1 APPENDIX B: Network Capability & Characteristics for Freight Services Photo (Aberdeen): representing the railway challenge of bulk and intermodal rail freight, co-existing with an increasing and enhanced passenger service. The significant growth forecast for Scotland mainly centres around successful intermodal traffic utilising road to rail swapbodies and tanks. Our export market requires 2,896 mm high containers and chilled and frozen products require to be moved in reefers which, as well as mainly being 2,896 mm high are also 2,550 mm to 2,600 mm wide all of which is challenging for some key Scottish routes on the intermodal wagons most commonly used for Scottish traffic. The requirement for reefer width and 2,896 mm height to, in particular, Inverness and Aberdeen is essential to secure growth therefore further analysis is required to confirm what work would be required to structures that are both foul to normal clearance and structures that would be infringed so that an informed view can be made on the scale of funding that would be required and whether or not there could be other more cost-effective solutions (ie bespoke wagons, container alternatives ie chamfered corners, speed restrictions plus enhanced maintenance regime) to permit specific combinations of wagon/swapbody/tank to run. This document is a snapshot in time, intended for rail freight industry use. It will be updated annually, or more frequently if required in line with enhancements, however please check the relevant condition of carriage form (RT3973CON, RT3973HAW, RT3973EXL or RT3973NUC), Sectional Appendix or Statement of Compatibility (SOC) to supplement this detail to inform decisions. Always use the most up to date information contained within the Conditional of Carriage forms and/or Sectional Appendix. Please note there may also be operational restrictions that are not captured in the detail below but could impact on timetabling. Please note that as Class 67 locomotives are not diagrammed to haul freight traffic in Scotland at the moment and are not currently forecast to be utilised more in the future, Class 67 speed restrictions have not been included within in this document therefore please check the Sectional Appendix/relevant SOC. Appendix B: Network 1

2 Contents Page 3 Published Gauge Map 4 Published Route Availability Map 5 Scottish Strategic Freight Network and Core Routes 6 Map of Freight Sites 7 Route 1 Central Belt to Border via West Coast Main Line 10 Route 2 Central Belt to Border via East Coast Mail Line & Millerhill/Edinburgh Sub 13 Route 3 Central Belt to Border via East Coast Mail Line & Waverley 16 Route 4 Central Belt to Border via Glasgow & South West Route & Glasgow Barrhead Kilmarnock 19 Route 5 Central Belt to Ayrshire & City Union Line 22 Route 6 Central Belt to Inverness 25 Route 7 Central Belt to Inverness via Fife (and Stirling, Alloa, Kincardine line) 28 Route 8 Central Belt to Aberdeen 31 Route 9 Central Belt to Aberdeen via Fife (and Stirling, Alloa, Kincardine line) 34 Route 10 Aberdeen to Inverness 36 Route 11 Inverness to Georgemas & Thurso (Far North) 38 Route 12 Central Belt to Fort William & Corpach Appendix B: Network 2

3 Published Gauge (as at Aug 18) Appendix B: Network 3

4 Published Route Availability (as at Aug 18) Appendix B: Network 4

5 Scottish Strategic Freight Network and Core Routes Appendix B: Network 5

6 Operational Freight Depot, Terminal or Private Siding Freight Yard: Strategic Freight Site, Not Currently In Use or In Development Appendix B: Network 6

7 Route 1: Central Belt Gretna via WCML Appendix B: Network 7

8 ROUTE DESCRIPTION Central Belt Gretna via WCML ROUTE REVIEW Trailing Weight: 1,865t (north) / 2,110t (south) via Holytown, 1,865t (north) / 2,195t (south) via Motherwell (Class 66, 56t wagon coupling strength) FREIGHT CAPABILITY ROUTE CLEARANCE Route 1 RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Wishaw - Holytown Br WWD-26 (Calder Via) Both RA 10 Scottish Central Coatbridge Central Stn* Down G Proh RT3973 FORMS FOR WCML Diversionary Routes GSW, Ayrshire, R&C or City Union / ECML, Carstairs or Shotts The route between Gretna and the central belt terminals of Mossend, Coatbridge and Grangemouth is electrified throughout and offers an average journey time of 7½ hours from the West Midlands. Bulk traffic up to 26.6 tonnes/axle (4-Axle wagon) and Container traffic up to 2,896 mm high by 2,600 mm wide. *There is a gauge restriction at Coatbridge Central Station in the Down Main direction which only applies to 2,550 mm and 2,600 mm wide combinations. ASPIRATIONS W10/W12 border to Grangemouth Longer Loops Coatbridge terminal capacity/capability Length 775m Journey Time Improvements/Better Paths Next Page INTERMODAL RT3973 FORM NO. BHM086CON LDS002CON LDS013CON LDS015CON LDS041CON LDS053CON LDS070CON LDS072CON LDS087CON LDS089CON LDS090CON LDS094CON LDS111CON LDS113CON LDS117CON LDS125CON LDS126CON LDS128CON LDS130CON LDS131CON LDS132CON LDS149CON LDS151CON LDS154CON LDS159CON LDS161CON LDS170CON LDS177CON LDS180CON PAD012CON PAD013CON PAD022CON PAD048CON PAD058CON PAD083CON PAD093CON PAD097CON PAD105CON PAD106CON PAD111CON PAD113CON PAD125CON RT3973 FORM NO. PAD001EXL PAD006EXL PAD173EXL HEAVY AXLE WEIGHT RT3973 FORM NO. LDS003HAW LDS021HAW LDS045HAW LDS052HAW LDS078HAW LDS086HAW LDS107HAW LDS132HAW LDS157HAW PAD247HAW 8 Appendix B: Network

9 6.4m = 1 SLU Location Down Up Quintinshill 566m 579m Lockerbie 535m 645m Beattock Village 550m 645m Beattock Summit 580m 580m Abington 625m 720m Carstairs 580m 490m Law 580m 645m Dalzell 1168m Braidhurst 430m 550m Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop 1 1,000m 1,000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m Appendix B: Network 9

10 Route 2: Central Belt ECML via Millerhill Appendix B: Network 10

11 ROUTE DESCRIPTION Central Belt ECML via Sub ROUTE REVIEW Trailing Weight: 1,865t (north) / 2,045t (south) (Class 66, 56t wagon coupling strength) Diversionary Routes Waverley, WCML The core route between the ECML border and the central belt terminals of Mossend, Coatbridge and Grangemouth via Millerhill is not electrified. It offers an average journey time of 7½ hours from Tees to a Central Belt Terminal. *There is a gauge restriction at Coatbridge Central Station, Down Main direction which only applies to 2,550 mm and 2,600 mm wide combinations Bulk traffic up to 26.6 tonnes/axle (4-Axle wagon) and Container traffic up to 2,896 mm high by 2,600 mm wide. FREIGHT CAPABILITY ROUTE CLEARANCE Route 2 ASPIRATIONS W10/W12 Carstairs to Grangemouth W12 via Midcalder to Holytown Length 775m Electrification via Edinburgh Suburban Main class route through Millerhill Yard Access to Grangemouth branch from the east Journey Time Improvements/Better Paths RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Grantshouse - Oxwellmains Br ECM8-109 Both RA 45 Slateford - Kingsknowe Br ECA2-138 Both RA 30 Br ECA2-137 (Slateford Via) Both RA 30 Br ECA2-86 (Linhouse Via) Both RA 45 Shotts Gauge will be updated April 2019 Br EGS2-149 (Oakbank Via) Both RA 45 Br EGS2-128 (Limefield Via) Both RA 45 Br EGS2-119 (Burngrange Via)Both RA 45 Br EGS2-082 (Fauldhouse Via)Both RA 45 Br EGS2-021 (Cleland Via) Both RA 45 Wishaw - Holytown Br WWD-26 (Calder Via) Both RA 10 Scottish Central Coatbridge Central Stn* Dn G Proh Newton E - Uddingston Br WCM2-37 Both RA 40 Br WCM2-29 Both RA 40 Br WCM2-24 (Orbiston Via) Both RA 25 Next Page Next Page RT3973 FORMS FOR ECML Appendix B: Network 11

12 Millerhill; 2 long trains can cause congestion - the Freddy sidings are: F4 54 SLU 350m F5 58 SLU 372m F6 65 SLU 416m F7 106 SLU 680m F4 is the through route so trains should not be planned to stable on this road 6.4m = 1 SLU Location Down Up Berwick 742m 390m Grantshouse 647m 580m Dunbar PL 390m Drem 470m 400m Prestonpans 365m Millerhill Freddie 4 350m 350m Millerhill Freddie 5 372m 372m Millerhill Freddie 6 416m 416m Millerhill Freddie 7 680m 680m Carstairs 580m 490m Law 580m 645m Dalzell 1168m Braidhurst 430m 550m Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m RT3973 FORMS FOR ECML INTERMODAL RT3973 FORM NO. LDS015CON LDS029CON LDS041CON LDS070CON LDS072CON LDS087CON LDS090CON LDS094CON LDS111CON LDS113CON LDS126CON LDS128CON LDS131CON LDS132CON LDS151CON LDS161CON LDS177CON PAD013CON PAD022CON PAD048CON PAD093CON PAD097CON PAD115CON PAD116CON RT3973 FORM NO. PAD001EXL PAD006EXL HEAVY AXLE WEIGHT RT3973 FORM NO. LDS003HAW LDS021HAW LDS045HAW LDS065HAW LDS086HAW LDS107HAW LDS132HAW LDS157HAW LDS162HAW PAD247HAW Appendix B: Network 12

13 Route 3: Central Belt ECML via Waverley Appendix B: Network 13

14 ROUTE DESCRIPTION Central Belt ECML via Waverley ROUTE REVIEW Trailing Weight: 1,865t (north) / 2,045t (south) (Class 66, 56t wagon coupling strength) Diversionary Routes Millerhill, WCML The core route between the ECML border and the central belt terminals of Mossend, Coatbridge and Grangemouth via Edinburgh Waverley is electrified. *There is a gauge restriction at Coatbridge Central Station, Down Main direction which only applies to 2,550 mm and 2,600 mm wide combinations Bulk traffic up to 26.6 tonnes/axle (4-Axle wagon) have permission to run and Container traffic up to 2,896 mm high by 2,550 mm wide. FREIGHT CAPABILITY ROUTE CLEARANCE Route 3 ASPIRATIONS W10/W12 Monktonhall to Grangemouth W12 via Midcalder to Holytown Length 775m Freight Capacity through Waverley Access to Grangemouth branch from the east RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Grantshouse - Oxwellmains Br ECM8-109 Both RA 45 Edinburgh & Haymarket Haymarket North Tunnel Both G Proh Mound Tunnel lines W & Z only G Slateford - Kingsknowe Br ECA2-138 Both RA 30 Br ECA2-137 (Slateford Via) Both RA 30 Br ECA2-86 (Linhouse Via) Both RA 45 Shotts Gauge will be updated April 2019 Br EGS2-149 (Oakbank Via) Both RA 45 Br EGS2-128 (Limefield Via) Both RA 45 Br EGS2-119 (Burngrange Via) Both RA 45 Br EGS2-082 (Fauldhouse Via) Both RA 45 Br EGS2-021 (Cleland Via) Both RA 45 Wishaw - Holytown Br WWD-26 (Calder Via) Both RA 10 Scottish Central Coatbridge Central Stn* Dn G Proh Newton E - Uddingston Br WCM2-37 Both RA 40 Br WCM2-29 Both RA 40 Br WCM2-24 (Orbiston Via) Both RA 25 Next Page Next Page RT3973 FORMS FOR ECML Appendix B: Network 14

15 6.4m = 1 SLU Location Down Up Berwick 742m 390m Grantshouse 647m 580m Dunbar PL 390m Drem 470m 400m Prestonpans 365m Carstairs 580m 490m Law 580m 645m Dalzell 1168m Braidhurst 430m 550m Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m RT3973 FORMS FOR ECML INTERMODAL RT3973 FORM NO. LDS015CON LDS029CON LDS041CON LDS070CON LDS072CON LDS087CON LDS090CON LDS094CON LDS111CON LDS113CON LDS126CON LDS128CON LDS131CON LDS132CON LDS151CON LDS161CON LDS177CON PAD013CON PAD022CON PAD048CON PAD093CON PAD097CON PAD115CON PAD116CON RT3973 FORM NO. PAD001EXL PAD006EXL HEAVY AXLE WEIGHT RT3973 FORM NO. LDS003HAW LDS021HAW LDS045HAW LDS065HAW LDS086HAW LDS107HAW LDS132HAW LDS157HAW LDS162HAW PAD247HAW Appendix B: Network 15

16 Route 4: Central Belt Gretna via G&SW Appendix B: Network 16

17 ROUTE DESCRIPTION Central Belt Gretna via GSW ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) Via Barassie/ Kilmarnock 2,000t (north & south) Via Annbank 2,000t (north & south) Via GBK 1,890t (north), 1,775t (south) Diversionary Routes WCML The routes between the G&SW border with LNW and the central belt terminals of Mossend, Coatbridge and Grangemouth are not electrified. Bulk traffic up to 26.6 tonnes/axle (4-Axle wagon) and Container traffic up to 2,896 mm high by 2,500 mm wide. The route via Annbank currently has gauge challenges however it is a through route. FREIGHT CAPABILITY ROUTE CLEARANCE Route 4 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA W9/W10/W12 border to Grangemouth Length 775m Journey Time Improvements/Better Paths RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD GSW Kirkconnel Stn Dn G 30 Mossgiel Tunnel Up G 35 Kilmarnock Stn P4 Up G Proh GBK Br GBK-65 (Cattle Br) Up G 15 Barrhead Stn P3 (Bay Pform)S G Proh Pollokshaws West Stn Dn G 30 Muirhouse Sth Jn - Larkfield Jn Both G Proh Ayrshire Br AYR4-17 Both RA 45 Br AYR4-21 Both RA 45 Barassie - Kilmarnock Br BAK-8 (Irvine Via) Both RA 25 Annbank - Mauchline Br ANN-28 (Failford Via) S RA 25 Br ANN-34 (Redcraig Via) S RA 25 R&C Br RCB-19 (Kirkwood Via) Both RA 10 Kilmarnock to Barassie requires a run round move at Barassie which has length limitations, and which could add an operating/safety risk as the yard is not lit or (with permission from DB Cargo) the Reception Loop at Falkland yard could also be used for a run round move. Next Page RT3973 FORMS FOR G&SW 17 Appendix B: Network

18 The direct route via the GBK is preferred, being the quickest route, however it has significant gauge and capacity constraints and traffic conveying above W7 (up to 2,896 mm high boxes) requires a turn-back move at the top of the Paisley Canal line as the Larkfield Curve is currently prohibited for most container moves. Next Page 6.4m = 1 SLU Location Down Up Thornhill 620m New Cumnock 325m Mauchline Kilmarnock 330m 240m Falkland Up Yd No m Falkland DGL 353m Barassie 359m 410m Barassie Yard 445m* Kilwinning 398m Brownhill 695m 695m Glengarnock 260m Elderslie 896m Arkleston 650m Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m *608m at Barassie Yard, subject to FL access agreement to use Road 4 RT3973 FORMS FOR G&SW INTERMODAL RT3973 FORM NO. BHM099CON LDS015CON LDS089CON LDS113CON LDS117CON LDS128CON LDS132CON LDS151CON LDS177CON PAD175CON HEAVY AXLE WEIGHT RT3973 FORM NO. LDS052HAW LDS078HAW LDS086HAW LDS107HAW PAD247HAW Appendix B: Network 18

19 Route 5: Central Belt Ayrshire Terminals Appendix B: Network 19

20 ROUTE DESCRIPTION Central Belt Ayrshire ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) Via R&C 2,645t (to Ayrshire) / 2,490t (from Ayrshire) Via City Union 2,750t (to Ayrshire) / 2,315t (from Ayrshire) Diversionary Routes City Union Line or GSW/WCML The route between Falkland/Hunterston/Hillington # /Elderslie and Mossend, Coatbridge and Grangemouth via the R&C is electrified ( # Deanside (Hillington) branch not currently electrified) however the other terminals to the west of Glasgow and Ayrshire are not located off electrified routes. The core route offers an average journey time of 2 hours from the Central Belt to ie. Falkland Yard. *There is a gauge restriction at Coatbridge Central Station, Down Main direction which only applies to 2,550 mm and 2,600 mm wide combinations. FREIGHT CAPABILITY ROUTE CLEARANCE Route 5 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA W9/W10/W12 border to Grangemouth Length 775m Journey Time Improvements/Better Paths RT3973 FORMS FOR AYRSHIRE Next Page RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPESPD Ayrshire Br LGS2-10 S RA 40 Br AYR4-17 Both RA 45 Br AYR4-21 Both RA 45 Barassie - Kilmarnock Br BAK-8 (Irvine Via) Both RA 25 Killoch Br KCH1-9 S RA 10 R&C Br RCB-19 (Kirkwood Via) Both RA 10 Scottish Central Coatbridge Central Stn* Dn G Proh High Street to Cowlairs City Union Line Up RA Proh City Union Line Dn RA 10 HST-261/004 Saltmarket Dn RA 5 HST-218/005 Clyde Street Dn RA 5 High St Bellgrove Br 240/116 (Class 66) Both L 10 Barnhill Station Dn Platform Dn G 30 Barnhill Tunnel Up G 15 Blochairn Tunnel Up G 5 Br SGN-12 (Coventry Drive) Up G 20 Alexandra Parade P2 Dn G 20 Duke Street Station Both G 20 Br SGN-16 & 15a (Duke St) Up G 20 Duke Street Tunnel Up G 20 Bellgrove Station Dn G 15 Appendix B: Network 20

21 Bulk traffic up to 26.6 tonnes/axle (4-Axle wagon) and Container traffic up to 2,896 mm high by 2,550 mm wide. The Deanside branch (Hillington) is W9/RA9 6.4m = 1 SLU Location Down Up Kilmarnock 330m 240m Falkland Up Yd No m Falkland DGL 353m Barassie 359m 410m Barassie Yard* 445m Kilwinning 398m Brownhill 695m 695m Glengarnock 260m Elderslie 896m Arkleston 650m Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m *608m at Barassie Yard, subject to FL access agreement to use Road 4 RT3973 FORMS FOR AYRSHIRE INTERMODAL RT3973 FORM NO. BHM099CON LDS015CON LDS070CON LDS072CON LDS089CON LDS113CON LDS128CON LDS132CON LDS151CON LDS177CON PAD175CON HEAVY AXLE WEIGHT RT3973 FORM NO. LDS052HAW LDS078CON LDS086HAW LDS107HAW LDS247HAW Appendix B: Network 21

22 Route 6: Central Belt Inverness Appendix B: Network 22

23 ROUTE DESCRIPTION Central Belt Inverness ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,535t (north & south) Diversionary Routes Fife via Stirling, Alloa, Kincardine (SAK) or Forth Bridge/Fife, Aberdeen The core route between the central belt terminals of Mossend, Coatbridge and Grangemouth to Inverness is not electrified. It offers an average journey time of under five hours from a Central Belt Terminal to Inverness for an intermodal service. ASPIRATIONS RA10 Permissions Min 2,896 mm high x 2,550 mm/2,600 mm wide on IKA/FKA/IDA W10/W12 with Electrification Length 640m Journey Time Improvements/Better Paths Removal of RT3973 restrictions FREIGHT CAPABILITY ROUTE CLEARANCE Route 6 6.4m = 1 SLU Location Down Up Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m Larbert 269m Dunblane 310m Dunkeld 301m Pitlochry 275m 265m Kingussie 280m 280m Kincraig 400m 400m Aviemore 505m 505m Carrbridge 375m 375m Slochd 400m 400m Tomatin 395m 395m Moy 400m 400m RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Scottish Central Gleneagles/Hilton Br 66 Up G 30 Gleneagles P1 & P2 Both G 40* *applies to FKA at S.25 at 2,550 mm only Perth Station P2 Both G 5 Highland Main Line Inverness Station P4 Both G Proh Inverness Station P2 & P3 Both G 10 RT3973 FORMS FOR INVERNESS INTERMODAL RT3973 FORM NO. LDS003CON LDS118CON LDS127CON HEAVY AXLE WEIGHT RT3973 FORM NO. 23 Appendix B: Network

24 Route 7: Central Belt Inverness via Fife & SAK Appendix B: Network 24

25 ROUTE DESCRIPTION Central Belt Inverness via Fife & SAK ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,535t (north & south) Diversionary Routes Highland Main Line, Aberdeen The route between the central belt terminals of Mossend, Coatbridge and Grangemouth to Inverness via Fife is not electrified. The Forth & Tay Bridges are RA8 Long Span structures, which does not mean that all RA8 traffic is permitted to run, therefore if the wagon permissions are not detailed in the Sectional Appendix then the Network Rail Structures Engineer requires to assess and approve any moves. FREIGHT CAPABILITY ROUTE CLEARANCE Route 7 ASPIRATIONS RA10 Permissions Min 2,896 mm high x 2,550 mm/2,600 mm wide on IKA/FKA/IDA W10/W12 with Electrification Length 640m Removal of RT3973 restrictions Journey Time Improvements/Better Paths RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Scottish Central Gleneagles/Hilton Br 66 Up G 30 Gleneagles P1 & P2 Both G 40* *applies to FKA at S.25 at 2.55 only Perth Station P2 Both G 5 Fife Thornton Nth - Thornton Sth Up RA 30 Thornton Sth - Kirkcaldy Yd Both RA 30 Kirkcaldy Yd Nth End - Sth End Dn RA 30 Kirkcaldy - Kinghorn Dn RA 30 North of Kinghorn - Aberdour Dn RA 30 Aberdour - Burntisland Up RA 30 Aberdour - Aberdour HABD Dn RA 30 Aberdour HABD - Dalgety Bay Dn RA 30 Inverkeithing I keithing Sth Up RA 30 Dalmeny Jn - Winchburgh Jn Up RA 30 Dalmeny Jn - Winchburgh Jn Dn RA 30 Highland Main Line Inverness Station P4 Both G Proh Inverness Station P2 & P3 Both G 10 Bulk traffic up to tonnes/axle (4-Axle wagon) and Container traffic up to 2,655 mm high by 2,550 mm wide. Next Page Next Page RT3973 FORMS FOR INVERNESS Appendix B: Network 25

26 6.4m = 1 SLU Location Down Up Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m Dalmeny 230m 285m Inverkeithing 390m Cambus 637m 637m Alloa 626m 626m Townhill No.1 & 2 390m 415m Thornton North 365m 410m Ladybank 420m Dunkeld 301m Pitlochry 275m 265m Kingussie 280m 280m Kincraig 400m 400m Aviemore 505m 505m Carrbridge 375m 375m Slochd 400m 400m Tomatin 395m 395m Moy 400m 400m RT3973 FORMS FOR INVERNESS INTERMODAL RT3973 FORM NO. LDS003CON LDS118CON LDS127CON HEAVY AXLE WEIGHT RT3973 FORM NO. Appendix B: Network 26

27 Route 8: Central Belt Aberdeen Appendix B: Network 27

28 ROUTE DESCRIPTION Central Belt Aberdeen ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,940t (north) / 2,175t (south) Diversionary Routes Highland Main Line, Fife The route between the central belt terminals of Mossend, Coatbridge and Grangemouth and Aberdeen via Perth - Dundee is not electrified. Bulk traffic up to tonnes/axle (4-Axle wagon) and Container traffic up to 2,705 mm high by 2,550 mm wide. The average journey time from a central belt terminal to Aberdeen is 4 hours. FREIGHT CAPABILITY ROUTE CLEARANCE Route 8 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA W10/W12 with electrification Length 640m Removal of RT3973 restrictions Capacity enhancement - loops Journey Time Improvements/Better Paths Removal of one train working on the Aberdeen Waterloo branch RT3973 FORMS FOR ABERDEEN INTERMODAL RT3973 FORM NO. LDS118CON LDS127CON LDS171CON HEAVY AXLE WEIGHT RT3973 FORM NO. LDS162HAW LDS183CON RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Scottish Central Gleneagles P1 & P2 3 Both G 40 Perth Station P2 Both G 5 Dundee Aberdeen Dundee Station P1 1 Both G 20 Dundee Station P 2, 3 & 4 Both G Proh Broughty Ferry Stn P1 2 Both G 25 Broughty Ferry Stn P2 2 Both G 30 Monifieth P2 3 Both G 30 Barry Links Station 3 Up G 25 Br ECN4-247 (Letham Grange) 4 Up G 20 Stonehaven P1 and 2 3 Both G 30 Portlethen Station P2 5 Both G 40 Portlethen Station P 1 3 Both G 40 Portlethen Station P 2 3 Both G 10 Aberdeen Stn P s 3, 4 & 5 Both G Proh Aberdeen Stn P 7 6 Both G Proh Next Page Notes on next page Appendix B: Network 28

29 6.4m = 1 SLU Location Down Up Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m Larbert 269m Dunblane DPL 310m Perth Dundee Loop 270m 271m Craiginches Loop tbc tbc 1 applies to FAA at 2,896 mm x 2,500 mm & FKA at S.25 at 2,550 mm 2 applies to IDA at 2,775 mm at 2,500 mm & FKA at S.25 at 2,550 mm 3 applies to FKA at S25 at 2,550 mm only 4 applies to FCA at 2,590 mm x 2438mm wide 5 applies to IDA at 2,775 mm at 2,500 mm, IFA/FIA at 2,590 mm x 2,500 mm, FKA at S.31 x 2,500 mm only 6 IKA/FKA S25 flat topped at 2,550 mm Prohibited Appendix B: Network 29

30 Route 9: Central Belt Aberdeen via Fife Appendix B: Network 30

31 ROUTE DESCRIPTION Central Belt Aberdeen via Fife ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,940t (north) / 1,775t (south) Diversionary Routes Highland Main Line, Perth - Dundee The route between the central belt terminals of Mossend, Coatbridge and Grangemouth and Aberdeen via Fife is not electrified. Bulk traffic up to tonnes/axle (4-Axle wagon) and there is a 20mph speed restriction over the Forth and Tay bridges. The Forth & Tay Bridges are RA8 Long Span structures, which does not mean that all RA8 traffic is permitted to run, therefore if the wagon permissions are not detailed in the Sectional Appendix then the Network Rail Structures Engineer requires to assess and approve any moves. Container traffic up to 2,705 mm high by 2,550 mm wide. FREIGHT CAPABILITY ROUTE CLEARANCE Route 9 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA W10/W12 with electrification Length 640m Removal of RT3973 restrictions Journey Time Improvements/Better Paths Removal of one train working on the Aberdeen Waterloo branch RT3973 FORMS FOR ABERDEEN INTERMODAL RT3973 FORM NO. LDS118CON LDS127CON LDS171CON HEAVY AXLE WEIGHT RT3973 FORM NO. LDS162HAW LDS183CON Next Page RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Thornton Nth - Thornton Sth Up RA 30 Thornton Sth - Kirkcaldy Yd Both RA 30 Kirkcaldy Yd Nth Sth Dn RA 30 Kirkcaldy - Kinghorn Dn RA 30 North of Kinghorn - Aberdour Dn RA 30 Aberdour - Burntisland Up RA 30 Aberdour - Aberdour HABD Dn RA 30 Aberdour HABD - Dalgety Bay Dn RA 30 Inverkeithing I keithing Sth Up RA 30 Dalmeny Jn - Winchburgh Jn Up RA 30 Dalmeny Jn - Winchburgh Jn Dn RA 30 Dundee Station P1 1 Both G 20 Dundee Station P 2, 3 and 4 Both G Proh Dundee Dundee C Up RA 30 Tay Bridge South Dn RA 30 St Fort Leuchars Up RA 30 Leuchars Cupar Dn RA 30 Seggiehill Cupar Both RA 30 Broughty Ferry Stn P1 2 Both G 25 Broughty Ferry Stn P2 2 Both G 30 Monifieth P2 3 Both G 30 Barry Links Station 3 Up G 25 Br 247 Letham Grange 4 Up G 20 Stonehaven P1 and 2 3 Both G 30 Portlethen Station P2 5 Both G 40 Portlethen Station P 1 3 Both G 40 Portlethen Station P 2 3 Both G 10 Aberdeen Stn P s 3, 4 & 5 Both G Proh Aberdeen Station P 7 6 Both G Proh Notes 1 to 6 on next page 31 Appendix B: Network

32 6.4m = 1 SLU Location Down Up Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Fouldubs Loop m 1000m Fouldubs Loop 2 600m 600m Fouldubs Loop 3 600m 600m Larbert 269m Dalmeny 230m 285m Inverkeithing 390m Cambus 637m 637m Alloa 626m 626m Townhill No.1 & 2 390m 415m Thornton North 365m 410m Ladybank 420m Craiginches Loop tbc tbc 1 applies to FAA at 2,896 mm x 2,500 mm & FKA at S.25 at 2,550 mm 2 applies to IDA at 2,775 mm at 2,500 mm & FKA at S.25 at 2,550 mm 3 applies to FKA at S25 at 2,550 mm only 4 applies to FCA at 2,590 mm x 2,438 mm wide 5 applies to IDA at 2,775 mm at 2,500 mm, IFA/FIA at 2,590 mm x 2,500 mm, FKA at S.31 x 2,500 mm only 6 IKA/FKA S25 flat topped at 2,550 mm Prohibited Appendix B: Network 32

33 Route 10: Aberdeen Inverness Appendix B: Network 33

34 ROUTE DESCRIPTION Aberdeen Inverness ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,595t (in both directions) Diversionary Routes Highland Main Line, Aberdeen (no diversionary routes for terminals on the Aberdeen Inverness route) The core route between Aberdeen and Inverness is not electrified. The Aberdeen Waterloo branch is one train working. FREIGHT CAPABILITY ROUTE CLEARANCE Route 10 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA W9/W10/W12 with electrification Length 640m Journey Time Improvements/Better Paths Removal of one train working on the Aberdeen Waterloo branch 6.4m = 1 SLU Location Down Up Inverurie 435m 435m Insch Huntly 455m 455m Keith 435m 435m Elgin 587m 548m Forres 1,289m 1,155m Nairn 400m 400m RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Aberdeen Stn Plat s 1, 3, 5 & 7 Both G Proh Elgin Station Platform 2 Both G 40 RT3973 FORMS FOR INVERNESS/ABERDEEN INTERMODAL RT3973 FORM NO. LDS118CON LDS127CON LDS171CON OPERATIONAL Trains running from Inverness on to the Inverness to Aberdeen line and vice versa require to run round to get to/from the Highland Main line, the options are:- 1) North Loop however this is only 190m; 2) Rose Street Curve via the fuel plant c 246m, as the fuel point is Scotrail s infrastructure this requires Scotrail to provide permission for the move; 3) Muir of Ord c 460m this would extend the journey time and would require an RETB fitted loco to proceed north from Inverness. Appendix B: Network 34

35 Route 11: Far North Line Appendix B: Network 35

36 ROUTE DESCRIPTION Far North Line ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,595t (in both directions) Diversionary Routes None The route between the Inverness and Georgemas is not electrified and it can accommodate bulk traffic up to tonnes/axle (4-Axle wagon) with permissions for some traffic to run up to RA8 to Georgemas and Container traffic up to 2,896 mm high by 2,500 mm wide. The average journey time from Inverness to Georgemas is 5 hours. RETB fitted locomotives are required. Muir of Ord can accommodate a run round move of 460m. FREIGHT CAPABILITY ROUTE CLEARANCE Route 11 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA RA8 Permissions W9/W10/W12 with electrification Length 640m Removal of RT3973 restrictions Journey Time Improvements/Better Paths Location Muir of Ord Dingwall Invergordon Tain Ardgay Lairg Rogart Brora Helmsdale Forsinard Georgemas 6.4m = 1 SLU Single 466m 410m 395m 255m 435m 302m 330m 330m 255m 250m 240m RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD Br 4 (Thurso Viaduct) S L (66) 20 Georgemas Jn - Brora 30mph Throughout, except: Br WCK-306 S RA 10 Br WCK-296 S RA 10 Br WCK-292 S RA 10 Br WCK-276 S RA 10 Br WCK-222 S RA 30 Dunrobin Castle - Golspie S RA 30 Golspie - Rogart S RA 30 Golspie - Rogart S RA 30 Rogart - Lairg S RA 30 Rogart - Lairg S RA 30 Rogart - Lairg S RA 30 Lairg - Oykel Via (Nth end) S RA 30 Br WCK-151 (Oykel Via) S RA 10 Oykel Via (sth end) - Carron Via RA 30 Carron Via - Br WCK-108 S RA 20 Br WCK-108 (excl) - Tain S RA 30 Fearn - Invergordon Br WCK-82 RA 50 Dingwall - Muir of Ord S RA 30 RT3973 FORMS FOR FAR NORTH INTERMODAL RT3973 FORM NO. HEAVY AXLE WEIGHT RT3973 FORM NO. NUCLEAR FORMS, NOT LISTED 36 Appendix B: Network

37 Route 12: Central Belt West Highland Line Appendix B: Network 37

38 ROUTE DESCRIPTION West Highland Line ROUTE REVIEW Trailing Weight: (Class 66, 56t wagon coupling strength) 1,250t (north) / 1,290 tonnes (south) Diversionary Routes None The route between the central belt terminals of Mossend, Coatbridge and Grangemouth and Fort William/Corpach is not electrified. The average journey time from the Central belt to Fort William is 7½ hours. RETB fitted locos are required. Bulk traffic up to tonnes/axle (4-Axle wagon). The West Highland line is RA5 however dispensation has historically been permitted for a limited number of services between RA6 and RA8 with x speed restrictions. Container traffic up to 2,896 mm high by 2,500 mm wide via Westerton and up to 2,743 mm high via Queen St Low Level. FREIGHT CAPABILITY ROUTE CLEARANCE Route 12 ASPIRATIONS Minimum 2,896 mm high x 2,550 mm/2,600 mm wide on FKA, IKA, IDA RA8 Permissions Removal of RT3973 restrictions W9/W10/W12 with electrification Length 640m Journey Time Improvements/Better Paths RT3973 FORMS FOR WHL INTERMODAL RT3973 FORM NO. LDS117CON HEAVY AXLE WEIGHT RT3973 FORM NO. LDS003HAW LDS065HAW Next Page RT3973/SA SPEED RESTRICTIONS TYPE GAUGE = G, ROUTE AVAILABILITY = RA, OPERATIONS = OP, LOCOMOTIVE = L PLEASE NOTE GAUGE SPEEDS ARE FOR SPECIFIC COMBINATIONS, NOT ALL INTERMODAL TRAFFIC LOCATION LINE TYPE SPD North Electrics Rutherglen N Exhibition C Route RA 20 Hyndland Sth - Hyndland E Up RA 30 Hyndland W Yoker Both RA 30 Dalmuir - Dalmuir Park Jn Dn RA 30 Bowling Dumbarton E Up RA 30 Dumbarton C Dalreoch Tnl Dn RA 30 Dalreoch Tnl Craigendoran Both RA 30 West Highland Line Craigendoran - Fort William 30mph throughout for RA6 to RA8 traffic except:- Br WHL-26 (Garelochhead Via)S RA 10 Br WHL-30 (Finnart Via) S RA 20 Br WHL-97 (Glen Falloch Via) S RA 30 Br WHL-109 (Croiteonan) S RA 20 Br WHL-116 S L (66) 40 Br WHL-117 (Fillan Via) S RA 20 Br WHL-131 S L (66) 30 Br WHL-149 (Gleann Via) S RA 30 Br WHL-151 (Horseshoe Via) S RA 20 Br WHL-197 S RA 20 Br WHL-201 (Gaur Via) S RA 45 Br WHL-259 S RA 20 Br MLG-2 (Lochy Viaduct) S RA 20 Appendix B: Network 38

39 6.4m = 1 SLU Location Down Up Mossend DGL 535m Mossend UP Loop 1 Mossend UP Loop 2 Mossend UP Loop 3 Coatbridge DGL 429m Garnqueen 650m Shettleston 620m Dumbarton C 128m Garelochhead CL 238m Single Glen Douglas 210m Single Arrochar 227m Single Ardlui 174m Single Crianlarich 212m Single Upper Tyndrum 190m Single Bridge of Orchy 209m Single Rannoch 171m Single Tulloch 235m Single Spean Bridge 285m Single Appendix B: Network 39

List of Adopted Stations (as of 22 nd August 2013)

List of Adopted Stations (as of 22 nd August 2013) List of Adopted Stations (as of 22 nd August 2013) 1. Aberdeen with Aberdeen in Bloom 2. Airdrie 3. Alexandra Parade with NHS Glasgow 4. Alloa with Alloa Rotary Club 5. Alness with Alness in Bloom 6. Annan

More information

Changes to your services

Changes to your services Changes to your services Saturday 30 May - Sunday 26 July 2015 Glasgow - Falkirk High - Edinburgh Alloa / Dunblane / Stirling - Edinburgh Edinburgh - Glenrothes - Edinburgh (Fife Circle)...plus busier

More information

Highland and Islands Enterprise. Highland Rail Room for Growth Study Final Report

Highland and Islands Enterprise. Highland Rail Room for Growth Study Final Report Highland Rail Room for Growth Study 24 March 2006 Highland Rail Room for Growth Study for Highlands and Islands Enterprise Cowan House Inverness Retail and Business Park Inverness IV2 7GF Report Verification

More information

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013 The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh

More information

Highland Mainline Journey Time Improvements Phase 2

Highland Mainline Journey Time Improvements Phase 2 Highland Mainline Journey Time Improvements Phase 2 1 Specified Outputs The objective for the second phase of the HML Improvements project was established in the Scottish Ministers Scotland High Level

More information

TIMETABLE PLANNING RULES

TIMETABLE PLANNING RULES TIMETABLE PLANNING RULES Scotland 2019 TIMETABLE Version 4.0 Issued by David Ross Timetable Planning Rules Specialist The Quadrant Elder Gate Milton Keynes Central Buckinghamshire MK9 1EN Tel. 07701055048

More information

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January

POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY. January POLICY SUBMISSION NETWORK RAIL SCOTLAND RAIL ROUTE UTILISATION STRATEGY January 2011 www.scdi.org.uk SCDI is an independent and inclusive economic development network which seeks to influence and inspire

More information

committee report To inform the Committee about the outcome from the Strategic Transport Projects Review (STPR)

committee report To inform the Committee about the outcome from the Strategic Transport Projects Review (STPR) committee report Strategic Transport Project Review Committee Strategy and Programmes Date of Meeting 30 January 2009 Date of report 08 January 2008 Report by Assistant Chief Executive (Business Support)

More information

ScotRail Performance Improvement Plan Making Things Better, Every Single Day.

ScotRail Performance Improvement Plan Making Things Better, Every Single Day. ScotRail Performance Making Things Better, Every Single Day. Page 1 INTRODUCTION Scotland s railway is undergoing enormous change. Right now, engineers here in the UK and in Japan are building our new

More information

"WE HAVE BEEN EXPECTING YOU!"

WE HAVE BEEN EXPECTING YOU! "WE HAVE BEEN EXPECTING YOU!" by ROGER BUTCHER Clayton DE Bo-Bo No.D8567 - location and date not known. The offer of a ride on D8567 into Leith Docks could not be refused! Colour-Rail 200602 In the latest

More information

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006

EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA. 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 EARL/S2/06/9/A EDINBURGH AIRPORT RAILWAY LINK BILL COMMITTEE AGENDA 9th Meeting, 2006 (Session 2) Tuesday 19 December 2006 The Committee will meet at 2.00 pm in Committee Room 6 1. Decisions on taking

More information

Quarterly Statistics for New Businesses

Quarterly Statistics for New Businesses Quarterly Statistics for New Businesses 2006 Scottish Business Statistics Business Start-up Statistics are produced quarterly by The Committee of Scottish Clearing Bankers (CSCB), which incorporates Bank

More information

statistics & trends 2005

statistics & trends 2005 statistics & trends 25 If you would like any further information on SPT, please visit our website www.spt.co.uk or write to us at the address below. If you have any comments on this report, or a query

More information

Our purpose is to promote the value good architecture and sustainable design adds to everyone s lives.

Our purpose is to promote the value good architecture and sustainable design adds to everyone s lives. Putting Good Design in Place Lessons from Scotland ICLRD, Sligo February 9th, 2017 Our purpose is to promote the value good architecture and sustainable design adds to everyone s lives. 1 Lerwick, Shetland

More information

Quarterly Statistics for New Businesses

Quarterly Statistics for New Businesses Quarterly Statistics for New Businesses 2007 Scottish Business Statistics Business Start-up Statistics are produced quarterly by The Committee of Scottish Clearing Bankers (CSCB), which incorporates Bank

More information

Contact your MSP about Scotland s Climate Change Plan

Contact your MSP about Scotland s Climate Change Plan Contact your MSP about Scotland s Climate Change Plan Nearly everyone in Scotland has an MSP on one of the four s responsible for reviewing Scotland s draft Climate Change Plan To find which of your is

More information

Consultation on the Disposal of Unused Police Premises

Consultation on the Disposal of Unused Police Premises Consultation on the of Unused Police Premises November 2017 January 2018 1. Responding to this Consultation About this Consultation 1.1 Consultation is important to Police Scotland and provides the opportunity

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

STIRLING TO KINCARDINE RE-OPENING OF LINE

STIRLING TO KINCARDINE RE-OPENING OF LINE PRIVATE and not for publication Notice No. NR/SC/17 NETWORK RAIL SUPPLEMENTARY NOTICE OF SIGNALLING AND PERMANENT WAY ALTERATIONS STIRLING TO KINCARDINE RE-OPENING OF LINE Operative from: Tuesday 25 th

More information

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT

WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT WRITTEN EVIDENCE FROM SCOTTISH ASSOCIATION FOR PASSENGER TRANSPORT Forth Crossing Public Transport Corridor: Introductory Notes The Scottish Association for Public Transport (SAPT) is concerned that the

More information

Hub Projects September 2014

Hub Projects September 2014 Hub Projects September 2014 Hub Territory Participant Organisation Schemes under Development / Project Type Capital Value Completed South East City of Edinburgh Council Drumbrae Library Hub Community 4.5

More information

Linkline. 1. Christmas and New Year Services. Information updates for staff and agents. Issue No 50/02 4th November 2013

Linkline. 1. Christmas and New Year Services.   Information updates for staff and agents. Issue No 50/02 4th November 2013 www.citylink.co.uk Linkline Information updates for staff and agents Issue No 50/02 4th November 2013 In this issue 1. Christmas & New Year Services 2. Halbeath Park & Ride 3. Hogmanay 1. Christmas and

More information

YOUR TRAVEL CONNECTIONS. scotrail.co.uk 1

YOUR TRAVEL CONNECTIONS. scotrail.co.uk 1 TRAVEL YOUR CONNECTIONS SCOTRAIL.CO.UK YOUR TICKET TO SCOTLAND scotrail.co.uk 1 Our aim is to make your journey as simple as possible. No matter if you re travelling to work, visiting friends or getting

More information

79% MARCH 2018 BROADBAND UPDATE HIGHLAND

79% MARCH 2018 BROADBAND UPDATE HIGHLAND MARCH 2018 BROADBAND UPDATE HIGHLAND Latest figures from independent broadband website thinkbroadband. com give an overview of the progress for the local authority area so far. Also of the coverage still

More information

FOR SALE PRIME HIGH YIELDING RETAIL INVESTMENT

FOR SALE PRIME HIGH YIELDING RETAIL INVESTMENT FOR SALE PRIME HIGH YIELDING RETAIL INVESTMENT 129-133 HIGH STREET, PERTH PH1 5UN OFFERS OVER 400,000 (14.32% NET INITIAL YIELD) EXECUTIVE SUMMARY High yielding prime retail investment opportunity; Total

More information

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh Gateway Connected Bathgate Lothian Gateway 05 The Site Whitehill Industrial Estate Development is being undertaken by Riddochhill Developments Limited, based at: Stotforth Hill House Windlestone Rushyford

More information

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17

Proposed Capital Programme 2016/17 to 2018/19 including the Capital Budget 2016/17 Proposed Capital Programme to 2018/19 including the Capital Budget Date of meeting 4 March 2016 Date of report 29 February 2016 Report by Assistant Chief Executive (Business Support) 1. Object of report

More information

Rail Update Station Usage Statistics and Network Rail Performance

Rail Update Station Usage Statistics and Network Rail Performance Rail Update Station Usage Statistics and Network Rail Performance Committee Operations Date of meeting 26 January 2018 Date of report 21 December 2017 Report by Senior Director 1. Object of report To update

More information

HGS Map Catalogue 21st July 2014 Version. Page 1 of 5

HGS Map Catalogue 21st July 2014 Version. Page 1 of 5 HIGHLAND GEOLOGICAL SOCIETY - MAP COLLECTION LISTED: 5 JUNE 2014 The donors are indicated by initials: JB = John Buchanan; PC = Peter Christie; TH = Tony Harris; MP= Murray Paterson; SR = Sinclair Ross.

More information

Approved Satellite Centres sorted by Address 3 column Local Authority Centre Name Centre Number Address 1 Address 2 Address 3 Aberdeen Sports

Approved Satellite Centres sorted by Address 3 column Local Authority Centre Name Centre Number Address 1 Address 2 Address 3 Aberdeen Sports Approved Satellite Centres 2016-17 sorted by Address 3 column Local Authority Centre Name Centre Number Address 1 Address 2 Address 3 Aberdeen Sports Village Aberdeen Sports Village Aquatic Centre APC16/028

More information

NATIONAL WALKING AND CYCLING NETWORK PROJECT PLAN. Introduction

NATIONAL WALKING AND CYCLING NETWORK PROJECT PLAN. Introduction NATIONAL WALKING AND CYCLING NETWORK PROJECT PLAN Introduction 1 The National Walking and Cycling Network (NWCN) has been designated as a national development within the National Planning Framework (NPF3),

More information

SCOTTISH TRANSPORT MATTERS

SCOTTISH TRANSPORT MATTERS No. 172 2016/4 President: Stewart Stevenson MSP Chairman: Dr. John McCormick ISSN 2047-6469 Tel: 07760 381 729 email: sapt@btinternet.com web: www.sapt.org.uk Scottish Association for Public Transport

More information

The object of this report is to update the Committee on rail issues in the SPT area, including:

The object of this report is to update the Committee on rail issues in the SPT area, including: Agenda 7 Rail Update in SPT area Committee Strategy and Programmes Date of meeting 18 March 2016 Date of report 24 February 2016 Report by Assistant Chief Executive (Operations) 1. Object of report The

More information

FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT)

FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT) FORTH CROSSING BILL CALL FOR EVIDENCE RESPONSE FCB8 SCOTTISH ASSOCIATION FOR PUBLIC TRANSPORT (SAPT) Assessment of Principles and Fit with Future Budgets Submission to Forth Crossing Bill and Finance Committees

More information

To notify the Committee of amendments to subsidised local bus service contracts since the last Committee.

To notify the Committee of amendments to subsidised local bus service contracts since the last Committee. Agenda item no 7 Amendments to subsidised local bus service contracts Committee Operations Date of meeting 10 November Date of report Report by Assistant Chief Executive (Operations) 1. Object of report

More information

FOR SALE RESTAURANT INVESTMENT

FOR SALE RESTAURANT INVESTMENT FOR SALE RESTAURANT INVESTMENT 17 MERCHANT STREET EDINBURGH EH1 2QD OFFERS OVER 505,000 (6.25% NET INITIAL YIELD) EXECUTIVE SUMMARY Long established restaurant investment located in the heart of Edinburgh

More information

FOR SALE VAT FREE RETAIL INVESTMENT

FOR SALE VAT FREE RETAIL INVESTMENT FOR SALE VAT FREE RETAIL INVESTMENT 4 SOUTH CLERK STREET, EDINBURGH EH8 9NZ OFFERS OVER 240,000 (6.50% NET INITIAL YIELD) EXECUTIVE SUMMARY Prominent retail investment on South Clerk Street; VAT Free investment,

More information

Caledonian Railway station design an overview

Caledonian Railway station design an overview Caledonian Railway station design an overview The station is the front door of the railway company as here at Callander. The old railway companies often sought to impress their customers with contemporary

More information

FOR SALE VAT FREE EDINBURGH RETAIL INVESTMENT

FOR SALE VAT FREE EDINBURGH RETAIL INVESTMENT FOR SALE VAT FREE EDINBURGH RETAIL INVESTMENT 76 NEWINGTON ROAD, EDINBURGH EH9 1QN OFFERS OVER 165,000 (6.5% NET INITIAL YIELD) EXECUTIVE SUMMARY Prominent retail investment in the sought after area of

More information

Revenue Funded Infrastructure Investment in Scotland

Revenue Funded Infrastructure Investment in Scotland Scottish Futures Trust Revenue Funded Infrastructure Investment in Scotland c. 2.5 billion revenue funded pipeline project information (Based on the best information available as at March 2014) PAGE 1

More information

Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening journeys serving Amazon.

Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening journeys serving Amazon. Service changes from 13 August 2018 A summary of changes is given below. Stagecoach East Scotland Service 3/3A: Townhill Dunfermline Duloch Park Proposal: Minor changes to late afternoon/early evening

More information

Ed Link. Regional Trustee for Scotland. Member of Perth and Cupar U3As

Ed Link. Regional Trustee for Scotland. Member of Perth and Cupar U3As Ed Link Regional Trustee for Scotland Member of Perth and Cupar U3As Growing your U3A? More Members and / or More U3As in Scotland? What is the Scope for Growth? Do we have the Capability? Do we have the

More information

All bus services within 5 minutes' walk of East Kilbride Travel Centre

All bus services within 5 minutes' walk of East Kilbride Travel Centre All bus services within 5 minutes' walk of East Kilbride Travel Centre N Arrochar Helensburgh Balloch Kilsyth Greenock Dumbarton Milngavie Kirkintilloch Cumbernauld Wemyss Bay Kilmacolm Clydebank Bishopbriggs

More information

FOR SALE RADIO STUDIO/OFFICE INVESTMENT

FOR SALE RADIO STUDIO/OFFICE INVESTMENT FOR SALE 11-19 BUCHANAN STREET, DUNDEE, DD4 6SD OFFERS IN EXCESS OF 265,000 (7.32% NIY) Sheridan Property Consultants INVESTMENT SUMMARY Extensively refurbished commercial property for the purposes of

More information

Team motivation, recognition and awards. The Flagship Awards for the Scottish Hotel Industry

Team motivation, recognition and awards. The Flagship Awards for the Scottish Hotel Industry Encouraging, recognising & rewarding excellence in hospitality JOIN SCOTLAND S LEADING INDEPENDENT HOTEL AWARDS Your opportunity to win in 32 hotel and 24 people categories Inspiring your team, promoting

More information

WRITERS TO THE SIGNET DEPENDANTS ANNUITY FUND AMENDMENT (SCOTLAND) BILL

WRITERS TO THE SIGNET DEPENDANTS ANNUITY FUND AMENDMENT (SCOTLAND) BILL WRITERS TO THE SIGNET DEPENDANTS ANNUITY FUND AMENDMENT (SCOTLAND) BILL PROMOTER S STATEMENT INTRODUCTION 1. As required under Rule 9A.2.3(d) of the Scottish Parliament s Standing Orders, this Promoter

More information

Guide to tickets and fares from 7 January 2019

Guide to tickets and fares from 7 January 2019 from 7 January 2019 page 1 of 7 Introduction This guide provides a summary of our popular and great value tickets and fares for Stagecoach services in the East of Scotland. For further information, visit

More information

UNIQUE VENUES for Corporate Entertaining

UNIQUE VENUES for Corporate Entertaining UNIQUE VENUES for Corporate Entertaining North of Scotland BRODIE CASTLE 24 miles east of Inverness 30 minutes from Inverness Airport Dinner: max 40 Old Stables Meetings & dinner: max 56 Marquee area:

More information

If you wish to attend one of the surgeries detailed below, please call to arrange an appointment.

If you wish to attend one of the surgeries detailed below, please call to arrange an appointment. As part of its ongoing commitment to investing in the Scottish community, Lloyds TSB Foundation holds a series of surgeries throughout Scotland for local recognised charities. The surgery is an opportunity

More information

News & Gen Report for week commencing 4 th July 2010

News & Gen Report for week commencing 4 th July 2010 News & Gen Report for week commencing 4 th July 2010 4 th July Firstscotrail Sleeper Diversions: Up Services The Glasgow portion of 1m11 left Glasgow at 21:39 where it travelled to Edinburgh to join the

More information

SFT Strategic Disposals

SFT Strategic Disposals SFT Strategic Disposals Accelerating Receipts & Increasing Certainty Paul Devine & Anna Tozer Strategic Disposals ASSISTING : To accelerate receipts & deliver best value from surplus assets with; NHS SCOTLAND

More information

BOOKING TRAVEL AND ACCOMMODATION FOR THE CELTIC CONFERENCE ON TUESDAY 26 TH MARCH 2019

BOOKING TRAVEL AND ACCOMMODATION FOR THE CELTIC CONFERENCE ON TUESDAY 26 TH MARCH 2019 BOOKING TRAVEL AND ACCOMMODATION FOR THE CELTIC CONFERENCE ON TUESDAY 26 TH MARCH 2019 Arranging transportation to the Celtic Conference is an integral part of the overall conference. FLIGHTS To ensure

More information

23 October Thank you for your correspondence dated 25 September, in which you requested the following information:

23 October Thank you for your correspondence dated 25 September, in which you requested the following information: Ref: 25-09-2013-120239-010 Mr Owen Everett request-178452- a0cd62c4@whatdotheyknow.com Ministry of Defence Main Building (06/D/00) Whitehall London SW1A 2HB United Kingdom +44 (0)20 721 89000 Telephone

More information

Buildings. Signal Boxes

Buildings. Signal Boxes Buildings Signal Boxes Of all the buildings developed specifically for the railways, the signal box holds a special place as one of the most instantly recognisable and loved. The sight of a signal box

More information

FALKIRK ARCHIVES. Records of Businesses. Bus Operators Finding Aid

FALKIRK ARCHIVES. Records of Businesses. Bus Operators Finding Aid FALKIRK ARCHIVES Records of Businesses Bus Operators Finding Aid Walter Alexander & Sons Ltd Walter Alexander began running buses in the Falkirk area in 1914. The first Charabanc New Belhaven (convertible

More information

Euro Railways. The Royal Scotsman. ne of the most luxurious. trains in the world.

Euro Railways. The Royal Scotsman. ne of the most luxurious. trains in the world. www.eurorailways.com 2005 Euro Railways The Royal Scotsman Inside this issue: Price List 2 On board services 2 Tour Categories 3 Sample menu 10 Costumer s Support 10 ne of the most luxurious and prestigious

More information

The PP/PFI Debt Burden What Labour has left for our children

The PP/PFI Debt Burden What Labour has left for our children THE TRUTH DISPELLING THE MYTHS & LEGENDS ABOUT SCOTLAND S ECONOMY The PP/PFI Debt Burden What Labour has left for our children Printed and published in the North of Scotland by Honest Jock, in the interests

More information

Bermuda House&Maxxium House TO LET CASTLE BUSINESS PARK, STIRLING FK9 4TS MODERN OPEN PLAN OFFICES FROM 10,000-40,000 SQ FT (929-3,716 SQ M) DRAFT

Bermuda House&Maxxium House TO LET CASTLE BUSINESS PARK, STIRLING FK9 4TS MODERN OPEN PLAN OFFICES FROM 10,000-40,000 SQ FT (929-3,716 SQ M) DRAFT TO LET Bermuda House&Maxxium House CASTLE BUSINESS PARK, STIRLING FK9 4TS FROM 10,000-40,000 SQ FT (929-3,716 SQ M) A703 Location Stirling is situated at the heart of central Scotland, providing excellent

More information

SCOTTISH TRANSPORT MATTERS

SCOTTISH TRANSPORT MATTERS No. 176 2017/4 ISSN 2047-6469 President: Chairman: Stewart Stevenson MSP Dr. John McCormick Tel: 07760 381 729 email: sapt@btinternet.com web: www.sapt.org.uk Scottish Association for Public Transport

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

Strathclyde Partnership for Transport Budget Book

Strathclyde Partnership for Transport Budget Book Budget Book 2014-15 Strathclyde Partnership for Transport Budget Book 2014-15 Contents Revenue Budget Introduction 4 Revenue Funding 6 Approved Revenue Budget -by Division 10 -by Subjective 11 Other Budgets

More information

Highland & Argyll LPD Partnership

Highland & Argyll LPD Partnership The Highland Council as Lead Local Authority Cairngorms National Park Authority Forestry Commison Scotland Highland & Argyll LPD Partnership SEPA Argyll & Bute Council Loch Lomond and the Trossachs National

More information

AA Street By Street: Glasgow, Ayr, East Kilbride, Greenock, Kilmarnock, Paisley By AA Publishing

AA Street By Street: Glasgow, Ayr, East Kilbride, Greenock, Kilmarnock, Paisley By AA Publishing AA Street By Street: Glasgow, Ayr, East Kilbride, Greenock, Kilmarnock, Paisley By AA Publishing If searched for the ebook AA Street by Street: Glasgow, Ayr, East Kilbride, Greenock, Kilmarnock, Paisley

More information

For Sale Prime Residential Development Land. Extending to 59.5 acres with Minded to Grant Planning Permission in Principle.

For Sale Prime Residential Development Land. Extending to 59.5 acres with Minded to Grant Planning Permission in Principle. For Sale Prime Residential Development Land Extending to 59.5 acres with Minded to Grant Planning Permission in Principle South Queensferry, Edinburgh Sale on behalf of Builyeon Farms LLP P2 Prime Development

More information

Go West: West and Central Scotland house prices per square metre fastest growing over last five years

Go West: West and Central Scotland house prices per square metre fastest growing over last five years NOT FOR BROADCAST OR PUBLICATION BEFORE 00:01, SATURDAY 18 AUGUST The Bank of Scotland House Price Per Square Metre Survey examines the movement in house prices on an average price per square metre (m

More information

Stagecoach in the Highlands Christmas & New Year Service Alterations

Stagecoach in the Highlands Christmas & New Year Service Alterations Stagecoach in the Highlands Christmas & New Year Service Alterions 2013-2014 Over the Festive Season (between 23 December 2013 and 05 January 2014) services will opere as detailed in this leaflet. Works

More information

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9

CONTENTS. Introduction Government 6. Scotland and Wales 6 Regulation 7 Passenger Transport Executives Main Line Railway Infrastructure 9 CONTENTS Introduction 5 1. Government 6 Scotland and Wales 6 Regulation 7 Passenger Transport Executives 7 2. Main Line Railway Infrastructure 9 Network Rail 9 Organisation 9 Route Utilisation Strategies

More information

University of the Third Age in Scotland. Rannoch Road, Perth

University of the Third Age in Scotland. Rannoch Road, Perth Unconfirmed Minutes of AGM held 2:15pm on 7 th June 2017 Letham St. Mark s, Present: Rannoch Road, Perth Representatives from the following U3As: Aberdeen, Bearsden & Milngavie, Callander & West Perthshire,

More information

Scotland's Employment by Industry and Geography

Scotland's Employment by Industry and Geography SPICe Briefing Pàipear-ullachaidh SPICe Scotland's Employment by Industry and Geography Alison O'Connor This paper provides an overview of employment in Scotland by industry sector and geography. Topics

More information

THE NATIONAL TRUST FOR SCOTLAND (GOVERNANCE ETC.) BILL

THE NATIONAL TRUST FOR SCOTLAND (GOVERNANCE ETC.) BILL THE NATIONAL TRUST FOR SCOTLAND (GOVERNANCE ETC.) BILL EXPLANATORY NOTES (AND OTHER ACCOMPANYING DOCUMENTS) CONTENTS 1. As required under Rule 9A.2 of the Parliament s Standing Orders, the following documents

More information

RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX

RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX RESIDENTIAL DEVELOPMENT SITE PLOTS AT WHITEHILLS SAWMILL, CROSSGATES, FIFE, KY4 8EX CROSSGATES, FIFE, KY4 8EX RESIDENTIAL DEVELOPMENT SITE AT WHITEHILLS SAWMILL, MILL FARM ROAD, BY CROSSGATES, FIFE, KY4

More information

Scottish Democratic Alliance. The Debt burden of PFI /PPP Contracts.

Scottish Democratic Alliance. The Debt burden of PFI /PPP Contracts. Scottish Democratic Alliance. The Debt burden of / Contracts. Project Name Cat Sector Region Capital Value 'm Inland Revenue Office Inland Revenue ASTUTE Class Training Service (ACTS).000 Central Scotland

More information

Scottish Index of Multiple Deprivation (SIMD) 2016 STEVE MORLEY, POLICY & RESEARCH ANALYST

Scottish Index of Multiple Deprivation (SIMD) 2016 STEVE MORLEY, POLICY & RESEARCH ANALYST Scottish Index of Multiple Deprivation (SIMD) 2016 STEVE MORLEY, POLICY & RESEARCH ANALYST Background SIMD 2016 published 31 August 2016 Fifth in series (previous versions in 2004, 2006, 2009, 2012) Looks

More information

Consultation on Improving Older Peoples Services in North West Glasgow

Consultation on Improving Older Peoples Services in North West Glasgow Consultation on Improving Older Peoples Services in North West Glasgow Travel and Access Assessment for Hospital and Gartnavel General Hospital November 2015 1. Executive Summary Having compared transport

More information

Oil and Gas Capabilities

Oil and Gas Capabilities ENERGY www.hie.co.uk Oil and Gas Capabilities Caithness and Sutherland Subsea fabrication, Caithness Caithness and Sutherland Oil and Gas Capabilities Caithness is situated on the north east edge of the

More information

Go First Go Far Go Forth Queensferry One

Go First Go Far Go Forth Queensferry One Go First Go Far Go Forth Queensferry One queensferryone.com A new, international waterside destination. queensferryone.com Edinburgh Forth Rail Bridge Forth Bridge Queensferry Crossing South Queensferry

More information

Eat Better Feel Better Update January 2016

Eat Better Feel Better Update January 2016 Eat Better Feel Better Update 2016 On Friday we launched the next phase of Eat Better Feel Better with the help of some fantastic Primary 1 and 2 kids from Dalmarnock Primary school,. The Campaign Keep

More information

Scottish FA member club pre-season friendly matches (season 2013/14) As at Monday 15 July 2013

Scottish FA member club pre-season friendly matches (season 2013/14) As at Monday 15 July 2013 Scottish FA member club pre-season friendly matches (season 2013/14) As at Monday 15 July 2013 Date Kick-off Home Team v Away Team Venue 16 July 2013 7.30pm Nairn County v Ross County Station Park 16 July

More information

Mary Murphy Slide Collection

Mary Murphy Slide Collection Europe Scotland, Aberdeen: Aberdeen Tour S-1991 Union Street. July 8, 1991 S-15 Europe Scotland, Aberdeen: Aberdeen Tour S-1991 Aberdeen Castle. July 8, 1991 S-16 Europe Scotland, Aberdeen: Aberdeen Tour

More information

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL

AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL AIRDRIE-BATHGATE RAILWAY AND LINKED IMPROVEMENTS BILL PROMOTER S MEMORANDUM CONTENTS INTRODUCTION 3 POLICY OBJECTIVES OF THE BILL 3 BACKGROUND 4 NECESSITY FOR A PRIVATE BILL 6 DETAILS OF THE PROPOSED RAILWAY

More information

Ulsterbus Coach & Sail Service 2018

Ulsterbus Coach & Sail Service 2018 Timetable Valid from May 2018 FREE WIFI ONBOARD SCOTTISH SERVICES Ulsterbus Coach & Sail Service 2018 to Scotland and England Book online: www.ulsterbustours.com or Telephone 028 9033 7004 #ShareTheExperience

More information

Services that provide diagnostic assessment of Autism Spectrum Disorder. Autism ACHIEVE Alliance

Services that provide diagnostic assessment of Autism Spectrum Disorder. Autism ACHIEVE Alliance Services that provide diagnostic assessment of Autism Spectrum Disorder Autism ACHIEVE Alliance 1 st February 2012 Services 1 that provide Diagnostic Assessment of ASD How was this document created? Services

More information

Strathclyde Partnership for Transport Budget Book

Strathclyde Partnership for Transport Budget Book Budget Book 2012-13 Strathclyde Partnership for Transport Budget Book 2012-13 Contents Revenue Budget Introduction 4 Revenue Funding 6 SPT Summaries -SPT Budget Summary 10 -Summary by Department 11 -Summary

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Investment Opportunities

Investment Opportunities Investment Opportunities Investing in Falkirk Central, well connected, affordable, industrious and ambitious. Modern, forward looking and bold. The Falkirk area is a nationally significant economic hub

More information

Hub Pipeline. Contents. Construction Completed.2 In Construction. 11 In Development 17 Qualifying Projects.21. September 2016.

Hub Pipeline. Contents. Construction Completed.2 In Construction. 11 In Development 17 Qualifying Projects.21. September 2016. Pipeline September 2016 Contents Completed.2 In. 11 In Development 17 Qualifying s.21 Page 1 of 24 s / Completed Drumbrae Hub 4.50 Dec 10 Nov 11 4 Day Care Offices Facilities Lothian Haddington Infants

More information

Scottish Youth Parliament Elections 2017 Information for Local Authorities and National Voluntary Organisations

Scottish Youth Parliament Elections 2017 Information for Local Authorities and National Voluntary Organisations Scottish Youth Parliament Elections 2017 Information for Local Authorities and National Voluntary Organisations July 2016 Table of Contents Introduction... 3 The Scottish Youth Parliament... 4 About the

More information

Scottish Parliament Elections: 2011

Scottish Parliament Elections: 2011 Scottish Parliament Elections: 2011 RESEARCH PAPER 11/41 24 May 2011 The SNP gained an overall majority in the Scottish Parliament in the elections on 5 May 2011. The paper provides data on voting trends

More information

PENTLAND HOUSE, EDINBURGH QUALITY OFFICE INVESTMENT

PENTLAND HOUSE, EDINBURGH QUALITY OFFICE INVESTMENT PENTLAND HOUSE, EDINBURGH QUALITY OFFICE INVESTMENT INVESTMENT SUMMARY Quality Office investment located in Scotland s Capital City Let to The Scottish Ministers with over 10 years unexpired Low passing

More information

SCOTTISH TRANSPORT MATTERS

SCOTTISH TRANSPORT MATTERS No. 178 2018/2 President: Stewart Stevenson MSP Chairman: Dr. John McCormick ISSN 2047-6469 Tel: 07760 381 729 email: sapt@btinternet.com web: www.sapt.org.uk Scottish Association for Public Transport

More information

Introduction. Kincraig Point

Introduction. Kincraig Point Introduction A beggar s mantle fringed wi gowd the gowd in King James VI of Scotland s description of Fife referred to the value of trade through its coastal ports. Modern walkers may strike gold of another

More information

8 KINNEDDAR MAINS STEADING, SALINE, FIFE, KY12 9LJ. Rossness Cottage, 93 Pettycur Road, Kinghorn. KY3 9RP

8 KINNEDDAR MAINS STEADING, SALINE, FIFE, KY12 9LJ. Rossness Cottage, 93 Pettycur Road, Kinghorn. KY3 9RP 8 KINNEDDAR MAINS STEADING, SALINE, FIFE, KY12 9LJ Rossness Cottage, 93 Pettycur Road, Kinghorn. KY3 9RP Rossness Cottage, 93 Pettycur Road, Kinghorn. KY3 9RP Seaside cottage with stunning views of Inchkeith

More information

Revenue Funded Infrastructure Investment in Scotland

Revenue Funded Infrastructure Investment in Scotland Scottish Futures Trust Revenue Funded frastructure vestment in Scotland c. 2.5 billion revenue funded pipeline project information (Based on the best information available as at April 2013) PAGE 1 PAGE

More information

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA More than Ports InchgreenDryDock Sat Nav: PA15 2NA First class port facility on the firth of Clyde with dry dock, repair quay and extensive land suitable for development Inchgreen DryDock Contents More

More information

Civils & Drainage Solutions

Civils & Drainage Solutions Edition 5 Now with new suppliers and products Civils & Drainage Solutions Introduction This updated version of the number one guide to Civils and Drainage Solutions contains some important changes including:

More information

Borders Rail Monitor BORDERS RAILWAY PERFORMANCE YEAR 1 REPORT

Borders Rail Monitor BORDERS RAILWAY PERFORMANCE YEAR 1 REPORT 1. Executive Summary Borders Rail Monitor BORDERS RAILWAY PERFORMANCE YEAR 1 REPORT This report by Borders Rail Monitor rail campaigners Bill Jamieson and David Spaven is based on one year s monitoring

More information

Tourism Development Plan for Scotland Questionnaire

Tourism Development Plan for Scotland Questionnaire Draft National Tourism Development Plan Public Consultation 2013 Tourism Development Plan for Scotland Questionnaire We would like your views on this Plan and, in particular, your comments on opportunities

More information

Scotland s railways - today

Scotland s railways - today Cynulliad Cenedlaethol Cymru National Assembly for Wales Y Pwyllgor Menter a Busnes Enterprise and Business Committee Ymchwiliad i r Blaenoriaethau ar gyfer Inquiry into the Priorities for the future dyfodol

More information

ROSYTH WATERFRONT COMMUNITY PLANNING WEEKEND

ROSYTH WATERFRONT COMMUNITY PLANNING WEEKEND WHAT WE ARE DOING TODAY ROSYTH WATERFRONT COMMUNITY PLANNING WEEKEND JTP S APPROACH JTP is an international placemaking practice of architects and urbanists with extensive experience of delivering successful

More information

3.1 Introduction In the, river flooding is reported across two distinct river catchments. Coastal flooding and surface water flooding are reported acr

3.1 Introduction In the, river flooding is reported across two distinct river catchments. Coastal flooding and surface water flooding are reported acr Flood Risk Management Strategy This section provides supplementary information on the characteristics and impacts of river, coastal and surface water flooding. Future impacts due to climate change, the