Appendix JK. Noise Barrier Visualizations. I-290 Eisenhower Expressway Cook County, Illinois. Prepared For: Illinois Department of Transportation
|
|
- Archibald Ward
- 5 years ago
- Views:
Transcription
1 Appendix JK Noise Barrier Visualizations I-290 Eisenhower Expressway Cook County, Illinois Prepared For: Illinois Department of Transportation Prepared By: WSP Parsons Brinckerhoff September August 2016
2 This page intentionally left blank
3 Appendix J Table of Contents NOISE BARRIER VISUALIZATIONS IDOT recognizes that noise barriers would be a new built element in the Project Corridor, and considers them a potential opportunity to provide visual enhancement to both the mainline and adjacent land uses. As such, IDOT is open to the innovative use of both traditional and new materials for noise barrier construction and will work with local communities to select the most appropriate material(s), character, and finishes for barriers with the local context. To achieve the ultimate desired character and aesthetic requested by the stakeholders, local financial participation may be required. The following illustrations are representative of the possible appearance of the proposed noise walls at various locations within the Project Corridor. The ultimate appearance of noise barriers will be determined during the final design phase of the project. No. Community Location 1 Westchester Wedgewood Drive and Bristol Avenue 2 Bellwood Harrison Street and 21 st Avenue 3 Maywood Bataan Drive and 18 th Avenue 4 Broadview Bataan Drive and 15 th Avenue 5 Maywood Bataan Drive and 8 th Avenue 6 Maywood Harrison Street and 1 st Avenue 7 Maywood Bataan Drive and 2 nd Avenue 8 Forest Park Lehmer Street and Beloit Avenue 9 Forest Park Lehmer Street and Marengo Drive 10/11/12 Oak Park Harrison Street and Maple Avenue 16 Oak Park Ridgeland Avenue and I Oak Park Flournoy Street and Austin Boulevard 24 Chicago Flournoy Street and Central Avenue 28 Chicago Congress Street and Denvir Avenue 29 Chicago Van Buren Street and Seeley Avenue
4 Noise Barrier Visualizations Location Map
5 Existing 1 Wedgewood Drive & Bristol Avenue Westchester
6 With Noise Wall 1 Wedgewood Drive & Bristol Avenue Westchester
7 Existing 2 Harrison Street & 21 st Avenue Bellwood
8 With Noise Wall 2 Harrison Street & 21 st Avenue Bellwood
9 Existing 3 Bataan Drive & 18 th Avenue Maywood
10 With Noise Wall 3 Bataan Drive & 18 th Avenue Maywood
11 Existing 4 Bataan Drive & 15 th Avenue Broadview
12 With Noise Wall 4 Bataan Drive & 15 th Avenue Broadview
13 Existing 5 Bataan Drive & 8 th Avenue Maywood
14 With Noise Wall 5 Bataan Drive & 8 th Avenue Maywood
15 Existing 6 Harrison Street & 1 st Avenue Maywood
16 With Noise Wall 6 Harrison Street & 1 st Avenue Maywood
17 Existing 7 Bataan Drive & 2 nd Avenue Maywood
18 With Noise Wall 7 Bataan Drive & 2 nd Avenue Maywood
19 Existing 8 Lehmer Street and Beloit Ave Forest Park
20 With Noise Wall 8 Lehmer Street and Beloit Ave Forest Park
21 Harlem Ave Ramp Without noise wall 9 Lehmer Street & Marengo Drive Forest Park
22 Harlem Ave Ramp With noise wall 9 Lehmer Street & Marengo Drive Forest Park
23 Harlem Ave Ramp Without noise wall 10 Harrison Street & Maple Avenue Oak Park
24 Harlem Ave Ramp With noise wall 10 Harrison Street & Maple Avenue Oak Park
25 Harlem Ave Ramp Without noise wall 11 Harrison Street & Maple Avenue Oak Park
26 Harlem Ave Ramp With noise wall 11 Harrison Street & Maple Avenue Oak Park
27 Harlem Ave Ramp Without noise wall 12 Harrison Street & Maple Avenue Oak Park
28 Harlem Ave Ramp With noise wall 12 Harrison Street & Maple Avenue Oak Park
29 Without Noise Wall 16 Ridgeland Avenue & I 290 Oak Park
30 With Noise Wall 16 Ridgeland Avenue & I 290 Oak Park
31 Without Noise Wall 21 Flournoy Street & Austin Boulevard Oak Park
32 With Noise Wall 21 Flournoy Street & Austin Boulevard Oak Park
33 Existing 24 Flournoy Street & Central Avenue Chicago
34 With Noise Wall 24 Flournoy Street & Central Avenue Chicago
35 Existing 28 Congress Street & Denvir Avenue Chicago
36 With Noise Wall 28 Congress Street & Denvir Avenue Chicago
37 Existing 29 VanBuren Street & Seeley Avenue Chicago
38 With Noise Wall 29 VanBuren Street & Seeley Avenue Chicago
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationA History of the Construction of the Radial Expressway System in Cook County
ILLINOIS ASSOCIATION OF STATE HIGHWAY ENGINEERS 2017 ANNUAL CONFERENCE SEPTEMBER 29, 2017 A History of the Construction of the Radial Expressway System in Cook County 1948-1964 Andrew Plummer Transportation
More informationTrans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for:
Trans Canada Highway Corridor Management Plan inal Draft Report Prepared for: City of Duncan Cowichan Tribes Council District of North Cowichan Cowichan Valley Regional District South Coast Region of the
More informationINTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE,
INTERVIEW WITH ED ROGERS FOR THE FOREST PARK HISTORICAL SOCIETY-INTERVIEW BEGAN MIDSENTANCE, NO INTRODUCTIONS, DATE, ETC. ER: previous was the town of Harlem, and Harlem has been around since 1853. It
More informationSection 3.6 Recreation
3.6 RECREATION This section evaluates the potential impacts of the proposed project on recreation within MTRP. The evaluation is based on field observations, a review of maps of MTRP and the MTRP Master
More informationDOWNTOWN BRT ALTERNATIVE - 19th AVE
DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing
More informationCHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES
CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES This chapter provides the detailed descriptions of the recommended Part 150 noise abatement, land use management, and program management measures
More informationAPPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS
Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More information2013 Regional Water System Improvements Program Public Hearing March 14, 2013
In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:
More informationSears Centre Arena Julie Avis
September 24, 2009 MMA Event Sears Centre Arena Julie Avis Jesper Jorgensen Account Executive S 4000 Morgan Street, IL 60609 Phone: 773-843-2091 Fax: 773-843-2078 Mobile: 773-255-3255 Email: jesperjorgensen@clearchannel,com
More informationCHAPTER 4 - COMMENTS AND COORDINATION Introduction Comments and Responding to Comments
Table of Contents SUMMARY...S-1 S.1 Joint CEQA/NEPA Document...S-1 S.2 Overview of Project Area... S-2 S.3 Purpose and Need... S-6 S.4 Proposed Action... S-6 S.5 Project Impacts... S-11 S.6 Coordination
More informationStudy Overview and Context
Study Overview and Context North Shore Coordination Plan Study Study Highlights Early 2016 to December 2017 Consultant team assistance Steering Committee review Two rounds of public open house events Project
More information2954 WEST LAKE STREET KINZIE CORRIDOR
OFFERING MEMORANDUM 2954 WEST LAKE STREET KINZIE CORRIDOR Presented by: ZACH PRUITT President 312.766.4289 zpruitt@cawleychicago.com NICHOLAS SCHAEFER Vice President 312.766.4285 nschaefer@cawleychicago.com
More informationPART 12 - Directory Services 1st Revised Sheet 1 SECTION 3 - Directory Distribution
PART 12 - Directory Services 1st Revised Sheet 1 GENERAL All terms and conditions set forth in this Section, including but not limited to those applicable to line(s) and network access line shall be fully
More informationI-75 in Hamilton County Project Termini
I-75 in Hamilton County Project Termini Introduction As part of the North South Transportation Initiative (NSTI), capacity improvements were recommended for the I-75 corridor through Hamilton County from
More informationClassifications, Inventory and Level of Service
Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon
More informationAustin-Bergstrom International Airport Master Plan Update
FINAL REPORT Prepared for: City of Austin Department of Aviation 3600 Presidential Boulevard Austin, Texas 78719 Prepared by: P&D Aviation A Division of P&D Consultants, Inc. 999 Town & County Road, 4
More informationProject Deliverable 4.1.3d Individual City Report - City of La Verne
Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationProfessional Providers Near You
Professional Providers Near You Please note: Not all providers offer all services. Please confirm what services are offered with the provider when making your appointment. EYE CARE ASSOCIATES 10215 W ROOSEVELT
More informationAlternatives Development and Evaluation Report
Airport Master Plan Alternatives Development and Evaluation Report Prepared by: AECOM Prepared for: Illinois Department of Transportation June 29, 2012 Table of Contents Topic Page Number Cover Sheet...
More information2nd Annual Historic L Station Tour. November 19, Presented By: The Illinois Historic Preservation Agency
2nd Annual Historic L Station Tour November 19, 2000 Presented By: The Illinois Historic Preservation Agency With: Chicago-L.org The Chicago Design Consortium 2nd Annual Historic L Station Tour Guide Dearborn-Milwaukee
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationActive Red Light Camera Approaches
1 Western Cermak SB 32 Lawrence Pulaski EB 2 Cermak Western EB 33 Central Irving Park SB 3 Western Peterson NB 34 Irving Park Central EB 4 Peterson Western SB 35 Western Lawrence SB 5 Irving Park Narragansett
More informationROUTE AVN ALLEGHENY VALLEY NORTH FLYER
ROUTE AVN ALLEGHENY VALLEY NORTH FLYER Route AVN Allegheny Valley North Flyer provides express service between Harrison Township and downtown Pittsburgh. The route is very similar to Route AV Allegheny
More informationSouth Bay Metro Green Line Extension
South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings
More informationTHE CTI STUDIO AT COBO CENTER. (800) Broadcast - Commercial - Photo - Webcast
THE CTI STUDIO AT COBO CENTER Broadcast - Commercial - Photo - Webcast A full-service production studio located in Detroit at Cobo Center (800) 743-6051 www.conferencetech.com FULL-SERVICE FACILITY CTI
More informationMETRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017
METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017 Orange Line BRT Project What is the Orange Line project? 17-mile
More informationAdvertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy
DRAFT ( ) Advertising, Sponsorship, Directional, and Wayfinding Signage on Multi-Use Trails Policy Prepared for: SATS Multi-Use Trails Jurisdictions Committee Table of Contents Introduction... 3 Signage
More informationVISITOR GUIDE. Welcome to the Oak Park Area! Welcome
Welcome to the Oak Park Area! Bellwood Berkeley Berwyn Broadview Brookfield Cicero Elmwood Park Forest Park Franklin Park Hillside Maywood Melrose Park North Riverside Northlake Oak Park River Forest River
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationThe Baker/Carver Regional Trail is intended to
Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.
More informationCIRCULATION (RENEWAL) STATISTICS At all locations, Including through the Internet April
Acorn Adult New 38 0.157% Acorn Juv New Books 1 0.004% Acorn 140 0.578% Acorn ILL Recd 6 0.025% Acorn Juv 41 0.169% Acorn Young Adult 8 0.033% Alsip New Item-Adult 28 0.116% Alsip New Item-Juvenile 8 0.033%
More informationProject Deliverable 4.1.3f Individual City Report - City of San Dimas
Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationREPRESENTATIVE ASSET PORTFOLIO» RECEIVER SERVICES // PROPERTY MANAGEMENT // BROKERAGE // GENERA L CONTRACTING
REPRESENTATIVE ASSET PORTFOLIO» RECEIVER SERVICES // PROPERTY MANAGEMENT // BROKERAGE // GENERA L CONTRACTING SELECT COMMERCIAL BROKERAGE PORTFOLIO MULTIFAMILY // RETAIL // OFFICE // INDUSTRIAL // SPECIAL
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare and Midway International Airports Site 217 1149 Candlewood Drive, Downers Grove May 17, 214 through May 31, 214 Visit the O Hare and Midway Noise Management
More informationFor Sale or Lease: 415 North Avenue Lombard, IL
o INVESTMENT HIGHLIGHTS Windy City Motor Sports Lombard Auto Exchange Prime commercial site for retail development Three (3) existing ingress / egress points, potential for a fourth (4th) 2.57 acres (111,930
More informationFARE MEDIA SALES OUTLETS
LEGEND: (*) - $20 Chicago Card available; (**) Touch-n- Go Location/$0 and $20 Chicago Card available; (T) Transit Card Vending Machine available. CTA Fare Media sales locations as of December 23, 2009.
More informationDAILY PERCENT OF ALL PERCENT OF ALL CATEGORY BOARDINGS BOARDINGS STATIONS STATIONS ACCESSIBLE 190, % %
Table 1 Summary of Station Accessibility DAILY PERCENT OF ALL PERCENT OF ALL CATEGORY BOARDINGS BOARDINGS STATIONS STATIONS KEY STATIONS ACCESSIBLE 190,655 71.2% 72 29.9% PARTIALLY ACCESSIBLE 0 0.0% 0
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More information2018 Service Implementation Plan Executive Summary
2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation
More informationPercent Hispanic Chicago. Median Income. Total Population 46,781 2,824,064 52,657 44,261 46,207 12,315 13,735 30,263 44,627 59,478 55,258 32,672
Chicago 2 581,558 2,824,064 46,781 2 1 3 2 Albany Park 8,577 52,657 44,261 1 5 Archer Heights 1,756 12,315 46,207 1 4.9% 1.5% 67.8% Armour Square 1 2,230 13,735 30,263 2 Ashburn 6,992 44,627 59,478 49.4%
More informationNoise Abatement Decision Report
Mid County Parkway NADR Noise Abatement Decision Report Noise Study Report, January 212 Riverside County, California 8-RIV-MCP PM./16.3; 8-RIV-2 PM 28./34.3 EA 8-F32 (PN 8125) April 212 This page intentionally
More informationCambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,
THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees
More informationCitrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013
Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:
More informationCUY LAKE TO LAKES TRAIL (PHASE 2): PID
1299 Superior Avenue Cleveland, Ohio 44114 216-241-2414 (extension 287) 216-621-3024 (fax) emay@mpo.noaca.org NOACA MEMORANDUM To: Melinda Bartizal (216) 584-2087 From: Ed May (216) 241-2414 ext. 287 Date:
More informationSubmitted to: NYX CAPITAL CORP. 1131a Leslie Street, Suite 201 Toronto, Ontario M3C 3L8 Attention: Mr. Tim Jessop Development Manager
New Development Setback Assessment in Proximity to Railway Corridor Orangeville Brampton Railway Proposed Residential Development at 12 Henderson Avenue, Brampton, Ontario Submitted to: NYX CAPITAL CORP.
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationAPPENDIX G WATER QUALITY IMPACTS
APPENDIX G WATER QUALITY IMPACTS Potential surface water quality impacts were compared between the alignment alternatives using a method developed by AHTD. A system was devised to calculate a stream crossing
More informationS i t e A n a ly s i s
S i t e A n a ly s i s 11 SECTION B SITE ANALYSIS Existing Conditions TRANSPORTATION CONTEXT: The Ohlone Greenway site, paralleling San Pablo Avenue to the west, is centrally located within the City of
More informationMain Line System Recommendations
(Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the
More informationNORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM
NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-044 Project Planning Reviews 1
More informationI-70/I-71 Project Public Meeting Presented By
I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,
More informationNotice of Availability of the Final Re-Evaluation of the. O Hare Modernization Environmental Impact Statement (Final
This document is scheduled to be published in the Federal Register on 10/14/2015 and available online at http://federalregister.gov/a/2015-26007, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Aviation
More informationAppendix 1: Phase I Strategies
Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030
More informationMilestone: Bridge to Nowhere scheduled for demolition Aug 14
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14
More informationDamen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501
Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More information* New Meelng, needs your support
1 # Town / City General Area Day Time Mee5ng Loca5on Notes 1 Beloit, WI Wisconsin, South Mon 6:00p St. Paul's Episcopal Church, 212 W. Grand Avenue, Beloit, WI Park in rear / Use back door 2 Blue Island,
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationCase: 1:14-cv Document #: 1 Filed: 05/02/14 Page 1 of 5 PageID #:1
Case: 1:14-cv-03251 Document #: 1 Filed: 05/02/14 Page 1 of 5 PageID #:1 4803-A MJM; MS055 4803-B MJM; MS056 IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF ILLINOIS EASTERN DIVISION ILLINOIS
More informationSex By Educational Attainment For The Population 25 Years And Over by Place and Township - CCDPH, 2000 Census
All Persons 25 Years & Older Males 25 Years & Older High School Graduate College Graduate High School Graduate College Graduate Area Name Total Number Percent Number Percent Total Number Percent Number
More informationTransportation Guide
2018 schedules Transportation Guide train pass to go here POWER HOUR: 5:30-6:30 pm, Saturday - Monday! (appointments recommended) An opportunity to extend meetings an additional hour after the 5:30 pm
More informationA BOAT RAMP TO NOWHERE
A BOAT RAMP TO NOWHERE A PROPOSAL FOR ACCESS TO HARVIE PASSAGE A Presentation to the City of Calgary December 2017 Presented by: Peter Crowe-Swords Bow River Trout Foundation Background: The Bow River
More informationPoverty Status in 1999 by Age by Place and Township-CCDPH, 2000 Census Persons for Whom Poverty was Determined
Persons for Whom Poverty was Determined Illinois 12,095,961 3,187,490 1,037,699 1,101,763 1,048,028 7,492,053 763,019 653,399 Cook County 5,285,159 1,370,855 457,767 473,964 439,124 3,310,413 325,543 278,348
More information* New Meekng, needs your support
+ Maps 1 # Town / City General Area Day Time Mee5ng Loca5on Notes 1 Beloit, WI Wisconsin, South Mon 6:00p St. Paul's Episcopal Church, 212 W. Grand Avenue, Beloit, WI Park in rear / Use back door 2 Blue
More informationCIRCULATION (RENEWAL) STATISTICS At all locations, Including through the Internet Year 2013
Acorn Adult Display 2 0.000% Acorn Adult New 3,088 0.125% Acorn Juv Display 1 0.000% Acorn Juv New Books 858 0.035% Acorn 14,310 0.581% Acorn ILL Recd 478 0.019% Acorn Juv 9,503 0.386% Acorn Young Adult
More informationSection 6: Infant Mortality Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3
Section 6: Infant Mortality Table Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3 Birth 2001: Section 6, Infant Mortality, Table 1.1, Infant Mortality Suburban Cook County 34,673 253
More informationQEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.
SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by
More informationSection 6: Infant Mortality Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3
Section 6: Infant Mortality Table Infant Mortality 1 Neonatal Mortality 2 Post Neonatal Mortality 3 Birth 2009: Section 6, Infant Mortality, Table 1.1, Infant Mortality Suburban Cook County 31,295 196
More informationchange your view 200 South Wacker Drive Chicago, IL
change your view 200 South Wacker Drive 200 South Wacker Drive offers superb views of the city and a unique central location on the banks of the Chicago River. Situated in the West Loop part of Chicago
More informationIL 390 Station. Wood Dale Open House Summary 5/18/17
Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216
More informationRaytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.
Raytown: overview Blue Ridge Cut-off map 18: p.42 RICE- TREMOTI HOME Raytown Tfwy KASAS 17: p.41 JUCTIO WITH ROCK ISLAD LIE RIGHT OF WAY 16: p.40 BUS STOP AT E 51ST AD BLUE RIDGE (KASAS ) Sterling Ave
More information2015%Ironbound%Spring%Warmup% Directions!
Riverfront Park 3 Brill St (Corner of Brill St and Raymond Boulevard) GSP Parkway: EXIT 145 to Route 280 East Exit 16 (Harrison Ave), make right at F.E. Rodgers Blvd, go past Wendy's, Path Station, cross
More informationONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST
ONE REMAINING OPPORTUNITY LAKE STREET, LOOKING SOUTHEAST THE PROJECT SET TO OPEN FALL OF 2017, THE EMERSON IS A TRANSIT ORIENTED, MIXED-USE DEVELOPMENT ANCHORED BY TARGET AT THE BASE OF 271 NEW LUXURY
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationAPPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY
APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed
More informationChicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationMemorandum / Letter of Intent
VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com
More informationBerwyn (IL) (Images Of America) By Douglas Deuchler READ ONLINE
Berwyn (IL) (Images Of America) By Douglas Deuchler READ ONLINE a gallery of burning cities all over America, images most of us would Just a few weeks ago, at a restaurant in Berwyn, Illinois, I listened
More information3.6 PARKLANDS, OPEN SPACE, AND RECREATION AREAS
3.6 PARKLANDS, OPEN SPACE, AND RECREATION AREAS 3.6.1 Introduction to Analysis 3.6.1.1 Summary of Results Approximately 2.28 acres of parkland, open space, and conservation easements would be acquired
More informationTrigger Point Justification Note 30 th August 2013
1. Introduction Trigger Point Justification Note 30 th August 2013 DCC constructed a highway assignment model of Tiverton and the surrounding area and this suggested that in pure capacity terms, up to
More informationAbout the Foothill Gold Line
About the Foothill Gold Line Board of Directors Marisol Rodriguez Member (Los Angeles Appointee) John Fasana Member (Metro Appointee) Doug Tessitor Chair (Pasadena Appointee) Sam Pedroza Vice Chair (SGVCOG
More informationMohawk Hudson Bike Hike Trail Crossroad Connection Study
Summary Report - April 21, 2003 Mohawk Hudson Bike Hike Trail Crossroad Connection Study Summary Report Introduction The Capital District Transportation Committee (CDTC), in partnership with Albany County,
More informationLee County Board of County Commissioners January 24, 2017 Workshop Meeting
Lee County Board of County Commissioners January 4, 017 Workshop Meeting 1 Review Current Transportation Priorities (Tiers 1,, 3) Discuss Status of Projects 3 Discuss Ranking Recommendations 1 State of
More informationFY Transportation Improvement Program Basic Project List (in Thousands)
FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue
More informationTRAIL INVENTORY. Appendix a. Trail INVENTORY A-1
Appendix a Trail INVENTORY A-1 NIRPC - Off-Road Trails & Shared Route Inventory - Summer, 2010 The following tables represent the existing regional trails system in Northwest Indiana. Both signed shared
More informationConnectivity is the new currency. -Mayor Pete Buttigieg, South Bend
2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. Connectivity is the new currency. -Mayor Pete Buttigieg, South Bend What is it? Major capital investment to double track 16 miles of our railroad
More informationMinistry of Transportation
This report is prepared for the sole use of Ministry of Transportation. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationWelcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,
Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how
More informationThe Atlanta BeltLine. Project Overview Map
The Atlanta BeltLine Project Overview Map The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit system, multi-use trails, greenspace, and affordable
More informationMAPS ARE ARRANGED IN ALPHEBETICAL ORDER BY STATE. SELECT THE CONTROL Ctrl and F KEYS AND TYPE YOUR CITY NAME San Diego: San Diego State University
MAPS ARE ARRANGED IN ALPHEBETICAL ORDER BY STATE. SELECT THE CONTROL Ctrl and F KEYS AND TYPE YOUR CITY NAME San Diego: San Diego State University Student Services West 5500 Campanile Drive San Diego,
More informationAPPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES
CHICAGO MIDWAY INTERNATIONAL AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE DRAFT APPENDIX H NOISE COMPATIBILITY PROGRAM ALTERNATIVES This appendix discusses the consideration and evaluation of
More informationDepartment-owned Facilities...Page A-2. Department-operated Facilities...Page A-4. Plaza Configurations - Department-owned Facilities
Appendix A Current Toll Schedules Departmentowned Facilities...Page A2 Departmentoperated Facilities...Page A4 Plaza Configurations Departmentowned Facilities Alligator Alley...Page A6 Beachline East Expressway...Page
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationAddresses. Site. Delivery June 2018
AJ Capital Partners is pleased to present for lease approximately 60,000 square feet of Class A office space at May Hosiery a historic campus of 6 irreplaceable buildings set on 4 acres in the rapidly
More informationTRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712
TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda Thursday, May 25, 2017 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,
More information