Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

Size: px
Start display at page:

Download "Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown."

Transcription

1 Raytown: overview Blue Ridge Cut-off map 18: p.42 RICE- TREMOTI HOME Raytown Tfwy KASAS 17: p.41 JUCTIO WITH ROCK ISLAD LIE RIGHT OF WAY 16: p.40 BUS STOP AT E 51ST AD BLUE RIDGE (KASAS ) Sterling Ave E 53rd St KASAS The City of Raytown includes approximately miles of the historic route, almost entirely along Blue Ridge Boulevard. It also includes one public historic trail site the Rice-Tremonti Home a public park affliated with the trail Cave Spring Park and a local historical society museum providing interpretive materials on the trails. Only one very minor deviation from the historic route is required through the center of downtown Raytown. A major opportunity for trail connections is coming to Raytown in the near future: the trail to be constructed along the former Chicago, Rock Island and Pacific railroad (commonly known as the Rock Island Line) intersects the historic trail alignment in the center of Raytown, and will ultimately connect the Kansas City Metro area to Katy Trail State Park, a rail trail that spans the entire state of Missouri. Connections to public transit are currently available at the northeast corner of Raytown, at East 51st St and Blue Ridge Boulevard, and along the west edge of the city, on Blue Ridge Boulevard/Blue Ridge Cutoff. To capitalize on historic trail and recreational connection opportunities, trailheads could potentially be located at Cave Spring Park, the intersection with the Rock Island Line right of way in downtown Raytown, and the Rice-Tremonti Home. Identification of an appropriate location for a minor trailhead (Level I, page 162) in the northeast corner of the Raytown would be desirable; one possibility might be in connection with a bus stop along Blue Ridge Boulevard near East 51st Street, although this would be in Kansas City rather than Raytown. The final length of the proposed retracement route within Raytown is 4.33 miles. P. 162 LEGED Shared use path Proposed HT alignment Mountain bike trail CAVE SPRIG PARK 19: p.43 Blue Pkwy / MO-350 E Gregory Blvd Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Beginning/end of segments Schools Bus stops Segment number & page Map data sources: see Appendix E, p Trail alignments: Raytown

2 Raytown: overview KASAS As the historic route follows Blue Ridge Boulevard across Raytown, and that road also connects historic trail sites, schools, the proposed Rock Island Line - Katy Trail Connector and Raytown s downtown commercial district, very few decisions in terms of the preferred routing of the constructed HT needed to be made within the scope of this project. Raytown Tfwy Sterling Ave E 53rd St Blue Ridge Cut-off Blue Ridge Elementary and ew Trails Early Learning Center Raytown Historical Society Raytown Central Middle IDEPEDECE Streetscape improvements on, looking west. at Sterling, looking north. Photos: Vireo Rice-Tremonti Home rock island line - katy trail connector Cave Spring Park E Gregory Blvd LEGED: SEE OPPOSITE PAGE west of downtown, looking west. Raytown Historical Society Museum, on. Trail alignments: Raytown 39

3 Raytown: Segment 16 LEGED: SEE OPPOSITE PAGE KASAS TRAILHEAD: BUS STOP AT 51ST AD BLUE RIDGE (KCMO) 15 E 51st St Blue Ridge Boulevard from East 51st Street at boundary with City of Kansas City to East 59th Street. CORRIDOR COECTIOS: Connects to transit at East 51st Street Connects to Raytown Middle and Schools E 53rd St OPPORTUITIES: The City of Raytown is considering a reduction of the road by a lane to allow room for improved sidewalks along this stretch of Blue Ridge Boulevard RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. E 56th St KASAS 17 Raytown Central Middle orthern Ave Sterling Ave Woodson Rd at Sterling Ave looking southwest. Photo: Vireo 40 Trail alignments: Raytown

4 Raytown: Segment 17 Cedar Ave Blue Ridge Boulevard from East 59th Street to East 63rd Street in downtown Raytown. ISSUES: Many sidewalks may need improvement here Raytown Rd Raytown Central Middle E 61st St CORRIDOR COECTIOS: Connects to Raytown Middle and Schools Passes thorough Raytown s downtown commercial area and recent streetscape improvements on East 63rd Street OPPORTUITIES: Future streetscape improvements may extend recent work on East 63rd Street northwest along Blue Ridge Boulevard On looking north near Raytown School. Photo: Vireo Raytown Trafficway RELATIOSHIP TO HISTORIC ROUTE: The historic route of the trail cuts just to the north of the Blue Ridge Boulevard/East 63rd Street intersection. The southern half of this segment diverges from the historic route slightly to follow existing road right-of-ways. 18 Raytown Historical Society On at E 62nd St looking north. Photo: Vireo Overton Ave E 66th Terr Rock Island Line - Katy Trail Connector Raytown Rd Willow Ave LEGED Proposed HT alignment Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Shared use path Mountain bike trail Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Schools Bus stops Adjacent segment number Map data sources: see Appendix E, p. 212 Recent streetscape redevelopment at Blue Ridge and, looking south. Photo: PS Trail alignments: Raytown 41

5 Raytown: Segment 18 LEGED: SEE OPPOSITE PAGE E 61st St Kentucky Blue Ridge Park Elm Lake Raytown Trafficway East 63rd Street west to Blue Ridge Boulevard, Blue Ridge southwest to Blue Ridge Boulevard/Cut-off, then south to intersection with Missouri way 350. ISSUES: Challenging intersection crossings for pedestrians on major streets (East 63rd Street and Blue Ridge Cut-off/Blue Ridge Boulevard) 17 TRAILHEAD: JUCTIO WITH ROCK ISLAD LIE CORRIDOR COECTIOS: Connects to future Rock Island Line - Katy Trail Connector Directly passes Raytown Historical Society and Rice-Tremonti Home Connects to Blue Ridge Elementary School Connects to transit at Blue Ridge Boulevard and Missouri way 350 KASAS Blue Ridge Cut-off E 65th St Rice-Tremonti Home Blue Ridge Elementary and ew Trails Early Learning Center Raytown Historical Society Rock Island Line - Katy Trail Connector OPPORTUITIES: The upcoming construction of a hiking-biking trail along the former Rock Island Line, to connect to Katy Trail State Park, is an opportunity for a major trailhead (Level I or II, page 162) and junction in the heart of Raytown P. 162 RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. Local knowledge suggests that for some part its period of use the historic trail followed a route from Raytown Center to the Rice-Tremonti Home as shown by the dotted purple line on this map, ( ) which may be interpreted in the area. Lane Ave Laurel Ave 19 Blue Trafficway - MO 350 Elm Ave Raytown Rd E 69th St ew streetscape on looking east. Photo PS Rice-Tremonti Home entrance off of E 65th St. Photo: Vireo 42 Trail alignments: Raytown

6 Raytown: Segment Cedar Ave Blue Ridge Boulevard from just north of Blue Trafficway/Missouri way 350 to boundary with City of Kansas City near East 75th Street. ISSUES: Busy multi-lane road with sidewalk only on one side of the road for most of this segment Floral Hills Cemetery Blue Tfway - MO 350 E 69th St CORRIDOR COECTIOS: Connects to Cave Spring Park Could provide safe pedestrian connection to nearby Westridge Elementary School (off map to southwest) Parallels transit route throughout its length OPPORTUITIES: Cave Spring Park is in the vicinity of the Barnes Farm, a campground used by historic trail travelers; it offers an opportunity for an HT trailhead and/or enhanced HT experience and interpretive developnent south of MO 350, looking south. Photo: Vireo TRAILHEAD: CAVE SPRIG PARK E Gregory Blvd RELATIOSHIP TO HISTORIC ROUTE: This segment is directly on the historic route of all three trails throughout its length. Cave Spring Park Existing parking and visitor center at Cave Spring Park. Photo: Vireo KASAS 20 E 75th St LEGED Proposed HT alignment Proposed HT alignment - other segments Approximate historic trail route City boundaries Bike lane Marked bike route Marked share the road Unmarked share the road Pedestrian hiking trail # Shared use path Mountain bike trail Equestrian trail Bus & public transit routes HT sites HT trailhead opportunities Schools Bus stops Adjacent segment number Map data sources: see Appendix E, p. 212 across from Cave Spring Park, looking south. Photo: Vireo Trail alignments: Raytown 43

OR MISSION TRAIL ELEMENTARY

OR MISSION TRAIL ELEMENTARY Leawood: overview OVERLAD PARK 24: p.70 I-LA PARK 32: p.72 TOMAHAWK PARK 23: p.69 31: p.71 GEZER PARK OR MISSIO TRAIL ELEMETARY 22: p.68 W 133rd St W 135th St KASAS CITY MO - other segments Beginning/end

More information

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail Lenexa: overview TRAFALGAR PARK 78: p.140 As the Westport Route crosses over Lenexa's boundaries with Olathe and Overland Park several times, approximately 2.75 or 3 miles of the historic route of the

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

Independence: overview

Independence: overview : overview Kentucky Ave 8: p.30 SUGAR CREEK SATA FE. OREGO, CALIFORIA 7: p.29 6: p.28 9: p.31 10: p.32 Square, Jackson County Courthouse. Photo: Vireo Trail swale area, Santa Fe Trail. Photo: Vireo HISTORIC

More information

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK Santa Fe, Oregon, and California ational Historic Trails Olathe: overview W 135th St W 143rd St GARDER 91: p.117 SATA FE UICORPORATED JOHSO COUTY W Santa Fe St ELM GROVE CAMPGROUD OREGO TRAIL W Dennis

More information

SERVICE AREA BOUNDARIES Beginning SFY2018

SERVICE AREA BOUNDARIES Beginning SFY2018 SERVICE AREA BOUNDARIES Beginning SFY2018 Service Area A (1) Boundaries -- all of Ray County Ray County Fellowship Senior Center 1015 West Royle Richmond, Missouri 64085 Service Area B Beginning at I-435

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018 West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015 Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations Rapid Transit Facilities 1 1.T.2 Brookpark Road Station Reconstruct and reconfigure the Brookpark Road station. 1 1.T.5 Puritas Avenue Station Reconstruct and reconfigure the Puritas Avenue (West 150th

More information

Royal Gorge Far Out Trail to Le Point

Royal Gorge Far Out Trail to Le Point Royal Gorge Far Out Trail to Le Point Direction to trailhead: From East Ridge Campground: Drive west from Canon City on US 50 to County Road 3A, the entrance road to the Royal Gorge Park. Turn left onto

More information

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low PIONEER TRAILS REGIONAL PLANNING COMMISSION TRANSPORTATION NEEDS -- 2015 TRANSPORTATION PLANNING GOALS BY MODOT CATEGORIES Pioneer Trails transportation needs are listed according to MoDOT s two major

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

EVERknowledgeable EVERresponsive EVERhonorable EVERGREEN.

EVERknowledgeable EVERresponsive EVERhonorable EVERGREEN. 7021 Johnson Drive Johnson County, KS 8450 & 8500 State Line Rd. Johnson County, Leawood, KS Property ID Size 48223 R1 34848 $100,000 Ryan Robertshaw allows for Group Home Smaller child care facility also

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

TABLE 1: STARTER PROJECTS YEARS SERVICES THAT CONTINUE IN EXISTING FORM

TABLE 1: STARTER PROJECTS YEARS SERVICES THAT CONTINUE IN EXISTING FORM Appendix A: Projects by Phase Fixed Route and Demand Response Projects TABLE 1: STARTER PROJECTS YEARS 0-5 + SERVICES THAT CONTINUE IN EXISTING FORM Non-ADA Paratransit Demand Response $600,000 $700,000

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have. TO: Golden Parks, Recreation and Museums Advisory Board FR: Al Head & Ben Davis, Golden Giddyup Tim Waters & Jerry Harcek, Golden Community Members RE: Singletrack Sidewalks Pilot Proposal 3.0, January,

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

MEETING MINUTES District 1 Trail Planning Meeting 1

MEETING MINUTES District 1 Trail Planning Meeting 1 MEETING MINUTES District 1 Trail Planning Meeting 1 June 1, 2017 2:00 PM 3:30 PM City of Two Harbors 2:00 Introductions Attendees: Lisa Austin, MnDOT Bryan Anderson, MnDOT Jasna Hadzic-Stanek, MnDOT Justin

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

Study Overview and Context

Study Overview and Context Study Overview and Context North Shore Coordination Plan Study Study Highlights Early 2016 to December 2017 Consultant team assistance Steering Committee review Two rounds of public open house events Project

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

The Transportation Corridor Overlay District

The Transportation Corridor Overlay District The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given

More information

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE PROJECT INTRODUCTION Project partners: St. Cloud Area Planning Organiza on (APO) and the City of St. Cloud. The project area is approximately 2.5 miles long, extending

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1 THE COLORADO TRAIL FOUNDATION Comments on the U.S. Forest Service Scoping Notice of August 13, 2010 Regarding the Relocation of THE COLORADO TRAIL AND CONTINENTAL DIVIDE NATIONAL SCENIC TRAIL From La Garita

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date SPECIAL COMMITTEE ON US ROUTE NUMBERING MEETING MINUTES FOR OCTOBER 17, 2013 AND REPORT TO SCOH OCTOBER 18, 2013 SHERATON DOWNTOWN DENVER, DENVER, COLORADO ADDENDUM OCTOBER 28, 2013 The meeting of the

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Figure San Dimas Bonita at San Dimas Avenue (view looking west) The adjoining neighborhood has an eclectic assortment of building types and uses, including: the historically significant but not architecturally or visually noteworthy San Dimas Lemon Association Packing

More information

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths.

Trails. Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. Trails Lois Jensen Nature Preserve is a 30 acre parcel on the north end of the city. It provides unspoiled wooded paths. TRAIL S, PATHS, ROUTES AND CONNECTORS Citizen input pointed to trails, paths, bike

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

A VISION FOR EL MIRAGE

A VISION FOR EL MIRAGE el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails

More information

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector Back Creek Back Creek is a east-west trail corridor proposed within the East Park District. The corridor s endpoints are the Cabarrus County line to the east and Reedy Creek Park to the southwest. The

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1

STOCKING CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1 STOCKING 51 5016 CENTENNIAL BLVD, THE NATIONS 1,429-11,982 RSF CREATIVE OFFICE + RETAIL + WAREHOUSE STOCKING 51 OAKPOINT REAL ESTATE 1 CONTENTS 1. STOCKING 51 OVERVIEW 2. FLOOR PLANS & AVAILABLE SPACES

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Welcome to the Future Kingston Point Rail Trail!

Welcome to the Future Kingston Point Rail Trail! Welcome to the Future Kingston Point Rail Trail! Today s tour will introduce the proposals for a linear park and non-motorized trail along a 1.5 mile stretch of the former Ulster & Delaware Railroad, from

More information

Confluence of Long Creek. Bellhaven Road. Approximate Corridor Length: 1.5 miles. Mecklenburg County Greenway Master Plan

Confluence of Long Creek. Bellhaven Road. Approximate Corridor Length: 1.5 miles. Mecklenburg County Greenway Master Plan Gum Branch Gum Branch is a northwest-southeast trail corridor that is located in the Southwest Park District. This corridor s endpoints are the confluence of Long Creek in the northwest and Bellhaven Road

More information

Welcome to the Cross County Trail Public Input Session!

Welcome to the Cross County Trail Public Input Session! Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.

More information

County of Peterborough Active Transportation Master Plan

County of Peterborough Active Transportation Master Plan The TMP developed a conceptual AT/cycling network for Peterborough County that identified both on-road and off-road (trail) AT facilities. This was a coarse network based on the existing trails and off-road

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs

More information

Needham Heights Neighborhood Association February Rail Trail Overview

Needham Heights Neighborhood Association February Rail Trail Overview Needham Heights Neighborhood Association February 4 2013 Rail Trail Overview Stone Dust Path, Devils River WI Needham Rail Trail Greenway: Working with the town to assist, advise and coordinate rail trail

More information

Downtown to Defiance Trolley Key Messages Jan. 2017

Downtown to Defiance Trolley Key Messages Jan. 2017 Downtown to Defiance Trolley Key Messages Jan. 2017 Overarching Messages This is a demonstration (pilot) project for one summer. We will evaluate how it went to see if we can offer it again in the future.

More information

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000. 1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and

More information

TRAILS INTERSECTION SIGNS

TRAILS INTERSECTION SIGNS TRAILS INTERSECTION SIGNS Intersection signs shall be placed at all trail intersections and located a minimum of 3 from the edge of trail. The top of the post shall pitch away from the sign and trail.

More information

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar

Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar Glacial Lakes State Trail Master Plan Amendment Trail Extension into Downtown Willmar Minnesota Department of Natural Resources Division of Parks and Trails July 2012 Glacial Lakes State Trail Master Plan

More information

CHAPTER FOUR: TRANSPORTATION

CHAPTER FOUR: TRANSPORTATION CHAPTER FOUR: TRANSPORTATION Barron County Comprehensive Plan: Transportation Page 61 Background Transportation facilities have a significant influence on land use, development and quality of life for

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS NORTH CENTRAL CAC AREA LITTLE VALLEY ROAD TO JUG HANDLE CREEK PLANNING AREA This planning area includes Cleone, Noyo,

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP // LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP PROJECT OVERVIEW MAP The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit

More information

Dallas Love Field Capital Program. September 16, 2015

Dallas Love Field Capital Program. September 16, 2015 Dallas Love Field Capital Program September 16, 2015 1 The Dallas Airport System Dallas Love Field, Dallas Executive Airport, Downtown Vertiport A $86 million City of Dallas enterprise Operated by the

More information

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Update on Trinity Trails Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Overview Provide review of trail planning and development along the main stem Trinity River

More information

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network Memo Date: Friday, December 22, 2017 Project: To: From: Subject: Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP Development of the Existing and Proposed Network HDR

More information

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

A number of goals were identified during the initial work on this Big Lake Transportation Plan. C. Transportation General Background Information Big Lake s transportation system includes all the roads, paths and facilities that allow the movement of private vehicles, trains and planes, as well as

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R

More information

Sacramento Placerville Transportation Corridor Alternatives Analysis

Sacramento Placerville Transportation Corridor Alternatives Analysis Sacramento Placerville Transportation Corridor Alternatives Analysis EL DORADO COUNTY TRANSPORTATION COMMISSION 1 Sacramento Placerville Transportation Corridor 2 Goal of the Project To give public officials

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center SO-UV I-70 UPPER SALT LICK TOO-PWECH SUNRISE 1 Town of Frisco Planning Area 1 NAH-OON-KARA I-70 Lake Hill Development Legend Existing Trails Existing USFS System Trails 2 A Existing Non-System Trails Bike

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT : Short Range Transit Plan Preferred Alternative August 2018 Table of Contents Executive Summary... 1 Preferred Alternative... 3 Best Practices for Route Design... 3 Project Goals... 4 Preferred Alternative...

More information

Understanding Your I-66 Trip

Understanding Your I-66 Trip Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic

More information

BACK COUNTRY UNIT PREFERRED ALTERNATIVE

BACK COUNTRY UNIT PREFERRED ALTERNATIVE BACK COUNTRY UNIT PREFERRED ALTERNATIVE San Francisco (118 mi) Carmel-By-The-Sea Carmel River Carmel Valley Road State Beach Private Property Point Lobos State Reserve Point Lobos Ranch RUSTIC CAMPING

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

Northeast Corridor Transportation Update

Northeast Corridor Transportation Update Northeast Corridor Transportation Update Presented by: Stuart Basham Division 10 Planning Engineer North Carolina Department of Transportation October 2, 2014 Today s presentation includes: I-485 Outer

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance

More information

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association GATEWAY PHASE 2 U.S. Forest Service and the Mount Shasta Trails Association PROJECT DEVELOPMENT Brief history - Gateway Phase 1 - IMBA conceptual plan - BikeShasta: concert series - USFS & MSTA partnered

More information

South cedar creek. Connectivity Plan

South cedar creek. Connectivity Plan South cedar creek Connectivity Plan Olathe, Kansas December 2013 South cedar creek Connectivity Plan City of Olathe December 2013 City of Olathe 100 East Santa Fe Olathe, KS 66051 913.971.8600 BNIM 106

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

Introduction. Project Overview

Introduction. Project Overview Washington Blvd./Andora Widening Project Community Open House & Public Scoping Meeting Summary Wednesday, September 21, 2016 6:00 7:30 p.m. Vencil Brown Elementary School, Roseville Introduction On Wednesday,

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WELCOME WELCOME TO THE SECOD CETRE I THE PARK PUBLIC OPE HOUSE WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WHAT IS THE PROJECT? The Centre in the Park Area Redevelopment Plan

More information

EXECUTIVE SUMMARY FALL Introduction. Findings

EXECUTIVE SUMMARY FALL Introduction. Findings EXECUTIVE SUMMARY FALL 2004 Introduction Trails are one of the most popular and highly desirable recreational resources in communities of all sizes throughout the country. In addition to providing a safe

More information