Allston Yards. Allston Yards. May 29, Allston Yards Allston, Massachusetts
|
|
- Damian Chambers
- 6 years ago
- Views:
Transcription
1 Allston Yards Allston Yards May 29, 2018
2 Allston Yards Site Plan Enhancements MBTA Commuter Rail Busses Shuttles Parking
3 Allston Yards April 30, 2018 plan Braintree Street Extension Arthur Street Extension West Street Building 4 Building 3 Building 1 East Street Lantera (residential) Building 2 52 Everett Street 38 Everett Street
4 Allston Yards April 30, 2018 plan Car drop-off area 5-foot wide sidewalk Building 4 Building 3 Building 1 West Street East Street
5 Allston Yards May 29, 2018 plan Car / shuttle bus drop-off area 10-foot wide sidewalk 8-foot wide landscaping Curb extensions Curb extensions West Street Building 4 Building 3 Building 1 East Street
6 Allston Yards MBTA Outreach April 30, 2018 meeting Request for Boston Landing Station access enhancements Request for MBTA Route 64 modifications May 21, 2018 four new stops added at Boston Landing: Inbound #500 approx. 6:04 AM Outbound #511 flag stop; approx. 10:31 PM Outbound #513 flag stop; approx. 12:11 PM Outbound #515 flag stop; approx. 2:16 PM
7 MBTA Boston Landing Station Update Boston Landing AM inbound / 2 PM outbound (planned) 2017 May 22, 2017 opening 2017 October daily riders Tuesday April 24, 2018 = 1,153 riders inbound / 15 outbound stops 20 inbound / 18 outbound stops Yawkey Station daily riders March 2014 new station opening (937 projected daily riders) inbound / 27 outbound stops
8 Allston Yards Bus Access
9 Allston Yards Public Transportation Watertown/ Waltham Harvard Central Square Kenmore Oak Square
10 The Arsenal on the Charles shuttles Red Line Harvard Square Orange Line Back Bay & Red Line South Boston Green Line (B) Chestnut Hill Avenue Green Line (C) Cleveland Circle
11 The Arsenal on the Charles shuttles 7:00 AM 10:00 AM departures every 7-15 minutes 4:00 PM 7:30 PM departures every 7-15 minutes South Boston: 7:00 AM 9:46 AM departures every minutes 4:00 PM 6:40 PM departures every minutes 7:20 AM 6:56 PM 11 daily stops at Boston Landing Back Bay: 7:00 AM 10:00 AM departures every minutes 4:00 PM 7:00 PM departures every minutes
12 Allston Yards Parking Braintree Street Extension Arthur Street Extension West Street East Street Building 4 Building 3 Building 1 Lantera (residential) Building 1: 230 Stop & Shop spaces Building residential spaces (0.5 space/unit) 52 Everett Street Buildings 2-4 locations available for interim parking Later project phases: 38 Everett Street 2 spaces / 1,000 sf office 0.5 spaces residential unit
13 Allston Yards Parking 20% 50% of residents live within walking distance of office (Source: development team data from comparable properties.) MBTA commuter rail, bus network, taxi/uber, shuttles, etc. all limit need for private automobile ownership Office/retail/residential shared parking potential Initial phase adjustment period additional on-site parking available prior to subsequent building construction
14 Allston Yards Comparable Residential Parking Cars/ Unit Transit Distance MBTA Line Station Allston Yards Commuter Rail Boston Landing Comparable properties: Location # Commuter Rail Yawkey Location # Red Alewife Location # Blue Wonderland By others: 125 Guest Street Commuter Rail Boston Landing 40 Rugg Road Commuter Rail Boston Landing 1550 Soldier s Field Road Commuter Rail Boston Landing
15 Allston Yards Conclusions: MBTA coordination to allow station access improvements Bus Access MBTA bus service improvements request Shuttle opportunities Appropriate parking
16 5 3 PERGOLA AMPHITHEATRE/ INTERACTIVE FOUNTAIN PLAZA/ FESTIVAL STREET 43,000 SF COMMUNITY GREEN GUEST STREET 23,000 SF LAWN 2 BUILDING 2 VOLVO 4 ALLSTON YARDS New England Development + Stop & Shop + Bozzuto + Southside Allston, MA LANDSCAPE SITE PLAN - COMMUNITY GREEN PAGE 1 MAY 29, 2018
17 AUGUST MOON FESTIVAL - BOSTON, MA AGITAGUEDA FESTIVAL - PORTUGAL CHALK ART FESTIVAL - DENVER, CO ST ANTHONY S FEAST - BOSTON, MA OPEN NEWBURY STREET - BOSTON, MA ALLSTON VILLAGE STREET FAIR - ALLSTON, MA OPEN NEWBURY STREET - BOSTON, MA GRACIA FESTIVAL - BARCELONA, SPAIN ASSEMBLY ROW - BOSTON, MA STREET DELIVERY FESTIVAL - BUCHAREST, ROMANIA ALLSTON YARDS New England Development + Stop & Shop + Bozzuto + Southside Allston, MA PRECEDENT IMAGERY - FESTIVAL STREETS PAGE 2 MAY 29, 2018
18 INTERACTIVE FOUNTAIN COMMUNITY PERGOLA COMMUNITY LAWN ALLSTON YARDS New England Development + Stop & Shop + Bozzuto + Southside Allston, MA PRECEDENT IMAGERY - COMMUNITY PARK ELEMENTS PAGE 3 MAY 29, 2018
19 ICE RINK DOG PARK FARMER S AND ART MARKET OUTDOOR MUSIC, YOGA AND MOVIES ALLSTON YARDS New England Development + Stop & Shop + Bozzuto + Southside Allston, MA PRECEDENT IMAGERY - COMMUNITY PARK ELEMENTS PAGE 4 MAY 29, 2018
20 1 CONTEXT New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 1 - VIEW FROM BUILDING 2 AT FOUNTAIN AND LAWN ALLSTON YARDS Allston, MA PAGE 5 MAY 29, 2018
21 2 CONTEXT New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 2 - VIEW EAST INTO COMMUNITY GREEN FROM ARTHUR STREET ALLSTON YARDS Allston, MA PAGE 6 MAY 29, 2018
22 3 CONTEXT New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 3 - VIEW EAST - GUEST STREET SIDEWALK ALLSTON YARDS Allston, MA PAGE 7 MAY 29, 2018
23 4 CONTEXT New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 4 - VIEW NORTH - ARTHUR BOULEVARD ALLSTON YARDS Allston, MA PAGE 8 MAY 29, 2018
24 5 CONTEXT New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 5 - VIEW NORTH - KISS + RIDE, BUILDING 4 ALLSTON YARDS Allston, MA PAGE 9 MAY 29, 2018
25 KEY PLAN 4,500 SF DOG PARK INCLUDES: PLANTING, LEASH ZONE, LARGE AND SMALL DOG ENCLOSURES ALLSTON YARDS New England Development + Stop & Shop + Bozzuto + Southside Allston, MA LANDSCAPE SITE PLAN - DOG PARK PAGE 10 MAY 29, 2018
26 BUILDING 2 BUILDING 3 BUILDING PEDESTRIAN ZONE FURNISHING ZONE CYCLE PARKING TRACK PERMEABLE PAVING GUEST STREET EXTENSION GUEST STREET EXTENSION PARKING CYCLE TRACK PEDESTRIAN ZONE PERMEABLE FURNISHING PAVING ZONE TOTAL TOTAL COMMUNITY GREEN New England Development + Stop & Shop + Bozzuto + Southside STREETSCAPE SECTION ALLSTON YARDS Allston, MA PAGE 11 MAY 29, 2018
27 BUILDING 3 BUILDING FRONTAGE FURNISHING ZONE PEDESTRIAN ZONE EAST STREET PEDESTRIAN ZONE FRONTAGE FRONTAGE FURNISHING ZONE PEDESTRIAN ZONE WEST STREET PEDESTRIAN ZONE FRONTAGE TOTAL TOTAL TOTAL TOTAL BUILDING 4 BUILDING 4 BUILDING ARTHUR STREET EXTENSION/ KISS AND RIDE PARKING PERMEABLE PAVING PEDESTRIAN ZONE FRONTAGE ARTHUR STREET New England Development + Stop & Shop + Bozzuto + Southside STREETSCAPE SECTION ALLSTON YARDS Allston, MA PAGE 12 MAY 29, 2018
BOSTON REGION METROPOLITAN PLANNING ORGANIZATION
PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,
More informationUrban Design and Development Scenarios
North Allston-Brighton Community-Wide Plan Urban Design and Development Scenarios The Cecil Group Brown, Richardson & Rowe The Louis Berger Group Byrne McKinney & Associates U 3 Ventures November 12, 2008
More informationMBTA ATM/Branding Opportunities 43 ATM Locations Available
MBTA ATM/Branding Opportunities 43 ATM Locations Available Line City Station Available Spaces Station Entries Blue East Boston Airport 1 7,429 Blue Revere Revere Beach 1 3,197 Blue Revere Wonderland 1
More informationII. BUS & RAPID TRANSIT SERVICES AND RECOMMENDED SERVICE CHANGES
II. Bus & Rapid Transit Services and Recommended Service Changes 3 II. BUS & RAPID TRANSIT SERVICES AND RECOMMENDED SERVICE CHANGES The recommendations from the 2004 Service Plan resulted in a restructuring
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationCommonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017
Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC
More information#1. Why is the City doing this project?
Community Workshop #2 January 2016 #1. Why is the City doing this project? Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change
More informationPre-Construction Public Meeting July 2017
Pre-Construction Public Meeting July 2017 Agenda Introduction to Project Team Project Description Schedule Impacts Communication/Public Outreach 2 Contractor Walsh Construction Design Team HDR Lead City
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationM E S T I Z O C U R T I S P A R K
ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC
More informationLancaster Square. Shape It #1 Workshop July 18, Lancaster Square
Shape It #1 Workshop July 18, 2018 Agenda Introduction Team Members Project Overview Summary of Input Presentation: What Makes a Great Public Space? On-site Workshop Discussions and Reporting Next Steps
More informationPreliminary 2004 Service Plan:
Preliminary 2004 Service Plan: Proposed Bus Service and Service Policy Modifications March 2004 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY TABLE OF CONTENTS Page I. Overview 1 II. Proposed Service Change
More informationBOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16
BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 171 Tremont will continue the transformation of Downtown Crossing into a revitalized neighborhood where all Bostonians can live, work, and play. 171
More informationBE PART OF MORE MORE
BE PART OF Welcome to Arsenal Yards Just west of Boston, along the Charles River, where Cambridge meets Boston, the next great neighborhood is underway. A one million + square foot mixed-use redevelopment
More informationDirections to MassDEP Offices
Directions to MassDEP Offices 1. Headquarters, Boston 2. Western Region, Springfield 3. Southeast Region, Lakeville 4. Central Region, Worcester New Address Effective November 17, 2014 5. Northeast Region,
More informationSOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014
Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood
More informationBoston College Parents Weekend 2010 Nearby Hotels
Boston College Parents Weekend 2010 Nearby Hotels Reservations for Parents Weekend should be made as soon as possible since the fall is a busy time of year, and many colleges in the area use the same hotels.
More informationBE PART OF MORE MORE
BE PART OF Welcome to Arsenal Yards Just west of Boston, along the Charles River, where Cambridge meets Boston, the next great neighborhood is underway. A one million + square foot mixed-use redevelopment
More informationDraft SamTrans Service Plan Public Outreach Presentation
Draft SamTrans Service Plan Public Outreach Presentation Main Street Park, Half Moon Bay October 16, 2012 Meeting Agenda Introduction Project Information & Background Proposed route changes Next Steps
More informationInteractive 2017 Zilker Park Area Schedules (Click on the DATE RANGE to view the appropriate map)
Interactive 2017 Zilker Park Area Schedules (Click on the DATE RANGE to view the appropriate map) Austin City Limits Festival September 25 October 1 October 2 5 October 6-8 October 9-12 October 13-15 October
More informationBoston, Ma Map READ ONLINE
Boston, Ma Map READ ONLINE If you are searched for the book Boston, Ma Map in pdf form, then you've come to the faithful website. We presented full version of this book in doc, txt, epub, DjVu, PDF forms.
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #6 January 30, 2014 Construction Liaison Group Jan 30 2014 1 OVERVIEW HAPPY BELATED NEW YEAR Works to Date Underground Utilities Bell
More informationMinnetonka Transit Study Peer Review Metropolitan Council
6 PEER REVIEW The purpose of the Minnetonka Transit Study is to further evaluate the transit market and service needs in Minnetonka and refine the service concepts that were developed in the Minnetonka-led
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationLEASING OPPORTUNITY OFFICE RETAIL MEDICAL RESTAURANT CONTACTS. Investment Contacts: Mike Krebsbach
LEASING OPPORTUNITY OFFICE RETAIL MEDICAL RESTAURANT Investment Contacts: Mike Krebsbach 303.407.9782 MKrebsbach@PinnacleREA.com Jamie Mitchell 303.962.9571 JMitchell@PinnacleREA.com CONTACTS Jamie Mitchell
More information2 N. jackson Ave. For sale or lease. ± 0.71 acre land parcel / ±30,927 Square Feet. At Alum rock Ave San Jose,CAlifornia SUBJECT N JACKSON AVE
For sale or lease At Alum rock Ave SUBJECT N JACKSON AVE ALUM ROCK AVE ± 0.71 acre land parcel / ±30,927 Square Feet JOHN B. MACHADO EXECUTIVE VICE PRESIDENT DIRECT: +1 408 282 3862 CELL: + 1 408 234 2606
More informationNext Stop News December 2018
Next Stop News December 2018 Get ready for 15-minute weekend light rail service starting on Sunday, January 6 Provide your feedback on the draft transit networks, attend a SacRT Forward open house Enjoy
More informationHouston Galleria Houston, TX
Houston Galleria Houston, TX Houston Galleria 52-acre site in southwest Houston 3,000,000 sq ft mixed-use complex Complex includes: More than 300 fine stores and restaurants Two Westin Hotels with a combined
More informationHarbord Village Phase 3
Planning and Growth Management Committee, City of Toronto, January 15, 2018 Items PG 25.4 & 4a Prioritization of Outstanding Heritage Conservation District Studies and Interim Protective Measures Harbord
More informationMillenia Partners is proud to present the iconic. Welcome to. Neighboring Tenants Include:
Welcome to Millenia Partners is proud to present the iconic downeast bldg as Available for Lease in Winter Park, Florida. The former Ralph Lauren retail bldg operated for decades and became a landmark
More informationSouthwest LRT Alignment Video Narration
Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.
More informationSOUTH LOOP RETAIL SPACE NEAR WINTRUST ARENA AND MCCORMICK PLACE
SOUTH LOOP RETAIL SPACE NEAR WINTRUST ARENA AND MCCORMICK PLACE 1935 S WABASH CHICAGO, IL 60616 Wayne Caplan Senior Vice President 312.529.5791 wayne.caplan@svn.com SVN CHICAGO COMMERCIAL 940 WEST ADAMS
More informationGeary Avenue: Option 2_Reconstruction
Geary Avenue: Option 2_Reconstruction *Any future street modifications will require coordination with City of Toronto Transportation Services Geary Avenue 20.0m Public ROW View West Potential-Option 2
More informationLocated in downtown Boston by the Fort Point Channel
Located in downtown Boston by the Fort Point Channel Overview History of the Station Renovation of the Station (Costs) Effects of the Renovation (Benefits) Future Plans Conclusion Beneficial Project Sources
More informationAttachment 1: Revitalizing Yonge Downtown Yonge Street
Attachment 1: Revitalizing Yonge Downtown Yonge Street Photo credit: Downtown Yonge BIA Attachment - Revitalizing Yonge Downtown Yonge Street 1 Photo credit: Downtown Yonge BIA Photo credit: Downtown Yonge
More informationMBTA Old Colony Commuter Rail Tie Replacement Project. Overview March 2011
MBTA Old Colony Commuter Rail Tie Replacement Project Overview March 2011 Project Description Emergency maintenance project to replace failing concrete ties with new timber ties Project History Failure
More informationMadison Metro Transit System
Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More information6 HIGH-OCCUPANCY-VEHICLE (HOV) LANES AND TRAVEL DEMAND MANAGEMENT (TDM) PROGRAMS
6 HIGH-OCCUPANCY-VEHICLE (HOV) LANES AND TRAVEL DEMAND MANAGEMENT (TDM) PROGRAMS Travel demand management (TDM) programs enable roadways, which have a fixed capacity, to accommodate more travelers without
More informationCOLLEGE STREET STUDY Community Consultation Meeting. December 2015
COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion
More informationPART I CRIME BY STATION: 2010 vs STATION YEAR CRIME COUNT
PART I CRIME BY STATION: 2010 vs. 2011 STATION YEAR CRIME COUNT ABINGTON 2010 Larceny 5 2010 Total 6 AIRPORT 2010 2011 Total 5 ALEWIFE 2010 Assault 1 0 2010 Total 43 2011 Arson 1 Larceny 32 4 ALLSTON ST-B
More informationINDEX Page 07 RiNo Denver. Page 19 N. Wynkoop Development
INDEX 01 02 Page 07 RiNo Denver Page 19 N. Wynkoop Development 02 03 A 14-ACRE MIXED USE COMMUNITY OF MAKERS AND INNOVATORS To the mountains I-25 Globeville I-70 Light Rail N Line RINO Brighton Blvd Washington
More informationBEACH & DOWNTOWN VisiTOr MAp & GuiDE Revised July 2017
BEACH & DOWNTOWN Visitor Map & Guide Revised July 2017 How to get here DRIVING DIRECTIONS From North Take Interstate 95 South to Exit 20 Turn left onto Hollywood Boulevard (east) Proceed east 2 miles to
More informationA VISION FOR EL MIRAGE
el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails
More informationWhat was Old is New Again
What was Old is New Again IN THE BEGINNING.. Streetcars were the backbone of transit: First developed 1885-1889 Fostered economic development of urban areas. Near the streetcar s peak in the early 1920
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013
ITS Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning Raymond Wright, P.E. City of Spokane Transportation Department 11707 East Sprague Avenue,
More informationTo: Mary Beth Avedesian B.F. Saul Company
1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 202.296.8625 TECHNICAL MEMORANDUM To: Mary Beth Avedesian B.F. Saul Company From: Daniel B. VanPelt, P.E., PTOE Felice B. Brychta, P.E. Tricia
More informationSOMERVISION & Green Line Extension Open House
SOMERVISION & Green Line Extension Open House Route 16 Station Mayor Joseph A. Curtatone CITY OF SOMERVILLE June 12, 2010 Route 16: Status Route 16 Station in Green Line DEIR as the Proposed Future Full-Build
More informationLOCATION TORONTO CANADA S LARGEST CITY
PROJECT SUMMARY LOCATION TORONTO CANADA S LARGEST CITY Rated as: World s best city to live in (by The Economist) Top intelligent community (by ICF) Most resilient city in the world (by Grosvenor Group)
More informationCrystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.
Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)
More informationFor Lease Retail Space LUXURY
1127 LUXURY Euclid Avenue,Cleveland, Ohio 44115 RYAN FISHER Vice President Retail Services DIRECT 216 239 5069 ryan.fisher@colliers.com > PROPERTY HIGHLIGHTS Excellent opportunity to locate at the center
More informationMMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA
MMHP INVESTMENT SALES OPPORTUNITY 9009 & 9011 Centreville Road Manassas, VA Investment Highlights Centrally located, 100% leased mobile home park in the strong-performing City of Manassas, VA The 10.02-acre
More informationMillenia Partners is proud to present the Park Ave. Welcome to. Neighboring Tenants Include:
Welcome to Millenia Partners is proud to present the Park Ave Plaza Restaurant as Available for Lease in Winter Park, Florida. The former restaurant operated for decades and became a landmark in Winter
More informationOF NEW ENGLAND ENTERTAINMENT RETAIL HOSPITALITY
APEX CENTER OF NEW ENGLAND 180 BOSTON POST ROAD WEST MARLBOROUGH, MA 475,000 SF / 43-ACRE PARK ENTERTAINMENT RETAIL HOSPITALITY NOW LEASING FOR SUMMER 2017 OPENING 11 high-profile buildings of 475,000
More informationTable 2: FFYs Transportation Improvement Program (TIP) Development Universe of Projects
Universe of s Previously scored projects to be considered for TIP funding this year; status noted Other active projects; not yet evaluated and not planned for evaluation in FFY QUINCY QUINCY INTERSECTION
More information1. Case Study Area and Character Sections
ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No
SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-032 WHEREAS, The San Francisco Municipal Transportation Agency has proposed the installation of parking and traffic modifications
More informationYarmouth Technical Assistance Panel Oct 17, Yarmouth TAP
Yarmouth Technical Assistance Panel Oct 17, 2017 Yarmouth TAP October 17, 2017 Westfield Technical Yarmouth Assistance Technical Assistance Panel, October Panel 26, 17, 2015 2017 About ULI the Urban Land
More information2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,
More informationCoca-Cola Zero Belfast Bikes.
Coca-Cola Zero Belfast Bikes www.belfastbikes.co.uk Background BelfastBike Share Scheme October 2009 - Notice of Motion July 2011 - Outline Business Case OBC concluded that a public bike share scheme could
More informationCTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus
CTPS staff considered roadways that carry on average more than 1,500 weekday MBTA bus passengers in one direction as candidates for dedicated bus lanes CTPS examined the average rates of weekday bus passenger
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationPIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION
PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with
More informationReal-Time Control Strategies for Rail Transit
Real-Time Control Strategies for Rail Transit Outline: Problem Description and Motivation Model Formulation Model Application and Results Implementation Issues Conclusions 12/08/03 1.224J/ESD.204J 1 Problem
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More information405 TERMINAL AVENUE OTTAWA, ON
405 TERMINAL AVENUE OTTAWA, ON NEW OFFICE DEVELOPMENT FOR LEASE Up to 160,000 sf GET YOUR ORGANIZATION ON TRACK 405 TERMINAL AVENUE New Office Development for Lease Building on the monumental success of
More informationIN THE HEART OF IT ALL
IN THE HEART OF IT ALL A N E W N E I G H BO R H O O D AWA I T S THE OPPORTUNITY As exclusive listing agent, Transwestern Consulting Group ( TCG ) and HFF are pleased to offer for sale Widett Circle, a
More informationBEST SUMMER EVER! SUMMER CAMPS 2016 FRIENDSHIP, ACCOMPLISHMENT, BELONGING. ymcaboston.org WALTHAM YMCA YMCA OF GREATER BOSTON SUMMER CAMP
BEST SUMMER EVER! FRIENDSHIP, ACCOMPLISHMENT, BELONGING SUMMER CAMPS 2016 WALTHAM OF GREATER BOSTON ymcaboston.org SUMMER CAMP BEGINS JUNE 20 REGISTRATION BEGINS JANUARY 30 MORE FUN THIS SUMMER The Y s
More informationCHURCH AVENUE CHULA VISTA, CA 91910
For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 CHURCH AVENUE CHULA VISTA, CA 91910 CHULA VISTA DEVELOPMENT OPPORTUNITY Excellent Location Near Vibrant Third Avenue
More information2011 SSSL 14u Directions
2011 SSSL 14u Directions Avon/Holbrook : - CROWLEY FIELD, FAGAN DRIVE, AVON, MA From 24 South: Route 24 North; Take exit 19A to merge onto Harrison Boulevard; Turn left at MA-28/E Main Street; Turn right
More informationNOTICE OF MEETINGS OF THE EXECUTIVE COMMITTEE OF THE PUEBLO CITY COUNCIL
NOTICE OF MEETINGS OF THE EXECUTIVE COMMITTEE OF THE PUEBLO CITY COUNCIL A MEETING OF THE EXECUTIVE COMMITTEE OF THE PUEBLO CITY COUNCIL WILL BE HELD ON MONDAY, FEBRUARY 25, 2013 COMMENCING AT 5:30 P.M.
More informationNEXT STOP NEWS September Extended Light Rail Service for Folsom Live
NEXT STOP NEWS September 2016 Extended Light Rail Service for Folsom Live Folsom Live returns for 2016 on Saturday, September 24. This year s venue features ten bands on four outdoor stages. The festivities
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationThis report recommends two new TTC transit services in southwest Toronto.
Report for Action New TTC Services - Southwest Toronto Date: March 20, 2018 To: TTC Board From: Chief Customer Officer Summary This report recommends two new TTC transit services in southwest Toronto.
More informationKAP Lot 3. Lot 3. Lot Lot 5. Lot 6. Lot 7. Lot 8. Lot KAP 81153
Public Notice April 26, 2018 Subject Property: 249 Westminster Ave W Lot A, District Lot 4, Group 7, Similkameen Division Yale (Formerly Yale Lytton) District, KAP92015 Application: Rezone PL2018-8201
More informationFormer Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018
Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables
More informationDOWNTOWN3RD THE DESTINATION
DOWNTOWN3RD Downtown3rd is Las Vegas' newest Metropolitan center. The Third Street corridor is the main artery running through dt 3 between Ogden St and Stewart Avenue and provides both Las Vegas residents
More information1. Introduction. 2. Overview of Existing Conditions
Comprehensive Boston Harbor Water Transportation Study and Business Plans; Water Transportation Strategy for the Boston Harbor s National & State Park: Existing Conditions October 2017 Table of Contents
More informationLEASING FOR OCTOBER 1, 2017 OPENING NOW UNDER CONSTRUCTION. 11 high-profile buildings of 475,000 SF:
BOSTON POST ROAD WEST 11-169 APEX DRIVE MARLBOROUGH, MA 475,000 SF / 43-ACRE PARK LEASING FOR OCTOBER 1, 2017 OPENING NOW UNDER CONSTRUCTION 11 high-profile buildings of 475,000 SF: 150,000 SF custom-designed
More information4. Proposed Transit Improvements
4. Proposed Transit Improvements The following proposed transit improvements have been assembled based on input received from the community meetings and from review and coordination with the TAC as well
More information2018 Service Implementation Plan Executive Summary
2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation
More informationMerchant Square Paddington: Brand Location Pack
Merchant Square Paddington: Brand Location Pack Merchant Square is a premium development in the heart of London s West End. Merchant Square is home to a captive audience of 6,000 employees and 4,000 residents
More informationMonday, September 18, 2017 Sunday, October 1, 2017
Monday, September 18, 2017 Sunday, October 1, 2017 CONSTRUCTION UPDATE* Hurricane Irma cleanup is complete and some landscaping repairs are underway. The project was secure and no major damages were encountered.
More informationChapter 13 Route Window NE12 Harold Wood station. Transport for London
Chapter 13 Route Window NE12 Harold Wood station HAROLD WOOD STATION 13 Route Window NE12 Harold Wood station 13.8 Harold Wood station is on Gubbins Lane close to the junction of A12 Colchester Road and
More informationPROJECT TEAM. Amacon has assembled a highly qualified project team ROBSON STREET. Amacon Developer. GBL Architect
PROJECT TEAM Amacon has assembled a highly qualified project team. Amacon Developer GBL Architect For over four decades, Amacon has been one of the most influential real estate development and construction
More informationPROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended
DATE: January 13, 2018 CASE NO(S).: PL160942 PROCEEDING COMMENCED UNDER subsection 22(7) of the Planning Act, R.S.O. 1990, c. P.13, as amended Applicant and Appellant: Subject: Existing Designation: Proposed
More informationCHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#
For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 CHULA VISTA DEVELOPMENT OPPORTUNITY Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building
More informationBID Boundaries I-395 Anacostia River 15 th St, SE S. Capitol St. Section of Buzzards Point
Summary Overview BID Boundaries I-395 Anacostia River 15 th St, SE S. Capitol St. Section of Buzzards Point 2 The Capitol Riverfront in Context AWI Framework Plan completed in 2003 3 Daytime Population
More informationEmployer: Dedham Health and Athletic Club. Dedham Health and Athletic Club
Employer Information Employer name: Type of business: Job location: City: State: MA Zip: 02026 Website: Why choose us? Cultural exchange activities Dedham Health and Athletic Club Athletic Club Dedham
More informationMOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013
MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013 WHY EXPAND MOSCONE? Moscone Center is at capacity Clients are demanding additional contiguous exhibition space The center is San Francisco s
More information230 CHURCH AVENUE CHULA VISTA, CA 91910
Excellent Location Near Vibrant Third Avenue Village High Density Zoning Building Height up to 45 Lot size of 11,326 sqft Flat/Graded Lot Ease of Access to Utility Hookups Multiple Allowed Uses For Additional
More informationToronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District
STAFF REPORT ACTION REQUIRED 440, 444, 450 and 462 Front Street West; 425, 439, 441 and 443 Wellington Street West; 6-18 Spadina Ave. and 1 and 19 Draper Street Urban Design Guidelines Final Report Date:
More informationFirst rail. August 2011
August 2011 First rail A downtown resident showed his son in early August the first completed section of embedded track on Fourth Street in front of the Farmer s Market. During July, the Central Corridor
More informationDRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017
DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION
More informationAlliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017
Alliant Energy Center Visioning Workshop Input Madison, WI July 2, 217 A neighborhood meeting was held on July 18 and 19 th, 217 to gather community feedback on the topics of connections, destination district,
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationDOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President
DOWNTOWN EAST RESTAURANT AND RETAIL SPACE AVAILABLE for lease Matt Friday Senior Vice President 612 336 4209 matt.friday@cbre.com David Daly Vice President 612 336 4319 david.daly@cbre.com Eric Sheaffer
More informationTown of Bradford West Gwillimbury Council Meeting October 2, 2018
COUNCIL HIGHLIGHTS Media Contact: Caleigh Clubine Communications Officer 905-775-5366 ext. 1103 cclubine@townofbwg.com Town of Bradford West Gwillimbury Council Meeting October 2, 2018 Note: This was the
More information