MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013
|
|
- Chad Hines
- 5 years ago
- Views:
Transcription
1 MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013
2 WHY EXPAND MOSCONE? Moscone Center is at capacity Clients are demanding additional contiguous exhibition space The center is San Francisco s Major economic engine: 21% of all tourism dollars and 27% hotel occupancy An independent study for shows $2 billion loss in direct spending without expansion The proposed Moscone Expansion will recover $734 million 2
3 MOSCONE EXPANSION PROJECT OBJECTIVES Maximize economic impact by attracting new clients and maintain existing clients by creating contiguous exhibition spaces and increasing the quantity of flexible meeting and ballroom spaces. Maintain continuous operations and revenue during improvement and expansion. Capitalize on Moscone s unique location in the city by improving its connections and relationship to the city s fabric. 3
4 MOSCONE EXPANSION PROJECT URBAN DESIGN PRICIPLES Activate streets by redesigning or relocating vehicular and service functions to create uninterrupted pedestrian-favored sidewalks fronted by active uses wherever possible. Enhance pedestrian circulation and interest by reintroducing lost mid-block passageways and reducing the length of uninterrupted frontages. Create new and improved connections to the Yerba Buena Gardens. Maximize the value of the City s infrastructure and urban planning investment by building at an appropriately high density. Improve Moscone s civic presence on Howard Street by creating an iconic and architecturally significant arrival experience. PLANNING DOCUMENT REFERENCES: BETTER STREETS PLAN, SAN FRANCISCO PLANNING DEPARTMENT YERBA BUENA STREET LIFE PLAN, YERBA BUENA COMMUNITY BENEFIT DISTRICT CENTRAL CORRIDOR PLAN, SAN FRANCISCO PLANNING DEPARTMENT CENTRAL SUBWAY PLAN, SFMTA 4
5 EXISTING CONDITIONS
6 TRUCK 6 EXISTING CONDITIONS LOWER LEVEL DIAGRAM
7 MISSION FOURTH THIRD HOWARD PEDESTRIAN TRUCK FOLSOM 7 EXISTING CONDITIONS SITE DIAGRAM
8 MISSION FOURTH THIRD PEDESTRIAN BUS LOADING FOLSOM 8 EXISTING CONDITIONS SITE DIAGRAM
9 ENHANCING THE PUBLIC REALM
10 MISSION THIRD STREET FRONTAGE FOURTH THIRD PARK BRIDGE WEST PLAZA YERBA BUENA PASEO TERRACE GARDEN HOWARD STREET PLAZA FOLSOM 10 PROPOSED SITE DIAGRAM
11 MISSION FOURTH THIRD PEDESTRIAN TRUCK BUS LOADING FOLSOM 11 PROPOSED SITE DIAGRAM: REDUCED PEDESTRIAN AND VEHICLE CONFLICTS
12 MISSION FOURTH THIRD FOLSOM 12 PROPOSED NEW MIDBLOCK ACCESS
13 FOURTH THIRD IMPROVED THIRD STREET STREETSCAPE
14 14 VIEW WEST FROM THIRD STREET
15 15 VIEW WEST FROM HOWARD STREET
16 16 EXISTING CONDITIONS
17 MISSION FOURTH THIRD HOWARD FOLSOM 17 EXISTING CONDITIONS ACCESSIBLE ROUTE DIAGRAM
18 EXISTING CONDITION ENLARGED ROUTE DIAGRAM
19 MODIFIED CONDITION ENLARGED ROUTE DIAGRAM
20 20 PROPOSED BRIDGE ACCESSIBLE ROUTE DIAGRAM
21 21 PROPOSED BRIDGE ENLARGED ROUTE DIAGRAM
22 THIRD STREET PROPOSED BRIDGE CROSS SECTIONS
23 PROPOSED SECTION
24 24 EXISTING CONDITIONS BRIDGE 24
25 25 PROPOSED BRIDGE PRECEDENTS 25
26 FOURTH THIRD HOWARD 26 PROPOSED SITE DIAGRAM: ENHANCED WEST PLAZA
27 27 27 EXISTING VIEW FROM HOWARD TOWARDS CHILDREN S CREATIVITY MUSEUM
28 28 28 PROPOSED VIEW WITHOUT NEW PARK BRIDGE
29 29 29
30 30 PROPOSED VIEW WITH NEW PARK BRIDGE AND WEST PLAZA
31 31 PROPOSED PLAZA PRECEDENTS
32 FOURTH THIRD THIRD HOWARD HOWARD PREFUNCTION ESPLANADE BALLROOM 32 PROPOSED YERBA BUENA PASEO
33 33 PROPOSED YERBA BUENA PASEO
34 34 YERBA BUENA PASEO PRECEDENTS
35 NO WORK BELOW DASHED BLUE LINE ADJACENT PUBLIC PLACE: TOTAL: 16,720SF EXISTING PUBLIC SPACES SOUTH OF MAIN LOBBY
36
37 NEW PROPOSED PUBLIC SPACE: TOTAL: 24,420SF PROPOSED PUBLIC SPACES SOUTH OF MAIN LOBBY
38 38 AERIAL VIEW FROM PLAYGROUND
39 AERIAL VIEW FROM PLAYGROUND
40 TERRACE GARDEN UPPER LEVEL SITE PLAN THIRD STREET
41 41 PROPOSED TERRACE GARDEN
42 FOURTH THIRD THIRD HOWARD HOWARD PREFUNCTION ESPLANADE BALLROOM 42 PROPOSED STREETSCAPE AT HOWARD STREET PLAZA
43 43 PROPOSED STREETSCAPE AT HOWARD STREET PLAZA
44 44 HOWARD STREET PLAZA PRECEDENTS
45 82-0 MEETING 55-0 BALLROOM 19-0 LOBBY LOBBY 0-0 EXHIBITION 45 PROPOSED SECTION
46 46 VIEW FROM PORTICO TO EAST
47 47 VIEW FROM PORTICO TO EAST
48 QUESTIONS?
49 THANK YOU
50 FLOOR PLANS
51 MISSION FOURTH THIRD HOWARD FOLSOM N 51 PROPOSED SITE PLAN
52 52 PROPOSED EXHIBITION LEVEL PLAN
53 FOURTH LOBBY THIRD HOWARD LOBBY LOBBY 53 PROPOSED FIRST LEVEL PLAN
54 FOURTH THIRD HOWARD PREFUNCTION ESPLANADE BALLROOM 54 PROPOSED MEZZANINE LEVEL PLAN
55 FOURTH THIRD PREFUNCTION HOWARD PREFUNCTION BALLROOM 55 PROPOSED SECOND LEVEL PLAN
56 FOURTH THIRD HOWARD PREFUNCTION TERRACE MEETING MEETING 56 PROPOSED THIRD LEVEL PLAN
MOSCONE EXPANSION PROJECT Yerba Buena Alliance PRESENTATION FEBRUARY 06, 2014
MOSCONE EXPANSION PROJECT Yerba Buena Alliance PRESENTATION FEBRUARY 06, 2014 MOSCONE EXPANSION PROJECT OBJECTIVES Expand the contiguous exhibition space increasing the quantity of highly flexible meeting
More informationMOSCONE EXPANSION AND IMPROVEMENT PROJECT
MOSCONE EXPANSION AND IMPROVEMENT PROJECT PLANNING COMMISSIONERS INFORMATIONAL MEETING 24 JULY 2014 EXPAND WITHIN THE EXISTING FOOTPRINT The project will result in 525,000 SF of new and repurposed space.
More informationTHE MOSCONE CENTER IN THE HEART OF SAN FRANCISCO EXPANDED FLEXIBLE IMPROVED
THE MOSCONE CENTER EXPANDED FLEXIBLE IMPROVED IN THE HEART OF SAN FRANCISCO IT IS BEAUTIFUL IT IS MEMORABLE. IT IS THE MOSCONE CENTER San Francisco is a premier world destination famous for fostering new
More informationSan Diego Convention Center Phase III Expansion. SDCCC Presentation to Mayor s Task Force June 2, 2009
Expansion SDCCC Presentation to Mayor s Task Force June 2, 2009 Agenda The TSA/HNTB Team Experience and Lessons Learned Project Methodology Issues and Opportunities Alternative Masterplan Concepts Under
More informationSecond Street SAN FRANCISCO, CALIFORNIA
PROPERTY OVERVIEW Two-tower, 9 and 10-story Class A building, featuring flexible, ±40,000 RSF floor plates Recently renovated outdoor plaza & lobbies San Francisco s largest office complex South of Market
More informationSecond Street SAN FRANCISCO, CALIFORNIA
PROPERTY OVERVIEW Two-tower, 9 and 10-story Class A building, featuring flexible, ±40,000 RSF floor plates Recently renovated outdoor plaza & lobbies San Francisco s largest office complex South of Market
More informationUpscale Mixed-Use Development Along West Main Street
Upscale Mixed-Use Development Along West Main Street For more information, contact: JOHN PRITZLAFF Senior Vice President 434 234 8416 john.pritzlaff@thalhimer.com JENNY STONER Associate 434 234 8417 jenny.stoner@thalhimer.com
More informationAttachment 1: Revitalizing Yonge Downtown Yonge Street
Attachment 1: Revitalizing Yonge Downtown Yonge Street Photo credit: Downtown Yonge BIA Attachment - Revitalizing Yonge Downtown Yonge Street 1 Photo credit: Downtown Yonge BIA Photo credit: Downtown Yonge
More informationMarriott International
History Mission Inn Bed & Breakfast once stood on the hotel site for over 50 years Completed in 1959, the 20 room bed & breakfast remained in service until 2010 Marriott International Founded in 1927 by
More information2 SITE ANALYSIS AND DESIGN CRITERIA
2 SITE ANALYSIS AND DESIGN CRITERIA PRELIMINARY DEVELOPMENT CRITERIA 12 URBAN CONTEXT 13 VIEW 14 SITE GRADING 16 EXISTING STRUCTURES 16 STRUCTURAL AND SEISMIC CONSTRAINTS 18 CRUISE INDUSTRY AND ACTIVITY
More informationMemorable Designs, Unforgettable places
Memorable Designs, Unforgettable places We create environments that connect people, introduce nature into life s moments and provide a backdrop against which unforgettable experiences unfold. DELRAY BEACH
More informationSeptember 30, 2016 PUBLIC HEARING RESULTS
The Sustainable Streets Division of the San Francisco Municipal Transportation Agency held a public hearing on Friday,, at 10:00 AM, in Room 416 (Hearing Room 4), City Hall, 1 Dr. Carlton B. Goodlett Place,
More informationSAN DIEGO CONVENTION CENTER
SAN DIEGO CONVENTION CENTER F L O O R P L A N S VISITSANDIEGO.COM 120517 FLOOR PLANS FRONT STREET FIRST AVENUE GASLAMP QUARTER FIFTH AVENUE WEST HARBOR DRIVE UPPER LEVEL MEETING ROOMS/BALLROOMS/SAILS PAVILION
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationHello Hello. Hello Hello Hello. East Midtown Study
Hello Hello Hello Hello Hello Hello East Midtown Study July 18, 2012 Introduction East Midtown Study Area ue Park Avenu GCT Page 2 - DCP East Midtown Study Orthophoto Base Map Copyrighted by the New York
More informationBABTA PRESENTATION CASSANDRA COSTELLO - MAY 2018
BABTA PRESENTATION CASSANDRA COSTELLO - MAY 2018 WHAT IS SAN FRANCISCO TRAVEL? MOSCONE EXPANSION EXPANSION QUICK FACTS On budget and on time-completion 2018 Increasing the largest contiguous exhibition
More informationCOMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.
COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4 Recommendation The Commissioner of Engineering and Public Works and the
More informationBoston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA
Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520
More informationBOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16
BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16 171 Tremont will continue the transformation of Downtown Crossing into a revitalized neighborhood where all Bostonians can live, work, and play. 171
More informationONE STOP SHOP. showers lockers bike parking valet parking. garden terrace retail options wi-fi security
be first ONE STOP SHOP Work doesn t disrupt life at 00 First Street a modern, 7-story, Class-A high-rise in prime South Financial District with numerous on-site amenities: showers lockers bike parking
More informationCONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5
2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration
More informationCHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT
CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT 5.1 GENERAL The recommended type and location of future land uses in Alpine should, in part, consider potential opportunities for future economic
More informationCOLLEGE STREET STUDY Community Consultation Meeting. December 2015
COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion
More informationFor Lease Retail Space LUXURY
1127 LUXURY Euclid Avenue,Cleveland, Ohio 44115 RYAN FISHER Vice President Retail Services DIRECT 216 239 5069 ryan.fisher@colliers.com > PROPERTY HIGHLIGHTS Excellent opportunity to locate at the center
More informationCalifornia Here We Come! A Growing Meetings Infrastructure Gives Planners More Reasons to Head Out West
California Here We Come! A Growing Meetings Infrastructure Gives Planners More Reasons to Head Out West By Patrick Simms AUGUST 1, 2015 The waterfront Portola Hotel & Spa at Monterey Bay is adjacent to
More informationRetail For Lease. (between Montgomery & Kearny) RHONDA DIAZ CALDEWEY Managing Director LIC #
Retail For Lease (between Montgomery & Kearny) RHONDA DIAZ CALDEWEY Managing Director rhonda.diaz@cushwake.com + 68 0 LIC #007 Prime Retail Space in Financial District s busiest corridor. Across from San
More informationUpdate: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018
Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018 1 GOVERNORS ISLAND IS FOR NEW YORKERS 2 WE RE MOVING TOWARDS A YEAR-ROUND, 24 HOUR COMMUNITY 3 Governors
More informationplaces Mooloolaba s heart five
five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised
More information2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More informationBRANDING PRICING CONFERENCE & EVENT BRANDING AREAS 2018 ENTIRE HOTEL CONFERENCE & EVENT BRANDING GUIDE
BRANDING AREAS 2018 CONFERENCE & EVENT BRANDING GUIDE CONFERENCE & EVENT BRANDING PRICING ENTIRE HOTEL ENTIRE HOTEL BRANDING GUIDE +1 214 761 7259 AnatoleBranding.com 32 ITEM & AREA PRICING 2018 PAGE ONE
More informationTHE CENTER OF IT ALL. 868 Mission Street Restaurant Space Available
THE CENTER OF IT ALL Mission Street Restaurant Space Available The Neighborhood DINING Zero Zero Cavalier Mourad LOCATED JUST STEPS FROM UNION SQUARE AND SOMA, Mission Street is found near some of San
More informationTREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board. April 8, 2015
TREASURE ISLAND AND YERBA BUENA ISLAND Treasure Island Development Authority Board April 8, 2015 AGENDA Ongoing Engineering & Design Activities Upcoming Construction Activities TREASURE ISLAND TIDA Board
More informationSONY CENTRE FOR THE PERFORMING ARTS WEST SIDE PLAZA
SONY CENTRE FOR THE PERFORMING ARTS WEST SIDE PLAZA PUBLIC REALM SUMMARY 2007-2014 2014.08.26 BERCZY PARK ST. LAWRENCE CENTRE FOR THE ARTS SONY CENTRE FOR THE PERFORMING ARTS p.2 2014.08.26 EXISTING CONDITIONS
More informationAnaheim Resort. Hotel Stay Impact
Anaheim Resort What: 1,100-acre district including Disneyland Resort theme parks, Anaheim Convention Center, hotels, restaurants and shops Annual visitors: more than 25 million Employees: more than 30,000
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Amending Transportation Code, Division II to prohibit parking on
More informationMemorandum / Letter of Intent
VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com
More informationREAL ESTATE TRANSACTION ADVISORY SERVICES
REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station
More informationFOR SALE Bernard Avenue Kelowna, BC acre development site in the heart of Downtown Kelowna
FOR SALE 426-454 Bernard Avenue Kelowna, BC PROPERTY DETAILS: 0.366 acre development site in the heart of Downtown Kelowna Previously approved for a mixed use development Well located in the heart of Downtown
More informationDirector, Community Planning, North York District
STAFF REPORT ACTION REQUIRED 3401 Dufferin Street and 1 Yorkdale Road - Yorkdale Shopping Centre Block Master Plan - Official Plan and Zoning By-law Amendment Applications - Preliminary Report Date: September
More informationOverview of the Southern Nevada Convention and Meeting Segment
Executive Summary Applied Analysis was retained by the Las Vegas Convention and Visitors Authority (the LVCVA ) to review and analyze the economic impacts associated with its various operations and southern
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationFor Sale. NNN - ARCO AMPM San Diego North County. Investment Opportunity ARCO AMPM - NNN LEASE- 4.2 CAP 761 N. Broadway, Escondido, CA 92025
For Sale Investment Opportunity ARCO AMPM - NNN LEASE- 4.2 CAP 761 N. Broadway, Escondido, CA 92025 NNN - ARCO AMPM San Diego North County Exclusively Offered By: Property Overview Price $4,600,000 Lease
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationFEASIBILITY PLANNING STUDY WISCONSIN CENTER [1] + CROSSROADS CONSULTING SERVICES FEASIBILITY PLANNING STUDY
ER [1] [2] HENRY B. GONZALEZ CONVENTION CENTER SAN ANTONIO TX - OPENED 2016 Populous is widely recognized in the industry as the thought leaders for convention and exhibition facility design. CONVENTION
More informationBanquet x x ,921 2,000 3,000 2,800 1, / 165
Convention Level FLORIDA BALLROOM 75 x 119 8 x 14-11 8 8,976 650 1,000 830 600 58 / 49 Florida Ballroom A 75 x 44 x 14-11 8 3,300 240 350 300 210 18 / 17 Florida Ballroom B 75 x 39 x 14-11 8 2,963 180
More informationNorth Building Exhibition Hall 300 Level
North Building Exhibition Hall 300 Level MONROE STREET TERRACE * SHOW PEDESTRIAN BRIDGE THIRD STREET PASS ELEVATOR * SHOW HALL A 48,600 HALL B 27,900 HALL C 27,900 HALL D 27,900 HALL E 57,700 22'W X 16'H
More informationOrganizing an event that your attendees rave about long after the team-building selfies
ii MEET IN THE CENTER OF IT ALL. Organizing an event that your attendees rave about long after the team-building selfies are shared is not an impossible dream. With more than 50,000 hotel rooms, plentiful
More informationMaking the TOD Vision a Reality: Two US Case Studies
Making the TOD Vision a Reality: Two US Case Studies The World Bank Transport Forum 2006 Washington, DC The South Boston Waterfront Boston, Massachusetts Boston s Unique Opportunity: 300 Acres Next to
More informationAUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS
AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS The Summer of 2010 has been a time of tremendous progress for the Amtrak/FEC Corridor project and its goal of restoring
More informationGreat Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17
WHAT? Great Wolf Resorts has identified Gilroy, California as a potential location for a new Great Wolf Lodge family resort and has entered into a 60-day period of exclusivity with the City and community
More informationCLIPPER COVE PROMENADE & MARINA DEVELOPMENT
CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review
More informationIberville International Maritime Terminal and Alexandra Pier
PLANNING & COMPETITION Location: Montreal, Canada Iberville International Maritime Terminal and Alexandra Pier Design Date: 2013 Master Planning: Provencher_Roy Last April 25, the Montreal Port Authority
More informationFor Sale - NNN. 76 Gas Station with Car Wash & Auto Repair 750 N Escondido Blvd Escondido, CA Duane R. Bernard. Exclusively Offered By:
For Sale - NNN 76 Gas Station with Car Wash & Auto Repair 750 N Escondido Blvd Escondido, CA 92025 Exclusively Offered By: Senior Associate Property Overview Price $8,350,000 Lease Type NNN GLA 27,112
More informationA VISION FOR EL MIRAGE
el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails
More informationTYSONS DEVELOPMENT, LLC
TYSONS DEVELOPMENT, LLC BE AT THE CENTER OF IT ALL Prominently located as the gateway to Tysons, Virginia, The View is being zoned as an entire urban block, combining three million square feet of office,
More informationNext Generation Cycleway Design. Improving connectivity and cycling behaviours through design
Next Generation Cycleway Design Improving connectivity and cycling behaviours through design Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated
More informationREDUCED RATE LEASE INCENTIVES NOW AVAILABLE
REDUCED RATE LEASE INCENTIVES NOW AVAILABLE FOR LEASE 222 E. Carrillo Street, Suite 101, Santa Barbara, California 93101 HayesCommercial.com Property Overview This high-identity storefront is less than
More informationBanquet x x ,921 2,200 3,000 3,120 2, / 165
Convention Level FLORIDA BALLROOM 75 x 119 8 x 14-11 8 8,975 650 1,000 832 666 58 / 49 Florida Ballroom A 75 x 44 x 14-11 8 3,325 230 350 288 216 66 78 18 / 17 Florida Ballroom B 75 x 39 6 x 14-11 8 2,963
More informationFIVE SIXTY PROMINENCE EXCELLENCE EXTRAORDINARY
ROMINENCE EXCELLENCE EXTRAORDINARY 3 LARGE BLOCKS AVAILABLE OCTOBER, 1 2017 AVAILABLE SACE 31 30 29 2 27 144,96 RSF 26 25 24 23 22 21 42,624 RSF 20 19 1 17 16 15 14 13 12 11 10,092 RSF 10 9 7 6 5 4 3 2
More informationDogpatch Community Task Force
Dogpatch Community Task Force Meeting #3 November 28, 2016 Agenda I. Welcome and Introductions II. Agenda Overview and Recap of Meeting #2 III. UCSF Response to Neighbor Request for Transparency and Cooperation:
More informationAnalysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio
Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL 04.01.14 HKS I Urban Design Studio Summary of Outreach Purpose of Stakeholder Outreach Identify and engage
More informationM E S T I Z O C U R T I S P A R K
ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC
More informationPhiladelphia Casino Application Review September 24, 2013 AKRF.COM
Philadelphia Casino Application Review September 24, 2013 AKRF.COM AKRF s Analysis Objectives 1. Third-party review of applications 2. Normalize estimates 3. Competitive effects net fiscal revenue 4. Induced
More information±700,000 sf. 3 Building Campus AVAILABLE FOR LEASE. KEVIN CUNNINGHAM SARAH BOHANNON
±700,000 sf 3 Building Campus AVAILABLE FOR LEASE HOWARD DALLMAR 650.688.8530 t KEVIN CUNNINGHAM 650.688.8521 t SARAH BOHANNON 650.358.5268 www.menlogateway.com project highlights The Peninsula s Premier
More informationCATA Summary. Trinidad & Tobago Barbados Spain Mexico New York Venezuela
CATA Summary Trinidad & Tobago Barbados Spain Mexico New York Venezuela One of the best and most famous hotels and private residences in the Caribbean that offers unparalleled service and spacious, luxurious
More informationPublic Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING
More informationANFR A NEW WAY TO MEET SFMEETINGS NEIGHBORHOOD NETWORK CONNECTIONS
ANFR A NEW WAY TO MEET SFMEETINGS NEIGHBORHOOD NETWORK CONNECTIONS GET CONNECTED San Francisco attendees have come to expect quality choices that elevate meetings to a more personalized experience. By
More informationNEW REDUCED RATE Prime Retail for $3.75 NNN
NEW REDUCED RATE Prime Retail for $3.75 NNN 222 E. Carrillo Street, Suite 101, Santa Barbara, California 93101 HayesCommercial.com Property Overview Adjacent to the Apple Store on the highly desirable
More informationNEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS
INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 23, 2019 DATE: February 13, 2019 SUBJECT: SP193-U-18-7 USE PERMIT ASSOCIATED WITH A SITE PLAN for an outdoor cafe within a public
More informationMarymount University Ballston Center Redevelopment
Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5 Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationFOR LEASE. Rare opportunity to sub-lease 6,216 SF of high profile retail space in Kelowna s Capri Centre Mall
FOR LEASE Kelowna, BC PROPERTY DETAILS: Rare opportunity to sub-lease 6,216 SF of high profile retail space in Kelowna s Capri Centre Mall Great location in the heart of Kelowna, with high exposure to
More informationDARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:
OUR VISION Our shared vision We are creating an iconic tropical hotel. A hotel that is uniquely Darwin. A hotel that embodies the rich natural and cultural heritage of the Top End. A gateway to the natural
More informationAlexandra pier: New terminal in an old port
TOPOS Alexandra pier: New terminal in an old port 30.08.201630.08.2016 < GO TO BLOG OVERVIEW Last April the Montreal Port Authority (MPA) officially unveiled its plans for the restoration of Alexandra
More informationTo apprise Council of the process and timeline for the preparation of the Final Concept Plan and report; and
Corporate NO: R243 Report COUNCIL DATE: November 20, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: November 15, 2006 FROM: Acting General Manager, Planning and Development FILE: 0850-20 (CF) SUBJECT:
More informationSan Jose Convention Center
San Jose Convention Center VENUES 150 West San Carlos Street, San Jose, CA 95113 800-SAN-JOSE www.sanjose.org FAST FACTS 3.9 miles to the Airport 550,000 sq. ft. total combined convention space 143,000
More informationMadison Metro Transit System
Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,
More informationMARCH 2019 CHARLOTTE OFFICE AVAILABILITY REPORT
MARCH 2019 CHARLOTTE OFFICE AVAILABILITY REPORT MARCH 2019 PROPERTY SPOTLIGHT introducing 332 w. bland st. character, history, and irreplaceable features The building dates back to the 1920 s, and features
More informationEXPERIENCE EXTRAORDINARY EVENTS FROM A NEW PERSPECTIVE
EXPERIENCE EXTRAORDINARY EVENTS FROM A NEW PERSPECTIVE Location SETTING THE STAGE FOR MEMORABLE EVENTS At Four Seasons Hotel San Francisco, we re all about inspiring you to enjoy luxury in new ways. Steps
More informationKANE PLAZA OFFICE TOWER. Main St at School Ave, Sarasota, FL 34237
PROPERTY OVERVIEW IAN BLACK REAL ESTATE has been retained as the exclusive agent for the management and leasing of KANE PLAZA, located in Downtown Sarasota at the roundabout at Main Street and 1 S School
More informationLas Vegas Convention and Visitors Authority MEMORANDUM
Las Vegas Convention and Visitors Authority MEMORANDUM Date: February 8, 2016 To: From: Re: Southern Nevada Tourism Infrastructure Committee Rossi Ralenkotter, President/CEO Las Vegas Convention Center
More informationWORLD CLASS CIT Y. WORLD CLASS ASSET. WORLD CLASS TENANTS.
WORLD CLASS CITY. WORLD CLASS ASSET. WORLD CLASS TENANTS. BUILDING INFORMATION PROPERTY HIGHLIGHTS 1.6 Million square foot office and retail complex 42-Story Spear Tower and 27-story Steuart Tower bridged
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationSAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009
SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 27, 2009 1 Project Limits 2 Project Partners City of San Antonio Provides project funding for project amenities (i.e.. Sidewalks, Landscaping, Lighting, etc.)
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationBloor Street West Rezoning Application for a Temporary Use By-law Final Report
STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council
More informationEP8.2 Presentation Exhibition GO Station Improvements
EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts
More informationMASTER PLAN July 24, 2014
MASTER PLAN July 24, 2014 Vision Statement The newly expanded Rif Curaçao Seaport will enhance the island s ability to welcome guests to a vibrant and entertaining waterfront. The Rif Seaport Curaçao development
More informationFloorplans & Specs. Index. West Building 100 Level West Building 200 Level West Building 300 Level
Floorplans & Specs Index Page West Building Level... 2-3 West Building 200 Level... 5-6 West Building 300 Level... 7-8 North Building Level... 9-10 North Building 200 Level... 11-12 North Building 300
More informationTHE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END.
THE MISSION. A PUBLIC PROCESS FROM BEGINNING TO END. URBAN DESIGN PRINCIPLES. QUALCOMM STADIUM SITE. I-5 805 15 I-8 DEVELOPMENT PATTERNS. I-5 805 I-I5 I-8 EMBRACE THE RIVER AND PARK SYSTEM. FROM THE MOUNTAINS
More informationPREMIUM OFFICES ALWAYS BUSINESS ONE CENTRAL
ONE CENTRAL PREMIUM ALWAYS BUSINESS A NEW CLASS OF BUSINESS SPACE OVERVIEW 7 ONE CENTRAL 11 STRATEGIC LOCATION 13 QUALITY & CERTIFICATIONS 19 CONNECTIVITY 23 AREA & AMENITIES 25 27 DEVELOPER OVERVIEW 7
More informationBuilding Summary BUILDING SIGNAGE AVAILABLE
Historical Overview The iconic L&C Complex has been a part of Nashville since 1957. Located in heart of downtown at the corner of 4th Ave and Church Street, the 287,000 SF office complex is considered
More informationPREMIER PLAZA PHASE 1
LEASING INFORMATION JEFFREY E. SMITH 956 221 0461 PREMIER PLAZA PHASE 1 LUXURY SHOPPING CENTER 25,000 SQ FT MCALLEN, TEXAS INTERSTATE HIGHWAY MCALLEN 69 MCALLEN INTERNATIONAL AIRPORT INTERSTATE HIGHWAY
More informationA BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012
A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012 Key factors impacting the border The Economy! Border wait times increasing, in excess of 45+ minutes in 24-hour cycle Outdate infrastructure
More informationEDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN
1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s
More informationhow it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE
how it started Downtown Waterfront Park How It Started March 2009 City of New Westminster Purchases 3.2 Hectare Westminster Pier Site March 2009 City of New Westminster and Design Team develop plan for
More informationHARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre
78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that
More information