue. This fear of crime owes a lot to the local physical infrastructure and outdated perceptions of the area but it is also a widespread issue that we would expect to see the winning TOC help address in their bid. 11. Accessibility (Q32) Team London Bridge has worked with the GLA and London Borough of Southwark to deliver accessibility improvements to the Thames riverside pedestrian route in We would welcome the opportunity to work with Network Rail, Transport for London and the winning TOC on a joint strategy that looks at accessibility more widely via all modes of transport. In the meantime, we believe the following are priorities: The development of a joint accessibility strategy with Network Rail, Transport for London and the London Borough of Southwark for London Bridge Station both during and after the redevelopment A plan for improved train to street links, particularly to Tooley Street and St Thomas Street (SE1) during the station redevelopment period ( ) Creating an accessible link to London Bridge City Pier on the Thames. Ensuring an alternative means of transport is enhanced to further alleviate pressure on the east / west underground routes Working with all relevant partners to make Elephant and Castle fully accessible in time for the changes to the Thameslink core services in

8 12. Cycle strategy (Q30) Team London Bridge is committed to providing excellent facilities for cyclists in its area. The London Bridge Station redevelopment whilst welcomed is causing the loss of the secure London Bridge Cycle Park. We would therefore strongly recommend a joined up approach that looks at needs of passengers using cycling as way to begin and end their rail journey. In particular we believe the franchise specification should include: An undertaking that the winning TOC will work with Network Rail to develop a cycling strategy for the combined franchise area that focuses on: - Secure cycle parking at London Bridge station - Cycle parking at stations operated by the TOC - How and when cycles can be transported on trains and that includes flexible, interim solutions for the London Bridge Station redevelopment period. 13. Environmental performance (Q33) As an organisation that is engaged with helping our members improve their environmental performance, we are fully supportive of including targets for reducing noise and pollution, and ensuring that the winning TOC has an appropriate staff travel plan and environment management system. We would also welcome targets related to: Green infrastructure on TOC operated land and facilities with particular reference to Green Walls 2 Waste, including exploring the possibility of a joint strategy with the winning TOC and Network Rail Local procurement. 14. London Bridge arches and tunnels Railway heritage defines the physical and social character of the London Bridge area. The arches and tunnels that surround the station are integral to this but in many cases are empty and badly maintained. In addition, due to the sheer size and condition of the arches, they act as a barrier to the rest of Southwark preventing the flow of services, development and people. 2 Green infrastructure is a planned network of green spaces and other environmental features including street trees, gardens, green roofs, green walls, community forests, parks, rivers, canals and wetlands. 8

9 Team London Bridge proposes the existing problems should be seen as an opportunity and are engaged in a research project to define future uses and encourage redevelopment. The outcomes of the Arches and Tunnels project can help enable radical improvements and the creation of a collection of temporary, semi-permanent and permanent spaces. These could to be used for display, production, teaching, knowledge transfer etc. of traditional and cultural skills, helping bring employment and entrepreneurial opportunities to the area. This enhancement to the immediate station environs will substantially benefit passengers and staff of the TOCs serving London Bridge, increasing off-peak leisure traffic, enhancing personal safety and creating a destination of the immediate area. Team London Bridge would welcome input from the successful TOC in the research and in the resulting long-term uses of these spaces. 15. Local employment and community engagement In addition to the issues raised in the consultation document, we would like to highlight the importance of local employment and community engagement. Working with SE1 neighbours Better Bankside and Waterloo Quarter, Team London Bridge has established a local employment service, Employ SE1, with the aim of helping local businesses to recruit local residents. We would therefore welcome the inclusion of a target for local recruitment for any new London Bridge based staff. In addition the BID has a well known role in brokering links between businesses in the area and local community groups including those working with young people. Team London Bridge hopes that the successful TOC has a Corporate Social Responsibility programme or a formal directive that will help the organisation engage with community groups in London Bridge and throughout the franchise network. 9

10 Appendix 1 Team London Bridge London Bridge Station Development - Planning application response on behalf of the London Bridge business community Recommendations: Station development plans 1. Publish a Construction Management Plan following liaison with the business community. 2. Implement Legible London as part of the station development. 3. Greater consideration should be given to station linkages with the London Bridge City Pier. 4. Increase cycling infrastructure capacity and facilities as part of the station Public realm development. 5. Address pedestrian congestion on Tooley Street. 6. Significantly improve the St. Thomas Street station exit and pedestrian environment. Arches & tunnels 7. Radically improve the Bermondsey Street tunnel environment. 8. Implement active frontages in the St. Thomas Street arches and Bermondsey Street tunnel. 9. Protect and enhance the existing cultural offer within the station master-plan. Retail and business strategy 10. Increase the quality and the range of the retail offer. 11. Designate St. Thomas Street arches as a location for creative retail and leisure outlets. Communication 12. Network Rail to work with Team London Bridge to produce a dedicated business communication strategy. 10

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London West London Economic Prosperity Board 21 March 2017 Title Orbital Rail in West London Report of Status Urgent Enclosures Officer Contact Details Amar Dave (LB Brent) Public No Appendix 1: Specification

More information

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local London City Airport London City Airport: Background London City Airport (LCY) is the only airport so close to the centre of London. It is also London s fastest growing airport, having grown twice as fast

More information

Investing in Greater Manchester transport 2017/2018

Investing in Greater Manchester transport 2017/2018 TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017 Guildford Society Transport Group Position Paper August 2017 Based on submissions in response to the June/July 2017 Local Plan consultation including material presented to Drop-in Session 15 July 2017.

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

3. Coach Supporting Statement

3. Coach Supporting Statement 3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy

More information

Creating a High Quality Business District

Creating a High Quality Business District Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall

More information

FirstGroup plc South Western

FirstGroup plc South Western FirstGroup plc South Western Rail franchise award Monday 27 March 2017 Overview Delighted to be selected by the Department for Transport (DfT) to operate the South Western franchise for at least seven

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE.

LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE. es s Pr og k in LONDON BRIDGE FUTURE STREETS: VISION AND PROJECTS 2014-2018 W or k in Pr og e ss W or A RESPONSE TO THE MAYOR OF LONDON ROADS TASK FORCE BY TEAM LONDON BRIDGE. 1 16 01LONDON BRIDGE TODAY

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS PERTH AND KINROSS COUNCIL 8 16/278 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS Report by Senior Depute Chief Executive (Equality, Community Planning & Public Service

More information

About ABTA. Executive summary

About ABTA. Executive summary ABTA response to the Department for Transport Draft Airports National Policy Statement new runway capacity and infrastructure at airports in the South East of England About ABTA ABTA The Travel Association

More information

Reducing traffic: a new plan for public transport

Reducing traffic: a new plan for public transport Reducing traffic: a new plan for public transport Our five point plan to improve Heathrow s public transport in 2015/16 1 2 3 4 5 Make public transport more attractive for passengers Ensure major rail

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

1 Executive Summary. 2 Introduction

1 Executive Summary. 2 Introduction 1 Executive Summary As part of Network Rail s planning application submission to London Borough of Southwark for London Bridge station, Network Rail has publicised its proposals and exhibited the plans

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

WELCOME SE16 PRINT WORKS MEET THE TEAM AND SITE TOUR

WELCOME SE16 PRINT WORKS MEET THE TEAM AND SITE TOUR WELCOME SE16 PRINT WORKS MEET THE TEAM AND SITE TOUR Welcome to the SE16 PRINT WORKS, and thank you for coming to our Meet the Team event. We hope you enjoy your tour of our site. Rotherhithe Canada Water

More information

Cabinet 16 December Cabinet, 16 December At a Special Cabinet Meeting of North Ayrshire Council at 2.30 p.m.

Cabinet 16 December Cabinet, 16 December At a Special Cabinet Meeting of North Ayrshire Council at 2.30 p.m. Cabinet 16 December 2014 Cabinet, 16 December 2014 - At a Special Cabinet Meeting of North Ayrshire Council at 2.30 p.m. Present Willie Gibson, Alan Hill, Marie Burns, John Bruce, Anthea Dickson, Tony

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

Strategic Cross Border Planning in the West Midlands

Strategic Cross Border Planning in the West Midlands Strategic Cross Border Planning in the West Midlands RTPI Planners, Birmingham 21/02/2018 Adam Harrison, TfWM Transport Governance and WMCA Renaissance: Why the West Midlands? Transforming our place? Challenges

More information

London Bridge station opens upgrade works

London Bridge station opens upgrade works On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018 NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA) To: POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE On: 22 MAY 2018 Report by: DIRECTOR OF ENVIRONMENT & COMMUNITIES Heading: Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority

More information

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

BHP Billiton Global Indigenous Peoples Strategy

BHP Billiton Global Indigenous Peoples Strategy BHP Billiton Global Indigenous Peoples Strategy Indigenous Peoples are critical partners and stakeholders in many of BHP Billiton s operations both within Australia and around the world. Many of our operations

More information

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act. Director: Dave Pearson, Director of Transport Services Report to: Bradford District Consultation Sub-Committee Date: 22 January 2018 Subject: Information Report 1 Purpose 1.1 Matters of information relating

More information

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool Transport Focus 2016 Bus Passenger Survey Briefing 22 March 2017 - Liverpool Presentation of BPS 2016 results David Sidebottom & Robert Pain Bus Passenger Survey 2016 - Scope 42 areas in England: a. 6

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

Train Stations are not just arrival and departure locations

Train Stations are not just arrival and departure locations Train Stations are not just arrival and departure locations The Railway Study Association Mike Goggin 31 October 2017 Contents Introduction to Steer Davies Gleave The Passenger The Neighbour & Non-Traveller

More information

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars

Peterborough. Bedford. Stevenage. Luton. St Albans. Finsbury Park. Kentish Town. St Pancras International. Farringdon. London Blackfriars The big picture King s Lynn Key Today In order to improve train services to and through London, we are investing 5.5bn in new and longer trains (new rolling stock), new track and new stations. This scheme,

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination.

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination. Devon Tourism Strategy 2013-2016 1.0 Introduction This strategy, produced by the Devon Tourism Partnership (), aims to provide an overarching guiding framework for the development of the tourism sector

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive Transport Focus Train punctuality the passenger perspective 2 March 2017 Anthony Smith, Chief Executive Transport Focus Independent transport user watchdog Rail passengers in Great Britain Bus, coach &

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

The Bus Services Bill and Municipal Bus Companies

The Bus Services Bill and Municipal Bus Companies The Bus Services Bill and Municipal Bus Companies Summary Why we need bus services What are municipal bus operators? Network Warrington Being commercial/serving the community Bus Services Bill Value to

More information

National Rail Performance Report - Quarter /16 (January-March 2016)

National Rail Performance Report - Quarter /16 (January-March 2016) National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm

Date: 22 September Grove Vale parking consultation. East Dulwich, South Camberwell. Head of Public Realm Item. 11 Report title: Ward(s) or groups affected: From: Classification: Open Date: 22 September 2011 Decision Taker: Camberwell Community Council Grove Vale parking consultation East Dulwich, South Camberwell

More information

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown 0 5 10 15 20 Kilometres Penrith Blacktown Parramatta Liverpool Bankstown Campbelltown accessibility outcomes Legend Outcomes targeted in Western Sydney are: public transport that is accessible throughout

More information

Borough High Street Low Emission Neighbourhood

Borough High Street Low Emission Neighbourhood Borough High Street Low Emission Neighbourhood Colourful Crossings Design Brief Better Bankside Business Improvement District Brief for Graphic Consultants December 2017 Page 1 of 10 1. Introduction Borough

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners Great Western Route Utilisation Strategy Evidence Submission June 2008 Wilder House Wilder Street Bristol BS2 8PH 0117 903 6868 www.westofengland.org 1 The West of England Partnership is the sub-regional

More information

Norwich Research Park Overarching Travel Plan November 2017

Norwich Research Park Overarching Travel Plan November 2017 Norwich Research Park Overarching Travel Plan November 2017 Norwich Research Park Overarching Travel Plan November 2017 Contents Page 1 Norwich Research Park Site & Development Proposals... 1 2 Site Location

More information

Section A: Scheme Summary

Section A: Scheme Summary Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054

More information

About Us. An introduction to Network Rail

About Us. An introduction to Network Rail About Us An introduction to Network Rail London King s Cross 02 Contents 04 A better railway for a better Britain 06 Network Rail in numbers 08 Our structure 10 Our routes 12 The national framework 14

More information

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update SALISBURY NHS FOUNDATION TRUST Paper: SFT 1922 Title: Transport Strategy & Green Travel Update Purpose of the Paper: To present an update on the Trust Transport Strategy and present a range of proposals

More information

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update Paper: SFT 2035 SALISBURY NHS FOUNDATION TRUST Title: Transport Strategy & Green Travel Update Purpose of the Paper: To present an update on the Trust Transport Strategy and present a range of proposals

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

BARNSLEY METROPOLITAN BOROUGH COUNCIL

BARNSLEY METROPOLITAN BOROUGH COUNCIL BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan REPORT OF THE EXECUTIVE DIRECTOR OF PLACE TO CABINET

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Business Forum. 16 March 2016

Business Forum. 16 March 2016 Business Forum 16 March 2 Rebuilding London Bridge: An update Mary Jordan Business Change Manager, Network Rail London Bridge station update 2015 Platforms 4 to 9 are currently closed for redevelopment,

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director

More information

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference. East West Rail Consortium 14 th June 2018 Agenda Item 3: Terms of Reference Recommendation: It is recommended that the meeting consider and agree subject to any amendment agreed by the meeting the revised

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain s rail

More information

SUBMISSION FROM RENFREWSHIRE COUNCIL

SUBMISSION FROM RENFREWSHIRE COUNCIL SUBMISSION FROM RENFREWSHIRE COUNCIL What does regeneration mean in your area? 1. Renfrewshire takes a broad view of regeneration activity. It firmly embedded in our strategic documents, such as the Single

More information

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch

Kent Route Utilisation Strategy consultation by Network Rail. A response from London TravelWatch Kent Route Utilisation Strategy consultation by Network Rail A response from London TravelWatch Published by London TravelWatch 6 Middle Street London EC1A 7JA Phone : 020 7505 9000 Fax : 020 7505 9003

More information

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009 PERTH AND KINROSS COUNCIL 4 09/494 Enterprise and Infrastructure Committee 4 November 2009 STRATEGIC PRIORITIES FOR TOURISM AND AREA TOURISM PARTNERSHIP ARRANGEMENTS Report by Depute Director (Environment)

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey Spring 2006 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

GIPPSLAND TOURISM MASTER PLAN

GIPPSLAND TOURISM MASTER PLAN GIPPSLAND TOURISM MASTER PLAN 2013-2018 1 GIPPSLAND TOURISM MASTER PLAN 2013-2018 GIPPSLAND TOURISM MASTER PLAN 2013-2018 The Gippsland Tourism Master Plan provides direction to build the competitiveness

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO)

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) IMPLEMENTATION AND TRANSITION STRATEGY LDMO MANDATE: To establish a destination management organization that provides

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

Haworth Tr T avel Plan r 10th February 2006

Haworth Tr T avel Plan r 10th February 2006 Haworth Travel Plan 10th February 2006 Haworth Travel Plan has been prepared for: Contents 1 Why have Haworth Travel Plan?... 3 2 Who will benefit from Haworth Travel Plan?... 4 3 What actions will be

More information

Please see the full job description and specification on page 4 for further details.

Please see the full job description and specification on page 4 for further details. Visit Belfast Welcome Centre Manager Full time, permanent post To support Visit Belfast s ambitious plans to drive further tourism growth to the city and region, we have an exciting opportunity for a Visit

More information

The National Transport Authority

The National Transport Authority The National Transport Authority iroute Conference Kilkenny June 2017 1 What We Do Bus, Rail & Light Rail Services Heading Taxi & Bus Licensing Investment Projects Lorem ipsum dolor sit amet, consectetur

More information

GUNGAHLIN TOWN CENTRE

GUNGAHLIN TOWN CENTRE GUNGAHLIN TOWN CENTRE PLANNING REFRESH SNAPSHOT NOVEMBER 2018 CONTENTS INTRODUCTION....1 Australian Capital Territory, Canberra 2018 This work is copyright. Apart from any use as permitted under the Copyright

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

ASLEF s Response to the East Anglia Rail Franchise Consultation

ASLEF s Response to the East Anglia Rail Franchise Consultation ASLEF s Response to the East Anglia Rail Franchise Consultation 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Update on implementation of Taking Revalidation Forward recommendations

Update on implementation of Taking Revalidation Forward recommendations Agenda item: 7 Report title: Report by: Action: Update on implementation of Taking Revalidation Forward recommendations Judith Chrystie, Assistant Director, Registration and Revalidation Judith.Chrystie@gmc-uk.org,

More information

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites.

A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites. Introduction: A Proposed Framework for the Development of Joint Cooperation On Nature Conservation and Sustainable Tourism At World Heritage Natural sites Between The tourism industry and the UNESCO, World

More information